Known Issues in V8.0

Aspen Engineering

Page 2: AspenEngineeringSuiteV8 0 Issues

Version Number: V8.0December 2012

Copyright (c) 2012 by Aspen Technology, Inc. All rights reserved.

Aspen Acol+™, Aspen Adsim®, Aspen Adsorption , Aspen Air Cooled Exchanger, Aspen Basic Engineering, AspenBatch Process Developer, Aspen Batch Modeler™, Aspen Batch Plus®, Aspen BatchSep™, Aspen Capital CostEstimator, Aspen CatRef®, Aspen Chromatography®, Aspen COMThermo®, Aspen Custom Modeler®, AspenDistillation Synthesis, Aspen Dynamics®, Aspen Energy Analyzer, Aspen FCC®, Aspen Fired Heater, AspenFiredHeater, Aspen Flare System Analyzer, Aspen FLARENET™, Aspen HTFS Research Network™, Aspen HX-Net®,Aspen Hydrocracker®, Aspen Hydrotreater™, Aspen HYSYS Amines™, Aspen HYSYS Dynamics™, Aspen HYSYSOLGAS 3-Phase™, Aspen HYSYS OLGAS™, Aspen HYSYS PIPESYS™, Aspen HYSYS RTO™ Offline, Aspen HYSYSUpstream Dynamics™, Aspen HYSYS Upstream Dynamics™, Aspen HYSYS Upstream™, Aspen HYSYS Upstream™,Aspen HYSYS®, Aspen HYSYS® Thermodynamics COM Interface, Aspen HYSYS®, Aspen HYSYS® PipelineHydraulics - OLGAS 2-Phase, Aspen HYSYS® Pipeline Hydraulics - OLGAS 3-Phase, Aspen HYSYS® PipelineHydraulics - PIPESYS, Aspen HYSYS® Offline Optimizer, Aspen HYSYS® Hydrocracker, Aspen HYSYS® Reformer,Aspen HYSYS® CatCracker, Aspen HYSYS® Petroleum Refining, Aspen Icarus Process Evaluator®, Aspen IcarusProject Manager®, Aspen In-Plant Cost Estimator, Aspen Kbase®, Aspen MINLP Optimization, Aspen Mixed IntegerOptimizer, Aspen Model Runner™, Aspen MPIMS™, Aspen MUSE™, Aspen Online Deployment™, Aspen OnLine®,Aspen OnLine®, Aspen OTS Framework, Aspen PIMS Advanced Optimization™, Aspen PIMS Submodel Calculator™,Aspen PIMS™, Aspen Plate Exchanger, Aspen Plate+™, Aspen Plus Optimizer™, Aspen Plus®, Aspen Plus®CatCracker, Aspen Plus® Dynamics, Aspen Plus® Hydrocracker, Aspen Plus® Hydrotreater, Aspen Plus®Reformer, Aspen Polymers, Aspen Polymers Plus™, Aspen Process Economic Analyzer, Aspen Process Manual™,Aspen Process Tools™, Aspen Properties®, Aspen Properties Mobile, Aspen Rate-Based Distillation, AspenRateSep™, Aspen RefSYS Catcracker™, Aspen RefSYS Hydrocracker™, Aspen RefSYS Reformer™, Aspen RefSYS™,Aspen Shell & Tube Exchanger, Aspen Shell & Tube Mechanical, Aspen Simulation Workbook™, Aspen SolubilityModeler, Aspen Split™, Aspen Tasc+™, Aspen Teams®, Aspen Utilities On-Line Optimizer, Aspen UtilitiesOperations™, Aspen Utilities Planner™, Aspen Zyqad™, SLM™, SLM Commute™, SLM Config Wizard™, the Aspenleaf logo, and Plantelligence are trademarks or registered trademarks of Aspen Technology, Inc., Burlington, MA.

All other brand and product names are trademarks or registered trademarks of their respective companies.

This documentation contains AspenTech proprietary and confidential information and may not be disclosed, used,or copied without the prior consent of AspenTech or as set forth in the applicable license agreement. Users aresolely responsible for the proper use of the software and the application of the results obtained.

Although AspenTech has tested the software and reviewed the documentation, the sole warranty for the softwaremay be found in the applicable license agreement between AspenTech and the user. ASPENTECH MAKES NOWARRANTY OR REPRESENTATION, EITHER EXPRESSED OR IMPLIED, WITH RESPECT TO THIS DOCUMENTATION,ITS QUALITY, PERFORMANCE, MERCHANTABILITY, OR FITNESS FOR A PARTICULAR PURPOSE.

Aspen Technology, Inc.200 Wheeler RoadBurlington, MA 01803-5501USAPhone: (1) 781-221-6400Toll Free: (1) (888) 996-7100URL: http://www.aspentech.com

Page 3: AspenEngineeringSuiteV8 0 Issues

Contents iii

Contents

Contents.................................................................................................................iii

Introduction............................................................................................................5

aspenONE Overview .........................................................................................5Known Issues Release Notes..............................................................................5Accessing aspenONE Documentation ..................................................................5

Aspen Exchange ......................................................................................................7

Aspen Exchange V8.0 .......................................................................................7

Process Modeling (Aspen Plus) ...............................................................................9

Aspen Plus V8.0 ...............................................................................................9OLI Interface V8.0.......................................................................................... 11Aspen Properties V8.0..................................................................................... 11Aspen Properties Mobile .................................................................................. 12Aspen Custom Modeler V8.0 ............................................................................ 12Aspen Model Runner V8.0 ............................................................................... 13Aspen Plus Dynamics V8.0 .............................................................................. 13Aspen Adsorption V8.0.................................................................................... 14Aspen Chromatography V8.0 ........................................................................... 14Aspen Utilities Planner V8.0............................................................................. 15Aspen Batch Modeler V8.0............................................................................... 16

Process Modeling (HYSYS) ....................................................................................18

Aspen HYSYS V8.0 ......................................................................................... 18Aspen HYSYS Dynamics V8.0........................................................................... 19Aspen HYSYS Upstream V8.0........................................................................... 20Aspen HYSYS Petroleum Refining V8.0.............................................................. 20

Exchanger Design and Rating................................................................................21

Exchanger Design and Rating Products V8.0 ...................................................... 21Aspen Air Cooled Exchanger V8.0..................................................................... 22Aspen Fired Heater V8.0 ................................................................................. 23Aspen Shell & Tube Exchanger V8.0 ................................................................. 23Aspen Shell & Tube Mechanical V8.0................................................................. 24Aspen Plate Exchanger V8.0 ............................................................................ 24Aspen HTFS Research Network V8.0 ................................................................. 25

Page 4: AspenEngineeringSuiteV8 0 Issues

iv Contents

Aspen MUSE V8.0........................................................................................... 25Aspen Plate Fin Exchanger V8.0 ....................................................................... 26

Economic Evaluation .............................................................................................27

Economic Evaluation V8.0 Product Family.......................................................... 27Aspen Process Economic Analyzer V8.0............................................................. 32Aspen In-Plant Cost Estimator V8.0 .................................................................. 32Aspen Capital Cost Estimator V8.0 ................................................................... 33Icarus Evaluation Engine V8.0 ......................................................................... 34

Energy and Flare Analysis .....................................................................................35

Aspen Energy Analyzer V8.0 ............................................................................ 35Aspen Flare System Analyzer V8.0 ................................................................... 36Aspen HYSYS Thermodynamics COM Interface V8.0 ........................................... 36

Aspen Simulation Workbook .................................................................................37

Aspen Simulation Workbook V8.0..................................................................... 37

Process Development............................................................................................39

Aspen Batch Process Developer V8.0 ................................................................ 39Aspen Solubility Modeler V8.0.......................................................................... 40Aspen Process Tools V8.0 ............................................................................... 41Aspen Process Manual V8.0 ............................................................................. 41

Aspen Basic Engineering .......................................................................................43

Aspen Basic Engineering V8.0 .......................................................................... 43

Operations Support ...............................................................................................45

Aspen Online Deployment V8.0 ........................................................................ 45Aspen OTS Framework V8.0 ............................................................................ 46Aspen Online V8.0.......................................................................................... 46

Aspen Plus Based Refinery Reactors .....................................................................47

Aspen Plus Catcracker V8.0 ............................................................................. 47Aspen Plus Hydrocracker V8.0 ......................................................................... 48Aspen Plus Hydrotreater V8.0 .......................................................................... 48Aspen Plus Reformer V8.0 ............................................................................... 49

Aspen Open Object Model Framework...................................................................51

Aspen Open Object Model Framework ............................................................... 51

Page 5: AspenEngineeringSuiteV8 0 Issues

Introduction 5

Introduction

aspenONE OverviewaspenONE is the comprehensive set of software solutions and professionalservices provided by AspenTech; these are designed to help processcompanies achieve their operational excellence objectives.

Known Issues Release NotesThis document contains a summary of known issues or limitations relating tothis release. Workarounds are suggested where possible.

Known issues are listed as those relating to:

Coexistence issues (different versions of products on the same computer).

Installation issues (potential problems arising during the install or uninstallprocedure).

Usability issues.

Please refer to the tables in each product section for issues relating to theproducts you are using.

Accessing aspenONEDocumentationaspenONE V8.0 includes new ways to access documentation associated withthe aspenONE products. Documentation is now available directly from theapplications. This eliminates the need to search for the Documentation DVD tofind the documents that you need and ensures that you can always find themost current version of the document that you are looking for.

Documentation can be found in the following ways:

Installation Guides and Release Notes can be found by clicking thecorresponding link on the first page of the Installation Browser.

Page 6: AspenEngineeringSuiteV8 0 Issues

6 Introduction

Context-sensitive help can be accessed by:

o Clicking the Help button on an application dialog box

o Pressing F1

o Clicking the application Help menu and selecting Help

Additional documents in PDF format can be accessed by:

o Clicking the Online Documentation link on the product’s Start page orStart tab or selecting Documentation from the product’s Help menu.This will open the Online Documentation Center from which you canview and/or download the product-specific documents.

o Logging onto the AspenTech Customer Support site and browsing theDocumentation page.

o Downloading all of the available documentation from the Customerwebsite by downloading the zip file that contains the documentation.

Note: The aspenONE Documentation DVD is no longer included in the DVDpackage. If you want a DVD that contains all PDF documents, you mayrequest one from AspenTech Support.

Page 7: AspenEngineeringSuiteV8 0 Issues

Aspen Exchange 7

Aspen Exchange

Aspen Exchange V8.0

Coexistence Issues Workaround or Comment

No known issues Not applicable

Installation Issues Workaround or Comment

No known issues Not applicable

General Usability Issues Workaround or Comment

No known issues Not applicable

Page 8: AspenEngineeringSuiteV8 0 Issues

8 Aspen Exchange

Page 9: AspenEngineeringSuiteV8 0 Issues

Process Modeling (Aspen Plus) 9

Process Modeling (AspenPlus)

Aspen Plus V8.0Coexistence Issues Workaround/Comment

No known issues Not applicable

Installation Issues Workaround/Comment

No known issues Not applicable

General Usability Issues Workaround/Comment

If you use multiple flowsheet sectionsand choose to hide some of them on theflowsheet, then attempt to move theicon representing a stream flowing intothe hidden section, Aspen Plus maycrash.

Sometimes property tables whichreference streams are not regeneratedafter making changes to a run.

This happens when the changes youmake are handled via an Edit Run. Toforce the tables to update, reinitialize thesimulation and re-run it. You can turn offInteractively Load Results on theTools | Options | Run tab to ensurethis is always updated.

If you use a filename which includesextra dots (such as file.name.bkp),some functions may not work.

Avoid using the period character (.) infilenames except before the actual fileextension.

When you attempt to use Aspen EnergyAnalyzer from an Aspen Plus run inwhich you opened a file from a non-writable folder, Aspen Energy Analyzerwill crash.

Copy the Aspen Plus file to a writablefolder and open it from this locationbefore using it with Aspen EnergyAnalyzer.

Page 10: AspenEngineeringSuiteV8 0 Issues

10 Process Modeling (Aspen Plus)

If, in Aspen Simulation Workbook, yourun an Aspen Plus case with EconomicAnalysis active, and that case fails toconverge, Economic Analysis does notrun but Aspen Simulation Workbookmay hang while waiting for economicresults.

In the Find Variables dialog box for theCustom Tables feature, the searchcapability does not work.

You can add variables to Custom Tablesfrom the tree view of the Find Variablesdialog box, or by copying and pastingthem form forms, etc.

Aspen Plus might crash If you enter aninvalid plant data URL.

Set the URL after saving your work anduse Save As Default so that the URL onlyneeds to be entered once.

If you add a variable which is displayedin a grid of results with only a commonunit of measure for the whole column ofdata (as in RadFrac profiles) to a customtable, and then change the unit for thatvariable from the custom table, thevalue converts to the new units both inthe custom table and in the grid, but inthe grid there is no indication of the newunits. The variable will be displayed in adifferent unit in the grid than the rest ofits column of data.

Avoid doing this and be aware of thispossibility when using custom tables. Youcan reset the units for the grid column bychanging them to any other unit, thenchanging the back.

Page 11: AspenEngineeringSuiteV8 0 Issues

Process Modeling (Aspen Plus) 11

OLI Interface V8.0

Coexistence Issues Workaround or Comment

No known issues Not applicable

Installation Issues Workaround or Comment

No known issues Not applicable

General Usability Issues Workaround or Comment

No known issues Not applicable

Aspen Properties V8.0

Coexistence Issues Workaround or Comment

No known issues Not applicable

Installation Issues Workaround or Comment

No known issues Not applicable

General Usability Issues Workaround or Comment

No known issues Not applicable

Page 12: AspenEngineeringSuiteV8 0 Issues

12 Process Modeling (Aspen Plus)

Aspen Properties Mobile

Coexistence Issues Workaround or Comment

No known issues Not applicable

Installation Issues Workaround or Comment

No known issues Not applicable

General Usability Issues Workaround or Comment

No known issues Not applicable

Aspen Custom Modeler V8.0

Coexistence Issues Workaround or Comment

No known issues Not applicable

Installation Issues Workaround or Comment

No known issues Not applicable

General Usability Issues Workaround or Comment

No known issues Not applicable

Page 13: AspenEngineeringSuiteV8 0 Issues

Process Modeling (Aspen Plus) 13

Aspen Model Runner V8.0

Coexistence Issues Workaround or Comment

No known issues Not applicable

Installation Issues Workaround or Comment

No known issues Not applicable

General Usability Issues Workaround or Comment

No known issues Not applicable

Aspen Plus Dynamics V8.0

Coexistence Issues Workaround or Comment

No known issues Not applicable

Installation Issues Workaround or Comment

No known issues Not applicable

General Usability Issues Workaround or Comment

No known issues Not applicable

Page 14: AspenEngineeringSuiteV8 0 Issues

14 Process Modeling (Aspen Plus)

Aspen Adsorption V8.0

Coexistence Issues Workaround or Comment

No known issues Not applicable

Installation Issues Workaround or Comment

No known issues Not applicable

General Usability Issues Workaround or Comment

No known issues Not applicable

Aspen Chromatography V8.0

Coexistence Issues Workaround or Comment

No known issues Not applicable

Installation Issues Workaround or Comment

No known issues Not applicable

General Usability Issues Workaround or Comment

No known issues Not applicable

Page 15: AspenEngineeringSuiteV8 0 Issues

Process Modeling (Aspen Plus) 15

Aspen Utilities Planner V8.0

Coexistence Issues Workaround or Comment

No known issues Not applicable

Installation Issues Workaround or Comment

No known issues Not applicable

General Usability Issues Workaround or Comment

Aspen Utilities Planner simulations cannotbe loaded if Aspen Plus is not installed.

Not applicable

Page 16: AspenEngineeringSuiteV8 0 Issues

16 Process Modeling (Aspen Plus)

Aspen Batch Modeler V8.0

Coexistence Issues Workaround or Comment

No known issues Not applicable

Installation Issues Workaround or Comment

No known issues Not applicable

General Usability Issues Workaround or Comment

No known issues Not applicable

Page 17: AspenEngineeringSuiteV8 0 Issues

Process Modeling (Aspen Plus) 17

Page 18: AspenEngineeringSuiteV8 0 Issues

18 Process Modeling (HYSYS)

Process Modeling (HYSYS)

Aspen HYSYS V8.0

Coexistence Issues Workaround or Comment

Extensions delivered with HYSYS V8.0can stop working after uninstallingHYSYS V7.3 in a machine having bothversions installed.

You can reregister the extensions. Go tothe Customize tab in the ribbon andselect register extension. Browse to theextensions folder and select theextension you want to register.

Installation Issues Workaround or Comment

No known issues Not applicable

General Usability Issues Workaround or Comment

Plant View: HYSYS might crash if youenter an invalid plant data URL.

Set the URL after saving your work anduse Save As Default so that the URL onlyneeds to be entered once.

HYSYS Equation Oriented (HYSYS EO):Some pages in the EO block forms donot show correctly, e.g. Local Scriptsand Script Methods. Synchronizationwas found to fail in some cases.

No workaround

When selecting a language that uses thecomma decimal separator in WindowsRegional Settings, Aspen HYSYS stillkeeps the dot as the decimal separator.

No workaround

The Animated Tutorials link in the AspenHYSYS Start Page incorrectly points tothe Aspen Plus Animated Tutorials page.

Workaround: Click Support Center in theAspen HYSYS Start Page. Then in theSupport Center page select the AspenHYSYS link and then the AnimatedTutorials Link.

Page 19: AspenEngineeringSuiteV8 0 Issues

Process Modeling (HYSYS) 19

Aspen HYSYS Dynamics V8.0

Coexistence Issues Workaround or Comment

No known issues Not applicable

Installation Issues Workaround or Comment

No known issues Not applicable

General Usability Issues Workaround or Comment

No known issues No known issues

Page 20: AspenEngineeringSuiteV8 0 Issues

20 Process Modeling (HYSYS)

Aspen HYSYS Upstream V8.0

Coexistence Issues Workaround or Comment

No known issues Not applicable

Installation Issues Workaround or Comment

No known issues Not applicable

General Usability Issues Workaround or Comment

No known issues Not applicable

Aspen HYSYS PetroleumRefining V8.0

Coexistence Issues Workaround or Comment

No known issues Not applicable

Installation Issues Workaround or Comment

No known issues Not applicable

General Usability Issues Workaround or Comment

Some very large reactor models fail toload because of memory issues.

We recommend to use Windows 7 64 bitand for XP machines to set the 3GBOption. This may resolve some of theissues.

Page 21: AspenEngineeringSuiteV8 0 Issues

Exchanger Design and Rating 21

Exchanger Design and Rating

Exchanger Design and RatingProducts V8.0This section contains a summary of known issues or limitations that apply tothe family of Exchanger Design and Rating products in the release. Theseknown issues include issues related to the Aspen Plus integration.

Workarounds are suggested where possible.

Coexistence Issues Workaround or Comment

No known issues Not applicable

Installation Issues Workaround or Comment

No known issues Not applicable

General Usability Issues Workaround or Comment

CQ00392063 – Labels are missing in

Headings / Remarks In Input |Problem Definition |Headings/Remarks, the labels such asCompany:, Location:, Service of Unit:,etc., are missing for new cases.

Affects all EDR applications.

Select Tools | Program Settings,Headings/Drawing tab and click OK.

This only need be done one time;

thereafter, the labels are present.

CQ00397130 – File-Open crashes if EDRhas exported to Excel.

Affects all EDR applications.

If an EDR file has been exported to Exceland then File-Open is selected, EDR willcrash. The workaround is to export toExcel and then close and reopen EDR.

CQ00404319 Process conditions shouldbe grayed out, as they are determinedby the relevant information from AspenPlus interface.

Any user changes to process conditionswithin the embedded EDR Browser willbe overwritten by the next Aspen Plusrun.

CQ00479429 When the embedded EDRbrowser in Aspen Plus has input focus

Open a different tab before starting theAspen Plus run.

Page 22: AspenEngineeringSuiteV8 0 Issues

22 Exchanger Design and Rating

General Usability Issues Workaround or Comment

during the Aspen Plus simulation run,the run status changes to “Inputchanged”.

CQ00485626 AspenPlus.exe remainsin memory if you close the EDR SizingConsole using the window close (X)button.

This will cause files to be locked andcause problems in subsequent AspenPlus runs.

The workaround is to close the EDRSizing Console using the Cancel button.

Aspen Air Cooled ExchangerV8.0Coexistence Issues Workaround or Comment

No known issues Not applicable

Installation Issues Workaround or Comment

No known issues Not applicable

General Usability Issues Workaround or Comment

No known issues Not applicable

Page 23: AspenEngineeringSuiteV8 0 Issues

Exchanger Design and Rating 23

Aspen Fired Heater V8.0

Coexistence Issues Workaround or Comment

No known issues Not applicable

Installation Issues Workaround or Comment

No known issues Not applicable

General Usability Issues Workaround or Comment

No known issues Not applicable

Aspen Shell & Tube ExchangerV8.0

Coexistence Issues Workaround or Comment

No known issues Not applicable

Installation Issues Workaround or Comment

No known issues Not applicable

General Usability Issues Workaround or Comment

The Advanced method is not yetavailable for kettles. Affects Shell&TubeExchanger.

None. The Standard Method gives wellproven results.

Nozzles on the side of an exchanger, asagainst on the top or bottom, are notcorrectly displayed on the Setting Plan.

The Example Files provided with theprogram have exchanger materials (andother text strings) omitted from theoutput.

If the files are re-run, the missingoutputs will re-appear.

Shell & Tube crashes when printing for Xand K shells.

Affects Shell&Tube Exchanger

Export to Microsoft Word or Excel andprint from there.

Page 24: AspenEngineeringSuiteV8 0 Issues

24 Exchanger Design and Rating

Aspen Shell & Tube MechanicalV8.0

Coexistence Issues Workaround or Comment

No known issues Not applicable

Installation Issues Workaround or Comment

No known issues Not applicable

General Usability Issues Workaround or Comment

The Advanced method is not yet

available for kettles.

Affects Shell&Tube.

None. The Standard Method gives wellproven results.

Nozzles on the side of an exchanger, asagainst on the top or bottom, are notcorrectly displayed on the Setting Plan

The Example Files provided with theprogram have exchanger materials (andother text strings) omitted from theoutput.

If the files are re-run, the missingoutputs will re-appear.

Aspen Plate Exchanger V8.0

Coexistence Issues Workaround or Comment

No known issues Not applicable

Installation Issues Workaround or Comment

No known issues Not applicable

General Usability Issues Workaround or Comment

No known issues Not applicable

Page 25: AspenEngineeringSuiteV8 0 Issues

Exchanger Design and Rating 25

Aspen HTFS Research NetworkV8.0

Coexistence Issues Workaround or Comment

No known issues Not applicable

Installation Issues Workaround or Comment

No known issues Not applicable

General Usability Issues Workaround or Comment

No known issues Not applicable

Aspen MUSE V8.0

Coexistence Issues Workaround or Comment

No known issues Not applicable

Installation Issues Workaround or Comment

No known issues Not applicable

General Usability Issues Workaround or Comment

No known issues Not applicable

Page 26: AspenEngineeringSuiteV8 0 Issues

26 Exchanger Design and Rating

Aspen Plate Fin Exchanger V8.0

Coexistence Issues Workaround or Comment

No known issues Not applicable

Installation Issues Workaround or Comment

No known issues Not applicable

General Usability Issues Workaround or Comment

No known issues Not applicable

Page 27: AspenEngineeringSuiteV8 0 Issues

Economic Evaluation 27

Economic Evaluation

Economic Evaluation V8.0Product FamilyThe following section describes known issues that can apply to EconomicEvaluation V8.0 Product Family.

Coexistence Issues Workaround or Comment

Machines having multiple versions ofAspen Economic Evaluation installedwill experience the followingbehavior:

Once V8.0 Aspen EconomicEvaluation is installed, it will becomethe default version on the machine.

This means the V8.0 version of theEconomic Evaluation API will becomethe default (or current) version.This could affect the behavior forusers who run the SpreadsheetImport/Export feature in V7.3.2

1. On a Windows XP machine, once V7.3.2ACCE is launched, the ACCE API currentversion will become V7.3.2 and theSpreadsheet Import/Export feature will workin the normal manner. Note:simultaneously running ACCE V8 and V7.3.2will cause problems in determining thecurrent API version. When this happens,shut down both versions of ACCE and startthe version where running the Spreadsheet

Import/Export feature is desired.

2. On a Windows 7 machine, the API currentversion does not change at runtime (as itdoes on an XP machine). Thus, once ACCEV8.0 is installed, this will become thedefault/current EE API version. If usersdesire to run the Spreadsheet Import/Exportfeature in V7.3.2, the V7.3.2 ICAPICOM.dllwill need to be re-registered. This can bedone via the following steps:

a. Close all Economic Evaluationprograms.

b. Open the command prompt as anadministrator. NOTE: It is notsufficient to have administratorprivileges. The User has to rightclick on the DOS shell application torun as administrator.

Page 28: AspenEngineeringSuiteV8 0 Issues

28 Economic Evaluation

c. Browse to the EE V7.3.2“Program\Sys” directory: E.G.:“\ProgramFiles(x86)\AspenTech\EconomicEvaluation V7.3.2\Program\Sys”.

d. Run the command: regsvr32icapicom.dll

e. A message dialog saying “DLLregister server was successful” etc.should be obtained.

f. Open V7.3.2 and run spreadsheet

import/export.

Note: follow the same instructions to re-registerV8.0 as the current API version (except run thecommand from the V8.0 Sys directory).

Installation Issues Workaround or Comment

No known issues Not applicable

Page 29: AspenEngineeringSuiteV8 0 Issues

Economic Evaluation 29

General Usability Issues Workaround or Comment

CQ – 404999

Source media may be required when Resiliencyis triggered.

The software will trigger Resiliency to configurethe application for a new or Restricted user on amachine. This will occur the first time any EEapplication is launched (by the user) and will notoccur again once it has successfully completed.Thus, in order for the system to behave asdesigned, it is important to let the Resiliencyprocess complete. Under normal situations,Resiliency can be completed without requiringthe Source Media from which the applicationwas installed from. However, there have beencomplications where a request is made duringthe Resiliency Process for the source media.

During testing, we have determined potentialcause for the source media requirement. Ifanother user on the same machine ran MS Excelfrom within the EE system, even if the Excelspreadsheet is merely opened and closedwithout saving, some file attributes change inExcel that cause the installer to think theinstallation has changed (the attributes that arechanged are invisible to the user). Once thishappens, the source media requirement is madeby the installer.

The root cause of this issue is a Microsoft Excel2003 design issue (it does not happen withWord 2003 or Excel 2007) and cannot be fullyaddressed within the application or installer. Asa reference, the following MS KB link describesthe Excel behavior.

http://support.microsoft.com/kb/840169

If the source media is available, theuser should make it available duringthis process. This media can be thedownload location, network drive, orDVD (when available).

If the source media is not available,the original user that ran MS Excelfrom the EE application will need torun the same test (under the originalaccount). If the Reporter was run,the user should open thecorresponding template xls file inExcel and save the file (w/o anychanges). This will change the timestamp on the file and the installerwill ignore it when the Resiliencyprocess is run. The Excel templatefiles are located in:

\Documents and Settings\AllUsers\Documents\AspenTech\SharedEconomic EvaluationV8.0\Reporter\Templates

CQ – 485811

This is a documentation issue:

The COA's for Communication and Alarmsystems need to be updated in the IcarusReference Guide (CODE of ACCOUNTS chapterPage 34-15).

781 Telephone System

782 Public Addess Gen. Alarm

783 Intrusion Det. System

784 Access Control System

785 Closed Circuit TV

786 Radio Systems

787 Area Network Systems

788 Meteorological Systems

In addition, the following Subytype needs to beadded to the DATABASE RELATIONS chapterpage 35-47.

650 PAGA system cabinets

Not applicable

Page 30: AspenEngineeringSuiteV8 0 Issues

30 Economic Evaluation

CQ - 467389

Running any Decision Analyzer Utility Module -AUM (e.g. Cooling Water or Instrument Air) on amachine having Microsoft Office 64 bit installedis not supported in EE V8.0. This feature isfunctional on 64 bit Operating Systems (e.g.Windows 7 64 bit) with Microsoft Office 32 bitinstalled.

Not applicable

Page 31: AspenEngineeringSuiteV8 0 Issues

Economic Evaluation 31

Running Economics from Aspen Plus or HYSYSV8.0 for the first time may result in the followingerror:

Shutdown Aspen Plus or HYSYSV8.0. Launch APEA V8.0 and let theprogram configuration (i.e.Resiliency) complete. AfterResiliency has completed, shutdownAPEA and launch either Aspen Plus

or HYSYS V8.0 and resume desiredworkflow.

CQ - 486287

For a custom pipe spec with sanitary pipematerial (304PS, 316PS), incorrect warningmessages for flange type are generated duringproject scan even when the flange type fields inthe spec are blank (no input).

WARN > 'EXT- 4' WARNING IN THEEXTERNAL PIPE SPEC FILE, FORSPEC:304PS

X-SMALL : FOR SANITARY PIPEMATL. ONLY LAP FLANGE IS ALLOWED

INPUT WILL BE IGNORED.WARN > 'EXT- 4' WARNING IN THE

EXTERNAL PIPE SPEC FILE, FORSPEC:304PS

SMALL : FOR SANITARY PIPE MATL.ONLY LAP FLANGE IS ALLOWED

INPUT WILL BE IGNORED.WARN > 'EXT- 4' WARNING IN THE

EXTERNAL PIPE SPEC FILE, FORSPEC:304PS

MEDIUM : FOR SANITARY PIPEMATL. ONLY LAP FLANGE IS ALLOWED

INPUT WILL BE IGNORED.WARN > 'EXT- 4' WARNING IN THE

EXTERNAL PIPE SPEC FILE, FORSPEC:304PS

LARGE : FOR SANITARY PIPEMATL. ONLY LAP FLANGE IS ALLOWED

INPUT WILL BE IGNORED.WARN > 'EXT- 4' WARNING IN THE

EXTERNAL PIPE SPEC FILE, FORSPEC:304PS

X-LARGE : FOR SANITARY PIPEMATL. ONLY LAP FLANGE IS ALLOWED

INPUT WILL BE IGNORED.

The warning messages do not prevent theproject evaluation or use of the custom pipespec. The pipe spec gets applied correctly.

The warning messages will not getgenerated if user specifies lap flangetype (‘B’) for each diameter break inthe sanitary pipe custom pipe spec.

Page 32: AspenEngineeringSuiteV8 0 Issues

32 Economic Evaluation

Aspen Process EconomicAnalyzer V8.0

Coexistence Issues Workaround or Comment

No known issues Not applicable

Installation Issues Workaround or Comment

No known issues Not applicable

General Usability Issues Workaround or Comment

No known issues Not applicable

Aspen In-Plant Cost EstimatorV8.0

Coexistence Issues Workaround or Comment

No known issues Not applicable

Installation Issues Workaround or Comment

No known issues Not applicable

General Usability Issues Workaround or Comment

No known issues Not applicable

Page 33: AspenEngineeringSuiteV8 0 Issues

Economic Evaluation 33

Aspen Capital Cost EstimatorV8.0

Coexistence Issues Workaround or Comment

No known issues Not applicable

Installation Issues Workaround or Comment

No known issues Not applicable

General Usability Issues Workaround or Comment

While working in a created worksheet fora component, there may be duplicatematerials listed in the correspondingmaterials drop-down list (e.g. 2selections for 304L).

NA. This is a result of “flattening” thesubscroll material lists from the ACCE GUI.Selecting either material instance isacceptable.

CQ – 450680

In Foreign Operating systems (e.g.German Windows), the instrumentationbulk sheet will not show dependentscrolls for sensor type, sensor elementtype.

Use the pivot table embedded in theinstrumentation worksheet as a guide forentering the desired sensor type/sensorelement type values.

Page 34: AspenEngineeringSuiteV8 0 Issues

34 Economic Evaluation

Icarus Evaluation Engine V8.0

Coexistence Issues Workaround or Comment

No known issues Not applicable

Installation Issues Workaround or Comment

No known issues Not applicable

General Usability Issues Workaround or Comment

No known issues Not applicable

Page 35: AspenEngineeringSuiteV8 0 Issues

Energy and Flare Analysis 35

Energy and Flare Analysis

Aspen Energy Analyzer V8.0

Coexistence Issues Workaround or Comment

No known issues Not applicable

Installation Issues Workaround or Comment

No known issues Not applicable

General Usability Issues Workaround or Comment

No known issues Not applicable

Page 36: AspenEngineeringSuiteV8 0 Issues

36 Energy and Flare Analysis

Aspen Flare System AnalyzerV8.0

Coexistence Issues Workaround or Comment

No known issues Not applicable

Installation Issues Workaround or Comment

No known issues Not applicable

General Usability Issues Workaround or Comment

No known issues Not applicable

Aspen HYSYS ThermodynamicsCOM Interface V8.0

Coexistence Issues Workaround or Comment

No known issues Not applicable

Installation Issues Workaround or Comment

No known issues Not applicable

General Usability Issues Workaround or Comment

No known issues Not applicable

Page 37: AspenEngineeringSuiteV8 0 Issues

Aspen Simulation Workbook 37

Aspen Simulation Workbook

Aspen Simulation WorkbookV8.0

Coexistence Issues Workaround or Comment

No known issues Not applicable

Installation Issues Workaround or Comment

No known issues Not applicable

General Usability Issues Workaround/Comment

Automatic Economic Evaluation withScenarios – When running a scenariostudy with a simulation case that hasautomatic Economic Evaluation turnedon, you must make the simulation casevisible in order for the scenario study tooperate properly.

To do this, make sure that the “Visible”checkbox is checked on the Simulationsgroup of the ASW ribbon bar in Excel.

Page 38: AspenEngineeringSuiteV8 0 Issues

38 Aspen Simulation Workbook

Page 39: AspenEngineeringSuiteV8 0 Issues

Process Development 39

Process Development

Aspen Batch Process DeveloperV8.0

Coexistence Issues Workaround or Comment

No known issues Not applicable

Installation Issues Workaround or Comment

No known issues Not applicable

General Usability Issues Workaround or Comment

On Windows 7 remote desktops, someAPBD dialog boxes might not show thecomplete label for a field.

On your remote Win7 desktop, change toWindows 7 Classic Theme using ControlPanel | Appearance andPersonalization | Personalization.

On Windows 7 remote desktops, certainatoms connected at an angle inmolecular structures might not bedisplayed in the structure.

On your remote Win7 desktop, change toWindows 7 Classic Theme using ControlPanel | Appearance andPersonalization | Personalization.

When generating Operating Instructionsusing a user template, Word mightapparently freeze on responding to popup message:

“Some errors occurred while generatingthe document …

Would you like to view the error lognow?”

The actual text will not be visible but thefile is still generated in the expectedlocation.

The file is still saved correctly and can beopened independently in Word.

Page 40: AspenEngineeringSuiteV8 0 Issues

40 Process Development

When running a batch including vaporemissions calculations using AspenProperties, a software crash mayhappen.

Run the batch again without deleting theAspen Properties files that were generated in

the working folder.

The top level Online Help only shows thetop level Index and Searches will onlyfind keywords contained at the top level,rather than finding entries in every topicof the Online Help. When moving todifferent topics in the Contents tab, theIndex and keyword search will only findentries contained in those topics.

Use the Contents to navigate through theonline help, or making local searchesunder the relevant topic.

There is an Alias field in the PureComponent Editor that may be edited bythe user. This Alias is used to identifythe component in the Aspen Propertiesdatabanks and must therefore match avalue in those databanks.

If the user enters an Alias that is notknown by Aspen Properties, thecomponent will be treated as a usercomponent and no parametersavailable, unless they are entered in thePure Component Dialog.

If the user entered Alias contains invalidcharacters for Aspen Properties, thesoftware may crash.

The Alias is usually filled in whenselecting a component from the AspenProperties databanks.

If the information is entered manuallyinstead, the user must be aware of theabove and ensure that no invalidcharacters are entered. Please observeAspen Properties rules. If the userintends to use a component from theAspen Properties databanks and is notsure of what its Alias may be, it is usefulto start Aspen Properties, use theComponent Search Wizard and check thecomponent Alias retrieved

Aspen Solubility Modeler V8.0

Coexistence Issues Workaround or Comment

No known issues Not applicable

Installation Issues Workaround or Comment

No known issues Not applicable

General Usability Issues Workaround or Comment

No known issues Not applicable

Page 41: AspenEngineeringSuiteV8 0 Issues

Process Development 41

Aspen Process Tools V8.0

Coexistence Issues Workaround/Comment

No known issues Not applicable

Installation Issues Workaround or Comment

No known issues Not applicable

General Usability Issues Workaround or Comment

Aspen Process Manual V8.0

Coexistence Issues Workaround or Comment

No known issues Not applicable

Installation Issues Workaround or Comment

No known issues Not applicable

General Usability Issues Workaround or Comment

No known issues Not applicable

Page 42: AspenEngineeringSuiteV8 0 Issues

42 Process Development

Page 43: AspenEngineeringSuiteV8 0 Issues

Aspen Basic Engineering 43

Aspen Basic Engineering

Aspen Basic Engineering V8.0

Coexistence Issues Workaround or Comment

When Aspen Basic Engineering V8.0 isinstalled concurrently with a V7.xversion and the user tries to open thehelp from V7.x, the help for V8.0 opens

Not applicable

Installation Issues Workaround or Comment

No known issues Not applicable

General Usability Issues Workaround or Comment

When using Simulation Importer toimport a HYSYS simulation, theconnection times out and not all of thedata is imported.

Open HYSYS one time before importingany simulations to initialize APED.

For a typical V8.0 Aspen BasicEngineering installation where only theEnd User Tools have been installed, theDrawing Editor Copy and Cut operationswill fail to copy the selected region tothe clipboard. Paste will return an errorindicating that there is nothing to paste.

Use the Symbol Replication Tool, i.e., runZyqadSymbolsReplication.exe inUserServices\bin, to copy the symbollibrary to the client system.

Page 44: AspenEngineeringSuiteV8 0 Issues

44 Aspen Basic Engineering

Page 45: AspenEngineeringSuiteV8 0 Issues

Operations Support 45

Operations Support

Aspen Online Deployment V8.0

Coexistence Issues Workaround or Comment

Simulator Support. Aspen Online Deployment V8.0 supportsversions V7.1, V7.3, and V8.0 of Aspen Plus,Aspen HYSYS, Aspen Custom Modeler, AspenModel Runner, and Exchanger Design andRating.

Earlier versions are not supported. VersionV7.3.2 of Aspen Plus is not supported.

Simulator version specification. A specific simulator version cannot bespecified for Exchanger Design and Rating(EDR) cases; the default version of EDR isused.

A specific version can be specified for AspenPlus, Aspen HYSYS, Aspen Model Runner andAspen Custom Modeler.

Installation Issues Workaround or Comment

Installing the online servers for AODrequires software from the AspenManufacturing suite.

Detailed installation guidelines for installingthe Manufacturing Suite software is providedin the Aspen Engineering Installation Guide.

Before installing the online applicationserver and web server, please carefully readthe Aspen Online Deployment sections in theInstallation Guide.

General Usability Issues Workaround or Comment

No known issues Not applicable

Page 46: AspenEngineeringSuiteV8 0 Issues

46 Operations Support

Aspen OTS Framework V8.0

Coexistence Issues Workaround or Comment

No known issues Not applicable

Installation Issues Workaround or Comment

No known issues Not applicable

General Usability Issues Workaround or Comment

Aspen OTS V8.0 can stop working whenuninstalling Aspen OTS V7.3.

Contact Aspentech Customer Support formore information how to repair the V8.0installation.

Aspen Online V8.0

Coexistence Issues Workaround or Comment

No known issues Not applicable

Installation Issues Workaround or Comment

No known issues Not applicable

General Usability Issues Workaround or Comment

Location of project files On Windows 2008 Server, project filescreated in certain locations (e.g. C:\) donot have sufficient default permissions inorder to allow Aspen OnLine to updatedatabase files. It is recommended thatproject files are created and stored in theAspen OnLine working directory. Thislocation isC:\AspenTech\AspenOnLineV8.0.Alternatively, ensure that the projectfolder has full access for all users inorder for Aspen OnLine to functionproperly.

Page 47: AspenEngineeringSuiteV8 0 Issues

Aspen Plus Based Refinery Reactors 47

Aspen Plus Based RefineryReactors

Aspen Plus Catcracker V8.0

Coexistence Issues Workaround or Comment

No known issues Not applicable

Installation Issues Workaround or Comment

No known issues Not applicable

General Usability Issues Workaround or Comment

No known issues Not applicable

Page 48: AspenEngineeringSuiteV8 0 Issues

48 Aspen Plus Based Refinery Reactors

Aspen Plus Hydrocracker V8.0

Coexistence Issues Workaround or Comment

No known issues Not applicable

Installation Issues Workaround or Comment

No known issues Not applicable

General Usability Issues Workaround or Comment

No known issues Not applicable

Aspen Plus Hydrotreater V8.0

Coexistence Issues Workaround or Comment

No known issues Not applicable

Installation Issues Workaround or Comment

No known issues Not applicable

General Usability Issues Workaround or Comment

No known issues Not applicable

Page 49: AspenEngineeringSuiteV8 0 Issues

Aspen Plus Based Refinery Reactors 49

Aspen Plus Reformer V8.0

Coexistence Issues Workaround or Comment

No known issues Not applicable

Installation Issues Workaround or Comment

No known issues Not applicable

General Usability Issues Workaround or Comment

No known issues Not applicable

Page 50: AspenEngineeringSuiteV8 0 Issues

50 Aspen Plus Based Refinery Reactors

Page 51: AspenEngineeringSuiteV8 0 Issues

Aspen Open Object Model Framework 51

Aspen Open Object ModelFramework

Aspen Open Object ModelFramework

Coexistence Issues Workaround or Comment

No known issues Not applicable

Installation Issues Workaround or Comment

No known issues Not applicable

General Usability Issues Workaround or Comment

No known issues Not applicable

Page 52: AspenEngineeringSuiteV8 0 Issues

52 Aspen Open Object Model Framework