as possible! in safety. - entwicklung & produktion | gerüst. … · 2020. 12. 14. ·...
TRANSCRIPT
MATO 2Façade scaffolding.
Swiss technology
2
Lightweight scaffolding for gre-ater versatility
3
Faster and more versatile - in safety.MATO 2 lightweight scaffolding gives the scaffolder the greatest possible versatility. At the heart of the system are the plates, mounted every 50 cm vertically and which facilitate connections in all four directions.
MATO 2 shows its strengths on round buildings and angular floor plans, permitting erection speeds which were previously impossible. Mezzanines, brackets and other accessories can be erected in seconds, with no tools whatsoever.
As strong as necessary – as light
Save up to 50% in time and moneyPractical experience has shown that using modern lightweight scaffolding instead of conventional heavy systems can produce a time saving of up to 50%. This is an impor-tant consideration, against a background of constantly increasing costs!
However, the lightweight method is not only advantageous when erecting scaffolding. Its low weight means that more can be carried, handling is safer and storage easier.
Systematic modularity
The special design features of the MATO 2 are the result of years of practical experience and targeted development work. The system is available as framework or tube and coupler scaffolding in widths of 95 or 65 cm. Both widths can be freely combined with each other.
The lightweight design has also been applied consistently to the aluminium scaffolding platforms, simplifying erection and guaranteeing the greatest possible safety for the user.
as possible!MATO 2 is a modern lightweight system, developed specifically to make erecting scaffolding more efficient and versatile. Steel frames with a wall thickness of 2.7 mm or aluminium frames with a wall thickness of 4 mm are used, depending upon the overall height and maximum load. The steel version permits a height of 60 m and above, whilst the aluminium version is suitable for 40 m and above.Frames with a wall thickness of 3.25 mm are available for particularly heavy loads. They are compatible with standard lightweight frames.
44
We want to provide you with outstanding scaffolding systems and faultless, comprehensive service. We believe that customer satisfac-tion means much more than just the correct, punctual execution of your order. We aim to be your competent partner for all questions and services to do with professional scaffolding.
Research and developmentWe are prepared to reinvent the wheel every day in order to stay successful. Standing still means going backwards. This applies to our industry too. For this reason we put a lot of time, money and effort into research into new technologies and the further development of exi-sting systems. Our solutions are intended to guarantee the greatest possible benefit and the highest possible level of safety for you, not just today, but in the future as well.
Customer-specific solutionsAnother of our strengths is the development of customer-specific solutions. Qualified designers, engineers and draughtsmen are happy to work out individual solutions in close cooperation with you.
Comprehensive restoration and repair service We have many years' experience of restoration and repair of com-mercially-available scaffolding systems. Various factors determine whether it is worth repairing faulty scaffolding. Talk to us first!
Old for new Is your old scaffolding making your labour costs too high – Is your scaffolding no longer making a profit? We have the right solution, whether a change of system or modernisation of your existing scaf-folding system.
FinanceWe and our banking partner shall be happy to make individual, practical suggestions.
A range of services which leaves no prayer unans-wered.
5
66
Contentsfrom A to Z
7
Table of contents
Outside bracket Page 13
Rack Page 22
Specimen load Page 17
Toe board, aluminium Page 19
Toe board, aluminium, powder-coated, Page 19
Toe board bracket Page 18
Toe board, wood Page 18
Toe board, wood, painted Page 19
Pedestrian passageway Page 21
Base post Page 9
Base frame Page 9
Guard rails Page 10
Guard rail posts Page 10
Scaffolding frame Page 9
Inside corner bracket with platform Page 16
Inside bracket Page 16
Bracket brace Page 16
Wall bracket Page 17
Cross bracket / Tie bar Page 12
Frame rack Page 22
Protective canopy bracket Page 16
Guard rail Page 11
Mesh panel Page 13
Special tie bar Page 20
End railing Page 11
Staircase bannister Page 20
Staircase handrail Page 21
Staircase frame Page 9
8
9
MATO 2
Scaffolding frame
• In galvanized steel tube• Tube Ø 48.3 mm
Wall thickness in mm Height in cm Width in cm Weight in kg Order no.
2.7 100 65 10.5 2-211100
2.7 200 65 17.5 2-211200
3.25 100 65 12 2-212100
3.25 200 65 20.5 2-212200
• In aluminiumWall thickness in mm Height in cm Width in cm Weight in kg Order no.
4 100 65 6.7 2-110100
4 200 65 10.5 2-110200
• In steel3.25 100 95 13.2 2-214100
3.25 200 95 21.6 2-214200
• Push-on bracket for scaffolding frameHeight in cm Weight in kg Order no.
50 2.8 2-214201
Staircase frame
• In aluminium• For staircase towers and mobile scaffolding
Wall thickness in mm Height in cm Width in cm Weight in kg Order no.
4 200 130 16.6 2-118200
• With stop-endWall thickness in mm Height in cm Width in cm Weight in kg Order no.
4 100 130 12.6 2-119100
4 200 130 18.3 2-119200
Base frame
•Formountingthefirstscaffoldingframe• In galvanised steel tube• Tube Ø 48.3 mm
Wall thickness in mm Length in cm Width in cm Weight in kg Order no.
3.25 40 65 6.2 2-216065
3.25 40 95 7.5 2-216095
3.25 40 130 10 2-216130
Base post
• In galvanized steelWall thickness in mm Height in cm Weight in kg Order no.
3.25 50 2.9 *2-223050
* Not held in stock
• In aluminiumWall thickness in mm Height in cm Weight in kg Order no.
4 50 1.1 *2-123050
* Not held in stock
36 frames in a vertical rack 2-28006520 frames in a horizontal rack 2-281065
2-119200
EN-conformity to SN EN 12810 and SN EN 12811
10
MATO 2
Guard rail posts
• In galvanised steel tube• Tube Ø 48.3 mmWall thickness in mm Height in cm Weight in kg Order no.
3.25 50 2.5 2-224050
3.25 100 4.6 2-224100
3.25 200 8.7 2-224200
3.25 300 13 *2-224300
3.25 400 17 *2-224400* Not held in stock
• In aluminiumWall thickness in mm Height in cm Weight in kg Order no.
4 50 1.3 2-122050
4 100 2.4 2-122100
4 200 4 2-122200
4 300 6.5 *2-122300
4 400 9 *2-122400* Not held in stock
Guard rail
• With diagonal struts• In galvanised steel tube
Length in cm Height in cm Weight in kg Order no.
100 50 5 2-230100
125 50 5.5 2-230125
150 50 6.5 2-230150
200 50 8 2-230200
250 50 9.9 2-230250
300 50 11.2 2-230300
• In aluminiumLength in cm Height in cm Weight in kg Order no.
100 50 3.4 2-130100
125 50 4 2-130125
150 50 4.2 2-130150
200 50 5 2-130200
250 50 6 2-130250
300 50 7 2-130300
25 per bundle, 25 per rack
20 per bundle, 20 per rack
EN-conformity to SN EN 12810 and SN EN 12811
11
MATO-2 MATO-2
Tobler AG MATO-2
MATO 2
Guard rail, aluminium
• With diagonal struts• In aluminium• With toe board
Length in cm Height in cm Weight in kg Order no.
100 100 6 *2-132100
150 100 8 *2-132150
200 100 10 *2-132200
250 100 12 *2-132250
300 100 13 *2-132300
350 100 14 2-132350
400 100 15 2-132400* Not held in stock
• Adjustable• In galvanised steel
Length in cm Height in cm Weight in kg Order no.
110 – 180 50 6.2 2-233180
180 x 330 50 9.2 2-233330
End railing
• In galvanized steel tubeLength in cm Height in cm Weight in kg Order no.
65 50 3.5 2-240065
95 50 4.2 2-240095
• In galvanized steel tube • With toe board
Length in cm Height in cm Weight in kg Order no.
65 100 6 2-243065
95 100 8 *2-243095* Not held in stock
Marked in RAL 4008
Marked in RAL 4008
25 per bundle
EN-conformity to SN EN 12810 and SN EN 12811
12
2-245065
2-245066
MATO 2
Cross bracket / tie bar
• As a tube coupling for installing platforms at intermediate levels • In galvanised steel tube• Lightweight version
Length in cm Weight in kg Order no.
65 4 2-244065
• With a threaded coupling at both endsLength in cm Weight in kg Order no.
65 4.2 2-245065
65 3.6 2-245066
• Cast head versionLength in cm Weight in kg Order no.
40 2.8 2-246040
65 4 2-246065
100 4.5 2-246100
125 5.3 2-246125
150 6.1 2-246150
200 8 2-246200
250 9.5 2-246250
300 11 2-246300
350 15.2 2-246350
400 17.2 2-246400
• ReinforcedLength in cm Weight in kg Order no.
95 4.2 2-247095
100 5 *2-247100* Not held in stock
• Heavyweight bracket, steelLength in cm Weight in kg Order no.
150 11 2-248150
200 12.5 2-248200
250 17.5 2-248250
300 18.5 *2-248300
350 21.5 *2-248350
400 24.6 *2-248400* Not held in stock
Marked in RAL 4008
EN-conformity to SN EN 12810 and SN EN 12811
13
Tobler AG MATO-2
Tobler AG MATO-2
2-2511002-251125
2-251127
MATO 2
Mesh panel
• In galvanised steel tube and mesh• With toe board
Length in cm Height in cm Weight in kg Order no.
65 100 12 2-234065
100 100 14 2-234100
150 100 17 2-234150
200 100 20 2-234200
250 100 22 2-234250
300 100 24 2-234300
• In aluminium• With toe board
Length in cm Height in cm Weight in kg Order no.
65 100 6 *2-134065
100 100 7 *2-134100
150 100 8.5 2-134150
200 100 10 2-134200
250 100 11 2-134250
300 100 12 2-134300* Not held in stock
Outside bracket
• For widening scaffolding outwards and inwards• For catwalks• Staircase installation and corner connections• In galvanised steel
Height in cm Width in cm Weight in kg Order no.
50 30 5 2-251030
50 65 7 2-251065
50 100 11.5 2-251100
50 125 12.8 2-251125
• In aluminiumHeight in cm Width in cm Weight in kg Order no.
50 65 3.5 2-151065
• Push-on bracket with half coupling for outside bracket 100 and 125 cm
Height in cm Width in cm Weight in kg Order no.
50 100/125 1.5 2-251127
EN-conformity to SN EN 12810 and SN EN 12811
14
2-2580202-258030 2-258060
2-258090
MATO 2
Inside bracket
• For widening scaffolding inwards• For hooking in
Width in cm Weight in kg Order no.
20.5 1.9 2-258020
30 2 2-258030
60 3 2-258060
90 6 *2-258090
*Only for use with steel tube frames 48.2 x 2.7/3.25 mm
Inside corner bracket with platform
• For creating inside corners unobstructed by tubesLength in cm Width in cm Weight in kg Order no.
20 20 3.4 1-160020
30 30 3.9 1-160030
70 70 13.5 *1-160070
* Only for use with frames with steel tube 48.20 x 2.7/3.25 mm
Bracket brace
• To support brackets under a heavy load, telescopic• For 30, 65, 95 and 125 brackets
Wall thickness in mm
Length in cm
Width in cm Weight in kg
Order no.
3.25 200 65 x 130 10 2-263200
Protective canopy bracket
• With platform groove• In galvanised steel tube Ø 48.3 mm• To protect passers-by
Width in cm Weight in kg Order no.
120 10.6 2-265120
160 12 2-265160
Inneneck- Rohrfrei- keine Kupplungen für Eckgeländer
EN-conformity to SN EN 12810 and SN EN 12811
15
1-267161
1-267163
MATO 2
Wall bracket
The wall bracket is used to mount façade scaffoldingwherever it cannot rest on the ground.
• In two parts, consisting of an aluminium lattice beam and a steel adapter (supplied as a set)
Length in cm Width in cm Weight in kg Order no.
160 40 18 1-267160
• Diagonal brace for wall bracket for accepting higher loadsWeight in kg Order no.
10.7 1-267163
Specimen load
Length in cm F in kg with diagonal support F in kg without diagonal support
30 4000 1100
60 2400 900
Baseplate
REGELANWENDUNG BELASTUNGSBEISPIEL
Feldlänge L = 250 cm
L FMIT SCHRÄGABSTÜTZUNG
FOHNE SCHRÄGABSTÜTZUNG
30 cm 4000 kg 1100 kg
60 cm 2400 kg 900 kg
F
L
Schrägabstützung
Mauerkonsole
Plattform zur Lastverteilung
Betonwand
Schalungsträger H20
Unterlagsholz 12 /20
Mauerkonsole
Belag
Geländer anbringenAlternativ :
Geländer
12
F
16
2-510020
2-510010
2-510014
MATO 2
Toe board bracket
• In galvanised steelWeight in kg Order no.
0.6 2-510010
• For attaching to a wooden toe board• Includes four rivets
Weight in kg Order no.
0.3 2-510014
• For attaching to an aluminium toe boardWeight in kg Order no.
0.1 2-510020
Toe board, wood
• Wooden board with galvanised steel bracket• Wood thickness 27 mm, primed in RAL 3031 red
Number per bundle
Length in cm
Height in cm
Weight in kg
Order no.
96 100 15 2.7 2-510100
96 125 15 3.3 2-510125
96 150 15 4 2-510150
96 200 15 5.2 2-510200
96 250 15 6.5 2-510250
96 300 15 7.5 2-510300
• End toe board, primed in RAL 3031 redNumber per
bundleLength in
cmHeight in
cmWeight
in kgOrder no.
96 65 15 2.2 2-510065
96 95 15 2.6 2-510095
EN-conformity to SN EN 12810 and SN EN 12811
17
Tobler AG MATO-2
Tobler AG MATO-2
MATO 2
Toe board, wood, painted
• Toe board painted in customer's RAL colour• Lengths of 200 cm and more are labelled• Delivery period 4 – 7 weeks• Primed in RAL 3031 red
Number per bundle Length in cm Height in cm Weight in kg Order no.
96 100 15 2.7 2-514100
96 150 15 4 2-514150
96 200 15 5.2 2-514200
96 250 15 6.5 2-514250
96 300 15 7.5 2-514300
• End toe board, painted, delivery period 4 – 7 weeks, primed in red RAL 3031Number per bundle Length in cm Height in cm Weight in kg Order no.
96 65 15 2.2 2-514065
96 95 15 3.6 2-514095
Toe board, aluminium
• In aluminium, with galvanised steel bracketNumber per bundle Length in cm Height in cm Weight in kg Order no.
96 100 15 1.2 2-512100
96 150 15 1.8 2-512150
96 200 15 2.4 2-512200
96 250 15 2.9 2-512250
96 300 15 3.5 2-512300
• End toe board
Number per bundle
Length in cm
Height in cm
Weight in kg
Order no.
96 65 15 0.8 2-512065
96 95 15 1.2 2-512095
Toe board, aluminium, powder coated
• In aluminium, with galvanised steel bracket• Toe board powder coated in customer's RAL colour• Lengths of 200 cm and more are labelled• Delivery period 6 – 7 weeks
Number per bundle
Length in cm
Height in cm
Weight in kg
Order no.
96 100 15 1.2 2-516100
96 150 15 1.8 2-516150
96 200 15 2.4 2-516200
96 250 15 2.9 2-516250
96 300 15 3.5 2-516300
• End toe board, powder coated, delivery period 4 – 7 weeksNumber per
bundleLength in
cmHeight in
cmWeight
in kgOrder no.
96 65 15 0.8 2-516065
96 95 15 1.2 2-516095
Text from data provided
Text from data provided
EN-conformity to SN EN 12810 and SN EN 12811
18
Tobler AG
Tobler AG Tobler AG
Tobler AG Tobler AG
MATO 2
Special tie bar
• For narrowing scaffolding lengthwise and stairwells• Frames and guard rail posts can be mounted• In galvanized steel tube• Only one frame can be mounted• Only for use with aluminium and steel coverings
Width in cm Weight in kg Order no.
65 7 2-272065
95 7.5 2-272095
Staircase bannister
• In galvanized steel tubeLength in cm Width in cm Weight in kg Order no.
250 50 16 *2-273250
300 50 20 *2-273300
* Not held in stock
• In aluminiumLength in cm Width in cm Weight in kg Order no.
250 50 8.5 2-173250
300 50 9.9 2-173300
EN-conformity to SN EN 12810 and SN EN 12811
19
2-149500
MATO 2
Staircase handrail
• Two-part set for Z-572250 stairsLength in cm Weight in kg Order no.
150 3.5 2-272150
250 5.6 2-272250* Not held in stock
Pedestrian passageway
• Lattice beam for bridging and/or pedestrian passageways• Aluminium lattice beam
Length in cm Height in cm Weight in kg Order no.
125 50 15.9 2-149125
150 50 16.9 2-149150
200 50 18.8 2-149200
250 50 20.7 2-149250
300 50 23.1 2-149300
500 50 32.4 2-149500
600 50 37 2-149600
750 50 44 2-149750
• Push-on bracket for platform bracketsLength in cm Weight in kg Order no.
25 3 2-251127
EN-conformity to SN EN 12810 and SN EN 12811
20
Frame racks - ideal for any use, simple to stack and suitable for transport to the site
Rack
• For 36 steel scaffolding framesLength in cm Width in cm Weight in kg Order no.
245 65 40 2-280065
245 95 48 2-280095
245 130 75 *2-280130* Not held in stock
• For 25 guard rails, collapsible, stackableLength in cm Width in cm Weight in kg Order no.
150 55 20 2-282150
Frame rack
• Two-parted, collapsible, stackable• For 20 scaffolding frames
Weight in kg Order no.
33.2 *2-281065
36.2 *2-281095
* Not held in stock
Simple stacking of guard rails Quick to assemble Loading and unloading possible from ground level
MATO 2
21
Apartment block in Lausanne with the MATO N temporary roof sys-tem.
22
Apartment block in Lausanne
23
All prices are net of VAT ex warehouse Rheineck
Deliveries: in accordance with the T&Cs of Tobler AG, Rheineck
General Terms and Conditions of Business (T&Cs) as at 1 January 2013
These T&Cs govern legal relationships between Tobler AG (hereinafter referred to as TOBLER) and its contracting part-ners (hereinafter referred to as Client) arising from the sale, rental and assembly of scaffolding, formwork and the corresponding accessories. They constitute a framework contract applicable to the conclusion of all contracts and are binding until revoked.
1. 1. Tender and conclusion of the contract1.1. Tenders, goods and services will be provided by TOBLER solely on the basis of these T&Cs, which will be deemed to have been accepted when the goods or services are ordered. The T&Cs will also expressly apply to all future orders by the Client.1.2. A contract will be concluded when TOBLER accepts a written, telephone or personal order unconditionally.1.3.VerbalassurancesbyTOBLERwillonlybevalidifconfirmedinwritingandsigned.1.4. TOBLER will only be bound by the Client‘s general terms and conditions of business if they correspond to its own or if it has agreed to them in writing. Divergent conditions of the Client which TOBLER has not expressly recognised in writing will not be binding upon it.
2. Technical documents2.1. Prospectuses, catalogues, etc. will not be binding in the absence of any agreement to the contrary. Details in technical documents will only be binding if they are expressly guaranteed in writing.2.2.Therighttomaketechnicalmodificationsisreserved.Differencesfromtheprospectusorfromdetailsinothersalesdocumentsorfromearlierdeliveriesintermsofconfiguration,weightsand measurements of the goods will only be relevant if the intended purpose of the goods is restrictedtoasignificantextent.2.3.Thefinalpotentialconfigurationisexpresslyreserved,particularlyinthecaseofnewdesignsorspecialconfigurations.2.4. TOBLER will be entitled to supply equivalent unbranded parts from subcontractors.
3. Terms of payment3.1. In the absence of any agreement to the contrary, payment must be made to TOBLER within thirty days, strictly net. The Client will be entitled to deduct a prompt payment discount of 2% for payment within ten days of the date of the invoice. Further deductions will only be admissible if expresslyagreedinwriting.Unjustifieddeductionswillbechargedretrospectively.3.2. In the case of arrears, the Client will be liable for 7% p.a. interest on arrears with effect from the due date of payment, without a reminder from TOBLER. 3.3. The absence of minor parts from the order or the assertion of claims under guarantee against TOBLER will not entitle the Client to delay payments due.3.4. Payment of the entire purchase price or the balance thereof will be due immediately if acceptance is delayed by the Client. The Client must bear the cost of any demurrage by the transport contractor.3.5. Should the deposit not be paid or the requisite security not be provided in accordance with the contract, TOBLER will be entitled to uphold or cancel the contract and demand compensation in either case.
4. Delivery terms4.1.Intheabsenceofanyagreementtothecontrary,theplaceoffulfilmentwillbeTOBLER‘sregisteredofficeinRheineck.4.2. Despatch and carriage are for the account and at the risk of the Client. The Client will be responsible for insurance against loss of any type whatsoever. The Client must bear any customs duty payable. 4.3. Pallets and crates are only made available on loan. The Client must return them at its own expense, otherwise TOBLER will invoice their cost.4.4.DeliverywillbemadeatthetimedesiredbytheClient,asfaraspossible.Notifiedoragreeddelivery periods and times will be observed as far as possible, but are not binding. Should delivery be delayed for reasons for which TOBLER is not responsible (force majeure, import or transport problems, delay by third-party suppliers, changes subsequently demanded by the Client, etc.), the delivery date will be postponed accordingly.4.5. A failure to observe the delivery deadline will not entitle the Client to cancel the contract, delay acceptance or demand compensation for delay.4.6. Should it be impossible to provide goods and services in the foreseeable future due to events over which TOBLER has no control, TOBLER will be entitled to cancel the contract by notifying the Client, without incurring liability for compensation.4.7. If the Client has been informed that the goods ordered are ready for despatch or collection, it willbeobligedtocollectorarrangedeliveryofthegoodswithinfiveworkingdaysofnotification.The Client will be in arrears of acceptance after this deadline has expired. In the event of arrears of acceptance, the Client will be obliged to compensate TOBLER for losses thus incurred. In this case, TOBLER will be entitled to retain the delivery at the expense and risk of the Client, store it on its premises, charging an appropriate fee, or cancel the contract, with payment of compensa-tion for the loss incurred by TOBLER. Delayed acceptance will be deemed to apply if the Client unjustifiablyrefusestoaccepttheconsignmentduetodelaysindelivery.EvenifTOBLERretainsthe goods or stores it on its premises, it will be entitled to cancel the contract at any time, without notice and without setting a period of grace, and to demand repayment of the loss which it has incurred.
5. Transfer of risk5.1. The risk applicable to the deliverable will be transferred to the Client when the consignment leaves TOBLER.6. Complaints6.1. The Client must inspect the goods and assembly work immediately after receipt and execu-tion.6.2. It must notify TOBLER of any shortcomings in writing within three days, otherwise the goods and services will be deemed to have been approved.
7. Guarantee under the purchase agreement7.1. In the case of new products (with the exception of timber, spare parts, tarpaulins, nets, any plastic components, small parts such as screws, nuts, etc., and mountings such as cables and tarpaulin ties), TOBLER will issue a guarantee to the Client for six months with effect from despatchoftheconsignmentfromTOBLER,providedthatexaminationandnotificationtakeplace punctually in accordance with paragraph 6. Liability for particular product characteristics will only be accepted if guaranteed in writing by TOBLER. Differences attributable to production or material will not give rise to entitlement to a guarantee. Moreover, the guarantee will lapse if the ClientoranauthorisedagentoftheClientmakesmodificationsorrepairstothegoodswithoutthe written agreement of TOBLER. 7.2. Any guarantee whatsoever for used items is precluded. No guarantee will apply to installed parts from third-party suppliers or if installed parts from third-party suppliers cause a fault or damage, or inhibit operation. 7.3. The guarantee may be restricted to repair or replacement of the defective parts, at TOBLER‘S discretion. Further claims under guarantee by the Client, particularly for redhibition, reduction or damages, are precluded.7.4. Replaced parts are the property of TOBLER and must be returned to it.7.5. Repair work or the supply of replacements will not extend or renew the period under para-graph 7.1. The guarantee period applicable to the original delivery will apply to the repaired or replaced parts.7.6.TOBLERwillbeentitledtorefusetorectifydefectsforaslongastheClientfailstofulfilitsobligations to TOBLER, without restriction.
7.7. TOBLER rejects any guarantee for damage attributable to normal wear and tear, inappropri-ate or violent handling, excess stress, inappropriate use and maintenance of the items, the use of unsuitable materials, accidents or force majeure.7.8. Only TOBLER may carry out repairs to scaffolding components. Otherwise any claim under guarantee will lapse.
8. Reservation of title under the purchase agreement8.1. TOBLER will remain the proprietor of the item purchased until the purchase price, including interest and any other costs, has been paid in full. The Client is obliged to inform any tenant of premises on which it accommodates the item purchased of the reservation of title in writing, before storing it.8.2. The Client authorises TOBLER to register retention of title with the responsible authority.8.3. The Client may not sell, pledge, loan or rent the purchased item until full payment of the purchase price, including all interest and costs, has been made. The Client also undertakes not to remove the purchase item from Swiss territory without the express written agreement of TOBLER. The Client must disclose the reservation of title immediately in the case of pledging, retention or seizure, and inform TOBLER in writing whenever possible, before the corresponding measure is taken.8.4. The Client is obliged to cooperate with measures necessary to protect TOBLER‘s property, at its own expense.8.5. The Client is obliged to insure the purchased item against all likely risks at its own expense tothebenefitofTOBLER,throughoutthetermofretentionoftitle.TheClientmustsubmitacorrespondingcertificateofinsuranceondemand.ShouldtheClientfailtocomplywiththisrequirement,TOBLERwillbeentitledtosubscribetoinsuranceforitsownbenefit,attheexpenseof the Client.
9. Provisions specific to rental9.1. Rent will always be net of carriage to and from the place of use. The costs of carriage will be charged separately, if it is arranged by TOBLER. 9.2. The Client is obliged to notify any tenant on whose premises it accommodates the rented goods of TOBLER‘s rights of ownership in writing, before placing it there.9.3.ThebenefitandriskassociatedwiththerentedgoodswillbetransferredtotheClientnolater than at the time at which it can dispose of said goods, i.e. either when the rented goods are transferred to the Client or a third party appointed by the latter at TOBLER‘s warehouse or when the rented goods are unloaded on site, if the Client has commissioned TOBLER with carriage. If delivery to an unoccupied building site is ordered, TOBLER will not assume any guarantee for the integrity and completeness of the delivery. 9.4. The Client must treat the rented goods with care and maintain them properly. The Client will be invoiced and must pay for damage and excessive wear attributable to inappropriate use of the rented goods. Formwork must be used as economically and carefully as possible and not cut. In particular, all formwork must be treated with release agent before concreting. Formwork beams must not be truncated under any circumstances. The greatest possible care must be taken when compressing concrete poured into the formwork, in order not to damage it. 9.5. All rented goods must be returned in a clean condition when the rental period ends. Other-wise the costs of subsequent cleaning will be invoiced to the Client. The Client is responsible for return carriage, which must take place at its own expense. The rented goods must be prepared for unloading so that they can be lifted easily by crane. A separate charge will be imposed for any work necessary for unloading, such as rearrangement, etc. 9.6. The rental charge for formwork does not include consumables (spacing tubes, plugs, tapers, release agent, etc.). When handling the elements, care must be taken that their wooden parts are not scratched (e.g. by sharp edges and corners of other elements). Particular care must be taken not to damage elements when cleaning them. Following use, the formwork must be placed on the pallets and in the crates provided. Small parts must be boxed. A separate charge will be made for any cleaning, sorting and repair work which may be necessary. Lost small parts must be replaced.9.7. The rented goods will be made available for the agreed term. Should the Client be in arrears of payment of the rent or should it handle the rented goods carelessly or contrary to instructions, TOBLER will be entitled to cancel the rental agreement immediately and repossess the rented goods. In this case, the costs of return carriage will be invoiced to the Client separately. The Client will also be obliged to pay compensation for premature termination of the rental agreement. In particular, TOBLER must be placed in the position which it would have enjoyed had the rental agreement remained in force for the entire anticipated rental term. In this case, TOBLER will not be obliged to ensure the re-rental of the goods throughout the remainder of the anticipated rental term.9.8.ShouldnofirmrentalagreementtermbeanticipatedorshouldtheClientcontinuetousethe rented goods beyond the contractual term originally intended, both parties will be entitled to terminate the rental agreement at any time, subject to observance of a fourteen-day period of notice.
10. Static calculations10.1. The prices do not include static calculations. They will be invoiced additionally at the request of and in accordance with the requirements of the Client.
11. Prohibition of assignment and offsetting11.1. The Client is not entitled to offset claims by TOBLER against its own claims unless TOBLER has expressly agreed to offsetting in writing.11.2. The Client is prohibited from assigning claims arising out of the contractual relationship with TOBLER to third parties.
12. Preclusion of further liability12.1.AnyclaimsbytheClient,withtheexceptionofthoseexpresslyidentifiedinthesetermsandconditions, on any legal basis whatsoever, particularly any claims for compensation, reduction or cancellation of the contract which are not expressly stipulated, are precluded. Under no circumstances will the Client be entitled to claim compensation for damage which does not affect thedelivereditemitself,suchaslossofproduction,lossofuse,orders,profitorotherdirectorindirect losses.
13. Amendments and liability13.1.TOBLERreservestherighttoamendtheseT&Csatanytime.TheClientwillbenotifiedof amendments by circular letter or in another suitable way. They will be deemed to have been accepted unless a written objection is received within one month.
14. Copyright14.1. TOBLER retains unrestricted title to drafts, drawings, etc. which it has prepared. They may not be copied or rendered accessible to third parties without TOBLER‘s permission.14.2. The imitation of goods, even if for exclusive personal use, will be subject to prosecution under criminal law.15. Applicable law and court of jurisdiction15.1. All legal relationships between the Client and TOBLER are governed by Swiss law, to the exclusion of the UN Convention on Contracts for the International Sale of Goods.15.2. The sole place of jurisdiction for any proceedings and the place of recovery, but only for Clients with a foreign domicile (Article 50(2) of the Swiss Debt Recovery and Bankruptcy Act), is the domicile of TOBLER in Rheineck. However, TOBLER is entitled to pursue the Client before the responsible court at the latter‘s domicile or place of residence, or before any other responsible court.
Langenhagstrasse 48-52 Fax +41 71 886 06 16 CH-9424 Rheineck [email protected] Tel. +41 71 886 06 06 www.tobler-ag.com