WAKA KOTAHI NZ TRANSPORT AGENCY ASSESSMENT TOOLS TEMPLATES: INSTRUCTIONS FOR USERS // 1
ASSESSMENT TOOLS TEMPLATES: INSTRUCTIONS FOR USERS
1 AUGUST 2020
[VERSION 1.0]
WAKA KOTAHI NZ TRANSPORT AGENCY ASSESSMENT TOOLS TEMPLATES: INSTRUCTIONS FOR USERS // 2
Copyright information
This publication is copyright © Waka Kotahi NZ Transport Agency. Material in it may be reproduced for personal or
in-house use without formal permission or charge, provided suitable acknowledgement is made to this publication
and Waka Kotahi NZ Transport Agency as the source. Requests and enquiries about the reproduction of material in
this publication for any other purpose should be made to the Manager, Corporate Information and Records
Management, Waka Kotahi NZ Transport Agency, Private Bag 6995, Wellington 6141. The permission to
reproduce material in this publication does not extend to any material for which the copyright is identified as being
held by a third party. Authorisation to reproduce material belonging to a third party must be obtained from the
copyright holder(s) concerned.
Disclaimer
Waka Kotahi NZ Transport Agency has endeavoured to ensure material in this document is technically accurate
and reflects legal requirements. However, the document does not override governing legislation. Waka Kotahi does
not accept liability for any consequences arising from the use of this document. If the user of this document is
unsure whether the material is correct, they should refer directly to the relevant legislation and contact Waka
Kotahi.
More information
Waka Kotahi
Published August 2020
If you have further queries, call our contact centre on 0800 699 000 or write to us:
Waka Kotahi NZ Transport Agency
Private Bag 6995
Wellington 6141
This document is available on the Waka Kotahi website at http://www.nzta.govt.nz
WAKA KOTAHI NZ TRANSPORT AGENCY ASSESSMENT TOOLS TEMPLATES: INSTRUCTIONS FOR USERS // 3
Table of contents
Copyright information .................................................................................................................. 2
Disclaimer ................................................................................................................................... 2
More information ......................................................................................................................... 2
Overview ........................................................................................................................................ 5
Approach to using macro and non-macro versions ................................................................. 5
Summary of the differences between the macro and non-macro templates ......................... 5
Pop-up text .................................................................................................................................... 5
Downloading the templates ......................................................................................................... 5
Removing pop-up text .................................................................................................................. 7
HOW TO COMPLETE THE EAST TEMPLATE (WITH MACROS) ................................................... 8
Overview of the two worksheets ................................................................................................. 8
Filling in the project-level information ....................................................................................... 8
Assessment of alternatives and options ................................................................................. 10
Name of alternative/option ........................................................................................................ 10
Save and back to Summary button ........................................................................................... 10
Del and GoTo buttons ............................................................................................................... 10
Add new alternative or option button ........................................................................................ 10
Fatal flaws ................................................................................................................................. 11
Saving the worksheet ................................................................................................................ 11
Hide or show descriptive text .................................................................................................... 12
HOW TO COMPLETE THE EAST TEMPLATE (WITHOUT MACROS) .......................................... 13
Filling in the EAST template (non-macros) .............................................................................. 13
Auto-population of ‘Investment objective’ ................................................................................. 13
Inserting row for additional ‘Investment objective’ .................................................................... 13
Filling in the rest of the sheet .................................................................................................... 14
Saving the worksheet ................................................................................................................ 14
HOW TO COMPLETE THE AST TEMPLATE (WITH MACROS) .................................................... 15
Filling in the AST template ........................................................................................................ 15
Filling in the ‘Name of Benefit’ section ...................................................................................... 15
Adding additional rows to the ‘Name of Benefit’ section ........................................................... 16
Filling in the ‘Name of Measure’ section ................................................................................... 17
Saving the worksheet ................................................................................................................ 18
HOW TO COMPLETE THE AST TEMPLATE (WITHOUT MACROS) ............................................ 19
Filling the AST (non-macros) .................................................................................................... 19
Filling in the ‘Name of Benefit’ section ...................................................................................... 19
Adding additional rows to the ‘Name of Benefit’ section ........................................................... 20
Filling in the ‘Name of Measure’ section ................................................................................... 20
Saving the worksheet ................................................................................................................ 20
WAKA KOTAHI NZ TRANSPORT AGENCY ASSESSMENT TOOLS TEMPLATES: INSTRUCTIONS FOR USERS // 4
HOW TO COMPLETE THE MCA TEMPLATE ................................................................................ 21
Filling in the MCA template ....................................................................................................... 21
Saving the worksheet ................................................................................................................ 21
WAKA KOTAHI NZ TRANSPORT AGENCY ASSESSMENT TOOLS TEMPLATES: INSTRUCTIONS FOR USERS // 5
Overview
This document provides instructions for how to complete the assessment tools templates, focusing
on using the Excel functionality. Use this document in conjunction with the user guidance
documents and templates for each assessment tool – the Early Assessment Sifting Tool (EAST),
multi-criteria analysis (MCA) and appraisal summary table (AST) – as shown in figures 1, 2 and 3
below.
Approach to using macro and non-macro versions
From an Excel functionality perspective, using the macro versions is recommended. However, if for
some reason you are unable to use the macro versions, a non-macro version is available.
For support with using macros, please contact your organisation’s system administrator.
Summary of the differences between the macro and non-macro templates
Macro Non-macro
Early Assessment Sifting Tool (EAST)
Uses two Excel worksheets:
• New Alternative or Option
– where each new
alternative or option is
assessed.
• Summary – assessment
information is then pulled
through to a summary
sheet.
Uses one Excel worksheet:
• Everything documented
within one worksheet.
• The investment objectives
will not auto-populate in
all instances.
Multi-criteria analysis (MCA) N/a One Excel worksheet:
• The template is designed
to provide consistency;
however, it provides
flexibility to accommodate
a project’s specific
circumstances.
Appraisal summary table (AST)
One Excel worksheet:
• Functionality to add
additional benefits.
• Pop-up box makes it
easier to populate
measures.
One Excel worksheet:
• Uses drop-down lists for
benefits and measures.
• Additional lines are
added manually.
Pop-up text
The templates have pop-ups that provide an explanation of the field to be completed.
Downloading the templates
You can download these templates from InvestHub through the link below:
https://invest.nzta.govt.nz/course/view.php?id=26
WAKA KOTAHI NZ TRANSPORT AGENCY ASSESSMENT TOOLS TEMPLATES: INSTRUCTIONS FOR USERS // 6
Figure 1
Figure 2
Figure 3
WAKA KOTAHI NZ TRANSPORT AGENCY ASSESSMENT TOOLS TEMPLATES: INSTRUCTIONS FOR USERS // 7
Removing pop-up text
To remove the pop-up text so that only completed project information is visible on the template,
carry out the following steps:
1. Press F5 or Fn+F5 > Special > Comments> OK.
Figure 4
2. Right-click to open the context menu and click Delete Comment.
Figure 5
WAKA KOTAHI NZ TRANSPORT AGENCY ASSESSMENT TOOLS TEMPLATES: INSTRUCTIONS FOR USERS // 8
HOW TO COMPLETE THE EAST TEMPLATE (with macros)
Overview of the two worksheets
There are two worksheets that you are required to fill in:
• New Alternative or Option – where each new alternative or option is assessed.
• Summary – assessment information is then pulled through to a summary sheet.
Filling in the project-level information
The first step required is to fill in project-level information, including investment objectives, in the
Project Overview section. This information in included at the top of the ‘Summary’ worksheet.
Figure 6
• Uses the date format DD/MM/YYYY.
• If there is more than one investment objective, you can add a row by clicking the ‘Add
investment objective’ button shown in figure 6 above.
Investment objective(s)
Project Overview
Add/Remove
WAKA KOTAHI NZ TRANSPORT AGENCY ASSESSMENT TOOLS TEMPLATES: INSTRUCTIONS FOR USERS // 9
• Once you have completed the ‘Investment objective’ cell, you need to save your work. After
saving, the content will auto-populate in two sections (see figures 7 and 8 below).
Figure 7
Figure 8
FIG 1.3 New Alternative/ Option Sheet
Auto-populate
WAKA KOTAHI NZ TRANSPORT AGENCY ASSESSMENT TOOLS TEMPLATES: INSTRUCTIONS FOR USERS // 10
Assessment of alternatives and options
The next step is to assess each new alternative or option. This assessment is undertaken by filling
in the ‘New Alternative or Option’ worksheet. Note that some cells in this worksheet require you to
enter text, while others have a drop-down list.
Name of alternative/option
• Do not use any special characters, such as punctuation marks – , . / ’ [] - (), etc. – when
naming the alternative or option.
Save and back to Summary button
When you have completed the worksheet, click the ‘Save and back to Summary’ button. When you
click this button, the following actions will occur:
• information auto-populates in the ‘Summary’ worksheet
• your details get saved in a new worksheet titled ‘New Alternative or Option (1)’
• the ‘New Alternative or Option’ worksheet stays unchanged. This is where you can fill details
for your next alternative or option.
Del and GoTo buttons
• Del and GoTo buttons appear on ‘Summary’ sheet for each saved alternative or option. Use
the Del button to delete the ‘Alternative or Option’ which is not required.
• Use the GoTo button to reach the saved alternative or option sheet.
Add new alternative or option button
Use the ‘Save and back to Summary’ button to create new worksheets. You can also create a new
sheet by clicking on the green tab ‘Add new alternative or option’ in the ‘Summary’ sheet, as shown
in figure 9 below.
WAKA KOTAHI NZ TRANSPORT AGENCY ASSESSMENT TOOLS TEMPLATES: INSTRUCTIONS FOR USERS // 11
Figure 9
Fatal flaws
If any fatal flaws have been identified for each alterative or option, the decision will automatically
populate as ‘Discontinue’. If a project team would like to progress with the alternative or option,
please change the fatal flaw question to ‘not a fatal flaw’.
Saving the worksheet
Keep saving the worksheet as you work on it.
Details auto-populate
New Alternative or Option sheet opens
Your saved details in New Alternative or Option (1) worksheet
Del & GoTo tabs
WAKA KOTAHI NZ TRANSPORT AGENCY ASSESSMENT TOOLS TEMPLATES: INSTRUCTIONS FOR USERS // 12
Hide or show descriptive text
The ‘Hide descriptive text’ or ‘Show descriptive text’ buttons can be used when a project team would like to hide or show the descriptive text within the
Summary worksheet. The ‘Hide descriptive text’ function can assist project teams when making comparative assessment across alternatives or options, as it
can make the colour-coded assessment for each criterion more visible.
Figure 10
Hide/show descriptive text
Add new alternative or option
WAKA KOTAHI NZ TRANSPORT AGENCY ASSESSMENT TOOLS TEMPLATES: INSTRUCTIONS FOR USERS // 13
HOW TO COMPLETE THE EAST TEMPLATE (without macros)
Filling in the EAST template (non-macros)
The EAST non-macro template provides the same assessment as the macro-enabled version.
However, it has only one worksheet. To start using the EAST non-macro template, fill in project-
level information, including the investment objectives, in the Project Overview section.
Figure 11
Auto-population of ‘Investment objective’
Once you type in the investment objective and save it, it will auto-populate in the header of the
table as shown in figure 12 below.
Figure 12
Inserting row for additional ‘Investment objective’
• The template provides for up to five investment objectives. It is highly unlikely that
additional investment objectives will be required, as investment objectives need to be kept
to a manageable number. However, functionality wise, you can insert an additional row if
you need to enter another investment objective. After you insert a row, you can copy the
format from the row above.
Sections to fill
Auto-populate
Drop-down list
WAKA KOTAHI NZ TRANSPORT AGENCY ASSESSMENT TOOLS TEMPLATES: INSTRUCTIONS FOR USERS // 14
• Once the row has been added, you also need to add a column in the section shown in
figure 13 below.
Figure 13
Filling in the rest of the sheet
Please note that in this sheet, some cells require a text input while others have a drop-down list to
select from.
You can insert additional rows by using the Excel ‘Insert Sheet Rows’ function.
Saving the worksheet
Keep saving the worksheet as you work on it.
Additional row/column creation space
WAKA KOTAHI NZ TRANSPORT AGENCY ASSESSMENT TOOLS TEMPLATES: INSTRUCTIONS FOR USERS // 15
HOW TO COMPLETE THE AST TEMPLATE (with macros)
Filling in the AST template
To start using the AST template, fill in project-level information, including the investment objectives.
Use the date format DD/MM/YYYY.
Figure 14
Filling in the ‘Name of Benefit’ section
• The AST aligns with the five outcomes in the Ministry of Transport (MoT) Transport Outcomes
Framework – Healthy and safe people, Resilience and security, Economic prosperity,
Environmental sustainability and Inclusive access. All five outcomes must stay visible, even if
not relevant to an activity.
• Use the drop-down list to select the appropriate benefit that applies to each outcome.
• The ‘Impact on greenhouse gas emissions’ and ‘Impact on Te Ao Māori’ are mandatory
benefits and pre-filled in the worksheet. Both need to be considered; however, if either is truly
not relevant to your project, leave blank.
• The template allows for alternative benefits to be added outside of the benefits framework.
Double-click on the last option in the drop-down list to type in an alternative benefit as shown in
figure 15 below
Fill the first 2 rows
WAKA KOTAHI NZ TRANSPORT AGENCY ASSESSMENT TOOLS TEMPLATES: INSTRUCTIONS FOR USERS // 16
Figure 15
• If multiple benefits apply, you can add them in additional rows (as shown in figure 16 below).
Adding additional rows to the ‘Name of Benefit’ section
• You can add additional rows to any of the ‘Name of Benefit’ sections listed in the first column.
For example, to add a row to ‘Healthy and safe people’, select the row below the heading and
click the blue button ‘Click to insert new row’. You can add more rows for other benefits in the
same way.
• To delete a row, select the row you want deleted and press ctrl + shift + d.
Figure 16
Add rows
Drop downs
Adding alternative benefits
WAKA KOTAHI NZ TRANSPORT AGENCY ASSESSMENT TOOLS TEMPLATES: INSTRUCTIONS FOR USERS // 17
Figure 17
Filling in the ‘Name of Measure’ section
Figure 18
• Measures can be selected from anywhere in the benefits framework. The pop-up contains the
list of measures grouped as they appear within the benefits framework.
You can’t select the name of the benefit (for example, ‘1.1 Impact on social cost of deaths and
serious injuries’) as these have only been included to assist with wayfinding; however, you can
select any of the measures that come under it (as shown in figure 19 below).
New row added here
Pre-filled
WAKA KOTAHI NZ TRANSPORT AGENCY ASSESSMENT TOOLS TEMPLATES: INSTRUCTIONS FOR USERS // 18
Figure 19
• Continue to complete the remainder of the template.
• It is recommended that the AST is printed using A3 paper size.
Saving the worksheet
Keep saving the worksheet as you work on it.
Header: Name of Benefit
Select the required Name of Measure
WAKA KOTAHI NZ TRANSPORT AGENCY ASSESSMENT TOOLS TEMPLATES: INSTRUCTIONS FOR USERS // 19
HOW TO COMPLETE THE AST TEMPLATE (without macros)
The AST template non-macro version is the same as the macro version. However, it does not have
the same functionality when adding benefits and measures.
Filling the AST (non-macros)
To start using the AST template, fill in project-level information, including the investment objectives.
Use the date format DD/MM/YYYY.
Filling in the ‘Name of Benefit’ section
• The AST aligns with the five outcomes in the Ministry of Transport (MoT) Transport Outcomes
Framework – Healthy and safe people, Resilience and security, Economic prosperity,
Environmental sustainability and Inclusive access. All five outcomes must stay visible, even if
not relevant to an activity.
• Use the drop-down list to select the appropriate benefit that applies to each outcome.
• The ‘Impact on greenhouse gas emissions’ and ‘Impact on Te Ao Māori’ are mandatory
benefits and pre-filled in the worksheet. Both need to be considered; however, if either is truly
not relevant to your project, leave blank.
• The template allows for alternative benefits to be added outside of the benefits framework.
Double-click on the last option in the drop-down list to type in an alternative benefit as shown in
figure 20 below
Figure 20
Drop-down list
Adding alternative benefits
WAKA KOTAHI NZ TRANSPORT AGENCY ASSESSMENT TOOLS TEMPLATES: INSTRUCTIONS FOR USERS // 20
Adding additional rows to the ‘Name of Benefit’ section
• To insert a row, select the entire row above where you want a row inserted, right-click and
select the ‘Insert’ option.
• To delete a row, select the entire row, right click and select the ‘Delete’ option.
Figure 21
Filling in the ‘Name of Measure’ section
• To add measures, select from the drop-down list that appears in each cell.
Figure 22
• It is recommended that the AST is printed using A3 paper size.
Saving the worksheet
Keep saving the worksheet as you work on it.
Select this row to insert row above
Drop-down list
WAKA KOTAHI NZ TRANSPORT AGENCY ASSESSMENT TOOLS TEMPLATES: INSTRUCTIONS FOR USERS // 21
HOW TO COMPLETE THE MCA TEMPLATE
Filling in the MCA template
• The MCA template is designed to provide consistency. However, it provides flexibility to
accommodate a project’s specific circumstances.
• There could be a number of alternatives and options included under one intervention heading
in ‘Intervention types sourced from intervention hierarchy’. Users should add and delete
columns and/or rows as needed. Project teams need to demonstrate that they have considered
a wide range of alternatives or options.
• MCA criteria should be selected according to requirements in Multi-criteria analysis: user
guidance. Users should add and delete columns and/or rows as needed.
• The ’Scoring System Key’ is provided for guidance. The scale can be customised according to
Multi-criteria analysis: user guidance requirements. Copy and paste the respective score, with
its colour code, into the sheet.
Saving the worksheet
Keep saving the worksheet as you work on it.
WAKA KOTAHI NZ TRANSPORT AGENCY ASSESSMENT TOOLS TEMPLATES: INSTRUCTIONS FOR USERS // 22
Figure 23
Version Control
Investment Objectives
Do minimum
Intervention types
Rating scale
Paste here