arrangements plan 1:500 · 2019-10-17 · confirmed on site before commencing construction....

1
T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T QUANTITIES Item Quantity Noticeboard 1 Bin enclosure (240L) 3 T E SETOUT DETAIL: B1 and B2 refer to Bin details (all types) GENERAL NOTES This drawing is to be read in conjunction with the other project drawings, specification and details. Services and dimensions Measurements, dimensions and levels to be confirmed on site before commencing construction. Services information is from Dial Before You Dig and may not be complete or accurate. The contractor is responsible for locating all services on site before commencing construction. GENERAL ARRANGEMENTS PLAN 1:500 T T T SETOUT DETAIL: B3 refer to Bin Type 3 detail T T T SETOUT DETAIL: N1 refer to Noticeboard detail T T T T T T T T Align edges of bin enclosure with edges of existing path Align enclosure with B1, sawcut asphalt to neat edge Retain edges of slab beside open drain with concealed concrete block walls Centre noticeboard between trees and offset 1m from line between tree trunks Existing tree in timber tree guard Comms pillar Timber tree guard Align front of bin with side of tree guard, offset side of enclosure 0.5m from tree guard Final location for B3 subject to review by Council

Upload: others

Post on 07-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ARRANGEMENTS PLAN 1:500 · 2019-10-17 · confirmed on site before commencing construction. Services information is from Dial Before You Dig and may not be complete or accurate. The

Scale

Fresh Landscape DesignLandscape Architects

ph (02) 6112 8617office 45 Glendale Lane Bywong NSW 2621web www.freshlandscape.com.au

Drawing

Project

Dwg no. Design Date Version1:500 at A3

FOR TENDER

Binda streetscape plan

ULSC Streetscape ProjectQueen Street, Binda

424 JC 25/9/19 A021-

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

T

TT

T

T

T

T

T

T

T

T

T

T

T

T

T

TT

T

T

T

T

T

T

T

Aerial photography: Fresh Landscape Design

Toilets

QUANTITIESItem QuantityNoticeboard 1Bin enclosure (240L) 3

B1

N1

QU

EEN STREET

WOODVILLE ROAD

BINDA STORE

B2

B3

LEGEND

Bin enclosure opening for rubbish

Seat back of seat

Noticeboard front of noticeboard

TelstraElectricityNBN

TEN

SETOUT DETAIL: B1 SCALE 1:200B1 and B2 refer to Bin details (all types)

GENERAL NOTESThis drawing is to be read in conjunction with the other project drawings, specification and details.

Services and dimensionsMeasurements, dimensions and levels to beconfirmed on site before commencing construction.

Services information is from Dial Before You Dig and may not be complete or accurate.The contractor is responsible for locating all services on site before commencing construction.

GENERAL ARRANGEMENTS PLAN 1:500

TTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTT

TTTTTTTTTTTTTTTTTTTTTT

T

T

T

TTTTTTTTTTTT

SETOUT DETAIL: B3 SCALE 1:200B3 refer to Bin Type 3 detail

TTTTTTTTTTTTTTTTTTTTTT

T

T

T

TTTTTTTTTTTT

T T T T T T T T T T T T T T T T T T

B3

B1 B2

SETOUT DETAIL: B1 SCALE 1:200N1 refer to Noticeboard detail

TTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTT

TTTTTTTTTTTTTTTTTTTTTT

T

T

T

TTTTTTTTTTTT

T T T T T T T T T T T T T

N1

Align edges of bin enclosure with edges of existing path

Align enclosure with B1, sawcut asphalt to neat edge

Retain edges of slabbeside open drain with concealed concrete block walls

Centre noticeboard between trees and offset 1m from line between tree trunks

Existing tree in timber tree guard

Comms pillar

Timber tree guardAlign front of bin with side of tree guard, offset side of enclosure 0.5m from tree guard

Final location for B3 subject to review by Council