Page 1 of 4 14 th August, 2015 Our Ref.: AR/3416AMS/rg Application Ref. No: 14/01562/OUT Pegasus Life Ltd., c/o Mr Graham Starling, Gleeds, 95 New Cavendish Street, London, W1W 6XF Arboricultural Method Statement for the protection of trees along Seal Drive during the proposed re-development at Wildernesse Estate, Sevenoaks, Kent, TN15 0EA Dear Mr. Starling, Thank you for your instruction to provide an Arboricultural Method Statement for the protection of trees along Seal Drive which will serve as the main access road during the Demolition Phase and initial Construction Phase of the approved re-development (Planning Application Ref no.: 14/01562/OUT) at Wildernesse House, Wildernesse Avenue, Sevenoaks. I have been supplied with the Demolition Method Statement (Ref no.: G/777/11671/DW/00) compiled by 777 Demolition, dated 27 th May 2015, Demolition Vehicle Access Plan (Fig 1) by Odyssey Markides, dated May 2015,Tree Protective Fencing Plan – General Arrangement (drawing no.: LL454-400-0028) and Tree Protective Fencing Plans - Detailed Arrangement (drawing nos.: LL454-400-0051, LL454-400-0052, LL454-400-0053, LL454-400-0054, LL454-400-0055) by Camlins Landscape Architects, dated May 2015. The construction route for the demolition and enabling works and initial construction activities will be from the A25 via Seal Drive and into Wildernesse Avenue, as shown at Appendix A. This route will remain in use until such time as the construction access plan for the Construction Phase has been agreed by Kent County Council and the proposed new access road off Park Lane has been constructed. Seal Drive is a single carriageway with a sealed tarmac surface. The trees either side of the road are at varying distances to the road edge and are growing within a grass verge. As shown in photographs 1 and 2 below.

Upload: others

Post on 13-Mar-2022

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Arboricultural Method Statement for the protection of

Page 1 of 4

14th August, 2015

Our Ref.: AR/3416AMS/rg

Application Ref. No: 14/01562/OUT

Pegasus Life Ltd., c/o Mr Graham Starling, Gleeds, 95 New Cavendish Street, London, W1W 6XF

Arboricultural Method Statement for the protection of trees along Seal Drive during the proposed re-development at Wildernesse Estate, Sevenoaks, Kent, TN15 0EA

Dear Mr. Starling,

Thank you for your instruction to provide an Arboricultural Method Statement for the protection of trees along Seal Drive which will serve as the main access road during the Demolition Phase and initial Construction Phase of the approved re-development (Planning Application Ref no.: 14/01562/OUT) at Wildernesse House, Wildernesse Avenue, Sevenoaks.

I have been supplied with the Demolition Method Statement (Ref no.: G/777/11671/DW/00) compiled by 777 Demolition, dated 27th May 2015, Demolition Vehicle Access Plan (Fig 1) by Odyssey Markides, dated May 2015,Tree Protective Fencing Plan – General Arrangement (drawing no.: LL454-400-0028) and Tree Protective Fencing Plans - Detailed Arrangement (drawing nos.: LL454-400-0051, LL454-400-0052, LL454-400-0053, LL454-400-0054, LL454-400-0055) by Camlins Landscape Architects, dated May 2015.

The construction route for the demolition and enabling works and initial construction activities will be from the A25 via Seal Drive and into Wildernesse Avenue, as shown at Appendix A. This route will remain in use until such time as the construction access plan for the Construction Phase has been agreed by Kent County Council and the proposed new access road off Park Lane has been constructed.

Seal Drive is a single carriageway with a sealed tarmac surface. The trees either side of the road are at varying distances to the road edge and are growing within a grass verge. As shown in photographs 1 and 2 below.

Page 2: Arboricultural Method Statement for the protection of

Page 2 of 4

Arboricultural Method Statement for the Protection of Trees at Our Ref.: AR/3416AMS/rg Seal Drive, Sevenoaks, Kent, TN15 0EA 14th August, 2015

I visited site on the 4th August 2015 and inspected the trees growing along either side of

Seal Drive, particularly the three trees growing adjacent to the A25 and Seal Drive junction. The trees comprise predominantly lime but with English oak towards the south-eastern end.

The protection status of the trees has not been investigated, however the site, including

Seal Drive and Wildernesse Avenue are situated within Wildernesse Conservation Area.

This method statement has been drawn up to comply with the recommendations of British Standard BS 5837: 2012, Trees in relation to design, demolition and construction – Recommendations [BS5837].

I have set out the protection and working methodology relevant to trees under the following headings, along with three appendices:

1. Tree pruning,

2. Tree protection along Seal Drive,

3. Trunk wrapping,

4. General matters. Appendix A. Demolition Vehicle Access Plan by Odyssey Markides Appendix B. Tree Protective Fencing Plan – General Arrangement by Camlins

Landscape Architects Appendix C. Trunk Wrapping Detail

1. Tree Pruning. 1.1 The vehicles accessing the site will vary between small vans, 40ft skip lorries, four axle

trucks to flatbed articulated vehicles. 1.2 The pruning requirements to create the required headroom underneath the crown

overhang to Seal Drive are based on the approximate maximum vehicle height using the access road, and I recommend a 4m clearance is provided.

Photograph 2. Looking south-east along Seal Drive

Photograph 1. Looking north-west along Seal Drive

Page 3: Arboricultural Method Statement for the protection of

Page 3 of 4

Arboricultural Method Statement for the Protection of Trees at Our Ref.: AR/3416AMS/rg Seal Drive, Sevenoaks, Kent, TN15 0EA 14th August, 2015 1.3 Where branches overhang the road these are to be pruned back in line with the road

edge to the recommended height of 4m. This will require the removal of small branches only and will not have any significant effect on the health and physiological condition of these trees and will not detract from the character or appearance of Seal Drive.

1.4 In relation to potential large loads using the access road, appropriate measures will be

implemented at such time, in order to minimise potential damage to overhanging branches above 4m, and may include additional pruning or the temporary tying back of branches.

1.5 Pruning works will be required to be in accordance with British Standard 3998:2010 Tree

work - Recommendations [BS3998]. 2. Tree Protection. 2.1 With reference to the Geological Survey Drift Map, Sheet 287, Sevenoaks, the site is on

the Lower Greensand Group, namely Sandgate Formation which consists of fine sands, silts and silty clays, and Folkestone Formation which comprises medium and coarse-grained, well-sorted cross-bedded sands and weakly cemented sandstones. Quaife Woodlands has not investigated the clay content of the soil and subject to a formal soil investigation I have assumed there to be some clay present. Clay is a shrinkable soil, susceptible to compaction which is harmful to tree roots.

2.2 Where tree roots pass beneath Seal Drive, the road itself provides adequate ground

protection to prevent root damage from compaction as a result of increased road usage. There is considerable root mass beyond the RPA and even if there were to be some loss to root fibre function under the road, overall it will be a minor proportion of the assimilative root mass. On that basis I am satisfied that no additional ground protection is required.

2.3 Some form of separation barrier is required to prevent vehicles encroaching onto the

grass verge along both sides of Seal Drive, to prevent direct damage to the trunks of retained trees, and to avoid compaction of the soil, which can arise from the single passage of a heavy vehicle, and so that the trees root functions remain unimpaired.

2.4 Within the verge area the combined zones of RPAs form the Construction Exclusion

Zone [CEZ] and will be protected using a series of timber bollards positioned at 3m intervals along both sides of Seal Drive, and as shown at Appendix B, and similar to those recently installed along Wildernesse Avenue.

2.5 The holes will be hand dug with a “shuv-holer” or something similar, which is a tool

enabling holes to be dug at the required diameter, thus minimising the extent of excavation, and to a depth of approximately 400mm to 500mm. Any roots smaller than 25mm diameter may be pruned back, making a clean cut. Where roots occur in clumps or roots over 25mm are identified these will be severed following consultation with the appointed arboriculturalist, or the spacings of the timber bollards moved accordingly.

2.6 This timber bollards are to be set in place before any work commences on site.

Page 4: Arboricultural Method Statement for the protection of

Page 4 of 4

Arboricultural Method Statement for the Protection of Trees at Our Ref.: AR/3416AMS/rg Seal Drive, Sevenoaks, Kent, TN15 0EA 14th August, 2015

3. Trunk Wrapping.3.1 Three trees at the junction of the A25 and Seal Drive on the eastern side are in close

proximity to the road edge and require trunk protection.

3.2 I have been advised that trunk wrapping using padding and chestnut battens is the preferred method of tree protection, and I attach a method for Trunk Wrapping at Appendix C.

4. General Matters.4.1 The protection measures are to be overseen by an individual, e.g. the Site Agent, to be

responsible for all arboricultural matters on site. There will be an initial induction meetingwith all those involved in attendance. This person must:

a) be present on site for the majority of the time,b) be aware of the arboricultural responsibilities,c) have the authority to stop any work that is causing, or has the potential to

cause harm to any tree,d) be responsible for ensuring that all site operatives are aware of their

responsibilities toward trees on site and along the access roads, and theconsequences of any failure to observe those responsibilities,

e) make immediate contact with the local authority and/or a retainedarboriculturalist in the event of any tree related problems occurring, whetheractual or potential.

I have taken account of the information provided to me and I am satisfied that the tree pruning requirements and tree protection measures I have set out with regard to the use of Seal Drive as the main demolition and initial construction access are fully in accordance with current standards and guidance.

Yours sincerely,

Becki Gawthorpe

Appendices:

Appendix A – Demolition Vehicle Access Plan Appendix B – Tree Protective Fencing Plan – General Arrangement Appendix C – Trunk Wrapping Detail

Page 5: Arboricultural Method Statement for the protection of

Job Title

Drawing Title

Job No

Drawn

Scale

Checked

Date

Rev

Designed

Approved

Client Drawing No

Telephone: 01256 331144

Fax: 01256 331134

E: [email protected]

W: www.odysseymarkides.com

Tuscany House

White Hart Lane

Basingstoke

Hampshire RG21 4AF

P:\14-345 - Wildernesse House, Sevenoaks\Tech\Acad\Drawing\Figures\Construction Access\14-345 Fig 1 Construction Access Option 1.dwg

WILDERNESSE HOUSE, SEVENOAKS

DEMOLITION VEHICLE ACCESS

1:10,000 MAY 15 MS

MS ACM ACM

14-345 FIGURE 1

N

REPRODUCED FROM ORDNANCE SURVEY R BY THE

PERMISSION OF THE CONTROLLER OF HER MAJESTY'S

STATIONERY OFFICE. C CROWN COPYRIGHT. ALL

RIGHTS RESERVED. LICENCE NUMBER 100045322.

Page 6: Arboricultural Method Statement for the protection of

SUNNYSIDE MEWS

HIGH STREET

CHURCH ROAD

WILD

ERNESSE

SEAL DR

IVE

PUDDING LANEZION

STREET

Seal

AVEN

UE

WILD

ER

NE

SS

E AV

EN

UE

PARK

LANE

PARK LAN

E

HIGH STREET

CH

UR

CH

Little Wychden

Andraitx

23

Ameroak

Firtrees

42

Chase

1

Keepers Lodge

5 to 8 40

Garden Cottage

Amberwood

1

31

Beech House

1

2

Fire StationCottage

3

15

Cottage

Witham

13

Glen Cottage

Abbotts House

3

33

Farm

1

Stidulfe Meade

Garage

Old Walls

3

Kentish

Chalmers

Underwood

The G

reen

Cottage

Briar

4

Hall

1

6

1

Little Hermitage

Wildernesse

Bretaneby

Forge

The New House

Byways

3

Chance Mead

1

4

Seal House

Wildernesse

1 to 7

Tayga

1 to 4

The

Red Court

Hawthorns

Wychden

The Homestead

Five Bell

s

6

23

Home

Yeoman

Cottage

The

Blac

k Ba

rn

4

Seal

Camden

4

Cam

den

Terra

ce

Village

Six Bells

(PH)

11a

Library

Council Cottages

Croiselles

Keepers Cottage

Tylers Barn

The

1 to 5

Villa

8

11

Laundry

21

(BH)

Meadow Court

Sunnyside

Wildernesse Cottage

4

Old

Park

35

Clonmore

House

Little Wilderness

55

3

44

1

Eastgate House

Seal

18 to 20

39

34

38

Lodge

East

Pavilion

35

1 to 6

Old

7

Point

The

28

24

PH16

14

32

6

Gar

den

Terra

ce

37

157

25

34

1

Chapel

Marchants

41

26

Gables

8

Beechwood

67

46

36 37

29

Garage

104.0104.0

parapet ht 117 .89

parapet ht 121 .88

threshold 100 .58

threshold 99 .66

threshold 103 .82

threshold 103 .88

103.69IC

103.47RE

threshold 103 .80

threshold 103 .78

threshold 103 .79

92 .70

92 .65IC

92 .69RE

IC

92 .66IC

92 .68IC

92 .67IC

IC

thre

shol

d 9

2.7

2

IC

para

pet

116

.96

parapet 116 .97

parapet 109 .41

parapet 107 .82

para

pet

107

.83

para

pet

112

.94

parapet 116 .95 para

pet

121

.89

parapet 109 .15

para

pet

117

.89

97 .34IC

97 .54IC

hand rail

hand rail

hand

rail

hand railhand rail

90 .815

554655 .320156452 .811

96 .609

554699 .619156379 .127

F98 .917

554736 .934156376 .459

92 .927

554694 .231156445 .931

A

E

G

H

102.183

554776 .130156367 .530

I

99 .979

554781 .622156404 .075

J

98 .623

554807 .631156406 .173

K

92 .706

554918 .297156444 .497

IL 87.70

IL 87.63

IL 88.52

IL 90.03

100¯

100¯

sw 150¯

sw 150¯

UTL

(UTL)

IL 92.00

100¯

100¯

IL 92.06

IL 92.02

100¯

IL 91.99100¯

100¯

150¯

IL 95.32

150¯

220¯

150¯

IL 97.50

100¯

150¯

150¯150¯

IL 98.78(UTL) IL 98.25

IL 95.62

IL 97.10

(UTL)

catch pits

cesspit

IL 96.67

100¯

150¯100¯100¯100¯

100¯

100¯

100¯

100¯

150¯

100¯

IL 96.18 IL 96.48IL 96.36

soakaway

IL 96.68

IL 97.65

soakawayIL 96.59

IL 99.20

IL 98.59

IL 99.84

IL 99.45

Blocked

IL 99.83

100¯

150¯

150¯

150¯

IL 97.97

IL 99.71

100¯ IL 99.96

IL 100.06IL 100.08

100¯

IL 100.24

IL 100.38

IL 100.41

IL 102.13

IL 103.09

IL 102.65

IL 102.92

IL 102.77

IL 102.72

100¯

100¯

100¯

100¯

IL 103.30

IL 103.06

IL 102.73IL 102.56IL 102.38

100¯

100¯ 100¯100¯

150¯

100¯

IL 101.34

IL 101.56

IL 101.59

dp 95.81

IL 94.63

IL 94.73

150¯

150¯150¯

dp 93.30

IL 95.87

150¯

88 .0

88 .5

87 .5

93 .5

94 .0

94 .5

91 .0

91 .5

92 .5

92 .0

93 .0

89 .0

89 .5

90 .0

90 .5

102.0102.5

95.0

95.5

96.0

94.5

94.0

96.5

97.5

97.0

100.0

99 .5

99 .0

98 .5

98 .0

100.

5

101.

0

101.

5

92 .5

93 .0

92 .0

91.5

92.0

92.5

93.0

93.5

97 .0

95.0

95.5

96.0

96.5

94 .0

94 .5

99.5

100.

0

96 .5

97 .0

97 .5

98 .0

98 .5

99 .0

94 .5

95 .0

96 .0

95 .5

97 .5

92 .5

93 .0

93 .5

94 .0

94 .5

97 .0

95 .0

95 .5

96 .0

96 .5

100.5

100.0

99 .5

102.0

101.5

101.0

95 .5

92 .0

93 .5

93 .0

94 .0

94 .5

95 .0

92 .5

91 .5

94.5

95.0

95.5

96.0

96.5

93.0

93.5

94.0

92 .5

98 .0

98 .5

99 .0

96 .5

96 .0

97 .0

97 .5

95 .0

95 .5

94 .5

94 .0

93 .5

99.5

98 .599 .0

97 .598 .0

101.0

101.5

102.0

102.5

103.0

100.0

100.5

99 .5

101.

5

102.

0

102.

5

101.

0

100.5

103.5

104.0

103.0

102.0

102.5

103.0

101.5

105.0

105.5

106.0

104.0

104.5

105.5

104.

5

105.

0

104.5

104.

0

105.0

103.

5

109.5

108.0

108.5

109.0

107.5

110 .0

109.5

109.0

108.5

108.0

107.5

110 .5

110 .0

109.5

111 .0

110 .0

110 .5

111 .5

112 .5

112 .0

108.0

108.5

109.0

107.5

109.5

109.5

108.0

109.0

108.5

106.5

107.0

107.5

104.0

104.5

105.5

106.0

105.0

114 .0

113 .5

111 .0

111 .5111 .5

113 .0

112 .5

112 .0

110 .0

112 .5

113 .0

111 .5

112 .0

111 .0

110 .5

109.5

109.0

110 .5

108.0

108.5

109.0

110 .0

109.5

ridge 110 .25

ridge 114 .90

ridge 118 .12

ridge 118 .15

99 .60

99 .78

99 .8799.9

3

99 .87

99.75

99.63

99 .97100.07100.19

eaves 103 .30

102.55

102.52

102.51

102.

5310

2.48

102.46102.22101.90

101.62

102.40102.29101.85

101.

22

101.13

107.41

107.

41

107.39107.35107.39

109.

58

109.

57ea

ves

114

.46

ridge

118

.50

109.59

109.

57

109.

5710

9.58

109.56109.65

112 .14112 .13

112 .13

eaves 114 .47

eave

s 1

12.0

7

eave

s 1

14.4

7

ridge 118 .53

107.84

108.14

108.61

108.65

108.78

108.84

109.49

109.92

110 .48

110 .67

110 .86

107.88

107.90

108.32

108.54

108.80

108.78

109.59

109.66

110 .38

flat

114

.46

flat

114

.57

eaves 117 .13

ridge 120 .50

eave

s 1

14.5

7

ridge

115

.13

eaves 117 .09

ridge 120 .50

ridge 117 .89

89.7

9

89.8

5

90.0

2

90.1

3

89.80

89.89

90.05

90.22

90.29

90.35

90.47

90.52

90.58

90.65 90.6

2

90.6

4

90.76

90.69

90.63

90.60

90.56

90.5

690

.50

eave

s 9

2.60

eaves 93.42

eaves 92.61

eave

s 9

8.79

eave

s 9

6.84

eaves 96.28

eaves 93.45

eaves 96.26

eaves 96.26

eave

s 9

6.26

eaves 96.89

eave

s 9

7.18

eave

s 9

6.09

eave

s 9

6.88

eaves 96.50

eave

s 1

01.5

1

eaves 96.17

eave

s 9

6.85

eaves 96.85

eave

s 9

7.18

eaves 97.19

eave

s 9

7.19

eaves 97.18

eave

s 9

7.18

eaves 96.52

eaves 96.86

eave

s 9

6.86

eaves 97.46

eave

s 9

8.07

eave

s 9

8.06

ridge 99.00eaves 97.35

eave

s 1

02.2

5

eave

s 1

02.3

1

eave

s 9

3.43

eaves 93.41

ridge 96.45

ridge

97.

27

ridge 97.27

ridge

96.

44

ridge 99.97

ridge

98.

28

ridge 100 .49

ridge 99.88

ridge

99.

87

ridge

100

.83

ridge 98.86

ridge 98.13

ridge

97.

72

ridge

98.

51

ridge

102

.25

ridge

100

.85

ridge

100

.84

ridge 100 .84

ridge 98.83

ridge 98.87

ridge

101

.68

ridge 98.44

ridge

100

.52

ridge 98.18

ridge 98.85

ridge

102

.97

ridge

102

.98

ridge

101

.68

ridge 96.46

roof

92.

49

roof

93.

45

roof 93.44

roof 93.41roof

93.

38

roof

93.

39

93.6

3

flat r

oof

94.6

5fla

t roo

f 94

.65

flat r

oof

94.2

5

ridge 99.35

ridge

100

.49 ridge 101 .13

89.68

89.73

89.63

gully channel

gully

cha

nnel

gully

cha

nnel

gully

cha

nnel

gully

cha

nnel

roof

93.

41

roof

94.

23

roof

94.

23

roof

94.

63

flat r

oof

94.2

4flat r

oof

94.6

5

eave

s 9

6.24

eaves 96.81

eaves 97.18

eaves 93.41

eaves 93.44

eaves 97.44

eave

s 9

2.56

eaves 92.56

ridge 99.87

ridge 100 .48

ridge

100

.85

ridge

100

.85

ridge 98.70

ridge 97.80

ridge

96.

45

ridge

100

.51

ridge 96.30

ridge

97.

28

ridge

97.

19

sv

94.67

93.98

97.8798.18

98.92

99.78

ridge 96.66

electric

100.77

ridge 118 .13

ridge 114 .93

ridge

109

.37

ridge

109

.34

ridge

109

.36

eaves 100 .55

95 .97

ridge

110

.31

ridge

110

.26

ridge 109 .36

eave

s 1

06.7

7

eave

s 1

08.0

8

eaves 103 .31

eaves 103 .35

eaves 101 .71

eaves 100 .29

eaves 99.68eaves 99.67

ridge

106

.25

ridge 106 .74

ridge 102 .18

ridge

101

.32

flat roof 98.22flat roof 98.22

97.92

98.5

398

.88

97 .38

eave

s 1

10.2

0

ridge

113

.58

ridge

113

.60

eaves 110 .23

eave

s 1

10.2

4

eaves 110 .22

eave

s 1

10.2

3

ridge

113

.60

ridge 114 .29ridge 114 .30

108.97

109.84

ridge 111 .26

eaves 106 .64

108.12

108.46

108.94

ridge 111 .25

eaves 108 .44

108.96

109.83

flat

roof

107

.52

eaves 110 .24

eaves 106 .81

eaves 107 .80

eaves 110 .23

eave

s 1

10.1

6

eave

s 1

10.1

4

eave

s 1

10.1

6

eave

s 1

13.5

3rid

ge 1

13.5

8

ridge 112 .14

ridge

115

.10

d i t c h

91 .0

91 .5

90 .0

90 .5

88 .5

89 .0

89 .5

86 .5

87 .5

88 .0

87 .0

85 .5

86 .0

85 .0

84 .5

87 .0

87 .5

86 .5

86 .0

97 .0

97 .5

98 .0

98 .5

101.0

101.5

100.0

100.5

99 .5

99 .0

102.0

93 .0

92 .5

92 .0

91 .0

91 .5

93 .5

94 .0

94 .5

95 .0

95 .5

96 .0

96 .5

89 .5

90 .0

90 .5

102.0

100.0

101.0

100.5

101.5

99 .5

95 .0

96 .0

96 .5

97 .0

97 .5

94 .5

95 .5

92 .5

93 .0

93 .5

94 .0

100.5

100.0

99 .5

99.0

99 .5

98.0

98.5

95.5

96.0

96.597

.0

97.5

95 .0

94 .5

94 .0

87 .0

87.5

86.5

88 .0

88 .5

89 .0

90 .0

89 .5

89 .0

89 .5

88 .5

89 .0

88 .0

87 .5

87 .0

87 .086.5

89.0

88.5

88.0

87.5

87.0

89.5

101.0

96.0

96.5

ridge

116

.79

eave

s 11

3.3

0

ridge 116 .21

eaves 101 .22

eave

s 101

.23rid

ge 10

4 .13

eaves 101 .23

ridge 104 .14

94.5

1

sv

sv

99 .60

ridge

104

.54

eave

s 1

01.1

8

eaves 100 .32

eaves 103 .22

108.0

108.

5

105.5

104.0

105.0

98 .5

99 .5

100.5

101.5

102.0

99.5

103.0

97.5

98.598

.0

99.0

100.5

101.5

101.0

95 .5

96 .5

96 .5

96 .0

93 .0

95 .0

93 .5

93 .0

106.5

107.0

107.5

104.5

106.0

97 .0

97 .5

98 .0

99 .0

100.0

101.0

102.5

103.5

97.0

100.

0

103.0

102.0

102.5

103.5

104.0

100.0

97 .0

97 .5

98 .0

98 .5

99 .0

99 .5

97 .0

94 .5

95 .0

96 .0

94 .5

95 .5

92 .5

93 .5

94 .0

92 .0

94 .0

92 .5

92 .0

90 .36IC

89 .90IC

IC

IC

90 .82IC

90 .87re

IC90 .82IC

90 .85IC

90 .82IC

IC

90 .68IC

90 .67IC

90 .71IC

90 .90IC

90 .89IC

90 .86IC

90 .88re

90 .85IC

IC

90 .82IC (RE)

90 .82IC

IC

IC91 .44IC

IC

91 .52IC

91 .51IC

91 .47IC

IC

IC

91 .85ICIC

sc

IC

91 .86IC

92 .20RE

92 .62RE

IC

91 .92IC

91 .92IC

91 .89RE

91 .92RE

IC

91 .85RE

IC

91 .90RE

91 .92IC

IC

IC

92 .60RE

92 .62IC

92 .64RE

92 .68IC

RE

92 .11IC

91 .57IC

91 .51IC

IC

IC91 .85IC

IC

91 .85IC

IC

IC

91 .85IC

91 .63IC

thre

shol

d 9

0.9

1

89 .95

threshold 92 .14

hand rail

hand railhand rail

hand rail

hand rail

hand rail

hand rail

ditch

91 .92IC

91 .91IC

IC

IC91 .93IC

IC

91 .00IC

90 .87IC

90 .87IC

90 .88IC

91 .28IC

IC

IC

91 .90IC

92 .23IC

92 .25IC91 .88

re

IC

IC

IC

IC

IC

89 .91IC

hand rail

hand

rail

hand

rail

hand

rail

hand

rail

hand

rail

hand rail

90 .271

554615 .178156459 .116

89 .711

554632 .012156484 .471

90 .750

554604 .430156438 .463

B

D

C

X

87 .954

554592 .810156776 .051

Y

89 .060

554602 .690156741 .081

High Street

Seal Drive

sw 150¯

IL 86.81

IL 87.99150¯

225¯

225¯

sw 150¯

IL 87.79

IL 88.23

225¯

sw 150¯

IL 88.10

sw 150¯

sw 1

50¯

100¯

UTL

100¯

UTL

100¯

100¯

100¯

UTL

(UTL)

(UTL)

IL 89.50

IL 89.70

(UTL)

(UTL)

225¯

100¯

100¯

IL 90.22

IL 90.26

(blocked)

(UTL)

IL 90.38

IL 90.48

IL 90.37

100¯100¯

100¯

IL 90.56

IL 90.44 IL 90.64

100¯

100¯ IL 90.84

IL 89.75

(RE)

IL 91.23

IL 91.21

100¯

100¯

91 .87MH

IL 91.28

100¯

IL 91.29

IL 91.04

100¯

100¯

IL 91.08

IL 91.28

IL 91.42

100¯

IL 91.23

100¯

IL 91.23

100¯

IL 91.19100¯

IL 91.23

IL 91.2691 .91IC

IL 91.20

100¯

100¯ 100¯

IL 90.67IL 91.26

91 .93IC

IL 91.24

IL 90.49

100¯

100¯

(UTL)

IL 90.43

100¯

(UTL) 220¯

IL 90.45

IL 90.23100¯

(UTL)

100¯

IL 89.86

IL 89.79

100¯

91 .60IC

IL 90.99

100¯

ICblocked

(UTL)

IL 90.86

blocked

(UTL)

IL 90.83

100¯

IL 91.06

100¯

(UTL)

(UTL)

IL 91.99100¯

IL 92.01

100¯

88 .05slab

d i t c h

d i t c h

d i t c h

d i t c h

d i t c h

B1

89 .316

554637 .272156517 .353

B3

88 .328

554648 .984156581 .377

B4

87 .405

554645 .992156613 .469

B5

89 .179

554605 .672156740 .719

B6

92 .817

554423 .189156529 .997

B7

99 .471

554417 .351156427 .994

B8 96 .403

554422 .057156475 .769

B10

93 .719

554465 .687156509 .036

B9

95 .920

554474 .058156495 .404

B11

100.273

554515 .952156409 .950

B12

97 .729

554594 .342156265 .738

sc

sc

sc

IL 89.89

re

220¯

IL 8

9.80

L

91 .816

554928 .715156484 .406

M

91 .360

554937 .938156550 .740

W

94 .837

555002 .177156623 .321

Wildernesse Avenue

Parl Lane

Wildernesse Avenue

d i t c h

d i t c h

B2

87 .515

554675 .026156524 .992

d i t c h

d i t c h

d i t c h

d i t c h

A4

97 .053

555075 .416156623 .753

IL 92.49

sw 225¯

A1

103.456

554949 .767156299 .051

A2

102.911

555036 .755156340 .121

A7

111 .872

555040 .728156108 .040

M

103.155

554912 .044156294 .232

N 103.237

554887 .200156283 .641

O

105.412

554804 .012156295 .338

P106.165

554797 .620156251 .616

threshold 104 .30

threshold 104 .30threshold 104 .29

threshold 104 .32

threshold 104 .30

RE104.26

104.00Stopcock

104.30IC

104.29IC

Q

108.169

554813 .545156208 .181

R

107.42RE

threshold 107 .50

threshold 107 .50

threshold 107 .49

threshold 107 .47

threshold 107 .47

threshold 104 .30

threshold 104 .31

threshold 104 .30

threshold 104 .30

threshold 104 .30

threshold 104 .30

threshold 104 .32

107.37RE

104.27RE

104.27RE

104.27RE

104.27RE

104.26RE

104.28IC

104.30RE

104.28RE

107.38RE

head 106 .76

head 106 .41

cill 106 .30

cill 104 .31

cill 105 .14cill 108 .30

S109.460

554891 .584156177 .478

T

108.876

554847 .090156203 .340

threshold 107 .49

threshold 107 .49

threshold 109 .70

threshold 109 .70

threshold 109 .71

head 109 .71head 109 .71

head 109 .70

head 114 .32

head 111 .79

head 111 .80

cill 108 .38

cill 113 .02

cill 110 .51

cill 113 .32

109.66

threshold 109 .70

threshold 112 .31

threshold 112 .26

threshold 112 .26

threshold 112 .27

threshold 104 .31

threshold 107 .47

over head cable

over head cable

cill

110

.23

cill

113

.03

cill 113 .02

cill 110 .53

cill 113 .31 cill 110 .81

cill 115 .68

cill 113 .40 cill 112 .29

cill 113 .17

cill 113 .09

cill 115 .68

cill 112 .25

cill

112

.85

cill 113 .34

cill 115 .69

cill 113 .03

cill 108 .32

cill 105 .15

cill 106 .74

cill 108 .33

cill 104 .32

head 114 .31

head 111 .80

head 111 .80

head 111 .80head 111 .80

head 114 .31

head 116 .98

head 116 .99head 114 .13

head 114 .41

head 114 .40

head 114 .10

head

111

.80

head

114

.34

head 106 .76

head 109 .70

head 106 .43

head 109 .71

head 109 .69

114 .62

120.94

120.93

114 .62

119 .42

119 .36

112 .07111 .70

u/si

de b

eam

109

.70

wal

l ht

111

.70

wal

l ht

109

.76

104.27RE

104.27RE

109.065

554799 .538156213 .356

depth 100 .48

150¯(UTL)

depth 100 .71

(UTL)

IL 103.12

IL 103.59

(UTL)

IL 103.68

IL 106.16

IL 106.21

IL 106.11

100¯

100¯

100¯

150¯

100¯

100¯

100¯

IL 103.61

100¯ IL 106.50

IL 103.44

(UTL)

soakaway

soakaway

IL 101.41

100¯

(UTL)

IL 101.22

100¯

IL 102.77

IL 108.48

100¯

IL 108.59

100¯

(UTL)

IL 108.83

100¯

(blocked) IL 106.50

100¯

IL 111 .01

IL 110 .68

100¯

100¯

100¯

100¯

100¯IL 104.00

100¯

KEY:

Root Protection Zones

Existing Trees To Be Retained

Protective Fencing (Standard)

Protective Fencing (Low Activity)

Chestnut Pailing Fence wrapped and secured to tree to provide additional protection.

Cam

lins

Ref

: PE

GAS

US

GEN

ERAL

/LL4

54 W

ILD

ERN

ESSE

HO

USE

/Cam

lins

Wor

k/D

raw

ings

/LL4

54-4

00-T

ende

r [R

ef.:

LL45

4REF

-400

-PU

BLIC

REA

LM B

ASE]

NOTES1. All dimensions in millimetres unless otherwise shown.2. All levels in metres above Ordinance Datum (mAOD) unless otherwise shown.3. All dimensions to be checked on site and any discrepancies reported to Employer

before pricing / work starts.4. Any ambiguities or discrepancies within this drawing and any other information given

elsewhere must be reported to Camlins and the Employer for clarification before pricingwork proceeds.

5. All drawings to be read in conjunction with other Camlins drawings and specificationinformation as required.

6. Refer to relevant Engineer's and Architect's work packages as appropriate forconfirmation of all engineering and architectural details.

7. All works to be carried out in accordance with the latest British Standards andappropriate codes of practice as a minimum.

Landscape Architects, New Dolanog House, Severn Road, Welshpool, Powys, SY21 7APTel: 01938 554886 / [email protected] / www.camlins.com

TENDER

WILDERNESSE HOUSEPEGASUSLIFE

General Arrangement - Protective Fencing Plan

Drawing No. Revision Scale DateLL454-400-0028 – 1:1250@A1 27.04.2015Drawn by Checked bySB AN

Revisions

N

Rev Date Description Revised by Checked by

- - - - -

Notes:Pre Construction Works:A pre-commencement site meeting shall be held prior to any works commencing on site, to agree all approved processes with the arboricultural consultant, tree works contractor, construction personnel and Seven Oaks District Council. This meeting should formally agree the methods of work, position of site facilities, material storage, compounds and tree protection measures prior to commencement of works on site.

No notice boards, cables, nails or other items shall be attached to any part of any retained tree.

Site operations, such as deliveries or machine operation shall be organised to avoid damage to the trunk or crown of the off site boundary trees. A Banksman shall be employed if machinery is passing or working close to retained trees.

Materials which could contaminate the soil e.g. concrete mixing, fuel, vehicle washing etc., shall not be discharged within 10m of thee stem of the retained group of trees and not on ground that slopes down to existing trees. Phytotoxic materials for use on site will be kept to an absolute minimum and stored on the hard standing to the south east corner of the site. All fuels will be held in bunded containers to prevent accidental spillage or leakage.

Fires will not be permitted on site.

Chestnut Pailing Fence

100m0m 50m10mScale 1:1250

10m

Typical Image Of Chestnut Pailing Fence

Buildings Proposed to be DemolishedRefer to Architects Drawings for Details

Page 7: Arboricultural Method Statement for the protection of

Appendix C

Trunk Wrapping for the Protection of Trees

(Adapted from AS4970 2009 Protection of trees on development sites)

1. Where a tree is to be retained and a Construction Exclusion Zone [CEZ] cannot beadequately established due to restricted access e.g close proximity of trees to access, thetrunk and branches in the lower crown will be protected.

2. The trunk and branches will be protected by wrapping two layers of hessian or carpetunderfelt around the trunk and branches for a minimum of 2m or as lower branches permit.

3. Wire or rope is used to secure 75x50x200 mm hardwood battens together around the trunk.These battens are not to be nailed or screwed to the trunk or branches.

4. The number of battens to be used is as required to encircle the trunk and the battens are toextend to the base of the tree.

5. The trunk protection is to be erected before any work commences on site, is to remain in situundamaged for the duration of all work or each phase, and only to be removed once all workis completed.

AS4970 2009 - Figure 4: Examples of Trunk, Branch and Ground Protection