army corps 2011 mitigation intro

7
US Army Corps of Engineers BUILDING STRONG ® Regional Update to Mitigation and Monitoring Guidelines and Regional Mitigation Ratios and Performance Standards Effort Presentation for Regulatory Information Forum 26 August 2010

Upload: timrdegraff

Post on 31-Jul-2015

1.364 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Army Corps 2011 Mitigation Intro

US Army Corps of Engineers

BUILDING STRONG®

Regional Update to Mitigation and Monitoring Guidelines andRegional Mitigation Ratios and Performance Standards EffortPresentation for Regulatory Information Forum

26 August 2010

Page 2: Army Corps 2011 Mitigation Intro

BUILDING STRONG®2

Regional Update to Corps Mitigation and Monitoring Guidelines

Purpose: ► Establish regional mitigation and monitoring policy► Ensure guidelines reflect 2008 joint EPA and Corps "mitigation rule"

regulations► Make programmatic changes to improve mitigation-related procedures

Regional effort:► Representatives from all four Corps districts in SPD (San Francisco,

Sacramento, Albuquerque, Los Angeles) covering Arizona, California, Nevada, Utah, New Mexico, and parts of Colorado and Texas

► Representative from South Pacific Division (SPD, Corps regional headquarters in California)

Goal: Provide guidance to the regulated community and Corps Regulatory project managers

► Expectations related to mitigation► Technical information (e.g., aquatic resource impact assessment, mitigation

plan preparation, mitigation monitoring requirements and procedures)

Page 3: Army Corps 2011 Mitigation Intro

BUILDING STRONG®3

Implementation

Potential Programmatic Changes:► Information management: synchronized submittal of monitoring reports► Emphasize Mitigation Ratio-setting concepts► Emphasize Expanded Performance standards► Minimum monitoring period may be expanded beyond 5 years► Map and drawing standards

Estimated Timeline: ► Draft expected completion summer 2010► Internal Corps coordination fall 2010► Revised draft out for formal interagency coordination winter 2010/2011► Public review winter 2010/2011► Final Implementation Spring 2011

Page 4: Army Corps 2011 Mitigation Intro

BUILDING STRONG®4

Mitigation Ratios and Performance Standards Effort

Goals: ► Establish regional procedure for setting mitigation ratios► Establish regional, uniform mitigation performance standard language (not targets)

Non-Corps Participants:► Dr. Richard Ambrose, UCLA► Dr. Eric Stein, SCCWRP

Regional effort:► Representatives from all four Corps districts in SPD (San Francisco, Sacramento,

Albuquerque, Los Angeles) covering Arizona, California, Nevada, Utah, New Mexico, and parts of Colorado and Texas

► Representative from South Pacific Division (SPD, Corps regional headquarters in California)

Expect completion of draft products:► Mitigation ratio-setting procedure: submitted to SPD► Uniform performance standards: Jan 2011

Interagency coordination prior to finalization

Page 5: Army Corps 2011 Mitigation Intro

BUILDING STRONG®5

Mitigation Ratio-Setting Procedure

Benefits:

► Would provide structured decision-making procedure while retaining flexibility

► Allows for qualitative or quantitative assessments of impacts & mitigation

► Would create written rationale (decision document) for each ratio determination

► Would be accompanied by guidance for each step of checklist

► Greater efficiency

Will allow incorporation of functional/condition assessments

Page 6: Army Corps 2011 Mitigation Intro

BUILDING STRONG®6

Uniform Performance Standards Benefits:

► Better predictability for regulated community► Increased ability of Regulatory agencies to ensure compliance► Better gauge of long-term ecological viability of mitigation sites► Allow improved scientific comparison between mitigation sites

Focus:► Ecological performance standards (not water treatment)► Incorporation of reference sites► Incorporation of functional/condition assessments

Overall goals: ► Uniform PS language, not specific targets

• Why? Specific targets would require substantial research• Different aquatic resources and ecoregions throughout four Districts• Good goal for future, funded effort by region

► Expand beyond flora-based PS• Why? Flora-based PS do not represent full suite of ecological functions provided by

impacted and mitigation sites

Page 7: Army Corps 2011 Mitigation Intro

BUILDING STRONG®7

Questions?