POOL PROGRAM Victory ASSEMBLING INSTRUCTIONS FOR ENCLOSURES revision: 15.3. 2020 99.MP.0056.EN

Upload: others

Post on 10-Jul-2020

8 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ASSEMBLING INSTRUCTIONS FOR ENCLOSURES...Rails ( package ) Faces Package ( contents for completion of assembly ) TRANSPORT OF THE ENCLOSURE 2 1 3 5 4 01 05 09 02 06 10 03 07 11 04

POOL PROGRAM

Victory

ASSEMBLING INSTRUCTIONS FOR ENCLOSURES

revision: 15.3. 2020

99.MP.0056.EN

Page 2: ASSEMBLING INSTRUCTIONS FOR ENCLOSURES...Rails ( package ) Faces Package ( contents for completion of assembly ) TRANSPORT OF THE ENCLOSURE 2 1 3 5 4 01 05 09 02 06 10 03 07 11 04

99.MP.0056.EN - ASSEMBLING PROCEDURE

· Prior to installation be sure to check your local building and zoning requirements.

· Please carry out the steps in the order set out in these instructions.

IMPORTANT

· Please read these instructions carefully before you start to assemble your enclosure.

SAFETY ADVICE

· Keep these instructions in a safe place for future reference.

· Wood/composite decking

dizzy spells.

· 3.5" thick foundation of reinforced concrete

TOOLS AND EQUIPMENT REQUIRED

· more informations about recommended tools are in this assemblingprocedure

· If using a step ladder or power tools, ensure that you follow the manufacturer's safety advice.

TRACK INSTALATION

A flat, level surface is required; any of the following is acceptable:

· Use of work gloves and safety glasses during assembly is required.

· Do not attempt to assemble the enclosure in windy or wet conditions.

· Do not touch overhead power cables (if any) with the aluminum profiles.

· Always wear shoes and safety goggles when working with extruded aluminum.

· Dispose of all plastic bags safely - keep them out of reach of small children.

· The enclosure must be positioned and attached on a flat level surface.

· Do not lean against or push t he enclosure during assembly.

· Keep children away from the assembly area.

· Do not position your enclosure in an area exposed to excessive wind or overhead tree limbs.

· Do not attempt to assemble the enclosure, if you are tired, have taken drugs or alcohol or if you are prone to

· Pavers set in Concrete

CLEANING

Polycarbonate panels can easily be cleaned by hosing down with cold clean water or with a soft cloth made

from100% cotton using a mild dish detergent solution and rinsing with cold water.

DO NOT use acetone, abrasive cleaners or other special detergents to clean the panels. This will void

warranty!

IMMEDIATE REMOVAL OF PROTECTION SHEETS FROM PANELS

The polyethylene masking (plastic sheets/foil) must be removed immediately from the panels during or

immediately after installation. The polyethylene masking covers the panels to protect them during

handling,hipping, storage, and installation. If it is removed at a later time, it may be very difficult if not

impossible to remove as it will stick to the panel. In hot climates, even 24 hours after the installation is

completed it may be too late to remove.

2 / 63

Page 3: ASSEMBLING INSTRUCTIONS FOR ENCLOSURES...Rails ( package ) Faces Package ( contents for completion of assembly ) TRANSPORT OF THE ENCLOSURE 2 1 3 5 4 01 05 09 02 06 10 03 07 11 04

INTRODUCTIONITEM

ASSEMBLING INSTRUCTIONS FOR ENCLOSURES

Page 4: ASSEMBLING INSTRUCTIONS FOR ENCLOSURES...Rails ( package ) Faces Package ( contents for completion of assembly ) TRANSPORT OF THE ENCLOSURE 2 1 3 5 4 01 05 09 02 06 10 03 07 11 04

99.MP.0056.EN - ASSEMBLING PROCEDURE

4 / 63

EXPEDITION - TRANSPORT OF ENCLOSURE TO CUSTOMER

The enclosure for customer is delivery in wooden transport box.

This wooden transport box must be secured on a truck to avoid movement, deformation and damage of the enclosure duringthe transport to a client and safer for loading and unloading of the enclosure too.

EXPEDITION - THE ENCLOSURE IS ON A BOARD OF THE TRUCK IN THE WOODEN TRANSPORT BOX

01

02

03

04

05

Segments ( package )

Wooden transport box

Rails ( package )

Faces

Package ( contents for completion of assembly )

TRANSPORT OF THE ENCLOSURE

2

1

3

5

4

Page 5: ASSEMBLING INSTRUCTIONS FOR ENCLOSURES...Rails ( package ) Faces Package ( contents for completion of assembly ) TRANSPORT OF THE ENCLOSURE 2 1 3 5 4 01 05 09 02 06 10 03 07 11 04

01 05 09

02 06 10

03 07 11

04 08 12

Segment nr.1 ( smallest )

Segment nr.2

Lateral door ( on large segment )*

* by this moment. Bottom rail is fixed to travel profile, only the upper rail is removed from the roof.Lateral door is delivered in complet piece

Handle of lateral door

Small detachabled face Plastic cap for rails

Segment nr.3 Large detachabled face Lock arrestment of segment + stopper

Segment nr.4 ( largest ) Rails End of rail + plastic backstop for travel

ENCLOSURE - MAIN PARTS

1

47

10

25

8

11

12

3

6

9

99.MP.0056.EN - ASSEMBLING PROCEDURE

5 / 63

Page 6: ASSEMBLING INSTRUCTIONS FOR ENCLOSURES...Rails ( package ) Faces Package ( contents for completion of assembly ) TRANSPORT OF THE ENCLOSURE 2 1 3 5 4 01 05 09 02 06 10 03 07 11 04

01 02 03 04The largest face without door The smallest face without door Arrestment of faceRubber sealing

FACE WITHOUT DOOR - MAIN PARTS

GENERAL PUTTING OF FACE TO SEGMENT

1

2

4

3

99.MP.0056.EN - ASSEMBLING PROCEDURE

6 / 63

Page 7: ASSEMBLING INSTRUCTIONS FOR ENCLOSURES...Rails ( package ) Faces Package ( contents for completion of assembly ) TRANSPORT OF THE ENCLOSURE 2 1 3 5 4 01 05 09 02 06 10 03 07 11 04

1 6 10 14

2 7 11 15

17

18

16

A

3 8

12

4

5

9 13

01 08

14

02 09

15

03 10

16

04

05

07

11

12

1306

17

18

A

Arrestment pin

Insert for pavement

Raw-plugs

Plastic cap for end of rail

Plastic backstop for travel

Connection for rail

Screw for fixed attach of face to segment

Screw for fixed of upper rail ( lateral door )

Stopper ( arrestment of segment )

Key for lock of arrestment

Screw for fix of rubber sealing on lath F

Plastic cap for hide of the power cable

Rivets

Plastic cap for gound rails

Sealing rubber for both faces

End of rail

Limit door stop for rail of the lateral door

Self-adhesive mounting tape

Technical drawing of enclosure

PACKAGE - BASIC CONTENS

7 / 63

99.MP.0056.EN - ASSEMBLING PROCEDURE

Page 8: ASSEMBLING INSTRUCTIONS FOR ENCLOSURES...Rails ( package ) Faces Package ( contents for completion of assembly ) TRANSPORT OF THE ENCLOSURE 2 1 3 5 4 01 05 09 02 06 10 03 07 11 04

8 / 63

99.MP.0056.EN - ASSEMBLING PROCEDURE

IDENTIFICATION OF THE SELECTED FIX MATERIAL FOR ASSEMBLY

SCREW

POZ. METRIC DIMENSION HEAD SHAPE USE FOR JOINT OF THE …

A1 5,5 x 32 mm PAN fix the face to beam profile of the edge segment

B1 3,9 x 6,5 mm PAN fix the rubber sealing on lath F ( doorsill of face )

C1 6,3 x 25 mm PAN fix the upper rail of the lateral door

D1 2,9 x 13 mm PAN fix the plastic caps in rail of the lateral door

RIVET

POZ. METRIC DIMENSION TYPE USE FOR JOINT OF THE …

A2 4 x 10 mm stopper for rails AZURE, connector, limit door stop

4 x 10 mm plastic backstop, end of rails, sealing lath F under faces

B2 4 x 16 mm base of the face arrestment, limit door stop

PLASTIC CAP

POZ. METRIC DIMENSION TYPE USE FOR JOINT OF THE …

A3 D 15 mm colour per rail cover of predrilling hole in ground rails

B3 D 13 mm black cover of predrilling hole for hide of the power cable

RUBBER SEALING

POZ. METRIC DIMENSION TYPE USE FOR JOINT OF THE …

A4 height 100 / 120 mm black mPVC sealing for bottom part of the face = sill

B4 4 x 8 mm black self-adhesive mounting tape under PC in groove of beam profile

FIX THE RAILS TO GROUND

( type of the fix material depend on basement type )

POZ. METRIC DIMENSION HEAD SHAPE USE FOR JOINT OF THE …

A5 6,3 x 32 mm PAN fix to wooden - standard

B5 8 x 60 mm raw plug fix to concrete - standard

Page 9: ASSEMBLING INSTRUCTIONS FOR ENCLOSURES...Rails ( package ) Faces Package ( contents for completion of assembly ) TRANSPORT OF THE ENCLOSURE 2 1 3 5 4 01 05 09 02 06 10 03 07 11 04

PREPARE JOBSITEITEM

ASSEMBLING INSTRUCTIONS FOR ENCLOSURES

Page 10: ASSEMBLING INSTRUCTIONS FOR ENCLOSURES...Rails ( package ) Faces Package ( contents for completion of assembly ) TRANSPORT OF THE ENCLOSURE 2 1 3 5 4 01 05 09 02 06 10 03 07 11 04

1

4

8

11

16

15

2

5

7

12

17 18 19

13

20

14

21 22

24

23

25 26

3 6

10

9

TOOLS FOR ASSEMBLY - RECOMMENDED

05

01

14

10

23

19

06

02

15

11

24

20

07

03

16

12

25

21

08

09 18

04

17

13

26

22

Soft pads

Vacuum cleaner

Dust - brush

Screwdriver bits

Cord - extension set

Hammer

Level ruler

Screwdriver - cross ( small / large )

Measuring tape

Steel band

Knife

Pencil color mark

Rivet pliers

Tongs

Metal saw

Scissors for edit of rubber sealing

Set - socket wrench

Accumulator screwdriver

Dril ( 4 ; mm; 6,2 ; 7mm )Ø mm Ø 5 Ø mm Ø Small flat pliers

Drill to concrete ( ; mm )Ø 8mm Ø 15

Pneumatic hammer

Flat pliers

Rubber soft hammer

File ( round / flat )

Screwdriver - flat ( small / large )

10 / 63

99.MP.0056.EN - ASSEMBLING PROCEDURE

Page 11: ASSEMBLING INSTRUCTIONS FOR ENCLOSURES...Rails ( package ) Faces Package ( contents for completion of assembly ) TRANSPORT OF THE ENCLOSURE 2 1 3 5 4 01 05 09 02 06 10 03 07 11 04

ELECTRICAL SUPPLY CONNECTION ENSURE AN ACCESS TO A POOL

This informations may not be corresponding with technical drawing / assembling documentation.

POSITION OF THE LARGEST ELEMENT

DIRECTION OF MOVEMENT OF THE ENCLOSURE

USUALLY PARKING POSITION OF THE ALL SEGMENTS TOGETHER

CLARIFY A POSITION OF THE ENCLOSURE - LARGEST SEGMENT - PARKZONE

11 / 63

99.MP.0056.EN - ASSEMBLING PROCEDURE

THESE SEVERAL BASIC STEPS GOING TO FOLLOW BEFORE ASSEMBLING PROCEDURE

PREPARING THE ASSEMBLY PLACE

Page 12: ASSEMBLING INSTRUCTIONS FOR ENCLOSURES...Rails ( package ) Faces Package ( contents for completion of assembly ) TRANSPORT OF THE ENCLOSURE 2 1 3 5 4 01 05 09 02 06 10 03 07 11 04

MINIMAL TIME FOR ASSEMBLY

12 / 63

99.MP.0056.EN - ASSEMBLING PROCEDURE

PREPARING OF THE RAILS ON THE ASSEMBLY PLACE

Prepare the rail for connection the parts of rail along total lenght of the rail

Put the sole connector into sole chamber of the rail, so that connectorwill be protrude with one half from total length of connector.

CLEANING THE ASSEMBLY PLACE

Assembling of the enclosure is made onstabilized, plain, level and clean surface !

Clean the surface around the pool, especialy theplaces, where the rail will be fixed

STEP - 1

STEP - 1 STEP - 2

Page 13: ASSEMBLING INSTRUCTIONS FOR ENCLOSURES...Rails ( package ) Faces Package ( contents for completion of assembly ) TRANSPORT OF THE ENCLOSURE 2 1 3 5 4 01 05 09 02 06 10 03 07 11 04

13 / 63

99.MP.0056.EN - ASSEMBLING PROCEDURE

FIX MATERIAL

RIVET 4x10 mm A2( 1 CONNECTOR = 1 pce for join of the connector to rail )

Rivet the connection - the same way for left and right rail.EACH CONNECTOR must be protrude with one half from total length of connector.

1/2

1/2

THE COMPOSE RAILS

THE MONOLITHIC RAIL

ATTENTION! TWO TYPES OF RAIL AZURE ARE AVAILABLE - COMPOSE OR MONOLITHIC !

for eliminate the side shifting of parts of rails.Both connectors are neccessary to push into edge of chamber of rail

POSITION OF CONNECTORS FOR COMPOSE OR MONOLITHIC RAILS ARE SAME TOO !

2 1

1.AXIS WIDTH

COMPOSE MONOLITHIC

1.AXIS WIDTH

1.AXIS WIDTH

2

2

1

1

OUTSIDE CONNECTOR INSIDE CONNECTOR

STEP - 3

STEP - 4

Page 14: ASSEMBLING INSTRUCTIONS FOR ENCLOSURES...Rails ( package ) Faces Package ( contents for completion of assembly ) TRANSPORT OF THE ENCLOSURE 2 1 3 5 4 01 05 09 02 06 10 03 07 11 04

THE LEFT RAIL THE RIGHT RAIL

D TO ONE PART OF RAILRILL D TO ONE PART OF RAILRILL

ONE PART OF RAIL

WITH RIVETING CONNECTORS

ONE PART OF RAIL

WITH RIVETING CONNECTORS

OTHER PART OF RAIL

WITHOUT CONNECTORS

OTHER PART OF RAIL

WITHOUT CONNECTORS

NO SIDE SHIFTING

FOR BOTH PARTS OF THE RAIL

NO SIDE SHIFTING

FOR BOTH PARTS OF THE RAIL

RIVET OF TWO CONNECTORS INTO ONE PART OF RAIL RIVET OF TWO CONNECTORS INTO ONE PART OF RAIL

CONNECTING THE PART OF RAIL

ALONG TOTAL LENGHT

CONNECTING THE PART OF RAIL

ALONG TOTAL LENGHT

14 / 63

99.MP.0056.EN - ASSEMBLING PROCEDURE

RIVET THE CONNECTION INTO LEFT AND RIGHT RAIL

STEP - 5

STEP - 6

STEP - 7

STEP - 8

Page 15: ASSEMBLING INSTRUCTIONS FOR ENCLOSURES...Rails ( package ) Faces Package ( contents for completion of assembly ) TRANSPORT OF THE ENCLOSURE 2 1 3 5 4 01 05 09 02 06 10 03 07 11 04

MEASUREMENTTHE LEADING LINES

ITEM

ASSEMBLING INSTRUCTIONS FOR ENCLOSURES

INNER WIDTH

BETWEEN RAILS

1.RAILS AXIS WIDTH

THE DISTANCE

FROM AXIS OF THE 1.RIGHT RAIL TO AXIS OF THE 1.LEFT RAIL

Page 16: ASSEMBLING INSTRUCTIONS FOR ENCLOSURES...Rails ( package ) Faces Package ( contents for completion of assembly ) TRANSPORT OF THE ENCLOSURE 2 1 3 5 4 01 05 09 02 06 10 03 07 11 04

LEGEND FOR TECHNICAL DOCUMENTATION / MEASUREMENT

USE

TECHNICAL

DOCUMENTATION

( see for example )

This inner length of enclosure is sum of length of thepool with minimal sufficient distance from the outeredge of the pool.

This width is between and aaxis of the 1.right rail xis

of the 1.left rail. checked by measuring

diagonals too

Must be!

This total length of rails is longer than is length ofenclosure.

This distance is space between the outer edge of thepool and inner edge of rail or detachabled face ofenclosure.

Is necessary to keep measuring diagonals too - both

diagonals must have same proportions !

This extension is m necessaryinimal for arrestment ofsegment or maximal for parks zone of all segmentsout of the pool.

check and measure these dimensions !W, L, A, R, D, DG

After every movement or adjustment the rails again

INNER LENGTH OF ENCLOSURE - L

DIMENSIONS OF POOL - P

These outer dimensions of pool are for assessment ofminimal distance from outer edge of the pool.

INNER WIDTH BETWEEN RAILS - W

This inner width of enclosure is sum of width of thepool with minimal sufficient distance from the outeredge of the pool.

1.RAILS AXIS WIDTH - A TOTAL LENGTH OF RAILS - R

DISTANCE - D

DIAGONAL - DG EXTENSION RAIL - PARKZONE

1.R

AIL

S A

XIS

WID

TH

- A

INNER LENGTH OF ENCLOSURE - LTOTAL LENGTH OF RAILS - R

THE LARGE FIXED

FACE OF ENCLOSURE

THE SMALL FIXED

FACE OF ENCLOSURE

INN

ER

WID

TH

BE

TW

EE

N R

AIL

S -

W

INNER WIDTH BETWEEN RAILS - W

OU

TE

R W

IDT

H O

F R

AIL

S

OUTER WIDTH OF RAILS

16 / 63

99.MP.0056.EN - ASSEMBLING PROCEDURE

Page 17: ASSEMBLING INSTRUCTIONS FOR ENCLOSURES...Rails ( package ) Faces Package ( contents for completion of assembly ) TRANSPORT OF THE ENCLOSURE 2 1 3 5 4 01 05 09 02 06 10 03 07 11 04

total length of rails R

direction of moving with segments off the poolthe

~D8

~D6

L1

inner length of enclosure

L2

inner length of enclosure

W2

inn

er

wid

th

be

twe

en

ra

ils

of

po

ol

ou

ter

wid

tho

f p

oo

l

P2

W1

inn

er

wid

th

be

twe

en

ra

ils

outer length of pool

P3

outer length of pool

P4

~D

3

~D

1

~D

4

~D

2

~D7

~D5

( - P1) : 2 = D1W1

W1( - P1) : 2 = D2

D1 = D2

( - P3) : 2 = D5L1

L1( - P3) : 2 = D6

D5 = D6

EXTENSION RAIL

FOR PARKZONE

R - L1

R - L2

( 2 - P4) : 2 = DL 7

L 8( 2 - P4) : 2 = D

D = D7 8

( 2 - P2) : 2 = D3W

W( 2 - P2) : 2 = D4

D3 = D4

1

1

2

2

3

3

4

4

CENTRE PER WIDTH DIMENSIONS

CENTRE PER LENGTH DIMENSIONS

USE

TECHNICAL

DOCUMENTATION

USE

TECHNICAL

DOCUMENTATION

17 / 63

99.MP.0056.EN - ASSEMBLING PROCEDURE

Page 18: ASSEMBLING INSTRUCTIONS FOR ENCLOSURES...Rails ( package ) Faces Package ( contents for completion of assembly ) TRANSPORT OF THE ENCLOSURE 2 1 3 5 4 01 05 09 02 06 10 03 07 11 04

3-TH STEP OF MEASUREMENT

4-TH STEP OF MEASUREMENT

ACCURATE CHECK OF THE RAILS AXIS WIDTH

ACCURATE CHECK OF THE DIAGONALS

A2

1.r

ail

s a

xis

wid

th

A1

1.r

ail

s a

xis

wid

th

1

1

2

2

3

3

4

4

USE

TECHNICAL

DOCUMENTATION

Diagonal DG1Diagonal DG2

Diagonal DG2Diagonal DG1

18 / 63

99.MP.0056.EN - ASSEMBLING PROCEDURE

A1

1.rails axis width

DG1

diagonal DG2diagonal

A1

1.rail axis width

A2

1.rail axis width

Page 19: ASSEMBLING INSTRUCTIONS FOR ENCLOSURES...Rails ( package ) Faces Package ( contents for completion of assembly ) TRANSPORT OF THE ENCLOSURE 2 1 3 5 4 01 05 09 02 06 10 03 07 11 04

FIXINGTHE LEADING LINES

ITEM

ASSEMBLING INSTRUCTIONS FOR ENCLOSURES

Page 20: ASSEMBLING INSTRUCTIONS FOR ENCLOSURES...Rails ( package ) Faces Package ( contents for completion of assembly ) TRANSPORT OF THE ENCLOSURE 2 1 3 5 4 01 05 09 02 06 10 03 07 11 04

UNLEVELNESS OF GROUND

2

1

1

the shifting, first drill and fix the rail on one end.2.) During the drilling, secure the rail against

1.) Keep perpendicular position of drillingmachine to the rail while drilling

FIRST FIX ONE RAIL BELONG THE LONGER SIDE OF THE POOL, THEN, ACCORDING TO THIS ONE, PROCEED WITH

MEASUREMENT AND PLACING THE SECOND RAIL ON THE OPPOSITE SIDE OF THE POOL.

For wooden floor use spiral dives.

to concrete or pavement surface

Standard r in produce,usually r are fixedails are predrilling

ails

by plastic raw-plugs 8mm - use drill8mm .

ØØ

Amount of raw-plugs depends on lenght ofrails and especialy on specification of

ground surface.

Important to clean the rails of dirt, the best way is touse vacuum cleaner and sweep carefully.

Need to underlay the railwith aluminium strips

FIXING THE FIRST RAIL

BEFORE DRILLING MAKE VISUAL

CHECK TOO, IF THE RAIL IS IN LINE ...

EVENTUALLY POSITION OF THE RAILS

MARKED ON SURFACE FOR CHECK DURING DRILL

PLASTIC RAW-PLUGS Ø8MM

PLASTIC CAPS

20 / 63

99.MP.0056.EN - ASSEMBLING PROCEDURE

STEP - 1 STEP - 2

Page 21: ASSEMBLING INSTRUCTIONS FOR ENCLOSURES...Rails ( package ) Faces Package ( contents for completion of assembly ) TRANSPORT OF THE ENCLOSURE 2 1 3 5 4 01 05 09 02 06 10 03 07 11 04

OPPOSITE END OF FIRST RAIL ! OPPOSITE END OF FIRST RAIL !

Don´t forget to clean the dirt from drilling holesunder the rails, use vacuum cleaner.

Again make visual check, if the isin perfect line. After that, measure the rails before

drilling opposite end to avoid shift.

first complet rail Check dimensions fromouter edge of pool for sure too ...

Insert the raw-plug into a cleaned hole

Not cleaned dirt may cause decreasestrength of this joint!

Slightly hammer in tight the railto the ground by screws!

21 / 63

99.MP.0056.EN - ASSEMBLING PROCEDURE

STEP - 3

STEP - 5

STEP - 7

STEP - 4

STEP - 6

STEP - 8

Page 22: ASSEMBLING INSTRUCTIONS FOR ENCLOSURES...Rails ( package ) Faces Package ( contents for completion of assembly ) TRANSPORT OF THE ENCLOSURE 2 1 3 5 4 01 05 09 02 06 10 03 07 11 04

Insert the raw-plug into a cleaned hole

Not cleaned dirt may cause decreasestrength of this joint!

Slightly hammer in tight the railto the ground by screws!

... continue drilling and fixingthe opposite end of the rail.

Important to clean the rails of dirt, the best way is touse vacuum cleaner and sweep carefully.

22 / 63

99.MP.0056.EN - ASSEMBLING PROCEDURE

OPPOSITE END OF FIRST RAIL !

OPPOSITE END OF FIRST RAIL !

Don´t forget to clean the dirt from drilling holes under the rails, use vacuum cleaner.

OPPOSITE END OF FIRST RAIL !

OPPOSITE END OF FIRST RAIL !

OPPOSITE END OF FIRST RAIL !

OPPOSITE END OF FIRST RAIL !

STEP - 9

STEP - 11

STEP - 13

STEP - 10

STEP - 12

STEP - 14

Page 23: ASSEMBLING INSTRUCTIONS FOR ENCLOSURES...Rails ( package ) Faces Package ( contents for completion of assembly ) TRANSPORT OF THE ENCLOSURE 2 1 3 5 4 01 05 09 02 06 10 03 07 11 04

Not cleaned dirt may cause decrease

strength of this joint!

BEFORE DRILLING MAKE VISUAL CHECK ,

IF THE RAIL IS IN LINE ! DON´T FORGET FOR CHECK OF DIAGONALS BETWEEN BOTH

RAILS TOO !

DIAGON

ALS( DG1

=DG2

)

Slightly hammer in tight the railto the ground by screws!

Important to clean the rails of dirt, thebest way is to use vacuum cleaner and

sweep carefully.

According to the first rail proceed to exact measurement - fixing the second rail on the opposite side of the pool.

MEASURE THE SECOND RAIL TO MEET 1ST RAIL AXIS WIDTH !

1ST RAIL AXIS WIDTH

( A1 = A2 )

Continue in the same way as the first railhas been fixed ...

CONTINUE IN DRILLING THE SAME WAY AS THE PREVIOUS STEPS OF DRILLING.

REST HOLES ON THIS FIRST RAIL

FIXING THE SECOND RAIL

23 / 63

99.MP.0056.EN - ASSEMBLING PROCEDURE

STEP - 1

STEP - 5

STEP - 3

STEP - 2

STEP - 6

STEP - 4

Page 24: ASSEMBLING INSTRUCTIONS FOR ENCLOSURES...Rails ( package ) Faces Package ( contents for completion of assembly ) TRANSPORT OF THE ENCLOSURE 2 1 3 5 4 01 05 09 02 06 10 03 07 11 04

Put plastic caps on the all holes and slightlybeat them in by rubber hammer

(colour of the caps depends on rails colour )

ULTIMATELY TO CLEAN THE RAILS OF DIRT,

THE BEST WAY IS TO USE SWEEP AND VACUUM

CLEANER AND .WASH THEM BY WATER STREAM

NOT CLEANED RAILS AND DIRT MAY

CAUSE DAMAGE OF ANODIZE COATING!

AFTER CLEAN MAYBE CONTINUE !

AFTER FIX THE RAIL TO THE GROUND PROCEED TO ...

PROCEDURE WITH PLASTIC CAPS !

CLEANING THE RAILS

1 2 3 4

24 / 63

99.MP.0056.EN - ASSEMBLING PROCEDURE

STEP - 1

STEP - 2

STEP - 3

Page 25: ASSEMBLING INSTRUCTIONS FOR ENCLOSURES...Rails ( package ) Faces Package ( contents for completion of assembly ) TRANSPORT OF THE ENCLOSURE 2 1 3 5 4 01 05 09 02 06 10 03 07 11 04

MANIPULATIONTHE SMALLEST FACE

ITEM

ASSEMBLING INSTRUCTIONS FOR ENCLOSURES

Page 26: ASSEMBLING INSTRUCTIONS FOR ENCLOSURES...Rails ( package ) Faces Package ( contents for completion of assembly ) TRANSPORT OF THE ENCLOSURE 2 1 3 5 4 01 05 09 02 06 10 03 07 11 04

Manipulation by minimal two persons (bringing the faces and the elements to the pool area)and find the simpliest and easiest way to the pool area !

Place the smallest face with the inner side on a soft pads material for protect the face against damage.

OUTER SIDETHE SMALLEST FACE

KNIFE SCISSORS

RUBBER SEALING

CUTTING TOOL

FOR RUBBER SEALING

PARALLELISM

PARALLELISM

Lay before front next to in a between rubber sealing and lath-F.a rubber sealing lath-F parallelism line

FINISH OF THE RUBBER SEALING BEFORE PUT OF FACE ON SEGMENT

THE SMALLEST FACE

STEP - 1

STEP - 2

BE CAREFUL WHILE MANIPULATE WITH FACES AND SEGMENTS TO AVOID DAMAGE,

DEFORMATION AND CRATCHING. AND RESPECT TO WEIGHT OF THE EVERY FACE AND SEGMENT

ASSURE SUFICIENT NUMBER OF PEOPLE FOR MANIPULATION WITH THE FACES AND SEGMENT.

26 / 63

99.MP.0056.EN - ASSEMBLING PROCEDURE

MANIPULATION WITH FACES AND SEGMENTS

SMALLEST / LARGEST FACE

SMALLEST FACE

SMALLEST FACE

SMALLEST / LARGEST SEGMENT

RUBBER

SEALING

LATH - F

Page 27: ASSEMBLING INSTRUCTIONS FOR ENCLOSURES...Rails ( package ) Faces Package ( contents for completion of assembly ) TRANSPORT OF THE ENCLOSURE 2 1 3 5 4 01 05 09 02 06 10 03 07 11 04

Make projection from on rubber sealing by help a ruler and pencil marker, then the

rubber sealing is cutting according to this mark.

the angle of face

Start in putting of rubber sealing on side where is lath-f is not riveted

( disengaged ) to doorsill of the smallest face.

STEP - 3

STEP - 4

STEP - 4.1

STEP - 4.2

STEP - 3.1 STEP - 3.2 STEP - 3.3

27 / 63

99.MP.0056.EN - ASSEMBLING PROCEDURE

ADJUSTMENT OF FIRST END OF RUBBER SEALING - THE SMALLEST FACE

FIXING THE FIRST END OF RUBBER SEALING IN LATH-F

MAKE PROJECTION LINE - ANGLE OF FACE ACCORDING TO INNER SIDE FACE PROFILE

DISENGAGED END OF THE LATH-F

CUTTING ACCORDING TO MARK

SMALLEST FACE

SMALLEST FACE

SMALLEST FACE

Page 28: ASSEMBLING INSTRUCTIONS FOR ENCLOSURES...Rails ( package ) Faces Package ( contents for completion of assembly ) TRANSPORT OF THE ENCLOSURE 2 1 3 5 4 01 05 09 02 06 10 03 07 11 04

Make projection from the angle of face on rubber sealing by help a ruler and pencil marker, then the rubber

sealing is cutting according to this mark - same way as like by first end of rubber sealing.

DISENGAGED END OF THE LATH-F

Press this disengegad part of this lath-F with rubber sealing on to the doorsill of this smallest face for

possible marking for cut.

STEP - 6

STEP - 6.1 STEP - 6.2

STEP - 7.1 STEP - 7.2

STEP - 7

STEP - 5.1 STEP - 5.2

28 / 63

ADJUSTMENT OF SECOND END OF RUBBER SEALING - THE SMALLEST FACE

SCREW 3,9 x 6,5 mm ( 2 pce for ensure of rubber sealing in lath-F )

FIX MATERIAL

99.MP.0056.EN - ASSEMBLING PROCEDURE

ENSURE FOR POSITION OF FIRST END OF RUBBER SEALING

STEP - 5

DRILLING AND SCREWING

THROUGH BY ONE WALL OF LATH-FSCREWS FOR ENSURE

A POSITION OF RUBBER SEALING

OUTER SIDE OF FACE

Page 29: ASSEMBLING INSTRUCTIONS FOR ENCLOSURES...Rails ( package ) Faces Package ( contents for completion of assembly ) TRANSPORT OF THE ENCLOSURE 2 1 3 5 4 01 05 09 02 06 10 03 07 11 04

SMALLEST FACE

STEP - 8

STEP - 8.1

STEP - 8.4 STEP - 8.5

DISENGAGED END OF THE LATH-F RIVET TO BACK

99.MP.0056.EN - ASSEMBLING PROCEDURE

29 / 63

FIX MATERIAL

RIVET 4x10 mm A2( rest numbers of rivets for finish fixing of lath-F )

DRILLING AND SCREWING

THROUGH BY ONE WALL OF LATH-F

SCREWS FOR ENSURE

A POSITION OF RUBBER SEALING

OUTER SIDE OF FACE

SCREW 3,9 x 6,5 mm ( 2 pce for ensure of rubber sealing in lath-F )

FIX MATERIAL

FINISH FIXING OF LATH-F

RUBBER SEALING CRAM IN ABOUT 10 MM

~ 1

0 M

M

STEP - 8.2

MAIN REASON FOR CRAM OF RUBBER

STEP - 8.3

Page 30: ASSEMBLING INSTRUCTIONS FOR ENCLOSURES...Rails ( package ) Faces Package ( contents for completion of assembly ) TRANSPORT OF THE ENCLOSURE 2 1 3 5 4 01 05 09 02 06 10 03 07 11 04

STEP - 1

STEP - 2

STEP - 1.1 STEP - 1.2STEP - 1.2 STEP - 1.1

LEFT SIDE OF THE ENCLOSURERIGHT SIDE OF THE ENCLOSURE

PUTTING THE SMALLEST FACE BACK ON THE SEGMENT

THE SMALLEST FACE INSERTED INTO GROOVE OF THE PROFILE OF SEGMENT ( STEP - 1.1 )

THE CORNERS OF THE SMALLEST FACE ALIGNED WITH CORNERS OF SEGMENT ( STEP - 1.2 )

THIS FACE FIXED BY SCREWED IN ALL PREDRILLING HOLES

INTO PROFILE OF THE SEGMENT

30 / 63

99.MP.0056.EN - ASSEMBLING PROCEDURE

SCREW 5,5 x 32 mm

FIX MATERIAL

Page 31: ASSEMBLING INSTRUCTIONS FOR ENCLOSURES...Rails ( package ) Faces Package ( contents for completion of assembly ) TRANSPORT OF THE ENCLOSURE 2 1 3 5 4 01 05 09 02 06 10 03 07 11 04

ITEM

ASSEMBLING INSTRUCTIONS FOR ENCLOSURES

MANIPULATIONTHE LARGEST FACE

Page 32: ASSEMBLING INSTRUCTIONS FOR ENCLOSURES...Rails ( package ) Faces Package ( contents for completion of assembly ) TRANSPORT OF THE ENCLOSURE 2 1 3 5 4 01 05 09 02 06 10 03 07 11 04

Manipulation by minimal two persons (bringing the faces and the elements to the pool area)and find the simpliest and easiest way to the pool area !

32 / 63

99.MP.0056.EN - ASSEMBLING PROCEDURE

Place the largest face with the inner side on a soft pads material for protect the face against damage.

FINISH OF THE RUBBER SEALING BEFORE PUT OF FACE ON SEGMENT

STEP - 1

LARGEST FACE

THE LARGEST FACE

BE CAREFUL WHILE MANIPULATE WITH FACES AND SEGMENTS TO AVOID DAMAGE,

DEFORMATION AND CRATCHING. AND RESPECT TO WEIGHT OF THE EVERY FACE AND SEGMENT

ASSURE SUFICIENT NUMBER OF PEOPLE FOR MANIPULATION WITH THE FACES AND SEGMENT.

MANIPULATION WITH FACES AND SEGMENTS

SMALLEST / LARGEST FACE SMALLEST / LARGEST SEGMENT

STEP - 2

PUTTING AND ENSURE OF THE RUBBER SEALING - THE LARGEST FACE

LARGEST FACE

SCREW 3,9 x 6,5 mm ( complet 4 pce, because 2 pce for ensure of each end rubber sealing in lath-F )

FIX MATERIAL

STEP - 2.1 STEP - 2.3STEP - 2.2

Page 33: ASSEMBLING INSTRUCTIONS FOR ENCLOSURES...Rails ( package ) Faces Package ( contents for completion of assembly ) TRANSPORT OF THE ENCLOSURE 2 1 3 5 4 01 05 09 02 06 10 03 07 11 04

33 / 63

99.MP.0056.EN - ASSEMBLING PROCEDURE

Make projection from on rubber sealing by help a ruler and pencil marker, then the

rubber sealing is cutting according to this mark.

the angle of face

STEP - 3

STEP - 4

STEP - 3.1 STEP - 3.2 STEP - 3.3

ADJUSTMENT OF BOTH END OF RUBBER SEALING - THE LARGEST FACE

MAKE PROJECTION LINE - ANGLE OF FACE ACCORDING TO OUTER SIDE FACE PROFILE CUTTING ACCORDING TO MARK

LARGEST FACE

STEP - 4.1

STEP - 4.3

STEP - 4.2

THE LARGEST FACE INSERTED INTO GROOVE OF THE PROFILE OF SEGMENT ( STEP - 1.1 )

THE CORNERS OF LARGEST FACE ALIGNED WITH CORNERS OF SEGMENT ( STEP - 1.2 )

PUTTING THE LARGEST FACE BACK ON THE SEGMENT

SCREW 5,5 x 32 mm

FIX MATERIAL

Page 34: ASSEMBLING INSTRUCTIONS FOR ENCLOSURES...Rails ( package ) Faces Package ( contents for completion of assembly ) TRANSPORT OF THE ENCLOSURE 2 1 3 5 4 01 05 09 02 06 10 03 07 11 04

POWER CABLELATERAL DOOR

ITEM

ASSEMBLING INSTRUCTIONS FOR ENCLOSURES

Page 35: ASSEMBLING INSTRUCTIONS FOR ENCLOSURES...Rails ( package ) Faces Package ( contents for completion of assembly ) TRANSPORT OF THE ENCLOSURE 2 1 3 5 4 01 05 09 02 06 10 03 07 11 04

POWER CABLE FOR SOLAR MOTORS

35 / 63

99.MP.0056.EN - ASSEMBLING PROCEDURE

THESE STEPS SHOWN NEEDED ADJUSTMENT OF POWER CABLE,

WHICH PREPARED FROM MADE FOR FUTURE AND LATERLY CONNECTION OF SOLAR MOTORS

* Assumption = plastic cap could hold the cable when the plastic cup will remove again for future connection of solar motors.

PLEASE THESE STEPS 1.1 - 1.8 IGNORE - IF THE ENCLOSURE HAVE SOLAR

MOTORS . CONNECTION OF SOLAR MOTORS IS IN ANOTHER ITEM.

STEP - A

STEP - B

STEP B - 1.1

STEP B - 1.4

STEP B - 1.7 STEP B - 1.8

STEP B - 1.2

STEP B - 1.5

STEP B - 1.3

STEP B - 1.6

CUT CABLE ON LENGHT 150 MM

ONLY INSIDE PART OF THE PLASTIC CAP PUT ON THIS SHORT PROJECTING END OF CABLE - ACCORDING TO STEP B - 1.7-1.8

LONG PROJECTING CABLE FROM MADE RUBBER RING TAKE OUT

INSERT THE CABLE INTO THE BEAM PROFILE TO A SHORT PROJECTING PART OF THE CABLE FROM BEAM PROFILE( 15 MM )

15 MM - END OF THE CABLE

INSIDE PART OF PLASTIC CAP PUT ON CABLE

THIS CONNECTION

( PLASTIC CAP + END OF CABLE )

AFTER INSERT TO HOLE

NOW THIS ENCLOSURE WITHOUT SOLAR MOTORS

NOW THIS ENCLOSURE WITH SOLAR MOTORS

THE LARGEST SEGMENT

POWER CABLE

ENTRY

LATERAL DOOR

Page 36: ASSEMBLING INSTRUCTIONS FOR ENCLOSURES...Rails ( package ) Faces Package ( contents for completion of assembly ) TRANSPORT OF THE ENCLOSURE 2 1 3 5 4 01 05 09 02 06 10 03 07 11 04

STEP - 1

THE LATERAL DOOR - IMPORTANT STEPS FOR PUT BACK ON RAILS

FIX THE UPPER RAIL OF THE LATERAL DOOR

36 / 63

STEP - 1.1 STEP - 1.2

UPPER RAIL WITH SCREWS PUT

TO PREDRILLING HOLES FROM MADE

RAIL TIGHTEN TO BOTTOM PROFILES

THE LARGEST SEGMENT

LATERAL DOOR AND UPPER RAILARE OUT FROM ENCLOSURE

FOR TRANSPORT IN WOODEN BOX.

Option of the wheel is possible after take out ofthe end cap of lateral door.

Each end cap for lateral door weren ´t deployedand tapped to travel profile.

UPPER RAIL IS NEED SCREWING BACK TO PREDRILLING HOLES IN MIDDLE PROFILE - H FROM MADE.

UPPERRAIL

NOEND CAP

LATERAL DOOR TRAVEL PROFILE

99.MP.0056.EN - ASSEMBLING PROCEDURE

SCREW

6,3 x 25 mm

FIX MATERIAL

Move of the lateral door will adjust on this segment by helpwith !setting of the wheels on upper travel profile

CUT VIEW FOR DETAIL OF WHEEL

ON UPPER TRAVEL PROFILE

Page 37: ASSEMBLING INSTRUCTIONS FOR ENCLOSURES...Rails ( package ) Faces Package ( contents for completion of assembly ) TRANSPORT OF THE ENCLOSURE 2 1 3 5 4 01 05 09 02 06 10 03 07 11 04

37 / 63

99.MP.0056.EN - ASSEMBLING PROCEDURE

THE LATERAL DOOR - PUT BETWEEN RAILS

Put and set a distance between this wheel and rail too !second wheel of the lateral on upper rail

SLIDE WITH LATERAL DOOR AT CAREFULLY, WHEN INNERHANDLE CROSSING OVER EDGE BEAM PROFILE !

After put of the lateral door between rail, this inner handlefixing to back to door by opposite way than was unassembly !

If inner handle is obstacle for crossing over edge beam profile,so inner handle must go away from door in this moment !

Put and set a distance between this wheel and rail !first wheel of the lateral on upper rail

STEP - 1

STEP - 2

STEP - 4

STEP - 3

SCREWDRIVER - CROSSTHE WHEEL

THE LATERAL DOOR DURING PUTTING IS NEED TO LIFT UP

FOR ENSURE AGAINST DAMAGE OF THE SEGMENT WITH LATERAL DOOR !

Page 38: ASSEMBLING INSTRUCTIONS FOR ENCLOSURES...Rails ( package ) Faces Package ( contents for completion of assembly ) TRANSPORT OF THE ENCLOSURE 2 1 3 5 4 01 05 09 02 06 10 03 07 11 04

38 / 63

99.MP.0056.EN - ASSEMBLING PROCEDURE

THE LATERAL DOOR - LIMIT DOOR STOP ON RAIL FOR THE MAXIMAL CLOSE

STEP - 1

STEP - 1.1

STEP - 1.1

STEP - 1.2

STEP - 1.2

STEP - 1.3

STEP - 1.4 STEP - 1.5

Align inside edge of lateral doormust against inside edge of beam profile

The positon of limit door stop find by help according to maximal close of lateral door !

The wheel stopped before limit door stop, whichthen is riveted to rail of the lateral door.

LIMIT DOOR STOP KEEP IN REACH POSITION AND THEN DRILL AND RIVET THROUGH LIMIT DOOR STOP TO UPPER RAIL

FIX MATERIAL

RIVET 4x10 mm A2( 2 pce of rivets for finish fixing )

LIMIT DOOR STOP( 2 pce for position = maximal close )

Page 39: ASSEMBLING INSTRUCTIONS FOR ENCLOSURES...Rails ( package ) Faces Package ( contents for completion of assembly ) TRANSPORT OF THE ENCLOSURE 2 1 3 5 4 01 05 09 02 06 10 03 07 11 04

39 / 63

99.MP.0056.EN - ASSEMBLING PROCEDURE

STEP - 1.4 STEP - 1.5

AGAIN THIS LIMIT DOOR STOP KEEP IN REACH POSITION,

THEN DRILL AND RIVET THROUGH LIMIT DOOR STOP TO UPPER RAIL

Align the lateral door before middle beam of enclosure,Keep some distance for hand for sufficient use of inner handle

STEP - 1

STEP - 1.1

STEP - 1.2

STEP - 1.3 The positon of limit door stop find by help according to maximal close of lateral door !

THE LATERAL DOOR - LIMIT DOOR STOP ON RAIL FOR THE MAXIMAL OPEN

The wheel stopped limit door stop, which then isriveted to rail of the lateral door.

STEP - 1.1

STEP - 1.2

FIX MATERIAL

RIVET 4x10 mm A2( 2 pce of rivets for finish fixing )

LIMIT DOOR STOP( 2 pce for position = maximal open )

Page 40: ASSEMBLING INSTRUCTIONS FOR ENCLOSURES...Rails ( package ) Faces Package ( contents for completion of assembly ) TRANSPORT OF THE ENCLOSURE 2 1 3 5 4 01 05 09 02 06 10 03 07 11 04

STEP 1 - LARGEST SEGMENT WITH LATERAL DOOR PUT ON GROUND RAIL

LEGEND FOR SINGLE FUTURE STEPS:

STEP 2 - FINISH SETTING FOR WHEELS OF THE LATERAL DOOR

STEP 3 - ALL END CAPS, COVERING LATH FOR LATERALR DOOR PUT BACCK INTO PROFILES

STEP 4 - LOCK OF THE LATERAL DOOR - DRILL HOLE TO BEAM PROFILE FOR PIN OF THE LOCK DOOR HANDLE

STEP-1 STEP-3 STEP-4STEP-2

40 / 63

99.MP.0056.EN - ASSEMBLING PROCEDURE

THE LATERAL DOOR - IMPORTANT STEPS ABOUT COVERING PARTS

end caps for upper rail of the lateral door (2),Now this of the lateral door (1),covering lath for upper rail

end caps for upper travel of the lateral door (3),

don´t put back, because then this same option of the wheel on upper rail will check

after put of this segment on ground rail too !

2

3

1

LATERAL DOOR

SOME END CAPS AND COVERING LATH MUST NOT PUT BACK INTO PROFILES AND RAIL

BEFORE THE FUTURE FINISH SETTING FOR WHEELS OF THE LATERAL DOOR,

WHEN THE LARGEST SEGMENT WILL PUT ON GROUND RAILS !

Page 41: ASSEMBLING INSTRUCTIONS FOR ENCLOSURES...Rails ( package ) Faces Package ( contents for completion of assembly ) TRANSPORT OF THE ENCLOSURE 2 1 3 5 4 01 05 09 02 06 10 03 07 11 04

PUTTINGOF ALL SEGMENTS

ITEM

ASSEMBLING INSTRUCTIONS FOR ENCLOSURES

Page 42: ASSEMBLING INSTRUCTIONS FOR ENCLOSURES...Rails ( package ) Faces Package ( contents for completion of assembly ) TRANSPORT OF THE ENCLOSURE 2 1 3 5 4 01 05 09 02 06 10 03 07 11 04

1.DISTANCE BETWEEN AXES

BE CAREFUL WHILE MANIPULATE WITH OTHER SEGMENTS TO AVOID DAMAGE,

DEFORMATION AND CRATCHING AND RESPECT TO WEIGHT OF THE EVERY SEGMENT

ASSURE SUFICIENT NUMBER OF PEOPLE FOR MANIPULATION WITH THE SEGMENT.

Manipulation by minimal two persons (bringing the other segments to thepool area) and find the simpliest and easiest way to the pool area !

SEGMENT NR.1

STEP 1.1

First stress to put the tracks downas per the drawing width.

Next:STEP 1.2

The segments are “spring loaded”

therefore, one side should be setin the track as the opposite end islifted up and set onto the track.

MANIPULATION WITH OTHER SEGMENTS

PUTTING OF ALL SEGMENTS ON THE RAILS

42 / 63

99.MP.0056.EN - ASSEMBLING PROCEDURE

STEP - 1.1

STEP - 1.1 STEP - 1.1

STEP - 1.1

STEP - 1.2

STEP - 1.2STEP - 1.2

STEP - 1.2

STEP - 1

Page 43: ASSEMBLING INSTRUCTIONS FOR ENCLOSURES...Rails ( package ) Faces Package ( contents for completion of assembly ) TRANSPORT OF THE ENCLOSURE 2 1 3 5 4 01 05 09 02 06 10 03 07 11 04

PUTTING THE SEGMENTS ON THE RAILS

WHILE PUTTING THE ELEMENTS ON THE RAILS TAKE CARE ABOUT SUFFICIENT DISTANCE

BETWEEN ARRESTMENT SHEETS AND THE GROUND ( RISK OF SHEETS OR PAVEMENT DAMAGE )

LIFT UP OF THE SEGMENT

MOVE OF THE SEGMENT

WHEELS ON RAIL,

ARRESTMENT SHEET INTO RAIL

43 / 63

99.MP.0056.EN - ASSEMBLING PROCEDURE

STEP - 2.1

STEP - 2.1

STEP - 2.2

STEP - 2.2

STEP - 2.3

STEP - 2.3

STEP - 2

Page 44: ASSEMBLING INSTRUCTIONS FOR ENCLOSURES...Rails ( package ) Faces Package ( contents for completion of assembly ) TRANSPORT OF THE ENCLOSURE 2 1 3 5 4 01 05 09 02 06 10 03 07 11 04

PUTTING THE SEGMENTS ON THE RAILS

THE SEGMENTS CAN DRIVE OUT FROM RAILS, BECAUSE THE RAILS ARE WITHOUT ENDS OF THE RAIL !

44 / 63

99.MP.0056.EN - ASSEMBLING PROCEDURE

STEP - 3.1

STEP - 3.2

STEP - 3.1.1 ( the smallest face ) STEP - 3.2.1 ( the largest face )

STEP - 3

NOW RAILS ARE WITHOUT ENSURING PARTS ( END OF THE RAIL ) AGAINST MOVEMENT OF THE SEGMENTS !

Page 45: ASSEMBLING INSTRUCTIONS FOR ENCLOSURES...Rails ( package ) Faces Package ( contents for completion of assembly ) TRANSPORT OF THE ENCLOSURE 2 1 3 5 4 01 05 09 02 06 10 03 07 11 04

STEP - 1

45 / 63

1

2

3

LATERAL DOOR

If this setting of lateral door is correct, now put back

these covering parts !

end caps for upper travel of the lateral door (3),

of the lateral door(1),covering lath for upper rail

end caps for upper rail of the lateral door (2),

end caps for bottom rail of the lateral door too.

STEP - 1.5

99.MP.0056.EN - ASSEMBLING PROCEDURE

THE LATERAL DOOR - CHECK SETTING OF THE WHEELS IN UPPER TRAVEL PROFILE

This option is same way as during put of lateral door between rails !

Check again this option of the wheels in upper travel profile - lateraldoor, after put of the largest segment on ground rail.

SCREWDRIVER - CROSS

SCREWDRIVER - CROSS

THE WHEEL

THE WHEEL

Then this upper rail tighten and repeat the setting of wheel again.

If this option of the wheels on upper rail isn´t sufficient, so upper rail of lateral door is possible tomove according to need after untighteen of the screws.

STEP - 1.3

STEP - 1.1

STEP - 1.2

STEP - 1.4

AT FIRST THE RAIL UNTIGHTEN,

MOVE WITH RAIL FOR OPTIMAL DISTANCE AGAINST WHEEL,

AFTER RAIL TIGHTEN BACK TO BOTTOM PROFILES

NOW RAIL TIGHTEN BACK TO BOTTOM PROFILES,

AFTER THAT REPEAT THE SETTING OF WHEEL AGAIN

Page 46: ASSEMBLING INSTRUCTIONS FOR ENCLOSURES...Rails ( package ) Faces Package ( contents for completion of assembly ) TRANSPORT OF THE ENCLOSURE 2 1 3 5 4 01 05 09 02 06 10 03 07 11 04

ALL COVERING PARTS - PUT AND RAP

ON PROFILE BY HELP A RUBBER MALLET

ONLY EACH END PART FOR RAIL

OF THE LATERAL DOOR MUST ENSURE BY HELP

A SCREW ACCORDING TO DETAIL

END PART MUST ENSURE BY HELP A SCREW

46 / 63

99.MP.0056.EN - ASSEMBLING PROCEDURE

STEP - 1

STEP - 1.1

STEP - 1.3

STEP - 1.2

STEP - 1.4

THE LATERAL DOOR - FINISH STEPS FOR ALL COVERING PARTS

SCREW2,9 x 13mm

Page 47: ASSEMBLING INSTRUCTIONS FOR ENCLOSURES...Rails ( package ) Faces Package ( contents for completion of assembly ) TRANSPORT OF THE ENCLOSURE 2 1 3 5 4 01 05 09 02 06 10 03 07 11 04

FINALIZINGTHE RAILS

ITEM

ASSEMBLING INSTRUCTIONS FOR ENCLOSURES

Page 48: ASSEMBLING INSTRUCTIONS FOR ENCLOSURES...Rails ( package ) Faces Package ( contents for completion of assembly ) TRANSPORT OF THE ENCLOSURE 2 1 3 5 4 01 05 09 02 06 10 03 07 11 04

DETAIL nr.1

- 1 pce RAIL ENDING PART = ( number of rivets according to number of segments

+ always an one rivet at more )

THE RAIL ENDING PARTS

FIX MATERIAL

RIVET 4x10 mm A2- 1 pce PLASTIC BACKSTOP = ( 2 pce for join into single rail of each segment )

END OF THE RAIL

DETAIL nr.3

DETAIL nr.2

DETAIL nr.4

FINALIZING THE RAILS

THE PLASTIC BACKSTOP

THE PLASTIC BACKSTOP

AFTER PUTTING THE SEGMENTS ON PROCEED:

- FIXING THE PLASTIC BACKSTOPS FOR ABSORB THE SHOCK OF TRAVEL AND DEFEND FOR REFUSE TO START OF SEGMENTS FROM RAILS- FIXING ENDINGS PARTS AVOID MOVING THE SEGMENTS OFF THE RAILS.

ARRESTMENT SHEET IN TRAVEL MUST

STOPED ON THIS PLASTIC BACKSTOPS !

TRAVEL MUST NOT BUMP /

HIT TO END OF RAIL !

2. DRILL

1. INSERT

PLASTIC BACKSTOP

INSERT

PLASTIC

BACKSTOP

RIVET

48 / 63

99.MP.0056.EN - ASSEMBLING PROCEDURE

BACKSTOPS PUSH INWARD TO FACE OF RAIL AND FIX IT TO THE RAIL BY RIVET.

ADJUSTMENT FOR POSITION OF BACKSTOPS MUST BE SO AS TRAVEL DO NOT BUMP

/ HIT TO END OF RAIL !

Page 49: ASSEMBLING INSTRUCTIONS FOR ENCLOSURES...Rails ( package ) Faces Package ( contents for completion of assembly ) TRANSPORT OF THE ENCLOSURE 2 1 3 5 4 01 05 09 02 06 10 03 07 11 04

DETAIL nr.3

DETAIL nr.1

DETAIL nr.4

DETAIL nr.2

THE RAIL ENDING PARTS

THIS NUMBER OF PLASTIC BACKSTOPS CAN BE DIFFERENT IN EVERY DELIVERY !

IMPORTANT RULE FOR FIX OF PLASTIC BACKSTOPS - USE FOR PLACES,WHICH WILL MORE ABSORB THE SHOCK PER MOVABLE WITH SEGMENTS

CORRECT FIX OF THE RAIL ENDING PARTS WITH PLASTIC BACKSTOPS

CORRECT PUT

PLASTIC CAP PUT TO RAIL ENDING PART

DRILL

RIVET

49 / 63

RIVET 4x10 mm A2( 1 pce RAIL ENDING PART = number of rivets according to number of segments + one rivet at more

FIX MATERIAL

99.MP.0056.EN - ASSEMBLING PROCEDURE

Page 50: ASSEMBLING INSTRUCTIONS FOR ENCLOSURES...Rails ( package ) Faces Package ( contents for completion of assembly ) TRANSPORT OF THE ENCLOSURE 2 1 3 5 4 01 05 09 02 06 10 03 07 11 04

ARRESTMENTTHE SEGMENTS

ITEM

ASSEMBLING INSTRUCTIONS FOR ENCLOSURES

Page 51: ASSEMBLING INSTRUCTIONS FOR ENCLOSURES...Rails ( package ) Faces Package ( contents for completion of assembly ) TRANSPORT OF THE ENCLOSURE 2 1 3 5 4 01 05 09 02 06 10 03 07 11 04

2

ARRESTMENT OF SEGMENTS

Segment nr.4 ( largest )

Segment nr.3

Segment nr.2

Segment nr.1 ( smallest )

PARK ALL THE SEGMENTS TO HAVE THE POOL

CLOSED WITH OVERLAPING OF SEGMENTS

THIS ARRESTMENT OF SEGMENTS SECURE THE ENCLOSURE ESPECIALY AGAINST A CLIMATIC INFLUENCES.

OVERLAPING

OVERLAPING

AFTER CHECKING, IF THE SEGMENTS OVERLAP

EACH OTHER PER A EDGE OF MAIN PROFILE

51 / 63

99.MP.0056.EN - ASSEMBLING PROCEDURE

1

ARRESTMENT OF SEGMENTS - BASIC FUNCTION

UNLOCKED UNLOCKEDLOCKED LOCKED

ARRESTMENT PIN ARRESTMENT LOCK

ARRESTMENT PINS ARE ON LEFT SIDE OF THE ENCLOSURE ALWAYS ! ARRESTMENT LOCKS ARE ON RIGHT SIDE OF THE ENCLOSURE ALWAYS !

THE RESOLUTION OF LEFT OR RIGHT SIDE OF THE ENCLOSURE IS ALWAYS DETERMINED FROM THE PERSPECTIVE OF THE LARGEST FACE!

Page 52: ASSEMBLING INSTRUCTIONS FOR ENCLOSURES...Rails ( package ) Faces Package ( contents for completion of assembly ) TRANSPORT OF THE ENCLOSURE 2 1 3 5 4 01 05 09 02 06 10 03 07 11 04

ARRESTMENT OF SEGMENTS - ADJUSTMENT OF PIN

52 / 63

99.MP.0056.EN - ASSEMBLING PROCEDURE

MIN. DISTANCE 1,5 MM

BETWEEN ANDRAIL PIN

UNLOCKED

LOCKED

THE EXSERTED ARRESTMENT PINKEEPING A MINIMUM DISTANCE ABOVETHE RAIL WHEN IS IN LOCKED POSITION.

1.) Uptighten screw by help imbus 2 mm, which

fix this pin in some position.

LEGEND FOR STEP nr.2:

length of pin from arrestment case.

2.) This pin grab by help with pliers and adjust

screw.

3.) Pull down the 3A and 3A reaching similar

parameters (distance 1,5 mm), after tighten

FLAT PLIERS IMBUS - 2 mm

1

2

3A

3B

STEP - 1

STEP - 3

STEP - 2

WITH UNIVERSAL LATCH LENGTH,

ARRESTMENTS ARE PROVIDED

WHICH NEEDS TO BE ADJUSTED ON JOBSITE.

Page 53: ASSEMBLING INSTRUCTIONS FOR ENCLOSURES...Rails ( package ) Faces Package ( contents for completion of assembly ) TRANSPORT OF THE ENCLOSURE 2 1 3 5 4 01 05 09 02 06 10 03 07 11 04

SEE ON DETAILS !

ITS SHAPE MUST NOT OBSTRUCT

INTO MOVEMENT OF TRAVEL !

IMPORTANT FOR STOPPER

STOPPER

TRAVEL

PIN IN POSITION FOR LOCKED !

STEP - 1

STEP - 3

STEP - 2

STEP - 4

FIX MATERIAL

RIVET 4x10 mm A2- 1 pce STOPPER = ( 2 pce for fix of the stopper for each segment )

ARRESTMENT OF SEGMENTS - ASSEMBLING STOPPER

53 / 63

99.MP.0056.EN - ASSEMBLING PROCEDURE

STOPPER MUST STOP OF MOVING SEGMENTS SAFELY, THEREFORE CENTRE OF STOPPER MUST MAXIMAL.

MOVE THIS SEGMENT

TO OVERLAPING BETWEEN SEGMENTS

Page 54: ASSEMBLING INSTRUCTIONS FOR ENCLOSURES...Rails ( package ) Faces Package ( contents for completion of assembly ) TRANSPORT OF THE ENCLOSURE 2 1 3 5 4 01 05 09 02 06 10 03 07 11 04

ARRESTMENT OF SEGMENTS - ASSEMBLING STOPPER

ARRESTMENT OF SEGMENTS - ASSEMBLING STOPPER

54 / 63

99.MP.0056.EN - ASSEMBLING PROCEDURE

CENTRE THE POSITION OF ARRESTMENT STOPPER

ACCORDING TO THE EXSERTED ARRESTMENT PIN

MAYBE MOVING WITH SEGMENT AWAY FOR EASILY

DRILLING - RIVETING OF STOPPER ON RAIL

DRILL RIVET

STEP - 5

STEP - 1

STEP - 3

STEP - 2

STEP - 6

MOVING WITH SEGMENTS BACK CAREFULLY,

SLOWLY - CHECK EACH OVERLAPING OF SEGMENTS

SLOWLY MOVING VERY SLOWLY MOVING

STOP IN STOPPER

Page 55: ASSEMBLING INSTRUCTIONS FOR ENCLOSURES...Rails ( package ) Faces Package ( contents for completion of assembly ) TRANSPORT OF THE ENCLOSURE 2 1 3 5 4 01 05 09 02 06 10 03 07 11 04

THE LARGEST SEGMENT + OTHER SEGMENTS ARE IN PARKING POSITION - MAXIMAL SAFE USE OF THE POOL.

THE SEGMENTS SEGMENT + OTHER SEGMENTS ARE IN PARKING POSITION - MAXIMAL SAFE USE OF THE POOL.

LEGEND: THE SMALLEST FACE

STOP FOR

OTHER SEGMENTS

STOP FOR LARGEST SEGMENT

ACCORDING LARGEST FACE

PLASTIC BACKSTOP WHEEL IN TRAVEL STOPPER

DISTANCE ACCORDING LARGEST FACETHE LARGEST SEGMENTARRESTMENT SHEET ENDING PART OF RAIL

2

5

5

5

5

2

2

2

1

3

3

3

7

1 3 5 7

2 4 6 8

6

8

4

ARRESTMENT OF SEGMENTS - PARKING POSITION FOR ALL SEGMENTS

PARKING POSITION

DETAIL nr.A / ISO VIEW

DETAIL nr.B / TOP VIEW

55 / 63

99.MP.0056.EN - ASSEMBLING PROCEDURE

Page 56: ASSEMBLING INSTRUCTIONS FOR ENCLOSURES...Rails ( package ) Faces Package ( contents for completion of assembly ) TRANSPORT OF THE ENCLOSURE 2 1 3 5 4 01 05 09 02 06 10 03 07 11 04

FACE ARRESTMENTSITEM

ASSEMBLING INSTRUCTIONS FOR ENCLOSURES

Page 57: ASSEMBLING INSTRUCTIONS FOR ENCLOSURES...Rails ( package ) Faces Package ( contents for completion of assembly ) TRANSPORT OF THE ENCLOSURE 2 1 3 5 4 01 05 09 02 06 10 03 07 11 04

FACE ARRESTMENT

FACE ARRESTMENT - FIXING TO FACE

PUT THIS COMPONENT ...

ARRESTMENT COMPONENTS

... ON DOORSILL OF FACE AND MARK HOLES ...

BOTTOM OF DOORSILL

HOLE OF COMPONENT

STEP - 2

HOLE OF COMPONENT MUST BE NEAR OF LOWER EDGE OF

DOORSILL !

RISK FOR DAMAGE - CRACK OF POLYCARBONATE IN FACE !

57 / 63

99.MP.0056.EN - ASSEMBLING PROCEDURE

FIX MATERIAL

RIVET 4x10 mm A2( 2 pce for join of the of sleeve - face arrestment )

THIS ARRESTMENT COMPONENTS SECURE THE ENCLOSURE

ESPECIALY AGAINST A CLIMATIC INFLUENCES.

THIS FACE ARRESTMENT ASSEMBLY ONLY ON FACES, WHEN COVER IS CLOSED !

STEP - 1

STEP - 2

Page 58: ASSEMBLING INSTRUCTIONS FOR ENCLOSURES...Rails ( package ) Faces Package ( contents for completion of assembly ) TRANSPORT OF THE ENCLOSURE 2 1 3 5 4 01 05 09 02 06 10 03 07 11 04

UNLOCKED ARRESTMENT LOCKED ARRESTMENT

MARK A POSITION OF PLASTIC INSERT ON GROUND

STEP - 6

CAREFULL DRILLING A HOLE INTO A PAVEMENT OR GROUND !

RISK FOR DAMAGE - CRACK OF PAVEMENT OR GROUND !!!

INSERT FOR PAVEMENT - DRILLING INTO PAVEMENT OR GROUND

FACE ARRESTMENT - BASIC FUNCTION

USE DRILL FOR DRILLING ...Ø15MM

... PUSH PLASTIC INSERT TO HOLE

58 / 63

... FOR DRILLING AND ... ... FIXING - RIVET TO DOORSILL

STEP - 3

STEP - 5

STEP - 7

STEP - 4

STEP - 6

STEP - 8

99.MP.0056.EN - ASSEMBLING PROCEDURE

Page 59: ASSEMBLING INSTRUCTIONS FOR ENCLOSURES...Rails ( package ) Faces Package ( contents for completion of assembly ) TRANSPORT OF THE ENCLOSURE 2 1 3 5 4 01 05 09 02 06 10 03 07 11 04

THE SMALLEST FACE - ADJUST OF THE RUBBER SEALING AGAINST RAIL

THE LARGEST FACE - ADJUST OF THE RUBBER SEALING AGAINST RAIL

59 / 63

99.MP.0056.EN - ASSEMBLING PROCEDURE

KNIFE

KNIFE

SCISSORS

SCISSORS

RECOMMENDED CUT FOR RUBBER

RECOMMENDED CUT FOR RUBBER

TOOL FOR ADJUST OF THE RUBBER SEALING

TOOL FOR ADJUST OF THE RUBBER SEALING

STEP - 5

STEP - 6

Page 60: ASSEMBLING INSTRUCTIONS FOR ENCLOSURES...Rails ( package ) Faces Package ( contents for completion of assembly ) TRANSPORT OF THE ENCLOSURE 2 1 3 5 4 01 05 09 02 06 10 03 07 11 04

FINALIZATIONITEM

ASSEMBLING INSTRUCTIONS FOR ENCLOSURES

Page 61: ASSEMBLING INSTRUCTIONS FOR ENCLOSURES...Rails ( package ) Faces Package ( contents for completion of assembly ) TRANSPORT OF THE ENCLOSURE 2 1 3 5 4 01 05 09 02 06 10 03 07 11 04

STEP - 1

FINALIZATION FOR DOOR HANDLE ON LATERAL DOOR

61 / 63

99.MP.0056.EN - ASSEMBLING PROCEDURE

STEP - 1.1

STEP - 1.3

STEP - 1.2

STEP - 1.4

DRILL THROUGH LATERAL DOOR,

THIS DOOR USE AS DRILLING TEMPLATE

PLASTIC CAPS TAKE OUT, DOOR HANDLE

UNSCREWED FROM LATERAL DOOR

DOOR HANDLE TAKE AWAY AND LATERAL

DOOR KEEP IN CLOSED STATUS

PUT TO HOLE SOME PLASTIC RING FOR PIN

DOOR HANDLE - UNLOCK

DRILL 11,9mm

DIAMETER

11,9mm

LATERAL DOOR

LATERAL DOOR

BEAM PROFILE

BEAM PROFILE

DOOR HANDLE - LOCK

Make hole to beam profile under lateral door ( diameter 11,9 mm for hole ) for lock function of the door handle.

Lateral door is closed and this door use as like a drilling template.

After drilling this outer door handle fixing to back to lateral door by opposite waythan was unassembly !

Page 62: ASSEMBLING INSTRUCTIONS FOR ENCLOSURES...Rails ( package ) Faces Package ( contents for completion of assembly ) TRANSPORT OF THE ENCLOSURE 2 1 3 5 4 01 05 09 02 06 10 03 07 11 04

DETAIL nr.1 - CLEAN ALL PARTS OF THE ENCLOSURE, LEADING LINES INCLUDED.

DETAIL nr.2 - CHECK FUNCTIONALITY OF ALL PARTS AND OF ENTIRE ENCLOSURE.

THE POLYETHYLENE MASKING (PLASTIC SHEETS/FOIL) IMMEDIATELY FROM THE

PANELS DURING OR IMMEDIATELY AFTER INSTALLATION.

MUST BE REMOVED

IF IT IS REMOVED AT A LATER TIME, IT MAY BE VERY DIFFICULT IF NOT IMPOSSIBLE TO REMOVE AS IT WILL

STICK TO THE PANEL. IN HOT CLIMATES, EVEN 24 HOURS AFTER THE INSTALLATION IS COMPLETED IT

MAY BE TOO LATE TO REMOVE.

FINALIZATION

REMOVE OF THE PROTECTION FOIL FROM ALL POLYCARBONATE

DETAIL nr.2DETAIL nr.1

PROTECTION FOIL REMOVE FOIL

DETAIL nr.2

CLEAN A PLACE OF ASSEMBLING AND RESTORE ALL THE OBSTACLES, WHICH HAD TO BE REMOVED

BEFORE THE MANIPULATION WITH SEGMENTS TOO.

DETAIL nr.1

CLEAN ALLARRESTMENTS FOR SEGMENTSFACE ARRESTMENTS

HANDLE / LOCKOPEN LATERAL DOOR

CHECK FUNCTIONALITY OF ALL PARTS

MOVABLE WITH SEGMENTS

62 / 63

99.MP.0056.EN - ASSEMBLING PROCEDURE

Page 63: ASSEMBLING INSTRUCTIONS FOR ENCLOSURES...Rails ( package ) Faces Package ( contents for completion of assembly ) TRANSPORT OF THE ENCLOSURE 2 1 3 5 4 01 05 09 02 06 10 03 07 11 04

ASSEMBLING INSTRUCTIONS FOR ENCLOSURES

STANDARD ENCLOSUREEND OF ASSEMBLY

Assembling instruction 99.MP.0058.EN ( connection of the solar motors )

ENCLOSURE -standard version isassembled,

assemblinginstruction ofanotherparts is includedin:

Assembling instruction 99.MP.0057.EN ( side change of the lateral door )

63 / 63

99.MP.0056.EN - ASSEMBLING PROCEDURE