![Page 1: ASCE EWRI International Low Impact Development ......ASCE EWRI International Low Impact Development Conference 2018 Kirstin Newfield, PhD Candidate, University of Toronto Supervisor:](https://reader034.vdocuments.net/reader034/viewer/2022050213/5f5fbd9ac5c7143b7f2dbf72/html5/thumbnails/1.jpg)
ASCE EWRI International Low Impact Development Conference 2018
Kirstin Newfield, PhD Candidate, University of Toronto
Supervisor: Dr. Jennifer Drake, University of Toronto
![Page 2: ASCE EWRI International Low Impact Development ......ASCE EWRI International Low Impact Development Conference 2018 Kirstin Newfield, PhD Candidate, University of Toronto Supervisor:](https://reader034.vdocuments.net/reader034/viewer/2022050213/5f5fbd9ac5c7143b7f2dbf72/html5/thumbnails/2.jpg)
• Benefits and Barriers of Low Impact Development (LID)
• Autocase for Sites Software Overview
• Neighbourhood Scale Case Study – Creekside Village
• Results
• Costs and Benefits of Permeable Pavement at the Neighbourhood Scale
• Autocase for Sites in the Design Process
2
![Page 3: ASCE EWRI International Low Impact Development ......ASCE EWRI International Low Impact Development Conference 2018 Kirstin Newfield, PhD Candidate, University of Toronto Supervisor:](https://reader034.vdocuments.net/reader034/viewer/2022050213/5f5fbd9ac5c7143b7f2dbf72/html5/thumbnails/3.jpg)
vanishingpoint.ca
1.toronto.ca
oala.ca
3
![Page 4: ASCE EWRI International Low Impact Development ......ASCE EWRI International Low Impact Development Conference 2018 Kirstin Newfield, PhD Candidate, University of Toronto Supervisor:](https://reader034.vdocuments.net/reader034/viewer/2022050213/5f5fbd9ac5c7143b7f2dbf72/html5/thumbnails/4.jpg)
• Allows for infiltration on paved surfaces
• no infiltration
• partial infiltration
• full infiltration (soils with infiltration >15 mm/hr (0.6 inch/hr))
4
![Page 5: ASCE EWRI International Low Impact Development ......ASCE EWRI International Low Impact Development Conference 2018 Kirstin Newfield, PhD Candidate, University of Toronto Supervisor:](https://reader034.vdocuments.net/reader034/viewer/2022050213/5f5fbd9ac5c7143b7f2dbf72/html5/thumbnails/5.jpg)
• Runoff prevention
• Use of existing natural systems and hydrological processes
• Treat stormwater close to the source
• Water Quality
• Air Quality
• Multifunctional landscapes
• landscape based approach, community livability
• Educational Opportunities
• Energy
• Urban Heat Island Effect
• Biodiversity
• …
5
![Page 6: ASCE EWRI International Low Impact Development ......ASCE EWRI International Low Impact Development Conference 2018 Kirstin Newfield, PhD Candidate, University of Toronto Supervisor:](https://reader034.vdocuments.net/reader034/viewer/2022050213/5f5fbd9ac5c7143b7f2dbf72/html5/thumbnails/6.jpg)
Barriers Identified in Literature:
1. Economic
2. Legal
3. Regulatory
4. Education and Awareness
5. Organizational
6. Cultural
7. Technological
Actual and perceived
(Cote & Wolfe 2014; Earles et al. 2009; Roy et al. 2008)
6
![Page 7: ASCE EWRI International Low Impact Development ......ASCE EWRI International Low Impact Development Conference 2018 Kirstin Newfield, PhD Candidate, University of Toronto Supervisor:](https://reader034.vdocuments.net/reader034/viewer/2022050213/5f5fbd9ac5c7143b7f2dbf72/html5/thumbnails/7.jpg)
Cost Analysis
- LID cost is often assessed using a cost analysis that is limited to the
capital, operation and maintenance costs of the project.
Cost- Benefit Analysis
- analysis of costs and benefits over the lifespan of the project using the
net present value (NPV)
Triple Bottom Line – Cost-Benefit Analysis (TBL-CBA)
- analysis of all social, environmental and financial costs and benefits
over the lifespan of a project
7
![Page 8: ASCE EWRI International Low Impact Development ......ASCE EWRI International Low Impact Development Conference 2018 Kirstin Newfield, PhD Candidate, University of Toronto Supervisor:](https://reader034.vdocuments.net/reader034/viewer/2022050213/5f5fbd9ac5c7143b7f2dbf72/html5/thumbnails/8.jpg)
• Uncertainty in capital, operation and maintenance cost information
• The value of social and environmental factors is challenging to measure
• An economic analysis in the conceptualization phase of a project can
be cost-prohibitive
8
![Page 9: ASCE EWRI International Low Impact Development ......ASCE EWRI International Low Impact Development Conference 2018 Kirstin Newfield, PhD Candidate, University of Toronto Supervisor:](https://reader034.vdocuments.net/reader034/viewer/2022050213/5f5fbd9ac5c7143b7f2dbf72/html5/thumbnails/9.jpg)
• Triple Bottom Line- Cost Benefit Analysis Software
• Automated economic decision making
• Validated data and models valuing the costs and benefits of LID
• Applied to site specific projects at various scales to determine the net-present
value (NPV) of financial, social and environmental impacts.
• Notable Projects:
• City of Pittsburgh - Stormwater plan
• City of Toronto – public parks infrastructure
• San Francisco International Airport – proposed green roof
9
![Page 10: ASCE EWRI International Low Impact Development ......ASCE EWRI International Low Impact Development Conference 2018 Kirstin Newfield, PhD Candidate, University of Toronto Supervisor:](https://reader034.vdocuments.net/reader034/viewer/2022050213/5f5fbd9ac5c7143b7f2dbf72/html5/thumbnails/10.jpg)
Financial
• capital expenditures
• operations and maintenance costs
• replacement costs
• residual value of assets
Social
• flood risk
• heat island effect
• shadow wage
Environmental
• air pollution reduction by vegetation
• water quality
• carbon reduction by vegetation
10
![Page 11: ASCE EWRI International Low Impact Development ......ASCE EWRI International Low Impact Development Conference 2018 Kirstin Newfield, PhD Candidate, University of Toronto Supervisor:](https://reader034.vdocuments.net/reader034/viewer/2022050213/5f5fbd9ac5c7143b7f2dbf72/html5/thumbnails/11.jpg)
1. How does the TBL-CBA of a neighbourhood development using
traditional stormwater management techniques compare with a
neighbourhood development using permeable pavement?
2. How can a tool such as Autocase for Sites inform the design process?
3. What further considerations can be made to improve TBL-CBA for
sites?
Conduct a TBL-CBA using Autocase for Sites on two stormwater
management design scenarios
1. Traditional Stormwater Management
2. Low Impact Development
11
![Page 12: ASCE EWRI International Low Impact Development ......ASCE EWRI International Low Impact Development Conference 2018 Kirstin Newfield, PhD Candidate, University of Toronto Supervisor:](https://reader034.vdocuments.net/reader034/viewer/2022050213/5f5fbd9ac5c7143b7f2dbf72/html5/thumbnails/12.jpg)
Community
• 28 ha residential community
• 158 homes
• community buildings
• roadways, sidewalks
• parking areas
• environmentally and socially
focused design
(Figure Adapted from Creek Side Village n.d.)
12
![Page 13: ASCE EWRI International Low Impact Development ......ASCE EWRI International Low Impact Development Conference 2018 Kirstin Newfield, PhD Candidate, University of Toronto Supervisor:](https://reader034.vdocuments.net/reader034/viewer/2022050213/5f5fbd9ac5c7143b7f2dbf72/html5/thumbnails/13.jpg)
• stormwater discharged to a
surface municipal drain which
drains to Whitemans Creek
• Type A soils – Sand and gravel
• Infiltration Rate - 135 mm/hr
• Hydraulic Conductivity
7.8x10-4 cm/s
(Figure Adapted from Creek Side Village
n.d.: Whitemans Creek in red, Municipal
Drain in blue)
13
![Page 14: ASCE EWRI International Low Impact Development ......ASCE EWRI International Low Impact Development Conference 2018 Kirstin Newfield, PhD Candidate, University of Toronto Supervisor:](https://reader034.vdocuments.net/reader034/viewer/2022050213/5f5fbd9ac5c7143b7f2dbf72/html5/thumbnails/14.jpg)
Traditional Stormwater Management
• ~1,600 m3 stormwater management pond (SMP)
• designed for enhanced water quality protection level and 35% impervious cover (MOECC, 2003)
• 1,900 m underground piping
• SMP replaces a landscaped area
• discharged into municipal drain
14
(Figure Adapted from Creek Side Village n.d.: SMP shown in red )
![Page 15: ASCE EWRI International Low Impact Development ......ASCE EWRI International Low Impact Development Conference 2018 Kirstin Newfield, PhD Candidate, University of Toronto Supervisor:](https://reader034.vdocuments.net/reader034/viewer/2022050213/5f5fbd9ac5c7143b7f2dbf72/html5/thumbnails/15.jpg)
LID (proposed site design)
• All pavements (roadways, parking lots) as permeable interlocking concrete pavers (PICP)
• Full infiltration PICP
• Landscaped area to accommodate additional trees and shrubs
15
(Figure Adapted from Creek Side Village n.d.: pavements in grey, landscaping in green)
![Page 16: ASCE EWRI International Low Impact Development ......ASCE EWRI International Low Impact Development Conference 2018 Kirstin Newfield, PhD Candidate, University of Toronto Supervisor:](https://reader034.vdocuments.net/reader034/viewer/2022050213/5f5fbd9ac5c7143b7f2dbf72/html5/thumbnails/16.jpg)
16(Autocase, 2018)
![Page 17: ASCE EWRI International Low Impact Development ......ASCE EWRI International Low Impact Development Conference 2018 Kirstin Newfield, PhD Candidate, University of Toronto Supervisor:](https://reader034.vdocuments.net/reader034/viewer/2022050213/5f5fbd9ac5c7143b7f2dbf72/html5/thumbnails/17.jpg)
17
(Autocase, 2018)
![Page 18: ASCE EWRI International Low Impact Development ......ASCE EWRI International Low Impact Development Conference 2018 Kirstin Newfield, PhD Candidate, University of Toronto Supervisor:](https://reader034.vdocuments.net/reader034/viewer/2022050213/5f5fbd9ac5c7143b7f2dbf72/html5/thumbnails/18.jpg)
18
![Page 19: ASCE EWRI International Low Impact Development ......ASCE EWRI International Low Impact Development Conference 2018 Kirstin Newfield, PhD Candidate, University of Toronto Supervisor:](https://reader034.vdocuments.net/reader034/viewer/2022050213/5f5fbd9ac5c7143b7f2dbf72/html5/thumbnails/19.jpg)
Design Scenario
Financial Environmental Social TBL
Traditional -$8,808,643 $74,674 $407,432 -$8,326,536
LID -$9,366,888 $134,543 $428,669 -$8,803,676
19
![Page 20: ASCE EWRI International Low Impact Development ......ASCE EWRI International Low Impact Development Conference 2018 Kirstin Newfield, PhD Candidate, University of Toronto Supervisor:](https://reader034.vdocuments.net/reader034/viewer/2022050213/5f5fbd9ac5c7143b7f2dbf72/html5/thumbnails/20.jpg)
20
-$8,000,000
-$7,000,000
-$6,000,000
-$5,000,000
-$4,000,000
-$3,000,000
-$2,000,000
-$1,000,000
$0
$1,000,000
Residual Value ofAssets
ReplacementCosts
Operations andMaintenance
CapitalExpenditures
Traditional Green Infrastructure
![Page 21: ASCE EWRI International Low Impact Development ......ASCE EWRI International Low Impact Development Conference 2018 Kirstin Newfield, PhD Candidate, University of Toronto Supervisor:](https://reader034.vdocuments.net/reader034/viewer/2022050213/5f5fbd9ac5c7143b7f2dbf72/html5/thumbnails/21.jpg)
21
$0
$50,000
$100,000
$150,000
$200,000
$250,000
$300,000
$350,000
Flood Risk Heat Island Effect Shadow Wage
Traditional Green Infrastructure
![Page 22: ASCE EWRI International Low Impact Development ......ASCE EWRI International Low Impact Development Conference 2018 Kirstin Newfield, PhD Candidate, University of Toronto Supervisor:](https://reader034.vdocuments.net/reader034/viewer/2022050213/5f5fbd9ac5c7143b7f2dbf72/html5/thumbnails/22.jpg)
22
-$150,000
-$100,000
-$50,000
$0
$50,000
$100,000
$150,000
Air PollutionReduced byVegetation Water Quality
Carbon Reductionby Vegetation
Carbon Emissionsfrom Concrete
Traditional Green Infrastructure
![Page 23: ASCE EWRI International Low Impact Development ......ASCE EWRI International Low Impact Development Conference 2018 Kirstin Newfield, PhD Candidate, University of Toronto Supervisor:](https://reader034.vdocuments.net/reader034/viewer/2022050213/5f5fbd9ac5c7143b7f2dbf72/html5/thumbnails/23.jpg)
• Both traditional and LID design scenarios have a comparable TBL-CBA
• Permeable pavement is shown to be a viable alternative
• The most significant costs impacting the TBL are capital and operation
and maintenance costs
• Often analyzed in isolation using a simple cost analysis
• software tool can showcase how these costs can be offset by valuing
the benefits
• as research progresses with operation and maintenance practices and
LID becomes more widely used these costs may decrease over time
relative to traditional infrastructure.
23
![Page 24: ASCE EWRI International Low Impact Development ......ASCE EWRI International Low Impact Development Conference 2018 Kirstin Newfield, PhD Candidate, University of Toronto Supervisor:](https://reader034.vdocuments.net/reader034/viewer/2022050213/5f5fbd9ac5c7143b7f2dbf72/html5/thumbnails/24.jpg)
• Design Stage Considerations
• flexibility in the software allows for use throughout the various stages
of design
• The results of this TBL-CBA demonstrate room for optimization in the
design of the LID scenario. This can be beneficial in the early stages
of design to compare alternatives.
• Stakeholders
• A TBL-CBA report can inform the discussion amongst the various
stakeholders (developers, owners, municipalities, regulatory bodies...)
• The breakdown of the various costs and benefits allows for various
stakeholders to understand how the site design impacts their interests.
24
![Page 25: ASCE EWRI International Low Impact Development ......ASCE EWRI International Low Impact Development Conference 2018 Kirstin Newfield, PhD Candidate, University of Toronto Supervisor:](https://reader034.vdocuments.net/reader034/viewer/2022050213/5f5fbd9ac5c7143b7f2dbf72/html5/thumbnails/25.jpg)
• More detailed inputs regarding water balance would highlight the site
specific benefits that LID can provide.
• Treatment Train benefits of LID
• Expanding the financial, social and environmental values that the TBL-
CBA models would help build the case for LID.
• Examples include: replenishing the groundwater table through
infiltration, accessibility benefits of permeable pavement, impacts of
stormwater discharge to a nearby watercourse
• Autocase is continually developing the software and including new
models as they become available including groundwater recharge and
a more detailed pollutant loading model
![Page 26: ASCE EWRI International Low Impact Development ......ASCE EWRI International Low Impact Development Conference 2018 Kirstin Newfield, PhD Candidate, University of Toronto Supervisor:](https://reader034.vdocuments.net/reader034/viewer/2022050213/5f5fbd9ac5c7143b7f2dbf72/html5/thumbnails/26.jpg)
26
http://www.mycreeksidevillage.ca/
https://autocase.com/
![Page 27: ASCE EWRI International Low Impact Development ......ASCE EWRI International Low Impact Development Conference 2018 Kirstin Newfield, PhD Candidate, University of Toronto Supervisor:](https://reader034.vdocuments.net/reader034/viewer/2022050213/5f5fbd9ac5c7143b7f2dbf72/html5/thumbnails/27.jpg)
• STEP and CH2M Hill Canada Ltd., 2016 (revised 2018). Inspection and
Maintenance Guide for Stormwater Management Ponds and
Constructed Wetlands.
• Center for Neighborhood Technology and American Rivers, 2010.
• Creek Side Village. "Creek Side Village." <www.mycreeksidevillage.ca>
(April 23, 2018].
• Impact Infrastructure. "Autocase for Sites." <https://autocase.com/>
(April 23, 2018].
27