ascade 220® sport salish owl scarf - cascade...
TRANSCRIPT
© 2017 Cascade Yarns® - All Rights Reserved.
Cascade 220® Sport
Salish Cowl Scarf
DK251
Designed by
Diane Zangl
© 2017 Cascade Yarns® - All Rights Reserved.
Cascade 220® Sport Salish Cowl Scarf Designed by Diane Zangl
Skill Level: Intermediate
Size: 48” Lower circumference x 11” long
Materials: Cascade Yarns® Cascade 220® Sport 100% Peruvian Highland Wool 50 g (1.75 oz) / 164 yds (150 m) MC: 2 hanks #8012 (Doeskin Heather) A: 1 hank of #8013 (Walnut Heather) B: 1 hank of #8914 (Granny Smith C: 1 hank of #9420 (Como Blue) D: 1 hank of #9677 (Teal Blue) US 4 (3.5mm)/16”- 36” circular knitting needles or size needed to obtain gauge Stitch marker Yarn Needle
Gauge: 24 sts x 24 rnds = 4” (10 cm) in color pattern To save time and ensure proper fit, take time to check gauge.
Abbreviations: BO = Bind Off CO = Cast On K = Knit K2tog = Knit 2 stitches together MC = Main Color P = Purl P2tog = Purl 2 stitches together St(s) = Stitch(es) YO = Yarn Over
Wrapped Ribbing: Rnd 1: *[P2, K2]; repeat from * to end of rnd. Rnd 2: *[P2, YO, K2, pass YO 2 Knit sts]; repeat from * to end of rnd. Repeat Rnds 1-2 for pattern.
Notes: Small crosses in Rnds 15-27 may be worked in duplicate st if desired. Cut separate strands, each about 1½ yd long, for large diamonds at center. Fold strand in half and start 1st st of diamond at fold. Work each side of diamond with 1 end of strand. Change to shorter needles as necessary.
Begin Pattern: With MC and longest needle, CO 288 sts. Being careful not to twist your sts, join in the rnd. PM. Work even in Wrapped Ribbing for 6 rnds. Change to Stockinette st and work even for 8 rnds.
© 2017 Cascade Yarns® - All Rights Reserved.
Work 40 rnds of chart, decrease on rnds 15 and 34 as follows: Rnd 15: *[K4, K2tog]; repeat from * to end of rnd. (240 sts) Rnd 34: *[K3, K2tog]; repeat from * to end of rnd. (192 sts) When chart has been completed, Knit 10 rnds with MC only. Next Rnd: *[P2tog, K2]; repeat from * to end of rnd. (144 sts) Rnd 1: *[P1, YO, K2, pass YO 2 knit sts]; repeat from * to end of rnd. Rnd 2: *[P1, K2]; repeat from * to end of rnd. Repeat last 2 rnds 5 times more.
Finishing: BO loosely in pattern. Block if necessary.
Pattern Chart:
Color Key
(MC)
(A)
(B)
(C)
(D)
Decrease Rnd