aspects of lrt operations safety
TRANSCRIPT
Aspects of
LRT Operations Safety
Toward Zero Deaths Conference
Nov 16-17, 2016
Michael Conlon, Director – Rail and Bus Safety
Metro Transit
SYSTEM SAFETY TASKS
BY PROJECT PHASE PROJECT
DEVELOPMENT ENGINEERING CONSTRUCTION ACTIVATION
Ongoing Final
Design Reviews
Empanel Safety
& Security
Review
Committee
Verify Design
Conformance to
CCIL and Design
Criteria For
- Fixed Facilities
- Systems
- Rolling Stock
Supplemental
Hazard Analyses
Pre Revenue
Operations
Emergency
Preparedness
Exercises
Training
SSOA and FTA
Readiness
Reviews
Final Safety
Certification
Report
Verify
Construction
Conformance
- Fixed Facilities
- Systems
- Rolling Stock
Verify Integrated
Testing
Public Outreach
Rules,
Procedures,
Plans
AA/NEPA/PE
Preliminary
Engineering
Safety
Certification
Planning
Preliminary
Hazard Analysis
Threat &
Vulnerability
Assessment
Critical Items
Lists
FINAL SAFETY CERTIFICATION REPORT
• Certificates of Compliance and of System Safety
• Executive Summary
• Design & Construction
• Passenger Vehicles
• Integrated Testing
• Contractor Provided Training & Manuals
• Rules, Procedures, Plans
• Emergency Preparedness
• Hazard & Threat Analysis
4
0
1
2
3
4
5
6
7
8
9
Jun
-14
Jul-
14
Au
g-
14
Se
p-
14
Oct-
14
Nov-
14
Dec-
14
Jan
-15
Fe
b-
15
Ma
r-1
5
Ap
r-15
Ma
y-
15
Jun
-15
Jul-
15
Au
g-
15
Se
p-
15
Oct-
15
Nov-
15
Dec-
15
Jan
-16
Total LRT Collisions by Month (since start of Green Line revenue service)
0
1
2
3
4
5
6
7
8
9
Total LRT Collisions by Month (since start of Green Line revenue service)
National Transit Database Peer Comparison
5
Our Peers
• Minneapolis/St. Paul
• San Diego
• Houston
• Salt Lake City
• Portland
• St. Louis
• Denver
• Cleveland
• Pittsburgh
• San Jose
• Dallas
Major Injuries Involving
• Bicyclist
• Pedestrian in crossing
• Pedestrian not in crossing
• Pedestrian crossing tracks
• Pedestrian walking along
tracks
• Other vehicle occupant
• Other
• Trespasser
• Suicide
Ranking The Peers Relative To The NTD Data
6
Assessing Metro Transit Injuries & Fatalities
7
NT
D M
ajo
r In
jurie
s a
nd
Fa
talit
ies p
er
10
0k T
rain
Mile
s
Year
ENGINEERING MITIGATIONS
8
Wig Wag LRV Headlamps
9
Hi-viz LRV accents
10
Pedestrian crossings – train approaching light
11
Train Approaching Lights – FHWA Waiver
12
Flashing Cantilevered Blankout for Motorists
13
Flashing Cantilevered Blankout – 2nd Train
14
Hiawatha Grade Crossing Enhancements
15
46th St Blue Line LRT Station
16
Google Maps
Hiawatha Ave @ 46th St
17
Google Maps
Platform Walkway Railing Extension Project
18
Pathway Crossing @ 46th St
19
46th St @ Hiawatha Ave.
Crossing Warning Enhancements
20
Platform Wayfinding Pilot Project – GL
Raymond Station
21
Comments and Questions
22
RELATED
23
Daily Attention toward Safe Operations
24
Rule Compliance Testing
25
Instructor Ride-A-Longs
26
Employee Awareness and Training
27