AREVA Wind

Company and project overview

13th – 14th of May 2014

Page 3: AREVA Wind - yrityksen perustaminen ja kehittä · PDF fileAgenda AREVA Renewables AREVA Wind Focus on AREVA Winds projects AREVA Wind – Company and project overview p. 3

Agenda

AREVA Renewables

AREVA Wind

Focus on AREVA Winds projects

AREVA Wind – Company and project overview p. 3

Page 4: AREVA Wind - yrityksen perustaminen ja kehittä · PDF fileAgenda AREVA Renewables AREVA Wind Focus on AREVA Winds projects AREVA Wind – Company and project overview p. 3

World leader in nuclear energy

An unique integrated model, from mining, reactor design and

back end solutions to recycling of fuel elements.

A key player in the Renewable Energies

Portfolio of diversified markets: Offshore Wind, concentrated

solar energy, bioenergy, H2 energy storage

AREVA offers solutions for power production with less CO2

Nuclear and Renewable Energy combining a synergetic and ecological energy mix with less CO2

AREVA Wind – Company and project overview p. 4

Page 5: AREVA Wind - yrityksen perustaminen ja kehittä · PDF fileAgenda AREVA Renewables AREVA Wind Focus on AREVA Winds projects AREVA Wind – Company and project overview p. 3

Nuclear and renewables: a well-rounded offering

AREVA Wind – Company and project overview p. 5

Page 6: AREVA Wind - yrityksen perustaminen ja kehittä · PDF fileAgenda AREVA Renewables AREVA Wind Focus on AREVA Winds projects AREVA Wind – Company and project overview p. 3

AREVA Renewables: a low-carbon portfolio with a strong track-record

Offshore Wind Concentrated Solar

Power Bioenergy Energy Storage

Supplying and installing

120 turbines with a 600

MW output (Global Tech I

& Trianel Windpark

Borkum)

Increasing production

capacity (3-fold)

More than 100 projects

worldwide totalizing over

2.5 GW

35 years of experience

125 MW solar thermal

project selected by

Reliance, a major

developer in India

300 MWe in operation,

construction and

advanced development

Decentralized systems for

storing and generating

power with or without

renewable energy sources

Myrte storage system

(500 KWc)

AREVA Wind – Company and project overview p. 6

Page 7: AREVA Wind - yrityksen perustaminen ja kehittä · PDF fileAgenda AREVA Renewables AREVA Wind Focus on AREVA Winds projects AREVA Wind – Company and project overview p. 3

Agenda

AREVA Renewables

AREVA Wind

Focus on AREVA Winds projects

AREVA Wind – Company and project overview p. 7

Page 8: AREVA Wind - yrityksen perustaminen ja kehittä · PDF fileAgenda AREVA Renewables AREVA Wind Focus on AREVA Winds projects AREVA Wind – Company and project overview p. 3

AREVA Wind customer value proposition

Offering comprehensive solutions to our customers based on our proven M5000 platform and strategic alliances with best-in-class partners.

►…M5000

delivered FAS

►…Installation

through

strategic

partnership

►…Full long

term OMS

package

AREVA Wind – Company and project overview p. 8

Page 9: AREVA Wind - yrityksen perustaminen ja kehittä · PDF fileAgenda AREVA Renewables AREVA Wind Focus on AREVA Winds projects AREVA Wind – Company and project overview p. 3

AREVA Wind industrial footprint

Bremerhaven (nacelles

and pre-commissioning

center) and Stade (blades)

2008

Le Havre

2015

UK industrial base

Site selection ongoing

A consistent set-up for optimized logistics and security of supply.

A flexible capacity of up to 300 machines per year.

AREVA Wind – Company and project overview p. 9

Page 10: AREVA Wind - yrityksen perustaminen ja kehittä · PDF fileAgenda AREVA Renewables AREVA Wind Focus on AREVA Winds projects AREVA Wind – Company and project overview p. 3

Development of our offshore technology to serial production and installation

2001 Start design of

the 5 MW

turbine

2004 Installation first

prototype onshore in

Bremerhaven

2007 Inauguration

production hall

2011 Inauguration full load test

bench

Late

90’ies First patent

of Aerodyn

2006 One more

prototype on a

tripod

2009 Six turbines in alpha

ventus

2010-2012 Increased production

output

2013 Intensive

installation

phase and

prototype

erecting of the

M5000-135

2008 Two more

prototypes of the

M5000

technology

2009 Former PN Rotor

bought by AREVA

– AREVA Blades

AREVA Wind – Company and project overview p. 10

Page 11: AREVA Wind - yrityksen perustaminen ja kehittä · PDF fileAgenda AREVA Renewables AREVA Wind Focus on AREVA Winds projects AREVA Wind – Company and project overview p. 3

Serial production Bremerhaven – Wind turbine manufacturing Stade – Blade manufacturing

Final assembly and turbine test (100%

of the turbines are full load teste Blade production

AREVA Wind – Company and project overview p. 11

Page 12: AREVA Wind - yrityksen perustaminen ja kehittä · PDF fileAgenda AREVA Renewables AREVA Wind Focus on AREVA Winds projects AREVA Wind – Company and project overview p. 3

German industrial base relying on a strong network of local suppliers

►Hydac System

►RENK AG

►Siempelkamp

►SSB, D

►Buderus

►Nacelle steel structure and

sunroof

►Deutsche

mechatronic

►(Air treatment)

►FAG Schaeffer ►Grossman

►Coswig

►Rother Erde

►Nexans

►Bremerhaven ►Stade

►Ambau

►Beckhoff

►Jovyatlas

►Siempelkamp ►Buderus

►Schneider Electric

►FWH

►AREVA’s main component suppliers – Illustrative

AREVA Wind – Company and project overview p. 12

Page 13: AREVA Wind - yrityksen perustaminen ja kehittä · PDF fileAgenda AREVA Renewables AREVA Wind Focus on AREVA Winds projects AREVA Wind – Company and project overview p. 3

Production facility Bremerhaven „Fischereihafen Süd“

►Offshore Terminal (planned)

► Airport

► Site 2

► Main Site

► Site 4

►Main Site (Am Lunedeich)

• Nacelle pre-asembly

• Nacelle final assembly

• S3 final assembly

► Site 3

►Site 2 (JHK)

• Nacell pre-assembly

• Hub assembly

►Site 3 (USM)

• S3 Section pre-assembly

►Site 4 (Seewindstraße)

• 5MW Test bench

• Storage area for WGT

AREVA Wind production facility overview

AREVA Wind – Company and project overview p. 13

Page 14: AREVA Wind - yrityksen perustaminen ja kehittä · PDF fileAgenda AREVA Renewables AREVA Wind Focus on AREVA Winds projects AREVA Wind – Company and project overview p. 3

Ramp up in 500 kW steps

Increased power to 3 MW, over 3

hours

1. endoscopy of the gearbox and

oil samples

Increased power to 5 MW, over 4

hours

2. endoscopy of the gearbox and

oil samples

Power 5 MW, over 12 hours

1. High reliability

2. Shortened commissioning offshore

3. Tests (capacity of 100 tests p.a.)

A 2.5-day test program for each

turbine

AREVA Test bench unique within the industry

AREVA Wind – Company and project overview p. 14

Page 15: AREVA Wind - yrityksen perustaminen ja kehittä · PDF fileAgenda AREVA Renewables AREVA Wind Focus on AREVA Winds projects AREVA Wind – Company and project overview p. 3

Illustration of AREVA Winds milestones

Highlights

First M5000 since 2004 in operation.

Successfully increased the production output from

17 nacelles in 2011 to 51 in 2012.

Fully functional supply chain of main components

and proactive supplier management.

The world‘s first serial 5 MW full load test bench.

Delivering 40 turbines for Trianel Windpark Borkum.

Delivering 80 turbines for Global Tech I.

2013 M5000-135 Prototype, evolution of the proven

M5000 technology.

AREVA Wind – Company and project overview p. 15

Page 16: AREVA Wind - yrityksen perustaminen ja kehittä · PDF fileAgenda AREVA Renewables AREVA Wind Focus on AREVA Winds projects AREVA Wind – Company and project overview p. 3

Safety is our first priority

Up to now without offshore accident

(Training center and seminars and a high

safety standard at AREVA are essential for

each offshore job for all of our

employees.)

AREVA Wind – Company and project overview p. 16

Page 17: AREVA Wind - yrityksen perustaminen ja kehittä · PDF fileAgenda AREVA Renewables AREVA Wind Focus on AREVA Winds projects AREVA Wind – Company and project overview p. 3

AREVA Wind M5000 technology

Leading to a light weight and robust 5 MW technology platform dedicated to offshore.

AREVA Wind – Company and project overview p. 17

Page 18: AREVA Wind - yrityksen perustaminen ja kehittä · PDF fileAgenda AREVA Renewables AREVA Wind Focus on AREVA Winds projects AREVA Wind – Company and project overview p. 3

Learning curve: An innovative concept

►Multibrid „Medium-speed drivetrain“ concept

►Air Treatment system

►Rotor blades

carbon fibre

reinforced

►Redundant

systems for high

reliability

AREVA Wind – Company and project overview p. 18

Page 19: AREVA Wind - yrityksen perustaminen ja kehittä · PDF fileAgenda AREVA Renewables AREVA Wind Focus on AREVA Winds projects AREVA Wind – Company and project overview p. 3

The M5000 Platform

M5000-116 M5000-135 Diff. Rated power 5,000 kW Rated power 5,050 kW 1%

Rotor diameter 116m Rotor diameter 135m 16.5%

Swept area 10,568 m2 Swept area 14,313 m2 35.5%

Top head mass 345 T Top head mass 375 T 4.0%

Type class / Market GL-TK 1B / Germany Type class/Market

GL-TK 1B & GL-TK

S

/ Germany, France,

UK

N/A

Design life time 20 Years Design life time 20 Years 0%

AEP @10m/s Rayleigh 23,08 GWh AEP @10m/s Rayleigh 25,3 GWh 9.8%

Serial production start 2008 Serial production start 2014 N/A

AREVA Wind – Company and project overview p. 19

Page 20: AREVA Wind - yrityksen perustaminen ja kehittä · PDF fileAgenda AREVA Renewables AREVA Wind Focus on AREVA Winds projects AREVA Wind – Company and project overview p. 3

In early 2011, the French government announced that it was issuing an international call for bids

for the installation of a total of 3 GW of offshore wind capacity.

The consortium Ailes Marines partnering Iberdrole, Eole RES, Neoen Marine, and AREVA was

awarded the Saint-Brieuc Bay project : a 500 MW wind farm located over 16 km from the shore, to

be installed between 2018 and 2020

A new call for tender was announced in 2013, for 1 GW with two field : Le Treport and

Noirmoutier-Yeu

AREVA is associated with GDF Suez, EDPR and Neoen Marine for those two projects

Bids will be submitted on November 29th.

To supply the French projects, as well as Belgium and the Southern UK, AREVA will settle an

industrial base in Le Havre to produce nacelle and blades

A local supply chain is being built to associate French companies in the offshore wind

development

Development AREVA Wind in France

AREVA Wind – Company and project overview p. 20

Page 21: AREVA Wind - yrityksen perustaminen ja kehittä · PDF fileAgenda AREVA Renewables AREVA Wind Focus on AREVA Winds projects AREVA Wind – Company and project overview p. 3

Agenda

AREVA Renewables

AREVA Wind

Focus on AREVA Winds projects

AREVA Wind – Company and project overview p. 21

Page 22: AREVA Wind - yrityksen perustaminen ja kehittä · PDF fileAgenda AREVA Renewables AREVA Wind Focus on AREVA Winds projects AREVA Wind – Company and project overview p. 3

AREVA Wind Projects alpha ventus

Commissioned in 2009

Key facts

Location German North Sea

Capacity 30MW (6 M5000 wind turbines)

Coast distance 56km

Water depth ~ 30m

Timeline

Customer DOTI (Eon, Vattenfall and EWE)

AREVA Wind – Company and project overview p. 22

Page 23: AREVA Wind - yrityksen perustaminen ja kehittä · PDF fileAgenda AREVA Renewables AREVA Wind Focus on AREVA Winds projects AREVA Wind – Company and project overview p. 3

The evolution of the M5000 technology M5000-135 prototype

Key facts

Location

Hub height

Rotor diameter

Rated power

Foundation

Installation

Hybrid tower

A27 motor way/Bremerhaven

130 m

135 m

5 MW

2013

Highlights

First M5000-135 in operation since October 2013.

Complete offshore nacelle design.

Concrete tower height 51,5 meter, Total height

above ground 197,2 m.

Top head mass 370 tons.

Owner Infra Fürth/Herzo Werke

AREVA Wind – Company and project overview p. 23

Page 24: AREVA Wind - yrityksen perustaminen ja kehittä · PDF fileAgenda AREVA Renewables AREVA Wind Focus on AREVA Winds projects AREVA Wind – Company and project overview p. 3

AREVA Wind Projects Trianel Windpark Borkum

200MW (40 M5000-116 wind turbines)

Key facts

Location German North Sea

Capacity

Coast distance 45km off Borkum

Water depth 28 to 36m

Timeline Installation und execution since July 2013

Customer Trianel (municipal suppliers)

Total number of wind turbines: 40

Base port: Eemshaven

Installation vessel: MPI Adventure

17 turbines installed (as of: 13th Jan. 2014)

Installation about to be finalized.

AREVA Wind – Company and project overview p. 24

Page 25: AREVA Wind - yrityksen perustaminen ja kehittä · PDF fileAgenda AREVA Renewables AREVA Wind Focus on AREVA Winds projects AREVA Wind – Company and project overview p. 3

AREVA Wind Projects Global Tech I

Key facts

Location

Capacity

Coast distance

Water depth

Timeline

Customer

German North Sea

400 MW (80 M5000-116 wind turbines)

~110 km

~ 40 m

Installation und execution since Aug. 2013

Municipal suppliers/Developers

Total number of wind turbines: 80

Base port: Bremerhaven/Jade-Weser-Port.

Installation vessel: THOR/Brav-Tern/Vidar

First turbines installed.

Almost 60 turbines installed.

AREVA Wind – Company and project overview p. 25

Page 26: AREVA Wind - yrityksen perustaminen ja kehittä · PDF fileAgenda AREVA Renewables AREVA Wind Focus on AREVA Winds projects AREVA Wind – Company and project overview p. 3

Global Tech I and Trianel Windpark Borkum Global Tech I Trianel Windpark Borkum

Installation of the first M5000-116 with THOR

Loading of nacelles at production hall

Installation first M5000-116 with MPI

Loading MPI in Eemshaven

AREVA Wind – Company and project overview p. 26

Page 27: AREVA Wind - yrityksen perustaminen ja kehittä · PDF fileAgenda AREVA Renewables AREVA Wind Focus on AREVA Winds projects AREVA Wind – Company and project overview p. 3

AREVA Wind Service offer

Service solutions tailored to

the customers needs.

24/7 Monitoring at the AREVA

Wind Monitoring Center.

3000 sensors, 129 redundant

components in 16

subsystems. Full service for the first five

years.

Cooperation with

experienced offshore

partners.

Ensuring high availability of

the offshore wind turbines.

Service highlights

AREVA Wind – Company and project overview p. 27

Page 28: AREVA Wind - yrityksen perustaminen ja kehittä · PDF fileAgenda AREVA Renewables AREVA Wind Focus on AREVA Winds projects AREVA Wind – Company and project overview p. 3

Simplify interfaces with customers during wind farm installation

A new vessel customized for 5MW+ WEC

Installation possible in harsher weather

conditions

Flexibility to install WEC and foundations

Building of strategic partnerships to

cover operations capacities in

important ports bordering the north and

the baltic sea

Bremerhaven Eemshaven (NL)

Stade Sassnitz

Partnership with HGO (Hochtief

Solutions/GeoSea) to secure WEC

installation

AREVA Wind – Company and project overview p. 28

Page 30: AREVA Wind - yrityksen perustaminen ja kehittä · PDF fileAgenda AREVA Renewables AREVA Wind Focus on AREVA Winds projects AREVA Wind – Company and project overview p. 3

80 WTG - 400 MW

MEG1

5 x 5 MW

Onshore prototypes

6 WTG - 30 MW

alpha ventus

40 WTG - 200 MW

Trianel Windpark

Borkum

2013

2009 80 WTG - 400 MW

Global Tech I

2013-2014

2004-2006-2008-2013

2016

Installed 75 MW + 60 MW + serial

inst. GT1

Under construction 600 MW

Preferred supplier

or signed contract 1,475 MW

Under negotiation >2 GW

100 WTG - 500 MW

Saint-Brieuc

2017 to 2018

More than 400 AREVA turbines selected in European wind parks

3 WTG - 15 MW

Aberdeen Bay

2015

70WTG - 350 MW

Wikinger

2016-2017

42 WTG - 210 MW

Deutsche Bucht

2017

AREVA Wind – Company and project overview p. 30

Page 31: AREVA Wind - yrityksen perustaminen ja kehittä · PDF fileAgenda AREVA Renewables AREVA Wind Focus on AREVA Winds projects AREVA Wind – Company and project overview p. 3

Thank you for your attention!

Page 32: AREVA Wind - yrityksen perustaminen ja kehittä · PDF fileAgenda AREVA Renewables AREVA Wind Focus on AREVA Winds projects AREVA Wind – Company and project overview p. 3

Safety Instructions for visitors to

AREVA Wind GmbH

Page 33: AREVA Wind - yrityksen perustaminen ja kehittä · PDF fileAgenda AREVA Renewables AREVA Wind Focus on AREVA Winds projects AREVA Wind – Company and project overview p. 3

Safety Instructions

Dangers for visitors

Tripping, falling and slipping

Falling from ladders

Traffic by fork-lift trucks and lift trucks:

they always have the right of way

Head injuries when entering installations

and by falling objects

Cutting injuries – do not touch any

installation, product and material

Page 34: AREVA Wind - yrityksen perustaminen ja kehittä · PDF fileAgenda AREVA Renewables AREVA Wind Focus on AREVA Winds projects AREVA Wind – Company and project overview p. 3

Safety Instructions

Personal protective equipment

Except for the parking areas and the office buildings,

It generally applies that:

Helmets must be worn

Safety boots must be worn

If the guest enters a S3 tower

Additional personal protective gear

(clothing and equipment) must be worn

This personal protective gear is only allowed

to be used after a thorough briefing.

Page 35: AREVA Wind - yrityksen perustaminen ja kehittä · PDF fileAgenda AREVA Renewables AREVA Wind Focus on AREVA Winds projects AREVA Wind – Company and project overview p. 3

Safety Instructions

Smoking areas and limitations of access

Smoking is only allowed outside near the indicated ashtrays.

Access is only allowed with a visitor`s badge,

and accompanied by a supervisor.

Access to testing fields is forbidden.

Keep a minimum distance of 1 m to stored magnets.

Access to S3 towers and installed wind turbines is only allowed after a specific briefing has been given.

Please respect all safety signs.

Page 36: AREVA Wind - yrityksen perustaminen ja kehittä · PDF fileAgenda AREVA Renewables AREVA Wind Focus on AREVA Winds projects AREVA Wind – Company and project overview p. 3

Safety Instructions

Walkabout through AREVA Wind GmbH

It is forbidden for visitors to walk around any AREVA facility alone.

Visitors must follow the instructions of AREVA`s staff.

Visitors are welcomed to ask our employees questions.

It is not permitted to take pictures, make audio or visual recordings.

Page 37: AREVA Wind - yrityksen perustaminen ja kehittä · PDF fileAgenda AREVA Renewables AREVA Wind Focus on AREVA Winds projects AREVA Wind – Company and project overview p. 3

Safety Instructions

Page 38: AREVA Wind - yrityksen perustaminen ja kehittä · PDF fileAgenda AREVA Renewables AREVA Wind Focus on AREVA Winds projects AREVA Wind – Company and project overview p. 3

Safety Instructions

Evacuation / Fire / Emergency

Follow the escape route signs.

Escape routs are clearly marked.

Visitors have to follow the instructions of AREVA employees.

In case of a fire alarm everybody must leave the building and follow the signs along the

paved road between Cordes GmbH and AREVA Wind GmbH.

EVERYBODY must proceed to the assembly point.

Page 39: AREVA Wind - yrityksen perustaminen ja kehittä · PDF fileAgenda AREVA Renewables AREVA Wind Focus on AREVA Winds projects AREVA Wind – Company and project overview p. 3

Assembly Point Customer Center

Page 40: AREVA Wind - yrityksen perustaminen ja kehittä · PDF fileAgenda AREVA Renewables AREVA Wind Focus on AREVA Winds projects AREVA Wind – Company and project overview p. 3

Assembly Point Production Site

Page 41: AREVA Wind - yrityksen perustaminen ja kehittä · PDF fileAgenda AREVA Renewables AREVA Wind Focus on AREVA Winds projects AREVA Wind – Company and project overview p. 3

Assembly Point Test bench

Page 42: AREVA Wind - yrityksen perustaminen ja kehittä · PDF fileAgenda AREVA Renewables AREVA Wind Focus on AREVA Winds projects AREVA Wind – Company and project overview p. 3

►Thank you for your attention! Enjoy your visit to AREVA WIND