asm template import r1
TRANSCRIPT
Asset ID Description Action ID
SAP FL no. FL Description Task ID
Example 547RC1-P-1000-A NAPHTHA FEED PUMP P-1000-A0330
Meridium
Assets Actions
Action Name Action TypeCondition
Monitoring TypeInterval Interval units
Recommended
Resource
Task Description Task TypeCondition-Based
TypeInterval unit Resp. BU
Vibration Monitoring CbM Periodic 1 Months PDR
Actions
Shutdown
requiredRisk ID Risk Name
Man Hour Unit rate MT costRequire
Shutdown?Failure Mode ID Failure Mode
1 4 500 2,000 No P-1000-R0010 Misalignment
Actions Risk (Failure)
Cost
Risk Description PF IntervalPF Interval
Units
(Unmitigated) OPE
& Finance
Probability
(Unmitigated)
Operational
Consequence
Description PF IntervalPF Interval
unitLikelihood Consequence
Misalignment due to vibration or improper installation - coupling typically becomes uncoupled, safety interlocks shutdown pump and driver3 Months 0.3 500
Risk (Failure)
(Unmitigated)
Financial
Production loss
(Unmitigated)
Financial
Matenance cost
Risk ID Risk name Action ID
Production loss Repairing cost Failure Mode ID Failure Mode Task ID
1,000,000 50,000 P-1000-R0010 Misalignment P-1000-A0330
Risk (Failure) Mitigations
Action Name
(Mitigated)
OPE & Finance
Probability
(Mitigated)
Operational
Consequence
(Mitigated)
Financial
Production loss
(Mitigated)
Financial
Matenance cost
Task Likelihood Consequence Production loss Repairing cost
Vibration Monitoring 0.05 500 1,000,000 50,000
Mitigations
Asset ID Strategy ID Description
547RC1-P-1000-A 547RC1-P-1000-A NAPHTHA FEED PUMP
Strategy Owner Strategy NotesRisk analysis
type
Quantitiative
resultPlan length
Chaiyananrittikul, Wuttichai Qualitative 5
Site
Reference
Strategy Re-
Evaluation Date
Asset Reference
ColumnAction ID Action Basis Name
547RC1-P-1000-A P-1000-A0330 Existing SAP Vibration Monitoring
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
Description Action TypeCondition
Monitoring TypeInterval
Interval
units
Recommended
ResourceCost
CbM Periodic 1 Months PDR 2,000
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
Cost Basis NonrecurringExisting
plan
Shutdown
RequiredMandatory
Implementation
Role
Historical Data FALSE
Target
Completion
Date
Asset Reference
ColumnRisk ID Risk Name Risk Description
547RC1-P-1000-A P-1000-R0010 Misalignment Misalignment due to vibration or improper installation - coupling typically becomes uncoupled, safety interlocks shutdown pump and driver
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
PF Interval PF Interval UnitsOperational
Probability
Operational
Consequence
Financial
Probability
3 Months 0.3 500 0.3
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
Financial
Production loss
Financial
Matenance cost
1,000,000 50,000
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
Asset ID Risk Reference ColumnAction Reference
Column
Operational
Probability
Operational
Consequence
547RC1-P-1000-A P-1000-R0010 P-1000-A0330 0.05 500
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
Financial
Probability
Financial
Production loss
Financial
Matenance cost
0.05 1,000,000 50,000
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0