For Senior Design Project P13051, PIV in a Lung Model. These documents describe how to assemble each component of the system. Assembly Procedure s

Upload: doananh

Post on 01-Apr-2018

219 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: Assembly Procedures - Rochester Institute of …edge.rit.edu/content/P13051/public/WorkingDocuments... · Web viewAssembly ProceduresFor P13051, PIV in a Lung Model Assembly Procedures

For Senior Design Project P13051, PIV in a Lung Model. These documents describe how to assemble each component of the system.

Assembly Procedures

For P13051, PIV in a Lung Model

Page 2: Assembly Procedures - Rochester Institute of …edge.rit.edu/content/P13051/public/WorkingDocuments... · Web viewAssembly ProceduresFor P13051, PIV in a Lung Model Assembly Procedures

Table of ContentsLung Tank and Model..................................................................................................................................2

Tank.........................................................................................................................................................2

Lung Model..............................................................................................................................................2

Pump System...............................................................................................................................................3

Pump Installation.....................................................................................................................................4

Piping Installation....................................................................................................................................4

Common Headers....................................................................................................................................7

Disconnect Instructions...........................................................................................................................8

Pressure System..........................................................................................................................................9

Connection Procedure.............................................................................................................................9

pg. 1P13051: Assembly Instructions

Page 3: Assembly Procedures - Rochester Institute of …edge.rit.edu/content/P13051/public/WorkingDocuments... · Web viewAssembly ProceduresFor P13051, PIV in a Lung Model Assembly Procedures

Lung Tank and Model

Parts Needed:

Part # Description Quantity Supplier Part # Supplier1 Acrylic Tank, 24"x24"x24", 1/2" thick 1 unit NA Steve Ipacs

11 Acrylic Sheet, 12"x12", 1" thick 2 unit 8560K357 McMaster-Carr54 Masterkleer PVC Tubing, 1/2" ID 1 ft 5233k84 McMaster-Carr49 Clear K&B Silicone II 9.8 1 unit 48285 Lowe’s57 Loctite 10G 3-Pack 1 pkg 7864 Lowe’s63 Double sided adhesive foam 1 unit Lowe’s14 Locking Ball Joint (Vanguard) 1 unit BBH-100 Amazon7 Acrylic Sheet, 24"x24", 1/4" thick 1 unit 8560K214 McMaster-Carr

Tank1. Machine 8 holes in the wall of the acrylic tank (Part 1) as specified in drawing2. Machine 8 manifolds out of acrylic, as specified in drawing, using Part 11 (4 manifolds per sheet)

3. Affix through wall connectors to the inside of the tank walls, lining up the hole pattern with the tank holes, covering contact area with super glue (57).

a. Apply a generous amount of silicone (49) to seal around the edge of each connector4. Machine tank lid from 24”x24” acrylic sheet (7) as specified in drawing

Lung Model1. Stick ½” tubing (54) over the outside of mouth opening and glue in place using super glue (57). 2. Hold firmly in place until glue dries (about 30 seconds).3. Add a layer of epoxy around the seam between the mouth and tubing to ensure it is a strong

connection. Let the model sit overnight.4. Attach the top of the lung model to small metal plate using double sided adhesive foam (63)5. Place ball joint (14) on tank lid with ball joint attachment sticking through the 2” hole in the lid. 6. Screw plate and lung model into ball joint so that it is attached to the lid.

pg. 2P13051: Assembly Instructions

Page 4: Assembly Procedures - Rochester Institute of …edge.rit.edu/content/P13051/public/WorkingDocuments... · Web viewAssembly ProceduresFor P13051, PIV in a Lung Model Assembly Procedures

7. Thread the other end of the ½” tubing through the 0.8” hole in the tank lid

Pump System

Parts Needed:

Part # Description Quantity Supplier Part # Supplier

15H75M Gear Pump 1 unit

H75M SiewertVariable Frequency Drive 1 unitMotor 1 unit

54 Masterkleer PVC Tubing, 1/2" ID 10 feet 5233k84 McMaster-Carr17 High-Pressure PVC Tubing, 1'' ID 2 feet 5238K778 McMaster-Carr18 High-Pressure PVC Tubing, 1.5'' ID 10 feet 52375K19 McMaster-Carr20 Tube clamps, 1.5'' 1 Package* 9579K84 McMaster-Carr21 Tube clamps, 1'' 1 Package* 5246K73 McMaster-Carr22 Tube clamps, 3/4" 1 Package* 5246K72 McMaster-Carr23 Tube clamps, 1/2" 1 Package* 5246K67 McMaster-Carr

51 1.5’’ to 1’’ reducing barbed coupling 1 unit 1429-211 Waterford Garden

24 Tube to pipe adapter, 1.25'', 1.5'' 1 Package+ 5372K151 McMaster-Carr

58 1’’ to 0.5’’ reducing barbed coupling 1 units 64291 US Plastics

52 1.5'' tube to 1.5 NPT adapter 3 units 61160 US Plastics27 Valve, ball, 1.5'' 2 units 47865K27 McMaster-Carr28 Valve, ball, 1.25'' 1 unit 47865K26 McMaster-Carr29 Pipe, 1-1/2'', 4'', Male-Male 2 units 44615K468 McMaster-Carr30 Coupling, 1 1/2'' 2 units 44605K188 McMaster-Carr31 Bulkhead, 1.5'' 2 units BF1.5THD1-O jehmco40 Manifold, 4 port, 90deg 1 unit MS1004-90 A1 manifold41 Manifold, 10 port, 90deg 4 units MS10010-90 A1 manifold

53 Tube to pipe, adapter, 3/8NPT, 1/2'' 1 Package* 5372K124 US Plastics

43 Tube to pipe, adapter, 3/8NPT, 3/4'' 8 Package* 5372K149 McMaster-Carr

44 Tube to pipe, adapter, 1/2NPT, 3/4'' 1 Package* 5372K132 McMaster-Carr

45 Tube to pipe adapter, 1/2NPT, 1'' 1 Package* 5372K143 McMaster-Carr46 High-Pressure PVC Tubing, 3/4" ID 10 feet 5238K768 McMaster-Carr9 Reservoir 1 unit 4439T15 McMaster-Carr

*Package = 10 units; +Package = 5 units

pg. 3P13051: Assembly Instructions

Page 5: Assembly Procedures - Rochester Institute of …edge.rit.edu/content/P13051/public/WorkingDocuments... · Web viewAssembly ProceduresFor P13051, PIV in a Lung Model Assembly Procedures

Pump Installation1. Mount pump (Part 15) to wood table or rubber mat2. Hook up VFD to 230 VAC 3 phase power and place controller in an easily accessible place. See

VFD Quick Start guide for more information. 3. On the suction side, everything from the tank to the pump should be 1.5” or larger to ensure

good liquid flow into the pump. Coming out of the pump, you should maintain 1.5” as far as you can until you have to branch off or adapt down to connect to your model.

4. Any questions can be directed to Bruce Javits of Siewert Equipment, 585-482-9640, [email protected].

Piping InstallationThe schematic attached in the appendix is provided as a guide for final installation. The pump will initially be set up for inhalation. Instructions for disassembly are included. Use pipe thread tape for all threaded connections and hose clamps for all barbed connections.

1. Modify the Reservoir tank (9)a. Drill a 2 3/8 in hole near the top of the tank. This will be used by the outlet tube to

return the glycerin mixture to the tank. b. On the opposite side, drill a 2 3/8 in hole, 5 inches from the bottom of the tank. This will

be used by the suction side of the pump.

pg. 4P13051: Assembly Instructions

Page 6: Assembly Procedures - Rochester Institute of …edge.rit.edu/content/P13051/public/WorkingDocuments... · Web viewAssembly ProceduresFor P13051, PIV in a Lung Model Assembly Procedures

2. Insert 1.5’’ bulkhead (31) into the two holes drilled into the reservoir tank. Screw in a 1.5’’ pipe to 1.5’’ tube barbed adapter (52) into each bulkhead.

3. Take the 2 - 1.5’’ (27) ball valve and insert a 1.5’’ pipe to 1.5’’ tube barbed adapter (52) into each side.

pg. 5P13051: Assembly Instructions

Page 7: Assembly Procedures - Rochester Institute of …edge.rit.edu/content/P13051/public/WorkingDocuments... · Web viewAssembly ProceduresFor P13051, PIV in a Lung Model Assembly Procedures

4. Take the 1.25’’ ball valve (28) and insert a 1.25’’pipe to 1.5’’ tube barbed adapter (24) into each side of the ball valve.

5. Insert the 4’’ long, 1.5’’ NPT pipe (29) into the outlet side of the pump. Insert 1.5’’ NPT coupling (30) onto the end of the pipe. Insert a 1.5’’ pipe to 1.5’’ tube barbed adapter (52) into the coupling. Repeat for suction side of tank.

pg. 6P13051: Assembly Instructions

Page 8: Assembly Procedures - Rochester Institute of …edge.rit.edu/content/P13051/public/WorkingDocuments... · Web viewAssembly ProceduresFor P13051, PIV in a Lung Model Assembly Procedures

6. Insert approximately 6 in of tubing on to the 1.5’’ pipe to 1.5’’ tube barbed adapter (52) at point 2 (in reference to the above schematic.) Use the correct hose clamp to secure the connection. Connect a modified 1.5’’ ball valve (27) to the end of the tube and secure with the correct size hose clamps.

7. Using 1.5’’ tubing, connect the modified 1.5’’ ball valve (27) located on the outlet side of pump to the 1.5’’ to 1’’ reducing barbed coupling (51). Use minimum amount of 1.5’’ tubing (18) and secure with the correct hose clamp.

8. Using 1’’ tubing, connect the 1.5’’ to 1’’ reducing barbed coupling (51) to the 1’’ to 0.5’’ reducing barbed coupling (58). Use the minimum amount of 1’’ tubing (17) and secure with the correct size hose clamp.

9. Connect other end of 1’’ to 0.5’’ reducing barbed coupling (58) to lung model using the minimum necessary amount of ½’’ tubing (54).

10. Connect 1.5’’ tubing (18) from the 1.5’’ pipe to 1.5’’ tube barbed adapter (52) on the suction side of pump to a modified 1.5’’ ball valve (27). Connect 1.5’’ tubing (18) from the other side of the ball valve to the 1.5’’ pipe to 1.5’’ tube barbed adapter (52) located at the bottom of the reservoir tank. Secure all connection with the correct size hose clamp.

pg. 7P13051: Assembly Instructions

Page 9: Assembly Procedures - Rochester Institute of …edge.rit.edu/content/P13051/public/WorkingDocuments... · Web viewAssembly ProceduresFor P13051, PIV in a Lung Model Assembly Procedures

Common Headers1. Insert 3/8’’ pipe to 1/2’’ tube barbed adapter (53) into each 3/8’’ port of the 20 port, 90 degree

manifold. Repeat for remaining 3 manifolds (41).2. Insert 1/2’’ pipe to 3/4’’ tube barbed adapter (44) into one 1/2’’ port of each 20 port, 90 degree

manifold (41).3. Insert 3/8’’ pipe to 3/4’’ tube barbed adapter (43) into each 3/8’’ port of the 4 port, 90 degree

manifold (40).4. Insert 1/2’’ pipe to 1’’ tube barbed adapter (45) into one 1/2’’ port of 4 port, 90 degree manifold

(40).

5. Insert threaded plug into every remaining hole on both manifolds.6. Insert tubing from needle valve onto the 3/8’’ pipe to 1/2’’ tube barbed adapter (53)on the 10

port, 90 degree manifold (41). Organize outlets so that similar flow rates are seen in each manifold. (example: group generation 4 outlet with generation 16 outlets) Secure with correct size hose clamp.

7. Connect 3/4’’ tubing (46) from the 1/2’’ pipe to 3/4’’ tube barbed (44) on the 10 port, 90 degree manifold (41) to the 3/8’’ pipe to 3/4’’ tube barbed adapter (43) on the 4 port, 90 degree manifold (40). Use minimum amount of tubing. Secure with correct size hose clamp.

8. Connect the 1/2’’ pipe to 1’’ tube barbed adapter (45) of 4 port, 90 degree manifold (40) to the 1.5’’ to 1’’ tube barbed reducing coupling (51). Use 1’’ tubing (17) and a length of 6 inches. Secure with correct size hose clamp.

9. Connect 1.5’’ tubing (18) from the 1.5’’ to 1’’ tube barbed reducing coupling (51) to the 1.25’’ ball valve (28) using the minimum amount of tubing. Secure with correct size hose clamp.

10. Connect the 1.25’’ pipe to 1.5’’ tube barbed adapter (24) of the 1.25’’ ball valve (28) to the 1.5’’ pipe to 1.5’’ tube barbed adapter (52) located at the top of the reservoir tank. Use 1.5’’ tubing (18) and the minimum amount of tubing. Secure with correct size hose clamp.

pg. 8P13051: Assembly Instructions

Page 10: Assembly Procedures - Rochester Institute of …edge.rit.edu/content/P13051/public/WorkingDocuments... · Web viewAssembly ProceduresFor P13051, PIV in a Lung Model Assembly Procedures

Disconnect Instructions1. Remove power from the pump motor.2. Close the three ball valves. 3. Remove tubing from 1.25’’ pipe to 1.5’’ tube barbed adapter (24) of the 1.25’’ ball valve (28)

that connects to the 1.5’’ bulkhead (31). Place a cap on the 1.5’’ tubing (18). 4. Remove tubing from the 1.5’’ pipe to 1.5’’ tube barbed adapter (52) of the 1.5’’ ball valve (27)

located on the suction side of the pump, closest to the pump. Place a cap on the 1.5’’ tubing (18).

5. Remove tubing from the 1.5’’ pipe to 1.5’’ tube barbed adapter (52) of the 1.5’’ ball valve (27) located on the outlet side of the pump, closest to the pump. Place a cap on the 1.5’’ tubing (18).

6. Using the attached diagram as a guide, reconnect the system as shown. Ensure all connections are secured with a hose clamp.

7. Open all three ball valves.

Fabrication

The reservoir tank needs to be modified in order to install the two 1.5’’ bulkheads. Two holes need to be drilled on opposite sides of the tank, one at the top and another at the bottom.

Facilities

Installing the tubing and the pump must be done in laser lab, with every component in its final location. All other steps can be carried out in the senior design lab.

Schedule

For the small scale assembly (20 outlets), the assembly will take approximately 8 hours for one person. The large scale assembly (80 outlets) will take approximately 12 hours for one person.

Personnel Requirements

This process can be completed by one person if schedule permits. It can be accomplished by any team member.

pg. 9P13051: Assembly Instructions

Page 11: Assembly Procedures - Rochester Institute of …edge.rit.edu/content/P13051/public/WorkingDocuments... · Web viewAssembly ProceduresFor P13051, PIV in a Lung Model Assembly Procedures

Pressure System

Parts needed:

Part # Description Quantity Supplier Part # Supplier54 Masterkleer PVC Tubing, 1/2" ID (ft) 50 5233k84 McMaster-Carr66 Clear Polyurethane Tubing 1/4" OD (ft) 10 5195T64 McMaster-Carr67 Tubing (1/8") (ft) 10 TYUTH-31618-100 OMEGA64 1/4 to 1/2 expansion coupling (10 per unit) 2 1VRW6 Grainger34 Minature Voltage Sensor 17 PX40-100G5V OMEGA35 Needle Valve 17 22325 US Plastics37 T-Splitter (10 per unit) 2 3YNE5 Grainger39 1/4 to 1/8 reducing coupling (10 per unit) 2 1VRW3 Grainger

53 1/2" Nylon Threaded Adapter With 3/8 NPT Thread 17 A6-8BN US Plastics

Connection Procedure1. With model secured in tank push ¼” OD tubing (66) into the push-to-connect adapter on the

desired outlet of the lung model.2. Applying small amount of adhesive to the 1/4” barb X 1/2” barb expansion coupling (64), push

1/4” tubing (66) on one end and ½” ID tubing (54) on the other end.3. Running ½” tubing (54) to tank wall connect this to the 3/8” NPT X 1/2” barb adapter (53) that is

screwed into the manifold.4. An identical 3/8” NPT X 1/2” barb (53) should be coming out of the wall on the other side of the

wall, connect ½” tubing (54) to the barb and connect other end to ½” end of T splitter (37) after applying small amount of adhesive.

5. The ½” tubing (54) should then be connected to the opposite side of the T splitter (37) and then be connected to the Needle Valve (35) in the same fashion.

6. Connect ¼” tubing (66) to the unconnected outlet of the T splitter with adhesive and run to the 1/4” X 1/8” reducer (39) connecting in the same fashion.

7. Attach the 1/8” tubing (67) to the reducer (39) with adhesive then connect free end to pressure sensor (34) with adhesive as well.

8. Sensor (34) should be appropriately hooked up on breadboard according to sensor calibration documentation.

pg. 10P13051: Assembly Instructions