Greg Jennings, PhD, PE Professor, Biological & Agricultural Engineering North Carolina State University [email protected] Stream Restoration Innovations and Opportunities

Upload: greg-jennings

Post on 27-Dec-2014

278 views

Category:

Technology


4 download

DESCRIPTION

 

TRANSCRIPT

Page 1: Asce nc jennings

Greg Jennings, PhD, PE Professor, Biological & Agricultural Engineering North Carolina State University [email protected]

Stream Restoration Innovations and Opportunities

Page 2: Asce nc jennings

•  Channel (bed & banks) •  Floodplain •  Water •  Sediment •  Plants & animals

Stream: A system of fluvial forms & habitats

Photo Credit: Eve Brantley, Auburn University

Page 3: Asce nc jennings

•  Communities of organisms and their physical, chemical, and biological environments

Streams are Ecosystems

Page 4: Asce nc jennings

1.  Bed stability & diversity

2.  Sediment transport balance

3.  In-stream habitat & flow diversity

4.  Bank stability (native plant roots)

5.  Riparian buffer (streamside forest)

6.  Active floodplain

7.  Healthy watershed

What makes a stream healthy?

Page 5: Asce nc jennings

Healthy Streams?

Page 6: Asce nc jennings

Stream Impairments •  Straightening & dredging •  Floodplain filling •  Watershed manipulation •  Sedimentation & stormwater •  Pollution discharges •  Utilities & culverts •  Buffer removal •  Disdain & neglect

Page 7: Asce nc jennings

§  Activities that initiate or accelerate the recovery of ecosystem health, integrity, and sustainability (SER, 2004).

Ecosystem Restoration

Page 8: Asce nc jennings

Why Restoration?

•  Water quality impairments •  Habitat loss •  Ecosystem degradation •  Land loss •  Safety concerns •  Infrastructure damage •  Flooding •  Aesthetics

Page 9: Asce nc jennings

1.  design of an ecological river restoration project should be based on a specified guiding image of a more dynamic, healthy river

2.  river’s ecological condition must be measurably improved

3.  river system must be more self-sustaining and resilient to external perturbations so that only minimal follow-up maintenance is needed

4.  during the construction phase, no lasting harm should be inflicted on the ecosystem

5.  pre- and post-assessment must be completed and data made publicly available

Standards for ecologically successful river restoration Palmer et al., Journal of Applied Ecology, 2005, 42, 208–217

Page 10: Asce nc jennings

•  Habitats & water quality •  Natural flow regimes •  Recreation & aesthetics •  Public enthusiasm

Outcomes of Ecosystem Restoration

Page 11: Asce nc jennings

1.  Channel morphology

2.  Floodplain structure

3.  Hydrologic & hydraulic analysis

4.  In-stream structures

5.  Habitats & vegetation

6.  Site & watershed conditions

7.  Monitoring, maintenance, education

Restoration Components

Page 12: Asce nc jennings

Stream Design Approaches 1.  Threshold Channel

2.  Alluvial Channel

a.  Regime Equations

b.  Analogy (Reference Reach)

c.  Hydraulic Geometry

d.  Analytical Models

3.  Combination of Methods

Page 13: Asce nc jennings

Threshold Channels

Page 14: Asce nc jennings

Alluvial Channels 1.  Movable boundary systems

2.  Complex design approach: assess sediment continuity and channel performance for a range of flows

3.  Dependent variables: Width, Depth, Slope, Planform

4.  Independent variables: Sediment inflow, Water inflow, Bank composition

5.  Empirical & Analytical approaches should be used concurrently

Page 15: Asce nc jennings

Steady State Equilibrium dimension, pattern and profile of the river and its velocity have adjusted to transmit the discharge and sediment load from its catchment under the present climate and land use conditions without any systematic erosion or deposition; namely regime conditions (Hey)

Page 16: Asce nc jennings

Alluvial Channels – Analogy Approach 1.  Reference reach: Must have similar bed/bank materials,

sediment inflow, slope, valley type, and hydrograph

2.  Upstream/downstream of design reach is best

3.  Nearby similar watershed acceptable

4.  Use as a starting point or check (BE CAREFUL)

Page 17: Asce nc jennings

Alluvial Channels – Hydraulic Geometry

Page 18: Asce nc jennings

1

10

100

1000

10000

0.1 1 10 100

Bankfull  Discharge,  Q  (cfs)

Drainage  Area  (sq  mi)

Hydraulic  Geometry  Regional  Curves

NC  Piedmont

NC  Mtn

MD  Alleghany

MD

NY

VT

OH  01

OH  05

OK

SW  OR

Pacific  NW

AZ

AZ  &  NM

Page 19: Asce nc jennings

1

10

100

1000

0.1 1 10 100

Cross-­‐section  Area  (sq  ft)

Drainage  Area  (sq  mi)

Hydraulic  Geometry  Regional  Curves

NC  Piedmont

NC  Mtn

MD  Alleghany

MD

NY

VT

OH  01

OH  05

OK

SW  OR

Pacific  NW

AZ

AZ  &  NM

Page 20: Asce nc jennings

Combination Approach to Natural Channel Design

1.  Existing Conditions – valley, watershed, constraints

2.  Design Goals

3.  Design Criteria

a.  Regime Equations

b.  Analogy (Reference Reach)

c.  Hydraulic Geometry (Regional Curves)

d.  Other Restoration Projects

4.  Analytical Models

Page 21: Asce nc jennings

1. Channel Morphology

•  Dimension (baseflow, bankfull, flood flows)

•  Pattern (meandering, straight, braided)

•  Profile (bedform – riffle, run, pool, glide, step)

2005 South Fork Mitchell River 2006

Photo Credits: Darrell Westmoreland, North State Environmental, Inc.

Page 22: Asce nc jennings

2011 South Fork Mitchell River

Page 23: Asce nc jennings

2011 South Fork Mitchell River

Page 24: Asce nc jennings

High-quality “reference” streams serve as design templates

Page 25: Asce nc jennings

Natural Stream Channel Stability (from Leopold)

•  River has a stable dimension, pattern and profile •  Maintains channel features (riffles, pools, steps) •  Does not aggrade (fills) or degrade (erodes)

Page 26: Asce nc jennings

Dimension (cross-section)

•  Area •  Width •  Depth •  Width/Depth Ratio •  Entrenchment Ratio •  Bank Height Ratio

Page 27: Asce nc jennings

Bankfull Stage: “incipient flooding” “corresponds to the discharge at which channel maintenance is the most effective, that is, the discharge at which moving sediment, forming or removing bars, forming or changing bends and meanders, and generally doing work results in the average morphologic characteristics” (Dunne & Leopold,1978)

Stream Corridor Restoration: Principles, Processes, and Practices. 1998. Federal Interagency Stream Restoration Working Group.

Page 28: Asce nc jennings

Bankfull Terrace

Page 29: Asce nc jennings

Bankfull Width, Wbkf = 36 ft; Bankfull Area, Abkf = 112 ft2

Mean Depth, dbkf = Abkf / Wbkf = 112 / 36 = 3.1 ft

Width to Depth Ratio, W/d = Wbkf / dbkf = 36 / 3.1 = 11.5

Page 30: Asce nc jennings

BHR = 5.3 / 2.5 = 2.1

Page 31: Asce nc jennings

Entrenchment Ratio = Wfpa / Wbkf = 75/15 = 5

Page 32: Asce nc jennings

Pool Run

Point Bar (deposition)

Glide

Riffle

Meandering Stream: Alluvial Forms

Page 33: Asce nc jennings

Sinuosity = stream length / valley length K = 1850 / 980 = 1.9

Valley Length

Page 34: Asce nc jennings

Meander Length Ratio = meander length / width = 78/15 = 5.2 Meander Width Ratio = belt width / width = 57/15 = 3.8

Radius of Curvature Ratio = radius / width = 23/15 = 1.5

Meander Length

Belt Width

Page 35: Asce nc jennings

Glide Slope

Riffle Slope

Run Slope

Pool Slope

Water Surface

Thalweg

Pool Spacing, Lp-p

Profile (bedform)

Riffle Slope Ratio, Srif / Sav

Pool Slope Ratio, Spool / Sav

Pool-to-Pool Spacing Ratio, Lp-p / Wbkf

Page 36: Asce nc jennings

2. Floodplain Structure

•  Regular (every year) flooding to relieve stress

•  Floodwater retention & riparian wetlands

•  Stormwater discharge retention & treatment

Page 37: Asce nc jennings

Priority 1: lift channel

Incised Stream

Priority 2 & 3: lower floodplain

Stream Corridor Restoration: Principles, Processes, and Practices. 1998. Federal Interagency Stream Restoration Working Group.

Page 38: Asce nc jennings

2006 Town Creek Tributary 2007

Priority 1: Raise channel to existing valley and construct new meandering channel

Rain will come during and immediately following construction!

ER = 15; W/d = 12

Page 39: Asce nc jennings

2008 Town Creek Tributary

Entrenchment Ratio = Wfpa / Wbkf = 150/10 = 1.6

Page 40: Asce nc jennings

Priority 1: Raise channel to existing valley and construct new meandering channel

2008 Purlear Creek 2009

ER = 7; W/d = 14

Page 41: Asce nc jennings

2009 Purlear Creek

Entrenchment Ratio = Wfpa / Wbkf = 100/14 = 7

Page 42: Asce nc jennings

Priority 2: Excavate lower floodplain and construct new meandering channel

2008 White Slough 2010

ER = 6; W/d = 11

Page 43: Asce nc jennings

White Slough 2010

Entrenchment Ratio = Wfpa / Wbkf = 72/12 = 6

Page 44: Asce nc jennings

Priority 2: Excavate lower floodplain and construct new meandering channel

2008 Trib to Saugatchee Creek 2008

ER = 5; W/d = 11

Page 45: Asce nc jennings

Priority 2: Excavate lower floodplain and construct new meandering channel

2004 NCSU Rocky Branch 2005

Page 46: Asce nc jennings

2006

NCSU Rocky Branch

2006

Page 47: Asce nc jennings

2008 NCSU Rocky Branch

Page 48: Asce nc jennings
Page 49: Asce nc jennings

Entrenchment Ratio = Wfpa / Wbkf = 48/12 = 4

Page 50: Asce nc jennings

2005 NCSU Rocky Branch 2006

Priority 3: Excavate narrow floodplain benches in confined systems

ER = 2.2; W/d = 12

Page 51: Asce nc jennings

2008 NCSU Rocky Branch

Page 52: Asce nc jennings

Priority 3: Excavate narrow floodplain benches in confined systems

2009 Little Shades Creek 2010

ER = 1.6; W/d = 15

Page 53: Asce nc jennings

Entrenchment Ratio = Wfpa / Wbkf = 60/38 = 1.6

Page 54: Asce nc jennings

Little Shades Creek 2010

Page 55: Asce nc jennings

Priority 3. Excavate floodplain benches and add structures to maintain straight channel

2000 NCSU Rocky Branch 2001

ER = 1.8; W/d = 14

Page 56: Asce nc jennings

NCSU Rocky Branch

2008

Page 57: Asce nc jennings

Qbkf: Bankfull discharge (cfs) appropriate for watershed size, sediment transport & valley conditions

Vav = Qbkf / Abkf: Bankfull average velocity (ft/s) appropriate for valley, soils, bed material

τav: Bankfull average applied shear stress (lb/ft2) & local max stresses appropriate for sediment transport conditions & bed/bank restistance

ωav: Bankfull average stream power (lb/ft/s) appropriate for sediment transport conditions

Riffle substrate size distribution appropriate for hydraulic conditions & habitats

Streambank protection to resist erosion (short-term & long-term)

3. Hydrologic & Hydraulic Analysis