AREAS OF UC-34
Rs. 9.260 Million
Rs. 2 % Million
Description of item Quantity Unit RateRate to be quoted
by the contractor
Sr #Ch
No
Item
NoRCC SEWER
Earth work excavation in open cutting for sewer and manholes
as shown in drawing i/c shuttering, timbering, dressing to
correct section and dimensions according to templates and
levels,and removing surface water,in all types of soil except
shingle,gravel complete in all respect
0' to 7' depth 1992.00 % 0Cft 5118.60
2 7 30 Supply and filling sand under floor for 6'' i/d sewer 309.83 % Cft 1742.00
Providing laying RCC pipe sewers moulded with cement
concrete 1:1 ½ :3 conforming to ASTM specification C-76-79
Class.II wall B,including carriage of pipe from factory to site of
work,lowering in trenches to correct alignment and grade ,
jointing with rubberring cutting pipes where necessary,
testing etc. complete.
12 i/d 138.00 P.Rft 411.75
4 3 13a
Rehandling of earth work lead up to a single through of Khassi,
Phorah or Shovel compaction of earth(soft, ordinary of hard
soil) mixising, moistening, earth to optimum moisture content
in layer of compaction etc
1593.80 %0Cft 2153.70
MANHOLE CHAMBER 4' DIA 6.170' DEPTH FOR 12"dia
SEWER 3.00 Nos
Earth work excavation in open cutting for sewer and manholes
as shown in drawing i/c shuttering, timbering, dressing to
correct section and dimensions according to templates and
levels,and removing surface water,in all types of soil except
shingle,gravel complete in all respect
’ to ’- ” depth 817.86 %0Cft 5118.60
2 6 2Dry rammad brick or stone ballast 1.5'' to 2'' (40mm to 50mm)
gauge66.27 %Cft 3894.00
3 6 3dCement concrete brick or stone ballast . ” to ” guage ratio
1:6:12 complete66.71 %Cft 10672.65
4 7 7iPacc brick work other than building upto 10ft height in cement
sand mortor Ratio 1:3118.02 %Cft 20797.25
5 7 10Extra for pacca brick work in steining of well or any other
circular masonry.118.02 %Cft 1572.85
6 6 5f
Cement concrete plain including placing, compacting, finishing
and curing complete (including screening and washing of stone
aggregate) Ratio 1:2:4
48.54 %Cft 21879.00
3
BID SCHEDULE
Name Of WorkCONSTRUCTION OF SEWERAGE, DRAIN, PCC / RCC IN AREAS OF UC-34 DISTRICT
GUJRANWALA. (NA-95)
Approx Cost
1 3 42
MRS Bi-Annual
Period (1st July 2017
to 31st December
2017)
3
42i
Time Limit: 45 Days
Earnest Money
21 3
1
Page 1 of 4
AREAS OF UC-34
7 1 1
Carriage of 100 Cft. (2.83 cu.m) of all materials like stone
aggregate, spawl, kankar lime (unslaked), surkhi, etc. or
150 Cft. (4.25 cu.m) of timber, by truck or by any other
means owned by the contractor. Carriage for Bajri quiry
sargodha (Sikhan Wali) to site of work (Analysis Attached) 170
km
42.72 %Cft 3953.70
8 21 9Extra for making and finishing benching floor work in manhole
chamber,with 1/8" thick cement finish.37.71 % Cft 1564.25
9 21 15a
Providing and fixing ” thick R.C.C manhole cover with tee
shaped C.I. frame of ” i/d (frame et weighting 37.324 Kg. Or
one mound as per Standard Drawing STD/PD No. 6, of 1977,
complete in all respect.
3.00 Each 7102.65
10 21 13
Providing and fixing 1 ¼:x1 ¼”x / ” (31x31x5 mm) angle iron
step, in manhole chambers, including carriage and setting the
same in work to correct lines and levels.
3.00 Each 242.20
11 11 7b½” thick cement plaster 1:2 cement sand morter upto 20'
height189.15 %Sft 2078.30
GULLY GRATING (12" X 12") 3.00 Nos
1 3 42
Earthwork excavation in open cutting for sewers and manholes
as shown in drawings including shuttering and timbering,
dressing to correct section and dimensions according to
templates and levels, and removing surface water, in all types
of soil except shingle, gravel and rock:-0-7' depth
236.25 %0Cft 5118.60
2 7 30 Supply and filling sand under floor for 6'' i/d sewer 47.25 % Cft 1742.00
3 21 1
P/L RCC sewer pipe moulded with cement concrete in 1:1½:3
C.C. confirming to ASTM specifications C76-79 Class-II wall”B”
complete in all respects. 6" i/d
36.00 P.Rft 132.15
4 313(a),2
4a
Rehandling of earth work lead up to a single through of Khassi,
Phorah or Shoval compaction of earth(soft, ordinary of hard
soil) mixising, moistening, earth to optimum moisture content
in layer of compaction etc complete.
189.00 %0Cft 1452.00
5 21 7-b Construction of gully grating chamber Size 12"X12" 3.00 Each 2931.85
SURFACE DRAIN
1 3 10(i)
Earthwork excavation in irrigation channels, drains, etc. to
designed section, grades and profiles, excavated material
disposed off and dressed within 50 ft. (15 m) lead:-
152.55 %0 Cft 4667.50
2 6 3 (d)
Cement concrete brick or stone ballast - / ’’ to ” guage in
foundation and plinth ratio (1:6:12)
90.00 % Cft 10672.65
3 20 1(b)(ii)
Tega formed of Pacca brick on end, laid in and over cement
sand mortar projecting to a height of not more then 6"
(150mm)top of drain along the property side where required,
laid to lines, grades, slopes, and shape according to the
engineer's drawing, 4-1/2" thick, ratio 1:5
240.00 % Rft 5839.40
4 7 4(i)Pacca brick work in foundation and plinth in cement sand
mortor ratio 1:5142.50 % Cft 18974.90
Page 2 of 4
AREAS OF UC-34
5 20 3(b)
Pacca brick work on edge, laid in reimbursement, in cement,
sand mortar, on side of drains and on other works where
required All joints to be completely filled and struck flush ratio
1:5
270.00 % Sft 8351.45
6 20 6(a)
Construction of Punjab standard drains of cement concrete 1:2
½:5 with cement concrete bedding ratio 1:6:12 complete laid
to the lines, grades, slopes and shapes,rendering exposed
surface of concrete with 1:1 cement sand mortor 1/4" (6mm)
thick, as per engineer drawings (excluding excavation ) Type I
300.00 P. Rft 102.95
7 6 6aii
Providing and laying reinforced cement concrete (including
prestressed concrete), using coarse sand and screened graded
and washed aggregate, in required shape and design, including
forms, moulds, shuttering, lifting, compacting, curing,
rendering and finishing exposed surface, complete (but
excluding the cost of steel reinforcement, its fabrication and
placing in position, etc.): (a) (ii)Reinforced cement concrete in
slab of raft / strip foundation base salb of column and retaining
wall etc and other structure member other than those
mentioned in 5 (a)(1) above not requiring for work (i.e)
horizental shuttering), complete in all respects:- type C
nominal mix 1:2:4
61.51 P.Cft 252.80
8 1 1
Carriage of 100 Cft. (2.83 cu.m) of all materials like stone
aggregate, spawl, kankar lime (unslaked), surkhi, etc. or 150
Cft. (4.25 cu.m) of timber, by truck or by any other means
owned by the contractor. Carriage for Bajri quiry sargodha
(Sikhan Wali) to site of work (Analysis Attached) (170Km)
54.13 %Cft 3953.70
9 6 9b
Fabrication of mild steel reinforcement for Cement concrete,
i/c cutting, bending, laying in position making joints and
fastening, including cost of binding wire and labour charges for
binding of steel reinforcement (also includes removel of rust
from bars.(Deformed bars) Grade 40
188.39 %. Kg 10736.00
PCC FLOORING
1 4 19C Dismantling cement concrete plain 1:2:4 1485.00 % Cft 6388.80
2 4 19d Dismantling cement concrete with brick aggregate 1485.00 % Cft 1742.40
3 3 17abc
Transportation of earth all types when the total distance, i.c
the lead covered in the item, is more than 1000 ft. upto 5 mile
2970.00 %0 Cft 5635.20
4 3 17abc
Filling watering ramming of earth under floor un dressed lead
upto a single throw of kassi, phora or shovel in ordinary soil,
transportation of earth all types when the total distance
includingthe lead covered up to 5 mile.
46150.00 %0 Cft 8248.80
5 6 3fCement concrete bick or stone ballast 1-1/2'' to 2'' guage in
foundation and plinth. Ratio 1:7:20.24260.00 % Cft 9346.60
6 6 5f
Cement concrete plain including placing, compacting, finishing
and curing complete (including screening and washing of stone
aggregate. Ratio 1:2:4
24260.00 % Cft 21879.00
7 1 1
Carriage of 100 Cft. (2.83 cu.m) of all materials like stone
aggregate, spawl, kankar lime (unslaked), surkhi, etc. or
150 Cft. (4.25 cu.m) of timber, by truck or by any other
means owned by the contractor..Carriage for Bajri quiry
sargodha (Sikhan Wali) to site of work (Analysis Attached) 170
km
21349.00 %Cft 3953.70
Page 3 of 4
AREAS OF UC-34
RAISING OF MAN HOLE CHAMBER1.00 Nos
1 4 19(c) Dismantling of PCC 1:2:4 3.04 %Cft 6388.80
2 7 07(i)Pacca brick work other than building upto 10ft.(3 m height)
1:3 6.00 %Cft 20797.25
3 7 10Extra for steining of well or any other circular Masonry.
6.00 %Cft 1572.85
4 11 7(b)½” thick ce e t plaster : ce e t sa d ortar
10.00 %Cft 2078.30
5 21 15a
Providing and fixing 6" thick R.C.C. manhole cover with tee
shaped C.I. frame of 22" I/d (frame set weighing 37.324 Kg. or
one mound as per StandardDrawing STD/PD No. 6, of 1977,
complete in all respect.
1.00 Each 7102.65
DEDUCTION COST OF OLD MATERIAL
1Deduction for cost of old material in shape of scrape C.I frame
and manhole cover of steel. 37.33 P.Kg 25.00
Contractor
Name & Address _____________
____________________________
EXECUTIVE ENGINEER
8. All the conditions of “Revised Contract Agreement” and conditions mentioned in the DNIT will form part of the agreement and binding upon the contractor.
7. The execution / completion of work strictly in accordance with the specifications, approved design / drawings and requirements of contract agreement to the entire
satisfaction of the Engineer-in-Charge will be exclusive responsibility of the contractor.
6. Any omission / error there in, for interpretation will be referred to rates standardized on the basis of “ Market Rate System” for the MRS Bi-Annual Period (1st July 2017 to 301st December 2017., in accordance with Government of the Punjab, Finance Department Notification No. RO9TECH)FD-2-3/2004, dated Lahore the 2
nd August, 2005 and
the decision of the competent authority will be final and binding upon the contractor.
1. Conditional tenders / rates will not be entertained.
PUBLIC HEALTH ENGG:DIVISION
9. As per Government of the Punjab, Finance Department, Notification No. RO(Tech)FD1-2/83(VI)(P) dated Lahore the 6th April, 2005, in case the total tendered amount is
less than 5% of the approved estimated (DNIT) amount, the lowest bidder will have to deposit an additional performance security from the Schedule Bank equal to the tendered
amount below estimated cost, within 15 days of submission of tenders or within expiry period of the bid, whichever is earlier.
4. Any item of work not included in this bid but during execution actually required to be executed at site will be paid after approval by the competent authority.
CONDITIONS: -
GUJRANWALA
5. The work should be executed in accordance with the availability of funds as required under Rule 2.82 of B&R Code. The department will not accept any responsibility for
loss sustained by the contractor due to interruption of work as a result of shortage of funds, delay in supply of material / labour or any other reason whatsoever related for
completion of work.
3. Work must be started at site within seven days from the issuance of acceptance letter, otherwise it will be considered as rescinded automatically.
2. Construction schedule towards completion of work should be provided by the Contractor within one week of the issuance of acceptance letter.
Page 4 of 4
UC-38
Rs. 9.260 Million
Rs. 2 % Million
Description of item Quantity Unit RateRate to be quoted
by the contractor
Sr #Ch
No
Item
NoRCC SEWER
Earth work excavation in open cutting for sewer and manholes
as shown in drawing i/c shuttering, timbering, dressing to
correct section and dimensions according to templates and
levels,and removing surface water,in all types of soil except
shingle,gravel complete in all respect
0' to 7' depth 12344.00 % 0Cft 5118.60
2 7 30 Supply and filling sand under floor for sewer 1919.70 % Cft 1742.00
Providing laying RCC pipe sewers moulded with cement
concrete 1:1 ½ :3 conforming to ASTM specification C-76-79
Class.II wall B,including carriage of pipe from factory to site of
work,lowering in trenches to correct alignment and grade ,
jointing with rubberring cutting pipes where necessary,
testing etc. complete.
12 i/d 846.00 P.Rft 411.75
4 3 13a
Rehandling of earth work lead up to a single through of Khassi,
Phorah or Shovel compaction of earth(soft, ordinary of hard
soil) mixising, moistening, earth to optimum moisture content
in layer of compaction etc
9875.00 %0Cft 2153.70
MANHOLE CHAMBER 4' DIA 6.170' DEPTH FOR 12"dia
SEWER 16.00 Nos
Earth work excavation in open cutting for sewer and manholes
as shown in drawing i/c shuttering, timbering, dressing to
correct section and dimensions according to templates and
levels,and removing surface water,in all types of soil except
shingle,gravel complete in all respect
’ to ’- ” depth 4361.92 %0Cft 5118.60
2 6 2Dry rammad brick or stone ballast 1.5'' to 2'' (40mm to 50mm)
gauge353.44 %Cft 3894.00
3 6 3dCement concrete brick or stone ballast . ” to ” guage ratio
1:6:12 complete355.78 %Cft 10672.65
4 7 7iPacc brick work other than building upto 10ft height in cement
sand mortor Ratio 1:3629.44 %Cft 20797.25
5 7 10Extra for pacca brick work in steining of well or any other
circular masonry.629.44 %Cft 1572.85
6 6 5f
Cement concrete plain including placing, compacting, finishing
and curing complete (including screening and washing of stone
aggregate) Ratio 1:2:4
258.88 %Cft 21879.00
3
42i
Time Limit: 45 Days
Earnest Money
21 3
1
BID SCHEDULE
Name Of WorkCONSTRUCTION OF DRAIN, SEWERAGE, PCC / RCC IN UC-38 DISTRICT
GUJRANWALA. (NA-95)
Approx Cost
1 3 42
MRS Bi-Annual
Period (1st July 2017
to 31st December
2017)
3
Page 1 of 4
UC-38
7 1 1
Carriage of 100 Cft. (2.83 cu.m) of all materials like stone
aggregate, spawl, kankar lime (unslaked), surkhi, etc. or
150 Cft. (4.25 cu.m) of timber, by truck or by any other
means owned by the contractor. Carriage for Bajri quiry
sargodha (Sikhan Wali) to site of work (Analysis Attached) 170
km
227.84 %Cft 3953.70
8 21 9Extra for making and finishing benching floor work in manhole
chamber,with 1/8" thick cement finish.201.12 % Cft 1564.25
9 21 15a
Providing and fixing ” thick R.C.C manhole cover with tee
shaped C.I. frame of ” i/d (frame et weighting 37.324 Kg. Or
one mound as per Standard Drawing STD/PD No. 6, of 1977,
complete in all respect.
16.00 Each 7102.65
10 21 13
Providing and fixing 1 ¼:x1 ¼”x / ” (31x31x5 mm) angle iron
step, in manhole chambers, including carriage and setting the
same in work to correct lines and levels.
16.00 Each 242.20
11 11 7b½” thick cement plaster 1:2 cement sand morter upto 20'
height1008.80 %Sft 2078.30
GULLY GRATING (12" X 12") 18.00 Nos
1 3 42
Earthwork excavation in open cutting for sewers and manholes
as shown in drawings including shuttering and timbering,
dressing to correct section and dimensions according to
templates and levels, and removing surface water, in all types
of soil except shingle, gravel and rock:-0-7' depth
1417.50 %0Cft 5118.60
2 7 30 Supply and filling sand under floor for 6'' i/d sewer 283.50 % Cft 1742.00
3 21 1
P/L RCC sewer pipe moulded with cement concrete in 1:1½:3
C.C. confirming to ASTM specifications C76-79 Class-II wall”B”
complete in all respects. 6" i/d
216.00 P.Rft 132.15
4 313(a),2
4a
Rehandling of earth work lead up to a single through of Khassi,
Phorah or Shoval compaction of earth(soft, ordinary of hard
soil) mixising, moistening, earth to optimum moisture content
in layer of compaction etc complete.
1134.00 %0Cft 1452.00
5 21 7-b Construction of gully grating chamber Size 12"X12" 18.00 Each 2931.85
SURFACE DRAIN
1 3 10(i)
Earthwork excavation in irrigation channels, drains, etc. to
designed section, grades and profiles, excavated material
disposed off and dressed within 50 ft. (15 m) lead:-
228.83 %0 Cft 4667.50
2 6 3 (d)
Cement concrete brick or stone ballast - / ’’ to ” guage in
foundation and plinth ratio (1:6:12)
135.00 % Cft 10672.65
3 20 1(b)(ii)
Tega formed of Pacca brick on end, laid in and over cement
sand mortar projecting to a height of not more then 6"
(150mm)top of drain along the property side where required,
laid to lines, grades, slopes, and shape according to the
engineer's drawing, 4-1/2" thick, ratio 1:5
360.00 % Rft 5839.40
4 7 4(i)Pacca brick work in foundation and plinth in cement sand
mortor ratio 1:5124.69 % Cft 18974.90
Page 2 of 4
UC-38
5 20 3(b)
Pacca brick work on edge, laid in reimbursement, in cement,
sand mortar, on side of drains and on other works where
required All joints to be completely filled and struck flush ratio
1:5
405.00 % Sft 8351.45
6 20 6(a)
Construction of Punjab standard drains of cement concrete 1:2
½:5 with cement concrete bedding ratio 1:6:12 complete laid
to the lines, grades, slopes and shapes,rendering exposed
surface of concrete with 1:1 cement sand mortor 1/4" (6mm)
thick, as per engineer drawings (excluding excavation ) Type I
450.00 P. Rft 102.95
7 6 6aii
Providing and laying reinforced cement concrete (including
prestressed concrete), using coarse sand and screened graded
and washed aggregate, in required shape and design, including
forms, moulds, shuttering, lifting, compacting, curing,
rendering and finishing exposed surface, complete (but
excluding the cost of steel reinforcement, its fabrication and
placing in position, etc.): (a) (ii)Reinforced cement concrete in
slab of raft / strip foundation base salb of column and retaining
wall etc and other structure member other than those
mentioned in 5 (a)(1) above not requiring for work (i.e)
horizental shuttering), complete in all respects:- type C
nominal mix 1:2:4
7.69 P.Cft 252.80
8 1 1
Carriage of 100 Cft. (2.83 cu.m) of all materials like stone
aggregate, spawl, kankar lime (unslaked), surkhi, etc. or 150
Cft. (4.25 cu.m) of timber, by truck or by any other means
owned by the contractor. Carriage for Bajri quiry sargodha
(Sikhan Wali) to site of work (Analysis Attached) (170Km)
6.77 %Cft 3953.70
9 6 9b
Fabrication of mild steel reinforcement for Cement concrete,
i/c cutting, bending, laying in position making joints and
fastening, including cost of binding wire and labour charges for
binding of steel reinforcement (also includes removel of rust
from bars.(Deformed bars) Grade 40
23.55 %. Kg 10736.00
PCC FLOORING
1 3 17abc
Filling watering ramming of earth under floor un dressed lead
upto a single throw of kassi, phora or shovel in ordinary soil,
transportation of earth all types when the total distance
includingthe lead covered up to 5 mile.
19040.00 %0 Cft 8248.80
2 6 3fCement concrete bick or stone ballast 1-1/2'' to 2'' guage in
foundation and plinth. Ratio 1:7:20.9520.00 % Cft 9346.60
3 6 5f
Cement concrete plain including placing, compacting, finishing
and curing complete (including screening and washing of stone
aggregate. Ratio 1:2:4
9520.00 % Cft 21879.00
4 1 1
Carriage of 100 Cft. (2.83 cu.m) of all materials like stone
aggregate, spawl, kankar lime (unslaked), surkhi, etc. or
150 Cft. (4.25 cu.m) of timber, by truck or by any other
means owned by the contractor..Carriage for Bajri quiry
sargodha (Sikhan Wali) to site of work (Analysis Attached) 170
km
8378.00 %Cft 3953.70
RAISING OF MAN HOLE CHAMBER5.00 Nos
1 4 19(c) Dismantling of PCC 1:2:4 15.20 %Cft 6388.80
2 7 07(i)Pacca brick work other than building upto 10ft.(3 m height)
1:3 30.00 %Cft 20797.25
Page 3 of 4
UC-38
3 7 10Extra for steining of well or any other circular Masonry.
30.00 %Cft 1572.85
4 11 7(b)½” thick ce e t plaster : ce e t sa d ortar
50.00 %Cft 2078.30
5 21 15a
Providing and fixing 6" thick R.C.C. manhole cover with tee
shaped C.I. frame of 22" I/d (frame set weighing 37.324 Kg. or
one mound as per StandardDrawing STD/PD No. 6, of 1977,
complete in all respect.
5.00 Each 7102.65
DEDUCTION COST OF OLD MATERIAL
1Deduction for cost of old material in shape of scrape C.I frame
and manhole cover of steel. 186.63 P.Kg 25.00
Contractor
Name & Address _____________
____________________________
3. Work must be started at site within seven days from the issuance of acceptance letter, otherwise it will be considered as rescinded automatically.
2. Construction schedule towards completion of work should be provided by the Contractor within one week of the issuance of acceptance letter.
PUBLIC HEALTH ENGG:DIVISION
9. As per Government of the Punjab, Finance Department, Notification No. RO(Tech)FD1-2/83(VI)(P) dated Lahore the 6th April, 2005, in case the total tendered amount is
less than 5% of the approved estimated (DNIT) amount, the lowest bidder will have to deposit an additional performance security from the Schedule Bank equal to the tendered
amount below estimated cost, within 15 days of submission of tenders or within expiry period of the bid, whichever is earlier.
4. Any item of work not included in this bid but during execution actually required to be executed at site will be paid after approval by the competent authority.
CONDITIONS: -
GUJRANWALA
5. The work should be executed in accordance with the availability of funds as required under Rule 2.82 of B&R Code. The department will not accept any responsibility for
loss sustained by the contractor due to interruption of work as a result of shortage of funds, delay in supply of material / labour or any other reason whatsoever related for
completion of work.
EXECUTIVE ENGINEER
8. All the conditions of “Revised Contract Agreement” and conditions mentioned in the DNIT will form part of the agreement and binding upon the contractor.
7. The execution / completion of work strictly in accordance with the specifications, approved design / drawings and requirements of contract agreement to the entire
satisfaction of the Engineer-in-Charge will be exclusive responsibility of the contractor.
6. Any omission / error there in, for interpretation will be referred to rates standardized on the basis of “ Market Rate System” for the MRS Bi-Annual Period (1st July 2017 to 301st December 2017., in accordance with Government of the Punjab, Finance Department Notification No. RO9TECH)FD-2-3/2004, dated Lahore the 2
nd August, 2005 and
the decision of the competent authority will be final and binding upon the contractor.
1. Conditional tenders / rates will not be entertained.
Page 4 of 4
UC 30
Rs. 9.260 Million
Rs. 2 % Million
Description of item Quantity Unit RateRate to be quoted
by the contractor
Sr #Ch
No
Item
NoRCC SEWER
Earth work excavation in open cutting for sewer and manholes
as shown in drawing i/c shuttering, timbering, dressing to
correct section and dimensions according to templates and
levels,and removing surface water,in all types of soil except
shingle,gravel complete in all respect
0' to 7' depth 32207.00 % 0Cft 5118.60
2 7 30 Supply and filling sand under floor for 6'' i/d sewer 3592.76 % Cft 1742.00
Providing laying RCC pipe sewers moulded with cement
concrete 1:1 ½ :3 conforming to ASTM specification C-76-79
Class.II wall B,including carriage of pipe from factory to site of
work,lowering in trenches to correct alignment and grade ,
jointing with rubberring cutting pipes where necessary,
testing etc. complete.
12" i/d 1580.00 P.Rft 411.75
15" i/d 564.00 P.Rft 505.50
4 3 13a
Rehandling of earth work lead up to a single through of Khassi,
Phorah or Shovel compaction of earth(soft, ordinary of hard
soil) mixising, moistening, earth to optimum moisture content
in layer of compaction etc
25765.90 %0Cft 2153.70
MANHOLE CHAMBER 4' DIA 6.170' DEPTH FOR 12"dia
SEWER 29.00 Nos
Earth work excavation in open cutting for sewer and manholes
as shown in drawing i/c shuttering, timbering, dressing to
correct section and dimensions according to templates and
levels,and removing surface water,in all types of soil except
shingle,gravel complete in all respect
’ to ’- ” depth 8546.59 %0Cft 5118.60
2 6 2Dry rammad brick or stone ballast 1.5'' to 2'' (40mm to 50mm)
gauge1281.22 %Cft 3894.00
3 6 3dCement concrete brick or stone ballast . ” to ” guage ratio
1:6:12 complete644.84 %Cft 10672.65
4 7 7iPacc brick work other than building upto 10ft height in cement
sand mortor Ratio 1:31140.86 %Cft 20797.25
5 7 10Extra for pacca brick work in steining of well or any other
circular masonry.1140.86 %Cft 1572.85
6 6 5f
Cement concrete plain including placing, compacting, finishing
and curing complete (including screening and washing of stone
aggregate) Ratio 1:2:4
469.22 %Cft 21879.00
3
42i
Time Limit: 45 Days
Earnest Money
MRS Bi-Annual
Period (1st July 2017
to 31st December
2017)
21 3
1 3
BID SCHEDULE
Name Of WorkCONSTRUCTION OF DRAIN, SEWERAGE PCC / RCC IN UC 30 DISTRICT
GUJRANWALA. (NA-95)
Approx Cost
1 3 42
Page 1 of 4
UC 30
7 1 1
Carriage of 100 Cft. (2.83 cu.m) of all materials like stone
aggregate, spawl, kankar lime (unslaked), surkhi, etc. or 150
Cft. (4.25 cu.m) of timber, by truck or by any other means
owned by the contractor. Carriage for Bajri quiry sargodha
(Sikhan Wali) to site of work (Analysis Attached) 170 km
412.96 %Cft 3953.70
8 21 9Extra for making and finishing benching floor work in manhole
chamber,with 1/8" thick cement finish.364.53 % Cft 1564.25
9 21 15a
Providing and fixing ” thick R.C.C manhole cover with tee
shaped C.I. frame of ” i/d (frame et weighting 37.324 Kg. Or
one mound as per Standard Drawing STD/PD No. 6, of 1977,
complete in all respect.
29.00 Each 7102.65
10 21 13
Providing and fixing 1 ¼:x1 ¼”x / ” (31x31x5 mm) angle iron
step, in manhole chambers, including carriage and setting the
same in work to correct lines and levels.
29.00 Each 242.20
11 11 7b½” thick cement plaster 1:2 cement sand morter upto 20'
height1828.45 %Sft 2078.30
MANHOLE CHAMBER 4' DIA 6.170' DEPTH FOR 15"dia
SEWER 9.00 Nos
Earth work excavation in open cutting for sewer and manholes
as shown in drawing i/c shuttering, timbering, dressing to
correct section and dimensions according to templates and
levels,and removing surface water,in all types of soil except
shingle,gravel complete in all respect
’ to ’- ” depth 2652.39 %0Cft 5118.60
2 6 2Dry rammad brick or stone ballast 1.5'' to 2'' (40mm to 50mm)
gauge397.62 %Cft 3894.00
3 6 3dCement concrete brick or stone ballast . ” to ” guage ratio
1:6:12 complete200.12 %Cft 10672.65
4 7 7iPacc brick work other than building upto 10ft height in cement
sand mortor Ratio 1:3344.79 %Cft 20797.25
5 7 10Extra for pacca brick work in steining of well or any other
circular masonry.344.79 %Cft 1572.85
6 6 5f
Cement concrete plain including placing, compacting, finishing
and curing complete (including screening and washing of stone
aggregate) Ratio 1:2:4
160.92 %Cft 21879.00
7 1 1
Carriage of 100 Cft. (2.83 cu.m) of all materials like stone
aggregate, spawl, kankar lime (unslaked), surkhi, etc. or 150
Cft. (4.25 cu.m) of timber, by truck or by any other means
owned by the contractor. Carriage for Bajri quiry sargodha
(Sikhan Wali) to site of work (Analysis Attached) 170 km
141.66 %Cft 3953.70
8 21 9
Extra for making and finishing benching floor work in manhole
chamber,with 1/8" thick cement finish.
113.13 % Cft 1564.25
9 21 15a
Providing and fixing ” thick R.C.C manhole cover with tee
shaped C.I. frame of ” i/d (frame et weighting 37.324 Kg. Or
one mound as per Standard Drawing STD/PD No. 6, of 1977,
complete in all respect.
9.00 Each 7102.65
1 3 42i
Page 2 of 4
UC 30
10 21 13
Providing and fixing 1 ¼:x1 ¼”x / ” (31x31x5 mm) angle iron
step, in manhole chambers, including carriage and setting the
same in work to correct lines and levels.
9.00 Each 242.20
11 11 7b½” thick cement plaster 1:2 cement sand morter upto 20'
height
555.12 %Sft 2078.30
GULLY GRATING (12" X 12") 15.00 Nos
1 3 42
Earthwork excavation in open cutting for sewers and manholes
as shown in drawings including shuttering and timbering,
dressing to correct section and dimensions according to
templates and levels, and removing surface water, in all types
of soil except shingle, gravel and rock:-0-7' depth
1181.25 %0Cft 5118.60
2 7 30 Supply and filling sand under floor for 6'' i/d sewer 236.25 % Cft 1742.00
3 21 1
P/L RCC sewer pipe moulded with cement concrete in 1:1½:3
C.C. confirming to ASTM specifications C76-79 Class-II wall”B”
complete in all respects. 6" i/d
180.00 P.Rft 132.15
4 313(a),2
4a
Rehandling of earth work lead up to a single through of Khassi,
Phorah or Shoval compaction of earth(soft, ordinary of hard
soil) mixising, moistening, earth to optimum moisture content
in layer of compaction etc complete.
945.00 %0Cft 1452.00
5 21 7-b Construction of gully grating chamber Size 12"X12" 15.00 Each 2931.85
PCC FLOORING
1 4 19C Dismantling cement concrete plain 1:2:4 5280.00 % Cft 6388.80
2 4 19d Dismantling cement concrete with brick aggregate 5280.00 % Cft 1742.40
3 3 17abc
Transportation of earth all types when the total distance, i.c
the lead covered in the item, is more than 1000 ft. upto 5 mile
10560.00 %0 Cft 5635.20
4 3 17abc
Filling watering ramming of earth under floor un dressed lead
upto a single throw of kassi, phora or shovel in ordinary soil,
transportation of earth all types when the total distance
includingthe lead covered up to 5 mile.
19190.00 %0 Cft 8248.80
5 6 3fCement concrete bick or stone ballast 1-1/2'' to 2'' guage in
foundation and plinth. Ratio 1:7:20.17595.00 % Cft 9346.60
6 6 5f
Cement concrete plain including placing, compacting, finishing
and curing complete (including screening and washing of stone
aggregate. Ratio 1:2:4
17595.00 % Cft 21879.00
7 1 1
Carriage of 100 Cft. (2.83 cu.m) of all materials like stone
aggregate, spawl, kankar lime (unslaked), surkhi, etc. or
150 Cft. (4.25 cu.m) of timber, by truck or by any other
means owned by the contractor..Carriage for Bajri quiry
sargodha (Sikhan Wali) to site of work (Analysis Attached) 170
km
15484.00 %Cft 3953.70
RAISING OF MAN HOLE CHAMBER2.00 Nos
1 4 19(c) Dismantling of PCC 1:2:4 6.08 %Cft 6388.80
2 7 07(i)Pacca brick work other than building upto 10ft.(3 m height)
1:3 12.00 %Cft 20797.25
3 7 10Extra for steining of well or any other circular Masonry.
12.00 %Cft 1572.85
Page 3 of 4
UC 30
4 11 7(b)½” thick ce e t plaster : ce e t sa d ortar
20.00 %Cft 2078.30
5 21 15a
Providing and fixing 6" thick R.C.C. manhole cover with tee
shaped C.I. frame of 22" I/d (frame set weighing 37.324 Kg. or
one mound as per StandardDrawing STD/PD No. 6, of 1977,
complete in all respect.
2.00 Each 7102.65
NON MRS ITEMS
1
P/L crushed stone / ” to ” gauge of approved guary under
and around RCC sewer upto half of pipe in sewer trenches as
per grade and alignment complete in all respects to the entire
satisfaction as per Engineer Incharge.
1666.73 P.Cft 90.22
DEDUCTION COST OF OLD MATERIAL
1Deduction for cost of old material in shape of scrape C.I frame
and manhole cover of steel. 74.65 P.Kg 25.00
Contractor
Name & Address _____________
____________________________
CONDITIONS: -
EXECUTIVE ENGINEER
8. All the conditions of “Revised Contract Agreement” and conditions mentioned in the DNIT will form part of the agreement and binding upon the contractor.
7. The execution / completion of work strictly in accordance with the specifications, approved design / drawings and requirements of contract agreement to the entire
satisfaction of the Engineer-in-Charge will be exclusive responsibility of the contractor.
6. Any omission / error there in, for interpretation will be referred to rates standardized on the basis of “ Market Rate System” for the MRS Bi-Annual Period (1st July 2017 to 301st December 2017., in accordance with Government of the Punjab, Finance Department Notification No. RO9TECH)FD-2-3/2004, dated Lahore the 2
nd August, 2005 and
the decision of the competent authority will be final and binding upon the contractor.
1. Conditional tenders / rates will not be entertained.
GUJRANWALA
5. The work should be executed in accordance with the availability of funds as required under Rule 2.82 of B&R Code. The department will not accept any responsibility for
loss sustained by the contractor due to interruption of work as a result of shortage of funds, delay in supply of material / labour or any other reason whatsoever related for
completion of work.
3. Work must be started at site within seven days from the issuance of acceptance letter, otherwise it will be considered as rescinded automatically.
2. Construction schedule towards completion of work should be provided by the Contractor within one week of the issuance of acceptance letter.
PUBLIC HEALTH ENGG:DIVISION
9. As per Government of the Punjab, Finance Department, Notification No. RO(Tech)FD1-2/83(VI)(P) dated Lahore the 6th April, 2005, in case the total tendered amount is
less than 5% of the approved estimated (DNIT) amount, the lowest bidder will have to deposit an additional performance security from the Schedule Bank equal to the tendered
amount below estimated cost, within 15 days of submission of tenders or within expiry period of the bid, whichever is earlier.
4. Any item of work not included in this bid but during execution actually required to be executed at site will be paid after approval by the competent authority.
Page 4 of 4
ABADIES UC 31
Rs. 9.260 Million
Rs. 2 % Million
Description of item Quantity Unit RateRate to be quoted
by the contractor
Sr #Ch
No
Item
NoRCC SEWER
Earth work excavation in open cutting for sewer and manholes
as shown in drawing i/c shuttering, timbering, dressing to
correct section and dimensions according to templates and
levels,and removing surface water,in all types of soil except
shingle,gravel complete in all respect
0' to 7' depth 15727.00 % 0Cft 5118.60
2 7 30 Supply and filling sand under floor for 6'' i/d sewer 1275.75 % Cft 1742.00
Providing laying RCC pipe sewers moulded with cement
concrete 1:1 ½ :3 conforming to ASTM specification C-76-79
Class.II wall B,including carriage of pipe from factory to site of
work,lowering in trenches to correct alignment and grade ,
jointing with rubberring cutting pipes where necessary,
testing etc. complete.
12" i/d 560.00 P.Rft 411.75
15" i/d 468.00 P.Rft 505.50
4 3 13a
Rehandling of earth work lead up to a single through of Khassi,
Phorah or Shovel compaction of earth(soft, ordinary of hard
soil) mixising, moistening, earth to optimum moisture content
in layer of compaction etc
12581.70 %0Cft 2153.70
MANHOLE CHAMBER 4' DIA 6.170' DEPTH FOR 12"dia
SEWER 10.00 Nos
Earth work excavation in open cutting for sewer and manholes
as shown in drawing i/c shuttering, timbering, dressing to
correct section and dimensions according to templates and
levels,and removing surface water,in all types of soil except
shingle,gravel complete in all respect
’ to ’- ” depth 2726.20 %0Cft 5118.60
2 6 2Dry rammad brick or stone ballast 1.5'' to 2'' (40mm to 50mm)
gauge220.90 %Cft 3894.00
3 6 3dCement concrete brick or stone ballast . ” to ” guage ratio
1:6:12 complete222.40 %Cft 10672.65
4 7 7iPacc brick work other than building upto 10ft height in cement
sand mortor Ratio 1:3393.40 %Cft 20797.25
5 7 10Extra for pacca brick work in steining of well or any other
circular masonry.393.40 %Cft 1572.85
6 6 5f
Cement concrete plain including placing, compacting, finishing
and curing complete (including screening and washing of stone
aggregate) Ratio 1:2:4
161.80 %Cft 21879.00
BID SCHEDULE
Name Of WorkCONSTRUCTION OF PCC DRAIN,SEWERAGE AND RCC IN ABADIES UC 31 DISTRICT
GUJRANWALA. (NA-95)
Approx Cost
1 3 42
3
3
42i
Time Limit: 45 Days
Earnest Money
MRS Bi-Annual
Period (1st July 2017
to 31st December
2017)
21 3
1
Page 1 of 5
ABADIES UC 31
7 1 1
Carriage of 100 Cft. (2.83 cu.m) of all materials like stone
aggregate, spawl, kankar lime (unslaked), surkhi, etc. or 150
Cft. (4.25 cu.m) of timber, by truck or by any other means
owned by the contractor. Carriage for Bajri quiry sargodha
(Sikhan Wali) to site of work (Analysis Attached) 170 km
142.40 %Cft 3953.70
8 21 9Extra for making and finishing benching floor work in manhole
chamber,with 1/8" thick cement finish.125.70 % Cft 1564.25
9 21 15a
Providing and fixing ” thick R.C.C manhole cover with tee
shaped C.I. frame of ” i/d (frame et weighting 37.324 Kg. Or
one mound as per Standard Drawing STD/PD No. 6, of 1977,
complete in all respect.
10.00 Each 7102.65
10 21 13
Providing and fixing 1 ¼:x1 ¼”x / ” (31x31x5 mm) angle iron
step, in manhole chambers, including carriage and setting the
same in work to correct lines and levels.
10.00 Each 242.20
11 11 7b½” thick cement plaster 1:2 cement sand morter upto 20'
height630.50 %Sft 2078.30
MANHOLE CHAMBER 4' DIA 6.170' DEPTH FOR 15"dia
SEWER 8.00 Nos
Earth work excavation in open cutting for sewer and manholes
as shown in drawing i/c shuttering, timbering, dressing to
correct section and dimensions according to templates and
levels,and removing surface water,in all types of soil except
shingle,gravel complete in all respect
’ to ’- ” depth 2180.96 %0Cft 5118.60
2 6 2Dry rammad brick or stone ballast 1.5'' to 2'' (40mm to 50mm)
gauge176.72 %Cft 3894.00
3 6 3dCement concrete brick or stone ballast . ” to ” guage ratio
1:6:12 complete177.89 %Cft 10672.65
4 7 7iPacc brick work other than building upto 10ft height in cement
sand mortor Ratio 1:3306.48 %Cft 20797.25
5 7 10Extra for pacca brick work in steining of well or any other
circular masonry.306.48 %Cft 1572.85
6 6 5f
Cement concrete plain including placing, compacting, finishing
and curing complete (including screening and washing of stone
aggregate) Ratio 1:2:4
143.04 %Cft 21879.00
7 1 1
Carriage of 100 Cft. (2.83 cu.m) of all materials like stone
aggregate, spawl, kankar lime (unslaked), surkhi, etc. or 150
Cft. (4.25 cu.m) of timber, by truck or by any other means
owned by the contractor. Carriage for Bajri quiry sargodha
(Sikhan Wali) to site of work (Analysis Attached) 170 km
125.92 %Cft 3953.70
8 21 9
Extra for making and finishing benching floor work in manhole
chamber,with 1/8" thick cement finish.
100.56 % Cft 1564.25
9 21 15a
Providing and fixing ” thick R.C.C manhole cover with tee
shaped C.I. frame of ” i/d (frame et weighting 37.324 Kg. Or
one mound as per Standard Drawing STD/PD No. 6, of 1977,
complete in all respect.
8.00 Each 7102.65
1 3 42i
Page 2 of 5
ABADIES UC 31
10 21 13
Providing and fixing 1 ¼:x1 ¼”x / ” (31x31x5 mm) angle iron
step, in manhole chambers, including carriage and setting the
same in work to correct lines and levels.
8.00 Each 242.20
11 11 7b½” thick cement plaster 1:2 cement sand morter upto 20'
height
493.44 %Sft 2078.30
GULLY GRATING (12" X 12") 8.00 Nos
1 3 42
Earthwork excavation in open cutting for sewers and manholes
as shown in drawings including shuttering and timbering,
dressing to correct section and dimensions according to
templates and levels, and removing surface water, in all types
of soil except shingle, gravel and rock:-0-7' depth
630.00 %0Cft 5118.60
2 7 30 Supply and filling sand under floor for 6'' i/d sewer 126.00 % Cft 1742.00
3 21 1
P/L RCC sewer pipe moulded with cement concrete in 1:1½:3
C.C. confirming to ASTM specifications C76-79 Class-II wall”B”
complete in all respects. 6" i/d
96.00 P.Rft 132.15
4 313(a),2
4a
Rehandling of earth work lead up to a single through of Khassi,
Phorah or Shoval compaction of earth(soft, ordinary of hard
soil) mixising, moistening, earth to optimum moisture content
in layer of compaction etc complete.
504.00 %0Cft 1452.00
5 21 7-b Construction of gully grating chamber Size 12"X12" 8.00 Each 2931.85
SURFACE DRAIN
1 3 10(i)
Earthwork excavation in irrigation channels, drains, etc. to
designed section, grades and profiles, excavated material
disposed off and dressed within 50 ft. (15 m) lead:-
355.95 %0 Cft 4667.50
2 6 3 (d)
Cement concrete brick or stone ballast - / ’’ to ” guage in
foundation and plinth ratio (1:6:12)
210.00 % Cft 10672.65
3 20 1(b)(ii)
Tega formed of Pacca brick on end, laid in and over cement
sand mortar projecting to a height of not more then 6"
(150mm)top of drain along the property side where required,
laid to lines, grades, slopes, and shape according to the
engineer's drawing, 4-1/2" thick, ratio 1:5
560.00 % Rft 5839.40
4 7 4(i)Pacca brick work in foundation and plinth in cement sand
mortor ratio 1:5237.19 % Cft 18974.90
5 20 3(b)
Pacca brick work on edge, laid in reimbursement, in cement,
sand mortar, on side of drains and on other works where
required All joints to be completely filled and struck flush ratio
1:5
630.00 % Sft 8351.45
6 20 6(a)
Construction of Punjab standard drains of cement concrete 1:2
½:5 with cement concrete bedding ratio 1:6:12 complete laid
to the lines, grades, slopes and shapes,rendering exposed
surface of concrete with 1:1 cement sand mortor 1/4" (6mm)
thick, as per engineer drawings (excluding excavation ) Type I
700.00 P. Rft 102.95
Page 3 of 5
ABADIES UC 31
7 6 6aii
Providing and laying reinforced cement concrete (including
prestressed concrete), using coarse sand and screened graded
and washed aggregate, in required shape and design, including
forms, moulds, shuttering, lifting, compacting, curing,
rendering and finishing exposed surface, complete (but
excluding the cost of steel reinforcement, its fabrication and
placing in position, etc.): (a) (ii)Reinforced cement concrete in
slab of raft / strip foundation base salb of column and retaining
wall etc and other structure member other than those
mentioned in 5 (a)(1) above not requiring for work (i.e)
horizental shuttering), complete in all respects:- type C
nominal mix 1:2:4
7.69 P.Cft 252.80
8 1 1
Carriage of 100 Cft. (2.83 cu.m) of all materials like stone
aggregate, spawl, kankar lime (unslaked), surkhi, etc. or 150
Cft. (4.25 cu.m) of timber, by truck or by any other means
owned by the contractor. Carriage for Bajri quiry sargodha
(Sikhan Wali) to site of work (Analysis Attached) (170Km)
6.77 %Cft 3953.70
9 6 9b
Fabrication of mild steel reinforcement for Cement concrete,
i/c cutting, bending, laying in position making joints and
fastening, including cost of binding wire and labour charges for
binding of steel reinforcement (also includes removel of rust
from bars.(Deformed bars) Grade 40
23.55 %. Kg 10736.00
PCC FLOORING
1 4 19C Dismantling cement concrete plain 1:2:4 1386.00 % Cft 6388.80
2 4 19d Dismantling cement concrete with brick aggregate 1386.00 % Cft 1742.40
3 3 17abc
Transportation of earth all types when the total distance, i.c
the lead covered in the item, is more than 1000 ft. upto 5 mile
2772.00 %0 Cft 5635.20
4 3 17abc
Filling watering ramming of earth under floor un dressed lead
upto a single throw of kassi, phora or shovel in ordinary soil,
transportation of earth all types when the total distance
includingthe lead covered up to 5 mile.
39380.00 %0 Cft 8248.80
5 6 3fCement concrete bick or stone ballast 1-1/2'' to 2'' guage in
foundation and plinth. Ratio 1:7:20.21090.00 % Cft 9346.60
6 6 5f
Cement concrete plain including placing, compacting, finishing
and curing complete (including screening and washing of stone
aggregate. Ratio 1:2:4
21090.00 % Cft 21879.00
7 1 1
Carriage of 100 Cft. (2.83 cu.m) of all materials like stone
aggregate, spawl, kankar lime (unslaked), surkhi, etc. or
150 Cft. (4.25 cu.m) of timber, by truck or by any other
means owned by the contractor..Carriage for Bajri quiry
sargodha (Sikhan Wali) to site of work (Analysis Attached) 170
km
18559.00 %Cft 3953.70
RAISING OF MAN HOLE CHAMBER2.00 Nos
1 4 19(c) Dismantling of PCC 1:2:4 6.08 %Cft 6388.80
2 7 07(i)Pacca brick work other than building upto 10ft.(3 m height)
1:3 12.00 %Cft 20797.25
3 7 10Extra for steining of well or any other circular Masonry.
12.00 %Cft 1572.85
4 11 7(b)½” thick ce e t plaster : ce e t sa d ortar
20.00 %Cft 2078.30
Page 4 of 5
ABADIES UC 31
5 21 15a
Providing and fixing 6" thick R.C.C. manhole cover with tee
shaped C.I. frame of 22" I/d (frame set weighing 37.324 Kg. or
one mound as per StandardDrawing STD/PD No. 6, of 1977,
complete in all respect.
2.00 Each 7102.65
NON MRS ITEMS
1
P/L crushed stone / ” to ” gauge of approved guary under
and around RCC sewer upto half of pipe in sewer trenches as
per grade and alignment complete in all respects to the entire
satisfaction as per Engineer Incharge.
1377.20 P.Cft 90.22
DEDUCTION COST OF OLD MATERIAL
1Deduction for cost of old material in shape of scrape C.I frame
and manhole cover of steel. 74.65 P.Kg 25.00
Contractor
Name & Address _____________
____________________________ GUJRANWALA
5. The work should be executed in accordance with the availability of funds as required under Rule 2.82 of B&R Code. The department will not accept any responsibility for
loss sustained by the contractor due to interruption of work as a result of shortage of funds, delay in supply of material / labour or any other reason whatsoever related for
completion of work.
3. Work must be started at site within seven days from the issuance of acceptance letter, otherwise it will be considered as rescinded automatically.
2. Construction schedule towards completion of work should be provided by the Contractor within one week of the issuance of acceptance letter.
PUBLIC HEALTH ENGG:DIVISION
9. As per Government of the Punjab, Finance Department, Notification No. RO(Tech)FD1-2/83(VI)(P) dated Lahore the 6th April, 2005, in case the total tendered amount is
less than 5% of the approved estimated (DNIT) amount, the lowest bidder will have to deposit an additional performance security from the Schedule Bank equal to the tendered
amount below estimated cost, within 15 days of submission of tenders or within expiry period of the bid, whichever is earlier.
4. Any item of work not included in this bid but during execution actually required to be executed at site will be paid after approval by the competent authority.
CONDITIONS: -
EXECUTIVE ENGINEER
8. All the conditions of “Revised Contract Agreement” and conditions mentioned in the DNIT will form part of the agreement and binding upon the contractor.
7. The execution / completion of work strictly in accordance with the specifications, approved design / drawings and requirements of contract agreement to the entire
satisfaction of the Engineer-in-Charge will be exclusive responsibility of the contractor.
6. Any omission / error there in, for interpretation will be referred to rates standardized on the basis of “ Market Rate System” for the MRS Bi-Annual Period (1st July 2017 to 301st December 2017., in accordance with Government of the Punjab, Finance Department Notification No. RO9TECH)FD-2-3/2004, dated Lahore the 2
nd August, 2005 and
the decision of the competent authority will be final and binding upon the contractor.
1. Conditional tenders / rates will not be entertained.
Page 5 of 5
UC 32
Rs. 13.889 Million
Rs. 2 % Million
Description of item Quantity Unit RateRate to be quoted
by the contractor
Sr #Ch
No
Item
NoRCC SEWER
Earth work excavation in open cutting for sewer and manholes
as shown in drawing i/c shuttering, timbering, dressing to
correct section and dimensions according to templates and
levels,and removing surface water,in all types of soil except
shingle,gravel complete in all respect
0' to 7' depth 19269.00 % 0Cft 5118.60
2 7 30 Supply and filling sand under floor for 6'' i/d sewer 2272.05 % Cft 1742.00
Providing laying RCC pipe sewers moulded with cement
concrete 1:1 ½ :3 conforming to ASTM specification C-76-79
Class.II wall B,including carriage of pipe from factory to site of
work,lowering in trenches to correct alignment and grade ,
jointing with rubberring cutting pipes where necessary,
testing etc. complete.
12" i/d 998.00 P.Rft 411.75
15" i/d 290.00 P.Rft 505.50
4 3 13a
Rehandling of earth work lead up to a single through of Khassi,
Phorah or Shovel compaction of earth(soft, ordinary of hard
soil) mixising, moistening, earth to optimum moisture content
in layer of compaction etc
15415.30 %0Cft 2153.70
MANHOLE CHAMBER 4' DIA 6.170' DEPTH FOR 12"dia
SEWER 18.00 Nos
Earth work excavation in open cutting for sewer and manholes
as shown in drawing i/c shuttering, timbering, dressing to
correct section and dimensions according to templates and
levels,and removing surface water,in all types of soil except
shingle,gravel complete in all respect
’ to ’- ” depth 4907.16 %0Cft 5118.60
2 6 2Dry rammad brick or stone ballast 1.5'' to 2'' (40mm to 50mm)
gauge397.62 %Cft 3894.00
3 6 3dCement concrete brick or stone ballast . ” to ” guage ratio
1:6:12 complete400.32 %Cft 10672.65
4 7 7iPacc brick work other than building upto 10ft height in cement
sand mortor Ratio 1:3708.12 %Cft 20797.25
5 7 10Extra for pacca brick work in steining of well or any other
circular masonry.708.12 %Cft 1572.85
6 6 5f
Cement concrete plain including placing, compacting, finishing
and curing complete (including screening and washing of stone
aggregate) Ratio 1:2:4
291.24 %Cft 21879.00
3
42i
Time Limit: 45 Days
Earnest Money
MRS Bi-Annual
Period (1st July 2017
to 31st December
2017)
21 3
1 3
BID SCHEDULE
Name Of WorkCONSTRUCTION OF DRAIN,SEWERAGE PCC / RCC IN UC 32 DISTRICT
GUJRANWALA. (NA-95)
Approx Cost
1 3 42
Page 1 of 5
UC 32
7 1 1
Carriage of 100 Cft. (2.83 cu.m) of all materials like stone
aggregate, spawl, kankar lime (unslaked), surkhi, etc. or 150
Cft. (4.25 cu.m) of timber, by truck or by any other means
owned by the contractor. Carriage for Bajri quiry sargodha
(Sikhan Wali) to site of work (Analysis Attached) 170 km
256.32 %Cft 3953.70
8 21 9Extra for making and finishing benching floor work in manhole
chamber,with 1/8" thick cement finish.226.26 % Cft 1564.25
9 21 15a
Providing and fixing ” thick R.C.C manhole cover with tee
shaped C.I. frame of ” i/d (frame et weighting 37.324 Kg. Or
one mound as per Standard Drawing STD/PD No. 6, of 1977,
complete in all respect.
18.00 Each 7102.65
10 21 13
Providing and fixing 1 ¼:x1 ¼”x / ” (31x31x5 mm) angle iron
step, in manhole chambers, including carriage and setting the
same in work to correct lines and levels.
18.00 Each 242.20
11 11 7b½” thick cement plaster 1:2 cement sand morter upto 20'
height1134.90 %Sft 2078.30
MANHOLE CHAMBER 4' DIA 6.170' DEPTH FOR 15"dia
SEWER 5.00 Nos
Earth work excavation in open cutting for sewer and manholes
as shown in drawing i/c shuttering, timbering, dressing to
correct section and dimensions according to templates and
levels,and removing surface water,in all types of soil except
shingle,gravel complete in all respect
’ to ’- ” depth 1363.10 %0Cft 5118.60
2 6 2Dry rammad brick or stone ballast 1.5'' to 2'' (40mm to 50mm)
gauge110.45 %Cft 3894.00
3 6 3dCement concrete brick or stone ballast . ” to ” guage ratio
1:6:12 complete111.18 %Cft 10672.65
4 7 7iPacc brick work other than building upto 10ft height in cement
sand mortor Ratio 1:3191.55 %Cft 20797.25
5 7 10Extra for pacca brick work in steining of well or any other
circular masonry.191.55 %Cft 1572.85
6 6 5f
Cement concrete plain including placing, compacting, finishing
and curing complete (including screening and washing of stone
aggregate) Ratio 1:2:4
89.40 %Cft 21879.00
7 1 1
Carriage of 100 Cft. (2.83 cu.m) of all materials like stone
aggregate, spawl, kankar lime (unslaked), surkhi, etc. or 150
Cft. (4.25 cu.m) of timber, by truck or by any other means
owned by the contractor. Carriage for Bajri quiry sargodha
(Sikhan Wali) to site of work (Analysis Attached) 170 km
78.70 %Cft 3953.70
8 21 9
Extra for making and finishing benching floor work in manhole
chamber,with 1/8" thick cement finish.
62.85 % Cft 1564.25
9 21 15a
Providing and fixing ” thick R.C.C manhole cover with tee
shaped C.I. frame of ” i/d (frame et weighting 37.324 Kg. Or
one mound as per Standard Drawing STD/PD No. 6, of 1977,
complete in all respect.
5.00 Each 7102.65
1 3 42i
Page 2 of 5
UC 32
10 21 13
Providing and fixing 1 ¼:x1 ¼”x / ” (31x31x5 mm) angle iron
step, in manhole chambers, including carriage and setting the
same in work to correct lines and levels.
5.00 Each 242.20
11 11 7b½” thick cement plaster 1:2 cement sand morter upto 20'
height
308.40 %Sft 2078.30
GULLY GRATING (12" X 12") 30.00 Nos
1 3 42
Earthwork excavation in open cutting for sewers and manholes
as shown in drawings including shuttering and timbering,
dressing to correct section and dimensions according to
templates and levels, and removing surface water, in all types
of soil except shingle, gravel and rock:-0-7' depth
2362.50 %0Cft 5118.60
2 7 30 Supply and filling sand under floor for 6'' i/d sewer 472.50 % Cft 1742.00
3 21 1
P/L RCC sewer pipe moulded with cement concrete in 1:1½:3
C.C. confirming to ASTM specifications C76-79 Class-II wall”B”
complete in all respects. 6" i/d
360.00 P.Rft 132.15
4 313(a),2
4a
Rehandling of earth work lead up to a single through of Khassi,
Phorah or Shoval compaction of earth(soft, ordinary of hard
soil) mixising, moistening, earth to optimum moisture content
in layer of compaction etc complete.
1890.00 %0Cft 1452.00
5 21 7-b Construction of gully grating chamber Size 12"X12" 30.00 Each 2931.85
SURFACE DRAIN
1 3 10(i)
Earthwork excavation in irrigation channels, drains, etc. to
designed section, grades and profiles, excavated material
disposed off and dressed within 50 ft. (15 m) lead:-
203.40 %0 Cft 4667.50
2 6 3 (d)
Cement concrete brick or stone ballast - / ’’ to ” guage in
foundation and plinth ratio (1:6:12)
120.00 % Cft 10672.65
3 20 1(b)(ii)
Tega formed of Pacca brick on end, laid in and over cement
sand mortar projecting to a height of not more then 6"
(150mm)top of drain along the property side where required,
laid to lines, grades, slopes, and shape according to the
engineer's drawing, 4-1/2" thick, ratio 1:5
320.00 % Rft 5839.40
4 7 4(i)Pacca brick work in foundation and plinth in cement sand
mortor ratio 1:5118.13 % Cft 18974.90
5 20 3(b)
Pacca brick work on edge, laid in reimbursement, in cement,
sand mortar, on side of drains and on other works where
required All joints to be completely filled and struck flush ratio
1:5
360.00 % Sft 8351.45
6 20 6(a)
Construction of Punjab standard drains of cement concrete 1:2
½:5 with cement concrete bedding ratio 1:6:12 complete laid
to the lines, grades, slopes and shapes,rendering exposed
surface of concrete with 1:1 cement sand mortor 1/4" (6mm)
thick, as per engineer drawings (excluding excavation ) Type I
400.00 P. Rft 102.95
Page 3 of 5
UC 32
7 6 6aii
Providing and laying reinforced cement concrete (including
prestressed concrete), using coarse sand and screened graded
and washed aggregate, in required shape and design, including
forms, moulds, shuttering, lifting, compacting, curing,
rendering and finishing exposed surface, complete (but
excluding the cost of steel reinforcement, its fabrication and
placing in position, etc.): (a) (ii)Reinforced cement concrete in
slab of raft / strip foundation base salb of column and retaining
wall etc and other structure member other than those
mentioned in 5 (a)(1) above not requiring for work (i.e)
horizental shuttering), complete in all respects:- type C
nominal mix 1:2:4
7.69 P.Cft 252.80
8 1 1
Carriage of 100 Cft. (2.83 cu.m) of all materials like stone
aggregate, spawl, kankar lime (unslaked), surkhi, etc. or 150
Cft. (4.25 cu.m) of timber, by truck or by any other means
owned by the contractor. Carriage for Bajri quiry sargodha
(Sikhan Wali) to site of work (Analysis Attached) (170Km)
6.77 %Cft 3953.70
9 6 9b
Fabrication of mild steel reinforcement for Cement concrete,
i/c cutting, bending, laying in position making joints and
fastening, including cost of binding wire and labour charges for
binding of steel reinforcement (also includes removel of rust
from bars.(Deformed bars) Grade 40
23.55 %. Kg 10736.00
PCC FLOORING
1 4 19C Dismantling cement concrete plain 1:2:4 2327.00 % Cft 6388.80
2 4 19d Dismantling cement concrete with brick aggregate 2327.00 % Cft 1742.40
3 3 17abc
Transportation of earth all types when the total distance, i.c
the lead covered in the item, is more than 1000 ft. upto 5 mile
4653.00 %0 Cft 5635.20
4 3 17abc
Filling watering ramming of earth under floor un dressed lead
upto a single throw of kassi, phora or shovel in ordinary soil,
transportation of earth all types when the total distance
includingthe lead covered up to 5 mile.
33525.00 %0 Cft 8248.80
5 6 3fCement concrete bick or stone ballast 1-1/2'' to 2'' guage in
foundation and plinth. Ratio 1:7:20.20288.00 % Cft 9346.60
6 6 5f
Cement concrete plain including placing, compacting, finishing
and curing complete (including screening and washing of stone
aggregate. Ratio 1:2:4
20288.00 % Cft 21879.00
7 1 1
Carriage of 100 Cft. (2.83 cu.m) of all materials like stone
aggregate, spawl, kankar lime (unslaked), surkhi, etc. or
150 Cft. (4.25 cu.m) of timber, by truck or by any other
means owned by the contractor..Carriage for Bajri quiry
sargodha (Sikhan Wali) to site of work (Analysis Attached) 170
km
17853.00 %Cft 3953.70
RAISING OF MAN HOLE CHAMBER3.00 Nos
1 4 19(c) Dismantling of PCC 1:2:4 9.12 %Cft 6388.80
2 7 07(i)Pacca brick work other than building upto 10ft.(3 m height)
1:3 18.00 %Cft 20797.25
3 7 10Extra for steining of well or any other circular Masonry.
18.00 %Cft 1572.85
4 11 7(b)½” thick ce e t plaster : ce e t sa d ortar
30.00 %Cft 2078.30
Page 4 of 5
UC 32
5 21 15a
Providing and fixing 6" thick R.C.C. manhole cover with tee
shaped C.I. frame of 22" I/d (frame set weighing 37.324 Kg. or
one mound as per StandardDrawing STD/PD No. 6, of 1977,
complete in all respect.
3.00 Each 7102.65
NON MRS ITEMS
1
P/L crushed stone / ” to ” gauge of approved guary under
and around RCC sewer upto half of pipe in sewer trenches as
per grade and alignment complete in all respects to the entire
satisfaction as per Engineer Incharge.
852.93 P.Cft 90.22
DEDUCTION COST OF OLD MATERIAL
1Deduction for cost of old material in shape of scrape C.I frame
and manhole cover of steel. 111.98 P.Kg 25.00
Contractor
Name & Address _____________
____________________________
CONDITIONS: -
EXECUTIVE ENGINEER
8. All the conditions of “Revised Contract Agreement” and conditions mentioned in the DNIT will form part of the agreement and binding upon the contractor.
7. The execution / completion of work strictly in accordance with the specifications, approved design / drawings and requirements of contract agreement to the entire
satisfaction of the Engineer-in-Charge will be exclusive responsibility of the contractor.
6. Any omission / error there in, for interpretation will be referred to rates standardized on the basis of “ Market Rate System” for the MRS Bi-Annual Period (1st July 2017 to 301st December 2017., in accordance with Government of the Punjab, Finance Department Notification No. RO9TECH)FD-2-3/2004, dated Lahore the 2
nd August, 2005 and
the decision of the competent authority will be final and binding upon the contractor.
1. Conditional tenders / rates will not be entertained.
GUJRANWALA
5. The work should be executed in accordance with the availability of funds as required under Rule 2.82 of B&R Code. The department will not accept any responsibility for
loss sustained by the contractor due to interruption of work as a result of shortage of funds, delay in supply of material / labour or any other reason whatsoever related for
completion of work.
3. Work must be started at site within seven days from the issuance of acceptance letter, otherwise it will be considered as rescinded automatically.
2. Construction schedule towards completion of work should be provided by the Contractor within one week of the issuance of acceptance letter.
PUBLIC HEALTH ENGG:DIVISION
9. As per Government of the Punjab, Finance Department, Notification No. RO(Tech)FD1-2/83(VI)(P) dated Lahore the 6th April, 2005, in case the total tendered amount is
less than 5% of the approved estimated (DNIT) amount, the lowest bidder will have to deposit an additional performance security from the Schedule Bank equal to the tendered
amount below estimated cost, within 15 days of submission of tenders or within expiry period of the bid, whichever is earlier.
4. Any item of work not included in this bid but during execution actually required to be executed at site will be paid after approval by the competent authority.
Page 5 of 5
ABADIES OF UC 35
Rs. 9.260 Million
Rs. 2 % Million
Description of item Quantity Unit RateRate to be quoted
by the contractor
Sr #Ch
No
Item
NoRCC SEWER
Earth work excavation in open cutting for sewer and manholes
as shown in drawing i/c shuttering, timbering, dressing to
correct section and dimensions according to templates and
levels,and removing surface water,in all types of soil except
shingle,gravel complete in all respect
0' to 7' depth 4883.00 % 0Cft 5118.60
2 7 30 Supply and filling sand under floor for 6'' i/d sewer 759.38 % Cft 1742.00
Providing laying RCC pipe sewers moulded with cement
concrete 1:1 ½ :3 conforming to ASTM specification C-76-79
Class.II wall B,including carriage of pipe from factory to site of
work,lowering in trenches to correct alignment and grade ,
jointing with rubberring cutting pipes where necessary,
testing etc. complete.
12" i/d 330.00 P.Rft 411.75
4 3 13a
Rehandling of earth work lead up to a single through of Khassi,
Phorah or Shovel compaction of earth(soft, ordinary of hard
soil) mixising, moistening, earth to optimum moisture content
in layer of compaction etc
3906.30 %0Cft 2153.70
MANHOLE CHAMBER 4' DIA 6.170' DEPTH FOR 12"dia
SEWER 5.00 Nos
Earth work excavation in open cutting for sewer and manholes
as shown in drawing i/c shuttering, timbering, dressing to
correct section and dimensions according to templates and
levels,and removing surface water,in all types of soil except
shingle,gravel complete in all respect
’ to ’- ” depth 1363.10 %0Cft 5118.60
2 6 2Dry rammad brick or stone ballast 1.5'' to 2'' (40mm to 50mm)
gauge110.45 %Cft 3894.00
3 6 3dCement concrete brick or stone ballast . ” to ” guage ratio
1:6:12 complete111.20 %Cft 10672.65
4 7 7iPacc brick work other than building upto 10ft height in cement
sand mortor Ratio 1:3196.70 %Cft 20797.25
5 7 10Extra for pacca brick work in steining of well or any other
circular masonry.196.70 %Cft 1572.85
6 6 5f
Cement concrete plain including placing, compacting, finishing
and curing complete (including screening and washing of stone
aggregate) Ratio 1:2:4
80.90 %Cft 21879.00
BID SCHEDULE
Name Of WorkCONSTRUCTION OF DRAIN, SEWERAGE PCC / RCC IN ABADIES OF UC 35 DISTRICT
GUJRANWALA. (NA-95)
Approx Cost
1 3 42
3
3
42i
Time Limit: 45 Days
Earnest Money
MRS Bi-Annual
Period (1st July 2017
to 31st December
2017)
21 3
1
Page 1 of 5
ABADIES OF UC 35
7 1 1
Carriage of 100 Cft. (2.83 cu.m) of all materials like stone
aggregate, spawl, kankar lime (unslaked), surkhi, etc. or 150
Cft. (4.25 cu.m) of timber, by truck or by any other means
owned by the contractor. Carriage for Bajri quiry sargodha
(Sikhan Wali) to site of work (Analysis Attached) 170 km
71.20 %Cft 3953.70
8 21 9Extra for making and finishing benching floor work in manhole
chamber,with 1/8" thick cement finish.62.85 % Cft 1564.25
9 21 15a
Providing and fixing ” thick R.C.C manhole cover with tee
shaped C.I. frame of ” i/d (frame et weighting 37.324 Kg. Or
one mound as per Standard Drawing STD/PD No. 6, of 1977,
complete in all respect.
5.00 Each 7102.65
10 21 13
Providing and fixing 1 ¼:x1 ¼”x / ” (31x31x5 mm) angle iron
step, in manhole chambers, including carriage and setting the
same in work to correct lines and levels.
5.00 Each 242.20
11 11 7b½” thick cement plaster 1:2 cement sand morter upto 20'
height315.25 %Sft 2078.30
GULLY GRATING (12" X 12") 10.00 Nos
1 3 42
Earthwork excavation in open cutting for sewers and manholes
as shown in drawings including shuttering and timbering,
dressing to correct section and dimensions according to
templates and levels, and removing surface water, in all types
of soil except shingle, gravel and rock:-0-7' depth
787.50 %0Cft 5118.60
2 7 30 Supply and filling sand under floor for 6'' i/d sewer 157.50 % Cft 1742.00
3 21 1
P/L RCC sewer pipe moulded with cement concrete in 1:1½:3
C.C. confirming to ASTM specifications C76-79 Class-II wall”B”
complete in all respects. 6" i/d
120.00 P.Rft 132.15
4 313(a),2
4a
Rehandling of earth work lead up to a single through of Khassi,
Phorah or Shoval compaction of earth(soft, ordinary of hard
soil) mixising, moistening, earth to optimum moisture content
in layer of compaction etc complete.
630.00 %0Cft 1452.00
5 21 7-b Construction of gully grating chamber Size 12"X12" 10.00 Each 2931.85
SURFACE DRAIN
1 3 10(i)
Earthwork excavation in irrigation channels, drains, etc. to
designed section, grades and profiles, excavated material
disposed off and dressed within 50 ft. (15 m) lead:-
254.25 %0 Cft 4667.50
2 6 3 (d)
Cement concrete brick or stone ballast - / ’’ to ” guage in
foundation and plinth ratio (1:6:12)
150.00 % Cft 10672.65
3 20 1(b)(ii)
Tega formed of Pacca brick on end, laid in and over cement
sand mortar projecting to a height of not more then 6"
(150mm)top of drain along the property side where required,
laid to lines, grades, slopes, and shape according to the
engineer's drawing, 4-1/2" thick, ratio 1:5
400.00 % Rft 5839.40
4 7 4(i)Pacca brick work in foundation and plinth in cement sand
mortor ratio 1:5154.69 % Cft 18974.90
5 20 3(b)
Pacca brick work on edge, laid in reimbursement, in cement,
sand mortar, on side of drains and on other works where
required All joints to be completely filled and struck flush ratio
1:5
450.00 % Sft 8351.45
Page 2 of 5
ABADIES OF UC 35
6 20 6(a)
Construction of Punjab standard drains of cement concrete 1:2
½:5 with cement concrete bedding ratio 1:6:12 complete laid
to the lines, grades, slopes and shapes,rendering exposed
surface of concrete with 1:1 cement sand mortor 1/4" (6mm)
thick, as per engineer drawings (excluding excavation ) Type I
500.00 P. Rft 102.95
7 6 6aii
Providing and laying reinforced cement concrete (including
prestressed concrete), using coarse sand and screened graded
and washed aggregate, in required shape and design, including
forms, moulds, shuttering, lifting, compacting, curing,
rendering and finishing exposed surface, complete (but
excluding the cost of steel reinforcement, its fabrication and
placing in position, etc.): (a) (ii)Reinforced cement concrete in
slab of raft / strip foundation base salb of column and retaining
wall etc and other structure member other than those
mentioned in 5 (a)(1) above not requiring for work (i.e)
horizental shuttering), complete in all respects:- type C
nominal mix 1:2:4
7.69 P.Cft 252.80
8 1 1
Carriage of 100 Cft. (2.83 cu.m) of all materials like stone
aggregate, spawl, kankar lime (unslaked), surkhi, etc. or 150
Cft. (4.25 cu.m) of timber, by truck or by any other means
owned by the contractor. Carriage for Bajri quiry sargodha
(Sikhan Wali) to site of work (Analysis Attached) (170Km)
6.77 %Cft 3953.70
9 6 9b
Fabrication of mild steel reinforcement for Cement concrete,
i/c cutting, bending, laying in position making joints and
fastening, including cost of binding wire and labour charges for
binding of steel reinforcement (also includes removel of rust
from bars.(Deformed bars) Grade 40
23.55 %. Kg 10736.00
PCC FLOORING
1 4 19C Dismantling cement concrete plain 1:2:4 3432.00 % Cft 6388.80
2 4 19d Dismantling cement concrete with brick aggregate 3432.00 % Cft 1742.40
3 3 17abc
Transportation of earth all types when the total distance, i.c
the lead covered in the item, is more than 1000 ft. upto 5 mile
6864.00 %0 Cft 5635.20
4 3 17abc
Filling watering ramming of earth under floor un dressed lead
upto a single throw of kassi, phora or shovel in ordinary soil,
transportation of earth all types when the total distance
includingthe lead covered up to 5 mile.
32800.00 %0 Cft 8248.80
4 6 3fCement concrete bick or stone ballast 1-1/2'' to 2'' guage in
foundation and plinth. Ratio 1:7:20.21100.00 % Cft 9346.60
5 6 5f
Cement concrete plain including placing, compacting, finishing
and curing complete (including screening and washing of stone
aggregate. Ratio 1:2:4
21100.00 % Cft 21879.00
6 1 1
Carriage of 100 Cft. (2.83 cu.m) of all materials like stone
aggregate, spawl, kankar lime (unslaked), surkhi, etc. or
150 Cft. (4.25 cu.m) of timber, by truck or by any other
means owned by the contractor..Carriage for Bajri quiry
sargodha (Sikhan Wali) to site of work (Analysis Attached) 170
km
18568.00 %Cft 3953.70
RAISING OF MAN HOLE CHAMBER2.00 Nos
1 4 19(c) Dismantling of PCC 1:2:4 6.08 %Cft 6388.80
Page 3 of 5
ABADIES OF UC 35
2 7 07(i)Pacca brick work other than building upto 10ft.(3 m height)
1:3 12.00 %Cft 20797.25
3 7 10Extra for steining of well or any other circular Masonry.
12.00 %Cft 1572.85
4 11 7(b)½” thick ce e t plaster : ce e t sa d ortar
20.00 %Cft 2078.30
5 21 15a
Providing and fixing 6" thick R.C.C. manhole cover with tee
shaped C.I. frame of 22" I/d (frame set weighing 37.324 Kg. or
one mound as per StandardDrawing STD/PD No. 6, of 1977,
complete in all respect.
2.00 Each 7102.65
SULLAGE CARRIER
1 3 10i
Earth work excavation in irrigation channel,drains, etc to
designed sanction, grades and profiles, excavated material
disposed off and dressed within 50 ft (15m) lead. (i) Ordinary
2800.00 %0 Cft 4667.50
2 6 3 (d)
Cement concrete brick or stone ballast - / ’’ to ” guage in
foundation and plinth ratio (1:6:12)
924.00 % Cft 10672.65
3 7 4(i)Pacca brick work in foundation and plinth in cement sand
mortor ratio 1:52363.00 % Cft 18974.90
4 6 5F
Cement concrete plain including placing, compacting, finishing
and curing complete (including screening and washing of stone
aggregate. Ratio 1:2:4
498.00 20823 21879.00
5 11 18aCement Pointing struck joints on wall upto to 20' height ratio
1.31750.00 %Sft 1845.40
6 6 6a(ii)c
Providing and laying reinforced cement concrete (including
prestressed concrete), using coarse sand and screened graded
and washed aggregate, in required shape and design, including
forms, moulds, shuttering, lifting, compacting, curing,
rendering and finishing exposed surface, complete (but
excluding the cost of steel reinforcement, its fabrication and
placing in position, etc.): (a) (ii)Reinforced cement concrete in
slab of raft / strip foundation base salb of column and retaining
wall etc and other structure member other than those
mentioned in 5 (a)(1) above not requiring for work (i.e)
horizental shuttering), complete in all respects:- type C
nominal mix 1:2:4
131.00 P.Cft 252.80
7 1 1
Carriage of 100 Cft. (2.83 cu.m) of all materials like stone
aggregate, spawl, kankar lime (unslaked), surkhi, etc. or 150
Cft. (4.25 cu.m) of timber, by truck or by any other means
owned by the contractor. Carriage for Bajri quiry sargodha
(Sikhan Wali) to site of work (Analysis Attached) 170 Km
554.00 % Cft 3953.70
8 6 9(b)
Fabrication of mild steel reinforcement for Cement concrete,
i/c cutting, bending, laying in position making joints and
fastening, including cost of binding wire and labour charges for
binding of steel reinforcement (also includes removel of rust
from bars.(Deformed bars) Grade 40
402.00 % Kg 10736.00
DEDUCTION COST OF OLD MATERIAL
1Deduction for cost of old material in shape of scrape C.I frame
and manhole cover of steel. 74.65 P.Kg 25.00
CONDITIONS: -
1. Conditional tenders / rates will not be entertained.
Page 4 of 5
ABADIES OF UC 35
Contractor
Name & Address _____________
____________________________ GUJRANWALA
5. The work should be executed in accordance with the availability of funds as required under Rule 2.82 of B&R Code. The department will not accept any responsibility for
loss sustained by the contractor due to interruption of work as a result of shortage of funds, delay in supply of material / labour or any other reason whatsoever related for
completion of work.
3. Work must be started at site within seven days from the issuance of acceptance letter, otherwise it will be considered as rescinded automatically.
2. Construction schedule towards completion of work should be provided by the Contractor within one week of the issuance of acceptance letter.
PUBLIC HEALTH ENGG:DIVISION
9. As per Government of the Punjab, Finance Department, Notification No. RO(Tech)FD1-2/83(VI)(P) dated Lahore the 6th April, 2005, in case the total tendered amount is
less than 5% of the approved estimated (DNIT) amount, the lowest bidder will have to deposit an additional performance security from the Schedule Bank equal to the tendered
amount below estimated cost, within 15 days of submission of tenders or within expiry period of the bid, whichever is earlier.
4. Any item of work not included in this bid but during execution actually required to be executed at site will be paid after approval by the competent authority.
EXECUTIVE ENGINEER
8. All the conditions of “Revised Contract Agreement” and conditions mentioned in the DNIT will form part of the agreement and binding upon the contractor.
7. The execution / completion of work strictly in accordance with the specifications, approved design / drawings and requirements of contract agreement to the entire
satisfaction of the Engineer-in-Charge will be exclusive responsibility of the contractor.
6. Any omission / error there in, for interpretation will be referred to rates standardized on the basis of “ Market Rate System” for the MRS Bi-Annual Period (1st July 2017 to 301st December 2017., in accordance with Government of the Punjab, Finance Department Notification No. RO9TECH)FD-2-3/2004, dated Lahore the 2
nd August, 2005 and
the decision of the competent authority will be final and binding upon the contractor.
Page 5 of 5
UC 27 (WESTERN SIDE )
Rs. 9.260 Million
Rs. 2 % Million
Description of item Quantity Unit RateRate to be quoted
by the contractor
Sr #Ch
No
Item
NoRCC SEWER
Earth work excavation in open cutting for sewer and manholes
as shown in drawing i/c shuttering, timbering, dressing to
correct section and dimensions according to templates and
levels,and removing surface water,in all types of soil except
shingle,gravel complete in all respect
0' to 7' depth 19467.00 % 0Cft 5118.60
2 7 30 Supply and filling sand under floor for 6'' i/d sewer 2016.90 % Cft 1742.00
Providing laying RCC pipe sewers moulded with cement
concrete 1:1 ½ :3 conforming to ASTM specification C-76-79
Class.II wall B,including carriage of pipe from factory to site of
work,lowering in trenches to correct alignment and grade ,
jointing with rubberring cutting pipes where necessary,
testing etc. complete.
12" i/d 886.00 P.Rft 411.75
15" i/d 401.00 P.Rft 505.50
4 3 13a
Rehandling of earth work lead up to a single through of Khassi,
Phorah or Shovel compaction of earth(soft, ordinary of hard
soil) mixising, moistening, earth to optimum moisture content
in layer of compaction etc
15573.40 %0Cft 2153.70
MANHOLE CHAMBER 4' DIA 6.170' DEPTH FOR 12"dia
SEWER 16.00 Nos
Earth work excavation in open cutting for sewer and manholes
as shown in drawing i/c shuttering, timbering, dressing to
correct section and dimensions according to templates and
levels,and removing surface water,in all types of soil except
shingle,gravel complete in all respect
’ to ’- ” depth 4361.92 %0Cft 5118.60
2 6 2Dry rammad brick or stone ballast 1.5'' to 2'' (40mm to 50mm)
gauge353.44 %Cft 3894.00
3 6 3dCement concrete brick or stone ballast . ” to ” guage ratio
1:6:12 complete355.84 %Cft 10672.65
4 7 7iPacc brick work other than building upto 10ft height in cement
sand mortor Ratio 1:3629.44 %Cft 20797.25
5 7 10Extra for pacca brick work in steining of well or any other
circular masonry.629.44 %Cft 1572.85
6 6 5f
Cement concrete plain including placing, compacting, finishing
and curing complete (including screening and washing of stone
aggregate) Ratio 1:2:4
258.88 %Cft 21879.00
3
42i
Time Limit: 45 Days
Earnest Money
MRS Bi-Annual
Period (1st July 2017
to 31st December
2017)
21 3
1 3
BID SCHEDULE
Name Of WorkCONSTRUCTION OF DRAIN, SEWERAGE PCC / RCC IN AREAS OF UC 36 DISTRICT
GUJRANWALA. (NA-95)
Approx Cost
1 3 42
Page 1 of 5
UC 27 (WESTERN SIDE )
7 1 1
Carriage of 100 Cft. (2.83 cu.m) of all materials like stone
aggregate, spawl, kankar lime (unslaked), surkhi, etc. or 150
Cft. (4.25 cu.m) of timber, by truck or by any other means
owned by the contractor. Carriage for Bajri quiry sargodha
(Sikhan Wali) to site of work (Analysis Attached) 170 km
227.84 %Cft 3953.70
8 21 9Extra for making and finishing benching floor work in manhole
chamber,with 1/8" thick cement finish.201.12 % Cft 1564.25
9 21 15a
Providing and fixing ” thick R.C.C manhole cover with tee
shaped C.I. frame of ” i/d (frame et weighting 37.324 Kg. Or
one mound as per Standard Drawing STD/PD No. 6, of 1977,
complete in all respect.
16.00 Each 7102.65
10 21 13
Providing and fixing 1 ¼:x1 ¼”x / ” (31x31x5 mm) angle iron
step, in manhole chambers, including carriage and setting the
same in work to correct lines and levels.
16.00 Each 242.20
11 11 7b½” thick cement plaster 1:2 cement sand morter upto 20'
height1008.80 %Sft 2078.30
MANHOLE CHAMBER 4' DIA 6.170' DEPTH FOR 15"dia
SEWER 6.00 Nos
Earth work excavation in open cutting for sewer and manholes
as shown in drawing i/c shuttering, timbering, dressing to
correct section and dimensions according to templates and
levels,and removing surface water,in all types of soil except
shingle,gravel complete in all respect
’ to ’- ” depth 1635.72 %0Cft 5118.60
2 6 2Dry rammad brick or stone ballast 1.5'' to 2'' (40mm to 50mm)
gauge132.54 %Cft 3894.00
3 6 3dCement concrete brick or stone ballast . ” to ” guage ratio
1:6:12 complete133.42 %Cft 10672.65
4 7 7iPacc brick work other than building upto 10ft height in cement
sand mortor Ratio 1:3229.86 %Cft 20797.25
5 7 10Extra for pacca brick work in steining of well or any other
circular masonry.229.86 %Cft 1572.85
6 6 5f
Cement concrete plain including placing, compacting, finishing
and curing complete (including screening and washing of stone
aggregate) Ratio 1:2:4
107.28 %Cft 21879.00
7 1 1
Carriage of 100 Cft. (2.83 cu.m) of all materials like stone
aggregate, spawl, kankar lime (unslaked), surkhi, etc. or 150
Cft. (4.25 cu.m) of timber, by truck or by any other means
owned by the contractor. Carriage for Bajri quiry sargodha
(Sikhan Wali) to site of work (Analysis Attached) 170 km
94.44 %Cft 3953.70
8 21 9
Extra for making and finishing benching floor work in manhole
chamber,with 1/8" thick cement finish.
75.42 % Cft 1564.25
9 21 15a
Providing and fixing ” thick R.C.C manhole cover with tee
shaped C.I. frame of ” i/d (frame et weighting 37.324 Kg. Or
one mound as per Standard Drawing STD/PD No. 6, of 1977,
complete in all respect.
6.00 Each 7102.65
1 3 42i
Page 2 of 5
UC 27 (WESTERN SIDE )
10 21 13
Providing and fixing 1 ¼:x1 ¼”x / ” (31x31x5 mm) angle iron
step, in manhole chambers, including carriage and setting the
same in work to correct lines and levels.
6.00 Each 242.20
11 11 7b½” thick cement plaster 1:2 cement sand morter upto 20'
height
370.08 %Sft 2078.30
GULLY GRATING (12" X 12") 10.00 Nos
1 3 42
Earthwork excavation in open cutting for sewers and manholes
as shown in drawings including shuttering and timbering,
dressing to correct section and dimensions according to
templates and levels, and removing surface water, in all types
of soil except shingle, gravel and rock:-0-7' depth
787.50 %0Cft 5118.60
2 7 30 Supply and filling sand under floor for 6'' i/d sewer 157.50 % Cft 1742.00
3 21 1
P/L RCC sewer pipe moulded with cement concrete in 1:1½:3
C.C. confirming to ASTM specifications C76-79 Class-II wall”B”
complete in all respects. 6" i/d
120.00 P.Rft 132.15
4 313(a),2
4a
Rehandling of earth work lead up to a single through of Khassi,
Phorah or Shoval compaction of earth(soft, ordinary of hard
soil) mixising, moistening, earth to optimum moisture content
in layer of compaction etc complete.
630.00 %0Cft 1452.00
5 21 7-b Construction of gully grating chamber Size 12"X12" 10.00 Each 2931.85
SURFACE DRAIN
1 3 10(i)
Earthwork excavation in irrigation channels, drains, etc. to
designed section, grades and profiles, excavated material
disposed off and dressed within 50 ft. (15 m) lead:-
640.71 %0 Cft 4667.50
2 6 3 (d)
Cement concrete brick or stone ballast - / ’’ to ” guage in
foundation and plinth ratio (1:6:12)
378.00 % Cft 10672.65
3 20 1(b)(ii)
Tega formed of Pacca brick on end, laid in and over cement
sand mortar projecting to a height of not more then 6"
(150mm)top of drain along the property side where required,
laid to lines, grades, slopes, and shape according to the
engineer's drawing, 4-1/2" thick, ratio 1:5
1008.00 % Rft 5839.40
4 7 4(i)Pacca brick work in foundation and plinth in cement sand
mortor ratio 1:5339.75 % Cft 18974.90
5 20 3(b)
Pacca brick work on edge, laid in reimbursement, in cement,
sand mortar, on side of drains and on other works where
required All joints to be completely filled and struck flush ratio
1:5
1134.00 % Sft 8351.45
6 20 6(a)
Construction of Punjab standard drains of cement concrete 1:2
½:5 with cement concrete bedding ratio 1:6:12 complete laid
to the lines, grades, slopes and shapes,rendering exposed
surface of concrete with 1:1 cement sand mortor 1/4" (6mm)
thick, as per engineer drawings (excluding excavation ) Type I
1260.00 P. Rft 102.95
Page 3 of 5
UC 27 (WESTERN SIDE )
7 6 6aii
Providing and laying reinforced cement concrete (including
prestressed concrete), using coarse sand and screened graded
and washed aggregate, in required shape and design, including
forms, moulds, shuttering, lifting, compacting, curing,
rendering and finishing exposed surface, complete (but
excluding the cost of steel reinforcement, its fabrication and
placing in position, etc.): (a) (ii)Reinforced cement concrete in
slab of raft / strip foundation base salb of column and retaining
wall etc and other structure member other than those
mentioned in 5 (a)(1) above not requiring for work (i.e)
horizental shuttering), complete in all respects:- type C
nominal mix 1:2:4
23.07 P.Cft 252.80
8 1 1
Carriage of 100 Cft. (2.83 cu.m) of all materials like stone
aggregate, spawl, kankar lime (unslaked), surkhi, etc. or 150
Cft. (4.25 cu.m) of timber, by truck or by any other means
owned by the contractor. Carriage for Bajri quiry sargodha
(Sikhan Wali) to site of work (Analysis Attached) (170Km)
20.30 %Cft 3953.70
9 6 9b
Fabrication of mild steel reinforcement for Cement concrete,
i/c cutting, bending, laying in position making joints and
fastening, including cost of binding wire and labour charges for
binding of steel reinforcement (also includes removel of rust
from bars.(Deformed bars) Grade 40
70.65 %. Kg 10736.00
PCC FLOORING
1 4 19C Dismantling cement concrete plain 1:2:4 495.00 % Cft 6388.80
2 4 19d Dismantling cement concrete with brick aggregate 495.00 % Cft 1742.40
3 3 17abc
Transportation of earth all types when the total distance, i.c
the lead covered in the item, is more than 1000 ft. upto 5 mile
990.00 %0 Cft 5635.20
4 3 17abc
Filling watering ramming of earth under floor un dressed lead
upto a single throw of kassi, phora or shovel in ordinary soil,
transportation of earth all types when the total distance
includingthe lead covered up to 5 mile.
47250.00 %0 Cft 8248.80
5 6 3fCement concrete bick or stone ballast 1-1/2'' to 2'' guage in
foundation and plinth. Ratio 1:7:20.19839.00 % Cft 9346.60
6 6 5f
Cement concrete plain including placing, compacting, finishing
and curing complete (including screening and washing of stone
aggregate. Ratio 1:2:4
19839.00 % Cft 21879.00
7 1 1
Carriage of 100 Cft. (2.83 cu.m) of all materials like stone
aggregate, spawl, kankar lime (unslaked), surkhi, etc. or
150 Cft. (4.25 cu.m) of timber, by truck or by any other
means owned by the contractor..Carriage for Bajri quiry
sargodha (Sikhan Wali) to site of work (Analysis Attached) 170
km
17458.00 %Cft 3953.70
RAISING OF MAN HOLE CHAMBER7.00 Nos
1 4 19(c) Dismantling of PCC 1:2:4 21.28 %Cft 6388.80
2 7 07(i)Pacca brick work other than building upto 10ft.(3 m height)
1:3 42.00 %Cft 20797.25
3 7 10Extra for steining of well or any other circular Masonry.
42.00 %Cft 1572.85
4 11 7(b)½” thick ce e t plaster : ce e t sa d ortar
70.00 %Cft 2078.30
Page 4 of 5
UC 27 (WESTERN SIDE )
5 21 15a
Providing and fixing 6" thick R.C.C. manhole cover with tee
shaped C.I. frame of 22" I/d (frame set weighing 37.324 Kg. or
one mound as per StandardDrawing STD/PD No. 6, of 1977,
complete in all respect.
7.00 Each 7102.65
NON MRS ITEMS
1
P/L crushed stone / ” to ” gauge of approved guary under
and around RCC sewer upto half of pipe in sewer trenches as
per grade and alignment complete in all respects to the entire
satisfaction as per Engineer Incharge.
1189.40 P.Cft 90.22
DEDUCTION COST OF OLD MATERIAL
1Deduction for cost of old material in shape of scrape C.I frame
and manhole cover of steel. 261.28 P.Kg 25.00
Contractor
Name & Address _____________
____________________________
CONDITIONS: -
EXECUTIVE ENGINEER
8. All the conditions of “Revised Contract Agreement” and conditions mentioned in the DNIT will form part of the agreement and binding upon the contractor.
7. The execution / completion of work strictly in accordance with the specifications, approved design / drawings and requirements of contract agreement to the entire
satisfaction of the Engineer-in-Charge will be exclusive responsibility of the contractor.
6. Any omission / error there in, for interpretation will be referred to rates standardized on the basis of “ Market Rate System” for the MRS Bi-Annual Period (1st July 2017 to 301st December 2017., in accordance with Government of the Punjab, Finance Department Notification No. RO9TECH)FD-2-3/2004, dated Lahore the 2
nd August, 2005 and
the decision of the competent authority will be final and binding upon the contractor.
1. Conditional tenders / rates will not be entertained.
GUJRANWALA
5. The work should be executed in accordance with the availability of funds as required under Rule 2.82 of B&R Code. The department will not accept any responsibility for
loss sustained by the contractor due to interruption of work as a result of shortage of funds, delay in supply of material / labour or any other reason whatsoever related for
completion of work.
3. Work must be started at site within seven days from the issuance of acceptance letter, otherwise it will be considered as rescinded automatically.
2. Construction schedule towards completion of work should be provided by the Contractor within one week of the issuance of acceptance letter.
PUBLIC HEALTH ENGG:DIVISION
9. As per Government of the Punjab, Finance Department, Notification No. RO(Tech)FD1-2/83(VI)(P) dated Lahore the 6th April, 2005, in case the total tendered amount is
less than 5% of the approved estimated (DNIT) amount, the lowest bidder will have to deposit an additional performance security from the Schedule Bank equal to the tendered
amount below estimated cost, within 15 days of submission of tenders or within expiry period of the bid, whichever is earlier.
4. Any item of work not included in this bid but during execution actually required to be executed at site will be paid after approval by the competent authority.
Page 5 of 5
Rate Amount Rate Amount
RCC SEWEREarth work excavation in open cutting for sewer and manholes as shown in drawing i/c shuttering,
timbering, dressing to correct section and dimensions according to templates and levels,and removing
surface water,in all types of soil except shingle,gravel complete in all respect
0' to 7' depth 24972.00 % 0Cft 5118.60 127822 5215.85 130250 5118.60 127822
2 Supply and filling sand under floor for 6'' i/d sewer 3019.28 % Cft 1742.00 52596 1775.10 53595 1742.00 52596
Providing laying RCC pipe sewers moulded with cement concrete 1:1 ½ :3 conforming to ASTM
specification C-76-79 Class.II wall B,including carriage of pipe from factory to site of work,lowering in
trenches to correct alignment and grade , jointing with rubberring cutting pipes where necessary,
testing etc. complete.
0.00 0 0.00
12" i/d 1330.00 P.Rft 411.75 547628 419.57 558032 411.75 547628
15" i/d 346.00 P.Rft 505.50 174903 515.10 178226 505.50 174903
4
Rehandling of earth work lead up to a single through of Khassi, Phorah or Shovel compaction of
earth(soft, ordinary of hard soil) mixising, moistening, earth to optimum moisture content in layer of
compaction etc
19977.30 %0Cft 2153.70 43025
2194.62
43843
2153.70
43025
5 #BEZUG! #BEZUG! ####### #BEZUG! #BEZUG! #BEZUG! #BEZUG! #BEZUG! #BEZUG!
MANHOLE CHAMBER 4' DIA 6.170' DEPTH FOR 12"dia SEWER 25.00 Nos
Earth work excavation in open cutting for sewer and manholes as shown in drawing i/c shuttering,
timbering, dressing to correct section and dimensions according to templates and levels,and removing
surface water,in all types of soil except shingle,gravel complete in all respect
’ to ’- ” depth 6815.50 %0Cft 5118.60 34886 5215.85 35549 5118.60 34886
2 Dry rammad brick or stone ballast 1.5'' to 2'' (40mm to 50mm) gauge 552.25 %Cft 3894.00 21505 3967.99 21913 3894.00 21505
3 Ce e t o rete ri k or sto e allast . ” to ” guage ratio : : o plete 555.90 %Cft 10672.65 59329 10875.43 60457 10672.65 59329
4 Pacc brick work other than building upto 10ft height in cement sand mortor Ratio 1:3 983.50 %Cft 20797.25 204541 21192.40 208427 20797.25 204541
5 Extra for pacca brick work in steining of well or any other circular masonry. 983.50 %Cft 1572.85 15469 1602.73 15763 1572.85 15469
6Cement concrete plain including placing, compacting, finishing and curing complete (including screening
and washing of stone aggregate) Ratio 1:2:4 404.50 %Cft 21879.00 88501 22294.70 90182 21879.00 88501
COMPARATIVE CUM FINANCIAL STATEMENT
CONSTRUCTION OF DRAIN, SEWERAGE PCC / RCC IN ABADIES OF UC 37 DISTRICT GUJRANWALA. (NA-95)
Sr # Description of item
As per T.S Estimate
Amount
M/S Pak National
Construction & Co
Govt. Contractor 1.90%
above
M/S Uptran
Construction & Co
Govt. Contractor At
Par Quantity Unit Rate
1
3
1
Page 1 of 9
7
Carriage of 100 Cft. (2.83 cu.m) of all materials like stone aggregate, spawl, kankar lime (unslaked),
surkhi, etc. or 150 Cft. (4.25 cu.m) of timber, by truck or by any other means owned by the contractor.
Carriage for Bajri quiry sargodha (Sikhan Wali) to site of work (Analysis Attached) 170 km 356.00 %Cft 3953.70 14075 4028.82 14343 3953.70 14075
8Extra for making and finishing benching floor work in manhole chamber,with 1/8" thick cement finish.
314.25 % Cft 1564.25 4916 1593.97 5009 1564.25 4916
9
Pro idi g a d fixi g ” thi k R.C.C a hole o er ith tee shaped C.I. fra e of ” i/d fra e et weighting 37.324 Kg. Or one mound as per Standard Drawing STD/PD No. 6, of 1977, complete in all
respect. 25.00 Each 7102.65 177566 7237.60 180940 7102.65 177566
10
Pro idi g a d fixi g ¼:x ¼”x / ” x x a gle iro step, i a hole ha ers, i ludi g
carriage and setting the same in work to correct lines and levels. 25.00 Each 242.20 6055 246.80 6170 242.20 6055
11 ½” thi k e e t plaster : e e t sa d orter upto ' height 1576.25 %Sft 2078.30 32759 2117.79 33382 2078.30 32759
MANHOLE CHAMBER 4' DIA 6.170' DEPTH FOR 15"dia SEWER 6.00 Nos
Earth work excavation in open cutting for sewer and manholes as shown in drawing i/c shuttering,
timbering, dressing to correct section and dimensions according to templates and levels,and removing
surface water,in all types of soil except shingle,gravel
’to ’- ” depth 1635.72 %0Cft 5118.60 8373 5215.85 8532 5118.60 8373
2 Dry rammad brick or stone ballast 1.5'' to 2'' (40mm to 50mm) gauge132.54 %Cft 3894.00 5161 3967.99 5259 3894.00 5161
3 Ce e t o rete ri k or sto e allast . ” to ” guage ratio : : o plete 133.42 %Cft 10672.65 14239 10875.43 14510 10672.65 14239
4Pacc brick work other than building upto 10ft height in cement sand mortor Ratio 1:3
229.86 %Cft 20797.25 47805 21192.40 48713 20797.25 47805
5 Extra for pacca brick work in steining of well or any other circular masonry. 229.86 %Cft 1572.85 3615 1602.73 3684 1572.85 3615
6Cement concrete plain including placing,compacting,finishing and curing complete (including screening
and washing of stone aggregate) Ratio 1:2:4 107.28 %Cft 21879.00 23472 22294.70 23918 21879.00 23472
7
Carriage of 100 Cft. (2.83 cu.m) of all materials like stone aggregate, spawl, kankar lime (unslaked),
surkhi, etc. or 150 Cft. (4.25 cu.m) of timber, by truck or by any other means owned by the
contractor..Carriage for Bajri quiry sargodha (Sikhan Wali) 94.44 %Cft 3953.70 3734 4028.82 3805 3953.70 3734
8Extra for making and finishing benching floor work in manhole chamber,with 1/8" thick cement finish.
75.42 % Cft 1564.25 1180 1593.97 1202 1564.25 1180
9
Pro idi g a d fixi g ” thi k R.C.C a hole o er ith tee shaped C.I. fra e of ” i/d fra e et
weighting 37.324 Kg. Or one mound as per Standard Drawing STD/PD No. 6, of 1977, complete in all
respect. 6.00 Each 7102.65 42616 7237.60 43426 7102.65 42616
10
Pro idi g a d fixi g ¼:x ¼”x / ” x x a gle iro step, i a hole ha ers, i ludi g
carriage and setting the same in work to correct lines and levels. 6.00 Each 242.20 1453 246.80 1481 242.20 1453
11 ½” thi k e e t plaster : e e t sa d orter upto ' height 370.08 %Sft 2078.30 7691 2117.79 7838 2078.30 7691
GULLY GRATING (12" X 12") 20.00 Nos
1
Earthwork excavation in open cutting for sewers and manholes as shown in drawings including shuttering
and timbering, dressing to correct section and dimensions according to templates and levels, and
removing surface water, in all types of soil except shingle, gravel and rock:-0-7' depth 1575.00 %0Cft 5118.60 8062 5215.85 8215 5118.60 8062
2 Supply and filling sand under floor for 6'' i/d sewer 315.00 % Cft 1742.00 5487 1775.10 5592 1742.00 5487
1
Page 2 of 9
3P/L RCC sewer pipe moulded with cement concrete in 1:1½:3 C.C. confirming to ASTM specifications C76-
Class-II all”B” o plete i all respe ts. " i/d 240.00 P.Rft 132.15 31716 134.66 32319 132.15 31716
Page 3 of 9
4
Rehandling of earth work lead up to a single through of Khassi, Phorah or Shoval compaction of
earth(soft, ordinary of hard soil) mixising, moistening, earth to optimum moisture content in layer of
compaction etc complete. 1260.00 %0Cft 1452.00 1830 1479.59 1864 1452.00 1830
5 Construction of gully grating chamber Size 12"X12" 20.00 Each 2931.85 58637 2987.56 59751 2931.85 58637
#BEZUG!
1 #BEZUG! #BEZUG! #BEZUG! #BEZUG! #BEZUG! #BEZUG! #BEZUG! #BEZUG! #BEZUG!
2 #BEZUG! #BEZUG! #BEZUG! #BEZUG! #BEZUG! #BEZUG! #BEZUG! #BEZUG! #BEZUG!
3 #BEZUG! #BEZUG! #BEZUG! #BEZUG! #BEZUG! #BEZUG! #BEZUG! #BEZUG! #BEZUG!
4 #BEZUG! #BEZUG! #BEZUG! #BEZUG! #BEZUG! #BEZUG! #BEZUG! #BEZUG! #BEZUG!
5 #BEZUG! #BEZUG! #BEZUG! #BEZUG! #BEZUG! #BEZUG! #BEZUG! #BEZUG! #BEZUG!
6 #BEZUG! #BEZUG! #BEZUG! #BEZUG! #BEZUG! #BEZUG! #BEZUG! #BEZUG! #BEZUG!
7 #BEZUG! #BEZUG! #BEZUG! #BEZUG! #BEZUG! #BEZUG! #BEZUG! #BEZUG! #BEZUG!
NON MRS ITEMS
1
P/L crushed stone / ” to ” gauge of approved guary under and around RCC sewer upto half
of pipe in sewer trenches as per grade and alignment complete in all respects to the entire
satisfaction as per Engineer Incharge. 1017.25 P.Cft 90.22 91776 91.93 93520 90.22 91776
Total #BEZUG! #BEZUG! #BEZUG!
Lowest
As per comparative cum financial statement the bid value of lowest bidder M/S Uptran Construction & Co Govt. Contractor worked out and
comes to Rs.9702444 /- against T.S. estimate / DNIT cost of Rs.9702444/- which is AT PAR. Thus tender is recommended for approvel in respect of M/S Uptran
Construction & Co Govt. Contractor please.
EXECUTIVE ENGINEER
PUBLIC HEALTH ENGG:DIVISION
GUJRANWALA
Note:-
Page 4 of 9
ABADIES OF UC 37
Rs. 9.260 Million
Rs. 2 % Million
Description of item Quantity Unit RateRate to be quoted
by the contractor
Sr #Ch
No
Item
NoRCC SEWER
Earth work excavation in open cutting for sewer and manholes
as shown in drawing i/c shuttering, timbering, dressing to
correct section and dimensions according to templates and
levels,and removing surface water,in all types of soil except
shingle,gravel complete in all respect
0' to 7' depth 24972.00 % 0Cft 5118.60
2 7 30 Supply and filling sand under floor for 6'' i/d sewer 3019.28 % Cft 1742.00
Providing laying RCC pipe sewers moulded with cement
concrete 1:1 ½ :3 conforming to ASTM specification C-76-79
Class.II wall B,including carriage of pipe from factory to site of
work,lowering in trenches to correct alignment and grade ,
jointing with rubberring cutting pipes where necessary,
testing etc. complete.
12" i/d 1330.00 P.Rft 411.75
15" i/d 346.00 P.Rft 505.50
4 3 13a
Rehandling of earth work lead up to a single through of Khassi,
Phorah or Shovel compaction of earth(soft, ordinary of hard
soil) mixising, moistening, earth to optimum moisture content
in layer of compaction etc
19977.30 %0Cft 2153.70
MANHOLE CHAMBER 4' DIA 6.170' DEPTH FOR 12"dia
SEWER 25.00 Nos
Earth work excavation in open cutting for sewer and manholes
as shown in drawing i/c shuttering, timbering, dressing to
correct section and dimensions according to templates and
levels,and removing surface water,in all types of soil except
shingle,gravel complete in all respect
’ to ’- ” depth 6815.50 %0Cft 5118.60
2 6 2Dry rammad brick or stone ballast 1.5'' to 2'' (40mm to 50mm)
gauge552.25 %Cft 3894.00
3 6 3dCement concrete brick or stone ballast . ” to ” guage ratio
1:6:12 complete555.90 %Cft 10672.65
4 7 7iPacc brick work other than building upto 10ft height in cement
sand mortor Ratio 1:3983.50 %Cft 20797.25
5 7 10Extra for pacca brick work in steining of well or any other
circular masonry.983.50 %Cft 1572.85
6 6 5f
Cement concrete plain including placing, compacting, finishing
and curing complete (including screening and washing of stone
aggregate) Ratio 1:2:4
404.50 %Cft 21879.00
3
42i
Time Limit: 45 Days
Earnest Money
MRS Bi-Annual
Period (1st July 2017
to 31st December
2017)
21 3
1 3
BID SCHEDULE
Name Of WorkCONSTRUCTION OF DRAIN, SEWERAGE PCC / RCC IN ABADIES OF UC 37 DISTRICT
GUJRANWALA. (NA-95)
Approx Cost
1 3 42
Page 5 of 9
ABADIES OF UC 37
7 1 1
Carriage of 100 Cft. (2.83 cu.m) of all materials like stone
aggregate, spawl, kankar lime (unslaked), surkhi, etc. or 150
Cft. (4.25 cu.m) of timber, by truck or by any other means
owned by the contractor. Carriage for Bajri quiry sargodha
(Sikhan Wali) to site of work (Analysis Attached) 170 km
356.00 %Cft 3953.70
8 21 9Extra for making and finishing benching floor work in manhole
chamber,with 1/8" thick cement finish.314.25 % Cft 1564.25
9 21 15a
Providing and fixing ” thick R.C.C manhole cover with tee
shaped C.I. frame of ” i/d (frame et weighting 37.324 Kg. Or
one mound as per Standard Drawing STD/PD No. 6, of 1977,
complete in all respect.
25.00 Each 7102.65
10 21 13
Providing and fixing 1 ¼:x1 ¼”x / ” (31x31x5 mm) angle iron
step, in manhole chambers, including carriage and setting the
same in work to correct lines and levels.
25.00 Each 242.20
11 11 7b½” thick cement plaster 1:2 cement sand morter upto 20'
height1576.25 %Sft 2078.30
MANHOLE CHAMBER 4' DIA 6.170' DEPTH FOR 15"dia
SEWER 6.00 Nos
Earth work excavation in open cutting for sewer and manholes
as shown in drawing i/c shuttering, timbering, dressing to
correct section and dimensions according to templates and
levels,and removing surface water,in all types of soil except
shingle,gravel complete in all respect
’ to ’- ” depth 1635.72 %0Cft 5118.60
2 6 2Dry rammad brick or stone ballast 1.5'' to 2'' (40mm to 50mm)
gauge132.54 %Cft 3894.00
3 6 3dCement concrete brick or stone ballast . ” to ” guage ratio
1:6:12 complete133.42 %Cft 10672.65
4 7 7iPacc brick work other than building upto 10ft height in cement
sand mortor Ratio 1:3229.86 %Cft 20797.25
5 7 10Extra for pacca brick work in steining of well or any other
circular masonry.229.86 %Cft 1572.85
6 6 5f
Cement concrete plain including placing, compacting, finishing
and curing complete (including screening and washing of stone
aggregate) Ratio 1:2:4
107.28 %Cft 21879.00
7 1 1
Carriage of 100 Cft. (2.83 cu.m) of all materials like stone
aggregate, spawl, kankar lime (unslaked), surkhi, etc. or 150
Cft. (4.25 cu.m) of timber, by truck or by any other means
owned by the contractor. Carriage for Bajri quiry sargodha
(Sikhan Wali) to site of work (Analysis Attached) 170 km
94.44 %Cft 3953.70
8 21 9
Extra for making and finishing benching floor work in manhole
chamber,with 1/8" thick cement finish.
75.42 % Cft 1564.25
9 21 15a
Providing and fixing ” thick R.C.C manhole cover with tee
shaped C.I. frame of ” i/d (frame et weighting 37.324 Kg. Or
one mound as per Standard Drawing STD/PD No. 6, of 1977,
complete in all respect.
6.00 Each 7102.65
1 3 42i
Page 6 of 9
ABADIES OF UC 37
10 21 13
Providing and fixing 1 ¼:x1 ¼”x / ” (31x31x5 mm) angle iron
step, in manhole chambers, including carriage and setting the
same in work to correct lines and levels.
6.00 Each 242.20
11 11 7b½” thick cement plaster 1:2 cement sand morter upto 20'
height
370.08 %Sft 2078.30
GULLY GRATING (12" X 12") 20.00 Nos
1 3 42
Earthwork excavation in open cutting for sewers and manholes
as shown in drawings including shuttering and timbering,
dressing to correct section and dimensions according to
templates and levels, and removing surface water, in all types
of soil except shingle, gravel and rock:-0-7' depth
1575.00 %0Cft 5118.60
2 7 30 Supply and filling sand under floor for 6'' i/d sewer 315.00 % Cft 1742.00
3 21 1
P/L RCC sewer pipe moulded with cement concrete in 1:1½:3
C.C. confirming to ASTM specifications C76-79 Class-II all”B”
complete in all respects. 6" i/d
240.00 P.Rft 132.15
4 313(a),2
4a
Rehandling of earth work lead up to a single through of Khassi,
Phorah or Shoval compaction of earth(soft, ordinary of hard
soil) mixising, moistening, earth to optimum moisture content
in layer of compaction etc complete.
1260.00 %0Cft 1452.00
5 21 7-b Construction of gully grating chamber Size 12"X12" 20.00 Each 2931.85
SURFACE DRAIN
1 3 10(i)
Earthwork excavation in irrigation channels, drains, etc. to
designed section, grades and profiles, excavated material
disposed off and dressed within 50 ft. (15 m) lead:-
1454.31 %0 Cft 4667.50
2 6 3 (d)
Cement concrete brick or stone ballast - / ’’ to ” guage in
foundation and plinth ratio (1:6:12)
858.00 % Cft 10672.65
3 20 1(b)(ii)
Tega formed of Pacca brick on end, laid in and over cement
sand mortar projecting to a height of not more then 6"
(150mm)top of drain along the property side where required,
laid to lines, grades, slopes, and shape according to the
engineer's drawing, 4-1/2" thick, ratio 1:5
2288.00 % Rft 5839.40
4 7 4(i)Pacca brick work in foundation and plinth in cement sand
mortor ratio 1:5816.94 % Cft 18974.90
5 20 3(b)
Pacca brick work on edge, laid in reimbursement, in cement,
sand mortar, on side of drains and on other works where
required All joints to be completely filled and struck flush ratio
1:5
2574.00 % Sft 8351.45
6 20 6(a)
Construction of Punjab standard drains of cement concrete 1:2
½:5 with cement concrete bedding ratio 1:6:12 complete laid
to the lines, grades, slopes and shapes,rendering exposed
surface of concrete with 1:1 cement sand mortor 1/4" (6mm)
thick, as per engineer drawings (excluding excavation ) Type I
2860.00 P. Rft 102.95
Page 7 of 9
ABADIES OF UC 37
7 6 6aii
Providing and laying reinforced cement concrete (including
prestressed concrete), using coarse sand and screened graded
and washed aggregate, in required shape and design, including
forms, moulds, shuttering, lifting, compacting, curing,
rendering and finishing exposed surface, complete (but
excluding the cost of steel reinforcement, its fabrication and
placing in position, etc.): (a) (ii)Reinforced cement concrete in
slab of raft / strip foundation base salb of column and retaining
wall etc and other structure member other than those
mentioned in 5 (a)(1) above not requiring for work (i.e)
horizental shuttering), complete in all respects:- type C
nominal mix 1:2:4
76.89 P.Cft 252.80
8 1 1
Carriage of 100 Cft. (2.83 cu.m) of all materials like stone
aggregate, spawl, kankar lime (unslaked), surkhi, etc. or 150
Cft. (4.25 cu.m) of timber, by truck or by any other means
owned by the contractor. Carriage for Bajri quiry sargodha
(Sikhan Wali) to site of work (Analysis Attached) (170Km)
67.66 %Cft 3953.70
9 6 9b
Fabrication of mild steel reinforcement for Cement concrete,
i/c cutting, bending, laying in position making joints and
fastening, including cost of binding wire and labour charges for
binding of steel reinforcement (also includes removel of rust
from bars.(Deformed bars) Grade 40
235.48 %. Kg 10736.00
PCC FLOORING
1 4 19C Dismantling cement concrete plain 1:2:4 1624.00 % Cft 6388.80
2 4 19d Dismantling cement concrete with brick aggregate 1624.00 % Cft 1742.40
3 3 17abc
Transportation of earth all types when the total distance, i.c
the lead covered in the item, is more than 1000 ft. upto 5 mile
3247.00 %0 Cft 5635.20
4 3 17abc
Filling watering ramming of earth under floor un dressed lead
upto a single throw of kassi, phora or shovel in ordinary soil,
transportation of earth all types when the total distance
includingthe lead covered up to 5 mile.
40690.00 %0 Cft 8248.80
5 6 3fCement concrete bick or stone ballast 1-1/2'' to 2'' guage in
foundation and plinth. Ratio 1:7:20.16792.00 % Cft 9346.60
6 6 5f
Cement concrete plain including placing, compacting, finishing
and curing complete (including screening and washing of stone
aggregate. Ratio 1:2:4
16792.00 % Cft 21879.00
7 1 1
Carriage of 100 Cft. (2.83 cu.m) of all materials like stone
aggregate, spawl, kankar lime (unslaked), surkhi, etc. or
150 Cft. (4.25 cu.m) of timber, by truck or by any other
means owned by the contractor..Carriage for Bajri quiry
sargodha (Sikhan Wali) to site of work (Analysis Attached) 170
km
14777.00 %Cft 3953.70
RAISING OF MAN HOLE CHAMBER 5.00 Nos
1 4 19(c) Dismantling of PCC 1:2:4 15.20 %Cft 6388.80
2 7 07(i)Pacca brick work other than building upto 10ft.(3 m height)
1:3 30.00 %Cft 20797.25
3 7 10Extra for steining of well or any other circular Masonry.
30.00 %Cft 1572.85
4 11 7(b)½” thi k e e t plaster : e e t sa d ortar
50.00 %Cft 2078.30
Page 8 of 9
ABADIES OF UC 37
5 21 15a
Providing and fixing 6" thick R.C.C. manhole cover with tee
shaped C.I. frame of 22" I/d (frame set weighing 37.324 Kg. or
one mound as per StandardDrawing STD/PD No. 6, of 1977,
complete in all respect.
5.00 Each 7102.65
NON MRS ITEMS
1
P/L crushed stone / ” to ” gauge of approved guary under
and around RCC sewer upto half of pipe in sewer trenches as
per grade and alignment complete in all respects to the entire
satisfaction as per Engineer Incharge.
1017.25 P.Cft 90.22
DEDUCTION COST OF OLD MATERIAL
1Deduction for cost of old material in shape of scrape C.I frame
and manhole cover of steel. 186.63 P.Kg 25.00
Contractor
Name & Address _____________
____________________________
CONDITIONS: -
EXECUTIVE ENGINEER
8. All the conditions of “Revised Contract Agreement” and conditions mentioned in the DNIT will form part of the agreement and binding upon the contractor.
7. The execution / completion of work strictly in accordance with the specifications, approved design / drawings and requirements of contract agreement to the entire
satisfaction of the Engineer-in-Charge will be exclusive responsibility of the contractor.
6. Any omission / error there in, for interpretation will be referred to rates standardized on the basis of “ Market Rate System” for the MRS Bi-Annual Period (1st July 2017 to 301st December 2017., in accordance with Government of the Punjab, Finance Department Notification No. RO9TECH)FD-2-3/2004, dated Lahore the 2
nd August, 2005 and
the decision of the competent authority will be final and binding upon the contractor.
1. Conditional tenders / rates will not be entertained.
GUJRANWALA
5. The work should be executed in accordance with the availability of funds as required under Rule 2.82 of B&R Code. The department will not accept any responsibility for
loss sustained by the contractor due to interruption of work as a result of shortage of funds, delay in supply of material / labour or any other reason whatsoever related for
completion of work.
3. Work must be started at site within seven days from the issuance of acceptance letter, otherwise it will be considered as rescinded automatically.
2. Construction schedule towards completion of work should be provided by the Contractor within one week of the issuance of acceptance letter.
PUBLIC HEALTH ENGG:DIVISION
9. As per Government of the Punjab, Finance Department, Notification No. RO(Tech)FD1-2/83(VI)(P) dated Lahore the 6th April, 2005, in case the total tendered amount is
less than 5% of the approved estimated (DNIT) amount, the lowest bidder will have to deposit an additional performance security from the Schedule Bank equal to the tendered
amount below estimated cost, within 15 days of submission of tenders or within expiry period of the bid, whichever is earlier.
4. Any item of work not included in this bid but during execution actually required to be executed at site will be paid after approval by the competent authority.