asset management and risk management dnv
TRANSCRIPT
-
8/22/2019 Asset Management and Risk Management Dnv
1/14
1
TV Sddeutschland Bau und Betrieb GmbH
SDDEUTSCHLAND
Risk
Expenditure
Asset Management and Cost Saving
Maintenance Strategy based on
Risk-Informed Decision Making.Cost effective, reliable, and safe through TV gAte and ROI
-
8/22/2019 Asset Management and Risk Management Dnv
2/14
2
TV Sddeutschland Bau und Betrieb GmbH
SDDEUTSCHLAND
Our World is changing
SOMEHOWRISK-INFORMED
Costs mustbe decreased
Increasing
responsibility
Worldwidecompetition
...........
Increased flexibilityneeded
Adaptedavailability needed
Knowledge Based
The Others are
doing itMore or LessPRESCRIPTIVE
-
8/22/2019 Asset Management and Risk Management Dnv
3/14
3
TV Sddeutschland Bau und Betrieb GmbH
SDDEUTSCHLAND
Understanding of RISK
Risk = Probability of Failure (PoF) x Consequence of Failure (CoF)
Whats really new?
Integral Approach new, traceable assessment criteria risk assessment requires multi-disciplinary team all type of equipment considered under one hat
more distinctive regarding the identification ofdamage/deterioration mechanism to addressoptimized inspection techniques
remnant life related (for predictable mechanism) confidence related
PoF
CoFSHE-related
Costs-related
systematic introduction of CoF
distinction between SHE and Cost/Reliability CoF
-
8/22/2019 Asset Management and Risk Management Dnv
4/14
4
TV Sddeutschland Bau und Betrieb GmbH
SDDEUTSCHLAND
Related Guidelines and Documents
ASME Risk Based InspectionVol. 1 General DocumentVol. 3 Fossil Fuel Fired Electric Power Generating Systems
EPRI Risk Based In-Service Inspection Evaluation Procedure WOG Application of Risk Based Methods for Piping In-Service Inspection API (American Petroleum Institute)
API 579 Fitness for ServiceAPI RP 580 Risk Based Inspection (qualitative)API RP 581 Risk Based Inspection (qualitative/quantitative)
Development of an European Guideline for Risk Based ISI/IST
and Maintenance:
Risk Based In-Service Inspection and Maintenance Procedures for European Industries
-
8/22/2019 Asset Management and Risk Management Dnv
5/14
5
TV Sddeutschland Bau und Betrieb GmbH
SDDEUTSCHLAND
Rank
ing
Risk-MatrixRisk-Matrix
Engineering Judgement Semi-Quantitative Analysis Cause-Consequence A. System Simulation ....
Optimization
Safety and Economic relatedOptimization
ISI/IST Scope, Locations,Method, and Frequency
Monitoring Design modifications Spare Parts Operation ....
Scaffolding Insulation Inspections
Servicing ....
Realiza
tion
Planning andCoordination
Nr Vorgangsname
1 Projekt lei tung2 Marktverantwortung
3 Projektvorlauf
7 Kick-of f -Meet ing
8 TP1: Sichtung / Met
13 Information / Kontro
17 TP2: Vernetzung / E
23 TP3: Datenbasis
27 Information / Kontro
31 TP4: Mitarbeiter
35 TP5: Vermarktung
40 Information / Kontro
44 A bsch luss
45 Projektnachlauf
Kauer
Schmitt,Schrder,S
Projektteam
12/23
1011121 2 3 4 5 6 7 8 91011121 2 3 4 5 6 7 8 9 1 011121 2 3 4 5 6 7 8 9 10
ft e 1 . H lft e 2 . H lft e 1 . H l ft e 2 . H l ft e 1 . H l ft e 2. Hlfte
Expe
rtPanel
Plant Specific Data
Generic DataData
Mining
Inspection Reports
Operating Window
Medium / Hazards
Damage/Deterioration
Mechanism
Reliability Data
....
Regulatory
Requirements
-
8/22/2019 Asset Management and Risk Management Dnv
6/14
6
TV Sddeutschland Bau und Betrieb GmbH
SDDEUTSCHLAND
TV-Software based Procedure
Representation of the contributionto risk of the subcomponents ofthe component 01P002:
PoFi * CoFi
-
8/22/2019 Asset Management and Risk Management Dnv
7/14
7
TV Sddeutschland Bau und Betrieb GmbH
SDDEUTSCHLAND
Inspection and Maintenance Planning
Risk-informed decision making using the risk matrix as central elementfor the long term strategy and day to day work planning
I: Run to FailureCorrective MaintenanceAim at zero expenditure
I
II
IIII
15 17
86 6
5
17 8
1
0
2
19
31
8231
2 2 05 2
18
11 6 215 4
Consequence of Failure (CoF)
ProbabilityofFailure(PoF
)
Economic Risk Ranking Diagram
II: ALARPAs Low as Reasonably Practicable viaPeriodical and Condition BasedMaintenance corresponding to riskPrinciple of expenditure minimization
III: UnacceptableUrgent measures like Change ofDesign, and/or Operation, Repair etc.
Principle of Risk Mitigation
-
8/22/2019 Asset Management and Risk Management Dnv
8/14
8
TV Sddeutschland Bau und Betrieb GmbH
SDDEUTSCHLAND
Risk-Orientied Master Plan
Explicit measures are planned on the basis of
the risk identified the information regarding risk driving components,subcomponents and damage/deterioration mechanisms
the information regarding acting damage/deteriorationmechanisms, remnant life and the confidence level achieved,through which adapted and adequate measures can beselected
the overall confidence level
by considering resources, spare part situation, .....
-
8/22/2019 Asset Management and Risk Management Dnv
9/14
9
TV Sddeutschland Bau und Betrieb GmbH
SDDEUTSCHLAND
Detailed Planning
No PoFReductionpossible
Notpossible
predictable f(t)
Calculate RemnantUseful Life
ConfidenceAssessment
Determine Interval, Method,Scope, and Place
f (Risk, Remnant Useful Life,Confidence)
Reductionof PoF
ConfidenceAssessment
non-predictable
Monitoring possible?
ConditionMonitoring
InfluenceMonitoring
ConfidenceAssessment
Determine Interval, Method,Scope, and Place
f (Risk, Confidence)
Reductionof Pof
Damage /DeteriorationMechanism
-
8/22/2019 Asset Management and Risk Management Dnv
10/14
10
TV Sddeutschland Bau und Betrieb GmbH
SDDEUTSCHLAND
Example 1: Shut-down postponement of a refinery
Discussion with the authority regarding the generalpossibility to extend the prescribed interval and aboutthe method going to be used
Assessment of 464 Subcomponents
Risk Ranking Result: - Extreme High: 0 %
- Very High: 7 %- High: 20 %- Medium: 33 %
- Low: 40 %
Extension more or less no problem for most of the equipment
At the end there were 25 pieces of equipment for which it wassimply not possible to extend the interval in the first place
-
8/22/2019 Asset Management and Risk Management Dnv
11/14
11
TV Sddeutschland Bau und Betrieb GmbH
SDDEUTSCHLAND
Example 1: Shut-down postponement
For those 25 we developed a detailed procedure how toreplace the internal by non-intrusive inspections(formalistic speaking the non-intrusive is replacing the
internal inspection)
The result was that this is possible for additionally 15 pieces
of equipmentResult:10 pieces of equipment (out of 464) remaining to be
internally inspected, repaired, or replaced at the originallyscheduled inspection time
Big Shut Down could be postponed(Savings > 8 Mio EUR)
-
8/22/2019 Asset Management and Risk Management Dnv
12/14
12
TV Sddeutschland Bau und Betrieb GmbH
SDDEUTSCHLAND
Example 2: Economic Strategy (Combined Cycle)
heatrecoverysteamgenerator
gasturbine
fuelgas
air intake
exhaustgas
water steamcycle
gene-rator
electric power
steam
turbinegene-rator
Plant Control
Gas- line 1
Gas- line 2
Bypass 1
Bypass 2
Steam- generator1
Steam- generator2
Steam- line
Condensatsystem
Feedwater system
Coolingsystem
Circuit breaker
Transformers
SystemausflleFehler pro Historie
0
5
10
15
20
25
30
35
40
45
Fa
ilures
Main Components
84,74
%8
4,5
2%
8
4,2
6%
80,1
3%
79,6
7%
78,7
5%
509,99
517,36
521,01
74,00%
76,00%
78,00%
80,00%
82,00%
84,00%
86,00%
Concept 1 Concept 2 Concept 3
485
490
495
500
505
510
515
520
525
averag
ePower[MW]
PmittelAF
NCF
The Decision for Concept 1 resultedin saving 40% of capital investment
-
8/22/2019 Asset Management and Risk Management Dnv
13/14
13
TV Sddeutschland Bau und Betrieb GmbH
SDDEUTSCHLAND
Optimization targets in ROI
Identification (ranking) of critical systems and components
Identification of possible damage / deterioration mechanisms
Suitable inspection and maintenance methods
Determination of scope, location, and intervals
Economic balance
Documentation and traceability
Adjusted requirements for specifications, quality, certification,...(Risk Oriented Design, Risk Oriented Quality), Insurance Risk,
.....
-
8/22/2019 Asset Management and Risk Management Dnv
14/14
14
TV Sddeutschland Bau und Betrieb GmbH
SDDEUTSCHLAND
Summary
; Cost OptimizationAppropriate balance between costs and benefits
; Cost ConcentrationPrioritizing on relevant and critical systems and components
; Cost TraceabilitySystematic decision making on thebasis of traceable measures
; Code ComplianceAPI, ASME, RIMAP, ...national standards
Risk
Expenditure