assessment of the capacity at the grtgaz / tigf interface
DESCRIPTION
Assessment of the capacity at the GRTgaz / TIGF interface. South Gas Regional Initiative – 2 nd Implementation Group meeting. GRTgaz / TIGF interface : Physical (1/2). Map of the area with the pipeline system of GRTgaz and TIGF:. GWh/d. GWh/d. TIGF->GRTgaz (Castillon). TIGF->GRTgaz (Cruzy). - PowerPoint PPT PresentationTRANSCRIPT
2006 December 11th
ERGEG South GRI – 2nd IG
Assessment of the capacity at the GRTgaz / TIGF interface
South Gas Regional Initiative – 2nd Implementation Group meeting
2006 December 11th
ERGEG South GRI – 2nd IG
- 2 -
GRTgaz / TIGF interface : Physical (1/2)
Map of the area with the pipeline system of GRTgaz and TIGF:
2006 December 11th
ERGEG South GRI – 2nd IG
- 3 -
GRTgaz / TIGF interface : Physical (2/2)
Capacity physically available at both points (current plans):GWh/d TIGF->GRTgaz (Castillon) GRTgaz->TIGF (Castillon)
Exit TIGF Entry GRTgaz
Exit GRTgaz Entry TIGF
2007 S: 100W: 50
S: 20W: 30
S: 110W: 90
S: 110W: 90
2008 S: 180W:180
S: 180W:180
S: 180W:150
S: 180W:150
2009 S: 180W:180
S: 180W:180
S: 180W:150
S: 180W:150
2010 S: 180W:180
S: 180W:180
S: 180W:150
S: 180W:150
2011 S: 180W:180
S: 180W:180
S: 180W:150
S: 180W:150
GWh/d TIGF->GRTgaz (Cruzy) GRTgaz->TIGF (Cruzy)
Exit TIGF Entry GRTgaz
Exit GRTgaz Entry TIGF
2007 S: 100W:20
S: 20W:20
S: 180W:170
S: 180W:170
2008 S: 30W: 30
S: 30W: 30
S: 190W:180
S: 190W:180
2009 S: 30W: 30
S: 30W: 30
S: 190W:180
S: 190W:180
2010 S: 30W: 30
S: 30W: 30
S: 190W:180
S: 190W:180
2011 S: 30W: 30
S: 30W: 30
S: 190W:180
S: 190W:180
Note:S = Summer capacity W= Winter capacity
2006 December 11th
ERGEG South GRI – 2nd IG
- 4 -
GRTgaz / TIGF interface : Contractual (1/2)
Two contractual links are offered to shippers:• Hérault: between “GRTgaz Sud” and TIGF• Dordogne: between “GRTgaz Ouest” and TIGF
Additionally, GRTgaz purchases capacity from TIGF for the internal needs of the “GRTgaz Sud” zone (invisible to shippers)
TIGF
PEG
Sud
PEG
Ouest
Montoir
Biriatou
Capacity bought by GRTgaz on TIGF’s network
Entry capacity offered to shippers by the TSOs
Exit capacity offered to shippers by the TSOs
Contractual entry-exit point
Contractual LNG entry point
Larrau
Hérault
Dordogne
Fos Dordogne
Montoir
2006 December 11th
ERGEG South GRI – 2nd IG
- 5 -
GRTgaz / TIGF interface : Contractual (2/2)
Annual capacity (at year end) is as follows:(Total / Booked / Available for Firm and Interruptible)
GWh/d TIGF->GRTgaz (Hérault) GRTgaz->TIGF (Hérault)
Exit TIGF Entry PEG Sud
Exit PEG Sud
Entry TIGF
2007 F: 10 / 7 / 3I: 20 / 0 / 20
F: 50 / 50 / 0I: 175 / 150 / 25
2008 F: 20 / 5 / 15I: 30 / 0 / 30
F: 285 / 215 / 70I: 0 / 0 / 0
2009 F: 20 / 5 / 15I: 30 / 0 / 30
F: 285 / 215 / 70I: 0 / 0 / 0
2010 F: 20 / 5 / 15I: 30 / 0 / 30
F: 285 / 215 / 70I: 0 / 0 / 0
2011 F: 20 / 5 / 15I: 30 / 0 / 30
F: 285 / 215 / 70I: 0 / 0 / 0
GWh/d TIGF->GRTgaz (Dordogne) GRTgaz->TIGF (Dordogne)
Exit TIGF Entry PEG Ouest
Exit PEG Ouest
Entry TIGF
2007 F: 0 / 0 / 0 I: 40 / 5 / 35
F: 43 / 34 / 9I: 13 / 11 / 2
2008 F: 0 / 0 / 0I: 40 / 5 / 35
F: 43 / 34 / 9I: 13 / 0 / 13
2009 Not relevant Not relevant
2010 Not relevant Not relevant
2011 Not relevant Not relevant
Note: from 2009 PEG Ouest will cease to exist as the balancing zones in the North of France will be merged.
2006 December 11th
ERGEG South GRI – 2nd IG
- 6 -
Utilisation rate in 2005/06
Utilisation rate data are for the period 01/01/2005 to 30/11/2006Hérault (GRTgaz data) (Negative value means entry onto GRTgaz
Network)Commercial (GWh/d) From 50 (F) + 175 (I) to - 10 (F) - 20 (I)
Average daily flow (GWh/d) 99.2
Maximum daily flow (GWh/d) 225.4
Minimum daily flow (GWh/d) - 3.0
Average utilisation rate (GRTgaz -> TIGF) (%)
198.3% of annual firm capacity[1], 44.1% of F+I
[1] Additional capacity is sold as monthly firm capacity in the summer.
Dordogne (GRTgaz data) (Negative value means entry onto GRTgaz Network)
Commercial (GWh/d) From 43 (F) + 13 (I) to - 40 (I)
Average daily flow (GWh/d) 42.0
Maximum daily flow (GWh/d) 59.4
Minimum daily flow (GWh/d) - 0.5
Average utilisation rate (GRTgaz -> TIGF) (%)
97.7% of annual firm capacity, 74.4% of F+I
2006 December 11th
ERGEG South GRI – 2nd IG
- 7 -
Capacity published on GRTgaz’ website (1/2)
Exit capacity in 200701/2007 02/2007 03/2007 04/2007 05/2007 06/2007 07/2007 08/2007 09/2007 10/2007 11/2007 12/2007
Capacité ferme mensuelle / monthly firm Capacity 50 000 50 000 50 000 50 000 210 000 210 000 210 000 210 000 210 000 50 000 50 000 50 000Capacité ferme annuelle / annual firm Capacity 50 000 50 000 50 000 50 000 50 000 50 000 50 000 50 000 50 000 50 000 50 000 50 000Capacité ferme souscrite / subscribed firm Capacity (*) 50 000 50 000 50 000 50 000 50 000 50 000 50 000 50 000 50 000 50 000 50 000 50 000Capacité ferme disponible pour réservation mensuelle / available firm Capacity for monthly booking
0 0 0 0 43 750 43 750 43 750 43 750 43 750 0 0 0
Capacité ferme disponible pour réservation annuelle / available firm Capacity for annual booking (**)
0 0 0 0 0 0 0 0 0 0 0 0
Capacité restituable / Releasable Capacity 0 0 0 0 0 1 000 1 000 1 000 1 000 1 000 1 000 1 000Capacité interruptible / Interruptible Capacity 175 000 175 000 175 000 175 000 175 000 175 000 175 000 175 000 175 000 175 000 175 000 175 000Capacité interruptible souscrite / subscribed Interruptible Capacity
175 000 175 000 175 000 159 603 158 753 157 753 157 753 157 753 157 753 150 069 150 062 150 062
Capacité interruptible disponible / available Interruptible Capacity (***)
0 0 0 15 397 16 247 3 000 3 000 3 000 3 000 3 000 0 0
01/2007 02/2007 03/2007 04/2007 05/2007 06/2007 07/2007 08/2007 09/2007 10/2007 11/2007 12/2007
Capacité ferme mensuelle / monthly firm Capacity 43 000 43 000 43 000 43 000 50 000 50 000 50 000 50 000 50 000 43 000 43 000 43 000Capacité ferme annuelle / annual firm Capacity 43 000 43 000 43 000 43 000 43 000 43 000 43 000 43 000 43 000 43 000 43 000 43 000Capacité ferme souscrite / subscribed firm Capacity (*) 43 000 43 000 43 000 43 000 43 000 43 000 43 000 43 000 43 000 34 400 34 400 34 400Capacité ferme disponible pour réservation mensuelle / available firm Capacity for monthly booking
0 0 0 0 3 375 3 375 3 375 3 375 3 375 8 600 8 600 8 600
Capacité ferme disponible pour réservation annuelle / available firm Capacity for annual booking (**)
0 0 0 0 0 0 0 0 0 8 600 8 600 8 600
Capacité restituable / Releasable Capacity 400 400 400 0 80 80 80 80 80 3 810 3 810 3 810Capacité interruptible / Interruptible Capacity 13 500 13 500 13 500 13 500 13 500 13 500 13 500 13 500 13 500 13 500 13 500 13 500Capacité interruptible souscrite / subscribed Interruptible Capacity
13 000 13 000 13 000 13 500 13 420 13 420 13 420 13 420 13 420 1 100 10 800 10 800
Capacité interruptible disponible / available Interruptible Capacity (***)
0 0 0 0 80 80 80 80 80 2 700 2 700 2 700
Capacité ferme / firm Capacity
Capacité ferme / firm Capacity
HERAULT
Capacité interruptible annuelle / annual
interruptible Capacity
Capacité interruptible annuelle / annual
interruptible Capacity
DORDOGNE
2006 December 11th
ERGEG South GRI – 2nd IG
- 8 -
Capacity published on GRTgaz’ website (2/2)
Entry capacity in 200701/2007 02/2007 03/2007 04/2007 05/2007 06/2007 07/2007 08/2007 09/2007 10/2007 11/2007 12/2007
Capacité ferme mensuelle / monthly firm Capacity 10 000 10 000 10 000 10 000 10 000 10 000 10 000 10 000 10 000 10 000 10 000 10 000Capacité ferme annuelle / annual firm Capacity 10 000 10 000 10 000 10 000 10 000 10 000 10 000 10 000 10 000 10 000 10 000 10 000Capacité ferme souscrite / subscribed firm Capacity (*) 10 000 10 000 10 000 10 000 10 000 10 000 10 000 10 000 9 850 7 045 7 045 7 045Capacité ferme disponible pour réservation mensuelle / available firm Capacity for monthly booking
0 0 0 0 0 0 0 0 150 2 955 2 955 2 955
Capacité ferme disponible pour réservation annuelle / available firm Capacity for annual booking (**)
0 0 0 0 0 0 0 0 150 2 955 2 955 2 955
Capacité restituable / Releasable Capacity 0 0 0 0 625 625 625 625 603 450 450 450Capacité interruptible / Interruptible Capacity 20 000 20 000 20 000 20 000 20 000 20 000 20 000 20 000 20 000 20 000 20 000 20 000Capacité interruptible souscrite / subscribed Interruptible Capacity
12 749 12 749 12 749 12 749 12 749 12 749 12 749 12 719 12 719 0 0 0
Capacité interruptible disponible / available Interruptible Capacity (***)
7 251 7 251 7 251 7 251 7 251 7 251 7 251 7 281 7 281 20 000 20 000 20 000
01/2007 02/2007 03/2007 04/2007 05/2007 06/2007 07/2007 08/2007 09/2007 10/2007 11/2007 12/2007
Capacité ferme mensuelle / monthly firm Capacity 0 0 0 0 0 0 0 0 0 0 0 0Capacité ferme annuelle / annual firm Capacity 0 0 0 0 0 0 0 0 0 0 0 0Capacité ferme souscrite / subscribed firm Capacity (*) 0 0 0 0 0 0 0 0 0 0 0 0Capacité ferme disponible pour réservation mensuelle / available firm Capacity for monthly booking
0 0 0 0 0 0 0 0 0 0 0 0
Capacité ferme disponible pour réservation annuelle / available firm Capacity for annual booking (**)
0 0 0 0 0 0 0 0 0 0 0 0
Capacité restituable / Releasable Capacity 0 0 0 0 0 0 0 0 0 0 0 0Capacité interruptible / Interruptible Capacity 40 000 40 000 40 000 40 000 40 000 40 000 40 000 40 000 40 000 40 000 40 000 40 000Capacité interruptible souscrite / subscribed Interruptible Capacity
5 200 5 200 5 200 5 200 5 180 5 180 5 180 5 150 5 150 5 000 5 000 5 000
Capacité interruptible disponible / available Interruptible Capacity (***)
34 800 34 800 34 800 34 800 34 820 34 820 34 820 34 850 34 850 35 000 35 000 35 000
Capacité ferme / firm Capacity
Capacité ferme / firm Capacity
Capacité interruptible annuelle / annual
interruptible Capacity
DORDOGNE
Capacité interruptible annuelle / annual
interruptible Capacity
HERAULT