Page 1: Ariisto - Goregaon - Addendum 1

EMPLOYER - ASHVI DEVELOPERS PRIVATE LIMITED

PROJECT - Strengthening & Construction of Residential Tower at Goregaon (West) Mumbai

 

 

 

Addendum 1 1 of 1                                          Seal & Sign of Bidder

TENDER FOR STRENGTHENING, RCC, STRUCTURAL, MEP AND FINISHES WORKS OF RESIDENTIAL TOWER AT GOREGAON (WEST) MUMBAI FOR ASHVI DEVELOPERS

PRIVATE LIMITED

ADDENDUM 1 (Date 16 November 2013)

Sl. No Tender Reference Clause Revision

1. Vol I / Section 4 / Contract Data Sheet

Name of Employee shall be

M/s Ashvi Developers Private Limited,

“Ariisto House”, N. S. Phadake Road,

Near East – West Flyover, Andheri (East),

Mumbai 400 069.

2. Vol I / Section 4 / Contract Data Sheet

Contractor shall use DG as available at site at no cost to be paid to Employer. Contractor to bear all operation and maintenance cost to maintain the DG in good working condition and hand over toEmployer in good working condition after completion of work.

3. Vol I / Section 5 / Appendix F Revised Basic Rate Annexure

4. Vol III / Section 8 / BOQ Revised BOQ for Strengthening Work

5. Pre-bid Meeting Queries Clarification to pre-bid meeting queries.

6. Submission Date Signed and stamped hard copy of Tender Document in sealed envelope to be submitted in Employer Office by 17:00 Hrs on Tuesday, 26 November 2013.

Page 2: Ariisto - Goregaon - Addendum 1

EMPLOYER - ASHVI DEVELOPERS PRIVATE LIMITEDPROJECT - Strengthening Construction of Residential Tower at Goregaon (West) Mumbai

Sr.No. Description Unit Basic RateAllowable

Wastage in %

1 CEMENT-OPC BAG 300.00 2%

2 REINFORCEMENT STEEL - TMT Fe 500 MT 47,000.00 3%

3 REINFORCEMENT STEEL - TMT Fe 500 MT 50,000.00 5%

4 RUBBLE Cum 800.00 5%

5 Concrete M60 (Including Pumping) Cum 7,200.00 5%

6 Concrete M50 (Including Pumping) Cum 6,607.00 5%

7 Concrete M40 (Including Pumping) Cum 5,161.00 5%

8 Concrete M30 (Including Pumping) Cum 5,039.00 5%

9 Concrete M25 (Including Pumping) Cum 4,839.00 5%

10 Concrete M20 (Including Pumping) Cum 4,550.00 5%

11 Concrete M15 (Including Pumping) Cum 4,250.00 5%

12 Concrete M10 (Including Pumping) Cum 3,800.00 5%

13 BRICKS (230x115x75) no 5.25 5%

14 BRICKS (230x150x75) no 10.50 5%

15 Solid blocks- 390x190x190mm NOS 55.00 3%

16 Solid blocks- 390x190x150mm NOS 36.00 3%

17 Solid blocks- 390x190x90mm NOS 26.00 3%

18 Siporex blocks - 100x240x650mm NOS 59.00 3%

19 Vitrified Tiles (600X600) Sqm 538.00 5%

20 Vitrified Tiles (300 x 300) Sqm 323.00 5%

21 Vitrified Tikes (800 x 800 ) Sqm 974.00 5%

22 Anti skid Ceramic Tiles (600x150) Sqm 753.00 5%

23 Black Granite 20mm thick Sqm 1,400.00 5%

24 Indian Marble18mm thick Sqm 484.00 5%

25 Baroda green marble Sqm 630.00 5%

26 Kota Stone Sqm 410.00 5%

27 Composite Arificial Marble 18mmthick sqm 2,400.00 5%

28 Glaas Mosaic Tiles Sqm 8,614.00 5%

29 Vitrified Tiles (1000X1000) Sqm 970.00 5%

30 Ceramic Tiles (300X300) Sqm 323.00 5%

31 Ceramic Tiles (300X600) Sqm 484.00 5%

BASIC RATE OF MATERIAL

Addendum 1 ‐ Basic Rate Annexure Page 1 of 3 Seal Sign of Bidder

Page 3: Ariisto - Goregaon - Addendum 1

EMPLOYER - ASHVI DEVELOPERS PRIVATE LIMITEDPROJECT - Strengthening Construction of Residential Tower at Goregaon (West) Mumbai

Sr.No. Description Unit Basic RateWastage in

%

32 Glazed Tiles (200x300) Sqm 284 5%

33 Texture Paint Sqm 645 3%

34 Teak wood frame size 6"x21/2" Cum 80,463 Not

Applicable

35 Teak wood frame size4""x21/2" Cum 80,463 Not

Applicable

36 Red meranti wood size 4"x21/2" Cum 35,761 Not

Applicable

37 Flush shutter 35mmthickwith commerical Veener finish with (ISI) sqm 2,906 Not

Applicable

38 Flush shutter 45mmthick withcommerical Veener finish (2HR FIRE RATING) sqm 4,540 Not

Applicable

39 Flush shutter 45mmthick with (1HR FIRE RATING) sqm 3,850 Not

Applicable

40 Alumininum sliding window including fixing sqm 3,770 Not

Applicable

41 Aluminium Window Toilet including fixing sqm 2,690 Not

Applicable

42 S.S railing with glass including fixing Rft 1,200 Not

Applicable

43 Gypsum ceiling board 12mmthick SFT 17 2%

44 Mortise handle with button dead lock No 1,200 Not

Applicable

45 Mortise lock No 1,300 Not

Applicable

46 Night Latch No 968 Not

Applicable

47 Open Door closer No 940 Not

Applicable

48 BRASS Butt Hinges 4"x1 1/2" Heavy Duty No 296 Not

Applicable

49 Handle S.S 12"LONG pair 750 Not

Applicable

50 S.S Railway type Hinge SIZE 125MM No 125 Not

Applicable

51 S.S Railway type Hinge SIZE 100MM No 88 Not

Applicable

52 HT Strands KG 60 Not

Applicable

53 35mm thick Flush shutter with laminate finish Sqm 2,906 Not

Applicable

54Flush shutter 35mmthick with commerical Veener finish (2HR FIRE RATING)

sqm 3,500 Not

Applicable

55 Aldrop Lock No 300 Not

Applicable

1

2

3

Bidder will submit list of materials with specifications as to quality and quantity as required on site at least one month inadvance to Employer. Such specifications shall be submitted along with the Price list and the vendor list. Employershall at its sole discretion either supply below or at par with the purchase rate or give consent to bidder for the

Employer will supply RMC, Steel and major finishing items along with MEP materials on a star rate basis as mentionedabove. Employer shall give all VAT bill to Contractor and it shall be consignee name in form of bid. Any increase ordecrease on the star rate will be in Employer’s account adjusted from RA Bill. Variation in the wastage is agreed byAriisto and bider. Employer will be liable to supply the fixed quantity according to the project and if any additionalquantity will be required to be procured by bidder for any reasons attributable to bidder and or on account of additionalwastage or for any other reasons it will be at the sole cost of bidder.

Above mentioned basic price of materials are the landed cost of materials at Project site including all taxes, duties,cesses including VAT, Central & Local taxes, Loading, Transportation etc. complete. The unloading shall be factored inthe overall item rate.

Contractor should submit the Reconcilation Statement along with Running Account Bill (RA Bill). Contractor should takeall necessary care to see that wastage should not be exceeded % mentioned . If wastage exceeds by below mentionedwastage %, cost of the extra wastage shall be recovered at 10% higher than supply rate and shall be deducted fromRunning Bill. For Rolling Margin, Testing shall be done from every lot of steel of all diameter received at site andwastage shall be calculated based on rolling margin

BASIC RATE OF MATERIAL

Addendum 1 ‐ Basic Rate Annexure Page 2 of 3 Seal Sign of Bidder

Page 4: Ariisto - Goregaon - Addendum 1

EMPLOYER - ASHVI DEVELOPERS PRIVATE LIMITEDPROJECT - Strengthening Construction of Residential Tower at Goregaon (West) Mumbai

4

5The Contractor, before procuring any item with base rate shall provide all documentary justification (three quotes) forthe base rate of materials. Final decision on supplier will be by Employer.

Formula for Basic price variation reimbursement is, = [(Actual procurement price - Basic Price)] + Appropriate Tax, if applicable.

Addendum 1 ‐ Basic Rate Annexure Page 3 of 3 Seal Sign of Bidder

Page 5: Ariisto - Goregaon - Addendum 1

1 Raft Scanned copy of ref drgs are attached Request you to provide the horizontal connection detailsbetween existing & new raft.

Not Required

2 For introduction of additional columns asper the drawings provided

PT Slab Scanned copy of ref drgs are attached We understand from drawings that existing slab & beams arePT. Kindly confirm the scope of destressing.

As per information PT bonding system is used and also weare breaking only concrete not any reinforcement and tendonso no need of destressing.

Punchured SlabAfter introducing additional columns, whether the puncheredslab will be PT or not. Kindly confirm. If PT then kindly confirmthe scope of Re-stressing.

These additional columns are not crossing any tendon andalso we are breaking only concrete not any reinforcement andtendon so Re-stressing is not required

New Slab & PT Beam ConnectionAs per drawings, the beams are PT beams, so kindly providethe details of connection of new slab with existing PT beams.

New slab beams are coming at the back side of lift only sowhereas old and new slab and beam connection is requiredwe will do epoxy grouting or equivalent.

Grade of Concrete

From drawings we understand that the existing slab grade isM40, whereas the grade of new concrete works is mentionedas M60 as per BOQ. Kindly provide the details of bonding inbetween

M60 grade is used for column, for additional column we arebreaking concrete at junction. For new column and slab/beamand raft provide Nitobond or equivalent for old and newconcrete bonding

Project: Ariisto Residential Tower Loction: Goregaon, MumbaiClient: Ashvi Developers Private Limited

TECHNICAL CLARIFICATION- CIVIL + FINISHES PACKAGESr No

Queries ClarificationReferenceDescription

Addendum 1 - Pre-bid Queries Clarification Seal Sign of Bidder