RECONCILIATION SUMMARY 1
Introduction .………………………………………………..………….. 1
2005-2008 “State of Good Repair” Needs Capital Reconciliation ……. 3
2005 Maintenance Needs Expense Reconciliation ……….…………… 9
APPENDICES
“State of Good Repair” Activities Reconciliation:
New York Public Library A1 …………………………….…..... Appendix A
Brooklyn Public Library B1 ……………………………....….... Appendix B
Queens Public Library C1 ……………………………….…..… Appendix C
Department of Education D1-44 ..……………………….…..… Appendix D
City University of New York E1-4 ..……………………….….. Appendix E
Police Department F1-10 .……………………………….……... Appendix F
Fire Department G1 ....…………………………………..….….. Appendix G
Administration for Children’s Services H1 .……………...……. Appendix H
Department of Homeless Services I1-7 .………………...…….. Appendix I
Department of Correction J1-3 ………………………………… Appendix J
Human Resources Administration K1-2 …………………....……. Appendix K
Department of Cultural Affairs L1-11 ...……....……………....… Appendix L
Department of Juvenile Justice M1 .…………….…..…….….... Appendix M
Department of Small Business Services N1- 5 ....…………… Appendix N
Dept. of Health & Mental Hygiene O1-3 ...………………..….. Appendix O
Health and Hospitals Corporation P1-10 ...…………….…..……. Appendix P
Department of Sanitation Q1-5 ……………………………...… Appendix Q
Department of Transportation R1-12 .……………………..…... Appendix R
Department of Parks and Recreation S1-16 ……………….….… Appendix S
Department of Citywide Administrative Services T1-12 .……... Appendix T
Assets to be Replaced/Abandoned U1-4 .…………………….... Appendix U
Table of Contents
-
1
Introduction
The City of New York has reported on Major Portions of the City’s Fixed Assets through the
AIMS Report for Fiscal Year 2004. The Executive Summary document published in October
2003 provides financially unconstrained repair and maintenance schedules on a Citywide and on
an agency basis by classes of assets and special systems. In addition, a more detailed Asset
Survey Report portrays funding needs required to achieve and maintain a “State of Good
Repair” on an asset basis and is available for review at the Office of Management and Budget.
The methodology used to compile the condition assessment and maintenance schedules is
contained in the Executive Summary.
Based on the recommended funding projections in the Asset Survey Report, participating
agencies were asked to indicate their respective Capital and Expense funding for the “State of
Good Repair” and maintenance activities detailed in the schedules. It is important to note that the
agencies’ planned activities indicated in this Agency Reconciliation do not represent specific
amounts in the Budget. The results are presented here as comparisons between agencies’ planned
activities and the Executive Summary’s recommendations.
Citywide “State of Good Repair” and Major Maintenance Needs
FY 2005-2008 Capital (“State of Good Repair”)
FY 2005 Expense (Major Maintenance)
Buildings 1,464,761,000 218,196,000
Piers & Bulkheads 392,977,000 4,732,000
Bridges 954,644,000 22,625,000
Parks Systems 113,268,000 23,932,000
Streets & Highways 1,403,780,000 -
Special Systems* 32,370,000 50,825,000
Total 4,361,800,000 320,310,000
* includes street lighting, traffic signal systems, ferries, and Rikers Island utilities.
Reconciliation Summary
-
2
Items Excluded from Study
While the study is comprehensive, a number of items and considerations were excluded from the condition review & costing estimates. They were not considered directly related to the structural integrity of the asset as defined by the Charter. These include but are not limited to:
Most equipment (fixed and movable)
Special operating systems within assets
Aesthetic considerations
Landscaping and outdoor elements
Statuary or ornamental edifices
Components not readily observable or accessible by field engineers
Fire alarm and security systems
Handicapped access requirements
Information obtained through testing or probing
Asbestos identification and removal
Programmatic needs not related to structural integrity
Efficiency improvements
Swing space/phasing costs, or premium time costs on an as-needed basis
Components deficient in code or local law compliance that do not impact on the integrity of the asset
Assets known to be scheduled for near-term total replacement
Asset Survey Report Context
The asset condition and maintenance schedule within the AIMS Report is not a budget document, but rather a broad, unconstrained analysis of a subset of general needs. It will serve as a planning tool and resource in addressing overall Citywide funding requirements. The report does not attempt in any manner to balance the City’s asset and infrastructure requirements against other important City needs, nor does it attempt to make any funding recommendations for different agencies. There is a general prioritization presented within individual assets of the relative importance of various repairs and maintenance items in terms of preserving the assets.
Due to the complexity of the analysis, the large scale of the project, the time frame for completion, the amount of estimation required, and the necessary methodology constraints, there are inherent limitations to the level of accuracy possible at the detailed asset and component level.
In this context it should be noted that the actual cost for a project may vary substantially from the amount estimated in this report when a detailed scope of work and cost estimate is completed. Agencies will not be restricted to any asset specific number contained in the reports when planning and developing their budget requests. It is further understood that there will be work items (i.e. programmatic) excluded from this study which may require additional expenditures.
-
3
As an annual reconciliation effort, agencies indicate their recently performed and planned activities as compared to the activities required to bring their assets up to a “State of Good Repair” which are listed in the Asset Survey Report and defined in the Executive Summary.
Responses were based on information available for the publication of the FY 2005 January Plan. These responses, together with their footnotes, represent a characterization of the agencies’ activities to achieve a “State of Good Repair”.
Agency Planned Activities Activities as estimated in the Asset Survey Report including those that are: a) Planned for
FY 2005-2008; b) Already performed since last survey; c) Being undertaken. Cost estimate of activities is not necessarily the amount funded in the Budget.
“State of Good Repair” Need Dollar amounts represented by cost estimates from the Asset Survey Report that are required
to bring the Agency’s assets included in the survey up to a “State of Good Repair”.
PercentageAgency Planned Activities/”State of Good Repair” Need
NEW YORK PUBLIC LIBRARY (NYPL)
Number of Assets 14
Total Square Footage 1,542,000sf
Agency Planned Activities $882,000
State of Good Repair Need $9,183,000
Percentage 10%
BROOKLYN PUBLIC LIBRARY (BPL)
Number of Assets 7
Total Square Footage 518,000sf
Agency Planned Activities $1,228,000
State of Good Repair Need $3,330,000
Percentage 37%
QUEENS PUBLIC LIBRARY (QPL)
Number of Assets 3
Total Square Footage 328,000sf
Agency Planned Activities $0
State of Good Repair Need $178,000
Percentage 0%
2005-2008 "State of Good Repair" Needs Capital Reconciliation
-
4
DEPARTMENT OF EDUCATION (DOE)
Number of Assets 1,111
Total Square Footage 114,496,000sf
Agency Planned Activities $229,855,000
State of Good Repair Need $689,257,000
Percentage 33%
* DOE has programmed work for 2005 and 2006 from the proposed 13.1 billion 5-year Plan. Facility specific state of good repairs will continue to be identified for 2007-2009 based on annually resurveyed conditions.
CITY UNIVERSITY OF NEW YORK (CUNY)
Number of Assets 82
Total Square Footage 6,021,000sf
Agency Planned Activities $9,037,000
State of Good Repair Need $46,167,000
Percentage 20%
NEW YORK POLICE DEPARTMENT (NYPD)
Number of Assets 96
Total Square Footage 4,334,000sf
Agency Planned Activities $25,467,000
State of Good Repair Need $34,907,000
Percentage 73%
NEW YORK FIRE DEPARTMENT (NYFD)
Number of Assets 20
Total Square Footage 523,000sf
Agency Planned Activities $409,000
State of Good Repair Need $6,071,000
Percentage 7%
ADMINISTRATION FOR CHILDREN’S SERVICES (ACS)
Number of Assets 10
Total Square Footage 291,000sf
Agency Planned Activities $649,000
State of Good Repair Need $906,000 Percentage 72%
-
5
DEPARTMENT OF HOMELESS SERVICES (DHS)
Number of Assets 60Total Square Footage 4,187,000sfAgency Planned Activities $27,471,000State of Good Repair Need $42,527,000Percentage 65%
DEPARTMENT OF CORRECTION (DOC)
Number of Assets 38Total Square Footage 4,986,000sfLinear Footage of Piers/Bulkheads 20,400ftAgency Planned Activities $14,225,000State of Good Repair Need $106,135,000Percentage 13%Rikers Island UtilitiesAgency Planned Activities $5,637,000State of Good Repair Need $7,670,000
Percentage 73%
HUMAN RESOURCES ADMINISTRATION (HRA)
Number of Assets 22Total Square Footage 1,047,000sfAgency Planned Activities $4,350,000State of Good Repair Need $7,217,000Percentage 60%
DEPARTMENT OF CULTURAL AFFAIRS (DCA)
Number of Assets 279Total Square Footage 10,038,000sfAgency Planned Activities $30,741,000State of Good Repair Need $50,646,000Percentage 61%
DEPARTMENT OF JUVENILE JUSTICE (DJJ)
Number of Assets 3Total Square Footage 400,000sfAgency Planned Activities $2,640,000State of Good Repair Need $5,753,000Percentage 46%
-
6
DEPARTMENT OF SMALL BUSINESS SERVICES (DSBS)
Number of Assets 175
Total Square Footage 13,100,000sf
Linear Footage of Piers/Bulkheads 106,900ft
Agency Planned Activities $27,986,000
State of Good Repair Need $234,782,000
Percentage 12%
* Most DSBS buildings are leased facilities and tenants could be responsible for capital improvement. New waterfront assets have been identified and added to the AIMS inventory last year, including the Passenger Ship Terminal and the Brooklyn Navy Yard.
DEPARTMENT OF HEALTH & MENTAL HYGIENE (DOHMH)
Number of Assets 18
Total Square Footage 982,000sf
Agency Planned Activities $7,715,000 State of Good Repair Need $9,880,000
Percentage 78%
HEALTH & HOSPITALS CORPORATION (HHC)
Number of Assets 112
Total Square Footage 16,903,000sf
Agency Planned Activities $64,166,000
State of Good Repair Need $149,528,000
Percentage 43%
DEPARTMENT OF SANITATION (DOS)
Number of Assets 98
Total Square Footage 5,124,000sf
Linear Footage of Piers/Bulkheads 37,800ft
Agency Planned Activities $15,499,000
State of Good Repair Need $61,533,000
Percentage 25%
DEPARTMENT OF TRANSPORTATION (DOT)
Bridge & Tunnels
Number of Assets 104
Total Deck Area 6,607,000sf
Agency Planned Activities $856,753,000
State of Good Repair Need $952,147,000
Percentage 90%
-
7
DEPARTMENT OF TRANSPORTATION (DOT) -- Continued
Streets & Highways
Miles 6,500
Agency Planned Activities $652,850,000
State of Good Repair Need $1,403,780,000
Percentage 47%
* The agency planned total represents estimates based on average cost per lane mile for reconstruction and resurfacing projects.
Facilities, Piers & Bulkheads
Number of Assets 82
Total Square Footage 3,410,000sf
Linear Footage of Piers/Bulkheads 27,900ft
Agency Planned Activities $24,447,000
State of Good Repair Need $87,604,000
Percentage 28%
Ferries
Number of Assets 7
Agency Planned Activities $24,500,000
State of Good Repair Need $24,700,000
Percentage 99%
DEPARTMENT OF PARKS & RECREATION (DPR)
Number of Assets 707
Total Square Footage 9,618,000sf
Linear Footage of Piers/Bulkheads 214,900ft
Agency Planned Activities $27,398,000
State of Good Repair Need $307,449,000
Percentage 9%
DEPARTMENT OF CITYWIDE ADMINISTRATIVE SERVICES (DCAS)
Number of Assets 79
Total Square Footage 13,056,000sf
Linear Footage of Piers/Bulkheads 29,700ft
Agency Planned Activities $65,127,000
State of Good Repair Need $120,448,000Percentage 54%
-
FY 2005-2008 Citywide "State of Good Repair" Needs Capital Reconciliation Summary (Based on FY 2004 Executive Summary)
# of Total Square Linear "State of Agency ReconciliationAgency Assets Footage Footage Good Repair" recently performed & %
Buildings Piers & Needs planned (FY 2005 - 2008) Bulkheads activities
New York Public Library (NYPL) 14 1,542,000 9,183,000 882,000 10% Brooklyn Public Library (BPL) 7 518,000 3,330,000 1,228,000 37% Queens Public Library (QPL) 3 328,000 178,000 - 0%
1 Department of Education (DOE) 1,111 114,496,000 689,257,000 229,855,000 33% City University (CUNY) 82 6,021,000 46,167,000 9,037,000 20% Police Department (NYPD) 96 4,334,000 34,907,000 25,467,000 73% Fire Department (NYFD) 20 523,000 6,071,000 409,000 7% Admin. for Children's Services (ACS) 10 291,000 906,000 649,000 72% Department of Homeless Services (DHS) 60 4,187,000 42,527,000 27,471,000 65% Department of Correction (DOC) 38 4,986,000 20,400 113,805,000 19,862,000 17% Human Resources Administration (HRA) 22 1,047,000 7,217,000 4,350,000 60% Department of Cultural Affairs (DCA) 279 10,038,000 50,646,000 30,741,000 61% Department of Juvenile Justice (DJJ) 3 400,000 5,753,000 2,640,000 46%
2 Dept. of Small Business Services (DSBS) 175 13,100,000 106,900 234,782,000 27,986,000 12% Dept. of Health & Mental Hygiene (DOHMH) 18 982,000 9,880,000 7,715,000 78% Department of Sanitation (DOS) 98 5,124,000 37,800 61,533,000 15,499,000 25% Department of Transportation (DOT) Bridges & Tunnels 104 6,607,000 (deck area) 952,147,000 856,753,000 90%
3 Streets & Highways (6,500 miles) 1,403,780,000 652,850,000 47% Facilities, Piers & Bulkheads 82 3,410,000 27,900 87,604,000 24,447,000 28% Ferries 7 24,700,000 24,500,000 99%
4 Dept. of Parks and Recreation (DPR) 707 9,618,000 214,900 307,449,000 27,398,000 9% Dept. of Citywide Admin. Services (DCAS) 79 13,056,000 29,700 120,448,000 65,127,000 54%SUBTOTAL 3,015 200,608,000 4,212,270,000 2,054,866,000 49% Health and Hospitals Corporation (HHC) 112 16,903,000 149,528,000 64,166,000 43%
5 TOTAL 3,127 217,511,000 437,600 4,361,800,000 2,119,032,000
1. DOE has programmed work for 2005 and 2006 from the proposed $13.1 billion 5-year Plan. Facility specific state of good repairs will continue to be identified for 2007-2009 based on annually resurveyed conditions.2. DSBS has had new waterfront assets identified and added to the AIMS inventory. 3. DOT planned total represents estimates based on average cost per lane mile for reconstruction and resurfacing projects. 4. DPR assets include buildings, park arches, park walls, and boardwalks.5. Activities recommended by the survey but not planned due to asset replacement/abandonment total $83 million, which equals approximately 2% of the total recommended.
E - 1
-
9
In addition to capital reconciliation agencies also participate in Citywide response to major
maintenance activities in the expense budget. Unlike repair needs which are readily identifiable
during surveys, maintenance activities can only be an estimated projection influenced by the
components’ current condition, standard lives, and scheduling of corrective work. In general, the
recommended amount represents a basic minimum to maintain the assets in a “State of Good
Repair” and assumes that the Capital work identified is carried out forthwith.
The methodology for major maintenance is documented in the Executive Summary. In
general, major maintenance is defined as those activities that should be performed at intervals of
at least one year or greater to maintain the useful life and integrity of the component (i.e.
repointing of brick in buildings). The majority of expense projects are periodic inspections and
minor repairs that are done in-house or subcontracted out. Major maintenance activities for
bridges, such as cleaning and debris removal, are exceptions which include large-scale
identifiable items that should not only occur regularly, but would also have a direct impact on the
structural integrity of the bridge over time.
As maintenance information may not be available or documented, agencies have been asked
to report on broad categories (%) closest to their experience.
NEW YORK PUBLIC LIBRARY (NYPL)
Recommended Maintenance Need $1,828,000
Percentage Reported 37%
BROOKLYN PUBLIC LIBRARY (BPL)
Recommended Maintenance Need $765,000
Percentage Reported 53%
QUEENS PUBLIC LIBRARY (QPL)
Recommended Maintenance Need $331,000
Percentage Reported 51%
2005 Maintenance Needs Expense Reconciliation
-
10
DEPARTMENT OF EDUCATION (DOE)
Recommended Maintenance Need $115,242,000
Percentage Reported 14%
* DOE will spend approximately $3.1 million on elevators, $4.7 million on HVAC, $2.2 million on emergency and security systems and $5.8 million on major maintenance through custodial staff.
CITY UNIVERSITY OF NEW YORK (CUNY)
Recommended Maintenance Need $8,866,000
Percentage Reported 52%
NEW YORK POLICE DEPARTMENT (NYPD)
Recommended Maintenance Need $7,754,000
Percentage Reported 80%
NEW YORK FIRE DEPARTMENT (NYFD)
Recommended Maintenance Need $921,000
Percentage Reported 20%
ADMINISTRATION FOR CHILDREN’S SERVICES (ACS)
Recommended Maintenance Need $454,000
Percentage Reported 4%
DEPARTMENT OF HOMELESS SERVICES (DHS)
Recommended Maintenance Need $5,826,000
Percentage Reported 100%
-
11
DEPARTMENT OF CORRECTION (DOC)
Facilities, Piers & Bulkheads
Recommended Maintenance Need $4,753,000
Percentage Reported 82%
Rikers Island Utilities
Recommended Maintenance Need $2,750,000
Percentage Reported 55%
HUMAN RESOURCES ADMINISTRATION (HRA)
Recommended Maintenance Need $1,864,000
Percentage Reported 29%
DEPARTMENT OF CULTURAL AFFAIRS (DCA)
Recommended Maintenance Need $11,739,000
Percentage Reported 0%
* DCA’s maintenance items are usually undertaken by individual cultural institutions. No City funds are spent on major maintenance.
DEPARTMENT OF JUVENILE JUSTICE (DJJ)
Recommended Maintenance Need $334,000
Percentage Reported 30%
DEPARTMENT OF SMALL BUSINESS SERVICES (DSBS)
Recommended Maintenance Need $8,504,000
Percentage Reported 39%
* DBS assets are currently maintained by EDC. Maintenance activities can be paid for through revenues gained from the rental stream or through rent concessions given to tenants.
DEPARTMENT OF HEALTH & MENTAL HYGIENE (DOHMH)
Recommended Maintenance Need $1,679,000
Percentage Reported 77%
-
12
HEALTH & HOSPITALS CORPORATION (HHC)
Recommended Maintenance Need $14,757,000
Percentage Reported 32%
DEPARTMENT OF SANITATION (DOS)
Recommended Maintenance Need $7,091,000
Percentage Reported 8%
* DOS maintenance work is mostly in response to safety concerns.
DEPARTMENT OF TRANSPORTATION (DOT)
Bridges & Tunnels
Recommended Maintenance Need $20,631,000
Percentage Reported 60%
* The reconciliation above does not reflect flag repairs on bridges included in the inventory.
Street Lighting & Traffic Signal Systems
Recommended Maintenance Need $45,625,000
Percentage Reported 100%
Facilities, Piers & Bulkheads
Recommended Maintenance Need $3,048,000
Percentage Reported 15%
Ferries
Recommended Maintenance Need $2,450,000
Percentage Reported 100%
DEPARTMENT OF PARKS & RECREATION (DPR)
Recommended Maintenance Need $39,442,000
Percentage Reported 11%
DEPARTMENT OF CITYWIDE ADMINISTRATIVE SERVICES (DCAS)
Recommended Maintenance Need $13,658,000
Percentage Reported 25%
-
FY 2005 Citywide Maintenance Needs Expense Reconciliation Summary (Based on FY 2004 Executive Summary)
FACILITIES RECONCILIATION OTHER SYSTEMS RECONCILIATIONElevators/ Special Agency
Agency Arch. Ext. Arch. Int. Electrical Mechanical Escalators Misc. Piers Bulkheads Bridges Ferries Systems Funded %
New York Public Library (NYPL) 454,000 392,000 274,000 527,000 181,000 679,000 37% Brooklyn Public Library (BPL) 274,000 129,000 139,000 165,000 58,000 404,000 53% Queens Public Library (QPL) 23,000 80,000 30,000 170,000 28,000 168,000 51% Department of Education (DOE) 22,382,000 17,483,000 39,246,000 32,747,000 3,383,000 15,900,000 14% City University (CUNY) 3,372,000 1,587,000 1,121,000 2,048,000 702,000 37,000 4,600,000 52% Police Department (NYPD) 2,155,000 2,001,000 1,408,000 1,896,000 293,000 6,167,000 80% Fire Department (NYFD) 424,000 154,000 150,000 177,000 4,000 12,000 187,000 20% Admin. for Children's Services (ACS) 142,000 46,000 93,000 128,000 45,000 16,000 4% Department of Homeless Services (DHS) 1,610,000 1,104,000 1,325,000 1,464,000 324,000 5,823,000 100% Department of Correction (DOC) 1,010,000 900,000 938,000 1,219,000 534,000 61,000 91,000 2,750,000 5,418,000 72% Human Resources Administration (HRA) 750,000 376,000 245,000 415,000 78,000 538,000 29% Department of Cultural Affairs (DCA) 3,818,000 2,173,000 2,375,000 2,025,000 648,000 700,000 - 0% Department of Juvenile Justice (DJJ) 132,000 66,000 35,000 71,000 30,000 100,000 30% Department of Small Business Services (DSBS) 1,898,000 613,000 2,442,000 1,737,000 350,000 15,000 510,000 939,000 3,283,000 39% Dept. of Health & Mental Hygiene (DOHMH) 502,000 163,000 582,000 225,000 207,000 1,293,000 77% Health and Hospitals Corporation (HHC) 2,814,000 1,810,000 4,409,000 2,782,000 2,908,000 33,000 4,694,000 32% Department of Sanitation (DOS) 1,655,000 1,149,000 1,070,000 1,553,000 118,000 70,000 1,026,000 451,000 567,000 8% Department of Transportation (DOT) 798,000 415,000 703,000 597,000 85,000 73,000 114,000 264,000 20,631,000 2,450,000 45,625,000 60,910,000 85% Dept. of Parks and Recreation (DPR) 4,817,000 1,791,000 2,634,000 1,761,000 146,000 1,678,000 253,000 437,000 1,993,000 23,932,000 4,440,000 11% Dept. of Citywide Admin. Services (DCAS) 1,645,000 1,781,000 3,420,000 2,099,000 4,127,000 367,000 220,000 3,429,000 25%
Citywide Reconciliation Total 118,616,000 Citywide Needs 50,675,000 34,213,000 62,639,000 53,806,000 14,249,000 2,618,000 2,331,000 2,402,000 22,624,000 2,450,000 72,307,000 320,310,000
NOTES:- DCA's maintenance items are usually undertaken by individual cultural institutions. No City funds are spent on major maintenance.- DBS receives some maintenance funds in the form of rent credits from the agency's tenants.- DOT's $20,631,000 Bridges reconciliation is 60%. This does not reflect flag repairs on bridges included in the inventory.- DOT's $45,625,000 Streets Lighting & Traffic Signal Systems reconciliation is 100%.- DOT's $2,450,000 Ferries reconciliation is 100%.- DOC Special System is Rikers Island Utilities and the reconciliation is 55%.
E - 2
-
Appendix
FMS ID/ Budget Code
Agency Activity Year
NEW YORK PUBLIC LIBRARY
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2004 Asset Information Management System Report at the Component level.
Agency Activity Funding
A
000NPL00026/27/2002Date of Last Survey:515 LENOX AVENUE
SCHOMBURG LIBRARY - MAIN BUILDING
850L-MROOF2004RoofArchitecture Exterior 104,917
Total Planned activities for $104,917NPL0002 000
000NPL00037/9/2002Date of Last Survey:40 LINCOLN CENTER PLAZA
LIBRARY FOR THE PERFORMING ARTS - LINCOLN CENTER
850L-LPARENO2004RoofArchitecture Exterior 72,040
Total Planned activities for $72,040NPL0003 000
000NPL00084/4/2003Date of Last Survey:20 WEST 53RD ST.
DONNELL - MEDIA CENTER
850LNC003DON2005RoofArchitecture Exterior 189,993
Total Planned activities for $189,993NPL0008 000
000NPL00109/28/1998Date of Last Survey:503 WEST 145TH ST.
HAMILTON GRANGE -
850LNM001HGR2004WindowsArchitecture Exterior 22,548
037LNC3HGROF2004RoofArchitecture Exterior 7,245
Total Planned activities for $29,793NPL0010 000
000NPL00125/29/2003Date of Last Survey:455 FIFTH AVE.
MID-MANHATTAN - BRANCH LIBRARY
850LNC3MDMAN2004RoofArchitecture Exterior 172,489
Total Planned activities for $172,489NPL0012 000
000NPL00149/14/1998Date of Last Survey:192 EAST BROADWAY
SEWARD PARK - BRANCH LIBRARY
037LNC3SEWPK2004FloorsArchitecture Interior 152,921
037LNC3SEWPK2004Interior WallsArchitecture Interior 67,863
037LNC3SEWPK2004CeilingsArchitecture Interior 32,439
037LNC3SEWPK2004General LightingElectrical Lighting 59,111
Total Planned activities for $312,333NPL0014 000
Total Planned Activities for : $881,565NEW YORK PUBLIC LIBRARY
Total Required for "State of Good Repair" for : NEW YORK PUBLIC LIBRARY $9,183,287
Page A - 1
-
Appendix
FMS ID/ Budget Code
Agency Activity Year
BROOKLYN PUBLIC LIBRARY
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2004 Asset Information Management System Report at the Component level.
Agency Activity Funding
B
000BPL000111/19/2002Date of Last Survey:GRAND ARMY PLAZA
BROOKLYN CENTRAL LIBRARY -
LBKA98CRP2003Exterior WallsArchitecture Exterior 73,333
LBKA98CRP2003RoofArchitecture Exterior 303,638
LBCA03CEN2004Conversion EquipmentMechanical Heating 258,366
LBCA03CEN2006DistributionMechanical Air Conditioning 288,217
LBCA03CEN2004Exhaust FansMechanical Ventilation 47,825
Total Planned activities for $971,379BPL0001 000
000BPL00041/24/2001Date of Last Survey:2115 OCEAN AVE.
KINGS HIGHWAY - BRANCH LIBRARY
LBCA00KHY2005WindowsArchitecture Exterior 157,677
Total Planned activities for $157,677BPL0004 000
000BPL00071/29/2001Date of Last Survey:240 DIVISION AVE.
WILLIAMSBURGH - BRANCH LIBRARY
LBKA98WBH2003Conversion EquipmentMechanical Air Conditioning 98,754
Total Planned activities for $98,754BPL0007 000
Total Planned Activities for : $1,227,810BROOKLYN PUBLIC LIBRARY
Total Required for "State of Good Repair" for : BROOKLYN PUBLIC LIBRARY $3,329,823
Page B - 1
-
Appendix CReport of Asset Maintenance Schedule activities Recently Performed or Included inAgency's Four Year Plan Reconciliation with FY 2004 Asset Information Management System Report at the Component level.QUEENS PUBLIC LIBRARY
Type of WorkAgency
Activity YearFMS ID/ Budget Code
Agency Activity Funding
$0Total Planned Activities for : QUEENS PUBLIC LIBRARY
Total Required for "State of Good Repair" for : QUEENS PUBLIC LIBRARY $178,000
Page C - 1
-
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2004 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
000BOE00048/31/2000Date of Last Survey:45 EAST 81 STREET
P. S. 6 - M -
A00005563/E23622005SwitchgearElectrical Under 600 Volts 78,516
A00005563/E23622005WiringElectrical Under 600 Volts 62,936
Total Planned activities for $141,452BOE0004 000
000BOE00056/13/2001Date of Last Survey:160 EAST 120 STREET
P. S. 7 - M -
A00005581/E23622006WiringElectrical Under 600 Volts 103,403
Total Planned activities for $103,403BOE0005 000
000BOE00073/8/2000Date of Last Survey:2581 ADAM CLAYTON POWELL BLVD.
I. S. 10 - M (TANDEM P.S.200-M) -
CIPFY20022002WindowsArchitecture Exterior 1,091,410
CIPFY20022002RoofArchitecture Exterior 73,985
Total Planned activities for $1,165,395BOE0007 000
000BOE000810/31/2000Date of Last Survey:320 WEST 21 STREET
P. S. 11 - M -
CIPFY2001/E23612001WindowsArchitecture Exterior 118,934
CIPFY2001/E23612001RoofArchitecture Exterior 62,259
Total Planned activities for $181,193BOE0008 000
000BOE00091/31/2000Date of Last Survey:1573 MADISON AVENUE
J. H. S. 13 - M -
M0131B3A/E23612004WindowsArchitecture Exterior 2,008,981
M0131B3A/E23612004RoofArchitecture Exterior 448,775
A00005654/E23622005WiringElectrical Under 600 Volts 141,807
Total Planned activities for $2,599,563BOE0009 000
000BOE001110/3/2000Date of Last Survey:328 WEST 48 STREET
I. S. 17 - M -
M0171E5A/E23612003Exterior WallsArchitecture Exterior 64,247
M0171E2A/E23612003ParapetsArchitecture Exterior 61,787
M0171E1A/E23612003RoofArchitecture Exterior 127,458
EMERG2003/E23612003PanelboardsElectrical Under 600 Volts 89,248
EMERG2003/E23612003WiringElectrical Under 600 Volts 114,507
Total Planned activities for $457,247BOE0011 000
000BOE00159/26/2002Date of Last Survey:145 STANTON STREET
J. H. S. 25 - M -
M0251E5A/E23612004Exterior WallsArchitecture Exterior 112,426
Total Planned activities for $112,426BOE0015 000
000BOE001810/3/2000Date of Last Survey:281 9TH AVENUE
P. S. 33 - M -
Page D - 1
-
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2004 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
M0331B3A/E23612004ParapetsArchitecture Exterior 246,347
M0331B3A/E23612004RoofArchitecture Exterior 566,405
A00005831/E23622005SwitchgearElectrical Under 600 Volts 91,603
A00005831/E23622005WiringElectrical Under 600 Volts 103,403
Total Planned activities for $1,007,758BOE0018 000
000BOE002111/7/2001Date of Last Survey:319 EAST 19 STREET
P. S. 40 - M -
A00005883/E23622006PanelboardsElectrical Under 600 Volts 95,198
A00005883/E23622006WiringElectrical Under 600 Volts 103,403
Total Planned activities for $198,601BOE0021 000
000BOE002310/24/2001Date of Last Survey:71 HESTER STREET
P. S. 42 - M -
CIPFY2001/E23612001WindowsArchitecture Exterior 900,666
Total Planned activities for $900,666BOE0023 000
000BOE002612/6/2002Date of Last Survey:2351 1ST AVENUE
J. H. S. 45 - M -
A00005969/E23622005FloorsArchitecture Interior 67,359
A00005964/E23622005WiringElectrical Under 600 Volts 159,465
Total Planned activities for $226,824BOE0026 000
000BOE002910/14/1999Date of Last Survey:433 EAST 100 STREET
P. S. 50 - M (UDC & ECF) -
A00017620/E23622006WindowsArchitecture Exterior 95,144
A00006026/E23622006General LightingElectrical Lighting 710,079
Total Planned activities for $805,223BOE0029 000
000BOE003111/1/2000Date of Last Survey:650 ACADEMY STREET
I. S. 52 - M -
M0521B3A/E23612004WindowsArchitecture Exterior 874,630
Total Planned activities for $874,630BOE0031 000
000BOE003212/11/2000Date of Last Survey:103 WEST 107 STREET
I. S. 54 - M - (J. H. S. 54 - M)
CIPFY2001/E23612001Exterior WallsArchitecture Exterior 211,424
CIPFY2001/E23612001WindowsArchitecture Exterior 1,373,842
CIPFY2001/E23612001ParapetsArchitecture Exterior 209,195
CIPFY2001/E23612001RoofArchitecture Exterior 431,589
CIPFY2001/E23612001CeilingsArchitecture Interior 76,063
A00006078/E23622005SwitchgearElectrical Under 600 Volts 104,689
A00006078/E23622005WiringElectrical Under 600 Volts 121,243
A00006073/E23622005General LightingElectrical Lighting 41,088
A00006079/E23622005DistributionMechanical Heating 36,285
Page D - 2
-
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2004 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
Total Planned activities for $2,605,418BOE0032 000
000BOE003412/5/2001Date of Last Survey:176 EAST 115 STREET
P. S. 57 - M -
M0571E5A/E23612004Exterior WallsArchitecture Exterior 102,159
M0571E4A/E23612004WindowsArchitecture Exterior 733,668
Total Planned activities for $835,827BOE0034 000
000BOE00361/19/2000Date of Last Survey:228 EAST 57 STREET
P. S. 59 - M - (TANDEM H.S. OF ART & DESIGN)
M0591E1A/E23612003RoofArchitecture Exterior 95,354
Total Planned activities for $95,354BOE0036 000
000BOE003711/13/2001Date of Last Survey:420 EAST 12 STREET
J. H. S. 60 - M -
E3000DDC5/E23612001WindowsArchitecture Exterior 1,370,124
Total Planned activities for $1,370,124BOE0037 000
000BOE00389/11/2000Date of Last Survey:610 EAST 12 STREET
P. S. 61 - M -
A00006179/E2362 2006FloorsArchitecture Interior 39,538
Total Planned activities for $39,538BOE0038 000
000BOE004010/1/2002Date of Last Survey:600 EAST 6 STREET
P. S. 64 - M (OL 71) -
M0646EA/E23612003Exterior WallsArchitecture Exterior 45,307
Total Planned activities for $45,307BOE0040 000
000BOE00441/31/2001Date of Last Survey:131 EAST 104 STREET
P. S. 72 - M -
A00006265/E23622006FloorsArchitecture Interior 39,010
Total Planned activities for $39,010BOE0044 000
000BOE00454/10/2000Date of Last Survey:735 WEST END AVENUE
P. S. 75 - M -
A00006275/E23622006SwitchgearElectrical Under 600 Volts 91,603
A00006275/E23622006WiringElectrical Under 600 Volts 103,404
A00006272/E23622006General LightingElectrical Lighting 519,674
Total Planned activities for $714,681BOE0045 000
000BOE004611/30/2000Date of Last Survey:220 WEST 121 STREET
P. S. 76 - M -
E3000DDC5/E23612001WindowsArchitecture Exterior 526,145
E3000DDC5/E23612001RoofArchitecture Exterior 113,879
A00006292/E23622005WiringElectrical Under 600 Volts 91,914
Total Planned activities for $731,938BOE0046 000
Page D - 3
-
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2004 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
000BOE004712/6/2002Date of Last Survey:55 EAST 120 STREET
P. S. 79 - M (MULT HANDICAP) -
A00006309/E23622006WindowsArchitecture Exterior 555,376
A00006311/E23622006WiringElectrical Under 600 Volts 45,957
Total Planned activities for $601,333BOE0047 000
000BOE00484/11/2002Date of Last Survey:212 W. 120TH ST
MID MANHT ADULT TRNG CTR - M -
A00006331/E23622005FloorsArchitecture Interior 295,979
Total Planned activities for $295,979BOE0048 000
000BOE00491/31/2001Date of Last Survey:219 EAST 109 STREET
P. S. 83 - M -
M1831B3A/E23612003WindowsArchitecture Exterior 262,415
M1831B3A/E23612003RoofArchitecture Exterior 403,549
A00006340/E23622006General LightingElectrical Lighting 475,391
Total Planned activities for $1,141,355BOE0049 000
000BOE005110/10/2001Date of Last Survey:160 WEST 78 STREET
P. S. 87 - M -
A00006380/E23622005WindowsArchitecture Exterior 385,853
A00006382/E23622005SwitchgearElectrical Under 600 Volts 100,055
A00006382/E23622005PanelboardsElectrical Under 600 Volts 90,984
A00006382/E23622005WiringElectrical Under 600 Volts 112,944
Total Planned activities for $689,836BOE0051 000
000BOE005310/14/1999Date of Last Survey:222 WEST 134 STREET
P. S. 92 - M -
A00006415/E23622006WiringElectrical Under 600 Volts 127,979
Total Planned activities for $127,979BOE0053 000
000BOE005510/25/1999Date of Last Survey:515 EAST HOUSTON STREET
P. S. 97 - M -
CIPFY2000/E23612000WindowsArchitecture Exterior 864,170
CIPFY2000/E23612000RoofArchitecture Exterior 140,240
CIPFY2000/E23612000Interior WallsArchitecture Interior 161,466
CIPFY2000/E23612000WiringElectrical Under 600 Volts 55,069
Total Planned activities for $1,220,945BOE0055 000
000BOE005610/16/2001Date of Last Survey:512 WEST 212 STREET
P. S. 98 - M -
M0981E4A/E23612004WindowsArchitecture Exterior 1,107,567
A00006466/E23522005ParapetsArchitecture Exterior 115,984
Total Planned activities for $1,223,551BOE0056 000
Page D - 4
-
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2004 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
000BOE005710/14/1999Date of Last Survey:410 EAST 100 STREET
J. H. S. 99 - M -
E3000DDC4/E23612000Exterior WallsArchitecture Exterior 45,540
E3000DDC4/E23612000ParapetsArchitecture Exterior 70,349
E3000DDC4/E23612000RoofArchitecture Exterior 165,772
Total Planned activities for $281,661BOE0057 000
000BOE005812/5/2001Date of Last Survey:141 EAST 111 STREET
P. S. 101 - M -
A00017615/E23622005Exterior WallsArchitecture Exterior 229,512
A00006516/E23622006FloorsArchitecture Interior 200,745
A00006506/E23622006General LightingElectrical Lighting 39,648
Total Planned activities for $469,905BOE0058 000
000BOE005911/7/2001Date of Last Survey:330 EAST 21 STREET
J. H. S. 104 - M -
A00006544/E23622005WindowsArchitecture Exterior 1,108,310
A00006546/E23622005SwitchgearElectrical Under 600 Volts 104,689
A00006546/E23622005WiringElectrical Under 600 Volts 121,243
Total Planned activities for $1,334,242BOE0059 000
000BOE006211/2/2000Date of Last Survey:285 DELANCY STREET
P. S. 110 - M -
M1101B3A/E23612003Exterior WallsArchitecture Exterior 1,107,784
M1101B3A/E23612003WindowsArchitecture Exterior 907,677
M1101B3A/E23612003ParapetsArchitecture Exterior 37,151
Total Planned activities for $2,052,612BOE0062 000
000BOE006611/26/2002Date of Last Survey:586 WEST 177 STREET
P. S. 115 - M -
M1151E5A/E23612004Exterior WallsArchitecture Exterior 319,303
A00006628/E23622005WindowsArchitecture Exterior 97,191
Total Planned activities for $416,494BOE0066 000
000BOE00681/8/2001Date of Last Survey:240 EAST 109 STREET
J. H. S. 117 - M -
A00017627/E23622006WindowsArchitecture Exterior 2,008,981
A00006671/E23622006FloorsArchitecture Interior 149,565
Total Planned activities for $2,158,546BOE0068 000
000BOE00694/10/2000Date of Last Survey:154 WEST 93 STREET
I. S. 118 - M - (J. H. S. 118 - M)
A00006678/E23622006General LightingElectrical Lighting 908,256
Total Planned activities for $908,256BOE0069 000
Page D - 5
-
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2004 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
000BOE00701/31/2001Date of Last Survey:232 EAST 103 STREET
P. S. 38 - M - (P. S. 121 - M)
M1211E5A/E23612003Exterior WallsArchitecture Exterior 592,459
M1211E4A/E23612003WindowsArchitecture Exterior 864,170
Total Planned activities for $1,456,629BOE0070 000
000BOE00762/12/2002Date of Last Survey:425 WEST 130 STREET
P. S. 129 - M -
CIPFY2000/E23612000RoofArchitecture Exterior 586,065
Total Planned activities for $586,065BOE0076 000
000BOE008510/24/2001Date of Last Survey:100 ATTORNEY STREET
P. S. 142 - M -
M1421E4A/E23612004WindowsArchitecture Exterior 66,096
A00006957/E23622005RoofArchitecture Exterior 677,663
Total Planned activities for $743,759BOE0085 000
000BOE008610/12/2000Date of Last Survey:511 WEST 182 STREET
I. S. 143 - M -
A00006985/E23622006WiringElectrical Under 600 Volts 141,807
Total Planned activities for $141,807BOE0086 000
000BOE008812/13/2001Date of Last Survey:150 WEST 105 STREET
P. S. 145 - M -
A00017962/E23622006RoofArchitecture Exterior 47,813
A00007021/E23622006WiringElectrical Under 600 Volts 66,870
Total Planned activities for $114,683BOE0088 000
000BOE00895/9/2002Date of Last Survey:421 EAST 106 STREET
P. S. 146 - M -
M1461B3A/E23612003Exterior WallsArchitecture Exterior 145,407
M1461B3A/E23612003WindowsArchitecture Exterior 385,760
M1461B3A/E23612003RoofArchitecture Exterior 48,344
A00007038/E23622005WiringElectrical Under 600 Volts 80,425
Total Planned activities for $659,936BOE0089 000
000BOE00901/5/2000Date of Last Survey:34 WEST 118 STREET
P. S. 149 - M (TANDEM M207 03) -
CIPFY2001/E23612001Exterior WallsArchitecture Exterior 166,605
CIPFY2001/E23612001WindowsArchitecture Exterior 622,059
CIPFY2001/E23612001RoofArchitecture Exterior 386,179
Total Planned activities for $1,174,843BOE0090 000
000BOE009210/4/2001Date of Last Survey:93 NAGLE AVE.
P. S. 152 - M -
M1521E5A/E23612003Exterior WallsArchitecture Exterior 88,155
Page D - 6
-
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2004 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
A00007063/E23622006FloorsArchitecture Interior 242,497
Total Planned activities for $330,652BOE0092 000
000BOE009812/13/2001Date of Last Survey:163 WEST 97 STREET
P. S. 163 - M -
A00007153/E23622006WiringElectrical Under 600 Volts 62,936
Total Planned activities for $62,936BOE0098 000
000BOE01005/15/2003Date of Last Survey:234 WEST 109 STREET
P. S. 165 - M -
A00007189/E23622005WindowsArchitecture Exterior 1,460,521
Total Planned activities for $1,460,521BOE0100 000
000BOE010510/12/2000Date of Last Survey:306 FORT WASHINGTON AVENUE
P. S. 173 - M -
CIPFY2000/E23612000WindowsArchitecture Exterior 738,845
CIPFY2000/E23612000RoofArchitecture Exterior 270,285
Total Planned activities for $1,009,130BOE0105 000
000BOE01061/18/2001Date of Last Survey:175 WEST 134 STREET
P. S. 175 - M (P175M-SIE VII) -
A00017842/E23622006WindowsArchitecture Exterior 1,178,841
Total Planned activities for $1,178,841BOE0106 000
000BOE010710/14/1999Date of Last Survey:370 WEST 120 STREET
P. S. 180 - M -
A00007324/E23622005WiringElectrical Under 600 Volts 103,403
Total Planned activities for $103,403BOE0107 000
000BOE011010/4/2001Date of Last Survey:349 CABRINI BOULEVARD
P. S./I.S. 187 - M -
M1871B3A/E23612003Exterior WallsArchitecture Exterior 167,843
M1871B3A/E23612003RoofArchitecture Exterior 169,475
Total Planned activities for $337,318BOE0110 000
000BOE011312/8/1999Date of Last Survey:311 EAST 82 STREET
P. S. 190 - M -
A00017876/E23622006WindowsArchitecture Exterior 60,276
Total Planned activities for $60,276BOE0113 000
000BOE01145/15/2003Date of Last Survey:210 WEST 61 STREET
P. S. 191 - M -
A00007430/E23622005RoofArchitecture Exterior 489,900
A00007432/E23622005SwitchgearElectrical Under 600 Volts 78,516
A00007432/E23622005PanelboardsElectrical Under 600 Volts 35,699
A00007432/E23622005WiringElectrical Under 600 Volts 70,804
Total Planned activities for $674,919BOE0114 000
Page D - 7
-
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2004 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
000BOE011612/6/2002Date of Last Survey:244 WEST 144 STREET
P. S. 194 - M -
A00007466/E23622005Exterior WallsArchitecture Exterior 100,179
A00007467/E23622005SwitchgearElectrical Under 600 Volts 78,516
A00007467/E23622005PanelboardsElectrical Under 600 Volts 44,624
A00007467/E23622005WiringElectrical Under 600 Volts 74,737
Total Planned activities for $298,056BOE0116 000
000BOE01183/19/2001Date of Last Survey:2230 5TH AVENUE
P. S. 197 - M -
M1971B3A/E23612003WindowsArchitecture Exterior 1,010,292
M1971B3A/E23612003ParapetsArchitecture Exterior 75,473
Total Planned activities for $1,085,765BOE0118 000
000BOE01193/20/2002Date of Last Survey:1700 3RD AVENUE
P. S. 198 - M -
M1981B3A/E23612004Exterior WallsArchitecture Exterior 851,811
M1981B3A/E23612004WindowsArchitecture Exterior 782,579
M1981B3A/E23612004ParapetsArchitecture Exterior 42,311
Total Planned activities for $1,676,701BOE0119 000
000BOE01221/31/2000Date of Last Survey:E. 116 ST. & F.D.R. DRIVE
MANHATTAN CTR. FOR MATH & SCI -M -
M4351E5A/E23612004Exterior WallsArchitecture Exterior 131,694
M4351E4A/E23612004WindowsArchitecture Exterior 254,380
A00007682/E23622005Conversion EquipmentMechanical Heating 89,974
A00007682/E23622005DistributionMechanical Heating 129,047
Total Planned activities for $605,095BOE0122 000
000BOE01231/3/2000Date of Last Survey:351 W. 18 ST
BAYARD RUSTIN HS FOR THE HUMAN-M - CHARLES EVANS HUGHES HS HUMAN.-
A00007692/E23622005Exterior WallsArchitecture Exterior 353,752
M4401E4A/E23612004WindowsArchitecture Exterior 39,140
A00007692/E23622005ParapetsArchitecture Exterior 58,438
A00007692/E23622005RoofArchitecture Exterior 312,793
A00007694/E23622005General LightingElectrical Lighting 253,649
CIPFY2001/E23612001Conversion EquipmentMechanical Heating 1,041,185
CIPFY2001/E23612001Terminal DevicesMechanical Heating 1,183,716
CIPFY2001/E23612001Exhaust FansMechanical Ventilation 94,578
Total Planned activities for $3,337,251BOE0123 000
000BOE012510/26/1999Date of Last Survey:200 MONROE ST.
SEWARD PARK ANNEX - M - UNIVERSITY NEIGHBORHOOD H. S.
M4456E/E23612003Exterior WallsArchitecture Exterior 103,995
Page D - 8
-
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2004 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
M4456E/E23612003WindowsArchitecture Exterior 516,073
Total Planned activities for $620,068BOE0125 000
000BOE012812/6/1999Date of Last Survey:145 W. 84 ST
LOUIS D. BRANDEIS HIGH SCHOOL -M -
M4701B3A/E23612004Exterior WallsArchitecture Exterior 381,406
M4701B3A/E23612004WindowsArchitecture Exterior 592,641
M4701B3A/E23612004ParapetsArchitecture Exterior 111,787
M4701B3A/E23612004RoofArchitecture Exterior 155,621
A00007787/E23622005General LightingElectrical Lighting 271,136
Total Planned activities for $1,512,591BOE0128 000
000BOE01291/11/2000Date of Last Survey:345 E. 15 ST.
HEALTH PROFESSIONS HIGH SCHOOL-M -
A00007807/E23622006WiringElectrical Under 600 Volts 159,465
Total Planned activities for $159,465BOE0129 000
000BOE01304/5/2001Date of Last Survey:317 E. 67 STREET
JULIA RICHMAN HIGH SCHOOL - M -
M4801B3A/E23612004Exterior WallsArchitecture Exterior 476,655
M4801B3A/E23612004WindowsArchitecture Exterior 2,380,278
M4801B3A/E23612004Interior WallsArchitecture Interior 118,706
Total Planned activities for $2,975,639BOE0130 000
000BOE01332/15/2001Date of Last Survey:122 AMSTERDAM AVE
MARTIN LUTHER KING JR H.S. - M -
A00018001/E23622006Exterior WallsArchitecture Exterior 1,328,468
A00007880/E23622006FloorsArchitecture Interior 137,139
Total Planned activities for $1,465,607BOE0133 000
000BOE014211/21/2001Date of Last Survey:225 W. 24 STREET
H.S. OF FASHION INDUSTRIES - M -
A00017901/E2362 2006Exterior WallsArchitecture Exterior 220,297
A00008012/E23622006Service EquipmentElectrical Under 600 Volts 57,207
A00008012/E23622006SwitchgearElectrical Under 600 Volts 261,722
A00008012/E23622006PanelboardsElectrical Under 600 Volts 95,198
A00008012/E23622006WiringElectrical Under 600 Volts 283,491
Total Planned activities for $917,915BOE0142 000
000BOE01458/30/2000Date of Last Survey:439 W. 49 ST
H.S. OF GRAPHIC COMMUN. ART - M -
M6251E1A/E23612002RoofArchitecture Exterior 536,113
Total Planned activities for $536,113BOE0145 000
000BOE01493/7/2000Date of Last Survey:127 E. 22 ST.
MABEL D. BACON HIGH SCHOOL - M -
Page D - 9
-
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2004 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
CIPFY2001/E23612001Exterior WallsArchitecture Exterior 528,174
CIPFY2001/E23612001WindowsArchitecture Exterior 219,631
CIPFY2001/E23612001FloorsArchitecture Interior 521,436
CIPFY2001/E23612001CeilingsArchitecture Interior 302,188
Total Planned activities for $1,571,429BOE0149 000
000BOE01501/11/2000Date of Last Survey:240 2ND AVE
MANH. COMP. NIGHT & DAY H.S. - M -
M6611B3A/E23612001Exterior WallsArchitecture Exterior 157,309
M6611B3A/E23612001WindowsArchitecture Exterior 511,405
M6611B3A/E23612001RoofArchitecture Exterior 136,009
Total Planned activities for $804,723BOE0150 000
000BOE015710/18/2000Date of Last Survey:1701 FULTON AVENUE
P. S. 4 - BX -
X0041B3A/E23622005Exterior WallsArchitecture Exterior 207,876
X0041B3A/E23622005WindowsArchitecture Exterior 1,290,116
X0041B3A/E23622005ParapetsArchitecture Exterior 56,891
Total Planned activities for $1,554,883BOE0157 000
000BOE01581/4/2000Date of Last Survey:564 JACKSON AVENUE
P. S. 5 - BX -
CIPFY2001/E23612000Exterior WallsArchitecture Exterior 93,734
CIPFY2001/E23612000WindowsArchitecture Exterior 702,598
Total Planned activities for $796,332BOE0158 000
000BOE015910/10/2000Date of Last Survey:1000 EAST TREMONT AVENUE
P. S. 6 - BX -
X0061B3A/E23612002WindowsArchitecture Exterior 958,075
A00013618/E23622005FloorsArchitecture Interior 122,378
Total Planned activities for $1,080,453BOE0159 000
000BOE01652/12/2003Date of Last Survey:3041 BRUCKNER BOULEVARD
P. S. 14 - BX -
X0141B3/E23612003Exterior WallsArchitecture Exterior 57,807
Total Planned activities for $57,807BOE0165 000
000BOE01668/31/2000Date of Last Survey:4550 CARPENTER AVENUE
P. S. 16 - BX -
E3000DDC5/E30002002WindowsArchitecture Exterior 102,756
Total Planned activities for $102,756BOE0166 000
000BOE01688/31/2000Date of Last Survey:4318 KATONAH AVENUE
P. S. 19 - BX -
X0191E4A/E23612004WindowsArchitecture Exterior 420,617
Total Planned activities for $420,617BOE0168 000
Page D - 10
-
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2004 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
000BOE017112/6/1999Date of Last Survey:660 WEST 236 STREET
P. S. 24 - BX -
A00013834/E23622006SwitchgearElectrical Under 600 Volts 91,603
A00013834/E23622006WiringElectrical Under 600 Volts 103,403
Total Planned activities for $195,006BOE0171 000
000BOE017712/5/2000Date of Last Survey:510 EAST 141 STREET
P. S. 30 - BX -
CIPFY2001/E23612001WindowsArchitecture Exterior 1,532,582
A00013941/E23622006WiringElectrical Under 600 Volts 91,914
A00013941/E23622006General LightingElectrical Lighting 55,974
CIPFY2001/E23612001Exhaust FansMechanical Ventilation 49,541
Total Planned activities for $1,730,011BOE0177 000
010BOE017712/5/2000Date of Last Survey:577 EAST 139 STREET
P. S. 30 - BX - AX (ECF-S X ECC 2)
CIPFY2001/E23612001WindowsArchitecture Exterior 86,003
Total Planned activities for $86,003BOE0177 010
000BOE018411/9/1999Date of Last Survey:3352 OLINVILLE AVENUE
P. S. 41 - BX -
A00017573/E23622006WindowsArchitecture Exterior 101,916
Total Planned activities for $101,916BOE0184 000
000BOE01852/8/2000Date of Last Survey:WASHINGTON AVE & CLAREMONT PKY
P. S. 42 - BX -
E3000DDC5/E30002002WindowsArchitecture Exterior 759,471
Total Planned activities for $759,471BOE0185 000
000BOE01864/14/2003Date of Last Survey:165 BROWN PLACE
P. S. 43 - BX -
X0431E5A/E23622005Exterior WallsArchitecture Exterior 357,521
A00014094/E23622005FloorsArchitecture Interior 314,992
A00014089/E23622005SwitchgearElectrical Under 600 Volts 91,603
A00014089/E23622005PanelboardsElectrical Under 600 Volts 95,198
A00014089/E23622005WiringElectrical Under 600 Volts 103,404
Total Planned activities for $962,718BOE0186 000
000BOE01872/6/2001Date of Last Survey:1825 PROSPECT AVENUE
P. S. 44 - BX -
EMERG2001/E23612001Exterior WallsArchitecture Exterior 324,167
EMERG2001/E23612001ParapetsArchitecture Exterior 510,764
EMERG2001/E23612001RoofArchitecture Exterior 172,586
Total Planned activities for $1,007,517BOE0187 000
Page D - 11
-
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2004 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
000BOE01882/2/2000Date of Last Survey:2502 LORILLARD PLACE
I. S. 45 - BX - (J. H. S. 45 - BX)
X0451EB3A/E23612003Exterior WallsArchitecture Exterior 68,378
A00014124/E23622005WiringElectrical Under 600 Volts 107,772
A00014124/E23622005General LightingElectrical Lighting 735,255
Total Planned activities for $911,405BOE0188 000
000BOE019310/10/2000Date of Last Survey:1550 VYSE AVENUE
P. S. 50 - BX -
X0501B3A/E23612002Exterior WallsArchitecture Exterior 307,314
X0501B3A/E23612002ParapetsArchitecture Exterior 89,351
Total Planned activities for $396,665BOE0193 000
000BOE020112/23/1999Date of Last Survey:888 REVEREND JAMES A. POLITE AVE
P. S. 60 - BX -
E3000DDC5/E30002000Exterior WallsArchitecture Exterior 491,929
E3000DDC5/E30002000WindowsArchitecture Exterior 687,659
E3000DDC5/E30002000ParapetsArchitecture Exterior 37,901
Total Planned activities for $1,217,489BOE0201 000
000BOE02071/22/2003Date of Last Survey:1001 JENNINGS STREET
P. S. 66 - BX -
A00014437/E23622006FloorsArchitecture Interior 90,512
A00014432/E23622006WiringElectrical Under 600 Volts 121,243
Total Planned activities for $211,755BOE0207 000
000BOE02092/22/2001Date of Last Survey:4011 MONTICELLO AVENUE
P. S. 68 - BX -
X0681B3A/E23612002Exterior WallsArchitecture Exterior 136,972
X0681B3A/E23612002WindowsArchitecture Exterior 340,312
X0681B3A/E23612002ParapetsArchitecture Exterior 393,381
X0681B3A/E23612002RoofArchitecture Exterior 166,519
Total Planned activities for $1,037,184BOE0209 000
000BOE021110/12/1999Date of Last Survey:1691 WEEKS AVENUE
P. S. 70 - BX -
X0706EA/E23612003RoofArchitecture Exterior 299,565
Total Planned activities for $299,565BOE0211 000
000BOE02123/13/2001Date of Last Survey:3040 ROBERTS AVENUE
P. S. 71 - BX -
X0711E2A/E23612002ParapetsArchitecture Exterior 99,628
A00014509/E23622006General LightingElectrical Lighting 36,650
Total Planned activities for $136,278BOE0212 000
Page D - 12
-
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2004 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
000BOE02132/26/2001Date of Last Survey:DEWEY & EDISON AVENUES
P. S. 72 - BX -
X0726EA/E23612003Exterior WallsArchitecture Exterior 55,186
X0726EA/E23612003ParapetsArchitecture Exterior 99,850
Total Planned activities for $155,036BOE0213 000
000BOE021810/25/2000Date of Last Survey:1250 WARD AVENUE
P. S. 77 - BX -
CIPFY2000/E23612001Exterior WallsArchitecture Exterior 463,839
CIPFY2000/E23612001WindowsArchitecture Exterior 1,326,612
Total Planned activities for $1,790,451BOE0218 000
000BOE02204/26/2000Date of Last Survey:125 EAST 181 STREET
P. S. 79 - BX -
BOIL2001/E23612001Conversion EquipmentMechanical Heating 45,132
BOIL2001/E23612001Terminal DevicesMechanical Heating 238,787
Total Planned activities for $283,919BOE0220 000
000BOE02235/14/2002Date of Last Survey:1700 MACOMBS ROAD
I. S. 82 - BX -
X0821B3A/E23612002Exterior WallsArchitecture Exterior 412,224
X0821B3A/E23612002WindowsArchitecture Exterior 1,123,623
X0821B3A/E23612002ParapetsArchitecture Exterior 281,200
X0821B3A/E23612002RoofArchitecture Exterior 273,361
Total Planned activities for $2,090,408BOE0223 000
000BOE02242/13/2001Date of Last Survey:950 RHINELANDER AVENUE
P. S. 83 - BX -
X0831B3/E23612003Exterior WallsArchitecture Exterior 75,697
X0831B3/E23612003WindowsArchitecture Exterior 389,463
Total Planned activities for $465,160BOE0224 000
000BOE02253/11/2002Date of Last Survey:1434 LONGFELLOW AVENUE
I. S. 84 - BX -
A00014729/E23622005WindowsArchitecture Exterior 776,160
A00014729/E23622005ParapetsArchitecture Exterior 63,729
A00014729/E23622005RoofArchitecture Exterior 39,460
A00014729/E23622005Interior WallsArchitecture Interior 96,107
A00014732/E23622005General LightingElectrical Lighting 56,389
Total Planned activities for $1,031,845BOE0225 000
000BOE02284/30/2002Date of Last Survey:1935 BUSSING AVENUE
P. S. 87 - BX -
A00014778/E23622005Exterior WallsArchitecture Exterior 38,772
A00014778/E23622005ParapetsArchitecture Exterior 73,203
Page D - 13
-
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2004 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
A00014778/E23622005RoofArchitecture Exterior 231,072
Total Planned activities for $343,047BOE0228 000
000BOE02305/16/2000Date of Last Survey:980 MACE AVENUE
P. S. 89 - BX -
X0891B3A2002Exterior WallsArchitecture Exterior 343,362
X0891B3A2002WindowsArchitecture Exterior 818,701
Total Planned activities for $1,162,063BOE0230 000
000BOE023210/26/2000Date of Last Survey:2200 AQUEDUCT AVENUE
P. S. 91 - BX -
A00014841/E23622006WiringElectrical Under 600 Volts 70,804
Total Planned activities for $70,804BOE0232 000
000BOE023411/15/2000Date of Last Survey:1535 STORY AVENUE
P. S. 93 - BX -
E3000DDC5/E30002001Exterior WallsArchitecture Exterior 433,491
E3000DDC5/E30002001WindowsArchitecture Exterior 678,788
A00014864/E23622006General LightingElectrical Lighting 51,834
Total Planned activities for $1,164,113BOE0234 000
010BOE023411/15/2000Date of Last Survey:1535 STORY AVENUE
P. S. 93 - BX - MINISCHOOL
E3000DDC5/E30002001WindowsArchitecture Exterior 100,490
Total Planned activities for $100,490BOE0234 010
000BOE023512/9/1999Date of Last Survey:3530 KINGS COLLEGE PLACE
P. S. 94 - BX -
BOIL2001/E23612001Conversion EquipmentMechanical Heating 270,056
BOIL2001/E23612001DistributionMechanical Heating 387,331
BOIL2001/E23612001Terminal DevicesMechanical Heating 184,413
BOIL2001/E23612001Exhaust FansMechanical Ventilation 61,327
Total Planned activities for $903,127BOE0235 000
000BOE023610/4/2000Date of Last Survey:3961 HILLMAN AVENUE
P. S. 95 - BX -
A00014910/E23622006SwitchgearElectrical Under 600 Volts 91,603
A00014910/E23622006PanelboardsElectrical Under 600 Volts 83,298
A00014910/E23622006WiringElectrical Under 600 Volts 80,425
Total Planned activities for $255,326BOE0236 000
000BOE02392/5/2002Date of Last Survey:1619 BOSTON ROAD
I. S. 98 - BX - (J. H. S. 98 - BX)
A00014961/E23622005WindowsArchitecture Exterior 1,797,627
A00014968/E23622005FloorsArchitecture Interior 252,966
A00014955/E23622005General LightingElectrical Lighting 168,886
Page D - 14
-
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2004 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
Total Planned activities for $2,219,479BOE0239 000
000BOE02404/6/2000Date of Last Survey:800 TAYLOR AVENUE
P. S. 100 - BX -
A00014976/E23622006General LightingElectrical Lighting 54,158
Total Planned activities for $54,158BOE0240 000
000BOE024111/10/1999Date of Last Survey:2750 LAFAYETTE AVENUE
J. H. S. 101 - BX -
E3000DDC5/E23612002Exterior WallsArchitecture Exterior 686,606
E3000DDC5/E23612002WindowsArchitecture Exterior 2,400,188
E3000DDC5/E23612002ParapetsArchitecture Exterior 40,706
E3000DDC5/E23612002RoofArchitecture Exterior 528,310
Total Planned activities for $3,655,810BOE0241 000
000BOE02544/18/2002Date of Last Survey:1155 CROMWELL AVENUE
P. S. 114 - BX -
A00015196/E23622006SwitchgearElectrical Under 600 Volts 78,516
A00015196/E23622006PanelboardsElectrical Under 600 Volts 80,323
A00015196/E23622006WiringElectrical Under 600 Volts 70,804
Total Planned activities for $229,643BOE0254 000
000BOE02564/3/2001Date of Last Survey:977 FOX STREET
I. S. 116 - BX -
E3000DDC5/E30002001ParapetsArchitecture Exterior 67,623
E3000DDC5/E30002001RoofArchitecture Exterior 575,599
A00015224/E23622006General LightingElectrical Lighting 993,132
Total Planned activities for $1,636,354BOE0256 000
000BOE025910/31/2000Date of Last Survey:1075 PUGSLEY AVENUE
P. S. 119 - BX -
CIPFY2000/E23612000WindowsArchitecture Exterior 274,892
Total Planned activities for $274,892BOE0259 000
000BOE026012/29/1999Date of Last Survey:890 CAULDWELL AVENUE
J. H. S. 120 - BX -
X1201B3A/E30002004WindowsArchitecture Exterior 980,877
X1201B3A/E30002004RoofArchitecture Exterior 47,911
Total Planned activities for $1,028,788BOE0260 000
000BOE026511/23/1999Date of Last Survey:175 WEST 166 STREET
P. S. 126 -BX (ECF) -
X126CC03A/ED0012003WindowsArchitecture Exterior 519,650
Total Planned activities for $519,650BOE0265 000
000BOE02694/6/2000Date of Last Survey:885 BOLTON AVENUE
I. S. 131 - BX -
Page D - 15
-
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2004 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
CIPFY2000/E23612000Exterior WallsArchitecture Exterior 520,822
CIPFY2000/E23612000WindowsArchitecture Exterior 450,856
CIPFY2000/E23612000ParapetsArchitecture Exterior 46,813
CIPFY2000/E23612000RoofArchitecture Exterior 37,054
CIPFY2000/E23612000Exhaust FansMechanical Ventilation 85,209
Total Planned activities for $1,140,754BOE0269 000
000BOE027710/17/2000Date of Last Survey:916 EAGLE AVENUE
P. S. 140 - BX -
A00015563/E23622006RoofArchitecture Exterior 315,340
A00015564/E23622006WiringElectrical Under 600 Volts 97,659
Total Planned activities for $412,999BOE0277 000
000BOE027812/6/1999Date of Last Survey:660 WEST 237 STREET
I. S. 141 - BX - (J. H. S. 141 - BX)
A00015575/E23622005WindowsArchitecture Exterior 1,606,229
Total Planned activities for $1,606,229BOE0278 000
000BOE028010/7/1999Date of Last Survey:120 WEST 231 STREET
I. S. 143 - BX - (J. H. S. 143 - BX )
CIPFY2000/E23612000Exterior WallsArchitecture Exterior 127,274
CIPFY2000/E23612000ParapetsArchitecture Exterior 41,514
CIPFY2000/E23612000RoofArchitecture Exterior 123,963
Total Planned activities for $292,751BOE0280 000
000BOE02825/13/2002Date of Last Survey:1000 TELLER AVENUE
I. S. 145 - BX -
X1451E4A/E23612002WindowsArchitecture Exterior 733,477
A00015650/E23622006General LightingElectrical Lighting 53,295
Total Planned activities for $786,772BOE0282 000
000BOE02842/28/2001Date of Last Survey:1600 WEBSTER AVENUE
I. S. 147 - BX -
CIPFY2001/E23612001WindowsArchitecture Exterior 78,559
Total Planned activities for $78,559BOE0284 000
000BOE028712/23/1999Date of Last Survey:920 EAST 167 STREET
P. S. 150 - BX -
A00015733/E23622005Exterior WallsArchitecture Exterior 144,209
A00015734/E23622005WiringElectrical Under 600 Volts 80,425
Total Planned activities for $224,634BOE0287 000
000BOE02894/4/2000Date of Last Survey:1007 EVERGREEN AVENUE
P. S. 152 - BX -
X1521B3A/E23612002Exterior WallsArchitecture Exterior 213,533
X1521B3A/E23612002WindowsArchitecture Exterior 60,450
Page D - 16
-
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2004 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
X1521B3A/E23612002ParapetsArchitecture Exterior 116,037
X1521B3A/E23612002RoofArchitecture Exterior 557,820
Total Planned activities for $947,840BOE0289 000
000BOE029112/19/2000Date of Last Survey:333 EAST 135 STREET
P. S. 154 - BX -
A00015793/E23622005WindowsArchitecture Exterior 555,376
Total Planned activities for $555,376BOE0291 000
000BOE029411/20/2000Date of Last Survey:757 CAULDWELL AVENUE
P. S. 157 - BX -
X1571B3A/E23612003WindowsArchitecture Exterior 581,084
Total Planned activities for $581,084BOE0294 000
000BOE030112/27/1999Date of Last Survey:1970 WEST FARMS ROAD
P. S. 214/I. S. 200 - BX - (I. S. 167 - BX)
CIPFY2000/23612000Exterior WallsArchitecture Exterior 265,433
A00015965/E23622005WindowsArchitecture Exterior 76,756
A00015964/E23622005RoofArchitecture Exterior 54,770
Total Planned activities for $396,959BOE0301 000
000BOE03032/26/2001Date of Last Survey:200 CITY ISLAND AVENUE
P. S. 175 - BX -
X1751E1A/E23612002RoofArchitecture Exterior 210,739
Total Planned activities for $210,739BOE0303 000
000BOE030411/27/2002Date of Last Survey:850 BAYCHESTER AVENUE
P. S. 178 - BX -
X1781B3A/E23612004Conversion EquipmentMechanical Air Conditioning 57,780
Total Planned activities for $57,780BOE0304 000
000BOE030512/10/2001Date of Last Survey:700 BAYCHESTER AVENUE
I. S. 180 - BX -
X1801B3A/E23612004Exterior WallsArchitecture Exterior 71,112
X1801B3A/E23612004RoofArchitecture Exterior 88,890
Total Planned activities for $160,002BOE0305 000
000BOE030810/28/1999Date of Last Survey:339 MORRIS AVENUE
I. S. 183 - BX -
X1831B3A/E23612002WindowsArchitecture Exterior 930,444
Total Planned activities for $930,444BOE0308 000
000BOE03142/1/2000Date of Last Survey:2280 AQUEDUCT AVENUE
I. S. 206B - BX -
A0016191/E23622005RoofArchitecture Exterior 226,777
Total Planned activities for $226,777BOE0314 000
Page D - 17
-
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2004 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
000BOE03155/1/2000Date of Last Survey:275 HARLEM RIVER PARK BRIDGE
P. S. 230/I. S. 229 (UDC) - BX - (P. S./I. S. 229 (UDC) - BX)
CIPFY2000/E23612000Exterior WallsArchitecture Exterior 249,657
CIPFY2000/E23612000WindowsArchitecture Exterior 118,610
CIPFY2000/E23612000ParapetsArchitecture Exterior 125,808
CIPFY2000/E23612000RoofArchitecture Exterior 625,351
Total Planned activities for $1,119,426BOE0315 000
000BOE03193/11/2002Date of Last Survey:1010 REV. J.A. POLITE AVE.
BRONX REGIONAL ALT. H.S. - BX -
X4011B3A/E30002003Exterior WallsArchitecture Exterior 338,092
X4011B3A/E30002003WindowsArchitecture Exterior 592,997
X4011B3A/E30002003RoofArchitecture Exterior 783,333
Total Planned activities for $1,714,422BOE0319 000
000BOE032112/14/1999Date of Last Survey:240 E. 172ND STREET
WILLIAM H. TAFT HIGH SCHOOL - BX -
X4101E4A/E23622005WindowsArchitecture Exterior 87,267
CIPFY2000/23612000RoofArchitecture Exterior 129,297
CIPFY2000/23612000CeilingsArchitecture Interior 75,617
Total Planned activities for $292,181BOE0321 000
000BOE03253/19/2003Date of Last Survey:196TH & RESERVOIR AVE.
WALTON HIGH SCHOOL - BX -
X4306EA/E23612003Exterior WallsArchitecture Exterior 146,811
X4306EA/E23612003ParapetsArchitecture Exterior 59,795
Total Planned activities for $206,606BOE0325 000
000BOE03272/1/2000Date of Last Survey:100 WEST MOSHOLU PARKWAY SOUTH
DEWITT CLINTON HIGH SCHOOL - BX -
X4401E5A/E23612002Exterior WallsArchitecture Exterior 477,974
A00016402/E23622005FloorsArchitecture Interior 110,689
Total Planned activities for $588,663BOE0327 000
000BOE03286/9/2003Date of Last Survey:75 W. 205TH STREET
BRONX H.S. OF SCIENCE - BX -
X4451E4A/E23622005Exterior WallsArchitecture Exterior 276,481
X4451E4A/E23622005WindowsArchitecture Exterior 1,151,487
X4451E4A/E23622005RoofArchitecture Exterior 73,489
A00016417/E23622005WiringElectrical Under 600 Volts 106,309
Total Planned activities for $1,607,766BOE0328 000
000BOE03293/16/2000Date of Last Survey:1980 LAFAYETTE AVE.
ADLAI E. STEVENSON H.S. - BX -
X4501B3A/E23612002Exterior WallsArchitecture Exterior 416,345
Page D - 18
-
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2004 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
X4501B3A/E23612002WindowsArchitecture Exterior 139,547
X4501B3A/E23612002ParapetsArchitecture Exterior 41,079
X4501B3A/E23612002RoofArchitecture Exterior 230,418
Total Planned activities for $827,389BOE0329 000
000BOE03311/11/2000Date of Last Survey:701 ST. ANN'S AVE.
SOUTH BRONX HIGH SCHOOL - BX -
X4701B3A/E23612004Exterior WallsArchitecture Exterior 308,426
X4701B3A/E23612004WindowsArchitecture Exterior 691,113
XRESTRUCT/E3002004WiringElectrical Under 600 Volts 57,446
Total Planned activities for $1,056,985BOE0331 000
000BOE03334/18/2002Date of Last Survey:333 E. 151ST STREET
ALFRED E. SMITH HIGH SCHOOL - BX -
X6001B3A/E23612004Exterior WallsArchitecture Exterior 35,605
X6001B3A/E23612004WindowsArchitecture Exterior 1,046,429
X6001B3A/E23612004RoofArchitecture Exterior 400,090
Total Planned activities for $1,482,124BOE0333 000
000BOE03362/19/2002Date of Last Survey:2474 CROTONA AVE.
GRACE H. DODGE HIGH SCHOOL - BX -
X6601B3A/E23612003Exterior WallsArchitecture Exterior 421,129
X6601B3A/E23612003WindowsArchitecture Exterior 1,067,428
X6601B3A/E23612003RoofArchitecture Exterior 315,632
Total Planned activities for $1,804,189BOE0336 000
000BOE03414/30/2002Date of Last Survey:2375 SOUTHERN BOULEVARD
P. S. 205B (ECF)- BX -
A00016934/E23622005RoofArchitecture Exterior 180,415
Total Planned activities for $180,415BOE0341 000
000BOE03483/4/2002Date of Last Survey:419 WAVERLY AVENUE
P. S. 11 - BK -
K0111B3A/E23612004WindowsArchitecture Exterior 1,104,985
K0111B3A/E23612004ParapetsArchitecture Exterior 137,182
K0111B3A/E23612004RoofArchitecture Exterior 447,419
Total Planned activities for $1,689,586BOE0348 000
000BOE035112/23/2002Date of Last Survey:71 SULLIVAN STREET
P. S. 15 - BK -
A00000185/E23622006Exterior WallsArchitecture Exterior 66,860
Total Planned activities for $66,860BOE0351 000
000BOE03521/29/2001Date of Last Survey:157 WILSON STREET
P. S. 16 - BK -
A00000203/E23622006FloorsArchitecture Interior 257,222
Page D - 19
-
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2004 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
A00000198/E23622006SwitchgearElectrical Under 600 Volts 73,282
A00000198/E23622006WiringElectrical Under 600 Volts 94,300
Total Planned activities for $424,804BOE0352 000
000BOE035511/19/2001Date of Last Survey:325 SOUTH 3RD STREET
P. S. 19 - BK -
K0191E4A/E23622005WindowsArchitecture Exterior 961,515
Total Planned activities for $961,515BOE0355 000
000BOE03571/29/2001Date of Last Survey:180 CHAUNCEY STREET
P. S. 21 - BK -
K0211B3A/E30002001Exterior WallsArchitecture Exterior 96,409
K0211B3A/E30002001WindowsArchitecture Exterior 87,561
Total Planned activities for $183,970BOE0357 000
000BOE03591/29/2001Date of Last Survey:787 LAFAYETTE AVENUE
P. S. 25 - BK -
K0256EA/E23612003Conversion EquipmentMechanical Heating 41,736
Total Planned activities for $41,736BOE0359 000
000BOE036012/26/2000Date of Last Survey:1014 LAFAYETTE AVENUE
P. S. 26 - BK -
A00000322/E23622005WindowsArchitecture Exterior 1,491,403
Total Planned activities for $1,491,403BOE0360 000
000BOE03641/24/2002Date of Last Survey:75 MESEROLE AVENUE
P. S. 31 - BK (OL126) -
K0311E5A/E23612003Exterior WallsArchitecture Exterior 403,015
K0311E1A/23612003RoofArchitecture Exterior 70,948
Total Planned activities for $473,963BOE0364 000
000BOE03662/1/2000Date of Last Survey:70 TOMPKINS AVENUE
I. S. 33 - BK -
K0331B3A/E23612000RoofArchitecture Exterior 829,940
Total Planned activities for $829,940BOE0366 000
000BOE036812/1/1999Date of Last Survey:272 MCDONOUGH STREET
I. S. 35 - BK - (J.H.S. 35 & P.S. 141 - BK)
K0356EA/E23612002Exterior WallsArchitecture Exterior 297,814
Total Planned activities for $297,814BOE0368 000
000BOE03699/7/2000Date of Last Survey:450 PACIFIC STREET
P. S. 38 - BK -
K0381B3A/E23612004WindowsArchitecture Exterior 520,178
K0381B3A/E23612004ParapetsArchitecture Exterior 46,573
K0381B3A/E23612004RoofArchitecture Exterior 592,549
Total Planned activities for $1,159,300BOE0369 000
Page D - 20
-
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2004 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
000BOE03724/9/2002Date of Last Survey:411 THATFORD AVENUE
P. S. 41 - BK -
A00000501/E23622005WindowsArchitecture Exterior 604,497
Total Planned activities for $604,497BOE0372 000
000BOE03743/25/2002Date of Last Survey:432 MONROE STREET
P. S. 44 - BK -
K0441E4A/E23612002WindowsArchitecture Exterior 680,398
Total Planned activities for $680,398BOE0374 000
000BOE037512/27/2000Date of Last Survey:84 SCHAFFER STREET
P. S. 45 - BK -
K0451E5A/E23612004Exterior WallsArchitecture Exterior 58,479
Total Planned activities for $58,479BOE0375 000
010BOE037512/27/2000Date of Last Survey:1160 DECATUR STREET
P. S. 45 - BK - AX (OL BSH-RDGWD ECC1)
K0451E1A/E23612004RoofArchitecture Exterior 122,594
Total Planned activities for $122,594BOE0375 010
000BOE037812/24/2002Date of Last Survey:223 GRAHAM AVENUE
I. S. 49 - BK -
A00000599/E23622006DistributionMechanical Heating 379,947
A00000599/E23622006DistributionMechanical Ventilation 156,552
A00000599/E23622006Exhaust FansMechanical Ventilation 33,546
Total Planned activities for $570,045BOE0378 000
000BOE03799/13/2000Date of Last Survey:183 SOUTH 3RD STREET
J. H. S. 50 - BK -
K0501E5A/E23622005Exterior WallsArchitecture Exterior 190,572
A00000612/E23622005WiringElectrical Under 600 Volts 107,772
Total Planned activities for $298,344BOE0379 000
000BOE03803/4/2003Date of Last Survey:350 5TH STREET
J. H. S. 51 - BK -
A00000628/E23622006SwitchgearElectrical Under 600 Volts 104,689
A00000628/E23622006WiringElectrical Under 600 Volts 121,243
Total Planned activities for $225,932BOE0380 000
000BOE038312/30/1999Date of Last Survey:2021 BERGEN STREET
I. S. 55 - BK -
K0551B3A/E23612000WindowsArchitecture Exterior 776,160
K0551B3A/E23612000RoofArchitecture Exterior 787,214
Total Planned activities for $1,563,374BOE0383 000
000BOE038712/18/2001Date of Last Survey:211 THROOP AVENUE
P. S. 59 - BK -
Page D - 21
-
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2004 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
A00000730/E23622006SwitchgearElectrical Under 600 Volts 64,122
A00000730/E23622006PanelboardsElectrical Under 600 Volts 71,399
A00000730/E23622006WiringElectrical Under 600 Volts 80,425
Total Planned activities for $215,946BOE0387 000
000BOE03943/26/2002Date of Last Survey:605 SHEPHERD AVENUE
P. S. 72 - BK -
K0721B3A/E23612004Exterior WallsArchitecture Exterior 284,535
K0721B3A/E23612004WindowsArchitecture Exterior 87,872
K0721B3A/E23612004ParapetsArchitecture Exterior 66,566
K0721B3A/E23612004RoofArchitecture Exterior 35,753
Total Planned activities for $474,726BOE0394 000
000BOE040912/19/2002Date of Last Survey:99 AVENUE P
I. S. 96 - BK -
K0961E5A/E23612004Exterior WallsArchitecture Exterior 72,652
Total Planned activities for $72,652BOE0409 000
000BOE041012/30/2002Date of Last Survey:1855 STILLWELL AVE.
P. S. 97 - BK -
K0976EA/E23612004Exterior WallsArchitecture Exterior 289,905
K0976EA/E23612004Interior WallsArchitecture Interior 73,631
K0976EA/E23612004CeilingsArchitecture Interior 60,068
Total Planned activities for $423,604BOE0410 000
000BOE04192/9/2000Date of Last Survey:200 LINWOOD STREET
P. S. 108 - BK -
K1081E4A/E23612002WindowsArchitecture Exterior 829,545
CIPFY2000/E23612000DistributionMechanical Heating 41,780
Total Planned activities for $871,325BOE0419 000
000BOE04201/29/2001Date of Last Survey:124 MONITOR STREET
P. S. 110 - BK -
K1101B3A/E23612002WindowsArchitecture Exterior 77,114
K1101B3A/E23612002RoofArchitecture Exterior 66,108
Total Planned activities for $143,222BOE0420 000
000BOE042312/17/2002Date of Last Survey:300 ADELPHI STREET
I. S. 113 - BK -
A00001233/E23622006Exterior WallsArchitecture Exterior 114,119
A00001232/E23622006RoofArchitecture Exterior 40,152
Total Planned activities for $154,271BOE0423 000
000BOE042412/20/2000Date of Last Survey:1077 REMSEN AVENUE
P. S. 114 - BK -
A00001243/E23622005WindowsArchitecture Exterior 683,524
Page D - 22
-
Appendix
FMS ID/ Budget Code
Agency Activity Year
DEPARTMENT OF EDUCATION
Type of Work
Report of Asset Maintenance Schedule Activities Recently Performed or Included in Agency's Four Year Plan Reconciliation with FY 2004 Asset Information Management System Report at the Component level.
Agency Activity Funding
D
Total Planned activities for $683,524BOE0424 000
000BOE04291/2/2002Date of Last Survey:18 BEAVER STREET
P. S. 120 - BK -
A00001320/E23622005WindowsArchitecture Exterior 644,382
Total Planned activities for $644,382BOE0429 000
000BOE04371/22/2002Date of Last Survey:4305 FT HAMILTON PKWY
P. S. 131 - BK -
A00001