U"lity Op"miza"on: Lessons from the Sea7le Seawall Presented by Sco7 Goss, SG3 Strategies
Lorelei Williams, Director, SDOT Capital Projects and Roadway Structures
PROJECTOVERVIEW
––––––––––
PARTICULARCHALLENGES
––––––––––
APPLICABLELESSONS
• Independence
• PreparaAon
• Flexibility
INTRODUCTION
4/19/17
3
PURPOSE AND NEED
VALUE AND ROLE OF UTILITY COORDINATION
Coordina"on is not design
• IssueanAcipaAon
• InterdisciplinarycoordinaAon
• Problemsolving
• Non-designaspects
• Makingsenseofapparentchaos
4/19/17
4
• InthelastslideyousawabitoftheexisAnguAliAesunderPier57.
• DemoliAonconsistedofremovingthesidewalk,seawallandeverythingdowntotherelievingpla[ormforawidthofabout35feet,by3300feetlong.
Demoli"on
Protect-in-place13.8kVelectricalductbankswithexposedconduits
Working Around Live U"li"es
PARTICULAR CHALLENGES
4/19/17
5
• NotdesignedforuAliAes
• LimiAngfactorforhanginguAlityservices
• IntegralunistrutforuAliAes
Light Penetra"ng Sidewalks
• Contractordecidedtoremovethecontainmentwallinthisarea(notthewholesite)
• AllworkwasthendrivenbyAdes
Tidal Influence
4/19/17
6
• Newlidsonliveelectricalvaults
• Falsework
• Exactgradecontrol–norisers
• Jetgroutheave
When Adjustment Is Not An Op"on
• Schedule
• UAlitycrewavailability
• UAlityinspectors,hotwatches,metercrews
• Specialtygasmainworkers
• CableandfiberopAcsplicers
Don’t Underes"mate The Influence Of U"li"es
LESSONS LEARNED
4/19/17
7
Sequencing U"li"es
• Newelectricalductbankswereamajorschedulefactor
• CoordinaAonwithsewer,water,telecomandgas
Improving access
• SPUaddedvaultstoallservices
• Nomoredirect-buryfirevalves
• Replaced1934lead-jointironpipewithpowder-coatedducAleiron
• AddedcathodicprotecAon
• Higher,sonotingroundwater
4/19/17
8
PrivateuAliAesdon’talwaysknowwheretolocatetheirfaciliAes.
• ProvidedplanandprofileforPSEgas
• DefinedconduitrouAngforalltelecoms
• ControlledforfuturecondiAons
Expect To Do It All
• Itendsupeverywhere
• Hydraulicforceslid,heaveandcrush
• Groutfillsallvoids,includingpipesandvaults
• Don’texpectjetgrouAngtoprotectuAliAes
Jet Grou"ng
4/19/17
9
Hidden Obstruc"ons • Concreteductbankoverpours
• WAC19.122.020(23)"Reasonableaccuracy"meanslocaAonwithin24inchesoftheoutsidedimensionsofbothsidesofanundergroundfacility
• AbandoneduAliAes–idenAfythem,orexpectchangedcondiAonsclaims–dotheresearchinadvance
• 3700’longby40’wideby14’deep,rightnexttotheviaduct
• TradiAonalpumpingwasexpectedtocausedrawdowneffectandviaductseglement
• Soilfreezingforwatercutoff
• TakesAmetofreeze
• IceexpandsoverAme
• Frozenelectricalductbanksandwaterservices
• TakesAmetothaw
Soil Freezing Instead of Dewatering
4/19/17
10
Soil Freezing Instead of Dewatering
Live U"lity Maps
• Immediaterecordofdailychangestoreflectnewandremoveditems
• Contractor’sdailydigpermitrequiredreviewofdailymapandcopiesintheequipment
• Createsalivingdocumentandimprovessafety
4/19/17
11
• 12”HPmainreplacement
• WeldingsteelinadeeptrenchtakesAme
• Polyethyleneismuchfaster
• Gasworkednightssothejobran24-hourdays
• Majorsafetyconcern
Gas Reloca"on
Telecom Reloca"on
• GelngtheiragenAon
• Schedulingspecialtycrews–copperandfiber
• Don’tforgetsplicingAme–2400pairstakesawhile
4/19/17
12
Coordina"on is Not Design…Except When It Is
UAlitycoordinaAonworksbestwhenindependentofcoredesignfuncAon,buttherecouldbemore“designservicesduringconstrucAon”thanexpected.
• “Pleaseredesignthe(sewer,water,gas,storm,telecom,etc.)forwork(today/tomorrow/nextweek)”
• Beflexibleandbereadytomakechangesimmediately,asin“westoppedwork,nowwhat?”
• Structuralsupportdesignnotfollowedinthefield
• Nosupervision
• Followtheloadpath
• Severecracking
• Scheduleimpactof300’ofunplannedductbankreplacement
Suppor"ng Electrical Duct Banks
4/19/17
14
U"lity Coordina"on • MeeAngs,meeAngs,meeAngs
• Mapsandroll-plots
• Lesson:Learnhoweverythingworksandhowitisbuilt
The closer you look, the more complex it is.
• Planahead
• Knowwhat’snext
• Don’tcutcornerstomaketodayeasier
4/19/17
15
Benefits from Dedicated U"lity Coordina"on
• GetaheadofprojectcomplexiAes
• ImproveconstrucAonsafetyandefficiency
• Happierend-users(begercustomerservice)
• INDEPENDENCE:UAlitycoordinaAonworksbestwhenindependentofcoredesignfuncAon,buttherecouldbemore“designservicesduringconstrucAon”thanexpected
• PREPARATION:DotheuAlityresearchhomeworkbutbepreparedtomakechangesinthefield
• FLEXIBILITY:UAlityprotecAonandrelocaAonmaybeabiggerpartofyourprojectthaniniAallyprojected
Conclusions
4/19/17
16
• Inherentlystablebutonlyuptoacertainpoint
• VehicleloadsaccountedforbutaddedloadsfromuAliAeswerenegoAatedwiththeuAlityprovidersandtherearecontrolsonnewuAlityaddiAons