artemis advanced rover technology for exploration on the moon using in situ utilization

28
ARTEMIS Advanced Rover Technology for Exploration on the Moon using In Situ utilization Jesse Hecht Sean Fierman Cedrick Ngalande

Upload: sheri

Post on 09-Feb-2016

32 views

Category:

Documents


0 download

DESCRIPTION

ARTEMIS Advanced Rover Technology for Exploration on the Moon using In Situ utilization. Jesse Hecht Sean Fierman Cedrick Ngalande. Storyboard. →. ↑. ↓. ↓. +. Assumptions. Lands remotely, un pressurized The motors we chose exist or can be built - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: ARTEMIS Advanced  Rover  Technology for Exploration on the Moon using  In Situ utilization

ARTEMISAdvanced

Rover Technology for

Exploration on theMoon using

InSitu utilization

Jesse Hecht

Sean Fierman

Cedrick Ngalande

Page 2: ARTEMIS Advanced  Rover  Technology for Exploration on the Moon using  In Situ utilization

2-Dec-04 USC 2004 AME 557 Space Exploration Architecture

Storyboard

↓ ↑ ↓

+

Page 3: ARTEMIS Advanced  Rover  Technology for Exploration on the Moon using  In Situ utilization

2-Dec-04 USC 2004 AME 557 Space Exploration Architecture

Assumptions

Lands remotely, un pressurized The motors we chose exist or can be built EVA / entrance / exit and navigation

issues are not our problems

Page 4: ARTEMIS Advanced  Rover  Technology for Exploration on the Moon using  In Situ utilization

2-Dec-04 USC 2004 AME 557 Space Exploration Architecture

Approach

Page 5: ARTEMIS Advanced  Rover  Technology for Exploration on the Moon using  In Situ utilization

2-Dec-04 USC 2004 AME 557 Space Exploration Architecture

Rover Design Total Size 14 x 6 x 6 ft (4.3 x 1.8 x 1.8 m) 4 ft diameter wheels (1.2m) Living space, pressurized volume 6.5 x 6 x 6 ft (234ft^3, 6.48m^3)

Chrysler Minivan is roughly 161ft^3 interior Low Center of Gravity Ground clearance – 2.5 ft (0.76m) Break over angle – 31 degrees Door area with 3 access points, 2 ladders Arm Lights by cameras for night vision Weight – 1 ton – less than requirement

Page 6: ARTEMIS Advanced  Rover  Technology for Exploration on the Moon using  In Situ utilization

2-Dec-04 USC 2004 AME 557 Space Exploration Architecture

Speed

1 mph needs 3 hp 25 mph needs 75 hp

Engine per wheel (instantaneous, no gears, high estimate)

Weight TOTAL 2000 lbs    

Velocity 25 mph 40.225 km/h

Wheel Diam 4 ft    

         

         

Velocity 36.67 ft/s    

Rev per sec 0.5 rev/s    

Ang. Vel 9.17 rad/s    

Torque 1000 lb*ft 1355.75 N*m

Hp 75 per wheel    

Page 7: ARTEMIS Advanced  Rover  Technology for Exploration on the Moon using  In Situ utilization

2-Dec-04 USC 2004 AME 557 Space Exploration Architecture

Power

Solar Panels

493 Watts sun angle @left horizon (beginning of race)

3259 Watts sun angle @ 12 degrees above horizon

4424 Watts sun angle @ directly overhead (6.5 days into race)

3259 Watts sun angle @ sun setting (13 days into race)

Page 8: ARTEMIS Advanced  Rover  Technology for Exploration on the Moon using  In Situ utilization

2-Dec-04 USC 2004 AME 557 Space Exploration Architecture

Power

Fuel Cells Space Shuttle 14kW, 66ft^3

(0.155m^3), 200lbs (91kg) + 100lbs (50kg) of oxygen and hydrogen per day (cryogenic) operates for 2600 hours

ARTEMIS – 7kW, 33ft^3, 100lbs + MgH2 and oxygen weight

Page 9: ARTEMIS Advanced  Rover  Technology for Exploration on the Moon using  In Situ utilization

2-Dec-04 USC 2004 AME 557 Space Exploration Architecture

SPECIALS

Dust Wheel design

Regolith shielding (radiation) 2 inch Al + 1.5 feet of regolith + fuel cell

materials Piloting with no windows!

LCD screens with picture in picture (PIP)

Page 10: ARTEMIS Advanced  Rover  Technology for Exploration on the Moon using  In Situ utilization

2-Dec-04 USC 2004 AME 557 Space Exploration Architecture

Lunar Wheels

Page 11: ARTEMIS Advanced  Rover  Technology for Exploration on the Moon using  In Situ utilization

2-Dec-04 USC 2004 AME 557 Space Exploration Architecture

Apollo Rover

Outer & inner frame Wire mesh Titanium

Page 12: ARTEMIS Advanced  Rover  Technology for Exploration on the Moon using  In Situ utilization

2-Dec-04 USC 2004 AME 557 Space Exploration Architecture

Rooster Tails

Push dirt outward NOT Upward

Page 13: ARTEMIS Advanced  Rover  Technology for Exploration on the Moon using  In Situ utilization

2-Dec-04 USC 2004 AME 557 Space Exploration Architecture

Turbine or Impeller Channels

Used to move all types of materials

Page 14: ARTEMIS Advanced  Rover  Technology for Exploration on the Moon using  In Situ utilization

2-Dec-04 USC 2004 AME 557 Space Exploration Architecture

Channels – Remove Dirt

Page 15: ARTEMIS Advanced  Rover  Technology for Exploration on the Moon using  In Situ utilization

2-Dec-04 USC 2004 AME 557 Space Exploration Architecture

Wheel Cross-Sections

Page 16: ARTEMIS Advanced  Rover  Technology for Exploration on the Moon using  In Situ utilization

2-Dec-04 USC 2004 AME 557 Space Exploration Architecture

Gravity, Centrifugal Force & Blades

Page 17: ARTEMIS Advanced  Rover  Technology for Exploration on the Moon using  In Situ utilization

2-Dec-04 USC 2004 AME 557 Space Exploration Architecture

No More Upward Rooster Tails

Main Interface with Lunar surface = Wheels Minimize dirt uplift from wheels

Page 18: ARTEMIS Advanced  Rover  Technology for Exploration on the Moon using  In Situ utilization

2-Dec-04 USC 2004 AME 557 Space Exploration Architecture

Radiation

Page 19: ARTEMIS Advanced  Rover  Technology for Exploration on the Moon using  In Situ utilization

2-Dec-04 USC 2004 AME 557 Space Exploration Architecture

Radiation

Rover shell is 2” of aluminum Partial In-Situ shield (1ft – 1.5 ft thickness) Flexible bladders (Internal & External) Fuel Cells

Page 20: ARTEMIS Advanced  Rover  Technology for Exploration on the Moon using  In Situ utilization

2-Dec-04 USC 2004 AME 557 Space Exploration Architecture

Dose

Page 21: ARTEMIS Advanced  Rover  Technology for Exploration on the Moon using  In Situ utilization

2-Dec-04 USC 2004 AME 557 Space Exploration Architecture

Problems

Coronal Mass Ejection Majority is protons Fequency varies with

sunspot cycle Solar min = 1 CME

week Solar Max = 2 to 3

PER DAY!!!!!!!!!!

1012 kg @ 1000 km/s

Page 22: ARTEMIS Advanced  Rover  Technology for Exploration on the Moon using  In Situ utilization

2-Dec-04 USC 2004 AME 557 Space Exploration Architecture

EVA

Pressurized and un pressurized sections Entrance / exit built into structure Ladders for side access

Page 23: ARTEMIS Advanced  Rover  Technology for Exploration on the Moon using  In Situ utilization

2-Dec-04 USC 2004 AME 557 Space Exploration Architecture

Way Stations

Arrive next to Way Station Use robotic arm for all supplies

Arm places materials through top No EVA

Page 24: ARTEMIS Advanced  Rover  Technology for Exploration on the Moon using  In Situ utilization

2-Dec-04 USC 2004 AME 557 Space Exploration Architecture

Sight

LCD monitors & cameras for piloting Use HDTV cameras and signal Located all around interior Main screen in front Screens act like windows for pilot Night lights by cameras

Page 25: ARTEMIS Advanced  Rover  Technology for Exploration on the Moon using  In Situ utilization

2-Dec-04 USC 2004 AME 557 Space Exploration Architecture

How we will win

Minimize complications Wheel size allows us to overcome most

obstacles Wheel base / spacing similar to HUMMER We can run at night Use of way stations

Page 26: ARTEMIS Advanced  Rover  Technology for Exploration on the Moon using  In Situ utilization

2-Dec-04 USC 2004 AME 557 Space Exploration Architecture

How we will win

We drive constantly rotation cycle crew of 3

  shift 1 shift 2 shift 3 shift 4 shift 5 shift 6 shift 7 shift 8 shift 9 shift 10 shift 11

Sean 8 8 0 8 8 0 8 8 0 8 8

Jesse 8 0 8 8 0 8 8 0 8 8 0

Cedrick 0 8 8 0 8 8 0 8 8 0 8

                      4 days

Page 27: ARTEMIS Advanced  Rover  Technology for Exploration on the Moon using  In Situ utilization

2-Dec-04 USC 2004 AME 557 Space Exploration Architecture

How we will win

Traverse fast in Maria, slower in HighlandsSpeed (mph)

Time (hrs)

Distance (miles)

Distance (km)

Total Distance (km)

Day 1 25 24 600 965.6 965.6

Day 2 25 24 600 965.6 1931.2

Day 3 15 24 360 579.4 2510.6

Day 4 8 24 192 309.0 2819.6

Day 5 9 24 216 347.6 3167.2

Day 6 8 24 192 309.0 3476.2

Day 7 9 24 216 347.6 3823.8

Day 8 9 24 216 347.6 4171.4

Day 9 12 24 288 463.5 4634.9

Day 10 11 24 264 424.9 5059.8

Day 11 10 24 240 386.2 5446.0

Finish race

Page 28: ARTEMIS Advanced  Rover  Technology for Exploration on the Moon using  In Situ utilization

2-Dec-04 USC 2004 AME 557 Space Exploration Architecture

How we will win

REUSEABLE ROVER!!! Hybrid power day/night use Towing capability Dust