MADHYA PRADESH POWER TRANSMISSION COMPANY LIMITED STATE LOAD DESPATCH CENTRE, NAYAGAON, RAMPUR, JABALPUR Telephone: (0761) 2970089 Fax: (0761) 2664343/2970119 e-mail [email protected] Corporate office: Madhya Pradesh Power Transmission Co. Ltd., Block No.2, Shakti Bhawan, Rampur, Jabalpur 482008, CIN-U40109MP2001SGC01 No.07-05/SG-9B-II/3871 Jabalpur,dated:27/01/2017
To
As per distribution list
Sub: Minutes of 55th meeting of Operation and Coordination Committee of MP.
The Minutes of 55th meeting of the Operation and Coordination Committee of MP held
on 22nd December 2016 at 11:00 AM at hotel Vijan Mahal, Tilhari, Mandla Road, Jabalpur
has been uploaded on the website of SLDC ‘www.sldcmpindia.com’ and can be downloaded.
(K.K.Parbhakar) Member Secretary OCC SLDC,MPPTCL,Jabalpur
vkbZ ,l vks : 9001-2008
ISO: 9001-2008
Distribution List
1. The Chief Engineer (T&C), MP Power Transmission Co. Limited, Jabalpur. Fax No- 0761-2665593, 2702710 Email- [email protected]
2. The Chief Engineer (Plg & Des), MP Power Transmission Co. Limited, Jabalpur, Fax No- 0761-2660908 Email- [email protected]
3. The Chief Engineer (Procurement.), MP Power Transmission Co. Limited, Jabalpur, .Fax No- 0761-2660908 Email – [email protected]
4. The Executive Director (O & M:Gen), MP Power Generating Company Limited, Jabalpur. Fax No- 0761-2664749, Email- [email protected], Email- [email protected]
5. The Chief Engineer (O & M:Hydel), MP Power Generating Company Limited, Jabalpur. Fax No- 0761-2664749.
6. The General Manager(PM), MPPMCL, Jabalpur Email – [email protected] [email protected]
7. The Superintending Engineer (GCC), MPPGCL, Jabalpur Email – [email protected] [email protected]
8. The General Manger (DCC-EZ), DISCOM Control Centre, MP Poorva Kshetra Vidyut Vitaran Co. Limited, Jabalpur, Fax No- 0761-2668503, Email – [email protected]
9. The Dy. General Manager (DCC –CZ), DISCOM Control Centre, MP Madhya Kshetra Vidyut Vitaran Co. Limited, Bhopal, Fax No-0755-2580611,Email- [email protected]
10. The Executive Engineer (DCC-WZ), DISCOM Control Centre, MP Paschim Kshetra Vidyut Vitaran Co. Limited, Near Polo Ground, Jail Road, Indore, Fax No- 0731-2421554, Email- [email protected]
11. The Executive Engineer, Sub Load Despatch Centre, MPPTCL, Indore, Fax No- 0731-2874515, Email – [email protected]
12. The Executive Engineer, Sub Load Despatch Centre, MPPTCL, Bhopal, Fax No- 0755-2885220, Email – [email protected]
13. The General Manger(RO), MPPMCL, In front of Bhojpur Club, E-4, Arera Colony,Bhopal, Fax No-0755-2423046, [email protected]
14. The Chief Engineer (PM&C), Narmada Hydroelectric Development Corpn. Ltd, NHDC Parisar, Shamla Hills, Bhopal – 462013., Fax No- 0755-4030130,Email – [email protected]
15. The Chief Electrical Distribution Engineer, West Central Railway (WCR), General Manager’s Office, Electrical Department, Jabalpur-482001 (MP), Fax: 0761-2627629, Email- [email protected]
16. The General Manager, Indira Sagar Power Station, NHDC Office complex, PO : Narmada Nagar, Distt : Khandwa (MP) – 450 119, Fax No- 07323-284080, Email – [email protected]
17. The General Manager, Omkareshwar Power Station, Prashsnik Bhawan, Urja Vihar, Sidhwarkut, Distt : Khandwa (MP) – 450 554, FaxNo-07280-271703, Email- [email protected]
18. The Director (Projects), BLA Power Limited, At : Niwari, PO: Khorsipan, Tah : Gadarwara, Distt ; Narsinghpur 487 551, Fax No. 07791-243667 / 243669, Email – [email protected]
19. The Sr. Vice President, Jaiprakash Power Ventures Ltd., Village Sirchopi Subpost Office-Agasod, Post Office-Bina- 470113 Distt- Sagar, Fax No. 07580-277200, Email – [email protected]
20. The Deputy General Manager, Kalpataru Satpura Transco Pvt. Ltd., Satpura Colony, Betul Road, Old
Itarsi, Distt. Hoshangabad, Email – [email protected]
21. M/s Ujaas Energy Ltd. 701, NRK Business park, Vijay Nagar Sqaure, Indore – 452010, Email id :- [email protected]
22. M/s Suzlon Global Services Ltd., 1090, Scheme no. 114, Park-2, Ring Road, Universal Hospital Row, Email- [email protected], Indore – 452010, [email protected]
MINUTES FOR 55TH MEETING OF OPERATION & COORDINATION COMMITTEE OF MP HELD AT 11:00 AM AT HOTEL VIJAN MAHAL, TILHARI,
MANDLA ROAD, JABALPUR ON 22NDDECEMBER 2016.
The 55th meeting of Operation & Coordination Committee of MP held on 22nd December 2016 at 11:00 AM at hotel Vijan MahaL, Tilhari, Mandla Road, Jabalpur under the Chairmanship of Shri P.A.R. Bende C.E.(SLDC). The list of participants is enclosed at Annexure -1.0.
Shri C.Bhandari, CEO & GM Shri Tripathi (Kalpataru Satpura Transco Pvt. Ltd.), the host of 55th
OCCM welcomed Shri P.A.R. Bende C.E.(SLDC) & Chairman OCC, Shri K.K.Parbhaker Member Secretary OCC & Addl. C.E.(SLDC), Shri A.K.Shankule ED(O&M) Generation, MPPGCL and Shri S.N. Goyal C.E.(Plg.&Design.) with bouquet of flowers. Thereafter he welcomed all the guests and participants. Shri C.Bhandari apprised the participants about the company and presented the Power point presentation of Company. He stated that Kalpataru was established in the Year 1969 is the largest single location manufacturer of lattice steel structure. He also stated that the company is transporting Transmission Tower to 28 countries across the world and company has been honored by Engineering Awards from EEPC. Thereafter he requested Shri P.A.R.Bende C.E.(SLDC) & Chairman OCC to take up the proceedings of meeting.
Shri P.A.R.Bende C.E.(SLDC) & Chairman OCC welcomed all the participants attending the
OCCM. He greeted and congratulated M/s Kalpataru Transmission Pvt Ltd for excellent arrangement in the meeting. He stated that the frequency remained within operating band in the range 70-75 % in the month of October and November 2016 and frequency profile remained improved. The average frequency for the month of Oct & Nov 2016 was 50.00 Hz. and 49.99 Hz respectively which is a good sign and hoped that with collective efforts across the country, the frequency profile within the band will reach above 90% mark soon. He also intimated that MP SLDC has started computing ATC-TTC of MP and uploaded the same on SLDC website. He stated that overall scenario for last two months in MP system operation performed well despite N-1 constraint and requested MPPTCL for system studies considering import capability of MP with N-1 criteria.
Thereafter Chairman OCC requested Member Secretary, OCC to take up the agenda points.
ITEM NO. 1 : CONFIRMATION OF MINUTES : Member Secretary OCC informed the committee that Minutes of 54th meeting of Operation & Coordination Committee of MP held on 22nd October 2016 at SLDC, MPPTCL, Nayagaon, Jabalpur were forwarded to the committee members vide No. 07-05/SG-9B-II/3020 dated 18.11.2016. No comments have been received to SLDC, Committee confirmed the minutes. ITEM NO. 2 : REVIEW OF SYSTEM OPERATION DURING THE MONTHS OCT 2016 TO NOV 2016.
2.1 Frequency Particulars: Member Secretary OCCM informed the committee that during Nov 2016 the system frequency was below 49.9 Hz for 9.02% of time against 5.43% of time during Oct 2016. The system frequency was above 50.05 Hz for 19.04% of time during Nov 2016 against 19.80% of time during Oct 2016. The system frequency was within the IEGC range of 49.9-50.05 Hz for 71.94% of the time during Nov 2016 against 74.77% of time during Oct 2016. The average monthly frequency was 50.00 Hz during month of Oct 2016 and 49.99 Hz during month of Nov 2016. The system frequency did not touch 49.20 Hz during the above period.
The detailed frequency particulars for the month of Oct 2016 and Nov 2016 are enclosed at
Annexure-2.1. The brief detail of frequency profile is given here under:
Month Average Minimum Maximum Instantaneous Instantaneous Minutes of 55th OCCM of MP 1
Frequency integrated integrated minimum maximum frequency over frequency over frequency frequency an hour an hour
Oct 2016 50.00 Hz 49.89 Hz 50.11 Hz 49.74 Hz 50.25 Hz Nov 2016 49.99 Hz 49.78 Hz 50.09 Hz 49.54 Hz 50.27 Hz
2.2 Operational Matters
2.2.1 Operational Discipline : Member Secretary, OCC informed the Committee that system
operated in terms of frequency profile for the months Oct 2016 and Nov 2016 is as given below:-
Month % of time % of time % of time Average No. of times Frequency Frequency frequency within Monthly frequency Below 49.9 above 50. 05 Hz the permissible frequency dipped below Hz range of 49.9- 49.2 Hz 50.05 Hz Oct 2016 5.43 % 19.80 % 74.77 % 50.00 Hz 0 Nov 2016 9.02 % 19.04 % 71.94 % 49.99 Hz 0
Voltage Profile: Member Secretary, OCC informed the Committee that during the months Oct 2016 and Nov 2016, the maximum and minimum voltage as recorded at following important 400 KV s/s in MP Grid is as given below-
Oct 2016 Nov 2016 Max. Voltage Min. Voltage Max. Voltage Min. Voltage Name of observed observed observed Observed Sr 400 KV
Voltag Volt
No Substation Voltage ag Voltage
Date e Date Date Date KV e KV KV KV
1 Indore 425 12.10.16 395 25.10.16 423 01.11.16 394 11.11.16 2 Itarsi 419 13.10.16 394 25.10.16 416 17.11.16 388 11.11.16 3 Bina 418 12.10.16 395 24.12.16 417 14.11.16 393 07.11.16 4 Gwalior 414 11.10.16 384 06.10.16 419 22.11.16 387 19.11.16 5 Nagda 427 12.10.16 397 27.10.16 425 16.11.16 393 08.11.16 6 Satpura 428 12.10.16 403 16.10.16 426 01.11.16 403 08.11.16 7 Birsinghpur 425 31.10.16 410 20.10.16 426 17.11.16 408 04.11.16 8 ISP 429 12.10.16 405 22.10.16 427 01.11.16 403 30.11.16
2.3.2 Status of Capacitor Banks in sub-transmission system : Member Secretary, OCC informed the Committee that the updated information of the status of capacitor banks in sub-transmission system as on
30th Nov 2016 as submitted by DISCOMs is as detailed below:-
Minutes of 55th OCCM of MP 2
Capacitor bank Capacitor Capacitor Req Requirem Capacitor Balance installed in Banks bank installed Uirem ent against banks capacitor good condition healthy but but defective & ent of non- already banks to be (No) not in service are repairable Repair repairable Covered covered in due to control (No) Again capacitor under ADB other
ckt problem St banks T-V schemes Each (No)
DISCOM Unit 600 1200 1500 600 1200 1500 600 1200 1500 No of 600 1200 600 1200 600 1500 KVA KVA KVA KVA KVA KVA KVA KVA KVA 100 KVA KVA KVA KVA KVA KVA R R R R R R R R R KVAR R R R R R R Units
Required
EZ 409 159 26 - - - 32 13 01 29 0 0 0 0 0 77
CZ 5 687 686 0 0 0 0 0 0 0 0 0 0 588 0 0
WZ 638 544 485 17 16 09 14 11 75 237 2 11 - - 0 114
Chairman OCC stated that in the ongoing Rabi season, the availability of Capacitor Banks in the
distribution network is utmost necessary for maintaining the voltages within operational range. He also
requested the Discoms to furnish all the information in the prescribed format and ensure healthiness and
availability of Capacitor Bank during Rabi season.
2.3.3 Status of Shunt Capacitor Banks installed at various EHV Transmission Substation: The Member Secretary, OCC informed the Committee that the updated information of the status of installed capacitor banks (in MVAR) in EHV transmission system as on 30.11.2016 as submitted by MPPTCL is as given below:-
Voltage Capacitor bank Capacity
Capacitor banks
Total capacity as on 30.11.2016 Capacitor Bank
Class installed as on Added after already covered
Installed but defective
30.09.16 (MVAR) Last OCC
under ADB T-V
& are not repairable
Meeting (No & MVAR) (MVAR)
220 KV 100.00 MVAR 0.00
100.00 MVAR All in Service 132 KV 1205.00 MVAR 0.00 1205.00 MVAR 33 KV 4384.50 MVAR 72.00 4456.50 MVAR Total 5689.50 MVAR 72.00 5761.50 MVAR
The Member Secretary, OCC brought to the notice of the Committee that during the last three
meetings, MPPTCL assured to submit the details of capacity banks at EHV level within a week time but not received the same. He reiterated the need that this data is required for calculation of ATC/TTC
Minutes of 55th OCCM of MP 3
using PSS/E software which will not give correct results without modeling of capacitor bank details in PSS/E software.
MPPTCL representative agreed to furnish the information shortly.
2.3.4 Status of completion of ongoing Transmission Schemes being executed by MPPTCL: Member Secretary, OCC informed the Committee that the various ongoing Transmission Schemes completed during the current financial year 2016-2017 (up to Nov. 2016) and plan for completion of various ongoing Transmission Schemes for the Year 2016-2017 is enclosed as Annexure 2.3.4(i) and 2.3.4(ii).
2.3.5 U/F and df/dt Relay Operation U/F and df/dt Relay Operation: Member Secretary, OCC informed the Committee that the frequency did not touch 49.20 Hz during Oct 2016 and Nov 2016. There was no df/dt operation during the same period. (ii) Defective u/f, df/dt relays: Member Secretary, OCC informed the Committee that MPPTCL has informed that all the df/dt relays are in good/healthy working condition and where the U/F relays are not available, the numerical relays programmed for under frequency operation.
2.4 Power Cuts / Load restrictions/Differential Load Shedding by DISCOMS & group
allocation to 33 KV feeders :
(i) Member Secretary informed the committee that the details of DISCOM wise Power supply given to various domestic categories during the period Oct 2016 and Nov 2016 is enclosed at Annexure 2.4(i).
(ii) Group Allocation to Newly Commissioned existing EHV substations:- Member
Secretary OCC informed the committee that the region wise list of 33 KV feeders emanating from various newly commissioned/existing EHV substations for which groups have not been allocated is given in Annexure 2.4 (ii). The DISCOM wise details of pending group allocation to 33 KV feeders as informed by respective Discom representative is given as below:-
SN DISCOM Region No of 33 KV feeders for which groups to be allocated
01 Jabalpur Nil 02 EAST Sagar Nil 03
Rewa Nil
04 Total 05 Indore 03 06 WEST Ujjain 09 07 Total 12 08 Bhopal 10 09 CENTRAL Gwalior 03 10 Total 13
TOTAL Grand Total 25
East Discom representative informed the committee that 01 No. feeder group allocation has been done and there is no pending. Representative from Central Discom informed that 10 No. group allocations has been done, 2 Nos. feeders named as 33KV Jatkheda-I and Jatkheda-II at Minutes of 55th OCCM of MP 4
132KV Shyampur EHV Substation are not existing and remaining 13 Nos. feeders group allocation is under process. West Discom representative informed the committee that group allocation of 1 No. feeder has been done, 3 No. feeders are not existing and for remaining 8 No. feeder”s group allocation is under process. The current updated status is enclosed as Annexure-2.4(ii).
ITEM NO. 3 : OPERATIONAL PLANNNING:
3.1 Generating Units under planned outage and proposed maintenance programme : Member Secretary informed the committee that the annual maintenance /outages of thermal generating units of MPPGCL during Jan.2017 to Feb ‘17 is Nil as intimated by ED(O&M:Gen.), MPPGCL, Jabalpur.
3.2 Proposed shutdown programme of Transmission lines / Transformers: Member Secretary informed the committee that the he proposed shutdown of transmission elements for the period 01.01.2017 to 28.02.2017 submitted by MPPTCL is enclosed as Annexure-3.2. 3.3 Long outages of transmission and elements and protections : Chairman OCC informed the committee about the long outages of transmission elements and protections and the status submitted by MPPGCL/MPPTCL are given below:
SN
Line/Transformer/Breaker/ Reactor etc. under long outage
Outage date
Reason Response from Utility
1 220 KV Bus bar protection scheme at SGTPS Birsinghpur
07.09.16 Due to mal-operation 220 KV Bus Bar Protection kept out
MPPGCL representative informed that 220 KV Bus bar protection scheme of M/s GE India Bangalore has been commissioned on dtd.23-05-2016 & taken into service w.e.f. 26.07.2016. Due to mal-operation it has been kept out since 07.09.2016 as intimated by SE (ET&I), SGTPS. MPPGCL intimated that a tripping through LBB protection observed on 25.11.2016 during failure of lightning arrestor of Unit No.2. Further, M/s GE India Bangalore has been informed about the matter for attending the same. MPPGCL representative informed that 220 KV bus bar protection scheme is out of service and M/s GE India, Bangalore has been requested for attending the same. Member Secretary, OCC requested MPPGCL to expedite the matter for earlier restoration of 220KV bus bar protection from system security point of view.
2 Main Breaker of 400 KV Nagda-Rajgarh-II
23.07.15 Y-phase CT burst / BKR Problem
400 KV Rajgarh- II is charged from 400 KV Main Bus-I, for ensuring connectivity with Main Bus-II. The work is in progress with work of providing Reactor on ISP Bay. 400 KV Rajgarh-I is shifted in diameter of 315 MVA ICT-IV, which has facility to connect on Main Bus-I and Main Bus-II. This will impact when outage of Bus-II occurs in outage of Nagda-Rajgarh–II circuit. MPPTCL representative informed in the meeting that the work will be taken up by end of March 2017.
3. 40 MVA 132/33 06.10.15 Internal MPPTCL informed that the repair work has been
Minutes of 55th OCCM of MP 5
KV Transformer ECE make at 132 KV Lakhnadon
sparking in Y Ph. HV side winding.
completed and the transformer has been commissioned on dated 05.11.2016.
4. 315 MVA, 400/220 kV ICT-I at 400 kV S/s Bina.
15.10.15 Due to Buchholtz relay alarm.
The transformer bank is out of circuit from 02.08.2015. 2 No. 105 MVA Units of these banks have failed. The complete bank has to The 315 MVA X’mer Sr. No. 6005210 is out of circuit from 15.10.2015. The Transformer has been shifted from Bina to M/s BHEL works for repairs. MPPTCL representative informed that the order for repair has been placed, the transformer is shortly to be despatched and expected to be commissioned by end of January 2017 as intimated by MPPTCL.
5. 315 MVA, 400/220 KV ICT at 400 KV S/s, Julwaniya.
05.01.16 The ICT has been removed for installation at Bina 400 KV S/s and commissioned there at 16:49 Hrs. on dtd. 05.01.2016. In 52nd OCCM MPPTCL representative informed the committee that new Transformer of 315 MVA, 400/220 KV EMCO make order has been placed. MPPTCL representative informed the Committee that it will be commissioned by the end of Feb-2017.
6. 315 MVA, 400/220 KV X’mer II (TELK make) Main Breaker at 400 KV S/s Katni
03.11.15 X’mer commissioned through bus coupler breaker since commissioning.
It has come to notice that the transformer-II has been connected through bus coupler breaker both side (400 KV & 220 KV) and there is no main breaker for this 315 MVA X’mer-II. In 54th OCCM MPPTCL informed the committee work of 220 KV Ckt. breaker has been completed and 400 KV Ckt. Bkr. work is under progress. MPPTCL representative informed that the work will be completed by end of Jan., 2017.
7. 40 MVA ,132 /33 KV EMCO make X’mer Sr.No. HT-1344/ 11641 at 132 KV S/s Ashta
10.05.16 Transformer failed on dated 10.05.2016 as intimated by T&C, MPPTCL.
50 MVA 132/33 KV X’mer has been commissioned on 18.11.2016 as intimated by MPPTCL.
8. 12.5 MVA, 132/66/33 KV X’mer CGL make Sr. No. 23615 at 132 KV S/s Pichhore
19.05.16 Transformer failed on 19.05.2016 as intimated by T&C, MPPTCL.
The load is manageable through (1x20 + 1x40) MVA X’mers in running condition at S/s Pichhore. Hence replacement of failed X’mer is not required as intimated by MPPTCL. In 52nd, 53rd & 54th OCCM, Chairman requested MPPTCL P&D to submit letter for removal of transformer from Asset. Representative from P&D informed that matter will be settled by end of Jan., 2017.
9. 20 MVA, BBL Make X’mer (Sr. No.-2195/4) at 132 KV S/s Katangi.
08.07.16 Tripped on differential indication.
16 MVA 132/33 kv X’mer has been commissioned on dated 09.11.2016 as intimated by MPPTCL.
10.
12.5MVA, BBL Make (Sr. No.-1428/3) at 132 KV S/s Chapda.
Not intimated
X’mer failed It has been proposed to withdraw the X’mer from system as intimated by MPPTCL. Representative from P&D, MPPTCL informed that comments for withdrawal of transformer is required from T&C, MPPTCL for further needful,
11.
40 MVA, ECE Make X’mer (Sr. N0.-86020) at 132 KV S/s Shajapur.
14.06.16 Tripped on differential indication.
X’mer is under investigation and testing. Internal Inspection of X’mer shall be done as soon as monsoon permits. Transformer is likely to be charged by January 2017 as intimated by MPPTCL. Representative informed that the transformer has
Minutes of 55th OCCM of MP 6
been charged on 22.12.2016. 12.
50 MVAR Line Reactor of 400 KV Katni – Damoh Ckt at 400 KV S/s Damoh (PGCIL).
Not intimated.
Tan-∂ of the bushing was not correct.
In 54th OCCM MPPTCL informed the committee that by end of November, 2016 line reactor shall be put into service. MPPTCL representative informed that new bushing has been installed and after testing and oil filtration work reactor will be put into service by end of Jany.2017.
13.
40 MVA, 132/33 KV BBL X’mer at 132 KV S/s, Chourai
25.09.16 Defect developed in transformer
50 MVA 132/33 KV X’mer has been commissioned on dated 10.11.2016 as intimated by MPPTCL.
14.
160 MVA, 220/132 KV BHEL X’mer at 220 KV S/s Jabalpur
30.09.16 MPPTCL informed in the 55th OCCM Xmer tripped on differential protection.
MPPTCL representative informed that X’mer is under testing & investigation. Further Company engineer has visited the site and matter is under process.
15.
20 MVA, 132/33 KV X’mer at 132 KV S/s Jaora.
07.09.16 Capacity enhancement work (20 MVA X’mer to be replaced by 50 MVA X’mer).
20 MVA X’mer has been shifted from Jaora to Neemuch as intimated by MPPTCL. Installation of 50 MVA new X’mer has been done and Xmer commissioned on dtd. 05.12.2016 at 132KV S/S Jaora as intimated by MPPTCL.
16.
63MVAR 400KV Bus reactor-II at STPS, Sarni
06.09.16 Not intimated
The Bus-reactor is out of service since 06.09.2016. MPPGCL representative informed that the cause of outage shall be intimated shortly to SLDC and reactor shall be commissioned by end of March 2017.
ITEM NO. 4 : OPERATIONAL STATISTICS FOR THE MONTH OF OCT 2016 AND NOV 2016:
The Member Secretary, OCC informed the committee that the details of actual generation, Schedule
from Central Sector, demand etc. are given in the following Annexures:
Annex. 4.1 Unit wise actual Generation of MPPGCL thermal Units and station wise Generation of
MPPGCL & NHDC Hydel Units. Annex. 4.2 Power Supply Position. Annex. 4.3 Hourly Average of Availability and Demand. Annex. 4.4 Hourly average schedule Vs Drawal of DISCOMs.
ITEM NO. 5.0 : SYSTEM DISTURBANCE IN MP DURING OCT 2016 AND NOV 2016 : The Member
Secretary, OCC informed the committee that there was no major grid disturbance in MP during OCT
2016 and NOV 2016. Moreover, the Grid Disturbances and Grid Incidents in MP during these months
are given in Annexure 5.0.
ITEM NO. 6.0 : IMPORTANT OPERATIONAL ISSUES:- 6.1 STATUS OF COMPLETION OF ONGOING SCHEMES FOR COMMISSIONING OF REACTORS /
TRANSMISSION ELEMENTS:- The Member Secretary, OCC informed the committee that the present status regarding schedule and commissioning of reactors / transmission elements is as below:-
Minutes of 55th OCCM of MP 7
Sr. No.
400 KV S/S Size MVAR
Implementing Agency
Expected Date of Commissioning as intimated in last OCC
1 Bus Reactor : ISP
125 MVAR
NHDC NHDC informed that the order for bus reactor has been placed on 03.08.2016, drawing received for approval and tentative date of commissioning by end of June 2017. More over Chairman OCC requested NHDC to commission the reactor before ensuing monsoon 2017 i.e. before May 2017.
2 Line reactor at Nagda-ISP line at Nagda end
50 MVAR
MPPTCL MPPTCL representative informed in the 55th OCCM that the work will be completed by March 2017.
3 Line Reactor on 400 kV Satpura –ISP line at STPS.
50 MVAR
MPPGCL MPPGCL representative informed that re-tendering is under process for procure-ment of line reactor and it will be made available by June 2017.
4 Bus Reactor at SSTPS
125 MVAR
MPPGCL Work will be carried out under PSDF as intimated by MPPGCL. Thereafter Chairman OCC stated in 54th and also in 55th OCCM that procurement process can be started without waiting for PSDF approval. MPPGCL representative informed in the 55th OCCM that NIT shall be floated in the first week of Jan. 2017 and Reactor is expected by June 2017.
6.2 Provision of synchronization facility at EHV sub-stations of MPPTCL:- The Member Secretary,
OCC informed the committee that as per Grid Code, the synchronization facility should be available at all
the Power Stations, 400 KV Sub-stations and 220 KV Sub-stations and 132 KV sub-stations in the path
of black start. Further it was informed by chairman OCC that synchronization trolley at 400 KV S/s Indore
is not in order and requires immediate attention for its proper functioning. MPPTCL representative informed the committee that order of 69 no. synchronization trolley
has been placed and 1 no. synchronization trolley has been delivered for checking and testing purpose
at 220KV S/S Barwaha. Further MPPTCL representative informed that the synchronization trolley will be
delivered in Feb.2017.
6.3 The Procedure for processing the new TSS application by WRC Railway:- The Member Secretary, OCC informed the committee that Indian Railways have been declared as “Deemed Licensee” vide Hon’ble CERC order dated 05.11.15. It is also laid down in aforesaid order that for each of the state concerned, all the TSS operating therein shall be treated as a “single entity” operating under a “Fragmented Control Area”. The concerned SLDC has been designated as the Nodal Agency by Hon’ble CERC, with powers vested for managing the scheduling of power to all the Railway’s traction sub-stations deemed to operate as a single entity under a “Fragmented Control Area” in MP. As per the directives, the Railways have availed long-term inter-state open access for their 37 nos. existing Traction Sub-stations in MP, by scheduling 200 MW power from Ratnagiri Gas & Power Pvt. Ltd. (RGPPL), Ratnagiri (MS). Thereafter new TSS are being under commissioning.
The MPPTCL has framed a procedure for processing the new TSS applications of Railways for connecting the new/upcoming sub-station. The procedure as received is attached as Annexure-6.3. 6.4 Training on Power Systems at WRPC, Mumbai:- The Member Secretary, OCC informed the committee that WRPC, Mumbai has intimated that NLDC is going to organize training on Power Systems
Minutes of 55th OCCM of MP 8
for five days by the International Consultant (M/s Tractebel) at WRPC, Mumbai. The training programme has been scheduled from 09.01.2017 to 13.01.2017. WRPC has requested to nominate engineers with protection ground for this training. SLDC requested the concerned utilities for submitting the nominations to SLDC.
The concerned utilities have confirmed the nominations in the meeting.
6.5 LINE DIFFERENTIAL PROTECTION ON SHORT LINES:- The Member Secretary, OCC informed the committee that in the 128th Protection Committee Meeting of WRPC scheduled on 06.12.16 & 07.12.16 at WRPC Mumbai, Line Differential Protection provision on short lines was discussed. This is in regard to the recommendation of the Sub Committee on relay under protection Task Force for Power System Analysis under Contingencies (Para-14 in Sec. 6 of the Report under Relay Setting guidelines for Transmission Lines):
Many transmission lines are now having OPGW or separate optic fiber laid for the communication. Where ever such facilities are available, it is recommended to have the line differential protection as Main-I protection with distance protection as backup (built-in Main relay or standalone). Main-II protection shall continue to be distance protection. For cables and composite lines, line differential protection with built in distance back up shall be applied as Main-I protection and distance relay as Main-II protection. Auto-re-closer shall be blocked for faults in the cables.
The matter was discussed in the meeting regarding line differential protection provision on short lines. Chairman OCC requested MPPTCL, MPPGCL and other concerned entities to submit the list of short lines on which the line differential protection has to be provided.
6.6 DATA FOR PROTECTION SETTING OF 400 KV AND ABOVE SYSTEM:- The Member Secretary, OCC informed the committee that WRPC has submitted the format for collection of data of protection settings of 400 KV and above system from all generating stations, load sub-stations for submission to WRPC. The format is enclosed as Annexure-6.6. The data of 400 KV Bina, Bhopal, Pithampur, Katni, Indore, Nagda, Chhegaon and ISP is received from MPPTCL and ISP. However the requisite data of JP Bina, 400 KV Sub Station Astha, Julwania,, SGTPS, SSTPS and STPS is to be submitted to the SLDC by respective utilities. SLDC requested utilities to furnish the transformer protection and backup protection details in the prescribed format by 24th December 2016 so that same may be forwarded to WRPC/WRLDC. MPPTCL submitted the data for Ashta & Julwania 400 KV S/s. Further Member Secretary requested MPPGCL to submit the data within 3 days to SLDC for onward submission to WRLDC/WRPC. 6.7 Overloading of 220 KV Gwalior(PGCIL)-Malanpur Ckt. I & II:- Member Secretary, OCC informed the committee that presently loading of 220 KV Gwalior (PGCIL)-Malanpur Ckt. I & II remain on higher side and it is expected to increase further and may cause over loading of these lines. The matter was taken up with POSOCO by SLDC. The Addl. General Manager, POSOCO had advised to provide load trimming scheme at Malanpur and Mehgaon for contingency of 220 KV Gwalior-Malanpur lines. Accordingly, CE (T&C) had proposed load drop scheme (two stage) at 220 KV S/s Malanpur which was forwarded to WRLDC for concurrence. Stage-1
Minutes of 55th OCCM of MP 9
If load on any of Gwalior-Malanpur circuit exceeds 250 MW, 132 KV S/s Malanpur-Badgaon line shall be open at Malanpur end in 500 msec. This will give relief of nearly 50 MW to 70 MW. Porsa-Ambah link shall be kept open, when be load dropping scheme in service. Stage-2 If loading of Gwalior-Malanpur is still more than 250 MW after operating stage-1, then after 132 KV Morar-I&II, shall be tripped after 300 msec. (in addition to stage-1 time of 500 msec.)Tripping of 132 KV (Morar I&II) shall give load relief of 50 MW. The WRLDC has requested for time delay for stage-1 as 250 msec. instead of 500 msec. and
for stage-2 as 200 msec. instead of 500 msec to ensure that load relief is obtained within 500 msec. The
CE(T&C) has intimated that the settings suggested by the WRLDC for load trimming scheme in Gwalior
area of MP cannot be adopted because Zone-II tripping time of 220 KV feeder is 300 ms. To avoid mal
operation of load trimming scheme, it is necessary that Stage-I should be operated with delay of 500 ms,
so that necessary time discrimination of 200 ms with Zone-II can be provided. Similarly the time delay of
800 ms for Stage-II operation selected.
The same has been intimated to WRLDC and CE(T&C) was requested to implement the Load
Trimming Scheme in Gwalior area. MPPTCL representative confirmed the committee in the meeting that
the scheme has been commissioned at 220 KV sub-station Malanpur successfully on dated 18.11.2016.
6.8 Charging of 3rd 220 KV Interconnector between 765 KV PGCIL and 220 KV S/s Satna (MP):-
Member Secretary, OCC informed the committee that there are 2 Nos. 220 KV Interconnectors between
765KV S/s Satna (PGCIL) and 220 KV S/s, Satna. The load on these 220 KV Interconnectors sometimes
increases up to 240-250 MW during peak load hours due to increased irrigational demand of MP. Such
high loading of these lines may lead to interruption in the area if any of the line trips.
He informed to overcome the issue of high loading of these 220 KV Interconnectors, the Testing
Wing of MPPTCL has proposed that a part of the 220 KV Satna(PG)-Katni line may be utilized as 220 KV
IIIrd Interconnector between 765 KV S/s Satna (PGCIL) and 220 KV S/s, Satna by opening jumper at
Location No.5. The proposed arrangement shall be as given below:
OPENED LINE JUMPER SATNA PGCIL x---- I/C-III
I/C-II I/C-I 400KV S/S KATNI 220KV S/S SATNA MPPTCL
The proposal of Testing Wing of MPPTCL has been examined and necessary concurrence for this interim measure was given by WRLDC on 08.12.2016. MPPTCL and Power Grid WRTS-II shall coordinate for revised protection settings and confirm to SLDC and WRLDC before charging the 3rd
Minutes of 55th OCCM of MP 10
interconnector between Satna (PG) – Satna 220 KV (MP). Progress in this regard may be conveyed to SLDC during the meeting. Member secretary requested MPPTCL to coordinate with PGCIL the above matter and expedite the work. 6.9 Ten Daily Reservoir operation table of MPPGCL HPS:- Member Secretary, OCC informed the committee that in the meeting held in Regional Office of MPPMCL at Bhopal on 24.09.2016 to discuss availability from Sardar Sarovar Project, ISP & OPS and State Hydel Plants for Rabi season, MPPGCL had agreed to obtain ten daily reservoir operation table from WRD and NVDA for their operation of their hydro generators. In last 54th OCCM, request has been made to MPPGCL for furnishing the same to
SLDC by 29th October 2016, but the same is not received by SLDC.
SLDC has requested MPPGCL to pursue the matter with WRD and submit the Ten Daily
reservoir operation table in the OCCM.
MPPGCL representative submitted the ten daily reservoir operation table of Bargi HPS in the
meeting. Member Secretary requested MPPGCL to submit the ten daily reservoir operation table of remaining HPS to SLDC at the earliest. 6.10 Charging of new 50 MVA, 132/33 KV transformer at 220 KV Anuppur S/s without obtaining real time code from SLDC and taking load by S/s officials :- Member Secretary, OCC informed the
committee that on dtd. 10.12.2016 at around 17.47 hrs. the 50 MVA X’mer at Anuppur S/s was taken on
load without submitting documents required for confirmation of compliance of regulatory requirement and
without obtaining the code/clearance from SLDC. He pointed out that the switching operation of
transmission elements without obtaining code and intimation to SLDC is not desirable for safe, secure
and smooth operation of integrated grid and also violation of IEGC section 1.5, 5.6.2(b) and MPEGC
clause 1.14. Such violation was also noticed in past also i.e on dtd 10.04.2016 and 15.04.2016 when the
transmission elements in Satna and Rewa were charged without obtaining real time code from SLDC.
The same was also informed vide this office letter no. 07-05/RPC-51/164 dtd 16.04.2016.
The matter was discussed in the meeting and Member secretary requested MPPTCL & other
entities to circulate invariably the formats of documents required to submit to SLDC prior to charging of
new transmission elements to all related field officers/offices of MPPTCL and also instructed all field
officials to strictly adhere to the compliance of regulations.
6.11 Hand tripping of Transmission elements without obtaining real time code from SLDC by S/s officials: - Member Secretary, OCC informed the committee that on dtd. 14.12.2016 at around 11.30
Hrs. the 40 MVA 132/33 kV X’mer was hand-tripped at 132 KV sub-station Banda without intimating the
reason and obtaining the code from SLDC. Such unilaterally switching operation of transmission
elements without obtaining code and intimation to SLDC is not desirable for safe, secure and smooth
operation of integrated grid and also violation of IEGC section 5.2 (b), 5.6.2(b) and MPEGC clause 6.1.3. Member Secretary, OCC requested MPPTCL to avoid such occurrences in future and instruct the
substation officials/incharge to comply to the Grid Code to ensure safety of the integrated system.
Minutes of 55th OCCM of MP 11
6.12 : FRC computation for Generators of MP for dated 30.11.2016.:- Member Secretary, OCC
informed the committee that WRLDC has requested all the states to compute the Frequency Response
Characteristics (FRC) for dated 30.11.2016 for the generators under the control area of each state at the
time of 2300 MW generation loss at Anapara due to tripping of 400 KV Anapara-Sarnath Double Ckt. and
resulting in frequency dip from 50.16 Hz to 49.89 Hz (0.27 Hz). Accordingly MP SLDC has computed the
FRC of the generators under the control area of MP SLDC. The observation of the computation of FRC
are given below:
Sr.No.
Unit No. Actual net interchange before the
event (MW)
Actual net interchange
after the event (MW)
Change in net interchange
(MW)
Response of the unit
(%age)
1. STP-10 252.54 251.67 -1 -3.2 2. STP-11 248.78 253.39 4.61 17.2 3. SGTPS-1 152.26 152.93 1 4.1 4. SGTPS-4 154.26 154.26 0 0 5. SGTPS-5 497.55 497.55 0 0 6. ATPS 215.93 211.97 -4 -17.0
7. SSTPS-1 349.65 349.65 0 0 8. SSTPS-2 353.58 353.58 0 0
The Chairman, OCC pointed out that, from the results it can be seen that frequency response
has been observed only from STP-11 and SGTPS-1 units and no response has been observed from
other units of MPPGCL. Moreover STPS-10 and ATPS-5 have contributed their negative response which
is not at all desirable. Thus from above it appears that either the RGMO of the above units are not in
service or the working of RGMO is not proper.
SLDC vide letter no. 07-05/RPC-55/3313 dtd. 08.12.2016 requested MPPGCL to look into the matter for
investigating the reasons for not contributing the desired response by MPPGCL units / negative response
and submit the same to SLDC latest by 15.12.2016. The Information has not been received from
MPPGCL till now. It is therefore requested MPPGCL shall submit the same in the meeting.
Member Secretary requested MPPGCL to submit the FRC data to SLDC for further submission
to WRLDC?WRPC and ensure the implementation and proper working of RGMO.
6.13 Integration of New Transmission Elements into the Grid:- Member Secretary, OCC informed the
committee that the transmission system in Madhya Pradesh is growing at a rapid pace. The process of
integration/charging of new transmission elements belonging to each entity requires compliance of
certain regulatory requirements and sharing of information/submission of documents to SLDC/RLDC.
Therefore mandatory documents and not limited to, to be submitted to SLDC/RLDC prior to issue of
charging code for new transmission element are as follows:-
1. Copy of approval by Electrical Inspector.
2. Intimation by Transmission Licensee Regarding anticipated charging of new elements
(Annexure6.13-A)
Minutes of 55th OCCM of MP 12
3. List Of Elements to be charged and Element Rating details. (Annexure- 6.13-B). 4. Undertaking by Transmission Licensee in respect of Telemetry and communication (Annexure- 6.13-C).
All the intra-state entities are requested to provide the above data in prescribed formats (enclosed) to
SLDC/RLDC prior to charging of new transmission elements. He stated that the matter was discussed and brought to the notice of all entities during 54th
OCCM. However, the desired information is still not being furnished for all the new transmission elements. He requested the intra-state entities to furnish the required information for integration of all new transmission elements into the grid, to SLDC/RLDC prior to applying for charging.
Member secretary OCC requested MPPTCL to circulate the formats of documents (as mentioned
above) required to be submitted to SLDC prior to charging of new transmission elements to all the field
officers/offices of MPPTCL, and adhere to compliance of regulations. ITEM NO. 7: BLACK-START MOCK DRILL OF HYDEL POWER STATIONS : 7.1 Black Start mock drill of Hydel stations of MPPGCL :- Member Secretary, OCC informed the committee that the last black start mock drill of Gandhisagar HPS was completed successfully on 04.04.2016 with extending supply to 132 KV S/s, Bherugarh Ratadiya & Ujjain for Simhastha 2016. The Black Start Mock Drill at Bargi, Pench, Indira Sagar Power Station (ISP), Omkareshwar Power Station (OSP) and Tons HPS were successfully completed on 28.09.16, 06.10.16, 14.10.16, 15.10.16 & 20.10.16 respectively. As per IEGC Black Start Mock Drill need to be conducted once in every 6 months duration.
In compliance to IEGC, SLDC has proposed that the black start mock drill of Birsinghpur Hydel Power station in MP shall be conducted on 28.12.2016. Member Secretary requested the MPPGCL to take up necessary measures for conducting the Black Start Mock Drill. The black start mock drill of at Rajghat & Madikheda HPS in MP is proposed in the first week of Jan-2017.
Chairman OCC stated that the the Black Start Mock Drill of Birsinghpur HPS shall invariably be
done in presence of Mock Drill team (.i.e, officials from SLDC, MPPTCL & GCC,MPPGCL) on 28.12.2016. ITEM NO 8: SOME IMPORTANT MATTERS REQUIRED IMMEDIATE ATTENTION: 8.1 Quarterly Review of Crisis Management Plan: Member Secretary, OCC informed the committee
that as discussed and intimated in various OCCMs, quarterly review of crisis management report is to be
furnished to Chief Engineer (GM), CEA New Delhi under intimation to SLDC Jabalpur and WRPC
Mumbai. Further the NHDC & SLDC are submitting the quarterly crisis management report to CE (GM)
CEA, New Delhi under intimation to WRPC, Mumbai.
However despite continuous persuasion by SLDC other state utilities i.e. MPPTCL, MPPGCL and
IPPs are not submitting the report to CEA. Member Secretary requested the entities to submit the CMP
report in prescribed format for the second quarter of 2016-17 (July-Sept 2016) to CEA under intimation to
SLDC and WRPC, Mumbai.
Minutes of 55th OCCM of MP 13
8.2 Status of Physical & Cyber Security in Power Sector regarding: Member Secretary, OCC informed the committee that the Status of physical & cyber security in Power Sector for the first quarter (April to June 2016) has not been received from any of the state utilities. In the past also this report is not being furnished by any of the state utilities despite constantly pursuing the same by SLDC in OCC meetings and also through correspondence.
The state entities are requested to furnish the Status of physical & cyber security in Power Sector for First quarter and second quarter of 2016-17 (April-June & July-Sept 2016) directly to the Chief Engineer (GM), CEA New Delhi under intimation to SLDC Jabalpur and WRPC Mumbai. ITEM NO. 9: AVAILABILITY BASED TARIFF (ABT) RELATED ISSUES: 9.1 Status of AMR system installed at SLDC:
SLDC representative informed the Committee about the status of AMR data received through AMR
system in the month of Nov 2016. He informed that the complete data of 534 meters was received
through AMR system and data of 89 Nos meters (Monthly-67 & Partial – 22) was not received through
AMR system. The incomplete data is received due to site related issues such as network problem,
modem burnt, Non ABT meter installed, meter defective, Elster meter installed and time drift in meters or
due to some other problems. The status of data received through AMR system is invariably sent to all
concerned offices including SE(T&C) offices through email latest by 4th of every month for furnishing the
missing data alongwith monthly JMR data. Further following points are discussed and resolved as
under:-
1. SLDC requested the CE(T&C) office to take up the matter with M/s Secure Meters Ltd for resolving
the site related issues such as time drift in meters, meter defective, Non ABT meter & elster meters installed, network problem and modem burnt, list of interface points is available at website as Annexure-I. CE(T&C) office have assured to resolve the site related issues with M/s Secure Meters Ltd shortly.
2. SLDC representative informed that integration of ABT meters installed at the interface points of newly commissioned substation / Xmers / HT consumers / OACs / REGs – 85 Nos. He also informed that SLDC vide email dated 13.12.2016 forwarded the list of interface points to CE(T&C) office for furnishing the details of meters, modem and SIMs for integrating the ABT meters with AMR system of SLDC. He requested the (T&C) office to arrange to furnish the same on priority basis so that integration of the ABT meters with AMR system could be done by SLDC. (T&C) office representative have assured to furnish the details shortly.
3. SLDC representative requested the CE(T&C) office to issue instructions to M/s Secure Meters Ltd for deputing their engineer at SLDC in the beginning of every month for attending the problems and ensuring the readability of meters installed at the interface points. Chairman OCC also advised the T&C office representative to write letter to M/s Secure Meters Ltd. (T&C) office representative have assured to issue instructions to M/s Secure Meters Ltd.
9.2 Providing AMR facility for the ABT meters installed at MPPGCL :
SLDC representative informed that ABT meters installed at the interface points of the power stations
have been integrated with AMR system of SLDC except Tons HPS, Pench HPS and Bargi HPS. He also
informed that list of interface points whose ABT meter data not received through AMR system of SLDC
for the month of Nov’2016 has been emailed to GCC, MPPGCL on 14th Dec 2016 and requested
Minutes of 55th OCCM of MP 14
MPPGCL to take up the matter with M/s Secure Meters Ltd. for integrating the balance meters with AMR
system of SLDC and resolve the problems related with non-readability of meters integrated earlier
successfully. MPPGCL representative informed that Idea SIMs with GPRS + GSM facility have been
provided to M/s Secure Meters Ltd for Bargi HPS and integration will be done in 1 or 2 days, he also
informed that , Idea SIMs are being arranged to resolve the network issue to Tons HPS and Pench HPS
meters will be integrated after establishment of optical link.
Further, SLDC representative also requested MPPGCL to intimate the plan for integrating the ABT
meters installed at SSTPS. MPPGCL representative informed that replacement of meters with AMR
facility is in progress and shall be done shortly.
9.3 Energy Accounting and settlement of DSM charges of Discom embedded Open Access Customers connected at 33KV level.
SLDC representative informed that in accordance with Madhya Pradesh Electricity Balancing and
Settlement Code (BSC) 2015 and as decided in the 48th OCC meeting that energy accounting of Discom
Embedded Open Access Customers (DEOACs) shall be done by the Discom Energy Accounting Group
(DEAG) of Discoms. Accordingly, SLDC has provided the training and necessary inputs to Discom
officials on 11th Dec 2015 and requested the Commercial Sections of Discons to issue necessary
instructions to Discom Energy Accounting Group (DEAG) to take over the energy accounting of DEOACs
from the month of April 2016.
SLDC representative further apprise the Committee that East Discom & West Discom are doing the
energy accounting and issuing the DSM charges Bill of embedded customers from the month of April
2016, but, no feedback regarding issuance of DSM Bill / energy accounting of the embedded customers
from the month of April 2016 is received from Central Discom. The Central Discom representative
informed that DEAG of Central Discoms is doing the energy accounting of Discom embedded open
access customers w.e.f. April 2016.
9.4 Requirement of Centralized agency of Discoms for providing the energy injection data of Renewable Energy Generators:
SLDC representative informed that State Energy Account (SEA) is prepared and issued on 7th of
every month as per Balancing and Settlement Code 2015 of MPERC. SLDC considers the monthly
energy injection data of Renewable Energy Generators (REGs) connected at 33KV level and below
furnished by the respective SE(O&M) of the Discoms, however, Discom officials are not furnishing the
data by 3rd of every month despite repeated request made by SLDC. Sometimes the complete data is
not furnished by the Discoms by 7th of month, due to this the SLDC does not include the complete data
of REGs which later on get included in the revised SEA issued by SLDC. He further informed that
collection of REG data is a cumbersome process for which SLDC has to talk to various Discom officials
every month. He proposed that Discoms may appoint a centralized agency preferably Discom Energy
Accounting Group (DEAG) of DCC and made them responsible for furnishing the energy injection data of
REGs to SLDC in required format. This will help the SLDC to deal with only one agency of Discoms. The
Minutes of 55th OCCM of MP 15
Chairman OCC advise the SLDC to take up the matter with commercial sections / Managing Directors of
Discoms. 9.5 Energy Accounting of Renewable Energy Generators (REGs) connected at 33KV as per the data recorded in ABT meter installed at the pooling station:
SLDC representative informed that it was discussed and decided in the 45th OCC meeting that
energy accounting of Renewable Energy Generators (REGs) shall be done as per the actual data
recorded in ABT meters installed at the pooling station, SLDC has requested the commercial sections of
Discoms to furnish the details of meter, modem & SIM of the pooling station, but, Central & West Discom has mainly furnished the generator wise details whereas pooling station wise details are required for the purpose of energy accounting at pooling station. He further
apprise the Committee that Discom officials has informed that in case of solar generators ABT meters are
installed at the generators end only and standby meter is installed at the grid substation. In such cases
where there is no separate pooling station and standby meter is installed at the grid substation, the grid
substation shall be considered as a pooling substation as per MPERC draft REG regulations.
Accordingly, SLDC vide letter no. 2117 dated 02.09.2016 and 3344 dated 14.12.2016 has requested the
SE(T&C), Nagda, Bhopal, Ujjain of MPPTCL to furnish the details of ABT meters installed at the grid
substations, but, details have not been received so far. He requested CE(T&C) office to provide the
details of ABT meter installed at the grid substation and instruct the site officials to coordinate with Wind
& Solar Generators for providing AMR facility. CE(T&C) office have assured to do the same.
ITEM NO 10: SCADA/EMS RELATED ISSUES: 10.1 ARRANGENEMENT OF TELEMETRY OF IMPORTANT 220KV SUB STATIONS & 132KV S/S HAVING INJECTION FROM RENEWABLES/CAPTIVE POWER PLANTS OR HAVING INTERDISCOM FEEDERS & HAVING TRACTION FEEDERS- SLDC informed that a list of 50 S/s were identified for commissioning of telemetry Out of which around
fifteen RTUs (220KV Sirmore, 132KV Rewa, 132KV Satna, 132KV Biora,132KV Sironj, 132KV
Chanderi, 132KV Bercha, 132KV Arniakala, 132KV Sonkach,132KV Kannod, 132KV Poliakala, 132KV
Momin Barodia,132KV Pachore, 132KV Jeerapur, 132KV Petlabad,132KV Jaora,132KV Shankargarh,
132 Khacrod) are pending. MPPTCL agreed to arrange the commissioning of balance stations at the
earliest.
SLDC further informed that the telemetry of fourteen number of RTUs having railway traction feeder
i.e.132KV Betul S/s, 132KV Bahadurpur S/s, 132KV Banmore S/s, 132KV Chegoan S/s, 132KV
Morena S/s, 132KV Datia S/s, 132KV Mullapura S/s, 132KV Mulatai S/s, 132KV Berasiya S/s, 132KV
Mungaoli S/s, 132KV Sehore S/s, 132KV Shujalpur S/s, 132KV Meghnagar S/s, 132KV Ayodhya S/s)
is also pending to be commissioned for monitoring of railway drawal. MPPTCL informed that the
arrangement of PLCC panels and outdoor equipments required for commissioning of these RTUs is
under progress and commissioning shall be taken up in phased manner.
The matter regarding intermittent functioning of newly commissioned RTUs specifically at 132KV Kushi,
132KV Khilchipur, 132KV Vijaypur,132KV Alot, 132KV Icchawar,132KV Gudgaon,132KV Mandideep is
Minutes of 55th OCCM of MP 16
also discussed and MPPTCL assured to look into it and rectify the problems to ensure round the clock
functioning of these newly commissioned RTUs.
10.2 UPGRADATION OF EXISTING RTUS & DISCREPANCY IN TELEMETRERED VALUES RECEIVED FROM DIFFERENT EHV S/S & POWER STATIONS The present status of telemetry discrepancy including upgradation requirement is discussed in
detail. The list of following important locations where RTU upgradation is required to accommodate
renewable feeders/other feeders/transformers was discussed in detail:-
Sl No. Name of Substation
whose RTU is required to be upgraded
Name of feeders/transformers required to be included in telemetry
01 220KV Sidhi S/s
220KV Sidhi –Hindalco and 220KV Sidhi- Rewa feeder is not functioning since last three months.
02 132KV Gudgaon S/s
RTU is to be upgraded to provide telemetry of important renewable feeders i.e. 132KV Gudgaon-Kukru Windfarms. 132KV Gudgaon- 33kV Inox -1, 132KV Gudgaon- 33KV Inox-2.
03 220KV Birsingpur S/s
The telemetry of 220KV IC-1 & 132KV Shahdol feeder is not available since last six month
04
220 KV Dewas S/s
33 KV MP Windfarm feeder is not available 33 KV Jamgodarani feeder 1,2 is not available
05 132 KV Jaora S/s
33 KV Ratlam Wind 1,2 is not available
06 132 KV Alot S/s
33 KV Narbheram is not available
07 220 KV Badnagar S/s
33 KV Kshema Power is not available
08 220KV Pipariya S/S 220/132KV Transformer, 220KV Pipariya- 220KV Chichli feeder not available,132KV Gadarwara feeer telemetry wrong.
09 220KV Anuppur S/s 132KV Shahdol,132KV Kotma 2, 132KV TRF 2 telemetry not available.
10 132KV Kotma S/s 132KV Anuppur feeder telemetry not available 11 220KV Shivpuri S/s 220/132KV Transformer telemetry is not available 12 220KV Pandurna 220KV Pandurna-Chindwara telemetry is not available 13 220KV Kotar Telemetry of newly commissioned 132/33KV
Transformer not available 14 220KV Chatarpur S/s Telemetry of 132/33KV Transformer-2 not available 15 Satpura TPS Telemetred value of ICT and STP-ISP feeder is wrong
from Power Station end. SLDC informed that lot of inconvenience in grid management is observed and hence upgradation of
above mentioned RTU is to be taken up on top most priority for which MPPTCL agreed.
10.3 PRESENT STATUS OF PROCUREMENT OF RTUs BY MPPGCL:- The matter of procurement of RTU for Rajghat HPS and Bansagar III HPS was discussed in detail.
The Telemetry of Rajghat HPS is out since last two & half years. In response MPPGCL informed that the Minutes of 55th OCCM of MP 17
order has already been placed and approval of drawings is under progress. The RTU is expected to be
delivered in next three months.
10.4 COMMISSIONING OF COMMUNICATION CHANNELS FOR DUAL REPORTIG OF RTUS AS
PER BACKUP SLDC REQUIREMENT:- The commissioning of SCADA/EMS system at SLDC Jabalpur and backup SLDC Bhopal is
already completed and the additional communication channel is required to be extended to respective
control centers for testing with new SCADA/EMS system. SLDC requested MPPTCL & MPPGCL to
provide RTU wise progress.
SLDC further informed that a separate meeting with Communication officers has also been
arranged in SLDC on 19-12-2016 and modified communication plan submitted to MPPTCL was
discussed in detail. To commission communication channels as per backup SLDC requirement,
strengthening of existing wideband communication node is also required to be arranged. The
requirement of new wideband nodes and OPGW has already been submitted to MPPTCL and MPPGCL.
It was informed by MPPGCL that work shall be taken up shortly.
10.5 Arrangement of space, Power Supply for installation of PMUs panels & wideband node
equipments:- SLDC informed that the PMUs at MPPTCL 400KV Sub stations namely Bhopal, Bina, Indore, Katni,
Nagda has already been delivered and installation & commissioning is under progress. The necessary
arrangement for space and power supply at these sub stations is required to be ensured by MPPTCL.
MPPTCL confirmed to arrange the same before installation activities.
SLDC further informed that wideband node equipments at 220Kv Chindwara, 220KV Seoni,
220KV Ratlam,220KV Shivpuri, 220KV Indore SZ, 220KV Shujalpur, 220KV Neemuch,132KV Waidhan,
220KV Rajgarh, 220KV Malanpur,400KV Pithampur, 220KV Pithampur, 132KV Indore Chambal, Pench
& Gandhisagar HPS is expected to be commissioned within next four months. MPPTCL & MPPGCL
officials confirmed to look into the matter for necessary provisions of space, DCPS, Air conditions. 10.6 LONG OUTAGE OF RTUS, PROBLEM IN DATA AND VOICE CHANNELS- The long outage of telemetry of following S/s is discussed in detail:-
Sl. No. Name of Sub Station Out from /Remark
01 Rajghat HPS Out from last two & half years 02
132KV Morwa S/s
More then one and half Year
03 132KV Waidhan Out from six month. Channel problem between Anuppur to Jabalpur
04 132KV Beohari Out from more then six month
05 132KV Umariya Out due to problem in power supply module in PLCC panel at Birsingpur Sub station
Minutes of 55th OCCM of MP 18
06 132KV Balaghat Frequent Outage at least three four time in a day is observed.
07 220KV Sidhi Communication channel problem MPPTCL, MPPGCL officials confirmed to look into the matter to sort out/ rectification of above RTU/data
channel.
10.7 Telemetry of railway TSS Sub Stations:-
It was informed by SLDC that the telemetry of 36 Nos railway Traction Sub Stations is required to
be provided by railway for monitoring of drawal by each TSS and also monitoring of demand of railway in
MP. To finalise the telemetry scheme, a series of meetings of various filed offices from railway & SLDC
were held at SLDC Jabalpur on various occasions. In response railway officials informed that the work
regarding telemetry of TSS is under progress and telemetry is expected to be commissioned by June
2017.
ITEM No 11 : DATE AND VENUE OF NEXT OCC MEETING :
It is proposed to hold 56th OCC meeting of Operation and Coordination Committee of MP on
27.02.2017 at Conference Hall of State Load Despatch Centre, MPPTCL, Nayagaon, Jabalpur.
Minutes of 55th OCCM of MP 19
Minutes of 55th OCCM of MP 20
Minutes of 55th OCCM of MP 21
Minutes of 55th OCCM of MP 22
FREQUENCY PARTICULARS Annexure-2.1
S. No.
Particulars
Oct-16
Nov-16
1
INTEGRATED OVER AN-HOUR
1.1
Maximum Frequency
50.11 Hz
Between 13.00 hrs & 14.00 Hrs on 02.10.16
50.09 Hz
Between 13.00 hrs & 14.00 Hrs on 06.11.16
1.2
Minimum Frequency
49.89 Hz
Between 14.00 hrs & 15.00 Hrs on 20.10.16
49.78 Hz
Between 17.00 hrs & 18.00 Hrs on 30.11.16
1.3 Average Frequency 50 Hz 49.99 Hz
2 INSTANTANEOUS FREQUENCY
2.1
Maximum Frequency
50.25 Hz AT 13.02 HRS ON 08.10.16
50.27 Hz AT 22.07 HRS ON 17.11.16
2.2
Minimum Frequency
49.74 Hz AT 17.53 HRS
ON 20.10.16
49.54 Hz AT 17.43. HRS ON
30.11.16 3 Percentage of time when frequency was :-
%age of time when frequency was
Oct-16
Nov-16
3.1
Below 48.5 Hz
0.00
0
3.2
Between 48.50 Hz and 48.8 Hz
0.00
0
3.3
Between 48.80 Hz and 49.2 Hz
0.00
0
3.4
Between 49.20 Hz and 49.5 Hz
0.00
0
3.5
Between 49.50 Hz and 49.7 Hz
0.00
0
3.6
Between 49.70 Hz and 49.9 Hz
5.43
9.02
3.7
Between 49.9 Hz and 50.05 Hz
74.78
71.94
3.8
Between 50.05 Hz AND 51.5 Hz
19.80
19.04
3.9
Above 51.5 Hz
0.00
0.00
4
No. of times frquency touched 48.80 Hz
0
0
4.1
No. of times frquency touched 48.60 Hz
0
0
4.2
No. of times frquency touched 51.0 Hz
0
0
Minutes of 55th OCCM of MP 23
Date Indore Itarsi Bina Gwalior Nagda Birsingpur ISP
Max Min Max Min Max Min Max Max Max Min Max Min Max Min 1 422 409 418 407 412 395 421 408 2 422 410 419 409 414 393 423 410 3 420 403 417 402 409 393 421 407 4 418 405 415 403 411 393 420 407 5 420 406 418 404 411 393 423 407 6 420 402 417 399 408 384 423 404 7 421 406 416 403 409 393 423 407 8 421 407 416 404 410 392 422 408 9 420 407 417 403 412 392 423 409
10 422 408 417 407 409 396 424 410 11 420 411 417 409 414 399 422 414 12 425 405 419 403 412 394 427 407 13 422 406 419 403 410 397 424 406 14 420 401 415 398 408 391 423 403 15 415 400 413 400 407 391 418 403 16 417 401 416 401 409 391 420 406 17 415 399 414 399 407 390 419 403 18 413 398 413 400 408 396 418 403 19 414 395 414 396 411 394 418 400 20 413 397 412 398 413 397 416 399 21 416 395 414 395 413 393 419 397 22 414 396 411 398 405 392 419 398 23 414 401 411 400 413 397 418 403 24 417 398 414 395 410 392 418 398 25 417 395 413 394 408 393 417 397 26 419 398 414 395 409 393 419 399 27 417 397 413 395 408 395 417 397 28 416 401 414 397 407 392 416 400 29 418 399 413 397 409 394 419 400 30 423 404 415 400 411 397 423 402 31 423 408 416 403 411 397 420 404
Max /Min 425 395 419 394 0 0 414 384 427 397 0 0 0 0
Voltage Profile During the Month of October- 2016
Voltage Profile During the Month of November - 2016
Date Indore Itarsi Bina Gwalior Nagda Birsingpur ISP
Max Min Max Min Max Min Max Min Max Min Max Min Max Min 1 423 407 416 402 410 399 422 404 2 421 403 415 397 407 395 420 401 3 420 402 415 398 413 393 419 400 4 420 398 414 394 409 393 421 399 5 417 400 409 394 412 393 418 399 6 418 396 412 391 410 394 421 393 7 420 397 413 391 409 391 423 395 8 420 396 414 392 409 392 421 393 9 419 396 412 392 408 390 422 395
10 419 396 413 393 410 391 423 396 11 418 394 413 388 410 392 424 395 12 419 402 413 397 412 391 422 402 13 419 403 414 398 410 395 422 404 14 419 399 415 394 414 391 421 400 15 420 399 414 395 411 392 422 401 16 422 401 416 397 414 392 425 402 17 422 397 416 395 415 388 424 399 18 419 398 414 393 414 389 424 399 19 419 397 414 394 417 387 421 398 20 420 397 414 394 416 397 423 396 21 416 398 413 394 419 394 423 400 22 417 398 413 393 419 393 421 399 23 418 395 414 392 415 391 422 396 24 419 398 413 393 413 390 422 401 25 418 400 413 395 418 398 424 400 26 417 398 411 392 416 394 421 399 27 419 398 414 393 415 395 424 401 28 418 401 413 398 414 390 421 402 29 419 398 413 394 413 392 420 400 30 417 396 412 390 411 393 421 395 31
Max /Min 423 394 416 388 0 0 419 387 425 393 0 0 0 0
Minutes of 55th OCCM of MP 24
ANNEXURE - 2.3.4(i)
M.P POWER TRANSMISSION COMPANY LIMITED TRANSMISSION WORKS COMPLETED DURING 2016-17 (UP TO 30.11.2016)
I EHV TRANSMISSION LINES S.
No.
NAME OF THE TRANSMISSION LINE / (FINANCED BY)
TYPE OF CIR CUITS
ROUTE LENGTH
CIRCUIT KMS.
DATE OF COMPL- ETION
DATE OF COMMI- SSIONING
A. 400 KV TRANSMISSION LINES NIL 0 0
B. 220 KV TRANSMISSION LINES
1 LILO of 220 KV Katni - Satna line at PGCIL, Satna DCDS 0.7 1.40 April'16 09.04.2016
2
LILO of one Ckt of 220kv DCDS Bhopal - Ashta line at 220kv S/S Mugaliya chhap. (DCDS) (2x26.459) (JICA)
DCDS 26.46 52.92 June'16 18.06.2016
3 LILO of 220KV line Indore 400 -Pithampur at Pithampur-II 220Kv S/s in Indore (2x6.898) (PFCIIi)
DCDS 6.90 13.80 June'16 10.06.2016
4
220Kv DCDS line from 400Kv S/s Bina to plant of M/s Bharat Oman Refinaries Ltd. Agasod, Bina (2x18.197) (Contr.Works)
DCDS 18.197 36.394 Aug'16 01.08.2016
C. 132 KV TRANSMISSION LINES
1 2nd Circuit of 132 Kv Gudgaon - Kukru Wind Power Ltd. Betul (Contributory work)
2nd ckt 22.5 22.50 Aprilo'16 07.04.2016
2 LILO of one circuit of Mandideep - Hoshangabad for 132 KV Sub-Station Tamot(2x1.686) (REC-I)
DCDS 1.686 3.37 Aprilo'16 30.04.2016
3 2nd Ckt. Of 132 Kv DCSS Gairatganj- Vidisha line (48.30) ADB-III 2nd ckt 48.27 48.27 May'16 10.05.2016
4 132Kv 2phase 2wire S/c line from 132Kv s/s Amla to GSS Bordehi of RVNL(1x23.5) Contrib
DCSS 23.29 23.29 May'16 06.05.2016
5
132Kv DCSS line from 132Kv S/s Madhotal to 11.5 MW Processing Plant of M/s Essel Jabalpur MSW Pvt.Ltd. at Kathonda Dist- Jabalpur Contrib.
DCSS 2.52 2.515 May'16 02.05.2016
6
2nd Ckt.of 132 KV Rewa - Mangawan line (Dist. Rewa) (JICA) approch section of mangawan end (4x2.079+1x6.75) (JICA) (Balance work)
2nd Ckt 8.829 15.066 June'16 27.06.2016
7 132 kv DCSS Datiya- Bhander line (1x34.038)ADB-III DCSS 34.04 34.04 June'16 27.06.2016
Minutes of 55th OCCM of MP 25
8 132 kv DCSS Ashoknagar - Kothiya line (1x27.5+4x2.5) ADB-III DCSS 37.50 37.50 June'16 09.06.2016
9 132 kv DCSS line from 132Kv S/s Lahar - 132Kv S/s Seondha (1x15.5) PFC-III
DCSS 16.70 16.70 June'16 24.06.2016
10 2nd ckt of Betul - Gudgaon line (1X57) ADB-III 2nd ckt 57.00 57.00 June'16 24.06.2016
11 132 kv DCDS line Panagar - Katangi (2x29.471) PFC-II DCDS 29.47 58.94 JULY'16 04.07.2016
12 132 kv DCSS line from 132Kv S/s Porsa - 132Kv S/s Ambah (1x22.524) PFC-III
DCDS 22.52 22.52 Aug'16 11.08.2016
13
2nd Ckt.of 132Kv DCSS Katangi tap line tapped to one ckt. Of 132Kv Balaghat-Seoni line (1x0.5+35.67) ADB-III
DCDS 35.67 35.67 Aug'16 29.08.2016
14 132 kv DCSS line Mehgaon - Pratappura (1x29.74) ADB-III DCDS 29.74 29.74 Aug'16 31.08.2016
15 132kv Jeerapur -Susner DCSS line (1x30.236) (JICA) DCSS 30.24 30.236 Sept'16 21.09.2016
16 2nd ckt of 132kv Bairagarh - Shyampur line (1x0.5+4x1.9+19) (ADB-III)
2nd ckt 19.04 19.04 Sept'16 28.09.2016
17
132 kv Ashoknagar - Eshagarh DCSS line (1x37) (Transco) (Est.Sanc.-0281dtd. 17.03.2015 for Rs.1895.67)
DCSS 38.50 38.50 Sept'16 30.09.2016
18
132KV DCDS line from 132KV S/s Pithampur (to be upgrated) for Pithampur SEZ Phase-II of AKVN(2x0.54) (contr. work)
DCDS 0.54 1.08 Sept'16 10.09.2016
19 132 kv DCSS line Datiya - Dabra (1x23.091) PFC-III DCSS 23.09 23.09 Oct'16 comm. On
10.10.2016
20 2nd ckt of 132kv RTS Mangliyagaon line (Contr. Work) 2nd ckt. 8.82 8.82 Oct'16 comm. On
19.10.2016
21 2nd ckt of 132Kv Chhatarpur- Khajuraho line (1x0.5+33.2) ADB-III 2nd ckt. 32.00 32 Oct'16 comm on
19.10.2016
22 2nd ckt of 132kv Kukshi - Alirajpur line (1x1+35.82) ADB-III 2nd ckt. 35.82 35.82 Oct'16 comm. On
22.10.2016
23 2nd Ckt. Of 132 Kv DCSS Tikamgarh- Budhera line (32.138) ADB-III 2nd ckt. 32.14 32.14 Oct'16 comm. On
26.10.2016
24 LILO of 132 kv Manawar - Kukshi Line at 132Kv S/s Singhana(2x3.1) ADB-III
DCDS 3.10 6.2 Oct'16 comm on 27.10.2016
25
132Kv DCDS line for LILO of both circuit of 132Kv Banmore -Morena/Hetampur DCDS line for 220Kv S/s Morena(2x0.781+4x2.974) (PFC-III)
DCDS 3.755 13.46 Nov'16 comm. On 06.11.2016
Minutes of 55th OCCM of MP 26
26 LILO of 132 kv Chhegaon - Nepanagar Line at 132Kv S/s Pandhana(2x1.895) ADB-III
DCDS 1.895 3.79 Nov'16 comm. On 04.11.2016
27 LILO of Khargone - Julwaniya DP line(132Kv) at Talakpura (2x1.1+1x0.8) ADB-III
DCDS 1.900 3.80 Nov'16 comm. On 20.11.2016
II. EHV SUB - STATIONS
S. No.
NAME OF SUBSTATION / (DISTRICT) / (FINANCED BY)
VOLTAGE RATIO
(KV)
No.OF X-mer & Cap. (MVA)
EFFECTIVE CAPACITY
MVA
DATE OF COMPL- ETION
DATE OF COMMI-
SSIONING
A. 400 KV SUBSTATIONS
1 1x125 MVAR 400 Kv Bus Reactor at existing 400Kv S/s Nagda ADB-III 400Kv Aug'16 09.08.2016
Nil 0.00 B. 220 KV SUBSTATIONS
a. 220 KV NEW SUBSTATIONS
1 220kv switching S/s at Nagra Dist- Ratlam Contrib.
220/132 KV 0.00 0 May'16 30.05.2016
2 Mugaliachhap(Bhopal) 220kv (New S/s)(1x160+40) (JICA)
220/132 KV 1x160 160 June'16 20.06.2016
C. 132 KV SUBSTATIONS
a. 132KV NEW SUBSTATIONS
1 Pratappura 132 KV New S/s (1x40) ADB-III (Dist- Bhind) 132/33KV 1x40 40 April'16
12.04.2016(33KV side)
&31.08.2016 (132KV side)
2 Tamot 132kv s/s (Distt. Raisen ) 1x50MVA (Transco) 132/33KV 1x40 40 May'16 05.05.2016
3 Bhander 132kv s/s (Distt. Datia) 1x63 (ADB-II) 132/33KV 1x63 63 June'16 28.06.2016
4 Kothiya 132kv s/s (Distt. Guna ) 1x40 MVA (ADB-III) 132/33KV 1x40 40 June'16 09.06.2016
5 Katangi 132kv s/s with 1 no. 132 kv feeder bay & 1x40 MVA (Distt. - Jabalpur) (PFC-III)
132/33KV 1x40 40 June'16
28.06.2016 from 33kV
& 05.07.2016 from 132Kv
6 Pithampur SEZ- II 132kv s/s 1x63 MVA (Distt.Dhar) (contr.work) 132/33KV 1x63 63 Sept'16 19.09.2016
7 Singhana 132kv s/s (Distt. Dhar) 1x40 MVA (ADB-III) 132/33KV 1x40 40 Oct'16 comm on
27.10.2016
8 Pandhana 132kv s/s (Distt. Khandwa) 1x63 MVA (ADB-III) 132/33KV 1x63 63 Nov'16 comm. On
04.11.2016
Minutes of 55th OCCM of MP 27
9 Talakpura 132kv s/s (Distt. Barwani) 1x40 MVA (ADB-III) 132/33KV 1x40 40 Nov'16 comm. On
23.11.2016
Minutes of 55th OCCM of MP 28
EHV TRANSMISSION WORKS UNDER PROGRESS AS ON 30.11.2016 Annexure-2.3.4(ii)
S.
No.
NAME OF THE TRANSMISSION LINE
CKT. KMS.
PROGRESS
IN %
Target for commis- sioning
A. 400 KV TRANSMISSION LINES 1 NIL 0 0% -
Sub Total (A) 0 B. 220 KV TRANSMISSION LINES 1 2nd Ckt of 220kv Satna - Chhatarpur line (152) 160 8% 2016-17
2
Upgradation of 132KV D/C Indore-II (Jaitpura) - Indore(N/Z) line on composite multi circuit monopole & LILO of one Ckt of 220kv Indore-II (Jaitpura) - Indore(400KV) line at 220kv S/S Indore(N/Z) (2x0.5+2x4+4x6.7)
35.8
44%
2018-19
3 220Kv DCDS line from Gwalior(Malanpur)- Morena (2X29.25) 58.5 60% 2016-17
4 LILO of one Ckt of 220kv DCDS Ashta - Dewas line at 220kv S/S Chapda (DCDS) (2x32.782)
66
3%
2017-18
5 220Kv DCDS line from Pithampur-Depalpur line (2X31) 62 37% 2017-18
6 220Kv FCFS line for LILO of both Ckt. Of Badnagar -Ratlam D/C line at 400Kv S/s Badnawar (2x1+4x8)
34
4%
2017-18
7 220Kv DCDS Julwaniya- Kukshi (2X58) 116 16% 2017-18 8 220Kv DCSS Shujalpur- Narsinghgarh line (1X43.6) 44 15% 2017-18
9
220Kv DCDS Morena(400KV S/s CWRTL Adani Group) - Sabalgarh DCDS line (2X57.339)
114.678
4%
10
LILO of 2nd ckt. Of Bansagar - Satna 220Kv line at Kotar 220 KV S/s. (2X5.693)
11.386
8%
C. 132 KV TRANSMISSION LINES 1 132kv Ichhawar -Sehore DCSS line (1x35.298) 35.298 66% 2017-18 2 132 kv DCDS Ujjain(220 kv) -Chandrawatiganj line (2x35.42) 70.84 79% 2016-17 3 132 kv DCSS Dewas-Barotha line (1x23) 23 60% 2016-17 4 132 kv DCSS Ghatabillod-Betama line (1x18) 18 29% 2016-17 5 132kv DCSS Gautampur -Depalpur line (1x19) 19 20% 2016-17 6 132kv Nagda(220kv)- Kachrod-Jaora DCSS line (1x64) 64 18% 2016-17 7 132kv DCSS Shujalpur( 220kv) -Pachhore DCSS line (1x35.5) 35.5 81% 2017-18 8 132kv Mugaliya Chaap - Sehore DCSS line (1x24) 24 14% 2016-17
9
132 kv DCSS line between 132Kv S/s Nasrullaganj & 220KV Itarsi s/s(1x53.209)
53.209
38%
2017-18
10
LILO of S/C ckt of 132 KV Seoni-Lakhnadon line at 220kv S/S Seoni (2x20)
40
5%
2017-18
11 132 kv DCSS Guna-Eshagarh line (1x72) 72 32% 2017-18 12 132 kv DCSS Line from 220Kv S/s Shivpuri-132Kv Bairad (1x32.859) 32.859 32% 2017-18 13 132 kv DCSS from 220Kv S/s Datiya-132kv S/s Indergarh (1x27.1) 27.1 49% 2017-18 14 132 kv DCSS line from 132Kv S/s Kymore-132Kv S/s Barhi (1x35) 35 5% 2017-18 15 132 kv Sirmour - Katra DCDS line (2x37.67) 75.34 18% 2017-18
16
132 kv DCSS line from220Kv S/s Chichli - 132Kv Karapgaon (1x31.059)
31.059
3%
2017-18
17 132 kv Sagar-Rahatgarh DCSS line (1x55) 55 13% 2016-17 18 132Kv DCSS line from 220Kv S/s Rajgarh to 132Kv S/s Jhabua (1x50) 50 33% 2016-17
19
LILO of Both circuit of 132 kv DCDS Gwalior(Mahalgaon) - Dabra/Karera line at 220 KV S/s Gwalior II) (2x2x7.87)
55.09
36%
2016-17
21 132 kv DCSS Dewas-Agrod line (1x20.76) 20.76 24% 2017-18
22 132 kv DCSS Khurai- Khimlasa line (1x20.937) 20.937 20% 2017-18
Minutes of 55th OCCM of MP 29
23
LILO of 132Kv Mungaoli Traction feeder at 132Kv S/s Mungaoli (4x7.8+2x0.7) Note: (4x7.8ckt.km line charged on 30.12.2015 by tapping )
32.6
96%
2017-18
24 LILO of 132Kv Vidisha- Bairasiya line at salamatpurr (2x0.162) 0.324 46% 2016-17 25 132 kv DCDS Line Chichli - Udaypura (2x47) (On 220Kv Tower) 94 28% 2018-19 26 132 kv DCSS Panagar - Patan line (1x22.749) 22.749 7% 2017-18 27 132 kv DCSS Badnagar - Chhayan Line (1x31) 31 33% 2016-17 28 132 kv DCSS Dhar - Teesgaon line (1x15.35) 15.35 16% 2017-18
31
LILO of 132 kv Ratlam - Meghnagar line at 132Kv S/s Petlawad (2x7.4)
14.8
5%
32 132 kv DCDS Beragarh - Intkhedi (2x8.7+4x1.5) 23.4 55% 2017-18 33 132 kv DCSS Udaipura - Silvani line (1x25.8) 25.8 38% 2017-18 34 132 kv DCSS Narsinghpur - Devnagar (1x23) 23 13% 2017-18 35 132 kv DCSS Karakbel - Belkheda (1x24.445) 24.445 11% 2017-18 36 132 kv DCDS Narsinghpur - Karakbel line (2x23) 46 15% 2017-18 37 132KV DCSS Sabalgarh - Kelaras line (1x25) 25 7% 2016-17 38 132kv DCDS line from Guna - Bhonra (2x25) 50 5% 38 132kv DCSS line from Kolaras - Mada line (1x18.366) 18.366 2%
39
132kv Birsinghpur -Shahdol DCSS line (1x45) (Revised Estt. Sanc.no.0187dtd.05.09.2016)
45
5%
2018-19
40
132 kv DCSS Line from 220Kv S/s Barwaha - 132Kv S/s Kishangarh (1x57.139)
57.139
92%
2016-17
41
132Kv 2 phase 2wire line from 132Kv s/s Semri-Harchan for PS to RTS Bagra Tawa(1x4.3)
4.3
98%
42
132Kv DCSS 2 phase 2wire line from 132Kv s/s Majhgawan for PS to TSS Majhgawan(1x0.19)
0.19
89%
43
132Kv DCSS 2 phase 2wire line from 132Kv s/s Rewa for PS to TSS Rewa(1x0.4)
0.4
73%
44
132Kv DCSS line from proposed 132Kv s/s Tamot to Sagar Yarn plant of M/s Sagar Manufacturer (P) Ltd.(1x3.1)
3.1
30%
S.
No.
NAME OF THE SUBSTATION
EFFECTIVE CAPACITY
MVA
PROGRESS
IN %
Target for commis- sioning
A. 400 KV SUBSTATIONS
1 400 KV sub-station Balaghat/Kirnapur with 2x100MVA 400/220 kv x-MER+ 1X40 MVA X-mer (Distt.Balaghat)
200
9%
2017-18
2
400 KV sub-station Badnawar with 2x315MVA 400/220 KV X-mer (Distt.Balaghat)
630
8%
2017-18
3
Bhopal (Sukhi Sewaniya) 400/220 kv s/s Addl. 315 MVA X-mer (Distt.Bhopal)
315
19%
2016-17
4 Chhegaon 400/220 kv s/s Addl. 315 MVA X-mer (Distt.Khandwa) 315 31% 2016-17
B. a
220 KV SUBSTATIONS
1
Julwaniya 220/132kv S/s at 400kv s/s (Distt. Badwani) (2x160+40 MVA) (1No. 160MVA Charged on 21.08.2015)
320
79%
2016-17
2
Gwalior-II 220kv (New S/s)(2x160+40) (1x160 charged on31.3.2015)
160
95%
2016-17
3
Upgradation of Chapda 132Kv S/s to 220kv with 1x160MVA (Distt. )
160
2%
2017-18
4
Upgradation of Depalpur 132Kv S/s to 220kv with 1x160MVA(Distt. )
160
9%
2017-18
5 Adampur 220/33kv S/s 2x50MVA 100 6% 2017-18
Minutes of 55th OCCM of MP 30
6
Upgradation of Kukshi 132Kv S/s to 220kv with 1x160MVA (Distt. )
160
11%
2017-18
7
Morena 220/132kv S/s 1x160 +1x63 MVA +2No.220Kv FB +4No.132Kv FB+6No.33Kv FB+BC +Capacitor Bank
160
70%
2016-17
C. 132 KV SUBSTATIONS (a) NEW SUBSTATIONS 1 Rahatgarh132kv s/s (Distt.Sagar) 40 60% 2016-17
2 Bairad 132kv s/s(Dist.-Shivpuri ) 40 16% 2017-18
3 Barahi 132kv s/s (Distt.Katni) 40 11% 2017-18
4 Karapgaon 132kv s/s (Distt-Narsinghpur) 40 14% 2017-18
5 Indergarh 132kv s/s (Distt.Datia) 40 25% 2017-18
6 Biston 132kv s/s (Distt. ) 1x40 MVA 40 24% 2017-18
7 Agrod 132kv s/s (Distt. ) 1x40 MVA 40 56% 2017-18
8 Chhayan 132kv s/s (Distt. ) 1x40 MVA 40 76% 2016-17
9 Teesgaon 132kv s/s (Distt. ) 1x40MVA 40 20% 2016-17
12 Waraseoni 132kv s/s (Distt.Balaghat ) 1x40 MVA 40 2% 2017-18
13 Devnagar 132kv s/s (Distt. Narsighpur) ) 1x40 MVA 40 35% 2017-18
14 Belkheda 132kv s/s (Distt. Jabalpur) ) 1x40 MVA 40 4% 2017-18
15 Khimlasa 132kv s/s (Distt. ) 1x40 MVA 40 3% 2017-18
16 Karakbel 132kv s/s (Distt. Narsinghpur) 1x40 MVA 40 17% 2017-18
17 Chinaur 132kv s/s (Distt. ) 1x40 MVA 40 45% 2016-17
18 Kelaras 132kv s/s with 1x63 MVA (Distt. ) 63 23% 2016-17
19 Narsinghgarh 132kv s/s with 1x40 MVA (Distt. ) 40 7% 2016-17
20 Salamatpur 132kv s/s with 1x40 MVA (Distt. ) 40 51% 2016-17
21 Intkhedi 132kv s/s (Distt. ) 1x63 MVA 63 69% 2017-18
22 Silvani 132kv s/s with 1x40 MVA (Distt. ) 40 12% 2017-18
23 Udaipura 132kv s/s with 1x40 MVA (Distt. ) 40 20% 24 Bilkishganj 132kv s/s with 1x50 MVA (Distt. ) 50 16%
25
Kishangarh 132kv s/s with 1 no. 132 kv feeder bay & 1x40 MVA (Distt. Dewash)
40
95%
2016-17
25 Jobat 132kv s/s with 1x40 MVA (Distt. ) 40 17% 2017-18
Minutes of 55th OCCM of MP 31
ANNEXURE-2.4(ii)
LIST OF 33KV FEEDERS UNDER MPPKVVCL, INDORE (For which group to be allocated)
INDORE REGION
Name of EHV Substation
Name of 33KV feeder
Date of commissioning of feeder bay
Date of commissioning
of feeder 220KV
220KV Indore (Jetpura)-II
33KV PGCIL-II feeder 24.08.2014
132KV
132KV Raukhedi
33KV DLF-I 33KV DLF-II
01.03.2014 01.03.2014
132KV Badgaon
33KV Discom Bay
29.11.2014
25.09.2015
UJJAIN REGION
Name of EHV Substation
Name of 33KV feeder Date of commissioning of feeder bay
Date of Charging of feeder
220KV
220KV Barod 33KV M&B-I&II
132KV
132KV Susner 33KV Evershine 21.05.2014 132KV Agar 33KV Enercon-I
33KV Enercon-II 33KV M&B-I 33KV M&B-II
132KV Nalkheda 33KV Kachnariya 33KV Lasuldiya Kelwa
132KV Sonkatch 33KV Industrial (MPAKVN)
Minutes of 55th OCCM of MP 32
ANNEXURE-2.4(ii)
LIST OF 33KV FEEDERS UNDER MPPKVVCL,BHOPAL (For which group to be allocated)
BHOPAL REGION
Name of EHV Substation
Name of 33KV feeder Date of charging of feeder
220 KV 220 KV Betul 33 KV Industrial 13.06.2014
220 KV Vidisha 33 KV ISanchi 30.01.2015
132 KV 132 KV Bareli 33 KV Barna
33 KV Boras 19.02.2014 19.02.2014
132 KV Biora 33 KV Nagar Palika 33 KV Water Works
09.03.2014 09.03.2014
132 KV Shyampur 33 KV Jatkheda-I 33 KV Jatkheda-II
07.05.2014 07.05.2014
132 KV Runaha 33 KV Runaha 33 KV Nazirabad 33 KV Ramgarh 33 KV Nayasamand
15.04.2015 18.09.2015 19.09.2015 19.12.2015
132 KV MACT Bhopal 33 KV Bairagarh chichli-2 15.11.2014
132 KV Gopalpur 33 KV AE, PHE 27.02.2015
132 KV Amrawad Khurd 33 KV AIIMS Hospital 33 KV AIIMS Residence 33 KV C-21 Mall 33 KV Katara Hills-II
29.02.2016 29.02.2016 01.06.2016 01.06.2016
GWALIOR REGION
Name of EHV Substation
Name of 33KV feeder Date of charging of feeder
220 KV 220 KV Sagalgarh 33 KV Mangrol 30.05.2014
132 KV 132 KV Datia 33 KV Karapura 17.05.2014 132 KV Ron 33 KV Mangarh 21.11.2013 132 KV Morar 33 KV Readymade
Garment 22.08.2014
132 KV Motizheel 33 KV Transport Nagar 30.05.2015
Minutes of 55th OCCM of MP 33
Annexure-2.4(ii)
LIST OF 33KV FEEDERS UNDER MPPKVVCL, JABALPUR (For which group to be allocated)
JABALPUR REGION
Name of EHV
Substation
Name of 33KV feeder
Date of commission- ing of feeder
bay
Date of commission- ing of feeder
220KV
NIL
132KV
132KV Borgaon 33KV FS-II 26.02.2013 12.04.2016
Minutes of 55th OCCM of MP 34
Discoms wise Average Supply Hours Annexure 2.4(i)
PARTICULARS
East Zone
Central Zone
Oct-16
Nov-16
Oct-16
Nov-16
Commissinary HQ
23:51
23:55
23:40
23:40
District HQ
23:55
23:55
23:45
23:44
Tehsil HQ
23:49
23:51
23:34
23:34
Rural -Mixed
23:31
23:34
22:57
22:59
Rural -DLF
23:31
23:34
23:11
23:17
Rural -Irrigation
9:58
9:58
9:34
9:41
PARTICULARS
West Zone
MP
Oct-16
Nov-16
Oct-16
Nov-16
Commissinary HQ
23:53
23:56
23:47
23:49
District HQ
23:48
23:55
23:50
23:52
Tehsil HQ
23:40
23:51
23:42
23:45
Rural -3Phase
22:53
23:02
23:14
23:17
Rural -1Phase
23:28
23:37
23:23
23:29
Total Rural
9:44
9:52
9:45
9:50
Minutes of 55th OCCM of MP 35
PROPOSED SHUT DOWN PROGRAMME OF TANSMISSION ELEMENTS OF 400 KV EQUIPMENTS/FEEDER FOR THE DURATION 01-01-2017 TO 28-02-2017
Annexure-3.2
S- NO-
NAME OF 400KV SUBSTATION
NAME OF 400KV EQUIPMENT/FEED
ER/LINE
CIRC UIT NO-
DATE
PERIOD OF
DURATION IN HRS-
MAINTENANCE WORK PROPOSED
REMARKS
FROM
TO
1 Bina 400 220KV Gwalior - 13-Feb-17 09:00 17:00 8:00 For Bay Maintenance Work.
2 Bina 400 220KV Datiya - 20-Feb-17 09:00 17:00 8:00 For Bay Maintenance Work.
3 Mahalgaon 220 220KV PGCIL 1 17-Jan-17 09:00 17:00 8:00 Erection of 220KV CVT
4 Mahalgaon 220 220KV PGCIL 2 18-Jan-17 09:00 17:00 8:00 Erection of 220KV CVT
5 Mahalgaon 220 220KV Datia - 2-Feb-17 09:00 17:00 8:00 Erection of 220KV CVT
6 Mahalgaon 220 220KV Bina - 4-Feb-17 09:00 17:00 8:00 Erection of 220KV CVT
7 Mehgaon 220 220KV Auraiya - 7-Jan-17 09:00 17:00 8:00 For Post monsson Maintanence
8 Malanpur 220 220KV Auraiya - 6-Jan-17 09:00 17:00 8:00 For Post monsson Maintanence
9 Malanpur 220 220KV PGCIL 1 12-Jan-17 09:00 17:00 8:00 For Post monsson Maintanence
10 Malanpur 220 220KV PGCIL 2 13-Jan-17 09:00 17:00 8:00 For Post monsson Maintanence
11 Indore 400 400KV Nagda - 2-Jan-17 08:00 17:00 9:00 For Maintenance & relay testing work
12 Sukha 220 220KV ICT - 1 1 9-Jan-17 09:00 17:00 8:00 For Bay Maintenance Work.
13 Sukha 220 220KV ICT - 1 1 10-Jan-17 09:00 17:00 8:00 For Bay Maintenance Work.
14 Sukha 220 220KV ICT - 2 2 11-Jan-17 09:00 17:00 8:00 For Bay Maintenance Work.
15 Sukha 220 220KV ICT - 2 2 12-Jul-17 09:00 17:00 8:00 For Bay Maintenance Work.
Minutes of 55th OCCM of MP 36
Unitwise / Stationwise Genration in MU A. Thermal Annexure 4.1 Stn. Name UNIT No. Capacity
MW Oct-16 Nov-16
AM
AR
KA
NTA
K 3 120 0.00 0.00
4 120 0.00 0.00 PH II 240 0.00 0.00
5 210 150.27 124.09 PH III 210 150.27 124.09 TOT 210 150.27 124.09
SA
TPU
RA
6 200 91.93 35.30 7 210 29.66 74.33
PH II 410 121.59 109.62 8 210 5.97 0.00 9 210 25.21 0.00
PH III 420 31.18 0.00 10 250 115.94 159.71 11 250 156.81 175.40
PH IV 500 272.75 335.11 TOT 1330 425.51 444.73
SA
NJA
Y G
AN
DH
I
1 210 63.32 6.20 2 210 31.09 76.93
PH I 420 94.40 83.13 3 210 34.42 0.00 4 210 68.33 97.14
PH II 420 102.75 97.14 5 500 340.52 249.48
PH III 500 340.52 249.48 TOT 1340 537.68 429.75
SSTP
S
1 600 135.54 223.17 2 600 82.68 304.53
PH1 1200 218.22 527.70
MPPGCL THERMAL 4080 1331.68 1526.27 Note : 1. Amarkantak Thermal Power Station-II Unit # 4 De-commissioned wef 01-May-2014.
2. Amarkantak Thermal Power Station-II Unit # 3 De-commissioned wef 13-Jan-2015.
B. Hydel Station Name Capacity
MW Oct-16 Nov-16 GANDHISAGAR 115.0 9.55 16.85 R.P.SAGAR 172.0 41.26 76.58 J.SAGAR 99.0 28.32 47.05 CHAMBAL 386.0 79.13 140.48 M.P.CHAMBAL 193.0 39.56 70.24 PENCH 160.0 78.20 36.15 M.P.PENCH 107.0 52.13 24.10 BARGI 90.0 64.55 45.35 TONS 315.0 174.34 134.82 BIRSINGHPUR 20.0 6.96 0.67 B.SGR(DEOLONDH) 60.0 16.63 0.00 B.SGR(SILPARA) 30.0 9.79 14.02 RAJGHAT 45.0 0.01 8.90 M.P.RAJGHAT 22.5 0.01 4.45 B.SGR(JINHA) 20.0 10.63 14.86 MADIKHEDA 60.0 21.92 10.24 TOTAL HYDEL 1186.0 462.17 405.48 MPPGCL Hydel 915.0 392.59 281.85 MPSEB HYDEL Share 917.5 396.53 318.74 C. NHDC (Ex-Bus)
Station Name Capacity MW Oct-16 Nov-16
Indira Sagar Hydel Project 1000 335.190 233.380 Omkareshwar Hydel Project 520 143.582 95.498
Minutes of 55th OCCM of MP 37
S No. Source Apr-16 May-16 Jun-16 Jul-16 Aug-16 Sep-16 Oct-16 Nov-16 Dec-16 Jan-17 Feb-17 Mar-17 Total
A. M.P. Availability 1 Thermal 1534.26 1058.71 641.73 332.22 352.62 928.27 1206.18 1404.48 0.00 0.00 0.00 0.00 7458.46 2 Hydel 71.27 73.63 49.50 146.54 372.19 392.84 393.36 315.61 0.00 0.00 0.00 0.00 1814.95 3 Total 1605.53 1132.35 691.22 478.76 724.82 1321.11 1599.54 1720.09 0.00 0.00 0.00 0.00 9273.42
B. Exchange with other States / Systems 1 Indira Sagar 120.81 146.45 52.97 496.81 731.60 304.97 330.31 229.04 0.00 0.00 0.00 0.00 2412.96 2 Omkareshwar 65.89 75.81 31.09 215.83 290.23 131.97 143.58 95.50 0.00 0.00 0.00 0.00 1049.89 3 MPPMCL Schedule from Central Sector of WR 1753.12 1394.10 1634.96 1127.74 933.38 1494.56 1394.87 1744.29 0.00 0.00 0.00 0.00 11477.02 4 MPPMCL Schedule from Central Sector ER 47.17 31.17 15.19 4.98 11.58 14.23 14.21 12.01 0.00 0.00 0.00 0.00 150.55 5 Total MPPMCL Schedule from Central Sector (WR+ER) 1800.29 1425.27 1650.15 1132.72 944.96 1508.79 1409.08 1756.30 0.00 0.00 0.00 0.00 11627.57 6 Deviation Energy of (WR+ER) -47.47 -70.17 -59.80 -88.60 -92.98 -83.76 -97.98 -84.59 0.00 0.00 0.00 0.00 -625.35 7 Schedule From DVC ER 232.92 202.40 229.04 111.04 8.12 57.86 134.56 201.32 0.00 0.00 0.00 0.00 1177.27 8 Schedule From Sugen 0.00 0.00 0.00 4.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.80 9 LANCO Amk 195.30 186.44 187.18 144.74 54.50 140.13 149.39 148.45 0.00 0.00 0.00 0.00 1206.12
10 SASAN 988.04 886.52 921.35 834.99 589.41 616.28 784.87 988.66 0.00 0.00 0.00 0.00 6610.12 11 ESSAR 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 12 J P Nigri 278.92 323.20 295.64 250.95 308.17 318.10 326.63 309.14 0.00 0.00 0.00 0.00 2410.75 13 MB Power 63.53 131.56 84.34 18.07 14.29 43.26 51.57 139.47 0.00 0.00 0.00 0.00 546.10 14 JHABUA Power 0.00 20.41 3.30 0.00 0.00 0.00 0.00 0.21 0.00 0.00 0.00 0.00 23.92 15 STOA Schedule other than MPPMCL 0.00 0.00 64.44 75.76 80.19 19.73 49.39 -82.36 0.00 0.00 0.00 0.00 207.15 16 Himachal Pradesh HYDAL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 17 BARH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 18 Schedule from Sardar Sarovar 8.89 19.97 78.71 257.09 527.28 268.86 313.48 77.27 0.00 0.00 0.00 0.00 1551.55 19 SCH to Railway from RGPPL_ebid 144.00 148.02 143.44 158.36 161.40 161.67 155.33 146.77 0.00 0.00 0.00 0.00 1218.99 20 Schedule from SEZ 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 21 Schedule from Rihand+Matatila 2.37 3.07 3.26 5.02 11.49 19.42 19.06 11.87 0.00 0.00 0.00 0.00 75.56
22 Medium Term Power Purchase from CSPDCL through PTC agaisnt PPA CSPDCCL dtd. 18.09.2012 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
23 Medium Term Power Purchase from Balco through PTC agaisnt PPA Balco dtd. 18.09.2012 Including Short term purchase against MTOA
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
24 Additional Power Purchase 6.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.53 25 Energy Exchange 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 26 Banking of Energy -145.84 -11.74 -77.54 -210.04 -297.14 -149.27 -1.48 527.43 0.00 0.00 0.00 0.00 -365.62 27 Sale of Power -321.72 -171.39 -105.78 -155.59 -512.51 -399.33 -472.36 -97.70 0.00 0.00 0.00 0.00 -2236.37 28 Total MP Schedule (Including Railway) 3253.22 3163.74 3477.52 2627.92 1890.17 2605.51 2919.52 4126.83 0.00 0.00 0.00 0.00 24064.44 29 Total MP Drawal (Including Railway) 3205.75 3093.57 3417.72 2539.32 1797.19 2521.75 2821.54 4042.24 0.00 0.00 0.00 0.00 23439.09 30 Wheeled Energy of Tawa HEG 0.00 0.00 0.00 6.87 11.38 8.33 5.95 10.89 0.00 0.00 0.00 0.00 43.41 31 Wheeled Energy of Wind Farm 18.13 9.25 25.91 19.94 12.96 6.17 6.30 2.33 0.00 0.00 0.00 0.00 100.99 32 Wheeled Energy of Solar Plant 16.07 15.81 13.19 8.67 8.05 12.82 14.09 14.40 0.00 0.00 0.00 0.00 103.11 33 Wheeled Energy of Ascent Hydro 1.39 1.16 0.67 0.05 0.13 0.98 0.62 0.54 0.00 0.00 0.00 0.00 5.54 34 POW ER PURCHASE by MPPMCL from BLA Power + JP BINA (Intra State STOA) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 35 Deviation Energy of MPPGCL Thermal 11.36 0.36 -7.88 -10.24 -10.91 2.46 9.39 0.31 0.00 0.00 0.00 0.00 -5.16 36 Energy Purchased by MP from Wind Farm 227.92 447.95 437.76 435.03 496.33 279.71 158.80 75.47 0.00 0.00 0.00 0.00 2558.97 37 Energy Purchased by MP from Solar Plant 87.17 87.65 75.92 76.23 48.36 77.74 85.50 86.28 0.00 0.00 0.00 0.00 624.87
38 Firm / Infirm Energy of HEG Mandideep+Hindalco+HEG Tawa +Trimula Ind. purchase by MP +Wheeled enrgy of CPP / IPP 20.37 8.23 8.07 21.17 23.00 50.10 -6.51 -25.86 0.00 0.00 0.00 0.00 98.55
39
Purchased from ASN Biomass Katni + RDM Care Ind. Biogas Pariyat + Pragya Energy Pvt. Ltd. Biogas Richhai+ Arya Energy Kotma + Orient Green Power Limited, Gadarawara Bio-Mass+Shaliwahna (CHH+Umariya) + JBP MSW
10.35
8.46
9.39
6.14
8.23
8.82
7.29
11.11
0.00
0.00
0.00
0.00
69.80
40 Deviation Energy of ISP 1.99 2.22 2.15 6.76 9.00 5.66 4.88 4.34 0.00 0.00 0.00 0.00 37.00 41 Schedule Energy of BLA Power against LTOA 7.85 1.92 2.76 1.09 0.16 1.69 0.00 0.00 0.00 0.00 0.00 0.00 15.45 42 Schedule Energy of JP BINA Power against LTOA 0.00 3.86 0.00 0.00 0.00 17.27 6.51 25.86 0.00 0.00 0.00 0.00 53.51 43 Import from bargi Left Bank Canal Power House + ISP NVDA 0.01 0.01 0.01 0.01 0.01 0.55 0.93 2.01 0.00 0.00 0.00 0.00 3.53 44 Chambal Complex Excess / less Overshare by MP -3.19 3.46 6.91 -6.51 -41.40 -14.62 -35.68 -59.26 0.00 0.00 0.00 0.00 -150.28 45 Rajghat Hydel Power Station Excess / Less Overshare by MP -0.03 0.01 -0.02 3.50 2.62 -0.02 -0.03 2.47 0.00 0.00 0.00 0.00 8.50
46 State Supply (Ex-Power st. Bus) 5397.37 5038.53 4767.84 4299.45 4111.75 4737.46 5153.00 6237.76 0.00 0.00 0.00 0.00 39743.15 47 AVERAGE DAILY (Ex-Bus) 179.91 162.53 158.93 138.69 132.64 157.92 166.23 207.93 #DIV/0! #DIV/0! #DIV/0! #DIV/0! 162.88 48 MINIMUM DAILY (MP Periphery) 167.37 137.08 134.68 107.18 92.82 135.71 143.39 189.11 0.00 0.00 0.00 0.00 92.82 49 MAXIMUM DAILY (MP Periphery) 177.75 174.97 166.73 144.25 142.69 177.30 194.93 214.77 0.00 0.00 0.00 0.00 214.77 50 State Supply (Ex-Power st. Bus):- YEAR : 2015-16 4281.50 4822.95 4090.97 4214.27 4371.53 5133.25 6395.72 6376.15 6847.93 6256.30 5773.75 5310.94 39686.35 51 Year ((16-17)-(15-16))*100/Year (15-16) 26.06 4.47 16.55 2.02 -5.94 -7.71 -19.43 -2.17 -100.00 -100.00 -100.00 -100.00 0.14 52 Unshedule L/S : Year-2016-17 0.00 5.37 0.00 0.27 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.64 53 Frequency Correction 3.92 1.95 2.34 1.38 1.52 1.86 1.89 3.34 0.00 0.00 0.00 0.00 18.20 54 Restricted Requirement : Year-2016-17 5401.30 5045.84 4770.18 4301.10 4113.27 4739.32 5154.89 6241.10 0.00 0.00 0.00 0.00 39767.00 55 Shedule L/S : Year-2016-17 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 56 Un-Restricted Requirement : Year-2016-17 5401.30 5045.84 4770.18 4301.10 4113.27 4739.32 5154.89 6241.10 0.00 0.00 0.00 0.00 39767.00
ENERGY BALANCE SHEET Year : 2016 - 17 Annexure 4.2
All figures in Million Unit
30
Minutes of 55th OCCM of MP 38
ENERGY BALANCE SHEET : Demand & Sypply Hours Year : 2016 - 17 Annexure 4.2
S.NO. Apr-16 May-16 Jun-16 Jul-16 Aug-16 Sep-16 Oct-16 Nov-16 Dec-16 Jan-17 Feb-17 Mar-17 Yr 16-17
C. MORNING PEAK (MAX) 1 DEMAND MET 7984 7347 7019 6147 6146 7909 8790 10816 0 0 0 0 10816 2 LOAD RELIEF 0 0 0 0 0 0 0 0 0 0 0 0 0
3 LOAD SHEDDING 0 0 0 0 0 0 0 0 0 0 0 0 0
D. EVENING PEAK (MAX) 1 DEMAND MET 8011 7902 7501 6903 6964 7963 8656 9487 0 0 0 0 9487 2 LOAD RELIEF 0 0 0 0 0 0 0 0 0 0 0 0 0
3 LOAD SHEDDING 0 0 0 0 0 0 0 0 0 0 0 0 0
F. REGISTERED MAXIMUM 8119 8045 7501 6903 6964 7963 8790 10816 0 0 0 0 10816 G. COMPUTED MAXIMUM DEMAND 8153 8050 7517 6913 6964 7978 8790 10839 0 0 0 0 10839
H. UNRESTRICTED MAXIMUM DEMAND 8153 8050 7517 6913 6964 7978 8790 10839 0 0 0 0 10839
I. Average Power Supply per day to 1. Div. Head Quarters 23:47 23:37 23:42 23:42 23:45 23:47 23:47 0:00 0:00 0:00 0:00 0:00 20:49 2. District Head Quarters 23:52 23:44 23:45 23:48 23:49 23:50 23:50 0:00 0:00 0:00 0:00 0:00 20:53 3. Tahsil Head Quarters 23:44 23:31 23:34 23:36 23:40 23:38 23:42 0:00 0:00 0:00 0:00 0:00 20:43 4. Rural -Mixed 23:25 22:52 22:54 22:56 23:05 23:10 23:14 0:00 0:00 0:00 0:00 0:00 20:15 5. Rural -DLF 23:32 23:09 23:06 23:12 23:18 23:17 23:23 0:00 0:00 0:00 0:00 0:00 20:25
6. Rural -Irrigation 9:51 9:37 9:37 9:39 9:42 9:43 9:45 0:00 0:00 0:00 0:00 0:00 8:30 J LOAD FACTOR % 92.33 79.51 82.87 78.80 74.42 78.71 74.88 77.48 #DIV/0! #DIV/0! #DIV/0! #DIV/0! 79.88
FREQUENCY ANALYSIS YEAR 2016-17
S.N PARTICULARS Apr-16 May-16 Jun-16 Jul-16 Aug-16 Sep-16 Oct-16 Nov-16 Dec-16 Jan-17 Feb-17 Mar-17 Yr 16-17
A. INTGRATED FREQUENCY 1 MAXIMUM 50.11 50.20 50.11 50.16 50.14 50.09 50.11 50.09 0.00 0.00 0.00 0.00 50.20
2 MINIMUM 49.80 49.78 49.82 49.82 49.67 49.85 49.89 49.78 0.00 0.00 0.00 0.00 49.67
B. INSTANTANEOUS FREQUENCY 1 MAXIMUM 50.32 50.44 50.37 50.35 50.35 50.24 50.25 50.27 0.00 0.00 0.00 0.00 50.44
2 MINIMUM 49.64 49.56 49.65 49.69 49.65 49.67 49.74 49.54 0.00 0.00 0.00 0.00 49.54 C. AVG FREQUENCY 49.98 50.00 50.00 50.01 50.00 50.00 50.00 49.99 0.00 0.00 0.00 0.00 50.00 D. % TIME WHEN FREQUENCY WAS
1 ABOVE 51.5 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2 50.05 TO 51.5 Hz 16.98 23.12 18.28 23.65 20.32 19.00 19.80 19.04 0.00 0.00 0.00 0.00 20.05 3 49.9 TO 50.05 Hz 69.94 69.78 74.09 72.35 73.73 75.15 74.78 71.94 0.00 0.00 0.00 0.00 72.72 4 49.7 TO 49.9 Hz 12.92 6.96 7.50 3.90 5.83 5.75 5.42 9.02 0.00 0.00 0.00 0.00 7.14 5 49.5 TO 49.7 Hz 0.16 0.14 0.13 0.10 0.12 0.10 0.00 0.00 0.00 0.00 0.00 0.00 0.09 6 49.2 TO 49.5 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7 48.8 TO 49.2 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8 48.5 TO 48.8 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
9 BELOW 48.5 Hz 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Minutes of 55th OCCM of MP 39
Hourly Average Own Generation, Schedule Drawal , Actual Drawal & Demand Month :- October 2016
FIGURES IN MW
Hrs.
FREQ.
Own Generation Schedule from
Tot Avl.
Act. Drl
Deviation
Intra State STO
A
DEMAN D MET
Load Shedding REST.
DEMAN D
UNRES
T. DEMA
ND
THER.
Incl Aux
THER.
Excl Aux
HYD.
ISP
OSP
Total IPPs
Injecti on
Total CPPs Injecti
on
Total
CSS
DVC ER
Sugen
Lanco
Sasan
Essar
JP
Nigri
MB
Power
Jhabu
a Power
SSP
SCH
to Railw
ay
SE Z
Banking
Sale
Pur
Total MTO
A at
MP
STO
A
Riha nd+ Mata tila- Rajg hat
Total
SCH
UN
SCH
TOTAL
1:00
50.00
1752
1594
469
378
174
46
305
2967
1821
167
0
182
996
0
426
60
0
387
209
0
-108
-331
0
0
9
25
3843
6810
3745
-98
0
6712
0
0
0
6714
6714
2:00
50.01
1735
1579
456
321
150
46
303
2856
1675
142
0
172
983
0
422
62
0
391
208
0
-96
-219
0
0
11
25
3775
6631
3676
-99
0
6532
0
0
0
6534
6534
3:00
50.02
1730
1575
447
324
137
46
295
2825
1650
142
0
168
959
0
422
63
0
395
210
0
-92
-179
0
0
11
25
3774
6599
3722
-52
0
6547
0
0
0
6547
6547
4:00
50.02
1730
1574
459
334
143
47
293
2850
1688
142
0
165
950
0
422
64
0
389
207
0
-93
-239
0
0
11
25
3731
6581
3674
-57
0
6524
0
0
0
6525
6525
5:00
49.99
1727
1571
463
377
152
46
268
2878
1724
155
0
168
957
0
422
62
0
419
206
0
-114
-332
0
0
13
25
3707
6585
3687
-20
0
6565
0
0
0
6569
6569
6:00
49.97
1763
1604
503
442
187
47
242
3025
1810
167
0
189
993
0
414
62
0
412
206
0
-122
-460
0
0
11
25
3707
6732
3713
7
0
6738
0
0
0
6745
6745
7:00
50.00
1783
1622
521
506
217
47
250
3164
1810
184
0
192
987
0
406
64
0
453
212
0
-132
-563
0
0
63
25
3702
6866
3848
146
0
7012
0
0
0
7015
7015
8:00
50.02
1800
1638
491
466
201
48
347
3190
1762
175
0
196
988
0
406
64
0
486
211
0
135
-462
0
0
59
25
4044
7234
3888
-156
0
7078
0
0
0
7079
7079
9:00
50.00
1802
1640
500
470
209
47
442
3309
1810
188
0
199
997
0
408
64
0
481
211
0
132
-658
0
0
33
25
3889
7198
3769
-121
0
7078
0
0
0
7080
7080
10:00
50.02
1809
1646
492
437
202
47
550
3375
1890
188
0
206
1020
0
411
64
0
366
214
0
138
-839
0
0
9
25
3693
7068
3567
-126
0
6942
0
0
0
6943
6943
11:00
50.00
1810
1647
492
430
202
47
607
3424
1884
185
0
199
1017
0
415
64
0
346
211
0
138
-892
0
0
-11
25
3581
7005
3432
-149
0
6856
0
0
0
6858
6858
12:00
50.00
1789
1628
440
403
178
46
625
3320
1833
175
0
196
995
0
418
63
0
326
203
0
136
-923
0
0
-34
25
3414
6734
3201
-213
0
6521
0
0
0
6523
6523
13:00
50.01
1760
1602
446
403
177
46
594
3268
1763
170
0
192
1000
0
418
65
0
338
201
0
150
-974
0
0
-28
25
3321
6589
3318
-2
0
6586
0
0
0
6588
6588
14:00
50.00
1754
1596
477
418
191
46
549
3277
1748
171
0
196
990
0
418
65
0
331
199
0
146
-929
0
0
-17
25
3341
6618
3298
-43
0
6576
0
0
0
6579
6579
15:00
49.98
1747
1590
496
462
202
41
464
3255
1766
170
0
192
993
0
418
59
0
321
203
0
144
-973
0
0
-5
25
3313
6568
3302
-11
0
6557
0
0
0
6563
6563
16:00
49.98
1752
1594
494
459
204
41
353
3145
1759
156
0
182
1000
0
418
60
0
336
206
0
147
-895
0
0
13
25
3407
6553
3342
-65
0
6488
0
0
0
6494
6494
17:00
49.97
1784
1623
481
542
227
41
228
3143
1804
173
0
185
1021
0
420
61
0
405
207
0
154
-937
0
0
40
25
3557
6700
3453
-104
0
6596
0
0
0
6603
6603
18:00
49.98
1859
1692
555
624
259
42
183
3356
1932
201
0
206
1068
0
433
69
0
527
210
0
-123
-965
0
0
70
25
3654
7009
3614
-40
0
6970
0
0
0
6975
6975
19:00
50.02
1923
1750
554
626
279
43
240
3491
2115
280
0
237
1075
0
445
82
0
514
213
0
-117
-698
0
0
58
25
4229
7720
4089
-139
0
7581
0
0
0
7582
7582
20:00
50.02
1883
1713
553
523
231
48
277
3346
2106
236
0
230
1086
0
446
92
0
522
215
0
-113
-718
0
0
54
25
4180
7526
4066
-114
0
7412
0
0
0
7413
7413
21:00
50.02
1835
1670
540
488
221
48
298
3266
2046
191
0
210
1086
0
445
74
0
549
214
0
-88
-790
0
0
56
25
4017
7283
3918
-100
0
7184
0
0
0
7184
7184
22:00
50.06
1775
1615
523
460
200
47
319
3164
1959
159
0
202
1090
0
445
73
0
483
213
0
-82
-760
0
0
65
25
3871
7035
3775
-96
0
6939
0
0
0
6939
6939
23:00
50.02
1761
1603
530
424
193
47
325
3122
1849
166
0
196
1075
0
444
73
0
392
212
0
-72
-440
0
0
8
25
3928
7050
3974
46
0
7096
0
0
0
7096
7096
24:00
50.04
1746
1589
494
430
196
45
334
3088
1828
162
0
189
1034
0
439
67
0
335
208
0
-112
-269
0
0
6
25
3911
6999
3826
-85
0
6914
0
0
0
6914
6914
Avg. 50.01 1784 1623 495 448 197 46 362 3171 1835 177 0 194 1015 0 424 67 0 413 209 0 -2 -644 0 0 21 25 3733 6904 3662 -70 0 6833 0 0 0 6836 6836
00 TO 06 HRS.
50.00 1740 1583 466 363 157 46 284 2900 1728 153 0 174 973 0 421 62 0 399 208 0 -104 -293 0 0 11 25 3756 6656 3703 -53 0 6603 0 0 0 6606 6606
06 TO 12 HRS.
50.01
1799
1637
489
452
202
47
470
3297
1832
183
0
198
1001
0
411
64
0
410
210
0
91
-723
0
0
20
25
3720
7017
3617
-103
0
6914
0
0
0
6916
6916
12 TO 18 HRS.
49.99
1776
1616
492
485
210
43
395
3241
1795
174
0
192
1012
0
421
63
0
376
204
0
103
-945
0
0
12
25
3432
6673
3388
-44
0
6629
0
0
0
6634
6634
06TO 18 HRS.
50.00
1787
1627
490
468
206
45
433
3269
1813
178
0
195
1007
0
416
64
0
393
207
0
97
-834
0
0
16
25
3576
6845
3503
-74
0
6772
0
0
0
6775
6775
18 TO 24 HRS.
50.03
1820
1657
532
492
220
46
299
3246
1984
199
0
211
1074
0
444
77
0
466
213
0
-98
-612
0
0
41
25
4023
7269
3941
-81
0
7188
0
0
0
7188
7188
Minutes of 55th OCCM of MP 40
Hourly Average Own Generation, Schedule Drawal , Actual Drawal & Demand Month :- November 2016
FIGURES IN MW
Hrs.
FREQ.
Own Generation Schedule from
Tot Avl.
Act. Drl
Deviation
Intra State STO
A
DEMAN D MET
Load Shedding REST.
DEMAN D
UNRES
T. DEMA
ND
THER.
Incl Aux
THER.
Excl Aux
HYD.
ISP
OSP
Total IPPs
Injecti on
Total CPPs Injecti
on
Total
CSS
DVC ER
Sugen
Lanco
Sasan
Essar
JP
Nigri
MB
Power
Jhabu
a Power
SSP
SCH
to Railw
ay
SE Z
Banking
Sale
Pur
Total MTO
A at
MP
STO
A
Riha nd+ Mata tila- Rajg hat
Total
SCH
UN
SCH
TOTAL
1:00
50.01
2001
1821
297
188
92
245
163
2805
2337
228
0
179
1325
0
407
188
0
70
211
0
345
-6
0
0
-156
14
5143
7948
4974
-169
0
7779
0
0
0
7781
7781
2:00
50.02
1974
1797
272
142
69
245
151
2676
2236
228
0
179
1344
0
407
181
0
70
208
0
345
0
0
0
-145
14
5067
7743
4931
-136
0
7607
0
0
0
7607
7607
3:00
50.01
1982
1803
289
113
52
245
137
2639
2211
222
0
181
1374
0
407
182
0
70
209
0
345
0
0
0
-139
14
5076
7715
5068
-8
0
7707
0
0
0
7708
7708
4:00
50.00
1994
1814
301
142
61
245
127
2690
2250
223
0
181
1364
0
407
182
0
76
205
0
345
0
0
0
-138
14
5108
7798
5093
-15
0
7783
0
0
0
7785
7785
5:00
50.01
2012
1831
296
199
81
245
116
2767
2324
228
0
183
1324
0
407
182
0
91
204
0
345
-16
0
0
-153
14
5131
7898
5058
-73
0
7826
0
0
0
7829
7829
6:00
49.97
2081
1894
334
280
121
246
117
2991
2397
286
0
197
1324
0
407
187
0
127
205
0
345
-14
0
0
-157
14
5316
8308
5193
-123
0
8184
0
0
0
8192
8192
7:00
49.96
2234
2033
498
469
185
246
123
3554
2447
358
0
221
1328
0
410
186
0
152
210
0
345
-175
0
0
-67
14
5428
8982
5723
295
0
9277
0
0
0
9289
9289
8:00
49.98
2291
2085
467
413
173
246
274
3658
2437
319
0
239
1317
0
412
183
0
175
208
0
1280
-217
0
0
-91
14
6275
9932
6129
-146
0
9787
0
0
0
9794
9794
9:00
49.99
2307
2099
482
405
178
248
430
3843
2455
342
0
242
1322
0
414
187
0
165
208
0
1280
-262
0
0
-115
14
6251
10094
6154
-97
0
9997
0
0
0
10003
10003
10:00
50.01
2284
2078
442
389
172
251
528
3860
2458
340
0
235
1326
0
416
182
0
142
207
0
1280
-209
0
0
-166
14
6227
10087
6072
-155
0
9932
0
0
0
9935
9935
11:00
50.01
2224
2024
386
388
161
251
604
3814
2446
298
0
214
1326
0
418
182
0
116
203
0
1280
-201
0
0
-178
14
6120
9934
5857
-262
0
9672
0
0
0
9674
9674
12:00
50.02
2118
1928
324
310
132
250
628
3571
2365
265
0
197
1317
0
418
188
0
102
193
0
1280
-235
0
0
-185
14
5917
9488
5580
-337
0
9151
0
0
0
9153
9153
13:00
50.00
2111
1921
293
275
115
248
613
3465
2354
271
0
193
1318
0
416
188
0
95
186
0
1281
-251
0
0
-242
14
5823
9288
5907
84
0
9372
0
0
0
9375
9375
14:00
50.00
2093
1904
320
331
132
247
559
3494
2369
262
0
190
1308
0
417
189
0
89
187
0
1281
-161
0
0
-231
14
5912
9406
5859
-53
0
9353
0
0
0
9358
9358
15:00
49.97
2101
1912
316
310
136
247
453
3374
2371
263
0
190
1309
0
417
189
0
83
191
0
1281
-200
0
0
-215
14
5891
9265
5875
-17
0
9249
0
0
0
9258
9258
16:00
49.94
2113
1923
345
337
137
251
296
3289
2336
260
0
190
1310
0
418
189
0
83
194
0
1281
-128
0
0
-188
14
5957
9246
5858
-98
0
9147
0
0
0
9165
9165
17:00
49.97
2192
1994
493
541
213
251
113
3606
2420
294
0
207
1311
0
418
189
0
101
198
0
1231
-332
0
0
-162
14
5888
9494
5526
-362
0
9131
0
0
0
9141
9141
18:00
49.96
2287
2081
563
614
229
254
91
3832
2501
356
0
249
1311
0
423
189
0
110
211
0
346
-163
0
0
-89
14
5458
9290
5272
-186
0
9104
0
0
0
9116
9116
19:00
50.02
2252
2050
472
452
195
255
127
3550
2467
307
0
214
1310
0
427
189
3
90
211
0
346
-250
0
0
-32
14
5296
8847
5144
-153
0
8694
0
0
0
8695
8695
20:00
50.01
2131
1939
428
333
149
252
148
3249
2375
276
0
193
1310
0
427
189
3
99
209
0
346
-214
0
0
-49
14
5177
8426
5081
-95
0
8330
0
0
0
8332
8332
21:00
50.03
2046
1862
396
286
122
255
162
3083
2297
245
0
172
1312
0
424
189
3
125
210
0
346
-175
0
0
-85
14
5078
8161
4860
-218
0
7943
0
0
0
7943
7943
22:00
50.09
2014
1833
335
244
109
255
166
2943
2226
240
0
172
1312
0
421
187
0
110
213
0
346
-143
0
0
-137
14
4959
7902
4701
-258
0
7644
0
0
0
7644
7644
23:00
50.01
2017
1835
342
342
142
256
168
3085
2340
251
0
179
1312
0
417
188
0
113
210
0
346
-21
0
0
-165
14
5182
8267
5203
21
0
8288
0
0
0
8289
8289
24:00
50.05
2009
1829
348
349
139
247
162
3074
2335
257
0
179
1314
0
411
188
0
90
204
0
346
-4
0
0
-168
14
5165
8239
5049
-116
0
8123
0
0
0
8124
8124
Avg. 50.00 2119 1929 377 327 137 249 269 3288 2365 276 0 199 1322 0 415 186 0 106 204 0 733 -141 0 0 -144 14 5535 8823 5424 -112 0 8712 0 0 0 8716 8716
00 TO 06 HRS.
50.00 2007 1827 298 177 79 245 135 2761 2292 236 0 183 1343 0 407 184 0 84 207 0 345 -6 0 0 -148 14 5140 7902 5053 -87 0 7814 0 0 0 7817 7817
06 TO 12 HRS.
50.00
2243
2041
433
396
167
249
431
3717
2435
320
0
225
1323
0
415
185
0
142
205
0
1124
-217
0
0
-134
14
6036
9753
5919
-117
0
9636
0
0
0
9641
9641
12 TO 18 HRS.
49.97
2149
1956
388
401
160
250
354
3510
2392
284
0
203
1311
0
418
189
0
93
194
0
1117
-206
0
0
-188
14
5821
9331
5716
-105
0
9226
0
0
0
9236
9236
06TO 18 HRS.
49.98
2196
1999
411
398
164
249
393
3613
2413
302
0
214
1317
0
416
187
0
118
200
0
1120
-211
0
0
-161
14
5929
9542
5818
-111
0
9431
0
0
0
9438
9438
18 TO 24 HRS.
50.03
2078
1891
387
334
143
254
156
3164
2340
263
0
185
1311
0
421
188
1
104
209
0
346
-134
0
0
-106
14
5143
8307
5006
-137
0
8170
0
0
0
8171
8171
Minutes of 55th OCCM of MP 41
Discomwise Hourly Average Schedule Drawal , Actual Drawal &Over(+)/Under(-) Drawal Month :- October 2016
FIGURES IN MW
Hrs.
FREQ.
EZONE CZONE WZONE Railway
SCH
Demand
Met
O/U DRL
SCH LS
Unsch
LS
Restricte d
Demand
Unrestrict ed
Demand
SCH
Demand
Met
O/U DRL
SCH LS
Unsch
LS
Restricte d
Demand
Unrestrict ed
Demand
SCH
Demand
Met
O/U DRL
SCH LS
Unsch
LS
Restricte d
Demand
Unrestrict ed
Demand
Total Sch
Total
Drawal
1:00 50.00 2120 2091 -28 0 0 2092 2092 2295 2273 -21 0 0 2274 2274 2229 2137 -92 0 0 2138 2138 209 210
2:00 50.01 2064 2029 -35 0 0 2030 2030 2237 2216 -22 0 0 2217 2217 2197 2080 -117 0 0 2080 2080 208 207
3:00 50.02 2038 2018 -20 0 0 2018 2018 2177 2168 -9 0 0 2168 2168 2228 2147 -80 0 0 2148 2148 210 213
4:00 50.02 2021 1996 -24 0 0 1996 1996 2160 2130 -30 0 0 2131 2131 2257 2190 -67 0 0 2191 2191 207 208
5:00 49.99 2002 1996 -6 0 0 1997 1997 2136 2133 -3 0 0 2134 2134 2281 2233 -48 0 0 2234 2234 206 203
6:00 49.97 1974 2011 37 0 0 2013 2013 2114 2167 53 0 0 2169 2169 2341 2353 12 0 0 2356 2356 206 207
7:00 50.00 2000 2043 43 0 0 2044 2044 2110 2173 63 0 0 2174 2174 2518 2572 54 0 0 2573 2573 212 224
8:00 50.02 2081 2022 -59 0 0 2022 2022 2215 2170 -45 0 0 2170 2170 2683 2670 -13 0 0 2670 2670 211 216
9:00 50.00 2025 1977 -48 0 0 1978 1978 2196 2203 7 0 0 2204 2204 2707 2677 -30 0 0 2678 2678 211 220
10:00 50.02 1995 1939 -56 0 0 1939 1939 2175 2168 -7 0 0 2168 2168 2629 2614 -15 0 0 2615 2615 214 221
11:00 50.00 1972 1898 -74 0 0 1899 1899 2170 2144 -26 0 0 2145 2145 2606 2599 -8 0 0 2599 2599 211 215
12:00 50.00 1925 1814 -111 0 0 1814 1814 2145 2049 -96 0 0 2050 2050 2501 2464 -37 0 0 2465 2465 203 194
13:00 50.01 1892 1839 -53 0 0 1840 1840 2064 2050 -14 0 0 2051 2051 2507 2509 1 0 0 2509 2509 201 188
14:00 50.00 1859 1788 -71 0 0 1789 1789 2074 2008 -66 0 0 2009 2009 2549 2593 44 0 0 2595 2595 199 187
15:00 49.98 1841 1760 -81 0 0 1761 1761 2038 1977 -61 0 0 1978 1978 2568 2625 56 0 0 2627 2627 203 196
16:00 49.98 1812 1748 -64 0 0 1750 1750 1984 1929 -55 0 0 1931 1931 2551 2608 57 0 0 2611 2611 206 203
17:00 49.97 1823 1779 -44 0 0 1781 1781 1983 1958 -25 0 0 1960 1960 2595 2652 57 0 0 2655 2655 207 206
18:00 49.98 1955 2066 111 0 0 2068 2068 2078 2137 60 0 0 2139 2139 2558 2549 -9 0 0 2551 2551 210 217
19:00 50.02 2376 2403 27 0 0 2404 2404 2372 2381 9 0 0 2381 2381 2627 2573 -54 0 0 2573 2573 213 224
20:00 50.02 2380 2379 -1 0 0 2379 2379 2446 2379 -67 0 0 2379 2379 2473 2429 -44 0 0 2430 2430 215 225
21:00 50.02 2362 2317 -45 0 0 2317 2317 2426 2332 -94 0 0 2333 2333 2356 2308 -48 0 0 2309 2309 214 226
22:00 50.06 2276 2203 -73 0 0 2203 2203 2361 2246 -115 0 0 2246 2246 2320 2262 -58 0 0 2262 2262 213 227
23:00 50.02 2216 2201 -15 0 0 2201 2201 2389 2413 24 0 0 2413 2413 2365 2265 -99 0 0 2265 2265 212 217
24:00 50.04 2175 2132 -43 0 0 2132 2132 2379 2340 -38 0 0 2340 2340 2373 2234 -139 0 0 2234 2234 208 208
Avg. 50.01 2049 2019 -30 0 0 2020 2020 2197 2173 -24 0 0 2174 2174 2459 2431 -28 0 0 2432 2432 209 211
00 TO 06 HRS. 50.00 2036 2024 -13 0 0 2024 2024 2187 2181 -5 0 0 2182 2182 2256 2190 -65 0 0 2191 2191 208 208
06 TO 12 HRS. 50.01 2000 1949 -51 0 0 1949 1949 2169 2151 -17 0 0 2152 2152 2607 2599 -8 0 0 2600 2600 210 215
12 TO 18 HRS. 49.99 1864 1830 -34 0 0 1832 1832 2037 2010 -27 0 0 2011 2011 2555 2589 34 0 0 2591 2591 204 200
06TO 18 HRS. 50.00 1932 1890 -42 0 0 1890 1890 2103 2081 -22 0 0 2082 2082 2581 2594 13 0 0 2596 2596 207 207
18 TO 24 HRS. 50.03 2298 2273 -25 0 0 2273 2273 2396 2349 -47 0 0 2349 2349 2419 2345 -74 0 0 2345 2345 213 221
Minutes of 55th OCCM of MP 42
Discomwise Hourly Average Schedule Drawal , Actual Drawal &Over(+)/Under(-) Drawal Month :- November 2016
FIGURES IN MW
Hrs.
FREQ.
EZONE CZONE WZONE Railway
SCH
Demand
Met
O/U DRL
SCH LS
Unsch
LS
Restricte d
Demand
Unrestrict ed
Demand
SCH
Demand
Met
O/U DRL
SCH LS
Unsch
LS
Restricte d
Demand
Unrestrict ed
Demand
SCH
Demand
Met
O/U DRL
SCH LS
Unsch
LS
Restricte d
Demand
Unrestrict ed
Demand
Total Sch
Total
Drawal
1:00 50.01 2283 2221 -62 0 0 2222 2222 2741 2770 28 0 0 2770 2770 2705 2574 -132 0 0 2575 2575 211 214
2:00 50.02 2179 2114 -65 0 0 2114 2114 2633 2648 15 0 0 2648 2648 2677 2631 -46 0 0 2631 2631 208 214
3:00 50.01 2117 2088 -29 0 0 2088 2088 2500 2587 87 0 0 2587 2587 2800 2818 18 0 0 2818 2818 209 215
4:00 50.00 2090 2043 -47 0 0 2044 2044 2528 2569 41 0 0 2569 2569 2893 2958 65 0 0 2959 2959 205 213
5:00 50.01 2104 2049 -55 0 0 2050 2050 2537 2579 42 0 0 2580 2580 2930 2990 60 0 0 2991 2991 204 207
6:00 49.97 2182 2135 -47 0 0 2137 2137 2612 2656 43 0 0 2658 2658 3107 3182 75 0 0 3185 3185 205 212
7:00 49.96 2339 2429 91 0 0 2432 2432 2690 2923 233 0 0 2927 2927 3549 3704 155 0 0 3708 3708 210 221
8:00 49.98 2564 2454 -109 0 0 2456 2456 2991 2979 -12 0 0 2981 2981 3970 4140 170 0 0 4143 4143 208 213
9:00 49.99 2607 2451 -156 0 0 2453 2453 3051 3052 1 0 0 3054 3054 4104 4280 176 0 0 4282 4282 208 214
10:00 50.01 2624 2434 -190 0 0 2435 2435 3079 3041 -38 0 0 3042 3042 4099 4244 144 0 0 4245 4245 207 213
11:00 50.01 2645 2381 -263 0 0 2382 2382 3110 2986 -124 0 0 2987 2987 4049 4095 46 0 0 4096 4096 203 210
12:00 50.02 2549 2246 -304 0 0 2246 2246 2995 2772 -223 0 0 2773 2773 3851 3937 86 0 0 3938 3938 193 196
13:00 50.00 2458 2300 -158 0 0 2301 2301 2832 2866 35 0 0 2867 2867 3872 4020 148 0 0 4022 4022 186 186
14:00 50.00 2411 2157 -254 0 0 2158 2158 2894 2805 -89 0 0 2806 2806 4012 4203 191 0 0 4205 4205 187 188
15:00 49.97 2341 2129 -212 0 0 2131 2131 2821 2742 -79 0 0 2745 2745 3954 4183 228 0 0 4187 4187 191 195
16:00 49.94 2346 2131 -215 0 0 2135 2135 2789 2702 -87 0 0 2708 2708 3946 4117 171 0 0 4125 4125 194 197
17:00 49.97 2355 2172 -183 0 0 2174 2174 2814 2743 -72 0 0 2746 2746 3915 4011 97 0 0 4016 4016 198 205
18:00 49.96 2510 2513 3 0 0 2516 2516 2900 2876 -24 0 0 2880 2880 3559 3496 -63 0 0 3500 3500 211 219
19:00 50.02 2656 2659 2 0 0 2659 2659 2793 2762 -31 0 0 2762 2762 3225 3053 -172 0 0 3054 3054 211 220
20:00 50.01 2583 2599 16 0 0 2600 2600 2730 2701 -29 0 0 2701 2701 2940 2811 -129 0 0 2811 2811 209 220
21:00 50.03 2486 2474 -12 0 0 2474 2474 2646 2615 -31 0 0 2615 2615 2786 2631 -156 0 0 2631 2631 210 223
22:00 50.09 2371 2293 -78 0 0 2293 2293 2567 2492 -75 0 0 2492 2492 2767 2636 -131 0 0 2636 2636 213 223
23:00 50.01 2409 2419 9 0 0 2419 2419 2757 2931 174 0 0 2931 2931 2856 2720 -136 0 0 2720 2720 210 219
24:00 50.05 2352 2314 -38 0 0 2314 2314 2811 2861 50 0 0 2861 2861 2877 2740 -137 0 0 2740 2740 204 208
Avg. 50.00 2398 2300 -98 0 0 2301 2301 2784 2777 -7 0 0 2779 2779 3394 3424 30 0 0 3426 3426 204 210
00 TO 06 HRS. 50.00 2159 2108 -51 0 0 2109 2109 2592 2635 43 0 0 2636 2636 2852 2859 7 0 0 2860 2860 207 213
06 TO 12 HRS. 50.00 2555 2399 -155 0 0 2401 2401 2986 2959 -27 0 0 2961 2961 3937 4067 130 0 0 4069 4069 205 211
12 TO 18 HRS. 49.97 2404 2234 -170 0 0 2236 2236 2842 2789 -53 0 0 2792 2792 3876 4005 129 0 0 4009 4009 194 198
06TO 18 HRS. 49.98 2479 2316 -163 0 0 2318 2318 2914 2874 -40 0 0 2876 2876 3907 4036 129 0 0 4039 4039 200 205
18 TO 24 HRS. 50.03 2476 2460 -17 0 0 2460 2460 2717 2727 10 0 0 2727 2727 2909 2765 -144 0 0 2765 2765 209 219
Minutes of 55th OCCM of MP 43
ANNEXURE-5.0
System Disturbance / System Incidence
1. System Disturbance on 01.10.2016 at 220 KV S/s Shivpuri: On dated 01.10.2016 at around 16:15 Hrs. M.P system was normal and frequency of National Grid was 50.06 Hz. Prior to fault there was heavy rain & storm in Shivpuri & Bina area. At around 16:21 Hrs. 220 KV Shivpuri – Bina (MPPTCL) Ckt & 220 KV Shivpuri – Bina (PGCIL) Ckt tripped due to transient fault. Simultaneously 132 KV Shivpuri – Pichhore Ckt tripped due to overloading. Due to the tripping of above feeders interruption occurred at 220 KV S/s Sabalgarh, 220 KV S/s Shivpuri, 132 KV S/s Shivpuri, Kolaras, Mohna, Vijaypur, Sheopur Kalan, Baroda & Jora and there was load loss of about 299MW. There was no generation loss and System was normalized in due course of time.
2. System Disturbance on 02.10.2016 at 220 KV S/s Chhindwara: On dated 02.10.2016 at around 15:10 Hrs. M.P system was normal and frequency of National Grid was 50.10Hz. At around 15:15 Grs. 220 KV R-Phase PT of 220 KV Main Bus – II failed at 220 KV S/s Chhindwara resunting in 220 KV Main Bus – II bus fault and 220 KV Main Bus – II Bus Bar Protection operated. Consequently tripping of following connected feeders and transformers:- 220 KV Chhindwara – Betul Ckt, 220 KV Chhindwara – Seoni Ckt, 220/132 KV, 160 MVA X’mer – II & 220 KV Bus Tie at 220 KV S/s Chhindwara. Due to the above tripping there was no interruption in any area and hence no load loss. There was no generation loss and System was normalized in due course of time.
3. System Disturbance on 06.10.2016 at 220 KV S/s Maihar : On dated 06.10.2016 at around 13:10 Hrs. M.P system was normal and frequency of National Grid was 50.07 Hz. Prior to fault 132 KV Maihar – Satna Ckt and 132 KV Amarpatan – Zinna Ckt was kept open for load management. At around 13:16 Hrs. due to transient fault 132 KV Maihar – Kymore Ckt tripped from 132 KV S/s Kymore end only. The 132 KV Maihar – Kymore Ckt did not trip from 132 KV S/s Maihar end due to problem in its Master trip relaya, consequently fault persisted and resulted in tripping of 220/132 KV, 160 MVA X’mer at 220 KV S/s Maihars. Due to the above tripping 132 KV supply failed at 220 KV S/s Maihar & 132 KV S/s Amarpatan and there was load loss of 62 MW. There was no generation loss and System was normalized in due course of time.
4. System Disturbance on 08.10.2016 at 220 KV S/s Anuppur: On dated 08.10.2016 at around 11:40 Hrs. M.P system was normal and frequency of National Grid was 50.01 Hz. Prior to fault 132 KV Rajmilan – Morwa Ckt & 132 KV Rajmilan – Waidhan Ckt was kept open for load management. At around 11:46 Hrs. transient fault occurred on 132 KV Shahdol – Anuppur Ckt but the Ckt did not trip from either end due to relay problem at 220 KV S/s Anuppur end. The fault was fed through 132 KV Main Bus at 220 KV S/s Anuppur resulting in tripping of all the elements connected to 132 KV Main Bus as follows:- 220/132 KV, 160 MVA X’mer – I & II, 132 KV Anuppur – Kotma Ckt – I & II. Due to this tripping 132 KV supply failed at 220 KV S/s Anuppur, 132 KV S/s Shahdol, 132 KV S/s Dindori, 132 KV S/s Dongrital & 132 KV S/s Rajmilan and there was load loss of about 62 MW occurred. There was no generation loss and System was normalized in due course of time.
5. System Disturbance on 15.10.2016 at 132 KV S/s Damoh: On dated 15.10.2016 at around 20:25 Hrs. M.P system was normal and frequency of National Grid was 50.00 Hz. At around 20:26 Hrs. ‘R’-Phase CT of 132 KV Interconnector – II burst at 132 KV S/s Damoh resulting
Minutes of 55th OCCM of MP 44
in tripping of 132 KV Interconnector-I and 132 KV Damoh – Hatta Ckt. Simultaneously 220/132 KV, 160 MVA X’mer – I & II at 220 KV S/s Damoh tripped due to jerk. Due to the above tripping interruption occurred at 132 KV S/s Damoh and there was load loss of about 12.2MW. There was no generation loss and System was normalized in due course of time.
6. System Disturbance on 16.10.2016 at STPS: On dated 16.10.2016 at around 11:20 Hrs. M.P system was normal and frequency of National Grid was 50.04 Hz. At 11:27 Hrs. tree fault fault occurred on 400 KV STPS – ISP Ckt and the feeder tripped from ISP end only. As the circuit breaker at STPS did not operate, resulting in operation of LBB Protection of 400 KV STPS – ISP Ckt at STPS end which initiated the operation of 400 KV Bus Bar Protection of 400 KV Main Bus – I at STPS. Consequently 400 KV STPS – ISP Ckt, 400 KV STPS – Seoni Ckt, 400 KV STPS – Astha Ckt – I, 400 KV Bus Coupler, 400/220 KV,500 MVA ICT, 62 MVAR Bus Reactor and Unit # 11 at STPS tripped. Due to the above tripping there was no load loss. There was generation loss of about 167 MW and System was normalized in due course of time.
7. System Disturbance on 17.10.2016 at 400 KV S/s Chhegaon: On dated 17.10.2016 at around 01:10 Hrs. M.P system was normal and frequency of National Grid was 49.97 Hz. At around 01:14 Hrs. ‘R’-phase PT of 220 KV Main Bus – II burst at 400 KV S/s Chhegaon resulting in 220 KV Bus fault and 220 KV Main Bus –II Bus Bar Protection operated at 400 KV S/s Chhegaon. Consequently 220 KV Chhegaon – Nimrani Ckt – II, 220 KV Chhegaon – Nepanagar Ckt, 220 KV Chhegaon – SSTPS Ckt – I & II, 220 KV Chhegaon – Khandwa Ckt – II, 220/132 KV and 160 MVA X’mer – II tripped at 400 KV S/s Chhegaon. Due to the above tripping there was no interruption in any area and hence no load loss. There was no generation loss and System was normalized in due course of time.
8. System Disturbance on 17.10.2016 at 400 KV S/s Chhegaon: On dated 17.10.2016 at around 01:10 Hrs. M.P system was normal and frequency of National Grid was 49.97 Hz. At around 01:14 Hrs. ‘R’-phase PT of 220 KV Main Bus – II burst at 400 KV S/s Chhegaon resulting in 220 KV Bus fault and 220 KV Main Bus – II Bus Bar Protection operated at 400 KV S/s Chhegaon. Consequently 220 KV Chhegaon – Nimrani Ckt – II, 220 KV Chhegaon – Nepanagar Ckt, 220 KV Chhegaon – SSTPS Ckt – I & II, 220 KV Chhegaon – Khandwa Ckt –II, 220/132 KV and 160 MVA X’mer – II tripped at 400 KV S/s Chhegaon. Due to the above tripping there was no interruption in any area and hence no load loss. There was no generation loss and System was normalized in due course of time.
9. System Disturbance on 23.10.2016 at 220 KV yard of 400 KV S/s Sukha: On dated 23.10.2016 at around 21:50 Hrs. M.P system was normal and frequency of National Grid was 50.12 Hz. At around 21:57 Hrs. 220 KV side LBB Protection of 400//220 KV, 315 MVA X’mer – I operated at 400 KV S/s Sukha (PGCIL) due to cable fault. Consequently Bus Bar Protection of 220 KV Main Bus – I operated and resulted in tripping of 220 KV Sukha – Panagar – I, 220 KV Sukha – Jabalpur – I, 220 KV Sukha – Narsinghpur and 220 KV Bus Tie. Due to the above tripping there was no interruption in any area and hence no load loss. There was no generation loss and System was normalized in due course of time.
10. System Disturbance on 09.11.2016 at 220 KV Tons HPS :On dated 09.11.16 at 07:35 Hrs. 220 KV Tons-Rewa Ckt I and Ckt II tripped from Tons end.These both ckt got tripped with no indication at Tons end along with 220 KV Bus coupler and because of problem in Unit no.2 .The 220 KV Tons-Rewa Ckt I,Ckt II and 220 KV Bus Coupler were normalized at 09:06 Hrs,09:07 Hrs and 12:17 Hrs respectively on 09.11.2016.
Minutes of 55th OCCM of MP 45
11. System Disturbance on 10.11.2016 at 220 KV S/s Pipariya : On dated 10.11.2016 from 09:32 Hrs shutdown was taken on 160 MVA Areva make Xmer for PMM work. After completion of the work at 16:41 Hrs. Xmer was charged but did’nt hold and its incoming CB’s LBB operated resulting in tripping of all 220 KV feeders connected on Main Bus-I (220 KV Narsingpur ,220 KV Itarsi II and bus tie got tripped .The system was normalized at 18:16 Hrs on 10.11.2016 after necessary measures.
12. System Disturbance on 14.11.2016 at 220 KV yard STPS Sarni : On 14.11.2016 at 05:14 Hrs. 220 KV Sarni(PH)-Sarni-IC-I tripped at STPS end along with 220 KV STPS-Itarsi Ckt III, 500 MVA ICT at STPS .Further 220 KV Sarni –STPS IC I tripped at 10:01 Hrs due to B-Phase CT burst at STPS yard along with STPS-Sarni IC II.500 MVA ICT at STPS, 220 KV STPS-Sarni IC II and 220 KV STPS-Itarsi III were normalized at 07:21 Hrs, 11:20 Hrs and 19:20 Hrs respectively. Later on after replacement of 220 KV B-phase CT , 220 KV Sarni-STPS IC-I was normalized at 00:07 Hrs on 16.11.2016.
13. System Disturbance on 19.11.2016 at OSP HPS : On dated 19.11.2016 220 KV OSP-
Barwaha tap Nimrani feeder tripped at 01:20 Hrs with operation of 220 KV Bus bar protection of Bus-A along with 220 KV Bus coupler ,220 KV OSP-Khandwa and 220 KV OSP-Julwania Ckt .Thereafter Unit no.III desyncronised and SF6 Gas pressure low alarm noticed on OSP-Barwaha feeder.220 KV Bus Coupler , OSP-Barwaha Ckt, OSP-Julwania feeder and OSP-khandwa feeder were normalized at 02:20 Hrs,02:31 Hrs.02:32 Hrs, and 02:45 Hrs.respectively.
14. System Disturbance on 21.11.2016 at 220 KV Satna : On dated 21.11.2016 at 04:22 Hrs 220 KV Satna-Chhatarpur Ckt tripped on Zone I,R-phase to ground,at both end.The ckt was charged at 04:27 Hrs but the line didn’t hold and declared faulty.It was intimated that at location no.239 of 220 KV Satna-Chhatarpur top and middle phase disc flashover tripping occured.Alternate supply was resumed by charging 132 KV Chhatarpur-bijawar line at 04:45 Hrs.
15. System Disturbance on 22.11.2016 at 220 KV S/s Shujalpur : On dated 22.11.2016 at 12:14 Hrs,220 Kv Bhopal-Shujalpur Ckt I tripped from Shujalpur end on Zone-I R-Phase indication with LBB operation,resulting in tripping of 160 MVA Xmer –I,Xmer-II and Xmer-III and 220 KV PGCIL-I ckt at Shujalpur .The 160 MVA Xmer –I,Xmer-III and Xmer-II and 220 KV PGCIL-I ckt were normalized at 12:21 Hrs,12:22 Hrs,13:10 Hrs and 12:34 Hrs respectively.
Minutes of 55th OCCM of MP 46
Minutes of 55th OCCM of MP 47
Minutes of 55th OCCM of MP 48
Minutes of 55th OCCM of MP 49
Minutes of 55th OCCM of MP 50
LIST OF TELEMETRY DISCRIPIENCY AND NOT CONNECTED PARAMETER ANNEXURE 10.2
1 400 KV BUS 2 VOLTAGE/FREQ N/C2 400/220 Kv Xmer-2 CB faulty.
1 132/33 KV TR CB FAULTY CLOSE2 132 KVBUSCOUPLER CB FAULTY CLOSE3 220 KV BUS COUPLER CB FAULTY CLOSE
1 132 KV BUS COUPLER CB FAULTY2 220/132 TR 3(160MVA 2) OLTC MW/MVAR INCORRECT VALUES.
1 BPL400-BDTL 765 1 & 2 TIE CB FAULTY2 80 MVAR REACTOR CB FAULTY3 400/220 ICT 1 & 3 CB FAULTY
1 132 KV TRACTION-2 CB FAULTY
1 220 KV BUS FREQUENCY N/A2 160 MVA XMER-1&2 OLTC Non-current3 160 MVA -1(132 KV SIDE) CB FAULTY4 132 KV BUS VOLTAGE,FREQUENCY INCORRECT/NON CURRENT 10
1 132 KV DATIA CB FAULTY CLOSE2 132 KV RAJGHAT CB FAULTY CLOSE3 132/33 KV TR NGEF CB FAULTY CLOSE
1 220 KV BUS-COUPLER CB FAULTY2 220 KV BUS-2 VOLTAGE,FREQUENCY Non-current
220 KV BUS-2 VOLTAGE,FREQUENCY INCORRECT/NON CURRENT1 132/33 TR 4 CB FAULTY CLOSE
1 132 KV GADARWARA CB MW/MVAR TRANSIT/NON CURRENT CLOSE2 220/132 TR 2 CB MW/MVAR N/A3 220 KV CHICHLI MW/MVAR N/A 40/05
1 220/132 KV TR 2 MW/MVAR/CB N/APROCESSES CONNECTION REQUIRED
2 220 KV BUS-COUPLER CB FAULTY3 220 KV BUS-2 VOLTAGE,FREQUENCY Non-current4 132 KC XMER-1 CB FAULTY
220 KV BINA MW/MVAR/CB Non-current/FAULTY
40 MVA XMER CB Non-current
132 KV BUS COUPLER CB FAULTY Open
132 KV TRACTION-1 MW/MVAR Non-currentALL 220KV &132KV CB NON CURRENT CLOSE
MANDIDEEP 220 KV S/S
HARDA 132 KV S/S
ASHTA 400 KV S/S
SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIEDGUNA 220 KV S/S
SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIEDGWALIOR 220 KV S/S
BHOPAL 400 KV S/S
SARNI 220 KV S/S
SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIEDMALANPUR 220 KV S/S
PICHORE 132 KV S/S
ALL CB FAULTY EXCEPT HANDIA1
DATIA 220 KV S/S
GANJBASODA 220 KV S/S
ITARSI 220 KV S/S
PIPARIA 220 KV S/S
SHIVPURI 220 KV S/S
ASHOKNAGAR 220 KV S/S
VIJAYPUR 132 KV S/S
Minutes of 55th OCCM of MP 51
Minutes of 55th OCCM of MP 52
1132 KV JULWANIA-NIMRANI CKT I CB/SOE N/C
2132 KV JULWANIA-NIMRANI CKT II CB/SOE N/C
3 132 KV JULWANIA-ANJAD CKT CB/SOE N/C4 132 KV JULWANIA- I/C I CB/SOE N/C5 132 KV JULWANIA- I/C II CB/SOE N/C6 400KV BUS 2 KV N/C7 400KV BUS 2 HZ N/C8 132/33 KV 40 MVA TR CB FAULTY
1 220/132 KV TR OLTC N/A2 132/33 KV TR I CB/OLTC FAULTY3 132/33 KV TR II OLTC N/A4 132 KV NIMRANI CB FAULTY CLOSE
1 220/132 TR2 160MVA OLTC N/A2 220/132 TR 1 4*40 MVA OLTC N/A3 220/132 TR2 160MVA MW Direction wrong4 220/132 TR 1 4*40 MVA MW Direction wrong Need to be reverse from field
1 220 KV BUS COUPLER CB FAULTY CLOSE
2220/132 KV TR 160 MVA (PRIMARY) CB FAULTY CLOSE
2 220/132 TR 3 P CB FAULTY3 400 KV REACTOR CB FAULTY4 400 KV BUS COUPLER CB FAULTY OPEN5 63 MVA TR CB FAULTY CLOSE6 220 kV BUS I & II FREQ NOT SHOWING IN DECIMAL POINT
1 132 KV I/C 2 MW N/C 2 220 KV B/C CB FAULTY3 132 KV RATANGARH II MW/MVAR/CB N/C
1 220KV BUS COUPLER CB FAULTY CLOSE2 132 KV BUS COUPLER CB FAULTY OPEN3 132 KV SARANGPUR II CB FAULTY CLOSE4 132 KV CAPECITOR BANK CB FAULTY CLOSE5 132 KV KURAWAR CB FAULTY CLOSE6 132 IC-1 MW,MVAR N/A PROCESSES CONNECTION REQUIRED
7132 IC-2 MW,MVAR N/A PROCESSES CONNECTION REQUIRED
1220/132 KV TR (160 MVA) 2 SECONDARY CB FAULTY CLOSE
2 132 KV BUS COUPLER CB FAULTY CLOSE3 220/132 KV TR (160 MVA) 2 SECCB N/A CLOSE
1 132 KV BUS COUPLER CB FAULTY CLOSE2 132 KV GRASIM CB FAULTY CLOSE
JULWANIA 400 KV S/S
PROCESSES CONNECTION REQUIRED
SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIEDNEPANAGAR 220 KV S/S
SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED
SHUJALPUR 220 KV S/S
BADOD 220 KV S/S
JULWANIA 220 KV S/S
SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIEDBARWAHA 220 KV S/S
SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED
NEEMUCH 220 KV S/S
CHEGAON 400 KV S/S
SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED
SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED
SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIEDNAGDA 220 KV S/S
Minutes of 55th OCCM of MP 53
3 132 KV MAHIDPUR -2 MW,MVAR N/A4 132 KV CAP BANK MVAR N/C
1 400KV BUS TIE CB FAULTY CLOSE2 400 KV RAJGRAH 1 CB FAULTY CLOSE3 400 KV DEHGAON LINE REACTOMVAR N/A4 400 KV ISP LINE REACTOR MVAR FUTURE FUTURE5 400 KV SHUJALPUR I MVAR N/A6 220 KV BUS II KV/FREQ N/A
1 132 KV SIDTUBE CB /MW/MVAR N/A2 132 KV INOX CKT (RE) CB /MW/MVAR N/A8
1 220 KV BUSCOUPLER CB FAULTY CLOSE2 220 KV INDORE CB FAULTY CLOSE
2 220/132 TR 1 & 2 OLTC N/A3 132/33 TR CB/OLTC N/A
1 220 KV MAHESHWAR 2 CB FAULTY OPEN2 220/132 TR1 OLTC N/C
3 132/33 TR3 MW/MVAR/CB/OLTC N/C
1 220 KV NAGDA I CB OPEN CLOSE2 132 KV MAXI MW/ MVAR N/C3 220/132 TR1 & TR2 OLTC N/C
1 220/132 TR1 & TR2 OLTC N/C2 220/132 TR2(SECONDARY SIDE) CB FAULTY2 132KV BUS COUPLER CB FAULTY CLOSE
1 132/33 KV TR-1 40 MVA MVAR NOT COMING2 132 KV MAIN BUS KV,HZ NOT COMING
1 CAP BANK MVAR N/C 10.66SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED
SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED
SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED
SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED
SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED
DEPALPUR 132 KV S/S
UJJAIN 220 KV S/S
INDORE SZ 220KV S/S
SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED
INDORE NZ (JETPURA) 220KV S/S
GHOSLA 132 KV S/S
DEWAS BNP 132 KV S/SSOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED
SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIEDINDORE EAST 220 KV S/S
NIMRANI 220 KV S/S
SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED
PITAMPUR 220 KV S/S
SHAJAPUR 220 KV S/S
ALL BREAKERS OF 132 SIDE ARE FAULTY EXCEPT 220/132 KV X-MAR II (HV DIDE)
NAGDA 400 KV S/S
SOE DATA NOT RECEIVED CONNECTIONS FOR ALL FEDEERS HAVE TO BE VERIFIED
Minutes of 55th OCCM of MP 54
DATA OUT FROM LONG TIME1 WAIDHAN 132KV S/S2 MORWA 132 KV S/S3 BEOHARI 132 KV S/S
LIST OF TELEMETRY DISCRIPIENCY AND NOT CONNECTED PARAMETERSr.no. DESCRIPTION Status telemetry value at SLDC actual value at site
1 220 KV INTERCONNECTOR 1 & 4 MW/MVAR N/C 115/15
1 220 KV KOTOR CB FAULTY CLOSE2 220 KV CHATARPUR CB FAULTY CLOSE1 220 KV B/C CB FAULTY CLOSE
1 400/200/33 KV TERTIARY REACTOR 1 & MVAR N/A
2 220 KV PGCIL 2 CB FAULTY CLOSE
1 220 KV BUS TIE CB FAULTY CLOSE
2 220 KV REWA MW/MVAR N/C3 220 KV HINDALCO MW/MVAR N/C
1 132 KV JP NIGRI CB/MW/MVAR N/C PROCESSES CONNECTION REQUIRED
2 220/132 TR 2 SEC CB N/C PROCESSES CONNECTION REQUIRED
1 220 KV TONS PH MW /MVAR 0 45/52 132 /33 KV TR 2 CB ,MW,MVAR N/A PROCESSES CONNECTION REQUIRED3 220 KV SATNA MW /MVAR 0 15/5
1 132 KV KOTMA CB N/A
2220/132 KV TR 2 (160 MVA) PRI & SEC CB N/A CLOSE
3 132 KV SHAHDOL CB ,MW,MVAR N/A4 132 KV KOTMA 2 CB ,MW,MVAR N/A
5 132 /33 KV TR 2 CB ,MW,MVAR N/A
1 220 KV SATPURA T P S CB /MW/MVAR N/C PROCESSES CONNECTION REQUIRED
1 132 KV ASHOK NAGAR CB /MW/MVAR N/C PROCESSES CONNECTION REQUIRED
1 220/132 KV TR 1 (160 MVA) SEC CB FAULTY CLOSE
2220/132 KV TR 2 (160 MVA) PRI & SEC CB N/A CLOSE
1 132 KV ANUPPUR 2 CB /MW/MVAR FAULTY PROCESSES CONNECTION REQUIRED
1 220 KV PGCIL SATNA MW 0 MFM PROBLUM
1 132 /33 KV TR 2 CB ,MW,MVAR N/A PROCESSES CONNECTION REQUIRED
KOTMA 132 KV S/S
MAIHAR 220 KV S/S
PANDURNA 220 KV S/S
BINA 220 KV S/S
CHATARPUR 220 KV S/S
BIRSINGHPUR 220 KV S/S
SATNA220 KV S/S
BINA 400 KV S/S
DAMOH 220 KV S/S
TIKAMGRAH 220 KV S/S
SIDHI 220 KV S/S
CHINDWARA 220 KV S/S
REWA 220 KV S/S
KOTAR 220 KV S/S
ANUPPUR 220 KV S/S
PROCESSES CONNECTION REQUIRED
Minutes of 55th OCCM of MP 55
Name at SLDC end at site end
1 GEN 6 GT MW/MVAR 76/4 02 GEN 7 GT MW/MVAR 152/4 03 GEN 6 GT CB FAULTY OPEN4 GEN 7 GT CB FAULTY OPEN5 220 KV TRB CB FAULTY CLOSE6 ITC 400/220 MW 280 2607 400 KV STP- ISP MW 220 200
1 220 KV SGTPS 3 CB TRANSIT CLOSE2 220 KV SGTPS 3 MW 456 503 TRACTION 1 & 2 MW/MVAR -7 7
STN TR FOR UNIT 5 CB/MW/MVAR NA
1 400/220 KV TR 1 & 2 (315MVA ) OLTC N/C
1 400/220 KV ICT CB FAULTY CLOSE2 400 KV DAMOH 1 CB FAULTY CLOSE
3 4004 KV DAMOH 2 CB FAULTY CLOSE4 220 KV GEN 4 CB FAULTY OPEN5 STN TR 1 ,2 3 CB/MW/MVAR NA
1 220 KV SIRMORE MVAR 494 52 221 KV SIRMORE MVAR 685 5
RAJGHAT H P S RTU OUT
TONS H P S
SATPURA T P S
A T P S T P S
SINGHA JI S T P S
S G T P S
Minutes of 55th OCCM of MP 56
TELEMETRY DISCRIPIENCY
Sr.no. DESCRIPTION Status telemetry value at SLDC actual value at site1 GEN 7 MVAR 125 52 GEN 3 MVAR 125 53 400 KV INDORE 2 MVAR 256 25
Sr.no. DESCRIPTION Status telemetry value at SLDC actual value at site