ashwani saxena directorcdn.cseindia.org/userfiles/ashwani_ruifdco.pdf · 2 kota rental to ownership...

15
Ashwani Saxena Executive Director Executive Director Rajasthan Urban Infrastructure & Finance Development Corporation (RUIFDCO) HCM RIPA, 7 th Feb, 2013

Upload: others

Post on 22-Aug-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Ashwani Saxena Directorcdn.cseindia.org/userfiles/ashwani_RUIFDCO.pdf · 2 Kota Rental to Ownership HiSh 71.66 4.01 3.54 1.12 1528 Housing Scheme 3 Jaipur Sanjay Nagar Bhatta Basti(Phase‐1)

Ashwani SaxenaExecutive DirectorExecutive Director

Rajasthan Urban Infrastructure &Finance Development Corporation (RUIFDCO)

HCM RIPA, 7th Feb, 2013

Page 2: Ashwani Saxena Directorcdn.cseindia.org/userfiles/ashwani_RUIFDCO.pdf · 2 Kota Rental to Ownership HiSh 71.66 4.01 3.54 1.12 1528 Housing Scheme 3 Jaipur Sanjay Nagar Bhatta Basti(Phase‐1)

Area 342,000 sq km Largest State in

India

URBAN RAJASTHAN AT A GLANCE

India

Population 68.62 million (Census 2011)

UrbanPopulation

17.08 million(24.89%)

(Census 2011)

StateCapital Jaipur

Districts 33URBAN LOCAL BODIES

Cities andULBs

Census towns-222ULBs- 184

Population 201 persons

URBAN LOCAL BODIESMunicipal Corporations 5Municipal Councils 30M i i l B d 149

pDensity

p(Census 2011)

Sewage Treatment

Completed- 7Under Progress- 24

Municipal Boards 149TOTAL 184

PARA-STATAL AGENCIESTreatment

Plant (No. of Towns)

(RUIDP/JnNURM)Planned- 5

(State Fund)

Development Authorities 2Urban Improvement Trusts 11TOTAL 13

Page 3: Ashwani Saxena Directorcdn.cseindia.org/userfiles/ashwani_RUIFDCO.pdf · 2 Kota Rental to Ownership HiSh 71.66 4.01 3.54 1.12 1528 Housing Scheme 3 Jaipur Sanjay Nagar Bhatta Basti(Phase‐1)

State Level Nodal Agency‐ RUIFDCODuration ‐ 7 Years (Beginning from the year 2005‐06)Duration 7 Years (Beginning from the year 2005 06)

Extended up to March, 2014.Mission Objective – includesD li f i i iti & i i f tiliti‐ Delivery of civic amenities & provision of utilities.‐ Urban Poor will have access to basis level of urbanservices including water and sanitation.

Ministry Sub‐Mission

No.  ofTowns

No. of Projects Cost

Amount in Cr. 

MoHUPABSUP 2 3 289.21

IHSDP 58 67 1035.48

M UDUIG 2 13 1227.74

MoUD3 7 74

UIDSSMT 35 37 609.93

Total  97 120 3162.36

Page 4: Ashwani Saxena Directorcdn.cseindia.org/userfiles/ashwani_RUIFDCO.pdf · 2 Kota Rental to Ownership HiSh 71.66 4.01 3.54 1.12 1528 Housing Scheme 3 Jaipur Sanjay Nagar Bhatta Basti(Phase‐1)

Project taken under JnNURM – UIG Jaipur & Ajmer(Water Supply & Sewerage)( pp y g )

S. N Nameof Project Length

(i  K ) Cost Remarks

Amount in cr. 

No. Nameof Project (in Km.) Cost Remarks

1 Solid Waste Management, Jaipur ‐ 13.20 Completed

2 Sewerage System, Ph‐I, Jaipur 344.12

297.90 In Progress3 Sewerage System, Ph‐II, Jaipur 41

4 Sewerage System  Ajmer – Pushkar 1454 Sewerage System, Ajmer  Pushkar 145

5 Ajmer – Pushkar TransmissionWater Supply 111.96 Completed

355.15

6 Ajmer – Pushkar Drinking Water Supply Transferred & Distribution 502.30 In Progress

Total 666.25

Page 5: Ashwani Saxena Directorcdn.cseindia.org/userfiles/ashwani_RUIFDCO.pdf · 2 Kota Rental to Ownership HiSh 71.66 4.01 3.54 1.12 1528 Housing Scheme 3 Jaipur Sanjay Nagar Bhatta Basti(Phase‐1)

View of Delawas STP, Jaipur

Page 6: Ashwani Saxena Directorcdn.cseindia.org/userfiles/ashwani_RUIFDCO.pdf · 2 Kota Rental to Ownership HiSh 71.66 4.01 3.54 1.12 1528 Housing Scheme 3 Jaipur Sanjay Nagar Bhatta Basti(Phase‐1)

Projects under UIDSSMTj

Amount in Cr.

S. No. Type of Project  No. of 

Projects Cost Expend.

l1 Water Supply 3 156.32 108.44

2 Sewerage with STP 12 512.26 256.36

3 Drainage 6 25.93 15.48

Total 21 694.51 380.28

Page 7: Ashwani Saxena Directorcdn.cseindia.org/userfiles/ashwani_RUIFDCO.pdf · 2 Kota Rental to Ownership HiSh 71.66 4.01 3.54 1.12 1528 Housing Scheme 3 Jaipur Sanjay Nagar Bhatta Basti(Phase‐1)

Water Supply

N   f  Storage Length of PipeNo. of Towns

Storage Length of Pipe

Sanction Completed Sanction Completed

3 24 No. 19 No. 729.46 K.M. 585.57 K.M.

No  of  STP Length of Sewer

Sewerage

No. of Towns

g

Sanction Capacity Completed Sanction Completed

12 14 No.  149.10 MLD 3 No. 1092.32 K M 632.04 K.M.4 49 3 K.M. 3 4

Drainage

L h  f D iNo. of Towns

Length of Drain

Sanction Completed

6 36 5 K M   25 39 K M6 36.5 K.M.  25.39 K.M.

Page 8: Ashwani Saxena Directorcdn.cseindia.org/userfiles/ashwani_RUIFDCO.pdf · 2 Kota Rental to Ownership HiSh 71.66 4.01 3.54 1.12 1528 Housing Scheme 3 Jaipur Sanjay Nagar Bhatta Basti(Phase‐1)

Projects Sanctioned Under RAY

S.N.  Town Project Name

Project Cost  (in Cr.)

Total Water S l Sewerage

Storm Water Proposed Total Supply  Sewerage  Water Drain  Dus

1 Jaipur Kiron ki Dhani  57.29 6.45 1.41 1.37 1104

2 Kota Rental to Ownership H i S h 71.66 4.01 3.54 1.12 15282 Kota Housing Scheme 71.66 4.01 3.54 1.12 1528

3 Jaipur Sanjay Nagar BhattaBasti (Phase‐1) 96.61 4.97 4.63 1.2 2340

4 Aj Pasand Nagar, Loharu  85 11 2 79 4 82 3 42 14484 Ajmer asa d aga , o a uBasti, Idgah Basti 85.11 2.79 4.82 3.42 1448

5 Bharatpur Namak Katra  9.08 2.17 ‐ 7.07 220Dhobi Gatta, Budh

6 Alwar Vihar, Behind PartapSchool

83.46 2.61 3.7 ‐ 1544

7 Bikaner Bhato & Odho ka Baas 17.28 0.35 0.33 2.38 350

l 23.35 18.43 16.56Total  420.49 23.35 (5.5%)*

18.43 (4.4%)*

16.56 (3.9%)* 8534

* Percentage to the total Project Cost

Page 9: Ashwani Saxena Directorcdn.cseindia.org/userfiles/ashwani_RUIFDCO.pdf · 2 Kota Rental to Ownership HiSh 71.66 4.01 3.54 1.12 1528 Housing Scheme 3 Jaipur Sanjay Nagar Bhatta Basti(Phase‐1)

S i l F t & I tiSpecial Features & InnovationsRain Water Harvestinga ate a est gProposal for STPReuse of waste water Adoption of green building concept through use of fly ashUse of solar street lightingg gProvision of bio gas plant

Page 10: Ashwani Saxena Directorcdn.cseindia.org/userfiles/ashwani_RUIFDCO.pdf · 2 Kota Rental to Ownership HiSh 71.66 4.01 3.54 1.12 1528 Housing Scheme 3 Jaipur Sanjay Nagar Bhatta Basti(Phase‐1)

It is planned to intercept & divert the discharge of 22 nallahsthrough 6 no. pumping station to sewerage treatment plant sog p p g g pthat water of Chambal River is not contaminated.Sanction Cost : Rs. 14959 LacC t To be laid laidComponents :

(1)Trunk main Sewer line:

To be laid laid1200 mm 4130m 3127.5m

1000 mm 2711.5m 2147.2m

(2) Intercepting Sewer line:To be laid laid

15927.5m 6673.6m

(3) Sewer Treatment Plant (STP): STP 2 nos.(30 MLD atDushera ground & 6Dushera ground & 6MLD at Balitha village)

Page 11: Ashwani Saxena Directorcdn.cseindia.org/userfiles/ashwani_RUIFDCO.pdf · 2 Kota Rental to Ownership HiSh 71.66 4.01 3.54 1.12 1528 Housing Scheme 3 Jaipur Sanjay Nagar Bhatta Basti(Phase‐1)

Projects Sanctioned Under NLCPWorks Covered:‐1. De‐silting2. Lake Development Work

S  I i  & 3. Sewerage Interception & Diversion

4. Water Quality Monitoring5 IEC activities

Nameof Lake Sanctioned A  

Date ofS i d  Implementing Agency

Amount in Cr. 

5. IEC activities6. Afforestation & Aeration etc.

Nameof Lake Amount  Sanctioned  Implementing Agency

Anasagar Lake, Ajmer 15.28 23.11.07 UIT, Ajmer

Pushkar Sarovar, 48 37 26 02 08 UIT AjmerPushkar 48.37 26.02.08 UIT, Ajmer

Pichola Lake, Udaipur 84.75 4.02.09 UIT, Udaipur & MC, Udaipur

Fateh Sagar, Udaipur 41.86 14.08.08 UIT, Udaipur

Nakki Lake, Mt. Abu 7.33 24.06.10 UIT, Abu

Page 12: Ashwani Saxena Directorcdn.cseindia.org/userfiles/ashwani_RUIFDCO.pdf · 2 Kota Rental to Ownership HiSh 71.66 4.01 3.54 1.12 1528 Housing Scheme 3 Jaipur Sanjay Nagar Bhatta Basti(Phase‐1)

Seven Sewerage ProjectsGovernment of Rajasthan sanctioned sewerage projects in 7 towns at atotal cost of Rs. 472.4 Cr. which are as under:1 Banswara1. Banswara2. Fatehpur Shekhawati3. Sriganganagar

hd4. Nathdwara5. Balotra6. Deedwana7. Makrana

Problems in the Project TownsToilet/ kitchen/ Bathroom waste is being disposed of into surfaceToilet/ kitchen/ Bathroom waste is being disposed of into surfacedrains wherever available or disposed of on the streets.In the absence of proper drainage system, wastewater is gettingcollected at several local depressions in the town and creatingcollected at several local depressions in the town and creatinginsanitary conditions and health hazard.

Page 13: Ashwani Saxena Directorcdn.cseindia.org/userfiles/ashwani_RUIFDCO.pdf · 2 Kota Rental to Ownership HiSh 71.66 4.01 3.54 1.12 1528 Housing Scheme 3 Jaipur Sanjay Nagar Bhatta Basti(Phase‐1)

bj i f h jObjective of the Sewerage Projects

Proper collection of waste water will improve thesanitary condition of the town

h h l h f h lImprove the health of the peopleIt can save ground water from pollutionT d ill b d i i l dTreated water will be used in agriculture andgardeningImprove overall environmentImprove overall environment

Page 14: Ashwani Saxena Directorcdn.cseindia.org/userfiles/ashwani_RUIFDCO.pdf · 2 Kota Rental to Ownership HiSh 71.66 4.01 3.54 1.12 1528 Housing Scheme 3 Jaipur Sanjay Nagar Bhatta Basti(Phase‐1)

Brief of Sewerage Projects (Phase‐I)

S. No

Name of Project

Approved Cost

Population 2011

Population Served by

Capacity of STP

Total Sewerline

to be laid INNo. Project Cost 2011 Ph-I Project in MLD to be laid IN K.M.

1 Banswara 69.33 97922 67222 ₋ 69

Fatehpur2 FatehpurShekhawati 67.65 92910 71707 7.5 70

3 Sriganganagar 88.92 273048 198000 35 37

4 Nathdwara 43.59 45047 39041 ₋ 47

5 Balotra 57.47 75345 62543 9 53

6 Deedwana 69.85 57584 35816 5 68

7 Makrana 75.63 101901 49589 6 72Total 472.44 743757 523918 62.50 416.00Total 472.44 743757 523918 62.50 416.00By March 14 all the Projects are Targeted to be completed