aspinall unit reservoir operations crfs meeting november 16, 2010

19
Aspinall Unit Reservoir Operations CRFS Meeting November 16, 2010

Upload: selena-rickett

Post on 01-Apr-2015

222 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Aspinall Unit Reservoir Operations CRFS Meeting November 16, 2010

Aspinall Unit

Reservoir OperationsCRFS Meeting

November 16, 2010

Page 2: Aspinall Unit Reservoir Operations CRFS Meeting November 16, 2010

Aspinall Unit Reservoirs• Blue Mesa Reservoir• Morrow Point Reservoir• Crystal Reservoir

Page 3: Aspinall Unit Reservoir Operations CRFS Meeting November 16, 2010
Page 4: Aspinall Unit Reservoir Operations CRFS Meeting November 16, 2010

Aspinall UnitSeasonal Operation Goals

• Blue Mesa Reservoir End of December target is 7490.0 ft• Meet the Black Canyon Water Right peak flow during May• Black Canyon of the Gunnison minimum flow is at least 300 cfs• Black Canyon flows to be kept fairly steady outside of peak flow.• Morrow Point and Crystal Reservoirs have drawdown rate

restrictions (i.e. feet/day)• Need to meet flood control needs of storing water in Blue Mesa

Reservoir and to avoid flooding down river in the town of Delta.• Adjust river flows for diversion needs through the Gunnison

Diversion Tunnel.• Meet all state water right needs on the river downstream.• Adjust flows for trout spawning needs in the fall and spring months.• Try to fill Blue Mesa Reservoir each year as much as possible.• Operate for endangered fish species.

Page 5: Aspinall Unit Reservoir Operations CRFS Meeting November 16, 2010

10/1

/01

1/7/

02

4/15

/02

7/22

/02

10/2

8/02

2/3/

03

5/12

/03

8/18

/03

11/2

4/03

3/1/

04

6/7/

04

9/13

/04

12/2

0/04

3/28

/05

7/4/

05

10/1

0/05

1/16

/06

4/24

/06

7/31

/06

11/6

/06

2/12

/07

5/21

/07

8/27

/07

12/3

/07

3/10

/08

6/16

/08

9/22

/08

12/2

9/08

4/6/

09

7/13

/09

10/1

9/09

1/25

/10

5/3/

10

8/9/

10

11/1

5/10

0

100,000

200,000

300,000

400,000

500,000

600,000

700,000

800,000

900,000

Blue Mesa Reservoir

Reservoir Content (AF)

Top of Active Conservation Pool

Water year 2002 record low year

Page 6: Aspinall Unit Reservoir Operations CRFS Meeting November 16, 2010

2010 Operations Review

Page 7: Aspinall Unit Reservoir Operations CRFS Meeting November 16, 2010

4/1/

08

4/30

/08

5/29

/08

6/27

/08

7/26

/08

8/24

/08

9/22

/08

10/2

1/08

11/1

9/08

12/1

8/08

1/16

/09

2/14

/09

3/15

/09

4/13

/09

5/12

/09

6/10

/09

7/9/

09

8/7/

09

9/5/

09

10/4

/09

11/2

/09

12/1

/09

12/3

0/09

1/28

/10

2/26

/10

3/27

/10

4/25

/10

5/24

/10

6/22

/10

7/21

/10

8/19

/10

9/17

/10

10/1

6/10

11/1

4/10

0

2

4

6

8

10

12

200,000

300,000

400,000

500,000

600,000

700,000

800,000

900,000Aspinall Unit Operations

(2008, 2009, 2010)Crystal Total Release,cfs

Unit Unreg Daily Inflow, cfs

Blue Mesa Content, af

2008Apr-Jul Inflow

1.0 MAF (148 %)

2009Apr-Jul Inflow

772 KAF (114 %)

2010Apr-Jul Inflow

494 KAF (73 %)

Page 8: Aspinall Unit Reservoir Operations CRFS Meeting November 16, 2010

10/1

/200

9

11/1

/200

9

12/1

/200

9

1/1/

2010

2/1/

2010

3/1/

2010

4/1/

2010

5/1/

2010

6/1/

2010

7/1/

2010

8/1/

2010

9/1/

2010

0.00

10.00

20.00

30.00

40.00

50.00

60.00

70.00

80.00

90.00

100.00

110.00

120.00

130.00

140.00

150.00

Upper Gunnison River Basin Snotel TrackingAggregate of 10 Snotel Sites above Crystal Reservoir

Statistical Average Index Current Year Index WY2010 Comparison Year Index WY2009

Date

Ind

ex

Sn

ow

Wa

ter

Eq

uiv

ele

nt

As of 09/30/2010 with 9 of 10 sites reporting, the basin wide SWE is

percent of average.

Data Provided by the Natural Resource Conservation Service

Page 9: Aspinall Unit Reservoir Operations CRFS Meeting November 16, 2010
Page 10: Aspinall Unit Reservoir Operations CRFS Meeting November 16, 2010
Page 11: Aspinall Unit Reservoir Operations CRFS Meeting November 16, 2010

3883 cfs

May 1 Forecast560 KAF

Actual 24 HR Peak4190 cfs on May 18

Page 12: Aspinall Unit Reservoir Operations CRFS Meeting November 16, 2010

4/1

/20

10

0:0

04

/4/2

01

0 0

:00

4/7

/20

10

0:0

04

/10

/20

10

0:0

04

/13

/20

10

0:0

04

/16

/20

10

0:0

04

/19

/20

10

0:0

04

/22

/20

10

0:0

04

/25

/20

10

0:0

04

/28

/20

10

0:0

05

/1/2

01

0 0

:00

5/4

/20

10

0:0

05

/7/2

01

0 0

:00

5/1

0/2

01

0 0

:00

5/1

3/2

01

0 0

:00

5/1

6/2

01

0 0

:00

5/1

9/2

01

0 0

:00

5/2

2/2

01

0 0

:00

5/2

5/2

01

0 0

:00

5/2

8/2

01

0 0

:00

5/3

1/2

01

0 0

:00

6/3

/20

10

0:0

06

/6/2

01

0 0

:00

6/9

/20

10

0:0

06

/12

/20

10

0:0

06

/15

/20

10

0:0

06

/18

/20

10

0:0

06

/21

/20

10

0:0

06

/24

/20

10

0:0

06

/27

/20

10

0:0

06

/30

/20

10

0:0

07

/3/2

01

0 0

:00

7/6

/20

10

0:0

07

/9/2

01

0 0

:00

7/1

2/2

01

0 0

:00

7/1

5/2

01

0 0

:00

7/1

8/2

01

0 0

:00

7/2

1/2

01

0 0

:00

7/2

4/2

01

0 0

:00

7/2

7/2

01

0 0

:00

7/3

0/2

01

0 0

:00

0

1,000

2,000

3,000

4,000

5,000

6,000

7,000

7420.00

7430.00

7440.00

7450.00

7460.00

7470.00

7480.00

7490.00

7500.00

7510.00

7520.00

Aspinall 2010 OperationsCrystal ReleaseBlue Mesa inflowBlue Mesa ElevationFill Target

Date

Flo

w (

cfs

)

Time period for daily changes in operations

Spring Peak release for Black Canyon Water Right.

Targeted fill short by 11.18 feet or 65,500 acre-feet.

Page 13: Aspinall Unit Reservoir Operations CRFS Meeting November 16, 2010

Jan

-20

10

Fe

b-2

01

0

Ma

r-2

01

0

Ap

r-2

01

0

Ma

y-2

01

0

Jun

-20

10

Jul-

20

10

Au

g-2

01

0

Se

p-2

01

0

Oct

-20

10

No

v-2

01

0

De

c-2

01

0

0

500

1,000

1,500

2,000

2,500

3,000

3,500

4,000

4,500

5,000

5,500

6,000

6,500

7,000

7,500

8,000

7456.00

7460.00

7464.00

7468.00

7472.00

7476.00

7480.00

7484.00

7488.00

7492.00

7496.00

7500.00

7504.00

7508.00

7512.00

7516.00

7520.00

Blue Mesa Reservoir

Forecasted Inflow

Actual Inflow

Comparative Year Inflow

Ave Unreg Inflow

Projected Elevation

Actual Elevation

Average Elevation

Date

Infl

ow

(c

fs)

Ele

va

tio

n (

Fe

et)

Projections based on 493590 Acre-Feet of April-July runoff

Spring peak for meeting water right

Page 14: Aspinall Unit Reservoir Operations CRFS Meeting November 16, 2010
Page 15: Aspinall Unit Reservoir Operations CRFS Meeting November 16, 2010

4/27/10 0:00 5/2/10 0:00 5/7/10 0:00 5/12/10 0:00 5/17/10 0:00 5/22/10 0:00 5/27/10 0:00 6/1/10 0:00 6/6/10 0:000

500

1,000

1,500

2,000

2,500

3,000

3,500

4,000

4,500

5,000

Gunnison River below TunnelF

low

in

cfs

Page 16: Aspinall Unit Reservoir Operations CRFS Meeting November 16, 2010

4/27/10 0:00 5/2/10 0:00 5/7/10 0:00 5/12/10 0:00 5/17/10 0:00 5/22/10 0:00 5/27/10 0:00 6/1/10 0:00 6/6/10 0:000

1,000

2,000

3,000

4,000

5,000

6,000

7,000

Gunnison River at Delta

At Delta

Below Tunnel

Flo

w i

n c

fs

Page 17: Aspinall Unit Reservoir Operations CRFS Meeting November 16, 2010

Water Year 2010 Projected Operations

Page 18: Aspinall Unit Reservoir Operations CRFS Meeting November 16, 2010

Jan

-20

10

Fe

b-2

01

0

Ma

r-2

01

0

Ap

r-2

01

0

Ma

y-2

01

0

Jun

-20

10

Jul-

20

10

Au

g-2

01

0

Se

p-2

01

0

Oct

-20

10

No

v-2

01

0

De

c-2

01

0

0

500

1,000

1,500

2,000

2,500

3,000

3,500

4,000

4,500

5,000

5,500

6,000

6,500

7,000

7,500

8,000

7456.00

7460.00

7464.00

7468.00

7472.00

7476.00

7480.00

7484.00

7488.00

7492.00

7496.00

7500.00

7504.00

7508.00

7512.00

7516.00

7520.00

Blue Mesa Reservoir

Forecasted Inflow

Actual Inflow

Comparative Year Inflow

Ave Unreg Inflow

Projected Elevation

Actual Elevation

Average Elevation

Date

Infl

ow

(c

fs)

Ele

va

tio

n (

Fe

et)

Projections based on 493590 Acre-Feet of April-July runoffCurrent Projection

End of Dec Target Elevation: 7490.00 feet

Dry fall, below aver-age inflows

Page 19: Aspinall Unit Reservoir Operations CRFS Meeting November 16, 2010

Water year 2011 we expect to meet the water right and fill blue Mesa