arun bose 11.7. 15

7
ARUN BOSE Mechanical Engineer Project Management ~Process improvement ~ Plant Maintenance Email: [email protected] Mobile: 99 038 37077 98 304 04733 Telephone: 033 2417 0498 Address: 188/38/1 Prince Anwar Shah Road Kolkata-700045 West Bengal India Nationality: Indian BASIC PROFILE Academic Specialisation: Bachelor of Mechanical Engineering Jadavpur University.-West Bengal .Industrial experience with: Britannia Industries Limited, IFB Ltd, Hindustan Lever Limited, Philips India, Tata Motors Skill Set Leadership: Accountable for the timely execution of all the projects to agreed scope within approved budget Resolution of bottlenecks Development actions for the reporters Analysing existing process parameters and detailing for improvement plan. Functional: Responsible for leading the capital budgeting exercise Responsible for project detailing. Responsible for detailing improvement plan Execution: Providing detailed engineering to ensure proper interface between Design, plan and execution. Advice and act on resourcing of project execution. Execution of improvement plan and establish the same.

Upload: arun-bose

Post on 14-Aug-2015

210 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Arun Bose  11.7. 15

ARUN BOSE

Mechanical Engineer Project Management ~Process improvement ~ Plant Maintenance

Email: [email protected]

Mobile: 99 038 37077 98 304 04733

Telephone: 033 2417 0498

Address:188/38/1 Prince Anwar Shah RoadKolkata-700045 West BengalIndia

Nationality: Indian

BASIC PROFILE

Academic Specialisation: Bachelor of Mechanical Engineering

Jadavpur University.-West Bengal

.Industrial experience with: Britannia Industries Limited, IFB Ltd, Hindustan Lever Limited,

Philips India, Tata Motors

Skill Set

Leadership: Accountable for the timely execution of all the projects to agreed scope within approved

budget Resolution of bottlenecks Development actions for the reporters Analysing existing process parameters and detailing for improvement plan.

Functional: Responsible for leading the capital budgeting exercise Responsible for project detailing. Responsible for detailing improvement plan

Execution: Providing detailed engineering to ensure proper interface between Design, plan and

execution. Advice and act on resourcing of project execution. Execution of improvement plan and establish the same.

Additional qualification / experience: Good communication skill in English. Computing skills to prepare reports, presentations. Adequately proficient for project tracking. Experience in managing multiple projects at a time.

Page 2: Arun Bose  11.7. 15

PROFESSIONAL EXPERIENCE

Mrs Bector Foods Specialities Limited: (May 2013 to November 2013)

Designation:

Setting up of Greenfield project at Jigni Industrial area at Bangalore for manufacturing baked food products.

Britannia Industries Limited (March 1992 to Oct 2012)

Designation: Regional Project Manager

Setting up Greenfield and brown field projects pan India within budgeted cost and timeline

Project site management, plant maintenance, process improvement and plant stabilization in various plants across pan India, arranging for clearance of statutory licences.

Initiating and driving changes for increased profitability.

I.F.B Industries Limited (November ’91 to February ’92)

Designation- Manager- Vendor Development

Management of vendor base and providing techno commercial support.

Hindustan Unilever Limited (April ’91 to October ’91)

Designation- Manager- Project & Maintenance

Co-ordinate and installation of new Projects in Glycerine and hard soap area at Garden Reach factory

Philips India (January ’82 to March ’91)

Designation: Manager Technical Assistance Department

Setting up production line and tooling for new product introduction.

Improvement / changes in existing line for in house and co-maker’s production unit.

Maintenance of plant.

Tata Motors Limited (August ’79 to December ’81)

Designation: Graduate Engineer Trainee confirmed as Design Engineer machine tool division

Process Improvement by redesigning of tools and jig Fixture.

Machine tool, jig and fixture design.

Personal details:

Marital Status: Married with one son. Family: Mother, Wife and Son.

DOB: 25th January 1956 Passport: Available Plant, Maintenance, Food, Project

Page 3: Arun Bose  11.7. 15

Annexure to Bio Data of Arun Bose

Detail of projects handled

Mrs Bector Foods Specialities Limited: (May 2013 to November 2013)

Setting up of Greenfield project at Jigni Industrial area at Bangalore for manufacturing baked food products.

Service rendered

Finalising factory layout from scratch.

Finalising of electrical single line diagram from scratch.

Setting up of new vendor base for Bangalore unit from scratch.

Setting up of crucial infrastructure like:

DG sets

Electrical installation

Air compressor

RO water plant

LPG LOT system

Manufacturing equipment

Air handling unit

Ante rooms

Air , Water , RO water , LPG pipe line

Setting up of factory security system

Completed accounting system

Obtaining all statutory licenses for the new manufacturing unit.

Successfully formed functional teams for crucial integration of the project.

Britannia Industries Limited (March 1992 to Oct 2012)

Designation: Regional Project Manager

Projects handled:

Major Brown field projects-

Revamp of electrical substation by Installation and energizing 1.5 MVA electrical substation at Kolkata plant.

Commissioning and activation of activated sludge type Effluent treatment plant at Kolkata Plant.

Additional capacity generation by Installation of Biscuit production line and associated infrastructure at Ganges Valley Foods, a subsidiary of Britannia Industries

Additional capacity generation by installation of Biscuit production lines and associated infrastructure at Britannia Industries, Uttaranchal unit

Additional capacity generation by installation of Snacks production line and associated infrastructure at Manna Foods Pvt Ltd a subsidiary of Britannia Industries

Page 4: Arun Bose  11.7. 15

Additional capacity generation by installation of Biscuit production line and associated infrastructure at Sunrise Biscuit Co Ltd, Guwahati a subsidiary of Britannia Industries

Additional capacity generation by installation of cake production line and associated infrastructure at Eastern Bakery a co maker of Britannia Industries

Additional capacity generation by installation of Biscuit production line and associated infrastructure at EPIC, a co maker of Britannia Industries

Expansion of production capacity by Installation of Biscuit production line and associated infrastructure including building construction at Sunrise Biscuit Co Ltd , Guwahati a subsidiary of Britannia Industries

Installation of Rusk production line and associated infrastructure at EPIC a co maker of Britannia Industries

Construction of Depot space and associated infrastructure at EPIC a co maker of Britannia Industries

Major Green field project-

Installation of Biscuit production setup with associated infrastructure including building at Ganges Valley Foods a subsidiary of Britannia Industries

Installation of Rusk production line and associated infrastructure at Brahmaputra Foods Guwahati a co maker of Britannia Industries

Installation of Biscuit production line and associated infrastructure including 1.2 lakh Sq. ft. civil construction at Britannia Industries, Uttaranchal unit. Expansion scheme

Maintenance and improvement

Set up maintenance infrastructure and ensured equipment maintenance after project completion at Ganges Valley Foods a subsidiary of Britannia Industries for 4 years (2000 to 2003)

Budgeting of maintenance activity and setting up infrastructure for control of plant downtime and cost of maintenance.

Introduced low cost alternate fuel for baking which led to a saving of INR 25 Mn per Year.

Redesigning of production line equipment, and small step improvement carried out for improved performance of equipment resulting in increase of production by 14%...

Stabilisation of production and attaining rated production by rejigging equipment and production methodology of cake production at Sundaram Foods at Mangaldoi near Gauhati a co maker of Britannia Industries Limited.

Key achievements:

Coordinating for compliance of all statutory regulation.

Performing team building exercises at project site and factories.

Seamless integration of new venture with existing set up.

Project conception, design with viability study, technical detailing

Ensure completion of project within defined cost and time parameter.

Page 5: Arun Bose  11.7. 15

I.F.B Industries Limited (November ’91 to February ’92)

Designation- Manager- Vendor Development

Responsibilities

Planning and coordinating vendors’ activities.

Technical development and support to the vendors.

Introduction of Vendor evaluation system.

Key contributions:

Improved logistic control for movement of material to vendor's premises

Hindustan Unilever Limited (April ’91 to October ’91)

Designation- Manager- Project & Maintenance

Responsibilities

Co-ordinate and installation of new Projects in Glycerine and hard soap area at Garden Reach factory

Key contributions

Upgrading of centrifuge at Glycerin plant

Upgrading of Hard Soap production line.

Philips India (January ’82 to March ’91)

Designation: Manager Technical Assistance Department

Responsibilities

Setting up new production centre for vendors complying with Philips Standard.

Resolving technical problems at the vendor’s premises for uninterrupted production.

Interdepartmental coordination and technical planning

Industrial relationship management

Plant maintenance and support service.

Setting up of new equipment/ facility for introduction of new products

Key contributions

Machine and Equipment design

Reduction of plant downtime due to plant breakdown from 5% to 1%.

Successful installation of various production lines.

Implementation of cost control measures.

Page 6: Arun Bose  11.7. 15

Tata Motors Limited (August ’79 to December ’81)

Designation: Graduate Engineer Trainee confirmed as Design Engineer machine tool division

Responsibilities

Co-ordination and implementing technical improvement of critical production equipment

Design of machine tools

Design of jigs and fixtures

Resolving Tool room technical problem

Key contributions:

Design of jigs and fixtures and automated turning machine on crash basis.

Trained at state of art tool room for manufacture of jigs and fixtures.

Development of hydraulic fixture for differential housing machine.

Improvement of cutter geometry for better tool life.

Transfer line study and improvement.

Greaves Cotton & Co. Ltd. (November ’78 to August ’79)

Designation- Marketing Engineer