The ASHRAE 90.1-2010 Energy
Code: How it Will Affect Your
Projects
![Page 3: ASHRAE 90.1-2010](https://reader036.vdocuments.net/reader036/viewer/2022082216/55cf9db6550346d033aed6ea/html5/thumbnails/3.jpg)
Presenter Jeff Boldt, PE, LEED® AP, HBDP
KJWW Engineering (450 staff)
Principal – Director of Engineering
Voting Member ASHRAE SSPC-90.1
Member Mechanical Sub-Committee (MSC)
• Chair - 90.1 Healthcare Working Group (WG)
• Chair - 90.1 Hydronic WG, Elevator WG, Duct Leakage WG
• Member - 90.1 Radiant WG & Heat Recovery WG
Member ASHRAE 189.1
Author AEDG Small & Large Healthcare
![Page 4: ASHRAE 90.1-2010](https://reader036.vdocuments.net/reader036/viewer/2022082216/55cf9db6550346d033aed6ea/html5/thumbnails/4.jpg)
Agenda
What is ASHRAE 90.1?
How is ASHRAE 90.1 enforced?
What changed in 90.1-2010?
Challenges?
Suggestions for compliance
![Page 5: ASHRAE 90.1-2010](https://reader036.vdocuments.net/reader036/viewer/2022082216/55cf9db6550346d033aed6ea/html5/thumbnails/5.jpg)
What is ANSI/ASHRAE/IES
Standard 90.1?
![Page 6: ASHRAE 90.1-2010](https://reader036.vdocuments.net/reader036/viewer/2022082216/55cf9db6550346d033aed6ea/html5/thumbnails/6.jpg)
ASHRAE 90.1
World’s most adopted building energy code
Basis for International Energy Conservation Code (IECC)
A compliance option in the IECC
Minimum code standards
![Page 7: ASHRAE 90.1-2010](https://reader036.vdocuments.net/reader036/viewer/2022082216/55cf9db6550346d033aed6ea/html5/thumbnails/7.jpg)
Scope of ASHRAE 90.1
Energy conservation code for buildings, except low-rise residential
Envelope
HVAC
Service Water Heating
Power & Lighting
Other
![Page 8: ASHRAE 90.1-2010](https://reader036.vdocuments.net/reader036/viewer/2022082216/55cf9db6550346d033aed6ea/html5/thumbnails/8.jpg)
Scope of ASHRAE 90.1
Buildings, except low-rise residential
Not 3 stories or less residential or any single-family residences
Low-rise hotel, prison, etc. are covered
New buildings and their systems
New portions of buildings & systems
New systems (equipment) in existing buildings
![Page 9: ASHRAE 90.1-2010](https://reader036.vdocuments.net/reader036/viewer/2022082216/55cf9db6550346d033aed6ea/html5/thumbnails/9.jpg)
9 Temperature ‘zones’ + ABC = 17
![Page 10: ASHRAE 90.1-2010](https://reader036.vdocuments.net/reader036/viewer/2022082216/55cf9db6550346d033aed6ea/html5/thumbnails/10.jpg)
Scope Addition
New equipment or building systems specifically identified in the standard that are part of industrial or manufacturing processes
Computer rooms are the first application
![Page 11: ASHRAE 90.1-2010](https://reader036.vdocuments.net/reader036/viewer/2022082216/55cf9db6550346d033aed6ea/html5/thumbnails/11.jpg)
How is ASHRAE 90.1
Enforced?
![Page 12: ASHRAE 90.1-2010](https://reader036.vdocuments.net/reader036/viewer/2022082216/55cf9db6550346d033aed6ea/html5/thumbnails/12.jpg)
How 90.1 is Enforced
EPAct 1992 requires DOE to review each version of 90.1 & requires all states to have energy codes substantially equal to the latest ‘approved’ version
DOE issues “Determinations”
Theoretically, within one year
States are given two years to comply
![Page 13: ASHRAE 90.1-2010](https://reader036.vdocuments.net/reader036/viewer/2022082216/55cf9db6550346d033aed6ea/html5/thumbnails/13.jpg)
DOE Determination
90.1-2010 was given a positive determination
States were notified October, 2011 that they must comply by October, 2013
![Page 14: ASHRAE 90.1-2010](https://reader036.vdocuments.net/reader036/viewer/2022082216/55cf9db6550346d033aed6ea/html5/thumbnails/14.jpg)
Most States Comply
Indiana adopts 90.1-2007
Illinois, Iowa, and Wisconsin adopt 2009 IECC with amendments
The 2009 IECC includes 90.1-2007 as a compliance option
Illinois will adopt IECC-2012 in July
2012 IECC adopts 90.1-2010
![Page 15: ASHRAE 90.1-2010](https://reader036.vdocuments.net/reader036/viewer/2022082216/55cf9db6550346d033aed6ea/html5/thumbnails/15.jpg)
State Compliance Map
![Page 16: ASHRAE 90.1-2010](https://reader036.vdocuments.net/reader036/viewer/2022082216/55cf9db6550346d033aed6ea/html5/thumbnails/16.jpg)
Why Should I Comply?
Required for LEED Certification
Prerequisite and need a couple points
Appendix G for more points
90.1-2010 for latest LEED version
Required for all federal facilities
Saves energy
Easy way to require energy efficient designs
![Page 17: ASHRAE 90.1-2010](https://reader036.vdocuments.net/reader036/viewer/2022082216/55cf9db6550346d033aed6ea/html5/thumbnails/17.jpg)
What Changed in ASHRAE
90.1 - 2010?
![Page 18: ASHRAE 90.1-2010](https://reader036.vdocuments.net/reader036/viewer/2022082216/55cf9db6550346d033aed6ea/html5/thumbnails/18.jpg)
ASHRAE 90.1-2010
90.1-2010 was released in October 2010
Goal was 30% less energy than 90.1-2004
2007 version saved only a few %
IECC has incorporated most changes
2009 has some
2011 interim update
2012 major edition accepts 90.1-2010
![Page 19: ASHRAE 90.1-2010](https://reader036.vdocuments.net/reader036/viewer/2022082216/55cf9db6550346d033aed6ea/html5/thumbnails/19.jpg)
ASHRAE 90.1-2010
Many Changes
Elevators was addendum DF!!
118 addenda proposed
![Page 20: ASHRAE 90.1-2010](https://reader036.vdocuments.net/reader036/viewer/2022082216/55cf9db6550346d033aed6ea/html5/thumbnails/20.jpg)
Building Envelope
2007 Requirements
Specifies wall, floor, and roof R-values
Windows and doors
• 40% window limit
• Window U and SHGF (NFRC 400)
• Vestibules
![Page 21: ASHRAE 90.1-2010](https://reader036.vdocuments.net/reader036/viewer/2022082216/55cf9db6550346d033aed6ea/html5/thumbnails/21.jpg)
Building Envelope
Roof Insul R20/16 cz1 >> R35/20 cz8
SHGF 0.25/0.40 cz1 >> 0.34/0.45 cz8
U-values 0.65/1.2 cz1 >> 0.34/0.45 cz8
VT/SHGC ratio 1.1 includes frame
![Page 22: ASHRAE 90.1-2010](https://reader036.vdocuments.net/reader036/viewer/2022082216/55cf9db6550346d033aed6ea/html5/thumbnails/22.jpg)
Building Envelope
Maximum 30% glass (bb)
Exception: 40% if
• Distribute glass to daylight > 50% of floor area
• Install daylight dimming
![Page 23: ASHRAE 90.1-2010](https://reader036.vdocuments.net/reader036/viewer/2022082216/55cf9db6550346d033aed6ea/html5/thumbnails/23.jpg)
Envelope – Continuity – Too Late
![Page 24: ASHRAE 90.1-2010](https://reader036.vdocuments.net/reader036/viewer/2022082216/55cf9db6550346d033aed6ea/html5/thumbnails/24.jpg)
![Page 25: ASHRAE 90.1-2010](https://reader036.vdocuments.net/reader036/viewer/2022082216/55cf9db6550346d033aed6ea/html5/thumbnails/25.jpg)
AHU Heat Gain (2013)
IFB Coils
Humidifiers
![Page 26: ASHRAE 90.1-2010](https://reader036.vdocuments.net/reader036/viewer/2022082216/55cf9db6550346d033aed6ea/html5/thumbnails/26.jpg)
Building Envelope – Air Barrier (bf)
Air barrier & joints must be detailed
![Page 27: ASHRAE 90.1-2010](https://reader036.vdocuments.net/reader036/viewer/2022082216/55cf9db6550346d033aed6ea/html5/thumbnails/27.jpg)
Air Barriers
Materials < 0.004 cfm/SF
Assembly < 0.040 cfm/SF
![Page 28: ASHRAE 90.1-2010](https://reader036.vdocuments.net/reader036/viewer/2022082216/55cf9db6550346d033aed6ea/html5/thumbnails/28.jpg)
Building Envelope
More S glazing than either E or W (bn)
Building orientation
Land purchases and campus planning
No public review comments
Exceptions
Storefront, Shaded building, Infill with nearby building on south, Alterations with no increase in glazing
![Page 29: ASHRAE 90.1-2010](https://reader036.vdocuments.net/reader036/viewer/2022082216/55cf9db6550346d033aed6ea/html5/thumbnails/29.jpg)
Building Envelope
![Page 30: ASHRAE 90.1-2010](https://reader036.vdocuments.net/reader036/viewer/2022082216/55cf9db6550346d033aed6ea/html5/thumbnails/30.jpg)
Building Envelope
![Page 31: ASHRAE 90.1-2010](https://reader036.vdocuments.net/reader036/viewer/2022082216/55cf9db6550346d033aed6ea/html5/thumbnails/31.jpg)
Miscellaneous
Cool roofs (f)
Cz1-3, with exceptions
Skylights with daylighting
![Page 32: ASHRAE 90.1-2010](https://reader036.vdocuments.net/reader036/viewer/2022082216/55cf9db6550346d033aed6ea/html5/thumbnails/32.jpg)
HVAC
Scope
Equipment efficiency ratings
Fan Power
Energy recovery
Reheat limitations
Economizers
Duct sealing and leakage
Other
![Page 33: ASHRAE 90.1-2010](https://reader036.vdocuments.net/reader036/viewer/2022082216/55cf9db6550346d033aed6ea/html5/thumbnails/33.jpg)
Fan Power
2007 requirements
CAV = 0.94 BHP/1000 cfm + Allowances
VAV = 1.30 BHP/1000 cfm + Allowances
Allowances for:
• Ducted return
• Return control devices
• Filters
• Heat recovery
• Silencers
![Page 34: ASHRAE 90.1-2010](https://reader036.vdocuments.net/reader036/viewer/2022082216/55cf9db6550346d033aed6ea/html5/thumbnails/34.jpg)
Fan Power
2010 requirements (VAV)
Offices <1.5 BHP/1000 cfm
Labs & Hospitals <2.3 BHP/1000 cfm
• Based on brake HP
• Includes all fans running at peak cooling load
• Also in IECC 2009
![Page 35: ASHRAE 90.1-2010](https://reader036.vdocuments.net/reader036/viewer/2022082216/55cf9db6550346d033aed6ea/html5/thumbnails/35.jpg)
Fan Power
Suggestions for compliance
Efficient fans
Low static systems
• Larger air handling units (but smaller motors)
• Fewer duct turns
• Shorter duct runs
• Requires early coordination of architectural design with HVAC design
• Sell the advantages!
![Page 36: ASHRAE 90.1-2010](https://reader036.vdocuments.net/reader036/viewer/2022082216/55cf9db6550346d033aed6ea/html5/thumbnails/36.jpg)
Fan Power
2007 ERU allowance
Whatever the pressure drop is
2010 ERU allowance (dj)
2.2*effectiveness – 0.5, except
Runaround coils = 0.6”
Provides incentive for higher efficiency
![Page 37: ASHRAE 90.1-2010](https://reader036.vdocuments.net/reader036/viewer/2022082216/55cf9db6550346d033aed6ea/html5/thumbnails/37.jpg)
Energy Recovery
2007 – if >70% OA and >5,000 cfm
![Page 38: ASHRAE 90.1-2010](https://reader036.vdocuments.net/reader036/viewer/2022082216/55cf9db6550346d033aed6ea/html5/thumbnails/38.jpg)
Reheat – Typical VAV Hospital
![Page 39: ASHRAE 90.1-2010](https://reader036.vdocuments.net/reader036/viewer/2022082216/55cf9db6550346d033aed6ea/html5/thumbnails/39.jpg)
Reheat
2007 requirements
Unlimited reheat if there are any pressure controlled spaces – many constant volume hospitals and labs
Many exceptions
IECC is less restrictive
![Page 40: ASHRAE 90.1-2010](https://reader036.vdocuments.net/reader036/viewer/2022082216/55cf9db6550346d033aed6ea/html5/thumbnails/40.jpg)
Reheat
2010 requirements
No reheat allowed unless:
• ≤30% of peak flow (≤50% if 20% DB) or
• Flow no more than required air changes
Exception if 75% of heat is recovered
Bans CAV systems in most hospitals & labs
ORs only pressurized when unoccupied
![Page 41: ASHRAE 90.1-2010](https://reader036.vdocuments.net/reader036/viewer/2022082216/55cf9db6550346d033aed6ea/html5/thumbnails/41.jpg)
Limit on Overhead Air Heating (BX)
Limits heating air temperature to 20F above room temperature when both supply outlet and return/exhaust inlet are >6-feet AFF
Supplemental heat may be needed
![Page 42: ASHRAE 90.1-2010](https://reader036.vdocuments.net/reader036/viewer/2022082216/55cf9db6550346d033aed6ea/html5/thumbnails/42.jpg)
Reheat
Suggestions for compliance
VAV systems
Perimeter heating
Condenser reheat
Heat pumps, fan coils, or chilled beams with dedicated outside air systems (DOAS) and enthalpy recovery
![Page 43: ASHRAE 90.1-2010](https://reader036.vdocuments.net/reader036/viewer/2022082216/55cf9db6550346d033aed6ea/html5/thumbnails/43.jpg)
Economizers
2007
2010 (cy)
![Page 44: ASHRAE 90.1-2010](https://reader036.vdocuments.net/reader036/viewer/2022082216/55cf9db6550346d033aed6ea/html5/thumbnails/44.jpg)
Economizers (cy)
Requires water economizer for some zones required to be humidified
Run cooling towers in the winter
Hospitals & some labs
![Page 45: ASHRAE 90.1-2010](https://reader036.vdocuments.net/reader036/viewer/2022082216/55cf9db6550346d033aed6ea/html5/thumbnails/45.jpg)
![Page 46: ASHRAE 90.1-2010](https://reader036.vdocuments.net/reader036/viewer/2022082216/55cf9db6550346d033aed6ea/html5/thumbnails/46.jpg)
Economizers – None vs. Air
![Page 47: ASHRAE 90.1-2010](https://reader036.vdocuments.net/reader036/viewer/2022082216/55cf9db6550346d033aed6ea/html5/thumbnails/47.jpg)
Economizers – Water vs. Condenser
![Page 48: ASHRAE 90.1-2010](https://reader036.vdocuments.net/reader036/viewer/2022082216/55cf9db6550346d033aed6ea/html5/thumbnails/48.jpg)
Energy Recovery Chillers for Healthcare
Facilities
Presented by:
• Jeff Boldt, P.E., LEED® AP
May 3, 2011
![Page 49: ASHRAE 90.1-2010](https://reader036.vdocuments.net/reader036/viewer/2022082216/55cf9db6550346d033aed6ea/html5/thumbnails/49.jpg)
![Page 50: ASHRAE 90.1-2010](https://reader036.vdocuments.net/reader036/viewer/2022082216/55cf9db6550346d033aed6ea/html5/thumbnails/50.jpg)
![Page 51: ASHRAE 90.1-2010](https://reader036.vdocuments.net/reader036/viewer/2022082216/55cf9db6550346d033aed6ea/html5/thumbnails/51.jpg)
Economizers
Suggestions for compliance
Use a winterized cooling tower
• Good energy saving measure for hospitals
Condenser Reheat
• No risk of tower freezing
• Good payback in new construction
• Synergistic with water economizer
![Page 52: ASHRAE 90.1-2010](https://reader036.vdocuments.net/reader036/viewer/2022082216/55cf9db6550346d033aed6ea/html5/thumbnails/52.jpg)
Duct Sealing (cq)
Ductwork and plenums with pressure ratings shall be seal class A
Shaft openings require bushings
25% of duct systems over 3” w.g. and ALL outdoor ducts shall be leak tested
Tested sections chosen by owner
Leakage class = 4 for all ducts
![Page 53: ASHRAE 90.1-2010](https://reader036.vdocuments.net/reader036/viewer/2022082216/55cf9db6550346d033aed6ea/html5/thumbnails/53.jpg)
Duct Leakage
Seal Class vs. Leakage Class
Seal Class C
Seal all transverse joints only
Seal Class B
All transverse joints and longitudinal seams
Seal Class A
All transverse joints, longitudinal seams, and duct wall penetrations
![Page 54: ASHRAE 90.1-2010](https://reader036.vdocuments.net/reader036/viewer/2022082216/55cf9db6550346d033aed6ea/html5/thumbnails/54.jpg)
Domestic Water Preheat
No changes
Required if:
Facility operates 24 hours a day.
Total installed heat rejection capacity of the water-cooled systems exceeds 6,000,000 (~430 cooling tons) Btu/h of heat rejection, and
Design service water heating load exceeds 1,000,000 Btu/h.
![Page 55: ASHRAE 90.1-2010](https://reader036.vdocuments.net/reader036/viewer/2022082216/55cf9db6550346d033aed6ea/html5/thumbnails/55.jpg)
Other HVAC Changes
Pump head calculation
Chilled water pipe sizing
Chilled water pump VSDs & pressure reset
Radiant panel insulation
Single-zone VAV requirements
Supply air temperature reset
One of the larger savings
![Page 56: ASHRAE 90.1-2010](https://reader036.vdocuments.net/reader036/viewer/2022082216/55cf9db6550346d033aed6ea/html5/thumbnails/56.jpg)
Other Mechanical Changes
BU= data centers = 3% of USA energy
Critical data centers definition continues to be revised
CO increases PTAC efficiency and extends to evap cooled equipment
![Page 57: ASHRAE 90.1-2010](https://reader036.vdocuments.net/reader036/viewer/2022082216/55cf9db6550346d033aed6ea/html5/thumbnails/57.jpg)
Other Mechanical Changes
Cp = VRF efficiencies per AHRI
Easy limits until 2012
![Page 58: ASHRAE 90.1-2010](https://reader036.vdocuments.net/reader036/viewer/2022082216/55cf9db6550346d033aed6ea/html5/thumbnails/58.jpg)
Lighting
Covers
Interior spaces of buildings
Exterior building features
Exterior grounds lighting powered through building
• Exceptions
– Emergency lighting that is normally off
– Lighting required by life safety statute
– Lighting in dwelling units
![Page 59: ASHRAE 90.1-2010](https://reader036.vdocuments.net/reader036/viewer/2022082216/55cf9db6550346d033aed6ea/html5/thumbnails/59.jpg)
Lighting
~ 30 lighting addenda
2 wattage reduction addenda
28 lighting control addenda
LPD dropped a little ~10% on average
![Page 60: ASHRAE 90.1-2010](https://reader036.vdocuments.net/reader036/viewer/2022082216/55cf9db6550346d033aed6ea/html5/thumbnails/60.jpg)
Lighting
Lighting power density changes for 2010
* Few changes between 2004 and 2007
*
![Page 61: ASHRAE 90.1-2010](https://reader036.vdocuments.net/reader036/viewer/2022082216/55cf9db6550346d033aed6ea/html5/thumbnails/61.jpg)
Lighting Controls
No daylighting rules until 2010
Addenda d, ab, al, ct
Obstructions >5’ tall end daylit areas
![Page 62: ASHRAE 90.1-2010](https://reader036.vdocuments.net/reader036/viewer/2022082216/55cf9db6550346d033aed6ea/html5/thumbnails/62.jpg)
![Page 63: ASHRAE 90.1-2010](https://reader036.vdocuments.net/reader036/viewer/2022082216/55cf9db6550346d033aed6ea/html5/thumbnails/63.jpg)
Daylit Lighting Controls (ab)
Lighting control for daylighted spaces
Primary sidelighted area
Secondary sidelighted area
Toplighting
Daylighted area (under skylights)
![Page 64: ASHRAE 90.1-2010](https://reader036.vdocuments.net/reader036/viewer/2022082216/55cf9db6550346d033aed6ea/html5/thumbnails/64.jpg)
Exterior Lighting
5 zones (i)
National parks
Residential
Other
Metro
0 – 1300W + 0-1.0 W/SF
![Page 65: ASHRAE 90.1-2010](https://reader036.vdocuments.net/reader036/viewer/2022082216/55cf9db6550346d033aed6ea/html5/thumbnails/65.jpg)
Occupancy Sensors
Added training rooms, lecture halls, storage 50-1000sf
Manual on
Exceptions – restrooms, public corridors and stairs
Bi-level control for most spaces
Not corridors
![Page 66: ASHRAE 90.1-2010](https://reader036.vdocuments.net/reader036/viewer/2022082216/55cf9db6550346d033aed6ea/html5/thumbnails/66.jpg)
Parking Garage
Reduce power 30% if no activity in >3600SF area
![Page 67: ASHRAE 90.1-2010](https://reader036.vdocuments.net/reader036/viewer/2022082216/55cf9db6550346d033aed6ea/html5/thumbnails/67.jpg)
Exterior (cd)
MUST turn off exterior lighting when sufficient daylight is available
Astronomical timer or daylight sensor
Façade and landscape lighting off from midnight or closing to 6am or opening
![Page 68: ASHRAE 90.1-2010](https://reader036.vdocuments.net/reader036/viewer/2022082216/55cf9db6550346d033aed6ea/html5/thumbnails/68.jpg)
Control Incentives
Addendum AC allows more LPD if more controls are added
Most options allow 5-10% increase
![Page 69: ASHRAE 90.1-2010](https://reader036.vdocuments.net/reader036/viewer/2022082216/55cf9db6550346d033aed6ea/html5/thumbnails/69.jpg)
Functional Testing (az)
Lighting control devices and control systems shall be tested to ensure that control hardware and software are calibrated, adjusted, programmed, and in proper working condition in accordance with the construction documents and manufacturer’s installation instructions.
![Page 70: ASHRAE 90.1-2010](https://reader036.vdocuments.net/reader036/viewer/2022082216/55cf9db6550346d033aed6ea/html5/thumbnails/70.jpg)
Lighting Automatic Shutoff
Whole-building shutoff
Exceptions for:
• Patient care areas
• Lighting required for 24-hour use
• Where automatic-off would be unsafe
Individual space controls
![Page 71: ASHRAE 90.1-2010](https://reader036.vdocuments.net/reader036/viewer/2022082216/55cf9db6550346d033aed6ea/html5/thumbnails/71.jpg)
Exit Signs Limited to 5 Watts
![Page 72: ASHRAE 90.1-2010](https://reader036.vdocuments.net/reader036/viewer/2022082216/55cf9db6550346d033aed6ea/html5/thumbnails/72.jpg)
Power - Receptacles (bs)
50% of 120V need automatic control in offices and computer classrooms
Includes modular partitions
Options
Time of day
Occupancy sensor
Another control or alarm system
![Page 73: ASHRAE 90.1-2010](https://reader036.vdocuments.net/reader036/viewer/2022082216/55cf9db6550346d033aed6ea/html5/thumbnails/73.jpg)
Power - Receptacles (bs)
Exceptions:
Receptacles specifically designated for equipment requiring 24 hour operation
Spaces where patient care is rendered
Spaces where an automatic shutoff would endanger the safety or security of the room or building occupant(s).
![Page 74: ASHRAE 90.1-2010](https://reader036.vdocuments.net/reader036/viewer/2022082216/55cf9db6550346d033aed6ea/html5/thumbnails/74.jpg)
Other Equipment
Booster Pumps
Sensor to start and/or control speed
Remote sensor or simulation logic
No PRV at pumps
Pumps off when no flow
![Page 75: ASHRAE 90.1-2010](https://reader036.vdocuments.net/reader036/viewer/2022082216/55cf9db6550346d033aed6ea/html5/thumbnails/75.jpg)
Other Equipment
Elevators
Lighting efficacy ≥35 LPW
Ventilation ≤ 0.33 W/cfm
Lights & fans off if unused for >15 minutes
Future – Movement efficiency
Future (2013) – Escalators & fast-walks
![Page 76: ASHRAE 90.1-2010](https://reader036.vdocuments.net/reader036/viewer/2022082216/55cf9db6550346d033aed6ea/html5/thumbnails/76.jpg)
Energy Modeling
16 buildings, 17 climate zones
Weighting factors
Hospital 2.8% of USA SF, Clinic 3.5%
Warehouse 13%, Stand-alone retail 12%
44 addenda for 2007
64 more for 2010
![Page 77: ASHRAE 90.1-2010](https://reader036.vdocuments.net/reader036/viewer/2022082216/55cf9db6550346d033aed6ea/html5/thumbnails/77.jpg)
90.1 Progress Indicator
1,632 runs = 16 buildings x 17 climate zones x three 90.1 standards x two 62.1 standards
![Page 78: ASHRAE 90.1-2010](https://reader036.vdocuments.net/reader036/viewer/2022082216/55cf9db6550346d033aed6ea/html5/thumbnails/78.jpg)
90.1-2010 Savings over 90.1-2004
24.8% including plug loads
30.9% excluding plug loads
![Page 79: ASHRAE 90.1-2010](https://reader036.vdocuments.net/reader036/viewer/2022082216/55cf9db6550346d033aed6ea/html5/thumbnails/79.jpg)
Check Lists
![Page 80: ASHRAE 90.1-2010](https://reader036.vdocuments.net/reader036/viewer/2022082216/55cf9db6550346d033aed6ea/html5/thumbnails/80.jpg)
![Page 81: ASHRAE 90.1-2010](https://reader036.vdocuments.net/reader036/viewer/2022082216/55cf9db6550346d033aed6ea/html5/thumbnails/81.jpg)
![Page 82: ASHRAE 90.1-2010](https://reader036.vdocuments.net/reader036/viewer/2022082216/55cf9db6550346d033aed6ea/html5/thumbnails/82.jpg)
![Page 83: ASHRAE 90.1-2010](https://reader036.vdocuments.net/reader036/viewer/2022082216/55cf9db6550346d033aed6ea/html5/thumbnails/83.jpg)
What if I Want More?
IGCC 2010 (includes 189.1) – More non-energy savings
ASHRAE-USGBC-IESNA Standard 189.1
Advanced Energy Design Guide series
Office, school, small healthcare, warehouse
50% now for SMO. January Large Healthcare. Big News!
![Page 84: ASHRAE 90.1-2010](https://reader036.vdocuments.net/reader036/viewer/2022082216/55cf9db6550346d033aed6ea/html5/thumbnails/84.jpg)
AEDG
Small Healthcare
Hospitals
Clinics
Cookbook method to achieve ~40% savings over 90.1-1999
![Page 85: ASHRAE 90.1-2010](https://reader036.vdocuments.net/reader036/viewer/2022082216/55cf9db6550346d033aed6ea/html5/thumbnails/85.jpg)
AEDG – Small Healthcare
Up to 90,000 SF
Includes hospitals, ASC, etc.
Not MOB that has no procedures
![Page 86: ASHRAE 90.1-2010](https://reader036.vdocuments.net/reader036/viewer/2022082216/55cf9db6550346d033aed6ea/html5/thumbnails/86.jpg)
AEDG – Small Healthcare
Similar savings to ASHRAE 90.1-2010
AEDGs qualify for LEED Energy Prerequisite without energy modeling
Documentation is still required
Existing AEDGs also qualify for 1 point
![Page 87: ASHRAE 90.1-2010](https://reader036.vdocuments.net/reader036/viewer/2022082216/55cf9db6550346d033aed6ea/html5/thumbnails/87.jpg)
AEDG – Large Healthcare
![Page 88: ASHRAE 90.1-2010](https://reader036.vdocuments.net/reader036/viewer/2022082216/55cf9db6550346d033aed6ea/html5/thumbnails/88.jpg)
AEDG – Large Healthcare
![Page 89: ASHRAE 90.1-2010](https://reader036.vdocuments.net/reader036/viewer/2022082216/55cf9db6550346d033aed6ea/html5/thumbnails/89.jpg)
AEDG Big Picture NO STEAM
“Advanced” VAV
Heat pump and Fan-Coil with DOAS
Lower fan energy
Publication scheduled for June
Ceiling height controversy
Unoccupied patient room ventilation
![Page 90: ASHRAE 90.1-2010](https://reader036.vdocuments.net/reader036/viewer/2022082216/55cf9db6550346d033aed6ea/html5/thumbnails/90.jpg)
AEDG Big Picture
Many requirements for a simple prescriptive path – no trusting an energy model!
Hospitals can use 50% less energy, even with USA codes!
We’ve done +/- 100 KBtu/Sf/Year
![Page 91: ASHRAE 90.1-2010](https://reader036.vdocuments.net/reader036/viewer/2022082216/55cf9db6550346d033aed6ea/html5/thumbnails/91.jpg)
Other Healthcare Topic
AEDG Large Healthcare
FGI-2010 Acoustical Requirements
Geothermal Healthcare HVAC
![Page 92: ASHRAE 90.1-2010](https://reader036.vdocuments.net/reader036/viewer/2022082216/55cf9db6550346d033aed6ea/html5/thumbnails/92.jpg)
Contact
Want a copy or a presentation?