arrowhead center capstone projectcecapstone.groups.et.byu.net/sites/default/files/...sustainable...

18
Sustainable Sustainable Sustainable Sustainable Infrastructure Infrastructure Infrastructure Infrastructure Courtesy of FritziRealty Arrowhead Center Capstone Project CEEn201 Sustainable InfractructureCase Study Professor G. Williams BYU Capstone Program Coordinator Wayne Y. Lee, Ph.D., P.E. (AZ & WA) Arrowhead Project Focal Mitchell Smith September 16, 2017 9/16/2017 1 WYL - 07/2017

Upload: others

Post on 04-Oct-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Arrowhead Center Capstone Projectcecapstone.groups.et.byu.net/sites/default/files/...Sustainable Infrastructure Arrowhead Center Capstone Project: Introduction • Located in Spanish

SustainableSustainableSustainableSustainable

InfrastructureInfrastructureInfrastructureInfrastructure

Courtesy of Fritzi Realty

Arrowhead Center Capstone Project

CEEn 201 Sustainable Infractructure Case Study

Professor G. Williams

BYU Capstone Program Coordinator

Wayne Y. Lee, Ph.D., P.E. (AZ & WA)

Arrowhead Project Focal

Mitchell Smith

September 16, 2017

9/16/2017 1WYL - 07/2017

Page 2: Arrowhead Center Capstone Projectcecapstone.groups.et.byu.net/sites/default/files/...Sustainable Infrastructure Arrowhead Center Capstone Project: Introduction • Located in Spanish

SustainableSustainableSustainableSustainable

InfrastructureInfrastructureInfrastructureInfrastructure

Introduction to BYU CEEn Capstone Program

October 11, 2017 2

Project “Soft” Skills• Customer & Vendor Relationship

• Team Dynamics & Interactions

• Challenge & Conflict Resolution

• Communication & Documentation

• Project Management & Execution

• Marketing & New Business Development

• Adaptability to Changes & Obstacles

• Liability & Risk Awareness & Assessment

• Negotiation & Compromise

Bridge

Customer• Project Objectives

• Delivery of Promises

• Returns in Investment

• Satisfy Constraints

• Competing requirements

• Government regulations

• Cost, time & legality

• Risk Management

New Business

Tech

nic

al

Sk

ills

& J

ob

Se

curi

ty

Co

ntr

ibu

tio

ns

& E

xp

ect

ati

on

s

Page 3: Arrowhead Center Capstone Projectcecapstone.groups.et.byu.net/sites/default/files/...Sustainable Infrastructure Arrowhead Center Capstone Project: Introduction • Located in Spanish

SustainableSustainableSustainableSustainable

InfrastructureInfrastructureInfrastructureInfrastructure

Arrowhead Center Capstone Project: Introduction

• Located in Spanish Fork, UT

• Center of properties is a former industrial (cannery) building constructed in the 1920’s

7/25/2017 3

Courtesy of L.E.I Engineering

Courtesy of Google

Courtesy of Google

Courtesy of Google

N

WYL - 07/2017

Page 4: Arrowhead Center Capstone Projectcecapstone.groups.et.byu.net/sites/default/files/...Sustainable Infrastructure Arrowhead Center Capstone Project: Introduction • Located in Spanish

SustainableSustainableSustainableSustainable

InfrastructureInfrastructureInfrastructureInfrastructure

Arrowhead Center Capstone Project: Historical Photos

• Arrowhead Historic Building Began Operation as a Packing Plant in 1925.

9/16/2017 WYL - 07/2017 4

Reference: Allred, L. P., “Spanish Fork: City on the Rio De Aguas Calientes”, J-Mart Publishing Co., Spanish Fork, UT., 1981 Photo Courtesy of CardCow.com

Page 5: Arrowhead Center Capstone Projectcecapstone.groups.et.byu.net/sites/default/files/...Sustainable Infrastructure Arrowhead Center Capstone Project: Introduction • Located in Spanish

SustainableSustainableSustainableSustainable

InfrastructureInfrastructureInfrastructureInfrastructure

Arrowhead Center Capstone Project: Aerial Site Photo

7/25/2017 5

Arrowhead Center Site

Courtesy of Google

WYL - 07/2017

Page 6: Arrowhead Center Capstone Projectcecapstone.groups.et.byu.net/sites/default/files/...Sustainable Infrastructure Arrowhead Center Capstone Project: Introduction • Located in Spanish

SustainableSustainableSustainableSustainable

InfrastructureInfrastructureInfrastructureInfrastructure

Arrowhead Center Capstone Project: Site Photos

7/25/2017 6

• ExteriorCourtesy of Google

East building

East building extension

manufacturing facility

East-west facility transition

West warehouseHabitat for

Humanity

Manufacturing / E-Commerce warehouse

WYL - 07/2017

Page 7: Arrowhead Center Capstone Projectcecapstone.groups.et.byu.net/sites/default/files/...Sustainable Infrastructure Arrowhead Center Capstone Project: Introduction • Located in Spanish

SustainableSustainableSustainableSustainable

InfrastructureInfrastructureInfrastructureInfrastructure

Arrowhead Center Capstone Project: Site Photos

• Interior: 2nd Floor – East Building

• Wood support beams/columns

• Low, large windows

• Reinforced concrete / masonry construction

7/25/2017 7WYL - 07/2017

Page 8: Arrowhead Center Capstone Projectcecapstone.groups.et.byu.net/sites/default/files/...Sustainable Infrastructure Arrowhead Center Capstone Project: Introduction • Located in Spanish

SustainableSustainableSustainableSustainable

InfrastructureInfrastructureInfrastructureInfrastructure

Arrowhead Center Capstone Project: Site Photos

• Interior: 1st Floor – East Building

• Steel trusses & solid wood frames

• Connect 2 building structures

• Masonry / concrete walls

• High windows

7/25/2017 8WYL - 07/2017

Page 9: Arrowhead Center Capstone Projectcecapstone.groups.et.byu.net/sites/default/files/...Sustainable Infrastructure Arrowhead Center Capstone Project: Introduction • Located in Spanish

SustainableSustainableSustainableSustainable

InfrastructureInfrastructureInfrastructureInfrastructure

Arrowhead Center Capstone Project: Site Photos

• Interior: 1st Floor – East-West Facility Transition

• Collapsed / Sunken concrete flooring

7/25/2017 9WYL - 07/2017

Page 10: Arrowhead Center Capstone Projectcecapstone.groups.et.byu.net/sites/default/files/...Sustainable Infrastructure Arrowhead Center Capstone Project: Introduction • Located in Spanish

SustainableSustainableSustainableSustainable

InfrastructureInfrastructureInfrastructureInfrastructure

Arrowhead Center Capstone Project: Site Photos

• Interior: 1st Floor

• Habitat for Humanity

• E-Commerce Warehouse

• Manufacturing facility

• Offices

7/25/2017 10WYL - 07/2017

Page 11: Arrowhead Center Capstone Projectcecapstone.groups.et.byu.net/sites/default/files/...Sustainable Infrastructure Arrowhead Center Capstone Project: Introduction • Located in Spanish

SustainableSustainableSustainableSustainable

InfrastructureInfrastructureInfrastructureInfrastructure

Arrowhead Center Capstone Project: Introduction

9/16/2017 11

• Arrowhead Center Development Project• Capstone collaboration with Sustainable Infrastructures class, government, developer, community

4

3

2 1

Existing Subdivision

Planned Subdivision

Page 12: Arrowhead Center Capstone Projectcecapstone.groups.et.byu.net/sites/default/files/...Sustainable Infrastructure Arrowhead Center Capstone Project: Introduction • Located in Spanish

SustainableSustainableSustainableSustainable

InfrastructureInfrastructureInfrastructureInfrastructure

Arrowhead Center Capstone Project: Surrounding Development

• Planned Residential Development Immediate South of Parcel 4

9/16/2017 WYL - 07/2017 12

4

3

2 1

Existing

Subdivision

Planned

Subdivision

Planned Subdivision

Ma

in S

tre

et

Page 13: Arrowhead Center Capstone Projectcecapstone.groups.et.byu.net/sites/default/files/...Sustainable Infrastructure Arrowhead Center Capstone Project: Introduction • Located in Spanish

SustainableSustainableSustainableSustainable

InfrastructureInfrastructureInfrastructureInfrastructure

Arrowhead Center Capstone Project: Preliminary Development Plan

9/16/2017 WYL - 07/2017 13

Page 14: Arrowhead Center Capstone Projectcecapstone.groups.et.byu.net/sites/default/files/...Sustainable Infrastructure Arrowhead Center Capstone Project: Introduction • Located in Spanish

SustainableSustainableSustainableSustainable

InfrastructureInfrastructureInfrastructureInfrastructure

Arrowhead Center Capstone Project: Initial Development Idea

• Preliminary land use recommendations for 4 parcels at Arrowhead Center, Spanish Fork, UT based on results from feasibility, cost and risk assessment studies using the following initial “desired” usage for all 4 parcels as a starting point

1. Adult 55+ community

2. Mixed use commercial/professional facilities

• Drug store (i.e. Walgreen) instead of gas station

• Doctor/dental offices

3. Historical building preservation – mixed use

• E-commerce warehouse, manufacturing, offices etc.

4. Residential

• Current Spanish Fork development density ~3 per acre

7/25/2017 14WYL - 07/2017

Arrowhead Center Development: Parcel Locations

12

3

4

Page 15: Arrowhead Center Capstone Projectcecapstone.groups.et.byu.net/sites/default/files/...Sustainable Infrastructure Arrowhead Center Capstone Project: Introduction • Located in Spanish

SustainableSustainableSustainableSustainable

InfrastructureInfrastructureInfrastructureInfrastructure

Arrowhead Center Capstone Project: Commercial Concept Option

9/16/2017 WYL - 07/2017 15

Page 16: Arrowhead Center Capstone Projectcecapstone.groups.et.byu.net/sites/default/files/...Sustainable Infrastructure Arrowhead Center Capstone Project: Introduction • Located in Spanish

SustainableSustainableSustainableSustainable

InfrastructureInfrastructureInfrastructureInfrastructure

Arrowhead Center Capstone Project: Collaboration & Partnership

• Development Plan Overview & Vision: Finding the Common Ground

7/25/2017 16WYL - 07/2017

Historic Site Preservation

& Land Use Development

Bu

sin

ess

Business Case

• Historical significance vs. costs, feasibility & risks

• Environmental – Potential lead/asbestos removal

• Code compliance - Structural/electrical/mechanical

• Water resources – Well/septic vs. city water/sewer

• Storm drain/run off – Low Impact Development (LID)

• Geotechnical – Soil/foundation assessment

• Short & long term investment costs vs. benefits

• Liability

• Profitability

• Traffic improvements

• Site plan & construction

• Tenant occupancy rate

• Maintenance & operation

• Risks assessment

Zoning, Planning & Regulations

• Environmental

• Code & ordinance compliance

• Historical significance

• Business growth potentials – tax revenues

• Traffic & infrastructures

• Compatibility to local development plan

Community Involvement

• Environmental

• Jobs

• Community growth

• Traffic

• Neighborhood compatibility, impact & benefits

• ConvenienceIdeal best use & best **

practices win-win scenario

** Best acceptable compromises under conflicting requirements & interests

Page 17: Arrowhead Center Capstone Projectcecapstone.groups.et.byu.net/sites/default/files/...Sustainable Infrastructure Arrowhead Center Capstone Project: Introduction • Located in Spanish

SustainableSustainableSustainableSustainable

InfrastructureInfrastructureInfrastructureInfrastructure

Arrowhead Center Capstone Project: Project Plan Summary

• Development Plan Summary

• Win-Win: Local Community � Property Owner/Developer � Government: City/County

• Community Impact � Business Development � Zoning, Planning & Regulations

• Revenue generation potentials

• Site use – Neighborhood compatibility

• Significance vs. Costs & Feasibility � Historic Site Preservation � Environmental Concerns/Impact

• Environmental – Potential lead/asbestos removal

• Structural, electrical, and mechanical updates to current seismic/building codes

• Water resources

• Well/septic vs treated city water/sewer

• Drainage & run off requirements in support of Spanish Fork’s L.I.D. (Low Impact Development)

• Site planning – Best practices, usage and neighborhood compatibility

• Geotechnical assessment

• Soil properties for ground support – foundation, structures etc. vs. ground settlement

• Lessons Learned: Sunken/collapsed concrete flooring

7/25/2017 17WYL - 07/2017

Page 18: Arrowhead Center Capstone Projectcecapstone.groups.et.byu.net/sites/default/files/...Sustainable Infrastructure Arrowhead Center Capstone Project: Introduction • Located in Spanish

SustainableSustainableSustainableSustainable

InfrastructureInfrastructureInfrastructureInfrastructure

Arrowhead Center CEEn 201 Project: Deliverables

• Development master plan

• Description

• Drawings/graphics

• Justifications for:

• Societal benefits (people)

• Environmental impacts/benefits (planet)

• Realistic financial plan (profit)

• Briefing/Presentation

• Assume a community meeting that includes city officials and interested public

7/25/2017 18WYL - 07/2017