4/19/17 1 U"lity Op"miza"on: Lessons from the Sea7le Seawall Presented by Sco7 Goss, SG3 Strategies Lorelei Williams, Director, SDOT Capital Projects and Roadway Structures PROJECT OVERVIEW –––––––––– PARTICULAR CHALLENGES –––––––––– APPLICABLE LESSONS Independence PreparaAon Flexibility INTRODUCTION

Upload: nguyentuong

Post on 11-Sep-2018

216 views

Category:

Documents


0 download

TRANSCRIPT

4/19/17

1

U"lity Op"miza"on: Lessons from the Sea7le Seawall Presented by Sco7 Goss, SG3 Strategies

Lorelei Williams, Director, SDOT Capital Projects and Roadway Structures

PROJECTOVERVIEW

––––––––––

PARTICULARCHALLENGES

––––––––––

APPLICABLELESSONS

•  Independence

•  PreparaAon

•  Flexibility

INTRODUCTION

4/19/17

2

PROJECT LOCATION

WATERFRONT SEATTLE’S FOUNDATION

4/19/17

3

PURPOSE AND NEED

VALUE AND ROLE OF UTILITY COORDINATION

Coordina"on is not design

•  IssueanAcipaAon

•  InterdisciplinarycoordinaAon

•  Problemsolving

•  Non-designaspects

•  Makingsenseofapparentchaos

4/19/17

4

•  InthelastslideyousawabitoftheexisAnguAliAesunderPier57.

•  DemoliAonconsistedofremovingthesidewalk,seawallandeverythingdowntotherelievingpla[ormforawidthofabout35feet,by3300feetlong.

Demoli"on

Protect-in-place13.8kVelectricalductbankswithexposedconduits

Working Around Live U"li"es

PARTICULAR CHALLENGES

4/19/17

5

•  NotdesignedforuAliAes

•  LimiAngfactorforhanginguAlityservices

•  IntegralunistrutforuAliAes

Light Penetra"ng Sidewalks

•  Contractordecidedtoremovethecontainmentwallinthisarea(notthewholesite)

•  AllworkwasthendrivenbyAdes

Tidal Influence

4/19/17

6

•  Newlidsonliveelectricalvaults

•  Falsework

•  Exactgradecontrol–norisers

•  Jetgroutheave

When Adjustment Is Not An Op"on

•  Schedule

•  UAlitycrewavailability

•  UAlityinspectors,hotwatches,metercrews

•  Specialtygasmainworkers

•  CableandfiberopAcsplicers

Don’t Underes"mate The Influence Of U"li"es

LESSONS LEARNED

4/19/17

7

Sequencing U"li"es

•  Newelectricalductbankswereamajorschedulefactor

•  CoordinaAonwithsewer,water,telecomandgas

Improving access

•  SPUaddedvaultstoallservices

•  Nomoredirect-buryfirevalves

•  Replaced1934lead-jointironpipewithpowder-coatedducAleiron

•  AddedcathodicprotecAon

•  Higher,sonotingroundwater

4/19/17

8

PrivateuAliAesdon’talwaysknowwheretolocatetheirfaciliAes.

•  ProvidedplanandprofileforPSEgas

•  DefinedconduitrouAngforalltelecoms

•  ControlledforfuturecondiAons

Expect To Do It All

•  Itendsupeverywhere

•  Hydraulicforceslid,heaveandcrush

•  Groutfillsallvoids,includingpipesandvaults

•  Don’texpectjetgrouAngtoprotectuAliAes

Jet Grou"ng

4/19/17

9

Hidden Obstruc"ons •  Concreteductbankoverpours

•  WAC19.122.020(23)"Reasonableaccuracy"meanslocaAonwithin24inchesoftheoutsidedimensionsofbothsidesofanundergroundfacility

•  AbandoneduAliAes–idenAfythem,orexpectchangedcondiAonsclaims–dotheresearchinadvance

•  3700’longby40’wideby14’deep,rightnexttotheviaduct

•  TradiAonalpumpingwasexpectedtocausedrawdowneffectandviaductseglement

•  Soilfreezingforwatercutoff

•  TakesAmetofreeze

•  IceexpandsoverAme

•  Frozenelectricalductbanksandwaterservices

•  TakesAmetothaw

Soil Freezing Instead of Dewatering

4/19/17

10

Soil Freezing Instead of Dewatering

Live U"lity Maps

•  Immediaterecordofdailychangestoreflectnewandremoveditems

•  Contractor’sdailydigpermitrequiredreviewofdailymapandcopiesintheequipment

•  Createsalivingdocumentandimprovessafety

4/19/17

11

•  12”HPmainreplacement

•  WeldingsteelinadeeptrenchtakesAme

•  Polyethyleneismuchfaster

•  Gasworkednightssothejobran24-hourdays

•  Majorsafetyconcern

Gas Reloca"on

Telecom Reloca"on

•  GelngtheiragenAon

•  Schedulingspecialtycrews–copperandfiber

•  Don’tforgetsplicingAme–2400pairstakesawhile

4/19/17

12

Coordina"on is Not Design…Except When It Is

UAlitycoordinaAonworksbestwhenindependentofcoredesignfuncAon,buttherecouldbemore“designservicesduringconstrucAon”thanexpected.

•  “Pleaseredesignthe(sewer,water,gas,storm,telecom,etc.)forwork(today/tomorrow/nextweek)”

•  Beflexibleandbereadytomakechangesimmediately,asin“westoppedwork,nowwhat?”

•  Structuralsupportdesignnotfollowedinthefield

•  Nosupervision

•  Followtheloadpath

•  Severecracking

•  Scheduleimpactof300’ofunplannedductbankreplacement

Suppor"ng Electrical Duct Banks

4/19/17

13

Support Ma7ers!

Suppor"ng Electrical Duct Banks

4/19/17

14

U"lity Coordina"on •  MeeAngs,meeAngs,meeAngs

•  Mapsandroll-plots

•  Lesson:Learnhoweverythingworksandhowitisbuilt

The closer you look, the more complex it is.

•  Planahead

•  Knowwhat’snext

•  Don’tcutcornerstomaketodayeasier

4/19/17

15

Benefits from Dedicated U"lity Coordina"on

•  GetaheadofprojectcomplexiAes

•  ImproveconstrucAonsafetyandefficiency

•  Happierend-users(begercustomerservice)

•  INDEPENDENCE:UAlitycoordinaAonworksbestwhenindependentofcoredesignfuncAon,buttherecouldbemore“designservicesduringconstrucAon”thanexpected

•  PREPARATION:DotheuAlityresearchhomeworkbutbepreparedtomakechangesinthefield

•  FLEXIBILITY:UAlityprotecAonandrelocaAonmaybeabiggerpartofyourprojectthaniniAallyprojected

Conclusions

4/19/17

16

•  Inherentlystablebutonlyuptoacertainpoint

•  VehicleloadsaccountedforbutaddedloadsfromuAliAeswerenegoAatedwiththeuAlityprovidersandtherearecontrolsonnewuAlityaddiAons

Precast Zees

4/19/17

17

Light Penetra"ng Sidewalks

Wall Face Panels