    LEANMANUFACTUTRINGa case study

    Prof. C.S.PurushothamanPromoter Director CREST PACKAGING PRIVATE LIMITED

    Promoter Director PROFESSIONAL PACKAGING GROUP

    Visiting Faculty & Examiner Universi ties of Mumbai, SNDT and Kerala

    Retired Chair Professor Director SIES School of Packaging

    26/11/2013 CSP TRG AIDS 1

  • 8/13/2019 Asq Meeting

    2/15

    The Company

    CREST PACKAGING PRIVATE LIMITED

    Established 1998

    Contract Packaging Professionals

    ISO 9001:2008 Certified Organisation

    Manufacturing Units 2nos. Total Workforce over 180

    Investment Rs. 1.5 Crores

    Monthly Turnover 3000 MT of Lubes Packaging

    Clientele Castrol, HPCL, Reliance, Bosch, Eicher, Royal

    Enfield, IOCL, BSL, BPCL & Tide Water

    26/11/2013 CSP TRG AIDS 2

  • 8/13/2019 Asq Meeting

    3/15

    Packages Handled

    POUCHES

    20ml, 40ml, 60ml, 100ml

    Over 1 Crore pouches /month with 15 FFS m/cs

    BOTTLES

    1 Lt to 5 Lts

    4 Complete filling lines

    Filler, Capping, Inkjet, Induction Seal and Taping

    PAILS

    3.5 Lt to 20 Lt with 4 auto lines DRUMS

    50Lt to 201 Lt

    26/11/2013 CSP TRG AIDS 3

  • 8/13/2019 Asq Meeting

    4/15

    Packages Handled

    26/11/2013 CSP TRG AIDS 4

  • 8/13/2019 Asq Meeting

    5/15

    FFS POUCHES

    3 side sealed pouch

    POUCH REJECTION CAUSES

    Leaked Pouches

    SEALING PARAMETERS

    Temperature, Pressure & Dwell Time

    26/11/2013 CSP TRG AIDS 5

  • 8/13/2019 Asq Meeting

    6/15

    FFS POUCHES1998

    2 nos per m/c - One Operator + One Packer For 16 m/cs 32 men

    Prodn 4,00,000 pouches per day

    Rejection 18% due to leaks (72,000)per day

    Labour Cost Rs. 12,800 per day

    26/11/2013 CSP TRG AIDS 6

  • 8/13/2019 Asq Meeting

    7/15

    ISSUES REJECTION - LEAKED POUCHES - 18% (2880Lts)

    COST OF QUALITY TANGIBLE

    Sorting 8 workmen per day (Rs.2400 per day)

    Reclaim - Oil loss 30% (864 Lts Rs.288000 per day)

    Prodn Loss 72000 per day (equivalent to 2.7 m/cs)

    6 manpower (Rs.4800) + Time + Electricity etc

    INTANGIBLE

    Messy Work Floor, Extra space, Image Loss

    DAILY PRODUCTION 4,00,000 pouches per day

    26/11/2013 CSP TRG AIDS 7

  • 8/13/2019 Asq Meeting

    8/15

    STRATEGY

    ROOT CAUSE ANALYSIS FOR LEAKAGES SYNERGISING MANPOWER

    26/11/2013 CSP TRG AIDS 8

  • 8/13/2019 Asq Meeting

    9/15

    ROOT CAUSE ANALYSIS

    MATERIAL

    Improper Laminate Specification Improper Laminate Curing

    Improper Laminate reels

    MACHINE

    Improper Temperature setting Improper Pressure setting

    Improper Dwell Time setting

    Improper Tension setting

    MEN Inadequate Training

    Inadequate supervision

    Improper Timing More free time

    Improper manpower allocation

    26/11/2013 CSP TRG AIDS 9

  • 8/13/2019 Asq Meeting

    10/15

    ROOT CAUSE ANALYSIS

    METHOD

    Improper Loadingof reel Improper pulling of pouches

    Improper packing and storage

    Improper Handling

    Optimising coding

    26/11/2013 CSP TRG AIDS 10

  • 8/13/2019 Asq Meeting

    11/15

    ROOT CAUSE ANALYSIS

    MATERIAL

    Improper Laminate Spec QC Check every reel Improper Laminate Curing Trial run of lot

    Improper Laminate reels - Trial run of lot

    MACHINE

    Improper Temperature setting - Optimised Improper Pressure setting - Optimised

    Improper Dwell Time setting - Optimised

    Improper Tension setting - Optimised

    MEN Inadequate Training Trained for the job

    Inadequate supervision SOP & systems

    Improper Timing More free time - Optimised

    Improper manpower allocation - Optimised

    26/11/2013 CSP TRG AIDS 11

  • 8/13/2019 Asq Meeting

    12/15

    ROOT CAUSE ANALYSIS

    METHOD

    Improper Loadingof reel 2 m/cs per person Improper pulling of pouches 2 m/cs per person Improper packing and storage - SOP

    Improper Handling - SOP

    Optimising coding Ink Jet Coding

    26/11/2013 CSP TRG AIDS 12

  • 8/13/2019 Asq Meeting

    13/15

    RESULT

    Rejection - 0.2% due to leaks

    SYNERGISING MANPOWER

    For 16 m/cs 10 men

    1 person per day

    26/11/2013 CSP TRG AIDS 13

  • 8/13/2019 Asq Meeting

    14/15

    TANGIBLE Sorting 7 workmen per day (Rs.2100 per day)

    Reclaim - Oil loss 17.8% (2484 Lts Rs.248400 per day)

    Prodn Loss 71,800 per day (equivalent to 2.7 m/cs)

    6 manpower (Rs.4800) + Time + Electricity etc

    INTANGIBLE

    No Messy Work Floor, Litt le space, Improved Image

    SAVINGS

    26/11/2013 CSP TRG AIDS 14