asset management plan 2016 · future users of the assets. public lighting infrastructure includes...

157
City of Charles Sturt Public Lighting Asset Management Plan 2016 Scenario 1 Version 4 May 2016 Reserve Lighting Bollard Lighting Car Park Lights Street Lights Lighting Maintenance Lighting the future City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Upload: others

Post on 19-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

City of Charles Sturt

Public Lighting

Asset Management Plan 2016

Scenario 1 Version 4

May 2016

Reserve Lighting Bollard Lighting Car Park Lights

Street Lights Lighting Maintenance Lighting the future

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 2: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

Document Control

Document ID: 59 299 140531 nams plus3 amp template v3.1 16/140821

Rev No Date Revision Details Author Reviewer Approver

A1 October 2008 Preliminary Draft Asset Management Plan AOS PHE JCO

B October 2008 First Edition TRIM 08/180369 AOS PHE BFI

2 March 2013 Revision 2 Version 1 TRIM 13/54900 (Draft) AGL PHE

2 March 2013 Revision 2 Version 2 TRIM 13/54900 (Draft) AGL PHE

2 May 2013 Revision 2 Version 3 TRIM 13/54900 (Draft) AGL PHE 3 July 2014 Revision 3 (Draft) ATO MBL PHE

4 May 2016 Revision 4 MBL/AGL/ATO PHE/SHU AMCtte 24 Apr 2017

1 Revision A & B are prior versions of this document created outside of the NAMS.PLUS template system

© Copyright 2014 – All rights reserved.

The Institute of Public Works Engineering Australasia.

www.ipwea.org/namsplus

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 3: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

TABLE OF CONTENTS

1. EXECUTIVE SUMMARY .................................................................................................................... 5 Context .......................................................................................................................................... 5 What does it Cost? ......................................................................................................................... 5 What we will do ............................................................................................................................. 6 What we cannot do ........................................................................................................................ 6 Managing the Risks ........................................................................................................................ 6 Confidence Levels........................................................................................................................... 6 The Next Steps ............................................................................................................................... 6

2. INTRODUCTION .............................................................................................................................. 8 2.1 Background ............................................................................................................................ 8 2.2 Goals and Objectives of Asset Management ......................................................................... 10 2.3 Plan Framework ................................................................................................................... 11 2.4 Core and Advanced Asset Management ................................................................................ 13 2.5 Community Consultation ...................................................................................................... 13

3. LEVELS OF SERVICE ....................................................................................................................... 14 3.1 Customer Research and Expectations ................................................................................... 14 3.2 Strategic and Corporate Goals .............................................................................................. 14 3.3 Legislative Requirements ...................................................................................................... 15 3.4 Community Levels of Service ................................................................................................ 16 3.5 Technical Levels of Service .................................................................................................... 17

4. FUTURE DEMAND......................................................................................................................... 20 4.1 Demand Drivers ................................................................................................................... 20 4.2 Demand Forecast ................................................................................................................. 20 4.3 Demand Impact on Assets .................................................................................................... 20 4.4 Demand Management Plan ........................................................ Error! Bookmark not defined. 4.5 Asset Programs to meet Demand ......................................................................................... 23

5. LIFECYCLE MANAGEMENT PLAN ................................................................................................... 24 5.1 Background Data .................................................................................................................. 24 5.2 Infrastructure Risk Management Plan ................................................................................... 27 5.3 Routine Operations and Maintenance Plan ........................................................................... 27 5.4 Renewal/Replacement Plan .................................................................................................. 30 5.5 Creation/Acquisition/Upgrade Plan ...................................................................................... 33 5.6 Disposal Plan ........................................................................................................................ 35 5.7 Service Consequences and Risks ........................................................................................... 35

6. FINANCIAL SUMMARY .................................................................................................................. 37 6.1 Financial Statements and Projections ................................................................................... 37 6.2 Funding Strategy .................................................................................................................. 41 6.3 Valuation Forecasts .............................................................................................................. 42 6.4 Key Assumptions made in Financial Forecasts ....................................................................... 43 6.5 Forecast Reliability and Confidence ...................................................................................... 44

7. PLAN IMPROVEMENT AND MONITORING ..................................................................................... 45 7.1 Status of Asset Management Practices ................................................................................. 45 7.2 Improvement Program ......................................................................................................... 47 7.3 Monitoring and Review Procedures ...................................................................................... 48 7.4 Performance Measures ........................................................................................................ 48

8. REFERENCES ................................................................................................................................. 49 9. APPENDICES ................................................................................................................................. 50

Appendix A Maintenance Response Levels of Service ............................................................... 51 Appendix B Projected 10 year Capital Renewal and Replacement Works Program .................... 52 Appendix C Projected Upgrade/Exp/New 10 year Capital Works Program .............................. 149 Appendix D Budgeted Expenditures Accommodated in LTFP .................................................. 150 Appendix E Abbreviations ...................................................................................................... 151

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 4: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

Appendix F Glossary .............................................................................................................. 152

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 5: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 5 -

1. EXECUTIVE SUMMARY

Context The City of Charles Sturt embraces some of Adelaide’s oldest suburban developments with many residential and business facilities dating back many years. Over time and under Council guidance the area has grown to include many diverse services utilising a mixture of infrastructure and soft assets. For many years the City has grown both in size and demand and when reflecting the State’s 30 year plan for growth, the expectation for coming years is no different. Asset age, and therefore intervening investment to ensure condition and service levels are maintained, continues to provide the Council and its staff with a complicated challenge. Asset Management plans assist in setting the scene as the City of Charles Sturt continues to balance investment in both growth and maintenance.

This plan contributes to achieving the appropriate balance of social, cultural, environmental and economic services which are the keys to sustainability. Whilst assets are about the physical, at the forefront to this planning is our community – the current and future users of the assets.

Public lighting infrastructure includes lights listed below which assist to support community safety, promote recreational activities and encourages public life. In doing so, they support personal wellbeing and community prosperity.

The public lighting network as at May 2016, consists of 17,373 lights comprising:

• 3,852 Metered or Metered/Assumed lights - Council owned and maintained

• 104 Energy Only lights – Council owned and maintained

• 2 Solar lights – Council owned and maintained

• 970 CLER lights – Council owned lights. Council contribute to operational and maintenance costs. SAPN maintain network

• 11,642 SLUoS lights - SA Power Network owned and maintained lights. Council contribute to operational and maintenance costs.

• 803 DPTI lights on arterial roads – DPTI bill council a fixed rate per annum to cover 50% cost of power consumed, maintenance and renewal.

The above numbers are based on billing accounts Council pay each year. Lighting has 3 separate components being: • Light Head (Luminaire and globe where

installed) • Light pole or attachment arm/ bracket where

mounted on a stobie pole, including internal wiring,

• Underground wiring. Operational cost for lighting has 4 components being: • Network access cost • Maintenance cost • Renewal cost (covered by depreciation) • Power cost

This Asset Management Plan is focused on the known Council owned and maintained Metered lighting, Energy Only, and CLER lighting infrastructure assets that have a replacement value of $8,893,000

What does it Cost? The projected outlays necessary to provide the services covered by this Asset Management Plan (AM Plan) including operations, maintenance, renewal and upgrade of existing assets over the 10 year planning period is $33,810,000 or $3,381,000 on average per year.

Estimated available funding for this period is $26,878,000 or $2,688,000 on average per year. The breakup of this expenditure is approximately $2.1m operation and maintenance and $0.58m Capital.

This represents 79% of the cost to provide the service leaving a funding shortfall of $693,000 on average per year. Operational costs, power consumption and SAPN fees, will be paid ahead of Capital costs. Projected expenditure required to provide services in the AM Plan compared with planned expenditure currently

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 6: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 6 -

included in the Long Term Financial Plan are shown in the graph below.

What we will do

We plan to provide public lighting services for the following: • Operation, maintenance, renewal and upgrade of

Council Owned public lighting to meet service levels set by Council in annual budgets.

• Contribute to the delivery of objectives as outlined in the Councils Community Plan 2013-2027.

• Deliver strategic documents that have influence on the existing and proposed public lighting network.

• Improve our knowledge about community expectation for public lighting function and capacity.

• Move towards a cleaner, lower energy intensive type of light (Light Emitting Diode (LED)) when undertaking renewal work.

What we cannot do We do not have enough funding to provide all services at the desired service levels or provide new services to meet increasing customer expectations. Works and services that cannot be provided under present funding levels are: • Renewal of all Council owned CLER lighting as

nominated in Appendix B • Renewal of Council owned Energy Only lighting as

nominated in Appendix B • New lighting projects in line with community

expectations.

Managing the Risks There are risks associated with providing the service and not being able to complete all identified activities and projects. We have identified major risks as: • Lack of routine maintenance program that can

increase the risk of criminal behaviour due to insufficient lighting

• Insufficient funding to conduct renewals resulting in an increased risk of personal injury and property damage

• Insufficient resources to conduct lighting audits which leaves Council at risk of rusting light poles that potentially may fall and cause damages to property or person.

We will endeavour to manage these risks within available funding by: • Undertaking a general condition and catalogue

audit every 5 years • Continuing to prioritise the renewal program

based on community demand • Commence a citywide scheduled maintenance

program to maintain existing Council owned light globes

Confidence Levels This AM Plan is based on financial accounts paid by the City of Charles Sturt and, an Asset Management database with data of mixed accuracy and is therefore medium to low level of confidence information.

The Next Steps The actions resulting from this AM Plan are: • Review and update asset management system to

reconcile data between billing account and asset register

• Undertake an annual review, and revision as triggered, of the AM Plan using condition based asset data.

• Adopt auditing processes that will ensure the integrity of the AM Plan so the Council can meet its legislative obligations.

• Improve processes to keep the Asset Register and financial General Ledger consistent and up to date using the Works and Assets system.

• Implement bulk changeover of Council owned lighting heads to modern, energy efficient LED technology.

• Introduce a process to write off assets due to strategic decision or impacting works, causing need to bring forward the renewal of public lighting.

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 7: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 7 -

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

• Establish an Environmental Framework that reflects the objectives of ‘Living Green to 2020’.

• Review and implement improved design and construction standards applying to Public Lighting to reduce maintenance and extend useful life.

• Review and, where possible, simplify the process for recording and actioning requests for Public Lighting maintenance/repairs.

• Introduce financial procedures that identify spending on maintenance and repairs for Public Lighting.

Questions you may have

What is this plan about? This AM Plan covers the lighting infrastructure assets that serve the City of Charles Sturt community’s lighting needs, specifically Council owned and maintained Metered lighting, CLER Tariff Lighting and Energy Only tariff lighting. The assets throughout the community area that enable people to pursue recreational activities during the evening or early morning, including, lighting on reserves and sportsgrounds, West Lakes lake lighting and lighting on shared use path networks.

What is an Asset Management Plan? Asset management planning is a comprehensive process to ensure delivery of services from infrastructure is provided in a financially sustainable manner.

An asset management plan details information about infrastructure assets including actions required to provide an agreed level of service in the most cost effective manner. The plan defines the services to be provided, how the services are provided and what funds are required to provide the services.

Why is there a funding shortfall? Most of the Council’s public lighting network was constructed by developers and from government grants, often provided and accepted without consideration of ongoing operations, maintenance and replacement needs.

Service from the assets are decreasing and maintenance costs are increasing as many of these assets are approaching or have reached the end of their useful life and require replacement.

Our present funding levels are insufficient to continue to provide existing services at current levels in the medium term as well as increasing customer expectations for new services.

What options do we have? Resolving the funding shortfall involves several steps: 1. Improving asset knowledge so that data

accurately records the asset inventory, how assets are performing and when assets are not able to provide the required service levels.

2. Improving our efficiency in operating, maintaining, renewing and replacing existing assets to optimise life cycle costs.

3. Identifying and managing risks associated with providing services from infrastructure.

4. Making trade-offs between service levels and costs to ensure that the community receives the best return from infrastructure.

5. Identifying assets surplus to needs for disposal to make saving in future operations and maintenance costs.

6. Consulting with the community to ensure that public lighting services and costs are affordable and meet community needs.

7. Developing partnership with other bodies, where available to provide services.

8. Seeking additional funding from governments and other bodies to better reflect a ‘whole of government’ funding approach to infrastructure services.

What happens if we don’t manage the shortfall? A funding shortfall means that there will be a decrease in one, or more of the asset condition, function, or capacity. This may be acceptable to the community due to other priorities. There is a limit to how far these can reduce before the asset becomes unserviceable and not fit for purpose. Continued degradation of assets leads to a ‘future generations can pay’ attitude, or a need to stop the service being provided by the asset and remove the asset, both options are not seen to be a sustainable long term outcome.

Page 8: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 8 -

2. INTRODUCTION

2.1 Background

This Asset Management Plan (AM Plan) is to demonstrate responsive management of assets (and services provided from assets), compliance with regulatory requirements, and to communicate funding needed to provide the required levels of service over a 20 year planning period.

The AM Plan follows the format for AM Plans recommended in Section 4.2.6 of the International Infrastructure Management Manual2.

The AM Plan is to be read with the organisation’s Asset Management Policy, Asset Management Strategy and the following associated planning documents:

• City of Charles Sturt Community Plan 2013-2027 – A city where people come first • City of Charles Sturt Corporate Plan 2013-2017 • City of Charles Sturt ‘Living Green to 2020’ • City of Charles Sturt Engineering & Open Space Guidelines • City of Charles Sturt Environmental Sustainability Policy • City of Charles Sturt Asset Accounting Policy • City of Charles Sturt Asset Fund Policy • City of Charles Sturt Crime Prevention Through Environmental Design Policy

The infrastructure assets covered by this AM Plan are shown in Table 2.1. These assets are used to provide public lighting to the community in public recreational areas and streets.

Table 2.1: Assets covered by this Plan

Asset category Dimension Replacement Value Metered/Assumed 3,852 $8,598,153 Energy Only 104 $171,564 Solar 2 $3,990 CLER 970 $119,293

TOTAL 4,928 $8,893,000

2 IPWEA, 2011, Sec 4.2.6, Example of an Asset Management Plan Structure, pp 4|24 – 27.

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 9: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 9 -

Key stakeholders in the preparation and implementation of this asset management plan are: Shown in Table 2.1.1.

Table 2.1.1: Key Stakeholders in the AM Plan

Key Stakeholder Role in Asset Management Plan Councillors/Board Members • Represent needs of community/shareholders,

• Allocate resources to meet the organisation’s objectives in providing services while managing risks,

• Ensure organisation is financially sustainable. Chief Executive Officer (CEO) • Allocate resources to meet the organisation’s objectives in providing services

while managing risks, • Ensure organisation is financially sustainable.

General Manager of Asset Management Services

• Overall responsibility for Asset Management • Ensure funds are invested appropriately to ensure best value for money is

delivered to the community • Provide leadership in influencing decision making processes related to Asset

Management. Asset Management Portfolio Managers • Provide Leadership for effective Asset Management.

• Identify resource requirements for delivering various assets management services to the community

• Ensuring Asset Management services are provided in accordance with Corporate Plan and organisation priorities.

• Deliver services in a cost effective and sustainable manner. Asset Managers of the Asset Classes • Identifying resource requirements for specific asset classes.

• Responsible for reviewing and keeping AM Plan up to date • Responsible for preparing budget submissions in accordance with the AM

Plan • Delivering nominated renewal, upgrade projects. • Responsible for Asset Officer. • Coordinate with Asset officers and field Workgroup Leaders to identify areas

of need, process improvement. Asset Officers and Data Owners • Custodian of Asset data

• Responsible for keeping asset data up to date • Preparation of AM Plan • Financial accounting for assets

Field workgroups and their leaders • Operation and Maintenance management to meet agreed levels of service. • Highlight issues requiring attention of senior management.

Internal users of Asset Services (e.g. Library and Community Servicers)

• Provide timely advice as to future asset usage and requirements • Communicate asset condition and maintenance requirements as needed

The community (residents, businesses, property owners)

• Be aware of service levels and costs. • Participate in consultation processes • Provide feedback on services.

State and Federal Government • Provide Leadership in promoting Best Practice Asset management • Facilitate Training and Education Re: Current AM Plan • Recognising the importance of LG Assets to community and provide funding

and other assistance to sustain

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 10: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 10 -

Our organisational structure for service delivery from infrastructure assets is detailed below,

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 11: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 11 -

2.2 Goals and Objectives of Asset Management

The organisation exists to provide services to its community. Some of these services are provided by infrastructure assets. We have acquired infrastructure assets by ‘purchase’, contract, construction internally and by donation of assets constructed by developers and others to meet increased levels of service.

Our goal in managing infrastructure assets is to meet the defined level of service (as amended from time to time) in the most cost effective manner for present and future consumers. The key elements of infrastructure asset management are:

• Providing a defined level of service and monitoring performance. • Managing the impact of growth through demand management and infrastructure investment. • Taking a lifecycle approach to developing cost-effective management strategies for the long-term that meet

the defined level of service. • Identifying, assessing and appropriately controlling risks, and • Having a long-term financial plan which identifies required, affordable expenditure and how it will be

financed.3

2.3 Plan Framework

Key elements of the plan are:

• Levels of service – specifies the services and levels of service to be provided by the organisation. • Future demand – how this will impact on future service delivery and how this is to be met. • Life cycle management – how Council will manage its existing and future assets to provide defined levels of

service. • Financial summary – what funds are required to provide the defined services, • Asset management practices. • Monitoring – how the plan will be monitored to ensure it is meeting organisation’s objectives. • Asset management improvement plan.

A road map for preparing an asset management plan is shown below.

3 Based on IPWEA, 2011, IIMM, Sec 1.2 p 1|7.

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 12: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 12 -

Road Map for preparing an Asset Management Plan Source: IPWEA, 2006, IIMM, Fig 1.5.1, p 1.11.

IS THE PLAN AFFORDABLE?

CORPORATE PLANNINGConfirm strategic objectives and establish AM policies, strategies & goals. Define responsibilities & ownership.Decide core or advanced AM Pan.Gain organisation commitment.

REVIEW/COLLATE ASSET INFORMATIONExisting information sourcesIdentify & describe assets.Data collectionCondition assessmentsPerformance monitoringValuation Data

ESTABLISH LEVELS OF SERVICEEstablish strategic linkagesDefine & adopt statementsEstablish measures & targetsConsultation

LIFECYCLE MANAGEMENT STRATEGIESDevelop lifecycle strategiesDescribe service delivery strategyRisk management strategiesDemand forecasting and managementOptimised decision making (renewals, new works, disposals)Optimise maintenance strategies

FINANCIAL FORECASTSLifecycle analysisFinancial forecast summaryValuation DepreciationFunding

IMPROVEMENT PLANAssess current/desired practicesDevelop improvement plan

ITERATIONReconsider service statementsOptions for fundingConsult with CouncilConsult with Community

DEFINE SCOPE & STRUCTURE OF PLAN

INFO

RM

ATI

ON

MA

NA

GE

ME

NT,

and

DA

TA IM

PR

OV

EM

EN

T

AM PLAN REVIEW AND

AUDIT

IMPLEMENT IMPROVEMENT

STRATEGY

ANNUAL PLAN / BUSINESS PLAN

INFO

RM

ATI

ON

MA

NA

GE

ME

NT,

and

DA

TA IM

PR

OV

EM

EN

T

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 13: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 13 -

2.4 Core and Advanced Asset Management

This Asset Management Plan (AM Plan) is prepared as a ‘core’ AM Plan over a 20 year planning period in accordance with the International Infrastructure Management Manual4. It is prepared to meet minimum legislative and organisational requirements for sustainable service delivery and long term financial planning and reporting. Core asset management is a ‘top down’ approach where analysis is applied at the ‘system’ or ‘network’ level.

Future revisions of this AM Plan will move towards ‘advanced’ asset management using a ‘bottom up’ approach for gathering asset information for individual assets to support the optimisation of activities and programs to meet agreed service levels in a financially sustainable manner.

2.5 Community Consultation

This ‘core’ AM Plan is prepared to facilitate community consultation initially through feedback on public display of draft AM Plans prior to adoption by the Council/Board. Future revisions of the AM Plan will incorporate community consultation on service levels and costs of providing the service. This will assist the Council/Board and the community in matching the level of service needed by the community, service risks and consequences with the community’s ability and willingness to pay for the service.

4 IPWEA, 2011, IIMM.

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 14: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 14 -

3. LEVELS OF SERVICE

3.1 Customer Research and Expectations

The organisation has not carried out any specific research on customer expectations of Council owned public lighting. This will be investigated for future updates of the AM Plan.

It should be noted however that initial outcomes from the recent community consultation surrounding the new long term community plan revision has been incorporated where applicable.

The organisation uses this information in developing its Strategic Plan and in allocation of resources in the budget.

3.2 Strategic and Corporate Goals

This AM Plan is prepared under the direction of the organisation’s Community, Sustainability and Corporate Plans. Relevant organisation goals and objectives and how these are addressed in this AM Plan are:

Table 3.2: Organisational Goals and how these are addressed in this Plan

Goal Objective How Goal and Objectives are addressed in AM Plan 2.6 Create and maintain an integrated, attractive and safe transport network that emphasises and focuses on pedestrians and cyclists.

2.6.8 Improve public lighting so it meets current standards for personal safety

Programmed renewal and upgrade of public lighting using CPTED principles where practical.

2.9 Create quality adaptable and integrated open space.

2.9.2 Improve personal safety on paths and public lighting on open space to comply with current standard for colour rendition and illumination level to encourage night time activity. Priorities include: • Recreational walking and

cycling loop and connections around the lake at West Lakes.

• Carparks and connections on open space across the City of Charles Sturt

Maintain public lighting to optimal luminescence so that customer satisfaction survey results from Open Space users is satisfactory.

3.6 Develop climate change adaption solutions

3.5.4 Continuously improve the energy and water efficiency of Council’s programs and operations

Programmed maintenance with a goal to increase the percentage of public lights using energy efficient technology.

The organisation will exercise its duty of care to ensure public safety in accordance with the infrastructure risk management plan prepared in conjunction with this AM Plan. Management of infrastructure risk is covered in Section 5.2

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 15: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 15 -

3.3 Legislative Requirements

The organisation has to meet many legislative requirements including Australian and State legislation and State regulations. These include:

Table 3.3: Legislative Requirements

Legislation Requirement

South Australian Local Government Act 1999

Sets out role, purpose, responsibilities and powers of Local Government including the preparation of a long term financial plan supported by asset management plans for sustainable service delivery.

South Australian State Records Act 1997

To ensure the City of Charles Sturt records and stores all relevant information as set out by the State Government of SA

Environment Protection Act 1993 To ensure that all reasonable and practicable measures are taken to protect, restore and enhance the quality of the environment having regard to the principles of ecologically sustainable development

Work Health & Safety Act 2012 To take a constructive role in promoting improvements in work health and safety practices and assisting in the preservation of public health and safety in all undertakings of the organisation.

Planning, Development and Infrastructure Act 2016

An act to provide for planning and regulate development in the state; to regulate the use and management of land and building and for other purposes

SA Public Health Act 2011 An Act Dealing With Public And Environmental Health; To Repeal The Health Act 1935, The Noxious Trades Act 1934 And The Venereal Diseases Act 1947; And For Other Purposes.

Aust Road Rules are applied under the SA Road Traffic Act 1961

An act which gives road authorities in each state delegated power to establish standards for all aspects of roadways, including paths and lighting.

Disability Discrimination Act 1992 Provides protection for everyone in Australia against discrimination based on disability. It encourages everyone to be involved in implementing the Act and to share in the overall benefits to the community and the economy that flow from participation by the widest range of people.

The organisation will exercise its duty of care to ensure public safety in accordance with the infrastructure risk management plan linked to this AM Plan. Management of risks is discussed in Section 5.2.

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 16: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 16 -

3.4 Community Levels of Service

Service levels are defined service levels in two terms, customer levels of service and technical levels of service.

Community Levels of Service measure how the community receives the service and whether the organisation is providing community value.

Community levels of service measures used in the asset management plan are:

Quality How good is the service? Function Does it meet users’ needs? Capacity/Utilisation Is the service over or under used?

The organisation’s current and expected community service levels are detailed in Tables 3.4 and 3.5. Table 3.4 shows the agreed expected community levels of service based on resource levels in the current long-term financial plan and community consultation/engagement.

Table 3.4: Community Level of Service

Service Attribute

Service Objective Performance Measure Process

Current Performance Expected position in 10 years based on current

LTFP COMMUNITY OUTCOMES

• Liveability and Place - “Create and maintain an integrated, attractive and safe transport network that emphasises and focuses on pedestrians and cyclists.”

• Liveability and Place - “Ensure that community facilities are developed and well maintained on an equitable basis.”

• Sustainability and Environment - “Develop climate change adaptation solutions.”

COMMUNITY LEVELS OF SERVICE Quality Streets and Reserves

are well lit Service requests for maintenance or new/upgrade of lights relating to areas being too dark.

19/year 40/year estimated based on current budget forecast

Organisational measure. % of globe assets in very good/good (1,2) and poor/very poor (4,5) condition and confidence levels

9% very good/good. 63% poor/very poor. Confidence level - Low

40% very good/good. 15% poor/very poor Based on renewed lights being high efficient LED. Confidence level: Medium

Function Public Lighting is in good working order

Service requests for maintenance of existing Council owned lights

167/year 100/year

Organisational measure. % of lighting assets in very good/good (1,2) and poor/very poor (4,5) condition and confidence levels

22% very good/good. 23% poor/very poor. Confidence level Low

Target 30% very good/good. 15% poor/very poor Based on renewed lights being high efficient LED. Confidence level Medium

Capacity/ Utilisation

Public Lighting is available and adequate for the facility

Service requests for new/upgrade of public lighting

33/year 30/year estimated based on current budget forecast

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 17: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 17 -

3.5 Technical Levels of Service

Technical Levels of Service - Supporting the community service levels are operational or technical measures of performance. These technical measures relate to the allocation of resources to service activities that the organisation undertakes to best achieve the desired community outcomes and demonstrate effective organisational performance.

Technical service measures are linked to annual budgets covering:

• Operations – the regular activities to provide services such as opening hours, cleansing, mowing grass, energy, inspections, etc.

• Maintenance – the activities necessary to retain an asset as near as practicable to an appropriate service condition (e.g. road patching, unsealed road grading, building and structure repairs).

• Renewal – the activities that return the service capability of an asset up to that which it had originally (e.g. frequency and cost of road resurfacing and pavement reconstruction, pipeline replacement and building component replacement).

• Upgrade – the activities to provide a higher level of service (eg widening a road, sealing an unsealed road, replacing a pipeline with a larger size) or a new service that did not exist previously (e.g. a new library).

Asset Managers plan, implement and control technical service levels to influence the customer service levels.5

Table 3.5 shows the technical level of service expected to be provided under this AM Plan. The agreed sustainable position in the table documents the position agreed by the Council/Board following community consultation and trade-off of service levels performance, costs and risk within resources available in the long-term financial plan.

5 IPWEA, 2011, IIMM, p 2.22

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 18: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 18 -

Table 3.5: Technical Levels of Service

Service Attribute

Service Objective Activity Measure Process

Current Performance * Desired for Optimum Lifecycle Cost **

Agreed Sustainable Position ***

TECHNICAL LEVELS OF SERVICE Operations Public Lights are energy

efficient Power Consumption (kW) reduces on a yearly basis

As at May 2016 8.1% of Council owned metered lights are energy efficient LED globes

All non-efficient lighting is replaced with efficient lighting (such as LED) within their useful life.

40% of non-efficient lighting will be replaced with efficient lighting (such as LED) within their useful life.

Public Lights are in good working condition

Condition Audit conducted every 5 years

Last Audit was conducted in 2010 Lighting audit should be completed every 5 years, however has not occurred since 2010 and is not scheduled until 2020.

Lighting under council administration is repaired as per agreed service standards.

Budget Council Owned Lights Only Operating Cost $1,889,000

Council Owned Lights Only Operating Cost $1,889,000

Further analysis required

Maintenance Public Lights are fully functional

Planned maintenance activities completed to schedule

No routine scheduled maintenance; lights are repaired when they fail.

Replace all globes past their useful life in year one and put all remaining globes on a scheduled maintenance program

Replace globes and clean luminaires on a 5 year rotational basis.

Public lighting requests for repair/maintenance are carried out in a timely fashion.

Reactive service requests completed within KPI timeframes

Lighting repair and maintenance request are delivered in 2 weeks for minor repairs, 6-8 weeks for major repairs

All repairs/maintenance are carried out within 2 weeks

Lighting repair and maintenance request are delivered in 2 weeks for minor repairs, 6-8 weeks for major repairs

Budget Reactive maintenance for Council owned metered lights $150,000 Planned maintenance for Council owned metred lights $50,000

Planned Maintenance $100,000 Reactive Maintenance $100,000

Planned Maintenance $150,000 Reactive Maintenance $50,000

Renewal Public lights are renewed with energy efficient lighting at the end of their useful life.

The number of lights that are renewed each year through light renewal capital project

Lights are replaced based on known issues and age – informal

Lighting is replaced based on age and condition at end of useful life.

Lighting is replaced on priority basis up to available budget.

Budget Renewals $386,000 Renewals $766,000 Renewals To Be Determined Upgrade/New Public Lights are

appropriately designed for the area of need.

The number of lights that are upgraded each year through light Upgrade/New capital project

New/Upgraded lights are installed based on customer requests and project based data.

New and upgraded lighting is prioritised based on the Corporate Plan and take into consideration customer requests.

New and upgraded lights will be installed based on the Corporate Plan and customer requests based on available budget.

Budget New/Upgrade $310,000 New/Upgrade $310,000 1 New/Upgrade To be determined

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 19: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 19 -

Note: * Current activities and costs (currently funded). ** Desired activities and costs to sustain current service levels and achieve minimum life cycle costs (not currently funded).

*** Activities and costs communicated and agreed with the community as being sustainable (funded position following trade-offs, managing risks and delivering agreed service levels).

Note 1 Budget figure currently inadequate to meet customer demand.

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 20: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 20 -

4. FUTURE DEMAND

4.1 Demand Drivers

Drivers affecting demand include population change, changes in demographics, seasonal factors, vehicle ownership rates, consumer preferences and expectations, technological changes, economic factors, agricultural practices, environmental awareness, etc.

4.2 Demand Forecast

The present position and projections for demand drivers that may impact future service delivery and utilisation of assets were identified and are documented in Table 4.3.

4.3 Demand Impact on Assets

The impact of demand drivers that may affect future service delivery and utilisation of assets are shown in Table 4.3.

Table 4.3: Demand Drivers, Projections and Impact on Services

Demand drivers Present position Projection Impact on services Population change Year Population

2015 112,714

Year Population

2016 115,037

2021 120,658

2026 125,889

Increased demand for quality open space areas that meet safety standards.

Demographic change Age/Year 2015

0-4 6%

5-14 10%

15-24 13%

25-44 28%

45-64 26%

65-74 9%

75+ 10%

Age/Year 2016 2021 2026

0-4 6% 5% 5%

5-14 11% 11% 11%

15-24 12% 12% 12%

25-44 27% 26% 25%

45-64 25% 26% 25%

65-74 10% 10% 10%

75+ 9% 10% 11%

Increased demand for integrated transport networks that cater for users.

Community expectation change

Community accepts the replacement of lighting. Expectation for lighting to be in good working order.

Anticipate increased demand for lighting to reduce criminal behaviour and protect the community.

Need to establish a routine maintenance program for areas such as RTLP and West Lakes edge.

Legislative change Lights constructed according to current legislation.

Lights constructed (and possibly) maintained according to future legislative requirements.

Unknown, likely to be greater regulation.

More litigious society Claims against Council for personal injury due to poor lighting are low.

Claims against Council for personal injury and incidence that occur due to poor lighting could increase.

Increased cost in defending Council actions and payments to claimants.

Land use densification Much of the Council area has low, or low/medium density land uses being residential and industry.

Delivery of the North West Growth Corridor in accordance with the ‘30-Year Plan for Greater Adelaide’ will replace industrial areas mixed-uses including medium/high density residential.

Greater activity on all transport networks in the growth corridor.

Transport changes Very high use of motor vehicles for most trips.

High cost motor vehicle trips substituted with active alternatives, especially for local trips and the journey to work.

Increased demand for an extension to the path network, change to lighting function and capacity.

Lifestyle changes Community just becoming aware of health benefits of physical activity such as

Increasing recreational walking and cycling and public life activities on the path network.

Change in path function and capacity.

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 21: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 21 -

walking and cycling starting to undertake more of these activities.

Increased demand for responsive maintenance and repairs to public lighting

Council financial sustainability

Council Long Term Financial Plan has been able to meet the required budgets to deliver most components to manage the lighting assets.

Limited revenue growth in Council rates and reduced size of grants from other tiers of government not matching required asset expenditures.

Decreased ability to fund timely renewal and upgrade of poor/very poor condition asset. Increased need for maintenance and repairs.

Council operational & services priority changes

Local government is inheriting services from State and Federal governments, and taking up new operations and services in response to community demand.

This trend is likely to accelerate, but there is limited revenue growth to fund them placing pressure on all operations and services including asset provision and maintenance.

Decreased ability to fund timely renewal and upgrade of poor/very poor condition asset. Increased need for maintenance and repairs.

Environmental sustainability

Lights are constructed to be more energy efficient

Cost of energy will continue to increase and pressure to keep Council rates low will drive the need for energy efficient lighting.

Increased frequency of inspections and maintenance and repairs. Installation of cost effective lighting projects

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 22: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 22 -

4.4 Demand Management Plan

Demand for new services will be managed through a combination of managing existing assets, upgrading existing assets,providing new assets to meet demand and demand management. Demand management practices include non-asset solutions, insuring against risks and managing failures.

Non-asset solutions focus on providing the required service without the need for the organisation to own the assets and management actions including reducing demand for the service, reducing the level of service (allowing some assets to deteriorate beyond current service levels) or educating customers to accept appropriate asset failures6. Examples of non-asset solutions include providing services from existing infrastructure such as aquatic centres and libraries that may be in another community area or public toilets provided in commercial premises.

Opportunities identified to date for demand management are shown in Table 4.4. Further opportunities will be developed in future revisions of this asset management plan.

Table 4.4: Demand Management Plan Summary

Demand drivers Impact on services Demand Management Plan

Population change Increased demand from the disabled and elderly

Negotiate with developers where a development affects public lighting so they are upgraded to CPTED standards. Review current development and transport documents for impacts on open space and transport networks.

Demographic change Increased demand for integrated transport networks that cater for pedestrians and cyclists.

Determine the areas where these demographic changes are likely to be greatest and give priority to upgrading cycling networks and walking routes in those areas.

Community expectation change

Need to establish a routine maintenance program for areas such as RTLP and West Lakes edge.

Discuss options for greater provision for these services with Field Services Portfolio to develop a strategy to fund these additional services.

Legislative change Unknown, likely to be greater regulation.

Be aware of any proposed changes to legislation, or introduction of new legislation that may impact on public lighting, and advocate for reasonableness of intent and impact.

More litigious society Increased cost in defending council actions and payments to claimants.

Improve work recording and retrieval systems. Improve the responsiveness and timelines of maintenance and repair activities.

Land use densification Greater activity on all transport networks in the growth corridor.

Identify the increase in population and workplace opportunities in the growth corridor to determine likely increased demand for public lighting.

Transport changes Increased demand for an extension to the path network, change to lighting function and capacity.

Raise the priority of public lighting upgrades to areas of greatest demand.

Lifestyle changes Change in path function and capacity. Increased demand for responsive maintenance and repairs to public lighting

Discuss options for greater provision for these services with Field Services Portfolio to develop a strategy to fund these additional services.

6 IPWEA, 2011, IIMM, Table 3.4.1, p 3|58.

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 23: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 23 -

Demand drivers Impact on services Demand Management Plan

Council financial sustainability

Decreased ability to fund timely renewal and upgrade of poor/very poor condition asset, and Increased need for maintenance and repairs.

Balance out expenditure on this asset class against requirement of other asset classes and services managed by council to achieve best value for money for the ratepayers and community.

Environmental sustainability

Increased frequency of inspections and maintenance and repairs. Installation of cost effective lighting projects.

Review material selection and work practices for higher standards offsetting these climatic effects.

4.5 Asset Programs to meet Demand

The new assets required to meet growth will be acquired free of cost from land developments and constructed/acquired by the organisation. New assets constructed/acquired by the organisation are discussed in Section 5.5. The cumulative value of new contributed and constructed asset values are summarised in Figure 1.

Figure 1: Upgrade and New Assets to meet Demand

Acquiring these new assets will commit the organisation to fund ongoing operations, maintenance and renewal costs for the period that the service provided from the assets is required. These future costs are identified and considered in developing forecasts of future operations, maintenance and renewal costs in Section 5.

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 24: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 24 -

5. LIFECYCLE MANAGEMENT PLAN

The lifecycle management plan details how the organisation plans to manage and operate the assets at the agreed levels of service (defined in Section 3) while optimising life cycle costs.

5.1 Background Data

5.1.1 Physical parameters

The assets covered by this AM Plan are shown in Table 2.1.

The lighting assets in this plan focus on CLER and Energy Only lights (Owned by Council and erected on SAPN infrastructure) and metered, Council owned lighting. These assets are located within reserves and sportsgrounds, on cycling and pedestrian networks and around the West Lakes lake.

The age profile of the assets include in this AM Plan is shown in Figure 2.

Figure 2: Asset Age Profile

This graph shows a boom in lighting construction for our reserves and sportsgrounds and path lighting in the 70’s, 80’s and 90’s.

Age profile information that was “unknown” was derived from engineering plans of reserve construction and/or extrapolated from asset condition of assets of a similar construction type or age. The confidence in the age data is uncertain. Current lighting programs are based on condition because age has been relatively unknown prior to this AM Plan.

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 25: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 25 -

5.1.2 Asset capacity and performance

The organisation’s services are generally provided to meet design standards where these are available.

Locations where deficiencies in service performance are known are detailed in Table 5.1.2.

Table 5.1.2: Known Service Performance Deficiencies

Location Service Deficiency Whole City Majority of lighting is incandescent lighting. They deteriorate rapidly after 5 years

and do not meet their lumens output. Whole City State of underground wiring is unknown Coastal locations Light poles are reaching the end of their useful life early because of rust and

structural problems.

The above service deficiencies were identified from customer requests and inspections.

5.1.3 Asset condition

A general audit by persons trained in auditing is conducted regularly, around every 7-8 years for Asset Register reconciliation and updated public lighting condition assessment. The last public lighting audit that was conducted was in 2010. Condition is continually monitored using ‘casual’ surveillance by Council staff.

The condition profile of our assets is shown in Figure 3.

Fig 3: Asset Condition Profile

Condition is measured using a 1 – 5 grading system7 as detailed in Table 5.1.3.

0 Rating are those lights that are unmeasured.

7 IPWEA, 2011, IIMM, Sec 2.5.4, p 2|79.

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 26: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 26 -

Table 5.1.3: Simple Condition Grading Model

Condition Grading Description of Condition 1 Very Good: only planned maintenance required 2 Good: minor maintenance required plus planned maintenance 3 Fair: significant maintenance required 4 Poor: significant renewal/rehabilitation required 5 Very Poor: physically unsound and/or beyond rehabilitation

5.1.4 Asset valuations

The value of assets covered by this asset management plan and recorded in the asset register as at December 2015 is shown below. Assets were last revalued at May 2016. Assets are valued at current replacement costs.

Current Replacement Cost $8,893,000

Depreciable Amount $8,893,000

Depreciated Replacement Cost8 $8,893,000

Annual Depreciation Expense $142,000

Note: Depreciation based on commissioned assets only hence is very low – this needs to be addressed. Useful lives were reviewed in May 2016 by the Asset Manager based on current replacement programs. Refer Table 5.4.1.Key assumptions made in preparing the valuations were:

• Valuation figures are based on 2014 values. • Straight line depreciation has been used. • Residual value of $9,000 (i.e. cost of disposal)

Major changes from previous valuations are due to using actual costs incurred from projects undertaken over previous years.

Various ratios of asset consumption and expenditure have been prepared to help guide and gauge asset management performance and trends over time.

Rate of Annual Asset Consumption 1.6% (Depreciation/Depreciable Amount)

Rate of Annual Asset Renewal 4.3% (Capital renewal expenditure/Depreciable amount)

Rate of Annual Asset Upgrade/New 3.5% (Capital upgrade expenditure /Depreciable amount)

Rate of Annual Asset Upgrade/New 3.6% (Including contributed assets)

In 2016 the organisation plans to renew assets at 271.8% of the rate they are being consumed and will be increasing its asset stock by 3.6% in the year. This rate of consumption will increase substantially once lighting assets are commissioned and full impact of depreciation are realised.

8 Also reported as Written Down Current Replacement Cost (WDCRC).

Residual Value

Depreciable Amount

Useful Life

Current Replacement

Cost

End of reporting period 1

Annual Depreciation

Expense

End of reporting period 2

Accumulated Depreciation

Depreciated Replacement

Cost

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 27: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 27 -

5.1.5 Historical Data

Historical data regarding public lighting condition, useful lives and renewal forecasts can be found in the City of Charles Sturts previous Asset Management Plan for Public Lights endorsed in 2008, TRIM reference 08/180369.

5.2 Infrastructure Risk Management Plan

An assessment of risks9 associated with service delivery from infrastructure assets has identified critical risks that will result in loss or reduction in service from infrastructure assets or a ‘financial shock’ to the organisation. The risk assessment process identifies credible risks, the likelihood of the risk event occurring, the consequences should the event occur, develops a risk rating, evaluates the risk and develops a risk treatment plan for non-acceptable risks.

Critical risks, being those assessed as ‘Very High’ - requiring immediate corrective action and ‘High’ – requiring prioritised corrective action identified in the Infrastructure Risk Management Plan, together with the estimated residual risk after the selected treatment plan is operational are summarised in Table 5.2. These risks are reported to management and Council/Board.

Table 5.2: Critical Risks and Treatment Plans

Service or Asset at Risk

What can Happen Risk Rating (VH, H)

Risk Treatment Plan Residual Risk *

Treatment Costs

Public Lighting - light failure

Danger to community – increase in criminal behaviour.

VH Audit lights in high risk areas and programme work to renew ageing lights.

M $500,000 est

Public Lighting - light failure

Bicycle or pedestrian accident on Shared Use Paths

H Implement a rolling 5 year program to clean and replace light globes

L $70,000

Public Lighting - light failure

Road accident H Budget to re-audit all lights in the next financial year with a priority to lights at risk.

M $40,000 est

Public Lighting – light failure along lake edge

Person fall into West Lakes

H Implement a rolling 5 year program to clean and replace light globes along lake edge.

L Portion of $65,000 planned maintenance budget.

Note * The residual risk is the risk remaining after the selected risk treatment plan is operational. 5.3 Routine Operations and Maintenance Plan

Operations include regular activities to provide services such as public health, safety and amenity, e.g. cleaning, street sweeping, grass mowing and street lighting.

Routine maintenance is the regular on-going work that is necessary to keep assets operating, including instances where portions of the asset fail and need immediate repair to make the asset operational again.

5.3.1 Operations and Maintenance Plan

Operations activities such as street sweeping and grass mowing frequency, intensity and spacing of street lights and cleaning frequency and opening hours of building and other facilities affect service levels including quality and function..

9 The City of Charles Sturt uses a framework that has been approved and is in accordance with International Standard ISO31000:2009

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 28: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 28 -

Maintenance includes all actions necessary for retaining an asset as near as practicable to an appropriate service condition including regular ongoing day-to-day work necessary to keep assets operating, e.g. road patching but excluding rehabilitation or renewal. Maintenance may be classified into reactive, planned and specific maintenance work activities.

Reactive maintenance is unplanned repair work carried out in response to service requests and management/supervisory directions.

Planned maintenance is repair work that is identified and managed through a maintenance management system (MMS). MMS activities include inspection, assessing the condition against failure/breakdown experience, prioritising, scheduling, actioning the work and reporting what was done to develop a maintenance history and improve maintenance and service delivery performance.

Specific maintenance is replacement of higher value components/sub-components of assets that is undertaken on a regular cycle including repainting, replacing air conditioning units, etc. This work falls below the capital/maintenance threshold but may require a specific budget allocation.

Actual past maintenance expenditure is shown in Table 5.3.1.

Table 5.3.1: Maintenance Expenditure Trends

Year Maintenance Expenditure Planned and Specific Unplanned

2012/13 $70,500 $5,250 2013/14 $79,050 $6,750 2014/15 $150,000 $50,000 2015/16 $150,000 $50,000

Planned maintenance work is currently 75% of total maintenance expenditure.

Due to increased customer requests and identified defects from the last audit, maintenance expenditure levels are considered to be inadequate to meet projected service levels. Where maintenance expenditure levels are such that will result in a lesser level of service, the service consequences and service risks have been identified. Service consequences are highlighted in this Asset Management Plan and service risks considered in the Infrastructure Risk Management Plan. Maintenance expenditure levels and renewals expenditure have been reviewed and increased as appropriate.

Assessment and prioritisation of reactive maintenance is undertaken by Council staff using experience and judgement.

5.3.2 Operations and Maintenance Strategies

The organisation will operate and maintain assets to provide the defined level of service to approved budgets in the most cost-efficient manner. The operation and maintenance activities include:

• Scheduling operations activities to deliver the defined level of service in the most efficient manner. • Undertaking maintenance activities through a planned maintenance system to reduce maintenance costs and

improve maintenance outcomes. • Undertake cost-benefit analysis to determine the most cost-effective split between planned and unplanned

maintenance activities (50 – 70% planned desirable as measured by cost). • Maintain a current infrastructure risk register for assets and present service risks associated with providing

services from infrastructure assets and reporting Very High and High risks and residual risks after treatment to management and Council/Board.

• Review current and required skills base and implement workforce training and development to meet required operations and maintenance needs.

• Review asset utilisation to identify underutilised assets and appropriate remedies, and over utilised assets and customer demand management options.

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 29: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 29 -

• Maintain a current hierarchy of critical assets and required operations and maintenance activities. • Develop and regularly review appropriate emergency response capability. • Review management of operations and maintenance activities to ensure Council is obtaining best value for

resources used.

Asset hierarchy

An asset hierarchy provides a framework for structuring data in an information system to assist in collection of data, reporting information and making decisions. The hierarchy includes the asset class and component used for asset planning, and financial reporting and service level hierarchy used for service planning and delivery.

The organisation’s service hierarchy is shown is Table 5.3.2.

Table 5.3.2: Asset Service Hierarchy

Service Hierarchy Service Level Objective Light globes Light globes are in good working order Luminaires Luminaires are clean and functional Poles Poles are structurally sound Electrical wiring Electrical wiring is fully functional Critical Assets

Critical assets are those assets which have a high consequence of failure but not necessarily a high likelihood of failure. By identifying critical assets and critical failure modes, organisations can target and refine investigative activities, maintenance plans and capital expenditure plans at the appropriate time.

Operations and maintenance activities may be targeted to mitigate critical assets failure and maintain service levels. These activities may include increased inspection frequency, higher maintenance intervention levels, etc. Critical assets failure modes and required operations and maintenance activities are detailed in Table 5.3.2.1.

Table 5.3.2.1: Critical Assets and Service Level Objectives

Critical Assets Critical Failure Mode Operations & Maintenance Activities Public lighting assets Failure resulting in inability for

users to conduct usual activities. Injury and property damage risk and increase in criminal activity

Maintenance and repairs in accordance with agreed response and service levels.

Standards and specifications

Maintenance work is carried out in accordance with the following Standards and Specifications.

• AS/NZS 3000/Electrical Installations. • AS 3008/Electrical installations – selection of cables. • AS 3116/Elastomer insulated electric cables and flexible cables for working voltages of 0.6/1 kV. • AS 3147/Electric Cables – thermoplastic insulated for working voltages up to and including 0.6/1 kV. • AS 2053/Non-metallic conduits and fittings. • AS 1939/Classification of degrees of protection provided by enclosures for electrical equipment. • AS 3137/Luminaries (light fittings). • AS1141.11 – 1996/Particle size distribution by dry sieving. • AS/NZ 60598.1/Luminaries Part 1 General Requirements and Tests.

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 30: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 30 -

5.3.3 Summary of future operations and maintenance expenditures

Future operations and maintenance expenditure is forecast to trend in line with the value of the asset stock as shown in Figure 4. Note that all costs are shown in current 2014 dollar values (i.e. real values).

Figure 4: Projected Operations and Maintenance Expenditure

Deferred maintenance, i.e. works that are identified for maintenance and unable to be funded, are to be included in the risk assessment and analysis in the infrastructure risk management plan.

Maintenance is funded from the operating budget where available. This is further discussed in Section 6.2.

5.4 Renewal/Replacement Plan

Renewal and replacement expenditure is major work which does not increase the asset’s design capacity but restores, rehabilitates, replaces or renews an existing asset to its original or lesser required service potential. Work over and above restoring an asset to original service potential is upgrade/expansion or new works expenditure.

5.4.1 Renewal plan

Assets requiring renewal/replacement are identified from one of three methods provided in the ‘Expenditure Template’.

• Method 1 uses Asset Register data to project the renewal costs using acquisition year and useful life to determine the renewal year, or

• Method 2 uses capital renewal expenditure projections from external condition modelling systems (such as Pavement Management Systems), or

• Method 3 uses a combination of average network renewals plus defect repairs in the Renewal Plan and Defect Repair Plan worksheets on the ‘Expenditure template’.

Method 1 was used for this AM Plan.

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 31: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 31 -

Table 5.4.1: Useful Lives of Assets

Asset (Sub)Category Useful life Globes – incandescent 5 years LED Light Panels 15 years Luminaires (Light Head) 30 years Poles 30 years Underground Wiring 30 years* (to be reviewed)

5.4.2 Renewal and Replacement Strategies

The organisation will plan capital renewal and replacement projects to meet level of service objectives and minimise infrastructure service risks by:

• Planning and scheduling renewal projects to deliver the defined level of service in the most efficient manner. • Undertaking project scoping for all capital renewal and replacement projects to identify:

o the service delivery ‘deficiency’, present risk and optimum time for renewal/replacement. o the project objectives to rectify the deficiency. o the range of options, estimated capital and life cycle costs for each option that could address the

service deficiency. o and evaluate the options against evaluation criteria adopted by the organisation. o select the best option to be included in capital renewal programs.

• Using ‘low cost’ renewal methods (cost of renewal is less than replacement) wherever possible. • Maintain a current infrastructure risk register for assets and service risks associated with providing services

from infrastructure assets and reporting Very High, High and Residual risks after treatment to management and Council/Board.

• Review current and required skills base and implement workforce training and development to meet required construction and renewal needs.

• Maintain a current hierarchy of critical assets and capital renewal treatments and timings required. • Review management of capital renewal and replacement activities to ensure Council is obtaining best value

for resources used.

Renewal ranking criteria

Asset renewal and replacement is typically undertaken to either:

• Ensure the reliability of the existing infrastructure to deliver the service it was constructed to facilitate (e.g. replacing a bridge that has a 5t load limit), or

• Ensure the infrastructure is of sufficient quality to meet the service requirements (e.g. roughness of a road).10

It is possible to get some indication of capital renewal and replacement priorities by identifying assets or asset groups that:

• Have a high consequence of failure. • Have a high utilisation and subsequent impact on users would be greatest. • The total value represents the greatest net value to the organisation. • Have the highest average age relative to their expected lives. • Are identified in the AM Plan as key cost factors. • Have high operational or maintenance costs. • Where replacement with modern equivalent assets would yield material savings.11

10 IPWEA, 2011, IIMM, Sec 3.4.4, p 3|60.

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 32: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 32 -

The ranking criteria used to determine priority of identified renewal and replacement proposals is detailed in Table 5.4.2.

Table 5.4.2: Renewal and Replacement Priority Ranking Criteria

Criteria Weighting Lighting Assets that are in Very Poor condition 40% Lighting Assets that are in Poor condition 30% Lights that have reached the end of their useful life

20%

Customer requests for lighting renewal 10% Total 100%

Renewal and replacement standards

Renewal work is carried out in accordance with the following Standards and Specifications.

• AS/NZS 3000/Electrical Installations. • AS 3008/Electrical installations – selection of cables. • AS 3116/Elastomer insulated electric cables and flexible cables for working voltages of 0.6/1 kV. • AS 3147/Electric Cables – thermoplastic insulated for working voltages up to and including 0.6/1 kV. • AS 2053/Non-metallic conduits and fittings. • AS 3137/Luminaries (light fittings).

5.4.3 Summary of future renewal and replacement expenditure

Projected future renewal and replacement expenditures are forecast to increase over time as the asset stock increases from growth. The expenditure is summarised in Fig 5. Note that all amounts are shown in real values.

11 Based on IPWEA, 2011, IIMM, Sec 3.4.5, p 3|66.

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 33: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 33 -

The projected capital renewal and replacement program is shown in Appendix B.

Fig 5: Projected Capital Renewal and Replacement Expenditure

Deferred renewal and replacement i.e. those assets identified for renewal and/or replacement and not scheduled in capital works programs, are to be included in the risk analysis process in the risk management plan.

Renewals and replacement expenditure in the organisation’s capital works program will be accommodated in the long term financial plan. This is further discussed in Section 6.2.

5.5 Creation/Acquisition/Upgrade Plan

New works are those works that create a new asset that did not previously exist, or works which upgrade or improve an existing asset beyond its existing capacity. They may result from growth, social or environmental needs. Assets may also be acquired at no cost to the organisation from land development. These assets from growth are considered in Section 4.4.

5.5.1 Selection criteria

New assets and upgrade/expansion of existing assets are identified from various sources such as councillor/director or community requests, proposals identified by strategic plans or partnerships with other organisations. Candidate proposals are inspected to verify need and to develop a preliminary renewal estimate. Verified proposals are ranked by priority and available funds and scheduled in future works programmes. The priority ranking criteria is detailed below.

Table 5.5.1: New Assets Priority Ranking Criteria

Criteria Weighting Project that is part of the Corporate Plan 40% Site that includes a number of assets in Poor or Very Poor condition

30%

Site that includes a number of assets at the end of their useful life (could also be in Poor or Very Poor

20%

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 34: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 34 -

Condition) Customer request for new lighting 10% Total 100%

5.5.2 Capital Investment Strategies

The organisation will plan capital upgrade and new projects to meet level of service objectives by:

• Planning and scheduling capital upgrade and new projects to deliver the defined level of service in the most efficient manner.

• Undertake project scoping for all capital upgrade/new projects to identify: o the service delivery ‘deficiency’, present risk and required timeline for delivery of the upgrade/new

asset. o the project objectives to rectify the deficiency including value management for major projects. o the range of options, estimated capital and life cycle costs for each options that could address the

service deficiency. o management of risks associated with alternative options. o and evaluate the options against evaluation criteria adopted by Council. o select the best option to be included in capital upgrade/new programs.

• Review current and required skills base and implement training and development to meet required construction and project management needs.

• Review management of capital project management activities to ensure Council is obtaining best value for resources used.

Standards and specifications for new assets and for upgrade/expansion of existing assets are the same as those for renewal shown in Section 5.4.2.

5.5.3 Summary of future upgrade/new assets expenditure

Projected upgrade/new asset expenditures are summarised in Fig 6. The projected upgrade/new capital works program is shown in Appendix C. All amounts are shown in real values.

Fig 6: Projected Capital Upgrade/New Asset Expenditure

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 35: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 35 -

Expenditure on new assets and services in the organisation’s capital works program will be accommodated in the long term financial plan. This is further discussed in Section 6.2.

5.6 Disposal Plan

Disposal includes any activity associated with disposal of a decommissioned asset including sale, demolition or relocation. Assets identified for possible decommissioning and disposal are shown in Table 5.6, together with estimated annual savings from not having to fund operations and maintenance of the assets. These assets will be further reinvestigated to determine the required levels of service and see what options are available for alternate service delivery, if any. Any revenue gained from asset disposals is accommodated in Council’s long term financial plan.

Table 5.6: Assets Identified for Disposal

Asset Reason for Disposal Timing Disposal Expenditure Operations & Maintenance Annual

Savings

Lighting End of Life As required $9,000pa Nil

5.7 Service Consequences and Risks

The organisation has prioritised decisions made in adopting this AM Plan to obtain the optimum benefits from its available resources. Decisions were made based on the development of 3 scenarios of AM Plans.

Scenario 1 - What we would like to do based on asset register data

Scenario 2 – What we should do with existing budgets and identifying level of service and risk consequences (i.e. what are the operations and maintenance and capital projects we are unable to do, what is the service and risk consequences associated with this position). This may require several versions of the AM Plan.

Scenario 3 – What we can do and be financially sustainable with AM Plans matching long-term financial plans.

The development of scenario 1 and scenario 2 AM Plans provides the tools for discussion with the Council/Board and community on trade-offs between what we would like to do (scenario 1) and what we should be doing with existing budgets (scenario 2) by balancing changes in services and service levels with affordability and acceptance of the service and risk consequences of the trade-off position (scenario 3).

5.7.1 What we cannot do

There are some operations and maintenance activities and capital projects that are unable to be undertaken within the next 10 years due to budgeting constraints. These include:

• Replacement of some lighting that is past its useful life • Replacement of some in-efficient lighting with energy efficient lighting • Replacement of some lighting in Poor or Very Poor condition • Construction of some new lighting requested by customers

5.7.2 Service consequences

Operations and maintenance activities and capital projects that cannot be undertaken within the available budget, will maintain or create service consequences for users. These include:

• Lighting that is not functional of fit for purpose • Lighting that has a higher energy use and creates more environmental greenhouse gases • Deterioration of existing lights

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 36: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 36 -

5.7.3 Risk consequences

The operations and maintenance activities and capital projects that cannot be undertaken within the available budget, may maintain or create risk consequences for the organisation. These include:

• Increase risk of criminal behaviour in poorly lit areas • Increase in damage to property or person due to accidents arising from poorly lit areas • Increase in customer complaints regarding lack of renewal of lights

These risks have been included with the Infrastructure Risk Management Plan summarised in Section 5.2 and risk management plans actions and expenditures included within projected expenditures.

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 37: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 37 -

6. FINANCIAL SUMMARY This section contains the financial requirements resulting from all the information presented in the previous sections of this AM Plan. The financial projections will be improved as further information becomes available on desired levels of service and current and projected future asset performance.

6.1 Financial Statements and Projections

The financial projections are shown in Fig 7 for projected operating (operations and maintenance) and capital expenditure (renewal and upgrade/expansion/new assets). Note that all costs are shown in real values.

Fig 7: Projected Operating and Capital Expenditure

6.1.1 Sustainability of service delivery

There are four key indicators for service delivery sustainability that have been considered in the analysis of the services provided by this asset category, these being the asset renewal funding ratio, long term life cycle costs/expenditures and medium term projected/budgeted expenditures over 5 and 10 years of the planning period.

Asset Renewal Funding Ratio

Asset Renewal Funding Ratio12 47%

The Asset Renewal Funding Ratio is the most important indicator and reveals that over the next 10 years, Council is forecasting that it will have 47% of the funds required for the optimal renewal and replacement of its assets.

Long term - Life Cycle Cost

Life cycle costs (or whole of life costs) are the average costs that are required to sustain the service levels over the asset life cycle. Life cycle costs include operations and maintenance expenditure and asset consumption (depreciation expense). The life cycle cost for the services covered in this asset management plan is $2,605,000 per year (average operations and maintenance expenditure plus depreciation expense projected over 10 years).

12 AIFMG, 2012, Version 1.3, Financial Sustainability Indicator 4, Sec 2.6, p 2.16

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 38: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 38 -

Life cycle costs can be compared to life cycle expenditure to give an initial indicator of affordability of projected service levels when considered with age profiles. Life cycle expenditure includes operations, maintenance and capital renewal expenditure. Life cycle expenditure will vary depending on the timing of asset renewals. The life cycle expenditure over the 10 year planning period is $2,369,000 per year (average operations and maintenance plus capital renewal budgeted expenditure in LTFP over 10 years).

A shortfall between life cycle cost and life cycle expenditure is the life cycle gap. The life cycle gap for services covered by this asset management plan is -$236,000 per year (-ve = gap, +ve = surplus).

Life cycle expenditure is 91% of life cycle costs.

The life cycle costs and life cycle expenditure comparison highlights any difference between present outlays and the average cost of providing the service over the long term. If the life cycle expenditure is less than that life cycle cost, it is most likely that outlays will need to be increased or cuts in services made in the future.

Knowing the extent and timing of any required increase in outlays and the service consequences if funding is not available will assist organisations in providing services to their communities in a financially sustainable manner. This is the purpose of the asset management plans and long term financial plan.

Medium term – 10 year financial planning period

This AM Plan identifies the projected operations, maintenance and capital renewal expenditures required to provide an agreed level of service to the community over a 10 year period. This provides input into 10 year financial and funding plans aimed at providing the required services in a sustainable manner.

These projected expenditures may be compared to budgeted expenditures in the 10 year period to identify any funding shortfall. In a core asset management plan, a gap is generally due to increasing asset renewals for ageing assets.

The projected operations, maintenance and capital renewal expenditure required over the 10 year planning period is $3,071,000 on average per year.

Estimated (budget) operations, maintenance and capital renewal funding is $2,369,000 on average per year giving a 10 year funding shortfall of $-702,000 per year. This indicates that Council expects to have 77% of the projected expenditures needed to provide the services documented in the AM Plan.

Medium Term – 5 year financial planning period

The projected operations, maintenance and capital renewal expenditure required over the first 5 years of the planning period is $3,187,000 on average per year.

Estimated (budget) operations, maintenance and capital renewal funding is $2,457,000 on average per year giving a 5 year funding shortfall of $-730,000. This indicates that Council expects to have 77% of projected expenditures required to provide the services shown in this asset management plan.

Asset management financial indicators

Figure 7A shows the asset management financial indicators over the 10 year planning period and for the long term life cycle.

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 39: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 39 -

Figure 7A: Asset Management Financial Indicators

Providing services from infrastructure in a sustainable manner requires the matching and managing of service levels, risks, projected expenditures and financing to achieve a financial indicator of approximately 1.0 for the first years of the asset management plan and ideally over the 10 year life of the Long Term Financial Plan.

Figure 8 shows the projected asset renewal and replacement expenditure over the 20 years of the AM Plan. The projected asset renewal and replacement expenditure is compared to renewal and replacement expenditure in the capital works program, which is accommodated in the long term financial plan

Figure 8: Projected and LTFP Budgeted Renewal Expenditure

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 40: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 40 -

Table 6.1.1 shows the shortfall between projected renewal and replacement expenditures and expenditure accommodated in long term financial plan. Budget expenditures accommodated in the long term financial plan or extrapolated from current budgets are shown in Appendix D.

Table 6.1.1: Projected and LTFP Budgeted Renewals and Financing Shortfall

Year End June 30

Projected Renewals ($'000)

LTFP Renewal Budget ($'000)

Renewal Financing Shortfall (- gap, + surplus) ($'000)

Cumulative Shortfall (- gap, + surplus) ($'000)

2016 $513 $386 $-127 $-127 2017 $1,041 $455 $-586 $-713 2018 $477 $417 $-60 $-773 2019 $1,091 $286 $-805 $-1,578 2020 $1,390 $296 $-1,094 $-2,672 2021 $123 $209 $86 $-2,586 2022 $341 $205 $-136 $-2,722 2023 $763 $150 $-613 $-3,335 2024 $209 $225 $16 $-3,319 2025 $41 $169 $128 $-3,191 2026 $86 $320 $234 $-2,957 2027 $154 $320 $166 $-2,792 2028 $268 $320 $52 $-2,740 2029 $268 $320 $52 $-2,688 2030 $1,854 $320 $-1,534 $-4,222 2031 $164 $320 $156 $-4,066 2032 $1,427 $320 $-1,107 $-5,172 2033 $1,136 $320 $-816 $-5,988 2034 $1,213 $320 $-893 $-6,882 2035 $2,754 $320 $-2,434 $-9,315

Note: A negative shortfall indicates a financing gap, a positive shortfall indicates a surplus for that year.

Providing services in a sustainable manner will require matching of projected asset renewal and replacement expenditure to meet agreed service levels with the corresponding capital works program accommodated in the long term financial plan.

A gap between projected asset renewal/replacement expenditure and amounts accommodated in the LTFP indicates that further work is required on reviewing service levels in the AM Plan (including possibly revising the LTFP) before finalising the asset management plan to manage required service levels and funding to eliminate any funding gap.

We will manage the ‘gap’ by developing this asset management plan to provide guidance on future service levels and resources required to provide these services, and review future services, service levels and costs with the community.

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 41: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 41 -

6.1.2 Projected expenditures for long term financial plan

Table 6.1.2 shows the projected expenditures for the 10 year long term financial plan.

Expenditure projections are in 2014 real values.

Table 6.1.2: Projected Expenditures for Long Term Financial Plan ($000)

Year Operations Maintenance Projected Capital Renewal

Capital Upgrade/New Disposals

2016 $1,926 $200 $513 $310 $9 2017 $1,994 $207 $1,041 $310 $9 2018 $2,061 $214 $477 $310 $9 2019 $2,129 $222 $1,091 $310 $9 2020 $2,197 $229 $1,390 $310 $9 2021 $2,265 $236 $123 $310 $9 2022 $2,332 $243 $341 $310 $9 2023 $2,400 $250 $763 $310 $9 2024 $2,468 $257 $209 $310 $9 2025 $2,536 $265 $41 $310 $9 2026 $2,603 $272 $86 $310 $9 2027 $2,671 $279 $154 $310 $9 2028 $2,739 $286 $268 $310 $9 2029 $2,807 $293 $268 $310 $9 2030 $2,874 $300 $1,854 $310 $9 2031 $2,942 $308 $164 $310 $9 2032 $3,010 $315 $1,427 $310 $9 2033 $3,078 $322 $1,136 $310 $9 2034 $3,146 $329 $1,213 $310 $9 2035 $3,213 $336 $2,754 $310 $9

All dollar values are in ($'000)'s

6.2 Funding Strategy

After reviewing service levels, projected expenditures identified in Section 6.1.2 will be accommodated in Council’s 10 year long term financial plan.

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 42: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 42 -

6.3 Valuation Forecasts

Asset values are forecast to increase as additional assets are added to the asset stock from construction, acquisition by Council and from assets constructed by land developers and others and donated to Council. Figure 9 shows the projected replacement cost asset values over the planning period in real values.

Figure 9: Projected Asset Values

Depreciation expense values are forecast in line with asset values as shown in Figure 10.

Figure 10: Projected Depreciation Expense

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 43: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 43 -

The depreciated replacement cost will vary over the forecast period depending on the rates of addition of new assets, disposal of old assets and consumption and renewal of existing assets. Forecast of the assets’ depreciated replacement cost is shown in Figure 11. The depreciated replacement cost of contributed and new assets is shown in the darker colour and in the lighter colour for existing assets.

Figure 11: Projected Depreciated Replacement Cost

6.4 Key Assumptions made in Financial Forecasts

This section details the key assumptions made in presenting the information contained in this asset management plan and in preparing forecasts of required operating and capital expenditure and asset values, depreciation expense and carrying amount estimates. It is presented to enable readers to gain an understanding of the levels of confidence in the data behind the financial forecasts.

Key assumptions made in this AM Plan and risks that these may change are shown in Table 6.4.

Table 6.4: Key Assumptions made in AM Plan and Risks of Change

Key Assumptions Risks of Change to Assumptions Forecasted on “today’s” dollars, Local Government Price Index (LGPI) is added in the financial budgeting cycle

If LGPI is not accurate, then over time, the forecast will be inaccurate

Staffing needs are resourced adequately Unable to resource planned asset management activities No significant changes in Legislation Changes may demand unplanned/unbudgeted asset

management activities Growth as forecast Forecasted growth may demand unplanned/unbudgeted asset

management activities

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 44: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 44 -

6.5 Forecast Reliability and Confidence

The expenditure and valuations projections in this AM Plan are based on best available data. Currency and accuracy of data is critical to effective asset and financial management. Data confidence is classified on a 5 level scale13 in accordance with Table 6.5.

Table 6.5: Data Confidence Grading System

Confidence Grade Description A Highly reliable Data based on sound records, procedures, investigations and analysis, documented properly and recognised

as the best method of assessment. Dataset is complete and estimated to be accurate ± 2% B Reliable Data based on sound records, procedures, investigations and analysis, documented properly but has minor

shortcomings, for example some of the data is old, some documentation is missing and/or reliance is placed on unconfirmed reports or some extrapolation. Dataset is complete and estimated to be accurate ± 10%

C Uncertain Data based on sound records, procedures, investigations and analysis which is incomplete or unsupported, or extrapolated from a limited sample for which grade A or B data are available. Dataset is substantially complete but up to 50% is extrapolated data and accuracy estimated ± 25%

D Very Uncertain Data is based on unconfirmed verbal reports and/or cursory inspections and analysis. Dataset may not be fully complete and most data is estimated or extrapolated. Accuracy ± 40%

E Unknown None or very little data held. The estimated confidence level for and reliability of data used in this AM Plan is shown in Table 6.5.1.

Table 6.5.1: Data Confidence Assessment for Data used in AM Plan

Data Confidence Assessment Comment Demand drivers Reliable Existing demand drivers are reliably researched Growth projections Uncertain Based on State Government 30 year plan and known increases

in the short medium term Operations expenditures Reliable Based on known expenditure and type of issue Maintenance expenditures Uncertain Dependent on industry wide cost structure. Quotations

received and used for best estimate. Projected Renewal exps. - Asset values

Reliable Method used is based on current contract rates.

- Asset residual values Uncertain No known residual value recorded against lights. - Asset useful lives Uncertain Data is based anecdotal and historical information. - Condition modelling Very Uncertain Based on Asset Condition as audited via site inspection in

2010. - Network renewals Uncertain Recently implemented works and assets system will allow

better modelling - Defect repairs Uncertain Recently implemented works and assets system will allow

better modelling Upgrade/New expenditures Reliable Many competing projects Disposal expenditures Uncertain Estimate only. Over all data sources the data confidence is assessed as medium to low confidence level for data used in the preparation of this AM Plan.

Table 7.2 sets out timeline for improvement plan to address data confidence.

13 IPWEA, 2011, IIMM, Table 2.4.6, p 2|59.

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 45: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 45 -

7. PLAN IMPROVEMENT AND MONITORING

7.1 Status of Asset Management Practices

7.1.1 Accounting and financial systems

The organisation implemented the TechnologyOne Finance One ERP module during 2002 and 2003. The system has been capturing all operating and capital expenses since that time. In the absence of a job costing application, the chart of accounts was developed to track all of the required information of a project as identified at the time by the project managers.

The capital works chart structure identifies the project, subproject, object and activity codes, and contained within the project and subproject numbers are codes to identify the manager, asset category, new/renew/upgrade and the project objective. The project and subproject define the location and objective of the project, the object code identifies the inputs into it, and the activity code identifies the nature of work being carried out.

The budgets for all our projects are also stored in Finance One at the project and subproject level. Reports are generated on a monthly basis from Finance One comparing actual to estimate. Once works have been completed, the subproject numbers are closed off, and the balance of the subproject is either capitalised into the Finance One Fixed Asset Register, or into a current Asset Management Services Fixed Asset Register, provided it meets the Threshold of Materiality.

Accountabilities for financial systems

The Finance One Fixed Asset Register stores all of the financial information relating to buildings, land, plant and equipment and furniture and fittings. It is used for the generation of depreciation, revaluations and disposal in these asset categories. Other asset categories including Roads, Drainage and Bridges were previously managed in stand-alone systems such as RoadPak, Excel, and GIS. A new consolidated Works and Assets system implemented during 2013 and 2014 has seen these assets consolidated to the one master register in Finance One

Finance One is also the organisation’s solution for Accounts Payable, General and Project Ledgers, Inventory Management and Purchasing. All Receipting, Accounts Receivable, Land Information and Bank Reconciliations are carried out in the Property and Rating solution. Human Resources is managed in the People One ERP module of the TechnologyOne application.

Infrastructure asset information in the Finance One application is managed by the Finance Department in conjunction with the Asset Management Planning team, and is done so based on information supplied by the asset managers and owners and in accordance with the Asset Accounting Policy.

Plant and Equipment, Land and Buildings, Furniture and Fittings asset information in the Finance One application is managed by the Finance Department, and is done so based on information supplied by the asset managers and owners and in accordance with the Asset Accounting Policy. All other assets are managed by the asset owners in their stand-alone systems.

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 46: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 46 -

Accounting standards and regulations

There are many Regulations and Accounting Standards that we must comply with; however, those that are specifically related to Asset Management are:

South Australian Local Government Act 1999

AASB 116 Property Plant and Equipment

AASB 1021 Depreciation

AASB 1045 Land Under Roads

Capital/maintenance threshold

The organisation has an Asset Accounting Policy that is reviewed annually by the Manager Financial Services. This policy details the expenditure that is to be capitalised, and the associated accounting treatment for non-current assets. It also sets the Threshold of Materiality for all asset categories; these values can be summarised as Land and Buildings at $5,000, Computer Equipment $1,000, Furniture and Fittings $500, Roads, Drains and Bridges $5,000, Mechanical Equipment $1,000 and Vehicles $5,000.

Where an individual asset falls below the threshold, but the assets form part of a network, such as park furniture on a reserve, then consideration will be given to capitalising the aggregated value providing they exceed the threshold. Acquisition costs of less than these thresholds will be expensed.

7.1.2 Asset management system

Assets were previously managed using a variety of systems and tools. In 2012 we commenced a project to consolidate asset data and works scheduling to reduce the risk of using disparate systems and processes. This has now resulted in an asset database which has been “cleansed” of duplicate and out of date data. This will be an on-going process.

Asset registers

The master asset data sits within the TechnologyOne works and assets system. The TechnologyOne core enterprise suite includes the existing Financials module resulting in a consolidated asset register.

Linkage from asset management to financial system

The consolidated asset register sits within the TechnologyOne core enterprise suite. The asset data is stored in the works and assets module with linked asset book data (financial data) in the financials module.

Accountabilities for asset management system and data maintenance

Asset Manager and Asset Officer (Data Owner) in liaison with the Asset Management Planning Business Unit.

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 47: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 47 -

7.2 Improvement Plan

The asset management improvement plan generated from this asset management plan is shown in Table 7.2.

Table 7.2: Improvement Plan

Task No Task Responsibility Resources Required Timeline 1 Undertake a full condition audit of all Council owned

lighting AM AO

Coordinator Asset Management

July 2018

2 Undertake a substantial revision of the Asset Management Plan using condition based asset data within the next 12-18 months – This will increase our data confidence level from low to medium, to Reliable as set out in Table 6.5.

AM AO Coordinator Asset Management

July 2018

3 Adopt auditing processes that will ensure the integrity of the Asset Management Plan so Council can meet its legislative obligations.

AM AO Management Accountant Coordinator Asset Management

July 2018

4 Improve processes to keep the Asset Register and financial General Ledger consistent with each other and up to date.

AM AO Management Accountant Coordinator Asset Management

July 2017

5 Introduce a process to write off assets due to strategic decision, or impacting works, causing need to bring forward the renewal of public lighting.

AO AO Transport Officer Management Accountant

Dec 2017

6 Improve processes that support the public lighting renewal program to focus on condition 5 and 4 lights that could be a risk to public safety.

AO AO Transport Officer

Dec 2017

7 Establish an Environmental Framework applicable to public lighting that delivers objectives of ‘Toward One Planet Living”.

AM AO Coordinator Sustainability Programs Transport Officer

Dec 2017

8 Work towards funding to allow us to run a cleaning and maintenance program on a 5 yearly rotational basis for all Council owned lighting.

AM AO Management Accountant Coordinator Asset Management

Dec 2017

9 Clarify ownership of all public lighting within the City AM AO Transport Officer

July 2018

10 Streamline the collection of lighting data and entry into the asset management system

AO Transport Officer

Dec 2017

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 48: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 48 -

7.3 Monitoring and Review Procedures

This AM Plan will be reviewed during annual budget planning processes and amended to recognise any material changes in service levels and/or resources available to provide those services as a result of budget decisions.

The AM Plan will be updated annually to ensure it represents the current service level, asset values, projected operations, maintenance, capital renewal and replacement, capital upgrade/new and asset disposal expenditures and projected expenditure values incorporated into the organisation’s long term financial plan.

The Local Government Act 1999 sets out the requirements for the organisation in relation to preparing and reviewing its Asset Management Plans.

Chapter 8 – Administrative and financial accountability Part 1 Strategic management plans

‘(1a) A Council must, in conjunction with the plans required under subsection (1), develop and adopt –

a) A long term financial plan for a period of at least 10 years and

b) An infrastructure and asset management plan, relating to the management and development of infrastructure and major assets by the council for a period of at least 10 years.

(4) A council may review its strategic plans under this section at any time but must –

(a) Undertake a review of

(i) Its long term financial plan; and

(ii) Any other elements of its strategic management plans prescribed by regulations for the purposes of this paragraph,

As soon as practicable after adopting the council’s annual business plans for a particular financial year and

(b) In an event, undertake a comprehensive review of its strategic management plans within 2 years after each general election cycle.’

Should the annual review cycle identify material changes that either have a significant financial or service delivery impact then the document will be resubmitted to the Asset Management Committee for review and update.

A comprehensive review of the AM Plan will be conducted every four years within 2 years of each general election cycle as prescribed in the LG Act 1999 unless required before that time.

7.4 Performance Measures

The effectiveness of the AM Plan can be measured in the following ways:

• The degree to which the required projected expenditures identified in this asset management plan are incorporated into Council’s long term financial plan,

• The degree to which 1-5 year detailed works programs, budgets, business plans and organisational structures take into account the ‘global’ works program trends provided by the asset management plan,

• The degree to which the existing and projected service levels and service consequences (what we cannot do), risks and residual risks are incorporated into the Council’s Strategic Plan and associated plans,

• The Asset Renewal Funding Ratio achieving the target of 1.0.

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 49: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 49 -

8. REFERENCES

IPWEA, 2006, ‘International Infrastructure Management Manual’, Institute of Public Works Engineering Australasia, Sydney, www.ipwea.org/IIMM

IPWEA, 2008, ‘NAMS.PLUS Asset Management’, Institute of Public Works Engineering Australasia, Sydney, www.ipwea.org/namsplus.

IPWEA, 2009, ‘Australian Infrastructure Financial Management Guidelines’, Institute of Public Works Engineering Australasia, Sydney, www.ipwea.org/AIFMG.

IPWEA, 2011, ‘International Infrastructure Management Manual’, Institute of Public Works Engineering Australasia, Sydney, www.ipwea.org/IIMM

TechnologyOne - FinanceOne, Corporate Financial System

City of Charles Sturt, Community Plan 2013-2027

City of Charles Sturt, Corporate Plan 2013-2017

City of Charles Sturt, ‘Living Green to 2020’

City of Charles Sturt, Engineering & Open Space Guidelines

City of Charles Sturt, Environmental Sustainability Policy

City of Charles Sturt, Asset Accounting Policy

City of Charles Sturt, Asset Fund Policy

World Commission on Environment and Development. (1987). Our Common Future. The Bruntland

Commission, UNESCO.

Ajuntament de Barcelona and United Cities and Local Governments. (2004). Agenda 21 for culture. United Cities and Local Government-Working Group on Culture. http://agenda21cultura.org/

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 50: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 50 -

9. APPENDICES

Appendix A Maintenance Response Levels of Service

Appendix B Projected 10 year Capital Renewal and Replacement Works Program

Appendix C Projected 10 year Capital Upgrade/New Works Program

Appendix D LTFP Budgeted Expenditures Accommodated in AM Plan

Appendix E Abbreviations

Appendix F Glossary

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 51: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 51 -

Appendix A Maintenance Response Levels of Service

To be developed.

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 52: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 52 -

Appendix B Projected 10 year Capital Renewal and Replacement Works Program

Charles Sturt CC - Report 6 - Appendix B 10 year Renewal & Replacement Program (Public_Lighting_May16_S1_V4)

Asset ID

Sub

Tariff Owner Maintainer

Rem Planned Renewal Useful

Category Life Renewal Cost Life

(Years) Year ($) (Years)

192272 Public Lighting - SLUoS - Low Pressure Sodium 90 - Hendon SLUOS SAPN SAPN -41 1976 $0 25

192140 Public Lighting - SLUoS - Low Pressure Sodium 90 - Woodville SLUOS SAPN SAPN -41 1976 $0 25

194250 Public Lighting - SLUoS - Sodium 150 - Grange SLUOS SAPN SAPN -41 1976 $0 25

191917 Public Lighting - SLUoS - Sodium 250 - Hindmarsh SLUOS SAPN SAPN -41 1976 $0 25

Subtotal $0

191927 Public Lighting - SLUoS - Low Pressure Sodium 90 - Albert Park SLUOS SAPN SAPN -40 1977 $0 25

191930 Public Lighting - SLUoS - Low Pressure Sodium 90 - Albert Park SLUOS SAPN SAPN -40 1977 $0 25

191932 Public Lighting - SLUoS - Low Pressure Sodium 90 - Albert Park SLUOS SAPN SAPN -40 1977 $0 25

191937 Public Lighting - SLUoS - Low Pressure Sodium 90 - Albert Park SLUOS SAPN SAPN -40 1977 $0 25

192102 Public Lighting - SLUoS - Low Pressure Sodium 90 - Albert Park SLUOS SAPN SAPN -40 1977 $0 25

192103 Public Lighting - SLUoS - Low Pressure Sodium 90 - Albert Park SLUOS SAPN SAPN -40 1977 $0 25

192105 Public Lighting - SLUoS - Low Pressure Sodium 90 - Albert Park SLUOS SAPN SAPN -40 1977 $0 25

192099 Public Lighting - SLUoS - Low Pressure Sodium 90 - Albert Park SLUOS SAPN SAPN -40 1977 $0 25

191956 Public Lighting - SLUoS - Low Pressure Sodium 90 - Cheltenham SLUOS SAPN SAPN -40 1977 $0 25

192120 Public Lighting - SLUoS - Low Pressure Sodium 90 - Cheltenham SLUOS SAPN SAPN -40 1977 $0 25

192115 Public Lighting - SLUoS - Low Pressure Sodium 90 - Cheltenham SLUOS SAPN SAPN -40 1977 $0 25

192107 Public Lighting - SLUoS - Low Pressure Sodium 90 - Cheltenham SLUOS SAPN SAPN -40 1977 $0 25

191884 Public Lighting - SLUoS - Low Pressure Sodium 90 - Kilkenny SLUOS SAPN SAPN -40 1977 $0 25

191893 Public Lighting - SLUoS - Low Pressure Sodium 90 - West Croydon SLUOS SAPN SAPN -40 1977 $0 25

191939 Public Lighting - SLUoS - Mercury 400 - Albert Park SLUOS SAPN SAPN -40 1977 $0 25

192101 Public Lighting - SLUoS - Sodium 100 - Albert Park SLUOS SAPN SAPN -40 1977 $0 25

192118 Public Lighting - SLUoS - Sodium 100 - Cheltenham SLUOS SAPN SAPN -40 1977 $0 25

192108 Public Lighting - SLUoS - Sodium 100 - Cheltenham SLUOS SAPN SAPN -40 1977 $0 25

192109 Public Lighting - SLUoS - Sodium 100 - Cheltenham SLUOS SAPN SAPN -40 1977 $0 25

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 53: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 53 -

192110 Public Lighting - SLUoS - Sodium 100 - Cheltenham SLUOS SAPN SAPN -40 1977 $0 25

192111 Public Lighting - SLUoS - Sodium 100 - Cheltenham SLUOS SAPN SAPN -40 1977 $0 25

192114 Public Lighting - SLUoS - Sodium 100 - Cheltenham SLUOS SAPN SAPN -40 1977 $0 25

Subtotal $0

192135 Public Lighting - SLUoS - Mercury 400 - Woodville South SLUOS SAPN SAPN -30 1987 $0 25

Subtotal $0

191946 Public Lighting - SLUoS - Low Pressure Sodium 90 - Cheltenham SLUOS SAPN SAPN -27 1990 $0 25

192112 Public Lighting - SLUoS - Low Pressure Sodium 90 - Cheltenham SLUOS SAPN SAPN -27 1990 $0 25

192146 Public Lighting - SLUoS - Mercury 400 - Albert Park SLUOS SAPN SAPN -27 1990 $0 25

192148 Public Lighting - SLUoS - Mercury 400 - Albert Park SLUOS SAPN SAPN -27 1990 $0 25

Subtotal $0

192245 Public Lighting - CLER - Sodium 150 - Hindmarsh CLER DPTI SAPN -24 1993 $0 25

191891 Public Lighting - SLUoS - Mercury 250 - West Croydon SLUOS SAPN SAPN -24 1993 $0 25

191892 Public Lighting - SLUoS - Mercury 250 - West Croydon SLUOS SAPN SAPN -24 1993 $0 25

192168 Public Lighting - SLUoS - Mercury 250 - West Croydon SLUOS SAPN SAPN -24 1993 $0 25

192160 Public Lighting - SLUoS - Mercury 250 - Woodville Park SLUOS SAPN SAPN -24 1993 $0 25

192162 Public Lighting - SLUoS - Mercury 250 - Woodville Park SLUOS SAPN SAPN -24 1993 $0 25

192239 Public Lighting - SLUoS - Mercury 400 - West Croydon SLUOS SAPN SAPN -24 1993 $0 25

192244 Public Lighting - SLUoS - Sodium 150 - Allenby Gardens SLUOS SAPN SAPN -24 1993 $0 25

192234 Public Lighting - SLUoS - Sodium 150 - Beverley SLUOS SAPN SAPN -24 1993 $0 25

192231 Public Lighting - SLUoS - Sodium 150 - Kilkenny SLUOS SAPN SAPN -24 1993 $0 25

192238 Public Lighting - SLUoS - Sodium 150 - West Croydon SLUOS SAPN SAPN -24 1993 $0 25

192240 Public Lighting - SLUoS - Sodium 150 - West Croydon SLUOS SAPN SAPN -24 1993 $0 25

Subtotal $0

192294 Public Lighting - SLUoS - Low Pressure Sodium 90 - 1202-1208 Old Port Road Royal Park SLUOS SAPN SAPN -23 1994 $0 25

192299 Public Lighting - SLUoS - Low Pressure Sodium 90 - 1226 Old Port Road Royal Park SLUOS SAPN SAPN -23 1994 $0 25

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 54: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 54 -

192259 Public Lighting - SLUoS - Low Pressure Sodium 90 - Albert Park SLUOS SAPN SAPN -23 1994 $0 25

192261 Public Lighting - SLUoS - Low Pressure Sodium 90 - Albert Park SLUOS SAPN SAPN -23 1994 $0 25

192263 Public Lighting - SLUoS - Low Pressure Sodium 90 - Albert Park SLUOS SAPN SAPN -23 1994 $0 25

192265 Public Lighting - SLUoS - Low Pressure Sodium 90 - Hendon SLUOS SAPN SAPN -23 1994 $0 25

192267 Public Lighting - SLUoS - Low Pressure Sodium 90 - Hendon SLUOS SAPN SAPN -23 1994 $0 25

192269 Public Lighting - SLUoS - Low Pressure Sodium 90 - Hendon SLUOS SAPN SAPN -23 1994 $0 25

192276 Public Lighting - SLUoS - Low Pressure Sodium 90 - Hendon SLUOS SAPN SAPN -23 1994 $0 25

192277 Public Lighting - SLUoS - Low Pressure Sodium 90 - Hendon SLUOS SAPN SAPN -23 1994 $0 25

192281 Public Lighting - SLUoS - Low Pressure Sodium 90 - Royal Park SLUOS SAPN SAPN -23 1994 $0 25

192282 Public Lighting - SLUoS - Low Pressure Sodium 90 - Royal Park SLUOS SAPN SAPN -23 1994 $0 25

192284 Public Lighting - SLUoS - Low Pressure Sodium 90 - Royal Park SLUOS SAPN SAPN -23 1994 $0 25

192286 Public Lighting - SLUoS - Low Pressure Sodium 90 - Royal Park SLUOS SAPN SAPN -23 1994 $0 25

192288 Public Lighting - SLUoS - Low Pressure Sodium 90 - Royal Park SLUOS SAPN SAPN -23 1994 $0 25

192290 Public Lighting - SLUoS - Low Pressure Sodium 90 - Royal Park SLUOS SAPN SAPN -23 1994 $0 25

192301 Public Lighting - SLUoS - Low Pressure Sodium 90 - Royal Park SLUOS SAPN SAPN -23 1994 $0 25

192295 Public Lighting - SLUoS - Low Pressure Sodium 90 - Royal Park SLUOS SAPN SAPN -23 1994 $0 25

192297 Public Lighting - SLUoS - Low Pressure Sodium 90 - Royal Park SLUOS SAPN SAPN -23 1994 $0 25

192298 Public Lighting - SLUoS - Low Pressure Sodium 90 - Royal Park SLUOS SAPN SAPN -23 1994 $0 25

192310 Public Lighting - SLUoS - Mercury 250 - Hendon SLUOS SAPN SAPN -23 1994 $0 25

192314 Public Lighting - SLUoS - Mercury 250 - Royal Park SLUOS SAPN SAPN -23 1994 $0 25

192316 Public Lighting - SLUoS - Mercury 400 - Albert Park SLUOS SAPN SAPN -23 1994 $0 25

192293 Public Lighting - SLUoS - Sodium 100 - 1202-1208 Old Port Road Royal Park SLUOS SAPN SAPN -23 1994 $0 25

192274 Public Lighting - SLUoS - Sodium 100 - Hendon SLUOS SAPN SAPN -23 1994 $0 25

192291 Public Lighting - SLUoS - Sodium 100 - Royal Park SLUOS SAPN SAPN -23 1994 $0 25

Subtotal $0

201892 Public Lighting - CLER - Sodium 250 - CLER DPTI SAPN -21 1996 $0 25

201913 Public Lighting - CLER - Sodium 250 - CLER DPTI SAPN -21 1996 $0 25

201914 Public Lighting - CLER - Sodium 250 - CLER DPTI SAPN -21 1996 $0 25

191908 Public Lighting - SLUoS - Low Pressure Sodium 90 - Croydon SLUOS SAPN SAPN -21 1996 $0 25

Subtotal $0

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 55: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 55 -

191797 Public Lighting - CLER - Sodium 250 - Hindmarsh CLER DPTI SAPN -19 1997 $0 25

192600 Public Lighting - SLUoS - Low Pressure Sodium 135 - Renown Park SLUOS SAPN SAPN -19 1997 $0 25

192619 Public Lighting - SLUoS - Mercury 400 - Findon SLUOS SAPN SAPN -19 1997 $0 25

Subtotal $0

192157 Public Lighting - CLER - Sodium 150 - Croydon CLER DPTI SAPN -16 2000 $0 25

192126 Public Lighting - CLER - Sodium 150 - Hindmarsh CLER DPTI SAPN -16 2000 $0 25

192127 Public Lighting - CLER - Sodium 150 - Hindmarsh CLER DPTI SAPN -16 2000 $0 25

193229 Public Lighting - CLER - Sodium 150 - West Lakes Shore CLER DPTI SAPN -16 2000 $0 25

193230 Public Lighting - CLER - Sodium 150 - West Lakes Shore CLER DPTI SAPN -16 2000 $0 25

193232 Public Lighting - CLER - Sodium 150 - West Lakes Shore CLER DPTI SAPN -16 2000 $0 25

193233 Public Lighting - CLER - Sodium 150 - West Lakes Shore CLER DPTI SAPN -16 2000 $0 25

193234 Public Lighting - CLER - Sodium 150 - West Lakes Shore CLER DPTI SAPN -16 2000 $0 25

193235 Public Lighting - CLER - Sodium 150 - West Lakes Shore CLER DPTI SAPN -16 2000 $0 25

192128 Public Lighting - SLUoS - Low Pressure Sodium 90 - Cheltenham SLUOS SAPN SAPN -16 2000 $0 25

192890 Public Lighting - SLUoS - Sodium 250 - Royal Park SLUOS SAPN SAPN -16 2000 $0 25

Subtotal $0

193557 Public Lighting - CLER - Sodium 100 - Seaton CLER DPTI SAPN -15 2001 $0 25

193590 Public Lighting - CLER - Sodium 100 - West Lakes CLER DPTI SAPN -15 2001 $0 25

193591 Public Lighting - CLER - Sodium 100 - West Lakes CLER DPTI SAPN -15 2001 $0 25

192251 Public Lighting - SLUoS - Sodium 100 - Royal Park SLUOS SAPN SAPN -15 2001 $0 25

193298 Public Lighting - SLUoS - Sodium 150 - Renown Park SLUOS SAPN SAPN -15 2001 $0 25

Subtotal $0

192391 Public Lighting - CLER - Sodium 150 - Seaton CLER DPTI SAPN -14 2002 $0 25

Subtotal $0

193783 Public Lighting - CLER - Sodium 150 - Woodville CLER DPTI SAPN -12 2004 $0 25

Subtotal $0

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 56: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 56 -

193781 Public Lighting - CLER - Sodium 150 - Woodville CLER DPTI SAPN -11 2005 $0 25

Subtotal $0

192319 Public Lighting - CLER - Low Pressure Sodium 135 - Royal Park CLER DPTI SAPN -10 2006 $0 25

193519 Public Lighting - CLER - Sodium 150 - Allenby Gardens CLER DPTI SAPN -10 2006 $0 25

191888 Public Lighting - SLUoS - Low Pressure Sodium 135 - West Croydon SLUOS SAPN SAPN -10 2006 $0 25

193517 Public Lighting - SLUoS - Low Pressure Sodium 135 - West Croydon SLUOS SAPN SAPN -10 2006 $0 25

193796 Public Lighting - SLUoS - Low Pressure Sodium 135 - West Croydon SLUOS SAPN SAPN -10 2006 $0 25

193795 Public Lighting - SLUoS - Low Pressure Sodium 90 - West Croydon SLUOS SAPN SAPN -10 2006 $0 25

Subtotal $0

194296 Public Lighting - CLER - Sodium 150 - 41A Park Terrace Ovingham CLER DPTI SAPN -6 2010 $0 60

191922 Public Lighting - CLER - Sodium 150 - Hindmarsh CLER DPTI SAPN -6 2010 $0 60

191919 Public Lighting - CLER - Sodium 250 - 115-123 Port Road Hindmarsh CLER DPTI SAPN -6 2010 $0 60

191918 Public Lighting - CLER - Sodium 250 - 139 Port Road Hindmarsh CLER DPTI SAPN -6 2010 $0 60

194294 Public Lighting - CLER - Sodium 250 - 39 Hawker Street Ovingham CLER DPTI SAPN -6 2010 $0 60

191969 Public Lighting - CLER - Sodium 250 - 70 Port Road Hindmarsh CLER DPTI SAPN -6 2010 $0 60

191920 Public Lighting - CLER - Sodium 250 - 99 Port Road Hindmarsh CLER DPTI SAPN -6 2010 $0 60

194258 Public Lighting - CLER - Sodium 250 - Flinders Park CLER DPTI SAPN -6 2010 $0 60

191921 Public Lighting - CLER - Sodium 250 - Hindmarsh CLER DPTI SAPN -6 2010 $0 60

191923 Public Lighting - CLER - Sodium 250 - Hindmarsh CLER DPTI SAPN -6 2010 $0 60

191968 Public Lighting - CLER - Sodium 250 - Hindmarsh CLER DPTI SAPN -6 2010 $0 60

191970 Public Lighting - CLER - Sodium 250 - Hindmarsh CLER DPTI SAPN -6 2010 $0 60

191971 Public Lighting - CLER - Sodium 250 - Hindmarsh CLER DPTI SAPN -6 2010 $0 60

191972 Public Lighting - CLER - Sodium 250 - Hindmarsh CLER DPTI SAPN -6 2010 $0 60

192087 Public Lighting - CLER - Sodium 250 - Hindmarsh CLER DPTI SAPN -6 2010 $0 60

192088 Public Lighting - CLER - Sodium 250 - Hindmarsh CLER DPTI SAPN -6 2010 $0 60

192091 Public Lighting - CLER - Sodium 250 - Hindmarsh CLER DPTI SAPN -6 2010 $0 60

194238 Public Lighting - CLER - Sodium 250 - Hindmarsh CLER DPTI SAPN -6 2010 $0 60

194257 Public Lighting - CLER - Sodium 250 - Kidman Park CLER DPTI SAPN -6 2010 $0 60

Subtotal $0

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 57: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 57 -

191866 Public Lighting - CLER - Sodium 100 - Woodville CLER DPTI SAPN -5 2011 $0 60

192106 Public Lighting - CLER - Sodium 250 - 70 Adam Street Hindmarsh CLER DPTI SAPN -5 2011 $0 60

193863 Public Lighting - CLER - Sodium 250 - Albert Park CLER DPTI SAPN -5 2011 $0 25

193868 Public Lighting - CLER - Sodium 250 - Albert Park CLER DPTI SAPN -5 2011 $0 25

192618 Public Lighting - SLUoS - Mercury 250 - Findon SLUOS SAPN SAPN -5 2011 $0 25

Subtotal $0

192247 Public Lighting - CLER - Sodium 250 - Hindmarsh CLER DPTI SAPN -2 2015 $0 25

191914 Public Lighting - SLUoS - Sodium 250 - Hindmarsh SLUOS SAPN SAPN -2 2015 $0 25

191915 Public Lighting - SLUoS - Sodium 250 - Hindmarsh SLUOS SAPN SAPN -2 2015 $0 25

191916 Public Lighting - SLUoS - Sodium 250 - Sec 5807 Port Road Hindmarsh SLUOS SAPN SAPN -2 2015 $0 25

Subtotal $0

193976 Public Lighting - CLER - Sodium 150 - 39 Park Terrace Ovingham CLER DPTI SAPN -1 2016 $0 25

192461 Public Lighting - CLER - Sodium 250 - Hindmarsh CLER DPTI SAPN -1 2016 $0 25

192987 Public Lighting - CLER - Sodium 250 - Hindmarsh CLER DPTI SAPN -1 2016 $0 25

192975 Public Lighting - CLER - Sodium 250 - OPP. No.78 Adam Street Hindmarsh CLER DPTI SAPN -1 2016 $0 25

Subtotal $0

196057 Public Lighting - Metered - Mercury 50 - Scullers Reserve - 168 Sportsmans Drive West Lakes METERED ENG ENG 0 2017 $4,544 25

195805 Public Lighting - Metered - Mercury 50 - Scullers Reserve - 168 Sportsmans Drive West Lakes METERED ENG ENG 0 2017 $4,544 25

195806 Public Lighting - Metered - Mercury 50 - Scullers Reserve - 168 Sportsmans Drive West Lakes METERED ENG ENG 0 2017 $4,544 25

195808 Public Lighting - Metered - Mercury 50 - Scullers Reserve - 168 Sportsmans Drive West Lakes METERED ENG ENG 0 2017 $4,544 25

195878 Public Lighting - Metered - Mercury 50 - Scullers Reserve - 168 Sportsmans Drive West Lakes METERED ENG ENG 0 2017 $4,544 25

195967 Public Lighting - Metered - Mercury 50 - Scullers Reserve - 168 Sportsmans Drive West Lakes METERED ENG ENG 0 2017 $4,544 25

196056 Public Lighting - Metered - Mercury 50 - Scullers Reserve - 170-184 Sportsmans Drive West Lakes METERED ENG ENG 0 2017 $4,544 25

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 58: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 58 -

195879 Public Lighting - Metered - Mercury 50 - Scullers Reserve - 168 Sportsmans Drive West Lakes METERED ENG ENG 0 2017 $4,544 25

195968 Public Lighting - Metered - Mercury 50 - Scullers Reserve - 168 Sportsmans Drive West Lakes METERED ENG ENG 0 2017 $4,544 25

196057 Public Lighting - Metered - Mercury 50 - Scullers Reserve - 168 Sportsmans Drive West Lakes METERED ENG ENG 0 2017 $4,544 25

195880 Public Lighting - Metered - Mercury 50 - Scullers Reserve - 168 Sportsmans Drive West Lakes METERED ENG ENG 0 2017 $4,544 25

195969 Public Lighting - Metered - Mercury 50 - Scullers Reserve - 168 Sportsmans Drive West Lakes METERED ENG ENG 0 2017 $4,544 25

196058 Public Lighting - Metered - Mercury 50 - Scullers Reserve - 168 Sportsmans Drive West Lakes METERED ENG ENG 0 2017 $4,544 25

195881 Public Lighting - Metered - Mercury 50 - Scullers Reserve - 168 Sportsmans Drive West Lakes METERED ENG ENG 0 2017 $4,544 25

195970 Public Lighting - Metered - Mercury 50 - Scullers Reserve - 168 Sportsmans Drive West Lakes METERED ENG ENG 0 2017 $4,544 25

196059 Public Lighting - Metered - Mercury 50 - Scullers Reserve - 168 Sportsmans Drive West Lakes METERED ENG ENG 0 2017 $4,544 25

195882 Public Lighting - Metered - Mercury 50 - Scullers Reserve - 168 Sportsmans Drive West Lakes METERED ENG ENG 0 2017 $4,544 25

195971 Public Lighting - Metered - Mercury 50 - Scullers Reserve - 168 Sportsmans Drive West Lakes METERED ENG ENG 0 2017 $4,544 25

196060 Public Lighting - Metered - Mercury 50 - Scullers Reserve - 168 Sportsmans Drive West Lakes METERED ENG ENG 0 2017 $4,544 25

195883 Public Lighting - Metered - Mercury 50 - Scullers Reserve - 168 Sportsmans Drive West Lakes METERED ENG ENG 0 2017 $4,544 25

195972 Public Lighting - Metered - Mercury 50 - Scullers Reserve - 168 Sportsmans Drive West Lakes METERED ENG ENG 0 2017 $4,544 25

196061 Public Lighting - Metered - Mercury 50 - Scullers Reserve - 168 Sportsmans Drive West Lakes METERED ENG ENG 0 2017 $4,544 25

195884 Public Lighting - Metered - Mercury 50 - Scullers Reserve - 168 Sportsmans Drive West Lakes METERED ENG ENG 0 2017 $4,544 25

195973 Public Lighting - Metered - Mercury 50 - Scullers Reserve - 168 Sportsmans Drive West Lakes METERED ENG ENG 0 2017 $4,544 25

196062 Public Lighting - Metered - Mercury 50 - Scullers Reserve - 168 Sportsmans Drive West Lakes METERED ENG ENG 0 2017 $4,544 25

195885 Public Lighting - Metered - Mercury 50 - Scullers Reserve - 168 Sportsmans Drive West Lakes METERED ENG ENG 0 2017 $4,544 25

195974 Public Lighting - Metered - Mercury 50 - Scullers Reserve - 168 Sportsmans Drive West Lakes METERED ENG ENG 0 2017 $4,544 25

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 59: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 59 -

196063 Public Lighting - Metered - Mercury 50 - Scullers Reserve - 168 Sportsmans Drive West Lakes METERED ENG ENG 0 2017 $4,544 25

195886 Public Lighting - Metered - Mercury 50 - Scullers Reserve - 168 Sportsmans Drive West Lakes METERED ENG ENG 0 2017 $4,544 25

195975 Public Lighting - Metered - Mercury 50 - Scullers Reserve - 168 Sportsmans Drive West Lakes METERED ENG ENG 0 2017 $4,544 25

196064 Public Lighting - Metered - Mercury 50 - Scullers Reserve - 168 Sportsmans Drive West Lakes METERED ENG ENG 0 2017 $4,544 25

195887 Public Lighting - Metered - Mercury 50 - Scullers Reserve - 168 Sportsmans Drive West Lakes METERED ENG ENG 0 2017 $4,544 25

195976 Public Lighting - Metered - Mercury 50 - Scullers Reserve - 168 Sportsmans Drive West Lakes METERED ENG ENG 0 2017 $4,544 25

196065 Public Lighting - Metered - Mercury 50 - Scullers Reserve - 168 Sportsmans Drive West Lakes METERED ENG ENG 0 2017 $4,544 25

195888 Public Lighting - Metered - Mercury 50 - Scullers Reserve - 168 Sportsmans Drive West Lakes METERED ENG ENG 0 2017 $4,544 25

195977 Public Lighting - Metered - Mercury 50 - Scullers Reserve - 168 Sportsmans Drive West Lakes METERED ENG ENG 0 2017 $4,544 25

196066 Public Lighting - Metered - Mercury 50 - Scullers Reserve - 168 Sportsmans Drive West Lakes METERED ENG ENG 0 2017 $4,544 25

195889 Public Lighting - Metered - Mercury 50 - Scullers Reserve - 168 Sportsmans Drive West Lakes METERED ENG ENG 0 2017 $4,544 25

195978 Public Lighting - Metered - Mercury 50 - Scullers Reserve - 168 Sportsmans Drive West Lakes METERED ENG ENG 0 2017 $4,544 25

196067 Public Lighting - Metered - Mercury 50 - Scullers Reserve - 168 Sportsmans Drive West Lakes METERED ENG ENG 0 2017 $4,544 25

195890 Public Lighting - Metered - Mercury 50 - Scullers Reserve - 168 Sportsmans Drive West Lakes METERED ENG ENG 0 2017 $4,544 25

195979 Public Lighting - Metered - Mercury 50 - Scullers Reserve - 168 Sportsmans Drive West Lakes METERED ENG ENG 0 2017 $4,544 25

196068 Public Lighting - Metered - Mercury 50 - Scullers Reserve - 168 Sportsmans Drive West Lakes METERED ENG ENG 0 2017 $4,544 25

195891 Public Lighting - Metered - Mercury 50 - Scullers Reserve - 168 Sportsmans Drive West Lakes METERED ENG ENG 0 2017 $4,544 25

195930 Public Lighting - Metered - Code Required - Code needs to be added to system - Anthea Court West Lakes METERED ENG ENG 0 2017 $4,544 25

196020 Public Lighting - Metered - Code Required - Code needs to be added to system - Anthea Court West Lakes METERED ENG ENG 0 2017 $4,544 25

195750 Public Lighting - Metered - Code Required - Code needs to be added to system - Anthea Court West Lakes METERED ENG ENG 0 2017 $4,544 25

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 60: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 60 -

195751 Public Lighting - Metered - Code Required - Code needs to be added to system - Anthea Court West Lakes METERED ENG ENG 0 2017 $4,544 25

195752 Public Lighting - Metered - Code Required - Code needs to be added to system - Anthea Court West Lakes METERED ENG ENG 0 2017 $4,544 25

195753 Public Lighting - Metered - Code Required - Code needs to be added to system - Anthea Court West Lakes METERED ENG ENG 0 2017 $4,544 25

195754 Public Lighting - Metered - Code Required - Code needs to be added to system - Anthea Court West Lakes METERED ENG ENG 0 2017 $4,544 25

195755 Public Lighting - Metered - Code Required - Code needs to be added to system - Anthea Court West Lakes METERED ENG ENG 0 2017 $4,544 25

195756 Public Lighting - Metered - Code Required - Code needs to be added to system - Anthea Court West Lakes METERED ENG ENG 0 2017 $4,544 25

195757 Public Lighting - Metered - Code Required - Code needs to be added to system - Anthea Court West Lakes METERED ENG ENG 0 2017 $4,544 25

195758 Public Lighting - Metered - Code Required - Code needs to be added to system - Anthea Court West Lakes METERED ENG ENG 0 2017 $4,544 25

195759 Public Lighting - Metered - Code Required - Code needs to be added to system - Anthea Court West Lakes METERED ENG ENG 0 2017 $4,544 25

195760 Public Lighting - Metered - Code Required - Code needs to be added to system - Anthea Court West Lakes METERED ENG ENG 0 2017 $4,544 25

195761 Public Lighting - Metered - Code Required - Code needs to be added to system - Anthea Court West Lakes METERED ENG ENG 0 2017 $4,544 25

195762 Public Lighting - Metered - Code Required - Code needs to be added to system - Anthea Court West Lakes METERED ENG ENG 0 2017 $4,544 25

195763 Public Lighting - Metered - Code Required - Code needs to be added to system - Anthea Court West Lakes METERED ENG ENG 0 2017 $4,544 25

195764 Public Lighting - Metered - Code Required - Code needs to be added to system - Anthea Court West Lakes METERED ENG ENG 0 2017 $4,544 25

195765 Public Lighting - Metered - Code Required - Code needs to be added to system - Anthea Court West Lakes METERED ENG ENG 0 2017 $4,544 25

195766 Public Lighting - Metered - Code Required - Code needs to be added to system - Anthea Court West Lakes METERED ENG ENG 0 2017 $4,544 25

195767 Public Lighting - Metered - Code Required - Code needs to be added to system - Anthea Court West Lakes METERED ENG ENG 0 2017 $4,544 25

195768 Public Lighting - Metered - Code Required - Code needs to be added to system - Anthea Court West Lakes METERED ENG ENG 0 2017 $4,544 25

195769 Public Lighting - Metered - Code Required - Code needs to be added to system - Anthea Court West Lakes METERED ENG ENG 0 2017 $4,544 25

195757 Public Lighting - Metered - Mercury 50 - Dotterel Reserve - Lot 4 Dotterel Drive West Lakes Shore METERED ENG ENG 0 2017 $4,544 25

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 61: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 61 -

195758 Public Lighting - Metered - Mercury 50 - Dotterel Reserve - Lot 4 Dotterel Drive West Lakes Shore METERED ENG ENG 0 2017 $4,544 25

195759 Public Lighting - Metered - Mercury 50 - Dotterel Reserve - Lot 4 Dotterel Drive West Lakes Shore METERED ENG ENG 0 2017 $4,544 25

195760 Public Lighting - Metered - Mercury 50 - Dotterel Reserve - Lot 4 Dotterel Drive West Lakes Shore METERED ENG ENG 0 2017 $4,544 25

195761 Public Lighting - Metered - Mercury 50 - Dotterel Reserve - Lot 4 Dotterel Drive West Lakes Shore METERED ENG ENG 0 2017 $4,544 25

195762 Public Lighting - Metered - Mercury 50 - Dotterel Reserve - Lot 4 Dotterel Drive West Lakes Shore METERED ENG ENG 0 2017 $4,544 25

195763 Public Lighting - Metered - Mercury 50 - Dotterel Reserve - Lot 4 Dotterel Drive West Lakes Shore METERED ENG ENG 0 2017 $4,544 25

195764 Public Lighting - Metered - Mercury 50 - Dotterel Reserve - Lot 4 Dotterel Drive West Lakes Shore METERED ENG ENG 0 2017 $4,544 25

195765 Public Lighting - Metered - Mercury 50 - Dotterel Reserve - Lot 4 Dotterel Drive West Lakes Shore METERED ENG ENG 0 2017 $4,544 25

195766 Public Lighting - Metered - Mercury 50 - Dotterel Reserve - Lot 4 Dotterel Drive West Lakes Shore METERED ENG ENG 0 2017 $4,544 25

195767 Public Lighting - Metered - Mercury 50 - Dotterel Reserve - Lot 4 Dotterel Drive West Lakes Shore METERED ENG ENG 0 2017 $4,544 25

195768 Public Lighting - Metered - Mercury 50 - Dotterel Reserve - Lot 4 Dotterel Drive West Lakes Shore METERED ENG ENG 0 2017 $4,544 25

195769 Public Lighting - Metered - Mercury 50 - Dotterel Reserve - Lot 4 Dotterel Drive West Lakes Shore METERED ENG ENG 0 2017 $4,544 25

195770 Public Lighting - Metered - Mercury 50 - Dotterel Reserve - Lot 4 Dotterel Drive West Lakes Shore METERED ENG ENG 0 2017 $4,544 25

195771 Public Lighting - Metered - Mercury 50 - Dotterel Reserve - Lot 4 Dotterel Drive West Lakes Shore METERED ENG ENG 0 2017 $4,544 25

194450 Public Lighting - Metered - Mercury 80 - Butler Reserve - 5A Butler Drive Hendon METERED ENG ENG 0 2017 $4,544 25

195511 Public Lighting - Metered - Mercury 80 - Butler Reserve - 5A Butler Drive Hendon METERED ENG ENG 0 2017 $4,544 25

195512 Public Lighting - Metered - Mercury 80 - Butler Reserve - 5A Butler Drive Hendon METERED ENG ENG 0 2017 $4,544 25

195015 Public Lighting - Metered - Mercury 80 - Butler Reserve - 5A Butler Drive Hendon METERED ENG ENG 0 2017 $4,544 25

197428 Public Lighting - Metered - Mercury 80 - Butler Reserve - 5A Butler Drive Hendon METERED ENG ENG 0 2017 $4,544 25

197429 Public Lighting - Metered - Mercury 80 - Butler Reserve - 5A Butler Drive Hendon METERED ENG ENG 0 2017 $4,544 25

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 62: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 62 -

197430 Public Lighting - CLER - Code Required - Code needs to be added to system - West Lakes Entrance Statement METERED ENG ENG 0 2017 $4,544 25

197431 Public Lighting - CLER - Code Required - Code needs to be added to system - West Lakes Entrance Statement METERED ENG ENG 0 2017 $4,544 25

197432 Public Lighting - CLER - Code Required - Code needs to be added to system - West Lakes Entrance Statement METERED ENG ENG 0 2017 $4,544 25

197433 Public Lighting - CLER - Code Required - Code needs to be added to system - West Lakes Entrance Statement METERED ENG ENG 0 2017 $4,544 25

Subtotal $417,000

195576 Public Lighting - CLER - Code Required - Code needs to be added to system - 49A Milner Street Hindmarsh CLER ENG SAPN 1 2018 $4,544 25

195076 Public Lighting - CLER - Code Required - Code needs to be added to system - Sec 5807 Port Road Hindmarsh CLER ENG SAPN 1 2018 $4,544 25

195079 Public Lighting - CLER - Code Required - Code needs to be added to system - Sec 5807 Port Road Hindmarsh CLER ENG SAPN 1 2018 $4,544 25

197223 Public Lighting - CLER - Mercury 80 - 57 Ibis Court Semaphore Park CLER ENG SAPN 1 2018 $4,544 25

197002 Public Lighting - CLER - Sodium 100 - Lot 2 West Beach Road West Beach CLER WESTTORR SAPN 1 2018 $4,544 25

194097 Public Lighting - CLER - Sodium 150 - Grange CLER DPTI SAPN 1 2018 $0 25

194085 Public Lighting - CLER - Sodium 150 - Henley Beach CLER DPTI SAPN 1 2018 $0 25

194087 Public Lighting - CLER - Sodium 150 - Henley Beach CLER DPTI SAPN 1 2018 $0 25

194094 Public Lighting - CLER - Sodium 150 - Henley Beach CLER DPTI SAPN 1 2018 $0 25

194095 Public Lighting - CLER - Sodium 150 - Henley Beach CLER DPTI SAPN 1 2018 $0 25

194971 Public Lighting - CLER - Sodium 50 - 30-32 Orsmond Street Hindmarsh CLER ENG SAPN 1 2018 $4,544 25

195464 Public Lighting - CLER - Sodium 50 - 39 Orsmond Street Hindmarsh CLER ENG SAPN 1 2018 $4,544 25

197302 Public Lighting - CLER - Sodium 50 - 47 Orsmond Street Hindmarsh CLER ENG SAPN 1 2018 $4,544 25

197303 Public Lighting - CLER - Sodium 50 - 6-8 Orsmond Street Hindmarsh CLER ENG SAPN 1 2018 $4,544 25

197293 Public Lighting - Energy Only - Low Pressure Sodium 18 - Angus Reserve - Lot 44 Angus Court Renown Park ENERGY ENG ENG 1 2018 $4,544 25

194749 Public Lighting - Energy Only - Mercury 50 - Audrey Street Reserve - 37 Audrey Street Tennyson ENERGY ENG ENG 1 2018 $4,544 25

195408 Public Lighting - Energy Only - Mercury 80 - Angus Reserve - Lot 44 Angus Court Renown Park ENERGY ENG ENG 1 2018 $4,544 25

197006 Public Lighting - Energy Only - Mercury 80 - Angus Reserve - Lot 44 Harrison Road Renown Park ENERGY ENG ENG 1 2018 $4,544 25

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 63: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 63 -

197003 Public Lighting - Energy Only - Mercury 80 - Sinclair Reserve - Sinclair Square Pennington ENERGY ENG ENG 1 2018 $4,544 25

197157 Public Lighting - Energy Only - Mercury 80 - St Andrews Way Reserve - 18 St Andrews Way West Lakes ENERGY ENG ENG 1 2018 $4,544 25

197004 Public Lighting - Energy Only - Mercury 80 - Stacey Reserve - 8A Jack Johnson Court Renown Park ENERGY ENG ENG 1 2018 $4,544 25

197017 Public Lighting - Energy Only - Mercury 80 BS 2000 - Harold and Cynthia Anderson Reserve - Lot B Seaview Road West Beach ENERGY ENG ENG 1 2018 $4,544 25

197141 Public Lighting - Energy Only - Mercury 80 BS 2000 - Harold and Cynthia Anderson Reserve - Sec 652 Seaview Road West Beach ENERGY ENG ENG 1 2018 $4,544 25

194884 Public Lighting - Energy Only - Mercury 80 BS 2000 - Harold and Cynthia Anderson Reserve - Sec 652 Seaview Road West Beach ENERGY ENG ENG 1 2018 $4,544 25

194750 Public Lighting - Energy Only - Sodium 50 - Audrey Street Reserve - 37 Audrey Street Tennyson ENERGY ENG ENG 1 2018 $4,544 25

194789 Public Lighting - Energy Only - Sodium 50 - Hythe Reserve - 2-4 Hythe Street Ridleyton ENERGY ENG ENG 1 2018 $4,544 25

194791 Public Lighting - Energy Only - Sodium 50 - Ivan Franko Reserve - Lot 3 McBurnie Close Brompton ENERGY ENG ENG 1 2018 $4,544 25

196999 Public Lighting - Energy Only - Sodium 50 - Josiah Mitton Reserve - Lot 100 Burley Griffin Boulevard Brompton ENERGY ENG ENG 1 2018 $4,544 25

197000 Public Lighting - Energy Only - Sodium 50 - Josiah Mitton Reserve - Lot 100 Burley Griffin Boulevard Brompton ENERGY ENG ENG 1 2018 $4,544 25

196998 Public Lighting - Energy Only - Sodium 50 - Josiah Mitton Reserve - Lot 100 Wood Avenue Brompton ENERGY ENG ENG 1 2018 $4,544 25

195597 Public Lighting - Metered - Code Required - Code needs to be added to system - 1 Kemp Street Woodville METERED ENG ENG 1 2018 $4,544 25

194728 Public Lighting - Metered - Code Required - Code needs to be added to system - 122-124 William Street Beverley METERED ENG ENG 1 2018 $4,544 25

194729 Public Lighting - Metered - Code Required - Code needs to be added to system - 122-124 William Street Beverley METERED ENG ENG 1 2018 $4,544 25

195088 Public Lighting - Metered - Code Required - Code needs to be added to system - 122-124 William Street Beverley METERED ENG ENG 1 2018 $4,544 25

195862 Public Lighting - Metered - Code Required - Code needs to be added to system - 13 Sunlake Place Tennyson METERED ENG ENG 1 2018 $4,544 25

195789 Public Lighting - Metered - Code Required - Code needs to be added to system - 16 Bluelake Court Tennyson METERED ENG ENG 1 2018 $4,544 25

194583 Public Lighting - Metered - Code Required - Code needs to be added to system - 165 Grange Road Beverley METERED ENG ENG 1 2018 $4,544 25

196598 Public Lighting - Metered - Code Required - Code needs to be added to system - 165 Grange Road Beverley METERED ENG ENG 1 2018 $4,544 25

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 64: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 64 -

194582 Public Lighting - Metered - Code Required - Code needs to be added to system - 167 Grange Road Beverley METERED ENG ENG 1 2018 $4,544 25

196596 Public Lighting - Metered - Code Required - Code needs to be added to system - 167 Grange Road Beverley METERED ENG ENG 1 2018 $4,544 25

196597 Public Lighting - Metered - Code Required - Code needs to be added to system - 167 Grange Road Beverley METERED ENG ENG 1 2018 $4,544 25

196823 Public Lighting - Metered - Code Required - Code needs to be added to system - 167 Grange Road Beverley METERED ENG ENG 1 2018 $4,544 25

195931 Public Lighting - Metered - Code Required - Code needs to be added to system - 18 Antigua Grove West Lakes METERED ENG ENG 1 2018 $4,544 25

195753 Public Lighting - Metered - Code Required - Code needs to be added to system - 18 Martinique Court West Lakes METERED ENG ENG 1 2018 $4,544 25

195103 Public Lighting - Metered - Code Required - Code needs to be added to system - 198 Bower Road Semaphore Park METERED ENG ENG 1 2018 $4,544 25

194571 Public Lighting - Metered - Code Required - Code needs to be added to system - 198 Bower Road Semaphore Park METERED ENG ENG 1 2018 $4,544 25

194572 Public Lighting - Metered - Code Required - Code needs to be added to system - 200 Bower Road Semaphore Park METERED ENG ENG 1 2018 $4,544 25

195979 Public Lighting - Metered - Code Required - Code needs to be added to system - 25/104 West Lakes Boulevard West Lakes METERED ENG ENG 1 2018 $4,544 25

194489 Public Lighting - Metered - Code Required - Code needs to be added to system - 4 Charles Sturt Avenue Grange METERED ENG ENG 1 2018 $4,544 25

194487 Public Lighting - Metered - Code Required - Code needs to be added to system - 4 Charles Sturt Avenue Grange METERED ENG ENG 1 2018 $4,544 25

195121 Public Lighting - Metered - Code Required - Code needs to be added to system - 4 Charles Sturt Avenue Grange METERED ENG ENG 1 2018 $4,544 25

194574 Public Lighting - Metered - Code Required - Code needs to be added to system - 49 Bower Street Woodville METERED ENG ENG 1 2018 $4,544 25

195104 Public Lighting - Metered - Code Required - Code needs to be added to system - 49 Woodville Road Woodville METERED ENG ENG 1 2018 $4,544 25

195112 Public Lighting - Metered - Code Required - Code needs to be added to system - 49A Orsmond Street Hindmarsh METERED ENG ENG 1 2018 $4,544 25

195605 Public Lighting - Metered - Code Required - Code needs to be added to system - 49A Orsmond Street Hindmarsh METERED ENG ENG 1 2018 $4,544 25

195606 Public Lighting - Metered - Code Required - Code needs to be added to system - 49A Orsmond Street Hindmarsh METERED ENG ENG 1 2018 $4,544 25

194573 Public Lighting - Metered - Code Required - Code needs to be added to system - 58 Woodville Road Woodville METERED ENG ENG 1 2018 $4,544 25

194488 Public Lighting - Metered - Code Required - Code needs to be added to system - 6 Charles Sturt Avenue Grange METERED ENG ENG 1 2018 $4,544 25

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 65: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 65 -

196449 Public Lighting - Metered - Code Required - Code needs to be added to system - Albert Greenshields Reserve - Torrens Road Brompton METERED ENG ENG 1 2018 $4,544 25

196232 Public Lighting - Metered - Compact Fluorecent 42W - Birkdale Grove West Lakes METERED ENG ENG 1 2018 $4,544 5

195814 Public Lighting - Metered - Compact Fluorecent 42W - Mariners Crescent West Lakes METERED ENG ENG 1 2018 $4,544 25

196887 Public Lighting - Metered - Compact Fluorecent 42W - MJ McInerney Reserve - Lot 101 Pinda Street West Croydon METERED ENG ENG 1 2018 $4,544 25

196628 Public Lighting - Metered - Code Required - Code needs to be added to system - Carnegie North Reserve - Oval - Cooke Crescent Royal Park

METERED ENG ENG 1 2018 $4,544 25

196631 Public Lighting - Metered - Code Required - Code needs to be added to system - Carnegie North Reserve - Oval - Crown Terrace Royal Park METERED ENG ENG 1 2018 $4,544 25

196627 Public Lighting - Metered - Code Required - Code needs to be added to system - Carnegie North Reserve - Oval - Kingston Avenue Royal Park

METERED ENG ENG 1 2018 $4,544 25

194494 Public Lighting - Metered - Code Required - Code needs to be added to system - Finsbury Avenue Streetscapes - 50 Northgate Street Woodville North

METERED ENG ENG 1 2018 $4,544 25

195618 Public Lighting - Metered - Code Required - Code needs to be added to system - Finsbury Avenue Streetscapes - 50 Park Avenue Woodville North

METERED ENG ENG 1 2018 $4,544 25

195553 Public Lighting - Metered - Code Required - Code needs to be added to system - Lot 10 Cedar Avenue Woodville South METERED ENG ENG 1 2018 $4,544 25

195116 Public Lighting - Metered - Code Required - Code needs to be added to system - Main Street Beverley METERED ENG ENG 1 2018 $4,544 25

195752 Public Lighting - Metered - Code Required - Code needs to be added to system - Martinique Court West Lakes METERED ENG ENG 1 2018 $4,544 25

196022 Public Lighting - Metered - Code Required - Code needs to be added to system - Martinique Court West Lakes METERED ENG ENG 1 2018 $4,544 25

195149 Public Lighting - Metered - Code Required - Code needs to be added to system - Pedlar Reserve - Outer - Pedlar Street Seaton METERED ENG ENG 1 2018 $4,544 25

195638 Public Lighting - Metered - Code Required - Code needs to be added to system - Pedlar Reserve - Outer - Pedlar Street Seaton METERED ENG ENG 1 2018 $4,544 25

194517 Public Lighting - Metered - Code Required - Code needs to be added to system - Pedlar Reserve - Outer - Sparrow Court Seaton METERED ENG ENG 1 2018 $4,544 25

196608 Public Lighting - Metered - Code Required - Code needs to be added to system - RTLP - Breakout North Reserve - 2/34-62 Military Road West Beach

METERED ENG ENG 1 2018 $4,544 25

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 66: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 66 -

194654 Public Lighting - Metered - Code Required - Code needs to be added to system - West Lakes Shore Foreshore - Lot 175 Bartley Terrace West Lakes Shore

METERED ENG ENG 1 2018 $4,544 25

195533 Public Lighting - Metered - Code Required - Code needs to be added to system - West Lakes Shore Foreshore - Lot 175 Bartley Terrace West Lakes Shore

METERED ENG ENG 1 2018 $4,544 25

195041 Public Lighting - Metered - Code Required - Code needs to be added to system - West Lakes Shore Foreshore - Lot 175 Bartley Terrace West Lakes Shore

METERED ENG ENG 1 2018 $4,544 25

197370 Public Lighting - Metered - Code Required - Code needs to be added to system - West Lakes Shore Foreshore - Lot 175 Bartley Terrace West Lakes Shore

METERED ENG ENG 1 2018 $4,544 25

197369 Public Lighting - Metered - Code Required - Code needs to be added to system - West Lakes Shore Foreshore - Lot 175 Keesing Place West Lakes Shore

METERED ENG ENG 1 2018 $4,544 25

195534 Public Lighting - Metered - Code Required - Code needs to be added to system - West Lakes Shore Foreshore - Lot 175 Newcombe Avenue West Lakes Shore

METERED ENG ENG 1 2018 $4,544 25

197257 Public Lighting - Metered - Compact Fluorecent 42W - 6 Eildon Court West Lakes METERED ENG ENG 1 2018 $4,544 25

195734 Public Lighting - Metered - Compact Fluorecent 42W - Eildon Court West Lakes METERED ENG ENG 1 2018 $4,544 25

195735 Public Lighting - Metered - Compact Fluorecent 42W - Eildon Court West Lakes METERED ENG ENG 1 2018 $4,544 25

195733 Public Lighting - Metered - Compact Fluorecent 42W - Hawaii Court West Lakes METERED ENG ENG 1 2018 $4,544 25

196013 Public Lighting - Metered - Compact Fluorecent 42W - Mariners Crescent West Lakes METERED ENG ENG 1 2018 $4,544 25

195126 Public Lighting - Metered - Compact Fluorecent 42W - River Park Reserve - Lot 342 Moorfield Terrace Allenby Gardens METERED ENG ENG 1 2018 $4,544 25

196014 Public Lighting - Metered - Compact Fluorecent 42W - Waikiki Court West Lakes METERED ENG ENG 1 2018 $4,544 25

195923 Public Lighting - Metered - Compact Fluorecent 42W - Waikiki Court West Lakes METERED ENG ENG 1 2018 $4,544 25

194584 Public Lighting - Metered - Mercury 250 - 2-4 Toogood Avenue Beverley METERED ENG ENG 1 2018 $4,544 25

195604 Public Lighting - Metered - Mercury 400 - Beverley Cemetery - Adam Street Hindmarsh METERED ENG ENG 1 2018 $4,544 25

196068 Public Lighting - Metered - Mercury 50 - 25/104 Sea Lake Court West Lakes METERED ENG ENG 1 2018 $4,544 25

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 67: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 67 -

195978 Public Lighting - Metered - Mercury 50 - 25/104 Sea Lake Court West Lakes METERED ENG ENG 1 2018 $4,544 25

195885 Public Lighting - Metered - Mercury 50 - 25/104 West Lakes Boulevard West Lakes METERED ENG ENG 1 2018 $4,544 25

195903 Public Lighting - Metered - Mercury 50 - 44 Antigua Grove West Lakes METERED ENG ENG 1 2018 $4,544 25

197272 Public Lighting - Metered - Mercury 50 - 44 Island Drive West Lakes METERED ENG ENG 1 2018 $4,544 25

195539 Public Lighting - Metered - Mercury 50 - Drainage North Reserve - Lot 106 Terminus Street Grange METERED ENG ENG 1 2018 $4,544 25

194466 Public Lighting - Metered - Mercury 50 - Drainage North Reserve - Lot 33 Janette Place Grange METERED ENG ENG 1 2018 $4,544 25

195537 Public Lighting - Metered - Mercury 50 - Drainage North Reserve - Lot 33 Sylvan Way Grange METERED ENG ENG 1 2018 $4,544 25

197372 Public Lighting - Metered - Mercury 50 - Edwin Reserve - 18 Varram Way West Lakes Shore METERED ENG ENG 1 2018 $4,544 25

195042 Public Lighting - Metered - Mercury 50 - Edwin Reserve - 5 Mooloola Way West Lakes Shore METERED ENG ENG 1 2018 $4,544 25

195489 Public Lighting - Metered - Mercury 50 - Eights Reserve - Lot 11 Sportsmans Drive West Lakes METERED ENG ENG 1 2018 $4,544 25

195490 Public Lighting - Metered - Mercury 50 - Eights Reserve - Lot 11 Sportsmans Drive West Lakes METERED ENG ENG 1 2018 $4,544 25

194994 Public Lighting - Metered - Mercury 50 - Eights Reserve - Lot 11 Sportsmans Drive West Lakes METERED ENG ENG 1 2018 $4,544 25

194995 Public Lighting - Metered - Mercury 50 - Eights Reserve - Lot 11 Sportsmans Drive West Lakes METERED ENG ENG 1 2018 $4,544 25

197323 Public Lighting - Metered - Mercury 50 - Eights Reserve - Lot 11 Sportsmans Drive West Lakes METERED ENG ENG 1 2018 $4,544 25

197325 Public Lighting - Metered - Mercury 50 - Eights Reserve - Lot 11 Sportsmans Drive West Lakes METERED ENG ENG 1 2018 $4,544 25

197335 Public Lighting - Metered - Mercury 50 - John Hindmarsh Frontage - 10 Carrondown Walk Brompton METERED ENG ENG 1 2018 $4,544 25

197326 Public Lighting - Metered - Mercury 50 - John Hindmarsh Frontage - 9 John Hindmarsh Frontage Brompton METERED ENG ENG 1 2018 $4,544 25

195493 Public Lighting - Metered - Mercury 50 - John Hindmarsh Frontage - 9 John Hindmarsh Frontage Brompton METERED ENG ENG 1 2018 $4,544 25

195496 Public Lighting - Metered - Mercury 50 - John Hindmarsh Frontage - Lot 81 John Hindmarsh Frontage Brompton METERED ENG ENG 1 2018 $4,544 25

197336 Public Lighting - Metered - Mercury 50 - John Hindmarsh Frontage - Lot 81 John Hindmarsh Frontage Brompton METERED ENG ENG 1 2018 $4,544 25

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 68: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 68 -

194998 Public Lighting - Metered - Mercury 50 - John Hindmarsh Frontage - Lot 81 John Hindmarsh Frontage Brompton METERED ENG ENG 1 2018 $4,544 25

194999 Public Lighting - Metered - Mercury 50 - John Hindmarsh Frontage - Lot 81 John Hindmarsh Frontage Brompton METERED ENG ENG 1 2018 $4,544 25

195492 Public Lighting - Metered - Mercury 50 - John Hindmarsh Frontage - Lot 82 Carrondown Walk Brompton METERED ENG ENG 1 2018 $4,544 25

197329 Public Lighting - Metered - Mercury 50 - John Hindmarsh Frontage - Lot 82 Carrondown Walk Brompton METERED ENG ENG 1 2018 $4,544 25

197330 Public Lighting - Metered - Mercury 50 - John Hindmarsh Frontage - Lot 82 John Hindmarsh Frontage Brompton METERED ENG ENG 1 2018 $4,544 25

197328 Public Lighting - Metered - Mercury 50 - John Hindmarsh Frontage - Lot 82 John Hindmarsh Frontage Brompton METERED ENG ENG 1 2018 $4,544 25

197334 Public Lighting - Metered - Mercury 50 - John Hindmarsh Frontage - Lot 83 Carrondown Walk Brompton METERED ENG ENG 1 2018 $4,544 25

195491 Public Lighting - Metered - Mercury 50 - John Hindmarsh Frontage - Lot 83 Carrondown Walk Brompton METERED ENG ENG 1 2018 $4,544 25

194997 Public Lighting - Metered - Mercury 50 - John Hindmarsh Frontage - Lot 83 Carrondown Walk Brompton METERED ENG ENG 1 2018 $4,544 25

194996 Public Lighting - Metered - Mercury 50 - John Hindmarsh Frontage - Lot 83 Francis Ridley Circuit Brompton METERED ENG ENG 1 2018 $4,544 25

196434 Public Lighting - Metered - Mercury 50 - John Hindmarsh Frontage - Torrens Road Brompton METERED ENG ENG 1 2018 $4,544 25

196435 Public Lighting - Metered - Mercury 50 - John Hindmarsh Frontage - Torrens Road Brompton METERED ENG ENG 1 2018 $4,544 25

197182 Public Lighting - Metered - Mercury 50 - Lot 51 Bahamas Grove West Lakes METERED ENG ENG 1 2018 $4,544 25

194459 Public Lighting - Metered - Mercury 50 - Maramba West Reserve - Lot 61 Maramba Avenue West Lakes METERED ENG ENG 1 2018 $4,544 25

194460 Public Lighting - Metered - Mercury 50 - Maramba West Reserve - Lot 61 West Lakes Boulevard West Lakes METERED ENG ENG 1 2018 $4,544 25

194461 Public Lighting - Metered - Mercury 50 - Maramba West Reserve - Lot 7 Sea Lake Court West Lakes METERED ENG ENG 1 2018 $4,544 25

195530 Public Lighting - Metered - Mercury 50 - Maramba West Reserve - Lot 8 Sea Lake Court West Lakes METERED ENG ENG 1 2018 $4,544 25

196067 Public Lighting - Metered - Mercury 50 - Maramba West Reserve - Lot 8 Sea Lake Court West Lakes METERED ENG ENG 1 2018 $4,544 25

197179 Public Lighting - Metered - Mercury 50 - Semaphore Park Foreshore - Lot 94 Mirani Court Semaphore Park METERED ENG ENG 1 2018 $4,544 25

196069 Public Lighting - Metered - Mercury 50 - Siesta Court West Lakes METERED ENG ENG 1 2018 $4,544 25

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 69: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 69 -

196070 Public Lighting - Metered - Mercury 50 - Siesta Court West Lakes METERED ENG ENG 1 2018 $4,544 25

195980 Public Lighting - Metered - Mercury 50 - Siesta Court West Lakes METERED ENG ENG 1 2018 $4,544 25

195889 Public Lighting - Metered - Mercury 50 - Siesta Court West Lakes METERED ENG ENG 1 2018 $4,544 25

195832 Public Lighting - Metered - Mercury 50 - Siesta Court West Lakes METERED ENG ENG 1 2018 $4,544 25

195833 Public Lighting - Metered - Mercury 50 - Siesta Court West Lakes METERED ENG ENG 1 2018 $4,544 25

195891 Public Lighting - Metered - Mercury 50 - Sunrise Court West Lakes METERED ENG ENG 1 2018 $4,544 25

195836 Public Lighting - Metered - Mercury 50 - Sunrise Court West Lakes METERED ENG ENG 1 2018 $4,544 25

195982 Public Lighting - Metered - Mercury 50 - Sunrise Court West Lakes METERED ENG ENG 1 2018 $4,544 25

195933 Public Lighting - Metered - Mercury 50 - West Lakes Boulevard West Lakes METERED ENG ENG 1 2018 $4,544 25

195038 Public Lighting - Metered - Mercury 50 - Woodlake Reserve - 32 Woodlake Avenue West Lakes METERED ENG ENG 1 2018 $4,544 25

195086 Public Lighting - Metered - Mercury 80 - 122-124 Toogood Avenue Beverley METERED ENG ENG 1 2018 $4,544 25

197351 Public Lighting - Metered - Mercury 80 - 122-124 Toogood Avenue Beverley METERED ENG ENG 1 2018 $4,544 25

197348 Public Lighting - Metered - Mercury 80 - 122-124 Toogood Avenue Beverley METERED ENG ENG 1 2018 $4,544 25

195087 Public Lighting - Metered - Mercury 80 - 122-124 William Street Beverley METERED ENG ENG 1 2018 $4,544 25

195580 Public Lighting - Metered - Mercury 80 - 122-124 William Street Beverley METERED ENG ENG 1 2018 $4,544 25

197442 Public Lighting - Metered - Mercury 80 - 122-124 William Street Beverley METERED ENG ENG 1 2018 $4,544 25

197443 Public Lighting - Metered - Mercury 80 - 122-124 William Street Beverley METERED ENG ENG 1 2018 $4,544 25

197444 Public Lighting - Metered - Mercury 80 - 122-124 William Street Beverley METERED ENG ENG 1 2018 $4,544 25

195392 Public Lighting - Metered - Mercury 80 - 2/34-62 Military Road Henley Beach South METERED ENG ENG 1 2018 $4,544 25

194667 Public Lighting - Metered - Mercury 80 - 2/34-62 Military Road West Beach METERED ENG ENG 1 2018 $4,544 25

197242 Public Lighting - Metered - Mercury 80 - 2/34-62 Seaview Road Henley Beach South METERED ENG ENG 1 2018 $4,544 25

197022 Public Lighting - Metered - Mercury 80 - 2/34-62 Seaview Road Henley Beach South METERED ENG ENG 1 2018 $4,544 25

194664 Public Lighting - Metered - Mercury 80 - 2/34-62 Seaview Road West Beach METERED ENG ENG 1 2018 $4,544 25

195181 Public Lighting - Metered - Mercury 80 - 2/34-62 Seaview Road West Beach METERED ENG ENG 1 2018 $4,544 25

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 70: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 70 -

195368 Public Lighting - Metered - Mercury 80 - 34-62 Military Road Henley Beach South METERED ENG ENG 1 2018 $4,544 25

194666 Public Lighting - Metered - Mercury 80 - 34-62 Military Road West Beach METERED ENG ENG 1 2018 $4,544 25

194439 Public Lighting - Metered - Mercury 80 - 64 Hubbard Street Beverley METERED ENG ENG 1 2018 $4,544 25

195385 Public Lighting - Metered - Mercury 80 - Drainage North Reserve - 5B Janette Place Grange METERED ENG ENG 1 2018 $4,544 25

197136 Public Lighting - Metered - Mercury 80 - Drainage North Reserve - 5B Janette Place Grange METERED ENG ENG 1 2018 $4,544 25

194468 Public Lighting - Metered - Mercury 80 - Drainage North Reserve - Lot 122 Terminus Street Grange METERED ENG ENG 1 2018 $4,544 25

194467 Public Lighting - Metered - Mercury 80 - Drainage North Reserve - Lot 124 McLean Avenue Grange METERED ENG ENG 1 2018 $4,544 25

194860 Public Lighting - Metered - Mercury 80 - Drainage North Reserve - Lot 272 Sylvan Way Grange METERED ENG ENG 1 2018 $4,544 25

195355 Public Lighting - Metered - Mercury 80 - Drainage North Reserve - Lot 272 Sylvan Way Grange METERED ENG ENG 1 2018 $4,544 25

194859 Public Lighting - Metered - Mercury 80 - Drainage North Reserve - Lot 33 Janette Place Grange METERED ENG ENG 1 2018 $4,544 25

197135 Public Lighting - Metered - Mercury 80 - Drainage North Reserve - Lot 33 Janette Place Grange METERED ENG ENG 1 2018 $4,544 25

197117 Public Lighting - Metered - Mercury 80 - Drainage North Reserve - Lot 64 Nash Street Grange METERED ENG ENG 1 2018 $4,544 25

196591 Public Lighting - Metered - Mercury 80 - Drainage North Reserve - Lot 64 Nash Street Grange METERED ENG ENG 1 2018 $4,544 25

196252 Public Lighting - Metered - Mercury 80 - Eights Reserve - Sportsmans Drive West Lakes METERED ENG ENG 1 2018 $4,544 25

195845 Public Lighting - Metered - Mercury 80 - Lot 157 West Lakes Boulevard West Lakes Shore METERED ENG ENG 1 2018 $4,544 25

195313 Public Lighting - Metered - Mercury 80 - MJ McInerney Reserve - Sec 1664 Sackville Street West Croydon METERED ENG ENG 1 2018 $4,544 25

194794 Public Lighting - Metered - Mercury 80 - Pedlar Reserve - Outer - Cairns Avenue Seaton METERED ENG ENG 1 2018 $4,544 25

194796 Public Lighting - Metered - Mercury 80 - Pedlar Reserve - Outer - West Lakes Boulevard Seaton METERED ENG ENG 1 2018 $4,544 25

197102 Public Lighting - Metered - Mercury 80 - Pedlar Reserve - Outer - West Lakes Boulevard Seaton METERED ENG ENG 1 2018 $4,544 25

197123 Public Lighting - Metered - Mercury 80 - Pedlar Reserve - Outer - West Lakes Boulevard Seaton METERED ENG ENG 1 2018 $4,544 25

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 71: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 71 -

197151 Public Lighting - Metered - Mercury 80 - Pedlar Reserve - Outer - West Lakes Boulevard Seaton METERED ENG ENG 1 2018 $4,544 25

196419 Public Lighting - Metered - Mercury 80 - River Park Reserve - Lot 342 Moorfield Terrace Allenby Gardens METERED ENG ENG 1 2018 $4,544 25

196420 Public Lighting - Metered - Mercury 80 - River Park Reserve - Lot 342 Moorfield Terrace Allenby Gardens METERED ENG ENG 1 2018 $4,544 25

196422 Public Lighting - Metered - Mercury 80 - River Park Reserve - Lot 342 Moorfield Terrace Allenby Gardens METERED ENG ENG 1 2018 $4,544 25

195428 Public Lighting - Metered - Mercury 80 - RTLP - Blamey Reserve - 452 Kooralla Grove Kidman Park METERED ENG ENG 1 2018 $4,544 25

195393 Public Lighting - Metered - Mercury 80 - RTLP - Blamey Reserve - Lot 1 Kooralla Grove Kidman Park METERED ENG ENG 1 2018 $4,544 25

195365 Public Lighting - Metered - Mercury 80 - RTLP - Breakout North Reserve - 34-62 Benham Place Henley Beach South METERED ENG ENG 1 2018 $4,544 25

194883 Public Lighting - Metered - Mercury 80 - RTLP - Breakout North Reserve - 34-62 Benham Place Henley Beach South METERED ENG ENG 1 2018 $4,544 25

197021 Public Lighting - Metered - Mercury 80 - RTLP - Breakout North Reserve - 34-62 Benham Place Henley Beach South METERED ENG ENG 1 2018 $4,544 25

195225 Public Lighting - Metered - Mercury 80 - RTLP - Breakout North Reserve - 34-62 Gibson Street West Beach METERED ENG ENG 1 2018 $4,544 25

195226 Public Lighting - Metered - Mercury 80 - RTLP - Breakout North Reserve - 34-62 Gibson Street West Beach METERED ENG ENG 1 2018 $4,544 25

195678 Public Lighting - Metered - Mercury 80 - RTLP - Breakout North Reserve - 34-62 Gibson Street West Beach METERED ENG ENG 1 2018 $4,544 25

195382 Public Lighting - Metered - Mercury 80 - RTLP - Breakout North Reserve - 34-62 Halsey Road Henley Beach South METERED ENG ENG 1 2018 $4,544 25

194902 Public Lighting - Metered - Mercury 80 - RTLP - Breakout North Reserve - 34-62 Halsey Road Henley Beach South METERED ENG ENG 1 2018 $4,544 25

194868 Public Lighting - Metered - Mercury 80 - RTLP - Breakout North Reserve - 34-62 Halsey Road Henley Beach South METERED ENG ENG 1 2018 $4,544 25

194870 Public Lighting - Metered - Mercury 80 - RTLP - Breakout North Reserve - 34-62 Halsey Road Henley Beach South METERED ENG ENG 1 2018 $4,544 25

197019 Public Lighting - Metered - Mercury 80 - RTLP - Breakout North Reserve - 34-62 Halsey Road Henley Beach South METERED ENG ENG 1 2018 $4,544 25

197143 Public Lighting - Metered - Mercury 80 - RTLP - Breakout North Reserve - 34-62 Halsey Road Henley Beach South METERED ENG ENG 1 2018 $4,544 25

197145 Public Lighting - Metered - Mercury 80 - RTLP - Breakout North Reserve - 34-62 Halsey Road Henley Beach South METERED ENG ENG 1 2018 $4,544 25

197146 Public Lighting - Metered - Mercury 80 - RTLP - Breakout North Reserve - 34-62 Halsey Road Henley Beach South METERED ENG ENG 1 2018 $4,544 25

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 72: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 72 -

197238 Public Lighting - Metered - Mercury 80 - RTLP - Breakout North Reserve - 34-62 Halsey Road Henley Beach South METERED ENG ENG 1 2018 $4,544 25

197239 Public Lighting - Metered - Mercury 80 - RTLP - Breakout North Reserve - 34-62 Halsey Road Henley Beach South METERED ENG ENG 1 2018 $4,544 25

195367 Public Lighting - Metered - Mercury 80 - RTLP - Breakout North Reserve - 34-62 Military Road Henley Beach South METERED ENG ENG 1 2018 $4,544 25

194668 Public Lighting - Metered - Mercury 80 - RTLP - Breakout North Reserve - 34-62 Military Road West Beach METERED ENG ENG 1 2018 $4,544 25

195183 Public Lighting - Metered - Mercury 80 - RTLP - Breakout North Reserve - 34-62 Military Road West Beach METERED ENG ENG 1 2018 $4,544 25

195184 Public Lighting - Metered - Mercury 80 - RTLP - Breakout North Reserve - 34-62 Nevis Street West Beach METERED ENG ENG 1 2018 $4,544 25

194888 Public Lighting - Metered - Mercury 80 - RTLP - Breakout North Reserve - 34-62 Nevis Street West Beach METERED ENG ENG 1 2018 $4,544 25

194889 Public Lighting - Metered - Mercury 80 - RTLP - Breakout North Reserve - 34-62 Nevis Street West Beach METERED ENG ENG 1 2018 $4,544 25

194890 Public Lighting - Metered - Mercury 80 - RTLP - Breakout North Reserve - 34-62 Nevis Street West Beach METERED ENG ENG 1 2018 $4,544 25

194891 Public Lighting - Metered - Mercury 80 - RTLP - Breakout North Reserve - 34-62 Nevis Street West Beach METERED ENG ENG 1 2018 $4,544 25

195672 Public Lighting - Metered - Mercury 80 - RTLP - Breakout North Reserve - 34-62 Nevis Street West Beach METERED ENG ENG 1 2018 $4,544 25

195674 Public Lighting - Metered - Mercury 80 - RTLP - Breakout North Reserve - 34-62 Nevis Street West Beach METERED ENG ENG 1 2018 $4,544 25

195675 Public Lighting - Metered - Mercury 80 - RTLP - Breakout North Reserve - 34-62 Opie Street West Beach METERED ENG ENG 1 2018 $4,544 25

195676 Public Lighting - Metered - Mercury 80 - RTLP - Breakout North Reserve - 34-62 Opie Street West Beach METERED ENG ENG 1 2018 $4,544 25

195677 Public Lighting - Metered - Mercury 80 - RTLP - Breakout North Reserve - 34-62 Opie Street West Beach METERED ENG ENG 1 2018 $4,544 25

194892 Public Lighting - Metered - Mercury 80 - RTLP - Breakout North Reserve - 34-62 Opie Street West Beach METERED ENG ENG 1 2018 $4,544 25

195223 Public Lighting - Metered - Mercury 80 - RTLP - Breakout North Reserve - 34-62 Opie Street West Beach METERED ENG ENG 1 2018 $4,544 25

195224 Public Lighting - Metered - Mercury 80 - RTLP - Breakout North Reserve - 34-62 Opie Street West Beach METERED ENG ENG 1 2018 $4,544 25

194669 Public Lighting - Metered - Mercury 80 - RTLP - Breakout North Reserve - 34-62 Opie Street West Beach METERED ENG ENG 1 2018 $4,544 25

194670 Public Lighting - Metered - Mercury 80 - RTLP - Breakout North Reserve - 34-62 Opie Street West Beach METERED ENG ENG 1 2018 $4,544 25

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 73: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 73 -

194671 Public Lighting - Metered - Mercury 80 - RTLP - Breakout North Reserve - 34-62 Opie Street West Beach METERED ENG ENG 1 2018 $4,544 25

194672 Public Lighting - Metered - Mercury 80 - RTLP - Breakout North Reserve - 34-62 Opie Street West Beach METERED ENG ENG 1 2018 $4,544 25

197027 Public Lighting - Metered - Mercury 80 - RTLP - Riverway Reserve - 31-43 Riverway Kidman Park METERED ENG ENG 1 2018 $4,544 25

194470 Public Lighting - Metered - Mercury 80 BS 2000 - Drainage North Reserve - Lot 122 Terminus Street Grange METERED ENG ENG 1 2018 $4,544 25

194486 Public Lighting - Metered - Sodium 150 - 138 Military Road Henley Beach METERED ENG ENG 1 2018 $4,544 25

195117 Public Lighting - Metered - Sodium 150 - Hubbard Street Beverley METERED ENG ENG 1 2018 $4,544 25

195611 Public Lighting - Metered - Sodium 150 - Hubbard Street Beverley METERED ENG ENG 1 2018 $4,544 25

195610 Public Lighting - Metered - Sodium 150 - Main Street Beverley METERED ENG ENG 1 2018 $4,544 25

194675 Public Lighting - Metered - Sodium 250 - 378 North Street Henley Beach METERED ENG ENG 1 2018 $4,544 25

194677 Public Lighting - Metered - Sodium 250 CLER - 138 North Street Henley Beach METERED/ASSUMED ENG ENG 1 2018 $4,544 25

194453 Public Lighting - Metered - Sodium 50 - John Hindmarsh Frontage - 24 Francis Ridley Circuit Brompton METERED ENG ENG 1 2018 $4,544 25

194454 Public Lighting - Metered - Sodium 50 - John Hindmarsh Frontage - Lot 83 Francis Ridley Circuit Brompton METERED ENG ENG 1 2018 $4,544 25

194455 Public Lighting - Metered - Sodium 50 - John Hindmarsh Frontage - Lot 83 Francis Ridley Circuit Brompton METERED ENG ENG 1 2018 $4,544 25

194456 Public Lighting - Metered - Sodium 50 - John Hindmarsh Frontage - Lot 83 Francis Ridley Circuit Brompton METERED ENG ENG 1 2018 $4,544 25

195525 Public Lighting - Metered - Sodium 50 - John Hindmarsh Frontage - Lot 83 Francis Ridley Circuit Brompton METERED ENG ENG 1 2018 $4,544 25

195834 Public Lighting - Metered - Sodium 50 - Sunrise Court West Lakes METERED ENG ENG 1 2018 $4,544 25

192065 Public Lighting - SLUoS - Mercury 250 - West Croydon METERED/ASSUMED ENG ENG 1 2018 $4,544 60

195671 Public Lighting - Solar - Fluorescent 40 - Lot 14 Seaview Road West Beach SOLAR ENG ENG 1 2018 $4,544 25

Subtotal $1,040,576

196571 Public Lighting - CLER - Mercury 50 - Bartley Terrace Semaphore Park CLER ENG SAPN 2 2019 $4,544 25

197156 Public Lighting - CLER - Mercury 80 - Sec 941 Reedie Street Henley Beach CLER ENG SAPN 2 2019 $4,544 25

197300 Public Lighting - CLER - Sodium 50 - 3 Orsmond Street Hindmarsh CLER ENG SAPN 2 2019 $4,544 25

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 74: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 74 -

197299 Public Lighting - CLER - Sodium 50 - 30-32 Orsmond Street Hindmarsh CLER ENG SAPN 2 2019 $4,544 25

197301 Public Lighting - CLER - Sodium 50 - 46 Orsmond Street Hindmarsh CLER ENG SAPN 2 2019 $4,544 25

197154 Public Lighting - Energy Only - Mercury 80 - Harold and Cynthia Anderson Reserve - Sec 652 Seaview Road West Beach ENERGY ENG ENG 2 2019 $4,544 25

196974 Public Lighting - Energy Only - Mercury 80 - Kirkcaldy Park - Lot 12 Charlotte Terrace Grange ENERGY ENG ENG 2 2019 $4,544 25

197227 Public Lighting - Energy Only - Mercury 80 - West Street Reserve - 14-16 West Street Brompton ENERGY ENG ENG 2 2019 $4,544 5

197155 Public Lighting - Energy Only - Mercury 80 URBAN - Harold and Cynthia Anderson Reserve - Sec 652 Seaview Road West Beach ENERGY ENG ENG 2 2019 $4,544 25

194793 Public Lighting - Energy Only - Sodium 100 - Gray Reserve - 15 Winston Crescent West Beach ENERGY ENG ENG 2 2019 $4,544 5

196877 Public Lighting - Energy Only - Sodium 50 - Josiah Mitton Reserve - Lot 100 Burley Griffin Boulevard Brompton ENERGY ENG ENG 2 2019 $4,544 25

195113 Public Lighting - Metered - Code Required - Code needs to be added to system - 49A Milner Street Hindmarsh METERED ENG ENG 2 2019 $4,544 5

195607 Public Lighting - Metered - Code Required - Code needs to be added to system - 49A Orsmond Street Hindmarsh METERED ENG ENG 2 2019 $4,544 5

195105 Public Lighting - Metered - Code Required - Code needs to be added to system - 64C Woodville Road Woodville METERED ENG ENG 2 2019 $4,544 5

195596 Public Lighting - Metered - Code Required - Code needs to be added to system - 64C Woodville Road Woodville METERED ENG ENG 2 2019 $4,544 5

195612 Public Lighting - Metered - Code Required - Code needs to be added to system - Lot 68 Halsey Road Henley Beach South METERED ENG ENG 2 2019 $4,544 5

195118 Public Lighting - Metered - Code Required - Code needs to be added to system - RTLP - Breakout North Reserve - Lot 68 Halsey Road Henley Beach South

METERED ENG ENG 2 2019 $4,544 5

195615 Public Lighting - Metered - Code Required - Code needs to be added to system - St Clair Recreation Reserve - Brocas Avenue St Clair METERED ENG ENG 2 2019 $4,544 25

194595 Public Lighting - Metered - Code Required - Code needs to be added to system - St Clair Recreation Reserve - Brocas Avenue St Clair METERED ENG ENG 2 2019 $4,544 25

195122 Public Lighting - Metered - Code Required - Code needs to be added to system - St Clair Recreation Reserve - Lot 70 Brocas Avenue St Clair

METERED ENG ENG 2 2019 $4,544 25

194596 Public Lighting - Metered - Code Required - Code needs to be added to system - St Clair Recreation Reserve - Woodville Road St Clair METERED ENG ENG 2 2019 $4,544 25

194597 Public Lighting - Metered - Code Required - Code needs to be added to system - St Clair Recreation Reserve - Woodville Road St Clair METERED ENG ENG 2 2019 $4,544 25

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 75: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 75 -

195819 Public Lighting - Metered - Code Required - Code needs to be added to system - Tiranna Reserve - Lakewood Court West Lakes METERED ENG ENG 2 2019 $4,544 25

196727 Public Lighting - Metered - Compact Fluorecent 42W - 18 Sierra Avenue Grange METERED ENG ENG 2 2019 $4,544 5

195993 Public Lighting - Metered - Low Pressure Sodium 18 - Hero Reserve - Lot 72 Lord Hobart Way West Lakes METERED ENG ENG 2 2019 $4,544 25

195741 Public Lighting - Metered - Low Pressure Sodium 18 - Hero Reserve - Lot 77 Lord Hobart Way West Lakes METERED ENG ENG 2 2019 $4,544 25

196484 Public Lighting - Metered - Mercury 400 - Beverley Cemetery - Adam Street Hindmarsh METERED ENG ENG 2 2019 $4,544 25

197128 Public Lighting - Metered - Mercury 50 - 343 Military Road Semaphore Park METERED ENG ENG 2 2019 $4,544 5

197261 Public Lighting - Metered - Mercury 50 - 343 Military Road Semaphore Park METERED ENG ENG 2 2019 $4,544 5

194443 Public Lighting - Metered - Mercury 50 - 77-81 Todville Street Woodville West METERED ENG ENG 2 2019 $4,544 25

195160 Public Lighting - Metered - Mercury 50 - Beverley Cemetery - Lot 100 Woolgina Street Beverley METERED ENG ENG 2 2019 $4,544 25

196245 Public Lighting - Metered - Mercury 50 - Hansen Reserve - Hansen Court West Lakes Shore METERED ENG ENG 2 2019 $4,544 25

194653 Public Lighting - Metered - Mercury 50 - Jubilee Reserve - Outer - Lot 94 Bartley Terrace West Lakes Shore METERED ENG ENG 2 2019 $4,544 25

195500 Public Lighting - Metered - Mercury 50 - Jubilee Reserve - Outer - Lot 94 Sansom Road West Lakes Shore METERED ENG ENG 2 2019 $4,544 25

197262 Public Lighting - Metered - Mercury 50 - Point Malcolm Reserve - 343 Military Road Semaphore Park METERED ENG ENG 2 2019 $4,544 5

195822 Public Lighting - Metered - Mercury 50 - Tiranna Reserve - Cooba Way West Lakes METERED ENG ENG 2 2019 $4,544 25

196016 Public Lighting - Metered - Mercury 50 - Tiranna Reserve - Kamo Way West Lakes METERED ENG ENG 2 2019 $4,544 25

195820 Public Lighting - Metered - Mercury 50 - Tiranna Reserve - Lakewood Court West Lakes METERED ENG ENG 2 2019 $4,544 25

195821 Public Lighting - Metered - Mercury 50 - Tiranna Reserve - Lakewood Court West Lakes METERED ENG ENG 2 2019 $4,544 25

195974 Public Lighting - Metered - Mercury 50 - Tiranna Reserve - Lot 7 Norman Gibson Court West Lakes METERED ENG ENG 2 2019 $4,544 25

195881 Public Lighting - Metered - Mercury 50 - Tiranna Reserve - Lot 7 Tiranna Way West Lakes METERED ENG ENG 2 2019 $4,544 25

194440 Public Lighting - Metered - Mercury 80 - 64 Hubbard Street Beverley METERED ENG ENG 2 2019 $4,544 5

195110 Public Lighting - Metered - Mercury 80 - 66 East Avenue Beverley METERED ENG ENG 2 2019 $4,544 5

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 76: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 76 -

195019 Public Lighting - Metered - Mercury 80 - Norman Reserve - 25 Norman Street Woodville METERED ENG ENG 2 2019 $4,544 25

195029 Public Lighting - Metered - Mercury 80 - Norman Reserve - 25 Norman Street Woodville METERED ENG ENG 2 2019 $4,544 25

195430 Public Lighting - Metered - Mercury 80 - RTLP - John Keeley Reserve - Lot 121 Mountbatten Terrace Flinders Park METERED ENG ENG 2 2019 $4,544 25

196392 Public Lighting - Metered - Mercury 80 - RTLP - John Keeley Reserve - Lot 121 Mountbatten Terrace Flinders Park METERED ENG ENG 2 2019 $4,544 25

196393 Public Lighting - Metered - Mercury 80 - RTLP - John Keeley Reserve - Lot 121 Mountbatten Terrace Flinders Park METERED ENG ENG 2 2019 $4,544 25

196394 Public Lighting - Metered - Mercury 80 - RTLP - John Keeley Reserve - Lot 121 Mountbatten Terrace Flinders Park METERED ENG ENG 2 2019 $4,544 25

196395 Public Lighting - Metered - Mercury 80 - RTLP - John Keeley Reserve - Lot 121 Mountbatten Terrace Flinders Park METERED ENG ENG 2 2019 $4,544 25

196396 Public Lighting - Metered - Mercury 80 - RTLP - John Keeley Reserve - Lot 121 Mountbatten Terrace Flinders Park METERED ENG ENG 2 2019 $4,544 25

196397 Public Lighting - Metered - Mercury 80 - RTLP - John Keeley Reserve - Lot 121 Mountbatten Terrace Flinders Park METERED ENG ENG 2 2019 $4,544 25

196398 Public Lighting - Metered - Mercury 80 - RTLP - John Keeley Reserve - Lot 121 Mountbatten Terrace Flinders Park METERED ENG ENG 2 2019 $4,544 25

196399 Public Lighting - Metered - Mercury 80 - RTLP - John Keeley Reserve - Lot 121 Mountbatten Terrace Flinders Park METERED ENG ENG 2 2019 $4,544 25

196400 Public Lighting - Metered - Mercury 80 - RTLP - John Keeley Reserve - Lot 121 Mountbatten Terrace Flinders Park METERED ENG ENG 2 2019 $4,544 25

196402 Public Lighting - Metered - Mercury 80 - RTLP - John Keeley Reserve - Lot 121 Mountbatten Terrace Flinders Park METERED ENG ENG 2 2019 $4,544 25

196403 Public Lighting - Metered - Mercury 80 - RTLP - John Keeley Reserve - Lot 121 Mountbatten Terrace Flinders Park METERED ENG ENG 2 2019 $4,544 25

196404 Public Lighting - Metered - Mercury 80 - RTLP - John Keeley Reserve - Lot 121 Mountbatten Terrace Flinders Park METERED ENG ENG 2 2019 $4,544 25

196405 Public Lighting - Metered - Mercury 80 - RTLP - John Keeley Reserve - Lot 121 Mountbatten Terrace Flinders Park METERED ENG ENG 2 2019 $4,544 25

196406 Public Lighting - Metered - Mercury 80 - RTLP - John Keeley Reserve - Lot 121 Mountbatten Terrace Flinders Park METERED ENG ENG 2 2019 $4,544 25

196407 Public Lighting - Metered - Mercury 80 - RTLP - John Keeley Reserve - Lot 121 Mountbatten Terrace Flinders Park METERED ENG ENG 2 2019 $4,544 25

196408 Public Lighting - Metered - Mercury 80 - RTLP - John Keeley Reserve - Lot 121 Mountbatten Terrace Flinders Park METERED ENG ENG 2 2019 $4,544 25

196409 Public Lighting - Metered - Mercury 80 - RTLP - John Keeley Reserve - Lot 121 Mountbatten Terrace Flinders Park METERED ENG ENG 2 2019 $4,544 25

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 77: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 77 -

196410 Public Lighting - Metered - Mercury 80 - RTLP - John Keeley Reserve - Lot 121 Mountbatten Terrace Flinders Park METERED ENG ENG 2 2019 $4,544 25

196411 Public Lighting - Metered - Mercury 80 - RTLP - John Keeley Reserve - Lot 121 Mountbatten Terrace Flinders Park METERED ENG ENG 2 2019 $4,544 25

196413 Public Lighting - Metered - Mercury 80 - RTLP - John Keeley Reserve - Lot 121 Mountbatten Terrace Flinders Park METERED ENG ENG 2 2019 $4,544 25

196414 Public Lighting - Metered - Mercury 80 - RTLP - John Keeley Reserve - Lot 121 Mountbatten Terrace Flinders Park METERED ENG ENG 2 2019 $4,544 25

196415 Public Lighting - Metered - Mercury 80 - RTLP - John Keeley Reserve - Lot 121 Mountbatten Terrace Flinders Park METERED ENG ENG 2 2019 $4,544 25

196416 Public Lighting - Metered - Mercury 80 - RTLP - John Keeley Reserve - Lot 121 Mountbatten Terrace Flinders Park METERED ENG ENG 2 2019 $4,544 25

196417 Public Lighting - Metered - Mercury 80 - RTLP - John Keeley Reserve - Lot 121 Mountbatten Terrace Flinders Park METERED ENG ENG 2 2019 $4,544 25

196889 Public Lighting - Metered - Mercury 80 - RTLP - John Keeley Reserve - Lot 17 Barrpowell Road Welland METERED ENG ENG 2 2019 $4,544 25

196890 Public Lighting - Metered - Mercury 80 - RTLP - John Keeley Reserve - Lot 17 Barrpowell Road Welland METERED ENG ENG 2 2019 $4,544 25

194810 Public Lighting - Metered - Mercury 80 - RTLP - John Keeley Reserve - Lot 17 Barrpowell Road Welland METERED ENG ENG 2 2019 $4,544 25

194811 Public Lighting - Metered - Mercury 80 - RTLP - John Keeley Reserve - Lot 23 Musgrave Avenue Welland METERED ENG ENG 2 2019 $4,544 25

196933 Public Lighting - Metered - Mercury 80 - RTLP - John Keeley Reserve - Lot 23 Musgrave Avenue Welland METERED ENG ENG 2 2019 $4,544 25

194922 Public Lighting - Metered - Mercury 80 - RTLP - John Keeley Reserve - Lot 25 Barrpowell Road Welland METERED ENG ENG 2 2019 $4,544 25

196932 Public Lighting - Metered - Mercury 80 - RTLP - John Keeley Reserve - Lot 27 Barrpowell Road Welland METERED ENG ENG 2 2019 $4,544 25

197047 Public Lighting - Metered - Mercury 80 - RTLP - John Keeley Reserve - Lot 52 Musgrave Avenue Welland METERED ENG ENG 2 2019 $4,544 25

195425 Public Lighting - Metered - Mercury 80 - RTLP - John Keeley Reserve - Lot 52 Musgrave Avenue Welland METERED ENG ENG 2 2019 $4,544 25

195319 Public Lighting - Metered - Mercury 80 - RTLP - John Keeley Reserve - Lot 7 Moorfield Terrace Allenby Gardens METERED ENG ENG 2 2019 $4,544 25

195409 Public Lighting - Metered - Mercury 80 - RTLP - John Keeley Reserve - Lot 7 Moorfield Terrace Allenby Gardens METERED ENG ENG 2 2019 $4,544 25

194812 Public Lighting - Metered - Mercury 80 - RTLP - John Keeley Reserve - Lot 7 Moorfield Terrace Allenby Gardens METERED ENG ENG 2 2019 $4,544 25

194901 Public Lighting - Metered - Mercury 80 - Somerset Reserve - 11 Riverway Fulham Gardens METERED ENG ENG 2 2019 $4,544 25

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 78: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 78 -

197124 Public Lighting - Metered - Mercury 80 - Somerset Reserve - 11 Somerset Avenue Fulham Gardens METERED ENG ENG 2 2019 $4,544 25

197426 Public Lighting - Metered - Mercury 80 - Windsor Reserve - Lot 100 Alderman Avenue Pennington METERED ENG ENG 2 2019 $4,544 25

197427 Public Lighting - Metered - Mercury 80 - Windsor Reserve - Lot 100 Booker Court Pennington METERED ENG ENG 2 2019 $4,544 25

195508 Public Lighting - Metered - Mercury 80 - Windsor Reserve - Lot 100 Booker Court Pennington METERED ENG ENG 2 2019 $4,544 25

195013 Public Lighting - Metered - Mercury 80 - Windsor Reserve - Lot 100 Booker Court Pennington METERED ENG ENG 2 2019 $4,544 25

195510 Public Lighting - Metered - Mercury 80 - Windsor Reserve - Lot 100 Butler Avenue Pennington METERED ENG ENG 2 2019 $4,544 25

195522 Public Lighting - Metered - Mercury 80 - Windsor Reserve - Lot 51 Butler Avenue Pennington METERED ENG ENG 2 2019 $4,544 25

197340 Public Lighting - Metered - Mercury 80 - Windsor Reserve - Lot 51 Butler Avenue Pennington METERED ENG ENG 2 2019 $4,544 25

197425 Public Lighting - Metered - Mercury 80 - Windsor Reserve - Lot 51 Dunstan Court Pennington METERED ENG ENG 2 2019 $4,544 25

197339 Public Lighting - Metered - Mercury 80 - Windsor Reserve - Lot 51 Windsor Avenue Pennington METERED ENG ENG 2 2019 $4,544 25

195032 Public Lighting - Metered - Mercury 80 - Windsor Reserve - Lot 51 Windsor Avenue Pennington METERED ENG ENG 2 2019 $4,544 25

195509 Public Lighting - Metered - Mercury 80 - Windsor Reserve - Lot 66 Booker Court Pennington METERED ENG ENG 2 2019 $4,544 25

195012 Public Lighting - Metered - Mercury 80 - Windsor Reserve - Lot 66 Booker Court Pennington METERED ENG ENG 2 2019 $4,544 25

197343 Public Lighting - Metered - Mercury 80 - Windsor Reserve - Lot 66 Booker Court Pennington METERED ENG ENG 2 2019 $4,544 25

197341 Public Lighting - Metered - Mercury 80 - Windsor Reserve - Lot 66 Butler Avenue Pennington METERED ENG ENG 2 2019 $4,544 25

195011 Public Lighting - Metered - Mercury 80 - Windsor Reserver - Lot 100 Booker Court Pennington METERED ENG ENG 2 2019 $4,544 25

195016 Public Lighting - Metered - Mercury 80 - Woodville Oval Dog Club - Lot 10 Cedar Avenue Woodville South METERED ENG ENG 2 2019 $4,544 25

197342 Public Lighting - Metered - Mercury 80 -Windsor Reserve - Lot 100 Butler Avenue Pennington METERED ENG ENG 2 2019 $4,544 25

195614 Public Lighting - Metered - Sodium 250 CLER - St Clair Recreation Reserve - Lot 70 Woodville Road St Clair METERED ENG ENG 2 2019 $4,544 25

194976 Public Lighting - Metered - Sodium 50 - 2 Crawford Lane Hindmarsh METERED ENG ENG 2 2019 $4,544 5

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 79: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 79 -

195468 Public Lighting - Metered - Sodium 50 - 2 Crawford Lane Hindmarsh METERED ENG ENG 2 2019 $4,544 5

194975 Public Lighting - Metered - Sodium 50 - 2 Orsmond Street Hindmarsh METERED ENG ENG 2 2019 $4,544 5

Subtotal $477,120

197408 Public Lighting - CLER - Code Required - Code needs to be added to system - Sec 5807 Port Road Hindmarsh CLER ENG SAPN 3 2020 $4,544 25

194954 Public Lighting - CLER - Mercury 80 - Frome Reserve - Lot 119 Frome Crescent West Lakes CLER ENG SAPN 3 2020 $4,544 25

195514 Public Lighting - CLER - Mercury 80 - St Clair Recreation Reserve - Lot 4 Woodville Road St Clair CLER ENG SAPN 3 2020 $4,544 25

194973 Public Lighting - CLER - Sodium 50 - 166-172 Orsmond Street Hindmarsh CLER ENG SAPN 3 2020 $4,544 25

195467 Public Lighting - CLER - Sodium 50 - 2 Orsmond Street Hindmarsh CLER ENG SAPN 3 2020 $4,544 25

194972 Public Lighting - CLER - Sodium 50 - 30-32 Orsmond Street Hindmarsh CLER ENG SAPN 3 2020 $4,544 25

197307 Public Lighting - CLER - Sodium 50 - 39 Milner Street Hindmarsh CLER ENG SAPN 3 2020 $4,544 25

194974 Public Lighting - CLER - Sodium 50 - 44 Orsmond Street Hindmarsh CLER ENG SAPN 3 2020 $4,544 25

197204 Public Lighting - CLER - Sodium 50 - 6-8 Milner Street Hindmarsh CLER ENG SAPN 3 2020 $4,544 25

197198 Public Lighting - CLER - Sodium 50 - 6-8 Orsmond Street Hindmarsh CLER ENG SAPN 3 2020 $4,544 25

197306 Public Lighting - CLER - Sodium 50 - 6-8 Orsmond Street Hindmarsh CLER ENG SAPN 3 2020 $4,544 25

196367 Public Lighting - Energy Only - Mercury 50 - Ross Reserve - Lot 323 Ross Avenue Flinders Park ENERGY ENG ENG 3 2020 $4,544 25

194961 Public Lighting - Energy Only - Mercury 50 - Wastell Reserve - Lot 38 Arthur Street Pennington ENERGY ENG ENG 3 2020 $4,544 25

195448 Public Lighting - Energy Only - Mercury 50 - Wastell Reserve - Lot 38 Arthur Street Pennington ENERGY ENG ENG 3 2020 $4,544 25

197005 Public Lighting - Energy Only - Mercury 80 - Angus Reserve - Lot 44 Bishop Street Renown Park ENERGY ENG ENG 3 2020 $4,544 25

195310 Public Lighting - Energy Only - Mercury 80 - Gelland Soldiers Memorial - 36 Rowell Crescent West Croydon ENERGY ENG ENG 3 2020 $4,544 25

196797 Public Lighting - Energy Only - Mercury 80 - Harold and Cynthia Anderson Reserve - Seaview Road West Beach ENERGY ENG ENG 3 2020 $4,544 25

194798 Public Lighting - Energy Only - Mercury 80 - St Clair Recreation Reserve - Lot 70 Woodville Road St Clair ENERGY ENG ENG 3 2020 $4,544 25

195309 Public Lighting - Energy Only - Mercury 80 - St Clair Recreation Reserve - Lot 70 Woodville Road St Clair ENERGY ENG ENG 3 2020 $4,544 25

196881 Public Lighting - Energy Only - Mercury 80 - St Clair Recreation Reserve - Lot 70 Woodville Road St Clair ENERGY ENG ENG 3 2020 $4,544 25

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 80: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 80 -

195303 Public Lighting - Energy Only - Sodium 50 - Hythe Reserve - 2-4 Wood Avenue Ridleyton ENERGY ENG ENG 3 2020 $4,544 25

195305 Public Lighting - Energy Only - Sodium 50 - Ivan Franko Reserve - Lot 3 McBurnie Close Brompton ENERGY ENG ENG 3 2020 $4,544 25

195306 Public Lighting - Energy Only - Sodium 50 - Moredun Reserve - Sec 3286 Moredun Street Tennyson ENERGY ENG ENG 3 2020 $4,544 25

195598 Public Lighting - Metered - Code Required - Code needs to be added to system - 11/6 Hughes Street North Woodville METERED ENG ENG 3 2020 $4,544 25

195599 Public Lighting - Metered - Code Required - Code needs to be added to system - 11/6 Leslie Street East Woodville METERED ENG ENG 3 2020 $4,544 25

194433 Public Lighting - Metered - Code Required - Code needs to be added to system - 111 Brocas Avenue St Clair METERED ENG ENG 3 2020 $4,544 25

194434 Public Lighting - Metered - Code Required - Code needs to be added to system - 111 Brocas Avenue St Clair METERED ENG ENG 3 2020 $4,544 25

195600 Public Lighting - Metered - Code Required - Code needs to be added to system - 15/6 Leslie Street East Woodville METERED ENG ENG 3 2020 $4,544 25

195601 Public Lighting - Metered - Code Required - Code needs to be added to system - 15/6 Leslie Street East Woodville METERED ENG ENG 3 2020 $4,544 25

195107 Public Lighting - Metered - Code Required - Code needs to be added to system - 15/6 Leslie Street East Woodville METERED ENG ENG 3 2020 $4,544 25

194575 Public Lighting - Metered - Code Required - Code needs to be added to system - 15/6 Leslie Street East Woodville METERED ENG ENG 3 2020 $4,544 25

194576 Public Lighting - Metered - Code Required - Code needs to be added to system - 15/6 Leslie Street East Woodville METERED ENG ENG 3 2020 $4,544 25

194577 Public Lighting - Metered - Code Required - Code needs to be added to system - 15/6 Leslie Street East Woodville METERED ENG ENG 3 2020 $4,544 25

195108 Public Lighting - Metered - Code Required - Code needs to be added to system - 5/67 Florence Street Woodville METERED ENG ENG 3 2020 $4,544 25

195602 Public Lighting - Metered - Code Required - Code needs to be added to system - 5/67 Florence Street Woodville METERED ENG ENG 3 2020 $4,544 25

195106 Public Lighting - Metered - Code Required - Code needs to be added to system - 5/67 Hughes Street North Woodville METERED ENG ENG 3 2020 $4,544 25

194578 Public Lighting - Metered - Code Required - Code needs to be added to system - 5/67 Leslie Street East Woodville METERED ENG ENG 3 2020 $4,544 25

194435 Public Lighting - Metered - Code Required - Code needs to be added to system - 8/6 Hughes Street North Woodville METERED ENG ENG 3 2020 $4,544 25

194436 Public Lighting - Metered - Code Required - Code needs to be added to system - 8/6 Leslie Street East Woodville METERED ENG ENG 3 2020 $4,544 25

195109 Public Lighting - Metered - Code Required - Code needs to be added to system - 9/6 Florence Street Woodville METERED ENG ENG 3 2020 $4,544 25

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 81: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 81 -

194437 Public Lighting - Metered - Code Required - Code needs to be added to system - 9/6 Hughes Street North Woodville METERED ENG ENG 3 2020 $4,544 25

194438 Public Lighting - Metered - Code Required - Code needs to be added to system - 9/6 Hughes Street North Woodville METERED ENG ENG 3 2020 $4,544 25

196636 Public Lighting - Metered - Code Required - Code needs to be added to system - Carnegie South Reserve - Oval - Crown Terrace Royal Park METERED ENG ENG 3 2020 $4,544 25

196637 Public Lighting - Metered - Code Required - Code needs to be added to system - Carnegie South Reserve - Oval - Crown Terrace Royal Park METERED ENG ENG 3 2020 $4,544 25

196639 Public Lighting - Metered - Code Required - Code needs to be added to system - Carnegie South Reserve - Oval - Crown Terrace Royal Park METERED ENG ENG 3 2020 $4,544 25

196640 Public Lighting - Metered - Code Required - Code needs to be added to system - Carnegie South Reserve - Oval - Crown Terrace Royal Park METERED ENG ENG 3 2020 $4,544 25

196641 Public Lighting - Metered - Code Required - Code needs to be added to system - Carnegie South Reserve - Oval - Crown Terrace Royal Park METERED ENG ENG 3 2020 $4,544 25

196635 Public Lighting - Metered - Code Required - Code needs to be added to system - Carnegie South Reserve - Oval - Kingston Avenue Royal Park

METERED ENG ENG 3 2020 $4,544 25

196605 Public Lighting - Metered - Code Required - Code needs to be added to system - Carnegie South Reserve - Oval - Lot 100 Crown Terrace Royal Park

METERED ENG ENG 3 2020 $4,544 25

196606 Public Lighting - Metered - Code Required - Code needs to be added to system - Carnegie South Reserve - Oval - Lot 104 Crown Terrace Royal Park

METERED ENG ENG 3 2020 $4,544 25

196607 Public Lighting - Metered - Code Required - Code needs to be added to system - Carnegie South Reserve - Oval - Lot 117 Lowe Street Royal Park

METERED ENG ENG 3 2020 $4,544 25

195670 Public Lighting - Metered - Code Required - Code needs to be added to system - Carnegie South Reserve - Oval - Lot 118 Lowe Street Royal Park

METERED ENG ENG 3 2020 $4,544 25

196614 Public Lighting - Metered - Code Required - Code needs to be added to system - Carnegie South Reserve - Oval - Lot 122 Kingston Avenue Royal Park

METERED ENG ENG 3 2020 $4,544 25

197253 Public Lighting - Metered - Code Required - Code needs to be added to system - Corcoran Reserve - Lot 116 Corcoran Drive West Lakes METERED ENG ENG 3 2020 $4,544 25

197254 Public Lighting - Metered - Code Required - Code needs to be added to system - Corcoran Reserve - Lot 116 Corcoran Drive West Lakes METERED ENG ENG 3 2020 $4,544 25

195484 Public Lighting - Metered - Code Required - Code needs to be added to system - Corcoran Reserve - Lot 116 Corcoran Drive West Lakes METERED ENG ENG 3 2020 $4,544 25

197256 Public Lighting - Metered - Code Required - Code needs to be added to system - Corcoran Reserve - Lot 116 Kerr Grove West Lakes METERED ENG ENG 3 2020 $4,544 25

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 82: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 82 -

194743 Public Lighting - Metered - Code Required - Code needs to be added to system - Flinders Park Oval - Outer - Lot 31 Flinders Parade Flinders Park

METERED ENG ENG 3 2020 $4,544 25

194744 Public Lighting - Metered - Code Required - Code needs to be added to system - Flinders Park Oval - Outer - Lot 31 Flinders Parade Flinders Park

METERED ENG ENG 3 2020 $4,544 25

194746 Public Lighting - Metered - Code Required - Code needs to be added to system - Flinders Park Oval - Outer - Lot 31 Pine Street Flinders Park

METERED ENG ENG 3 2020 $4,544 25

194747 Public Lighting - Metered - Code Required - Code needs to be added to system - Flinders Park Oval - Outer - Lot 31 Pine Street Flinders Park

METERED ENG ENG 3 2020 $4,544 25

195172 Public Lighting - Metered - Code Required - Code needs to be added to system - Flinders Park Oval - Outer - Lot 31 Rawlings Avenue Flinders Park

METERED ENG ENG 3 2020 $4,544 25

195660 Public Lighting - Metered - Code Required - Code needs to be added to system - Flinders Park Oval - Outer - Lot 31 Rawlings Avenue Flinders Park

METERED ENG ENG 3 2020 $4,544 25

194465 Public Lighting - Metered - Code Required - Code needs to be added to system - Henley and Grange Memorial Oval - Outer - Lot 17 Atkin Street Henley Beach

METERED ENG ENG 3 2020 $4,544 25

194463 Public Lighting - Metered - Code Required - Code needs to be added to system - Henley and Grange Memorial Oval - Outer - Lot 17 Chambers Street Henley Beach

METERED ENG ENG 3 2020 $4,544 25

195039 Public Lighting - Metered - Code Required - Code needs to be added to system - Henley and Grange Memorial Oval - Outer - Lot 17 Cudmore Terrace Henley Beach

METERED ENG ENG 3 2020 $4,544 25

195040 Public Lighting - Metered - Code Required - Code needs to be added to system - Henley and Grange Memorial Oval - Outer - Lot 17 Cudmore Terrace Henley Beach

METERED ENG ENG 3 2020 $4,544 25

195531 Public Lighting - Metered - Code Required - Code needs to be added to system - Henley and Grange Memorial Oval - Outer - Lot 17 Cudmore Terrace Henley Beach

METERED ENG ENG 3 2020 $4,544 25

195532 Public Lighting - Metered - Code Required - Code needs to be added to system - Henley and Grange Memorial Oval - Outer - Lot 17 Cudmore Terrace Henley Beach

METERED ENG ENG 3 2020 $4,544 25

194464 Public Lighting - Metered - Code Required - Code needs to be added to system - Henley and Grange Memorial Oval - Outer - Lot 17 White Street Henley Beach

METERED ENG ENG 3 2020 $4,544 25

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 83: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 83 -

194462 Public Lighting - Metered - Code Required - Code needs to be added to system - Henley and Grange Memorial Oval - Outer - Sec 1662 Chambers Street Henley Beach

METERED ENG ENG 3 2020 $4,544 25

195061 Public Lighting - Metered - Code Required - Code needs to be added to system - Ledger Oval - Outer - 108 Hill Street Woodville South METERED ENG ENG 3 2020 $4,544 25

195060 Public Lighting - Metered - Code Required - Code needs to be added to system - Ledger Oval - Outer - 108 Ledger Road Woodville South METERED ENG ENG 3 2020 $4,544 25

195557 Public Lighting - Metered - Code Required - Code needs to be added to system - Ledger Oval - Outer - 108 Ledger Road Woodville South METERED ENG ENG 3 2020 $4,544 25

195561 Public Lighting - Metered - Code Required - Code needs to be added to system - Matheson Reserve - Outer - Buccleuch Avenue Findon METERED ENG ENG 3 2020 $4,544 25

195959 Public Lighting - Metered - Code Required - Code needs to be added to system - Oarsman Reserve - Lot 68 Military Road Tennyson METERED ENG ENG 3 2020 $4,544 25

196307 Public Lighting - Metered - Code Required - Code needs to be added to system - RTLP - Tedder Reserve - Findon Road METERED ENG ENG 3 2020 $4,544 25

196638 Public Lighting - Metered - Code Required - Code needs to be added to system - Woodville Oval - Koolunda Avenue Woodville METERED ENG ENG 3 2020 $4,544 25

194477 Public Lighting - Metered - Code Required - Code needs to be added to system - Woodville Oval - Koolunda Avenue Woodville South METERED ENG ENG 3 2020 $4,544 25

194479 Public Lighting - Metered - Code Required - Code needs to be added to system - Woodville Oval - Koolunda Avenue Woodville South METERED ENG ENG 3 2020 $4,544 25

194485 Public Lighting - Metered - Code Required - Code needs to be added to system - Woodville Oval - Koolunda Avenue Woodville South METERED ENG ENG 3 2020 $4,544 25

194529 Public Lighting - Metered - Code Required - Code needs to be added to system - Woodville Oval - Koolunda Avenue Woodville South METERED ENG ENG 3 2020 $4,544 25

195554 Public Lighting - Metered - Code Required - Code needs to be added to system - Woodville Oval - Koolunda Avenue Woodville South METERED ENG ENG 3 2020 $4,544 25

194484 Public Lighting - Metered - Code Required - Code needs to be added to system - Woodville Oval - Lot 1 Cedar Avenue Woodville South METERED ENG ENG 3 2020 $4,544 25

195552 Public Lighting - Metered - Code Required - Code needs to be added to system - Woodville Oval - Lot 1 Cedar Avenue Woodville South METERED ENG ENG 3 2020 $4,544 25

195048 Public Lighting - Metered - Code Required - Code needs to be added to system - Woodville Oval - Lot 1 Cedar Avenue Woodville South METERED ENG ENG 3 2020 $4,544 25

195541 Public Lighting - Metered - Code Required - Code needs to be added to system - Woodville Oval - Lot 1 Cedar Avenue Woodville South METERED ENG ENG 3 2020 $4,544 25

195542 Public Lighting - Metered - Code Required - Code needs to be added to system - Woodville Oval - Lot 1 Cedar Avenue Woodville South METERED ENG ENG 3 2020 $4,544 25

194471 Public Lighting - Metered - Code Required - Code needs to be added to system - Woodville Oval - Lot 1 Cedar Avenue Woodville South METERED ENG ENG 3 2020 $4,544 25

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 84: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 84 -

194530 Public Lighting - Metered - Code Required - Code needs to be added to system - Woodville Oval - Oval Avenue Woodville South METERED ENG ENG 3 2020 $4,544 25

194531 Public Lighting - Metered - Code Required - Code needs to be added to system - Woodville Oval - Oval Avenue Woodville South METERED ENG ENG 3 2020 $4,544 25

194532 Public Lighting - Metered - Code Required - Code needs to be added to system - Woodville Oval - Oval Avenue Woodville South METERED ENG ENG 3 2020 $4,544 25

195920 Public Lighting - Metered - Compact Fluorecent 42W - Mariners Reserve - 53 Mariners Crescent West Lakes METERED ENG ENG 3 2020 $4,544 25

196011 Public Lighting - Metered - Compact Fluorecent 42W - Mariners Reserve - 53 Mariners Crescent West Lakes METERED ENG ENG 3 2020 $4,544 25

196012 Public Lighting - Metered - Compact Fluorecent 42W - Mariners Reserve - 53 Mariners Crescent West Lakes METERED ENG ENG 3 2020 $4,544 25

195810 Public Lighting - Metered - Compact Fluorecent 42W - Mariners Reserve - 53 Mariners Crescent West Lakes METERED ENG ENG 3 2020 $4,544 25

195811 Public Lighting - Metered - Compact Fluorecent 42W - Mariners Reserve - 53 Mariners Crescent West Lakes METERED ENG ENG 3 2020 $4,544 25

195812 Public Lighting - Metered - Compact Fluorecent 42W - Mariners Reserve - 53 Mariners Crescent West Lakes METERED ENG ENG 3 2020 $4,544 25

195813 Public Lighting - Metered - Compact Fluorecent 42W - Mariners Reserve - 53 Mariners Crescent West Lakes METERED ENG ENG 3 2020 $4,544 25

195730 Public Lighting - Metered - Compact Fluorecent 42W - Mariners Reserve - Mariners Crescent West Lakes METERED ENG ENG 3 2020 $4,544 25

196010 Public Lighting - Metered - Compact Fluorecent 42W - Mariners Reserve - Settlers Drive West Lakes METERED ENG ENG 3 2020 $4,544 25

194483 Public Lighting - Metered - Fluorescent 40 - Woodville Oval - Cedar Avenue Woodville South METERED ENG ENG 3 2020 $4,544 25

194480 Public Lighting - Metered - Fluorescent 40 - Woodville Oval - Oval Avenue Woodville South METERED ENG ENG 3 2020 $4,544 25

194482 Public Lighting - Metered - Fluorescent 40 - Woodville Oval - Oval Avenue Woodville South METERED ENG ENG 3 2020 $4,544 25

195548 Public Lighting - Metered - Fluorescent 40 - Woodville Oval - Oval Avenue Woodville South METERED ENG ENG 3 2020 $4,544 25

195550 Public Lighting - Metered - Fluorescent 40 - Woodville Oval - Oval Avenue Woodville South METERED ENG ENG 3 2020 $4,544 25

195054 Public Lighting - Metered - Fluorescent 40 - Woodville Oval - Oval Avenue Woodville South METERED ENG ENG 3 2020 $4,544 25

196799 Public Lighting - Metered - Known Luminaire - METERED ENG ENG 3 2020 $4,544 25

196800 Public Lighting - Metered - Known Luminaire - METERED ENG ENG 3 2020 $4,544 25

196811 Public Lighting - Metered - Known Luminaire - METERED ENG ENG 3 2020 $4,544 25

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 85: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 85 -

196812 Public Lighting - Metered - Known Luminaire - METERED ENG ENG 3 2020 $4,544 25

196814 Public Lighting - Metered - Known Luminaire - METERED ENG ENG 3 2020 $4,544 25

196815 Public Lighting - Metered - Known Luminaire - METERED ENG ENG 3 2020 $4,544 25

196816 Public Lighting - Metered - Known Luminaire - METERED ENG ENG 3 2020 $4,544 25

196817 Public Lighting - Metered - Known Luminaire - METERED ENG ENG 3 2020 $4,544 25

196818 Public Lighting - Metered - Known Luminaire - METERED ENG ENG 3 2020 $4,544 25

196819 Public Lighting - Metered - Known Luminaire - METERED ENG ENG 3 2020 $4,544 25

196820 Public Lighting - Metered - Known Luminaire - METERED ENG ENG 3 2020 $4,544 25

196821 Public Lighting - Metered - Known Luminaire - METERED ENG ENG 3 2020 $4,544 25

196822 Public Lighting - Metered - Known Luminaire - METERED ENG ENG 3 2020 $4,544 25

196295 Public Lighting - Metered - LED Single Bar 23 - RTLP - Tedder Reserve - Belgrave Avenue METERED ENG ENG 3 2020 $4,544 25

195740 Public Lighting - Metered - Low Pressure Sodium 18 - Rapid Reserve - Lot 83 Jane Flaxman Court West Lakes METERED ENG ENG 3 2020 $4,544 25

195994 Public Lighting - Metered - Low Pressure Sodium 18 - Rapid Reserve - Lot 83 Jane Flaxman Court West Lakes METERED ENG ENG 3 2020 $4,544 25

195737 Public Lighting - Metered - Low Pressure Sodium 18 - Rapid Reserve - Lot 83 Rapid Court West Lakes METERED ENG ENG 3 2020 $4,544 25

195905 Public Lighting - Metered - Low Pressure Sodium 18 - Rapid Reserve - Lot 83 Water Witch Court West Lakes METERED ENG ENG 3 2020 $4,544 25

196803 Public Lighting - Metered - Mercury 50 - METERED ENG ENG 3 2020 $4,544 25

196804 Public Lighting - Metered - Mercury 50 - METERED ENG ENG 3 2020 $4,544 25

196805 Public Lighting - Metered - Mercury 50 - METERED ENG ENG 3 2020 $4,544 25

197271 Public Lighting - Metered - Mercury 50 - Barbados Court West Lakes METERED ENG ENG 3 2020 $4,544 5

195649 Public Lighting - Metered - Mercury 50 - Beverley Cemetery - Lot 100 Woolgina Street Beverley METERED ENG ENG 3 2020 $4,544 25

195351 Public Lighting - Metered - Mercury 80 - Boyd Reserve - Lot 156 Boyd Crescent West Lakes Shore METERED ENG ENG 3 2020 $4,544 25

195795 Public Lighting - Metered - Mercury 50 - 20 Lakeside Court Tennyson METERED ENG ENG 3 2020 $4,544 25

195952 Public Lighting - Metered - Mercury 50 - 20 Lakeside Court Tennyson METERED ENG ENG 3 2020 $4,544 25

195954 Public Lighting - Metered - Mercury 50 - 20 Lakeside Court Tennyson METERED ENG ENG 3 2020 $4,544 25

196045 Public Lighting - Metered - Mercury 50 - 20 Lakeside Court Tennyson METERED ENG ENG 3 2020 $4,544 25

196044 Public Lighting - Metered - Mercury 50 - 20 Sunlake Place Tennyson METERED ENG ENG 3 2020 $4,544 25

195951 Public Lighting - Metered - Mercury 50 - 20 Sunlake Place Tennyson METERED ENG ENG 3 2020 $4,544 25

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 86: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 86 -

195792 Public Lighting - Metered - Mercury 50 - 20 Sunlake Place Tennyson METERED ENG ENG 3 2020 $4,544 25

195794 Public Lighting - Metered - Mercury 50 - 20 Sunlake Place Tennyson METERED ENG ENG 3 2020 $4,544 25

195917 Public Lighting - Metered - Mercury 50 - Mariners Reserve - Lot 32 Lord Hobart Way West Lakes METERED ENG ENG 3 2020 $4,544 25

196047 Public Lighting - Metered - Mercury 50 - Oarsman Reserve - 11 Lakeside Court Tennyson METERED ENG ENG 3 2020 $4,544 25

196048 Public Lighting - Metered - Mercury 50 - Oarsman Reserve - 11 Lakeside Court Tennyson METERED ENG ENG 3 2020 $4,544 25

195955 Public Lighting - Metered - Mercury 50 - Oarsman Reserve - 11 Lakeside Court Tennyson METERED ENG ENG 3 2020 $4,544 25

195956 Public Lighting - Metered - Mercury 50 - Oarsman Reserve - 11 Lakeside Court Tennyson METERED ENG ENG 3 2020 $4,544 25

195863 Public Lighting - Metered - Mercury 50 - Oarsman Reserve - 11 Lakeside Court Tennyson METERED ENG ENG 3 2020 $4,544 25

195864 Public Lighting - Metered - Mercury 50 - Oarsman Reserve - 11 Lakeside Court Tennyson METERED ENG ENG 3 2020 $4,544 25

195865 Public Lighting - Metered - Mercury 50 - Oarsman Reserve - 11 Lakeside Court Tennyson METERED ENG ENG 3 2020 $4,544 25

195867 Public Lighting - Metered - Mercury 50 - Oarsman Reserve - 11 Lakeside Court Tennyson METERED ENG ENG 3 2020 $4,544 25

195957 Public Lighting - Metered - Mercury 50 - Oarsman Reserve - Lot 68 Lakeside Court Tennyson METERED ENG ENG 3 2020 $4,544 25

195796 Public Lighting - Metered - Mercury 50 - Oarsman Reserve - Lot 68 Military Road Tennyson METERED ENG ENG 3 2020 $4,544 25

195797 Public Lighting - Metered - Mercury 50 - Oarsman Reserve - Lot 68 Military Road Tennyson METERED ENG ENG 3 2020 $4,544 25

196051 Public Lighting - Metered - Mercury 50 - Oarsman Reserve - Lot 68 Military Road Tennyson METERED ENG ENG 3 2020 $4,544 25

195868 Public Lighting - Metered - Mercury 50 - Oarsman Reserve - Military Road West Lakes Shore METERED ENG ENG 3 2020 $4,544 25

194943 Public Lighting - Metered - Mercury 50 - Point Malcolm Reserve - 343 Military Road Semaphore Park METERED ENG ENG 3 2020 $4,544 25

195434 Public Lighting - Metered - Mercury 50 - Point Malcolm Reserve - 343 Military Road Semaphore Park METERED ENG ENG 3 2020 $4,544 25

195435 Public Lighting - Metered - Mercury 50 - Point Malcolm Reserve - 343 Military Road Semaphore Park METERED ENG ENG 3 2020 $4,544 25

197286 Public Lighting - Metered - Mercury 50 - Point Malcolm Reserve - 343 Military Road Semaphore Park METERED ENG ENG 3 2020 $4,544 25

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 87: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 87 -

197165 Public Lighting - Metered - Mercury 50 - Semaphore Park Foreshore - Lot 97 Third Avenue Semaphore Park METERED ENG ENG 3 2020 $4,544 25

194478 Public Lighting - Metered - Mercury 50 - Woodville Oval - Koolunda Avenue Woodville South METERED ENG ENG 3 2020 $4,544 25

197385 Public Lighting - Metered - Mercury 50 - Woodville Oval - Oval Avenue Woodville South METERED ENG ENG 3 2020 $4,544 25

195055 Public Lighting - Metered - Mercury 50 - Woodville Oval - Oval Avenue Woodville South METERED ENG ENG 3 2020 $4,544 25

195056 Public Lighting - Metered - Mercury 50 - Woodville Oval - Oval Avenue Woodville South METERED ENG ENG 3 2020 $4,544 25

195551 Public Lighting - Metered - Mercury 50 - Woodville Oval - Oval Avenue Woodville South METERED ENG ENG 3 2020 $4,544 25

196801 Public Lighting - Metered - Mercury 80 - METERED ENG ENG 3 2020 $4,544 25

196798 Public Lighting - Metered - Mercury 80 - METERED ENG ENG 3 2020 $4,544 25

196809 Public Lighting - Metered - Mercury 80 - METERED ENG ENG 3 2020 $4,544 25

194561 Public Lighting - Metered - Mercury 80 - Collins Reserve - Outer - 1 Chatswood Crescent Kidman Park METERED ENG ENG 3 2020 $4,544 25

194562 Public Lighting - Metered - Mercury 80 - Collins Reserve - Outer - 1 Chatswood Crescent Kidman Park METERED ENG ENG 3 2020 $4,544 25

194563 Public Lighting - Metered - Mercury 80 - Collins Reserve - Outer - 1 Chatswood Crescent Kidman Park METERED ENG ENG 3 2020 $4,544 25

194564 Public Lighting - Metered - Mercury 80 - Collins Reserve - Outer - 1 Chatswood Crescent Kidman Park METERED ENG ENG 3 2020 $4,544 25

195591 Public Lighting - Metered - Mercury 80 - Collins Reserve - Outer - Lot 1 Barbara Street Kidman Park METERED ENG ENG 3 2020 $4,544 25

195587 Public Lighting - Metered - Mercury 80 - Collins Reserve - Outer - Lot 1 Barbara Street Kidman Park METERED ENG ENG 3 2020 $4,544 25

195096 Public Lighting - Metered - Mercury 80 - Collins Reserve - Outer - Lot 1 Barbara Street Kidman Park METERED ENG ENG 3 2020 $4,544 25

195099 Public Lighting - Metered - Mercury 80 - Collins Reserve - Outer - Lot 1 Barbara Street Kidman Park METERED ENG ENG 3 2020 $4,544 25

196582 Public Lighting - Metered - Mercury 80 - Collins Reserve - Outer - Lot 1 Barbara Street Kidman Park METERED ENG ENG 3 2020 $4,544 25

197449 Public Lighting - Metered - Mercury 80 - Collins Reserve - Outer - Lot 1 Barbara Street Kidman Park METERED ENG ENG 3 2020 $4,544 25

197450 Public Lighting - Metered - Mercury 80 - Collins Reserve - Outer - Lot 1 Barbara Street Kidman Park METERED ENG ENG 3 2020 $4,544 25

194568 Public Lighting - Metered - Mercury 80 - Collins Reserve - Outer - Lot 1 Betty Avenue Kidman Park METERED ENG ENG 3 2020 $4,544 25

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 88: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 88 -

195092 Public Lighting - Metered - Mercury 80 - Collins Reserve - Outer - Lot 1 Chatswood Crescent Kidman Park METERED ENG ENG 3 2020 $4,544 25

195093 Public Lighting - Metered - Mercury 80 - Collins Reserve - Outer - Lot 1 Chatswood Crescent Kidman Park METERED ENG ENG 3 2020 $4,544 25

195094 Public Lighting - Metered - Mercury 80 - Collins Reserve - Outer - Lot 1 Chatswood Crescent Kidman Park METERED ENG ENG 3 2020 $4,544 25

195588 Public Lighting - Metered - Mercury 80 - Collins Reserve - Outer - Lot 1 Chatswood Crescent Kidman Park METERED ENG ENG 3 2020 $4,544 25

195584 Public Lighting - Metered - Mercury 80 - Collins Reserve - Outer - Lot 1 Chatswood Crescent Kidman Park METERED ENG ENG 3 2020 $4,544 25

195585 Public Lighting - Metered - Mercury 80 - Collins Reserve - Outer - Lot 1 Chatswood Crescent Kidman Park METERED ENG ENG 3 2020 $4,544 25

195586 Public Lighting - Metered - Mercury 80 - Collins Reserve - Outer - Lot 1 Chatswood Crescent Kidman Park METERED ENG ENG 3 2020 $4,544 25

197445 Public Lighting - Metered - Mercury 80 - Collins Reserve - Outer - Lot 1 Chatswood Crescent Kidman Park METERED ENG ENG 3 2020 $4,544 25

197448 Public Lighting - Metered - Mercury 80 - Collins Reserve - Outer - Lot 1 Chatswood Crescent Kidman Park METERED ENG ENG 3 2020 $4,544 25

195101 Public Lighting - Metered - Mercury 80 - Collins Reserve - Outer - Lot 1 Morton Street Kidman Park METERED ENG ENG 3 2020 $4,544 25

194428 Public Lighting - Metered - Mercury 80 - Collins Reserve - Outer - Lot 1 Morton Street Kidman Park METERED ENG ENG 3 2020 $4,544 25

194429 Public Lighting - Metered - Mercury 80 - Collins Reserve - Outer - Lot 1 Sydney Avenue Kidman Park METERED ENG ENG 3 2020 $4,544 25

194569 Public Lighting - Metered - Mercury 80 - Collins Reserve - Outer - Lot 1 Walter Street Kidman Park METERED ENG ENG 3 2020 $4,544 25

195593 Public Lighting - Metered - Mercury 80 - Collins Reserve - Outer - Lot 1 Walter Street Kidman Park METERED ENG ENG 3 2020 $4,544 25

194566 Public Lighting - Metered - Mercury 80 - Collins Reserve - Outer - Lot 73 Barbara Street Fulham Gardens METERED ENG ENG 3 2020 $4,544 25

194567 Public Lighting - Metered - Mercury 80 - Collins Reserve - Outer - Lot 73 Betty Avenue Fulham Gardens METERED ENG ENG 3 2020 $4,544 25

194565 Public Lighting - Metered - Mercury 80 - Collins Reserve - Outer - Lot 82 Valetta Road Fulham Gardens METERED ENG ENG 3 2020 $4,544 25

195589 Public Lighting - Metered - Mercury 80 - Collins Reserve - Outer - Lot 83 Barbara Street Fulham Gardens METERED ENG ENG 3 2020 $4,544 25

195590 Public Lighting - Metered - Mercury 80 - Collins Reserve - Outer - Lot 83 Barbara Street Fulham Gardens METERED ENG ENG 3 2020 $4,544 25

195097 Public Lighting - Metered - Mercury 80 - Collins Reserve - Outer - Lot 83 Barbara Street Fulham Gardens METERED ENG ENG 3 2020 $4,544 25

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 89: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 89 -

195098 Public Lighting - Metered - Mercury 80 - Collins Reserve - Outer - Lot 83 Barbara Street Fulham Gardens METERED ENG ENG 3 2020 $4,544 25

195095 Public Lighting - Metered - Mercury 80 - Collins Reserve - Outer - Lot 83 Barbara Street Fulham Gardens METERED ENG ENG 3 2020 $4,544 25

197451 Public Lighting - Metered - Mercury 80 - Collins Reserve - Outer - Lot 83 Barbara Street Fulham Gardens METERED ENG ENG 3 2020 $4,544 25

197452 Public Lighting - Metered - Mercury 80 - Collins Reserve - Outer - Lot 83 Barbara Street Fulham Gardens METERED ENG ENG 3 2020 $4,544 25

197009 Public Lighting - Metered - Mercury 80 - David Reserve - Lot 68 Dunn Avenue Findon METERED ENG ENG 3 2020 $4,544 25

194920 Public Lighting - Metered - Mercury 80 - Fawk Reserve - Outer - 171B Hamilton Road Athol Park METERED ENG ENG 3 2020 $4,544 25

195515 Public Lighting - Metered - Mercury 80 - Frank Mitchell Park - Outer - Lot 83 Minns Street East Woodville West METERED ENG ENG 3 2020 $4,544 25

196254 Public Lighting - Metered - Mercury 80 - Henley and Grange Memorial Oval - Outer - METERED ENG ENG 3 2020 $4,544 25

196255 Public Lighting - Metered - Mercury 80 - Henley and Grange Memorial Oval - Outer - METERED ENG ENG 3 2020 $4,544 25

196256 Public Lighting - Metered - Mercury 80 - Henley and Grange Memorial Oval - Outer - METERED ENG ENG 3 2020 $4,544 25

196257 Public Lighting - Metered - Mercury 80 - Henley and Grange Memorial Oval - Outer - METERED ENG ENG 3 2020 $4,544 25

195520 Public Lighting - Metered - Mercury 80 - Henley and Grange Memorial Oval - Outer - Lot 12 Atkin Street Henley Beach METERED ENG ENG 3 2020 $4,544 25

194448 Public Lighting - Metered - Mercury 80 - Henley and Grange Memorial Oval - Outer - Lot 12 Atkin Street Henley Beach METERED ENG ENG 3 2020 $4,544 25

195524 Public Lighting - Metered - Mercury 80 - Henley and Grange Memorial Oval - Outer - Lot 13 Atkin Street Henley Beach METERED ENG ENG 3 2020 $4,544 25

197358 Public Lighting - Metered - Mercury 80 - Henley and Grange Memorial Oval - Outer - Lot 13 Atkin Street Henley Beach METERED ENG ENG 3 2020 $4,544 25

197356 Public Lighting - Metered - Mercury 80 - Henley and Grange Memorial Oval - Outer - Lot 13 Atkin Street Henley Beach METERED ENG ENG 3 2020 $4,544 25

197357 Public Lighting - Metered - Mercury 80 - Henley and Grange Memorial Oval - Outer - Lot 14 Atkin Street Henley Beach METERED ENG ENG 3 2020 $4,544 25

197355 Public Lighting - Metered - Mercury 80 - Henley and Grange Memorial Oval - Outer - Lot 8 Atkin Street Henley Beach METERED ENG ENG 3 2020 $4,544 25

195028 Public Lighting - Metered - Mercury 80 - Henley and Grange Memorial Oval - Outer - Lot 8 Atkin Street Henley Beach METERED ENG ENG 3 2020 $4,544 25

194449 Public Lighting - Metered - Mercury 80 - Pine Lodge Reserve - Lot 82 Pine Lodge Crescent Seaton METERED ENG ENG 3 2020 $4,544 25

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 90: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 90 -

195023 Public Lighting - Metered - Mercury 80 - Pine Lodge Reserve - Lot 82 Pine Lodge Crescent Seaton METERED ENG ENG 3 2020 $4,544 25

195518 Public Lighting - Metered - Mercury 80 - Pine Lodge Reserve - Lot 82 Pine Lodge Crescent Seaton METERED ENG ENG 3 2020 $4,544 25

197023 Public Lighting - Metered - Mercury 80 - RTLP - George Jones Reserve - 31-43 Riverway Kidman Park METERED ENG ENG 3 2020 $4,544 25

197024 Public Lighting - Metered - Mercury 80 - RTLP - George Jones Reserve - 31-43 Riverway Kidman Park METERED ENG ENG 3 2020 $4,544 25

194808 Public Lighting - Metered - Mercury 80 - RTLP - George Jones Reserve - Lot 1 Riverway Kidman Park METERED ENG ENG 3 2020 $4,544 25

194873 Public Lighting - Metered - Mercury 80 - RTLP - George Jones Reserve - Lot 1 Riverway Kidman Park METERED ENG ENG 3 2020 $4,544 25

194903 Public Lighting - Metered - Mercury 80 - RTLP - George Jones Reserve - Lot 26 Riverway Kidman Park METERED ENG ENG 3 2020 $4,544 25

197032 Public Lighting - Metered - Mercury 80 - RTLP - Tedder Reserve - 333 Belgrave Avenue Flinders Park METERED ENG ENG 3 2020 $4,544 25

197121 Public Lighting - Metered - Mercury 80 - RTLP - Tedder Reserve - 333 Findon Road Flinders Park METERED ENG ENG 3 2020 $4,544 25

196308 Public Lighting - Metered - Mercury 80 - RTLP - Tedder Reserve - Findon Road METERED ENG ENG 3 2020 $4,544 25

196306 Public Lighting - Metered - Mercury 80 - RTLP - Tedder Reserve - Findon Road METERED ENG ENG 3 2020 $4,544 25

195374 Public Lighting - Metered - Mercury 80 - RTLP - Tedder Reserve - Lot 91 Belgrave Avenue Flinders Park METERED ENG ENG 3 2020 $4,544 25

194874 Public Lighting - Metered - Mercury 80 - RTLP - Tedder Reserve - Lot 92 Belgrave Avenue Flinders Park METERED ENG ENG 3 2020 $4,544 25

194936 Public Lighting - Metered - Mercury 80 - RTLP - Tedder Reserve - Lot 92 Belgrave Avenue Flinders Park METERED ENG ENG 3 2020 $4,544 25

195373 Public Lighting - Metered - Mercury 80 - RTLP - Tedder Reserve - Lot 92 Belgrave Avenue Flinders Park METERED ENG ENG 3 2020 $4,544 25

197119 Public Lighting - Metered - Mercury 80 - RTLP - Tedder Reserve - Lot 92 Belgrave Avenue Flinders Park METERED ENG ENG 3 2020 $4,544 25

195017 Public Lighting - Metered - Mercury 80 - Woodville Oval - Lot 10 Oval Avenue Woodville South METERED ENG ENG 3 2020 $4,544 25

196610 Public Lighting - Metered - Sodium 250 - Ledger Oval - Outer - 108 Hill Street Woodville South METERED ENG ENG 3 2020 $4,544 25

195556 Public Lighting - Metered - Sodium 250 - Ledger Oval - Outer - 108 Hill Street Woodville South METERED ENG ENG 3 2020 $4,544 25

196615 Public Lighting - Metered - Sodium 250 - Ledger Oval - Outer - 108 Ledger Road Woodville South METERED ENG ENG 3 2020 $4,544 25

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 91: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 91 -

196609 Public Lighting - Metered - Sodium 250 - Ledger Oval - Outer - 108 Ledger Road Woodville South METERED ENG ENG 3 2020 $4,544 25

197390 Public Lighting - Metered - Sodium 250 - Ledger Oval - Outer - 108 Ledger Road Woodville South METERED ENG ENG 3 2020 $4,544 25

192462 Public Lighting - SLUoS - Sodium 150 - Hindmarsh SLUOS SAPN SAPN 3 2020 $0 25

Subtotal $1,090,560

246850 Lighting - AD Whiteford Reserve Lighting Fletcher Road Henley Beach South METERED/ASSUMED OSR OSR 4 2021 $4,544 60

196249 Public Lighting - CLER - Mercury 50 - Cooba Way West Lakes CLER ENG SAPN 4 2021 $4,544 25

201305 Public Lighting - CLER - Mercury 80 - CLER ENG SAPN 4 2021 $4,544 25

201571 Public Lighting - CLER - Mercury 80 - CLER ENG SAPN 4 2021 $4,544 25

202032 Public Lighting - CLER - Mercury 80 - CLER ENG SAPN 4 2021 $4,544 25

202033 Public Lighting - CLER - Mercury 80 - CLER ENG SAPN 4 2021 $4,544 25

194451 Public Lighting - CLER - Mercury 80 - St Clair Recreation Reserve - Lot 70 Woodville Road St Clair CLER ENG SAPN 4 2021 $4,544 25

196310 Public Lighting - CLER - Sodium 100 - West Beach Road West Beach CLER WESTTORR SAPN 4 2021 $4,544 25

196311 Public Lighting - CLER - Sodium 100 - West Beach Road West Beach CLER WESTTORR SAPN 4 2021 $4,544 25

196313 Public Lighting - CLER - Sodium 100 - West Beach Road West Beach CLER WESTTORR SAPN 4 2021 $4,544 25

197251 Public Lighting - CLER - Sodium 50 - 2 Milner Street Hindmarsh CLER ENG SAPN 4 2021 $4,544 25

195521 Public Lighting - Energy Only - Mercury 80 - Lines Reserve - 7 Crafter Street Grange ENERGY ENG ENG 4 2021 $4,544 25

195021 Public Lighting - Energy Only - Mercury 80 - Lines Reserve - Lot 98 Crafter Street Grange ENERGY ENG ENG 4 2021 $4,544 25

195031 Public Lighting - Energy Only - Mercury 80 - Lines Reserve - Lot 98 Crafter Street Grange ENERGY ENG ENG 4 2021 $4,544 25

197434 Public Lighting - Energy Only - Mercury 80 - Lines Reserve - Lot 98 Lines Street Grange ENERGY ENG ENG 4 2021 $4,544 25

194505 Public Lighting - Energy Only - Sodium 50 - Brompton Green Reserve - Lot 151 Ranelagh Street Brompton ENERGY ENG ENG 4 2021 $4,544 25

194506 Public Lighting - Energy Only - Sodium 50 - Brompton Green Reserve - Lot 151 Ranelagh Street Brompton ENERGY ENG ENG 4 2021 $4,544 25

194507 Public Lighting - Energy Only - Sodium 50 - Josiah Mitton Reserve - Lot 151 Ranelagh Street Brompton ENERGY ENG ENG 4 2021 $4,544 25

194295 Public Lighting - SLUoS - Low Pressure Sodium 135 - Ovingham METERED/ASSUMED ENG ENG 4 2021 $4,544 60

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 92: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 92 -

194241 Public Lighting - SLUoS - Low Pressure Sodium 55 - Flinders Park METERED/ASSUMED ENG ENG 4 2021 $4,544 60

194251 Public Lighting - SLUoS - Low Pressure Sodium 90 - 1 Kilkenny Road Woodville Park METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191947 Public Lighting - SLUoS - Low Pressure Sodium 90 - 1 Port Road Cheltenham METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191933 Public Lighting - SLUoS - Low Pressure Sodium 90 - 1006-1008 Port Road Albert Park METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191944 Public Lighting - SLUoS - Low Pressure Sodium 90 - 1007-1023 Port Road Cheltenham METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191934 Public Lighting - SLUoS - Low Pressure Sodium 90 - 1014-1034 Glyde Street Albert Park METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191935 Public Lighting - SLUoS - Low Pressure Sodium 90 - 1014-1034 Port Road Albert Park METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191941 Public Lighting - SLUoS - Low Pressure Sodium 90 - 1029-1031 Port Road Cheltenham METERED/ASSUMED ENG ENG 4 2021 $4,544 60

192104 Public Lighting - SLUoS - Low Pressure Sodium 90 - 1044-1046 Port Road Albert Park METERED/ASSUMED ENG ENG 4 2021 $4,544 60

194265 Public Lighting - SLUoS - Low Pressure Sodium 90 - 11 Clark Terrace Seaton METERED/ASSUMED ENG ENG 4 2021 $4,544 60

194266 Public Lighting - SLUoS - Low Pressure Sodium 90 - 17 Mitchell Street West Seaton METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191960 Public Lighting - SLUoS - Low Pressure Sodium 90 - 26/853-867 Port Road Woodville METERED/ASSUMED ENG ENG 4 2021 $4,544 60

192124 Public Lighting - SLUoS - Low Pressure Sodium 90 - 26/853-867 Port Road Woodville METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191978 Public Lighting - SLUoS - Low Pressure Sodium 90 - 310A-316 Port Road Hindmarsh METERED/ASSUMED ENG ENG 4 2021 $4,544 60

194254 Public Lighting - SLUoS - Low Pressure Sodium 90 - 44 West Lakes Boulevard Albert Park METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191896 Public Lighting - SLUoS - Low Pressure Sodium 90 - 521-527 Garnet Street West Croydon METERED/ASSUMED ENG ENG 4 2021 $4,544 60

192068 Public Lighting - SLUoS - Low Pressure Sodium 90 - 539 Port Road West Croydon METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191894 Public Lighting - SLUoS - Low Pressure Sodium 90 - 553 Port Road West Croydon METERED/ASSUMED ENG ENG 4 2021 $4,544 60

192063 Public Lighting - SLUoS - Low Pressure Sodium 90 - 585 Port Road West Croydon METERED/ASSUMED ENG ENG 4 2021 $4,544 60

194283 Public Lighting - SLUoS - Low Pressure Sodium 90 - 592 Wright Street Henley Beach METERED/ASSUMED ENG ENG 4 2021 $4,544 60

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 93: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 93 -

192062 Public Lighting - SLUoS - Low Pressure Sodium 90 - 595-603 Jane Street West Croydon METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191824 Public Lighting - SLUoS - Low Pressure Sodium 90 - 608 Port Road Allenby Gardens METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191825 Public Lighting - SLUoS - Low Pressure Sodium 90 - 612-620 Coombe Road Allenby Gardens METERED/ASSUMED ENG ENG 4 2021 $4,544 60

192057 Public Lighting - SLUoS - Low Pressure Sodium 90 - 617 Aroona Road West Croydon METERED/ASSUMED ENG ENG 4 2021 $4,544 60

192058 Public Lighting - SLUoS - Low Pressure Sodium 90 - 617 Port Road West Croydon METERED/ASSUMED ENG ENG 4 2021 $4,544 60

192059 Public Lighting - SLUoS - Low Pressure Sodium 90 - 617 Port Road West Croydon METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191830 Public Lighting - SLUoS - Low Pressure Sodium 90 - 644-646 Port Road Beverley METERED/ASSUMED ENG ENG 4 2021 $4,544 60

192054 Public Lighting - SLUoS - Low Pressure Sodium 90 - 649 Port Road Woodville Park METERED/ASSUMED ENG ENG 4 2021 $4,544 60

192053 Public Lighting - SLUoS - Low Pressure Sodium 90 - 657 Port Road Woodville Park METERED/ASSUMED ENG ENG 4 2021 $4,544 60

192049 Public Lighting - SLUoS - Low Pressure Sodium 90 - 691 Port Road Woodville Park METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191875 Public Lighting - SLUoS - Low Pressure Sodium 90 - 699-707 Port Road Woodville Park METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191873 Public Lighting - SLUoS - Low Pressure Sodium 90 - 721-723 Port Road Woodville Park METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191840 Public Lighting - SLUoS - Low Pressure Sodium 90 - 742-748 Port Road Beverley METERED/ASSUMED ENG ENG 4 2021 $4,544 60

192041 Public Lighting - SLUoS - Low Pressure Sodium 90 - 761 Port Road Woodville METERED/ASSUMED ENG ENG 4 2021 $4,544 60

192039 Public Lighting - SLUoS - Low Pressure Sodium 90 - 779 Port Road Woodville METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191959 Public Lighting - SLUoS - Low Pressure Sodium 90 - 869 Port Road Cheltenham METERED/ASSUMED ENG ENG 4 2021 $4,544 60

192141 Public Lighting - SLUoS - Low Pressure Sodium 90 - 869 Port Road Cheltenham METERED/ASSUMED ENG ENG 4 2021 $4,544 60

192122 Public Lighting - SLUoS - Low Pressure Sodium 90 - 869 Port Road Cheltenham METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191855 Public Lighting - SLUoS - Low Pressure Sodium 90 - 894-900 Port Road Woodville South METERED/ASSUMED ENG ENG 4 2021 $4,544 60

192119 Public Lighting - SLUoS - Low Pressure Sodium 90 - 933 Port Road Cheltenham METERED/ASSUMED ENG ENG 4 2021 $4,544 60

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 94: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 94 -

191929 Public Lighting - SLUoS - Low Pressure Sodium 90 - 982-986 May Street Albert Park METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191931 Public Lighting - SLUoS - Low Pressure Sodium 90 - 988-990 Malin Street Albert Park METERED/ASSUMED ENG ENG 4 2021 $4,544 60

192100 Public Lighting - SLUoS - Low Pressure Sodium 90 - 996 Murray Street Albert Park METERED/ASSUMED ENG ENG 4 2021 $4,544 60

192097 Public Lighting - SLUoS - Low Pressure Sodium 90 - Albert Park METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191925 Public Lighting - SLUoS - Low Pressure Sodium 90 - Albert Park METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191938 Public Lighting - SLUoS - Low Pressure Sodium 90 - Albert Park METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191928 Public Lighting - SLUoS - Low Pressure Sodium 90 - Albert Park METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191997 Public Lighting - SLUoS - Low Pressure Sodium 90 - Allenby Gardens METERED/ASSUMED ENG ENG 4 2021 $4,544 60

192001 Public Lighting - SLUoS - Low Pressure Sodium 90 - Allenby Gardens METERED/ASSUMED ENG ENG 4 2021 $4,544 60

192002 Public Lighting - SLUoS - Low Pressure Sodium 90 - Allenby Gardens METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191823 Public Lighting - SLUoS - Low Pressure Sodium 90 - Allenby Gardens METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191826 Public Lighting - SLUoS - Low Pressure Sodium 90 - Allenby Gardens METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191827 Public Lighting - SLUoS - Low Pressure Sodium 90 - Allenby Gardens METERED/ASSUMED ENG ENG 4 2021 $4,544 60

194239 Public Lighting - SLUoS - Low Pressure Sodium 90 - Allenby Gardens METERED/ASSUMED ENG ENG 4 2021 $4,544 60

194240 Public Lighting - SLUoS - Low Pressure Sodium 90 - Beverley METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191829 Public Lighting - SLUoS - Low Pressure Sodium 90 - Beverley METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191831 Public Lighting - SLUoS - Low Pressure Sodium 90 - Beverley METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191835 Public Lighting - SLUoS - Low Pressure Sodium 90 - Beverley METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191836 Public Lighting - SLUoS - Low Pressure Sodium 90 - Beverley METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191837 Public Lighting - SLUoS - Low Pressure Sodium 90 - Beverley METERED/ASSUMED ENG ENG 4 2021 $4,544 60

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 95: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 95 -

191838 Public Lighting - SLUoS - Low Pressure Sodium 90 - Beverley METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191839 Public Lighting - SLUoS - Low Pressure Sodium 90 - Beverley METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191841 Public Lighting - SLUoS - Low Pressure Sodium 90 - Beverley METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191842 Public Lighting - SLUoS - Low Pressure Sodium 90 - Beverley METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191843 Public Lighting - SLUoS - Low Pressure Sodium 90 - Beverley METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191844 Public Lighting - SLUoS - Low Pressure Sodium 90 - Beverley METERED/ASSUMED ENG ENG 4 2021 $4,544 60

192004 Public Lighting - SLUoS - Low Pressure Sodium 90 - Beverley METERED/ASSUMED ENG ENG 4 2021 $4,544 60

192005 Public Lighting - SLUoS - Low Pressure Sodium 90 - Beverley METERED/ASSUMED ENG ENG 4 2021 $4,544 60

192008 Public Lighting - SLUoS - Low Pressure Sodium 90 - Beverley METERED/ASSUMED ENG ENG 4 2021 $4,544 60

192009 Public Lighting - SLUoS - Low Pressure Sodium 90 - Beverley METERED/ASSUMED ENG ENG 4 2021 $4,544 60

192010 Public Lighting - SLUoS - Low Pressure Sodium 90 - Beverley METERED/ASSUMED ENG ENG 4 2021 $4,544 60

192011 Public Lighting - SLUoS - Low Pressure Sodium 90 - Beverley METERED/ASSUMED ENG ENG 4 2021 $4,544 60

192012 Public Lighting - SLUoS - Low Pressure Sodium 90 - Beverley METERED/ASSUMED ENG ENG 4 2021 $4,544 60

192013 Public Lighting - SLUoS - Low Pressure Sodium 90 - Beverley METERED/ASSUMED ENG ENG 4 2021 $4,544 60

192014 Public Lighting - SLUoS - Low Pressure Sodium 90 - Beverley METERED/ASSUMED ENG ENG 4 2021 $4,544 60

192016 Public Lighting - SLUoS - Low Pressure Sodium 90 - Beverley METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191942 Public Lighting - SLUoS - Low Pressure Sodium 90 - Cheltenham METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191943 Public Lighting - SLUoS - Low Pressure Sodium 90 - Cheltenham METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191945 Public Lighting - SLUoS - Low Pressure Sodium 90 - Cheltenham METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191948 Public Lighting - SLUoS - Low Pressure Sodium 90 - Cheltenham METERED/ASSUMED ENG ENG 4 2021 $4,544 60

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 96: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 96 -

191949 Public Lighting - SLUoS - Low Pressure Sodium 90 - Cheltenham METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191950 Public Lighting - SLUoS - Low Pressure Sodium 90 - Cheltenham METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191951 Public Lighting - SLUoS - Low Pressure Sodium 90 - Cheltenham METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191952 Public Lighting - SLUoS - Low Pressure Sodium 90 - Cheltenham METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191953 Public Lighting - SLUoS - Low Pressure Sodium 90 - Cheltenham METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191954 Public Lighting - SLUoS - Low Pressure Sodium 90 - Cheltenham METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191955 Public Lighting - SLUoS - Low Pressure Sodium 90 - Cheltenham METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191957 Public Lighting - SLUoS - Low Pressure Sodium 90 - Cheltenham METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191958 Public Lighting - SLUoS - Low Pressure Sodium 90 - Cheltenham METERED/ASSUMED ENG ENG 4 2021 $4,544 60

194259 Public Lighting - SLUoS - Low Pressure Sodium 90 - Cheltenham METERED/ASSUMED ENG ENG 4 2021 $4,544 60

192121 Public Lighting - SLUoS - Low Pressure Sodium 90 - Cheltenham METERED/ASSUMED ENG ENG 4 2021 $4,544 60

192116 Public Lighting - SLUoS - Low Pressure Sodium 90 - Cheltenham METERED/ASSUMED ENG ENG 4 2021 $4,544 60

192117 Public Lighting - SLUoS - Low Pressure Sodium 90 - Cheltenham METERED/ASSUMED ENG ENG 4 2021 $4,544 60

192125 Public Lighting - SLUoS - Low Pressure Sodium 90 - Cheltenham METERED/ASSUMED ENG ENG 4 2021 $4,544 60

192073 Public Lighting - SLUoS - Low Pressure Sodium 90 - Croydon METERED/ASSUMED ENG ENG 4 2021 $4,544 60

192074 Public Lighting - SLUoS - Low Pressure Sodium 90 - Croydon METERED/ASSUMED ENG ENG 4 2021 $4,544 60

192075 Public Lighting - SLUoS - Low Pressure Sodium 90 - Croydon METERED/ASSUMED ENG ENG 4 2021 $4,544 60

192076 Public Lighting - SLUoS - Low Pressure Sodium 90 - Croydon METERED/ASSUMED ENG ENG 4 2021 $4,544 60

192077 Public Lighting - SLUoS - Low Pressure Sodium 90 - Croydon METERED/ASSUMED ENG ENG 4 2021 $4,544 60

192078 Public Lighting - SLUoS - Low Pressure Sodium 90 - Croydon METERED/ASSUMED ENG ENG 4 2021 $4,544 60

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 97: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 97 -

192079 Public Lighting - SLUoS - Low Pressure Sodium 90 - Croydon METERED/ASSUMED ENG ENG 4 2021 $4,544 60

192080 Public Lighting - SLUoS - Low Pressure Sodium 90 - Croydon METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191901 Public Lighting - SLUoS - Low Pressure Sodium 90 - Croydon METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191902 Public Lighting - SLUoS - Low Pressure Sodium 90 - Croydon METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191903 Public Lighting - SLUoS - Low Pressure Sodium 90 - Croydon METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191904 Public Lighting - SLUoS - Low Pressure Sodium 90 - Croydon METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191905 Public Lighting - SLUoS - Low Pressure Sodium 90 - Croydon METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191906 Public Lighting - SLUoS - Low Pressure Sodium 90 - Croydon METERED/ASSUMED ENG ENG 4 2021 $4,544 60

194243 Public Lighting - SLUoS - Low Pressure Sodium 90 - Findon METERED/ASSUMED ENG ENG 4 2021 $4,544 60

194244 Public Lighting - SLUoS - Low Pressure Sodium 90 - Findon METERED/ASSUMED ENG ENG 4 2021 $4,544 60

194246 Public Lighting - SLUoS - Low Pressure Sodium 90 - Findon METERED/ASSUMED ENG ENG 4 2021 $4,544 60

194247 Public Lighting - SLUoS - Low Pressure Sodium 90 - Findon METERED/ASSUMED ENG ENG 4 2021 $4,544 60

194245 Public Lighting - SLUoS - Low Pressure Sodium 90 - Flinders Park METERED/ASSUMED ENG ENG 4 2021 $4,544 60

194279 Public Lighting - SLUoS - Low Pressure Sodium 90 - Flinders Park METERED/ASSUMED ENG ENG 4 2021 $4,544 60

194280 Public Lighting - SLUoS - Low Pressure Sodium 90 - Flinders Park METERED/ASSUMED ENG ENG 4 2021 $4,544 60

194281 Public Lighting - SLUoS - Low Pressure Sodium 90 - Flinders Park METERED/ASSUMED ENG ENG 4 2021 $4,544 60

194277 Public Lighting - SLUoS - Low Pressure Sodium 90 - Fulham Gardens METERED/ASSUMED ENG ENG 4 2021 $4,544 60

194256 Public Lighting - SLUoS - Low Pressure Sodium 90 - Grange METERED/ASSUMED ENG ENG 4 2021 $4,544 60

194282 Public Lighting - SLUoS - Low Pressure Sodium 90 - Henley Beach METERED/ASSUMED ENG ENG 4 2021 $4,544 60

194284 Public Lighting - SLUoS - Low Pressure Sodium 90 - Henley Beach METERED/ASSUMED ENG ENG 4 2021 $4,544 60

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 98: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 98 -

192082 Public Lighting - SLUoS - Low Pressure Sodium 90 - Hindmarsh METERED/ASSUMED ENG ENG 4 2021 $4,544 60

192083 Public Lighting - SLUoS - Low Pressure Sodium 90 - Hindmarsh METERED/ASSUMED ENG ENG 4 2021 $4,544 60

192084 Public Lighting - SLUoS - Low Pressure Sodium 90 - Hindmarsh METERED/ASSUMED ENG ENG 4 2021 $4,544 60

192085 Public Lighting - SLUoS - Low Pressure Sodium 90 - Hindmarsh METERED/ASSUMED ENG ENG 4 2021 $4,544 60

192086 Public Lighting - SLUoS - Low Pressure Sodium 90 - Hindmarsh METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191979 Public Lighting - SLUoS - Low Pressure Sodium 90 - Hindmarsh METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191980 Public Lighting - SLUoS - Low Pressure Sodium 90 - Hindmarsh METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191909 Public Lighting - SLUoS - Low Pressure Sodium 90 - Hindmarsh METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191911 Public Lighting - SLUoS - Low Pressure Sodium 90 - Hindmarsh METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191912 Public Lighting - SLUoS - Low Pressure Sodium 90 - Hindmarsh METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191975 Public Lighting - SLUoS - Low Pressure Sodium 90 - Hindmarsh METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191976 Public Lighting - SLUoS - Low Pressure Sodium 90 - Hindmarsh METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191804 Public Lighting - SLUoS - Low Pressure Sodium 90 - Hindmarsh METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191805 Public Lighting - SLUoS - Low Pressure Sodium 90 - Hindmarsh METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191806 Public Lighting - SLUoS - Low Pressure Sodium 90 - Hindmarsh METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191807 Public Lighting - SLUoS - Low Pressure Sodium 90 - Hindmarsh METERED/ASSUMED ENG ENG 4 2021 $4,544 60

194248 Public Lighting - SLUoS - Low Pressure Sodium 90 - Kidman Park METERED/ASSUMED ENG ENG 4 2021 $4,544 60

194285 Public Lighting - SLUoS - Low Pressure Sodium 90 - Kidman Park METERED/ASSUMED ENG ENG 4 2021 $4,544 60

194252 Public Lighting - SLUoS - Low Pressure Sodium 90 - Kilkenny METERED/ASSUMED ENG ENG 4 2021 $4,544 60

194264 Public Lighting - SLUoS - Low Pressure Sodium 90 - Lot 99 Clark Terrace Seaton METERED/ASSUMED ENG ENG 4 2021 $4,544 60

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 99: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 99 -

192096 Public Lighting - SLUoS - Low Pressure Sodium 90 - Lot51 Port Road Albert Park METERED/ASSUMED ENG ENG 4 2021 $4,544 60

194267 Public Lighting - SLUoS - Low Pressure Sodium 90 - Seaton METERED/ASSUMED ENG ENG 4 2021 $4,544 60

194268 Public Lighting - SLUoS - Low Pressure Sodium 90 - Seaton METERED/ASSUMED ENG ENG 4 2021 $4,544 60

194269 Public Lighting - SLUoS - Low Pressure Sodium 90 - Seaton METERED/ASSUMED ENG ENG 4 2021 $4,544 60

194271 Public Lighting - SLUoS - Low Pressure Sodium 90 - Seaton METERED/ASSUMED ENG ENG 4 2021 $4,544 60

194272 Public Lighting - SLUoS - Low Pressure Sodium 90 - Seaton METERED/ASSUMED ENG ENG 4 2021 $4,544 60

194273 Public Lighting - SLUoS - Low Pressure Sodium 90 - Seaton METERED/ASSUMED ENG ENG 4 2021 $4,544 60

194274 Public Lighting - SLUoS - Low Pressure Sodium 90 - Seaton METERED/ASSUMED ENG ENG 4 2021 $4,544 60

194275 Public Lighting - SLUoS - Low Pressure Sodium 90 - Seaton METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191900 Public Lighting - SLUoS - Low Pressure Sodium 90 - Sec 2292 Port Road Croydon METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191907 Public Lighting - SLUoS - Low Pressure Sodium 90 - Sec 5802 Port Road Croydon METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191991 Public Lighting - SLUoS - Low Pressure Sodium 90 - Welland METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191817 Public Lighting - SLUoS - Low Pressure Sodium 90 - Welland METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191818 Public Lighting - SLUoS - Low Pressure Sodium 90 - Welland METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191820 Public Lighting - SLUoS - Low Pressure Sodium 90 - Welland METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191821 Public Lighting - SLUoS - Low Pressure Sodium 90 - Welland METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191822 Public Lighting - SLUoS - Low Pressure Sodium 90 - Welland METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191992 Public Lighting - SLUoS - Low Pressure Sodium 90 - Welland METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191993 Public Lighting - SLUoS - Low Pressure Sodium 90 - Welland METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191995 Public Lighting - SLUoS - Low Pressure Sodium 90 - Welland METERED/ASSUMED ENG ENG 4 2021 $4,544 60

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 100: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 100 -

191996 Public Lighting - SLUoS - Low Pressure Sodium 90 - Welland METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191886 Public Lighting - SLUoS - Low Pressure Sodium 90 - West Croydon METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191889 Public Lighting - SLUoS - Low Pressure Sodium 90 - West Croydon METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191890 Public Lighting - SLUoS - Low Pressure Sodium 90 - West Croydon METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191895 Public Lighting - SLUoS - Low Pressure Sodium 90 - West Croydon METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191897 Public Lighting - SLUoS - Low Pressure Sodium 90 - West Croydon METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191898 Public Lighting - SLUoS - Low Pressure Sodium 90 - West Croydon METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191899 Public Lighting - SLUoS - Low Pressure Sodium 90 - West Croydon METERED/ASSUMED ENG ENG 4 2021 $4,544 60

192072 Public Lighting - SLUoS - Low Pressure Sodium 90 - West Croydon METERED/ASSUMED ENG ENG 4 2021 $4,544 60

192069 Public Lighting - SLUoS - Low Pressure Sodium 90 - West Croydon METERED/ASSUMED ENG ENG 4 2021 $4,544 60

192070 Public Lighting - SLUoS - Low Pressure Sodium 90 - West Croydon METERED/ASSUMED ENG ENG 4 2021 $4,544 60

192066 Public Lighting - SLUoS - Low Pressure Sodium 90 - West Croydon METERED/ASSUMED ENG ENG 4 2021 $4,544 60

192067 Public Lighting - SLUoS - Low Pressure Sodium 90 - West Croydon METERED/ASSUMED ENG ENG 4 2021 $4,544 60

192061 Public Lighting - SLUoS - Low Pressure Sodium 90 - West Croydon METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191808 Public Lighting - SLUoS - Low Pressure Sodium 90 - West Hindmarsh METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191809 Public Lighting - SLUoS - Low Pressure Sodium 90 - West Hindmarsh METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191810 Public Lighting - SLUoS - Low Pressure Sodium 90 - West Hindmarsh METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191812 Public Lighting - SLUoS - Low Pressure Sodium 90 - West Hindmarsh METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191813 Public Lighting - SLUoS - Low Pressure Sodium 90 - West Hindmarsh METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191814 Public Lighting - SLUoS - Low Pressure Sodium 90 - West Hindmarsh METERED/ASSUMED ENG ENG 4 2021 $4,544 60

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 101: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 101 -

191815 Public Lighting - SLUoS - Low Pressure Sodium 90 - West Hindmarsh METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191816 Public Lighting - SLUoS - Low Pressure Sodium 90 - West Hindmarsh METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191982 Public Lighting - SLUoS - Low Pressure Sodium 90 - West Hindmarsh METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191984 Public Lighting - SLUoS - Low Pressure Sodium 90 - West Hindmarsh METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191985 Public Lighting - SLUoS - Low Pressure Sodium 90 - West Hindmarsh METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191986 Public Lighting - SLUoS - Low Pressure Sodium 90 - West Hindmarsh METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191987 Public Lighting - SLUoS - Low Pressure Sodium 90 - West Hindmarsh METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191988 Public Lighting - SLUoS - Low Pressure Sodium 90 - West Hindmarsh METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191989 Public Lighting - SLUoS - Low Pressure Sodium 90 - West Hindmarsh METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191990 Public Lighting - SLUoS - Low Pressure Sodium 90 - West Hindmarsh METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191860 Public Lighting - SLUoS - Low Pressure Sodium 90 - Woodville METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191872 Public Lighting - SLUoS - Low Pressure Sodium 90 - Woodville METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191868 Public Lighting - SLUoS - Low Pressure Sodium 90 - Woodville METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191870 Public Lighting - SLUoS - Low Pressure Sodium 90 - Woodville METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191861 Public Lighting - SLUoS - Low Pressure Sodium 90 - Woodville METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191862 Public Lighting - SLUoS - Low Pressure Sodium 90 - Woodville METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191863 Public Lighting - SLUoS - Low Pressure Sodium 90 - Woodville METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191864 Public Lighting - SLUoS - Low Pressure Sodium 90 - Woodville METERED/ASSUMED ENG ENG 4 2021 $4,544 60

192031 Public Lighting - SLUoS - Low Pressure Sodium 90 - Woodville METERED/ASSUMED ENG ENG 4 2021 $4,544 60

192033 Public Lighting - SLUoS - Low Pressure Sodium 90 - Woodville METERED/ASSUMED ENG ENG 4 2021 $4,544 60

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 102: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 102 -

192034 Public Lighting - SLUoS - Low Pressure Sodium 90 - Woodville METERED/ASSUMED ENG ENG 4 2021 $4,544 60

192035 Public Lighting - SLUoS - Low Pressure Sodium 90 - Woodville METERED/ASSUMED ENG ENG 4 2021 $4,544 60

192036 Public Lighting - SLUoS - Low Pressure Sodium 90 - Woodville METERED/ASSUMED ENG ENG 4 2021 $4,544 60

192038 Public Lighting - SLUoS - Low Pressure Sodium 90 - Woodville METERED/ASSUMED ENG ENG 4 2021 $4,544 60

192040 Public Lighting - SLUoS - Low Pressure Sodium 90 - Woodville METERED/ASSUMED ENG ENG 4 2021 $4,544 60

192042 Public Lighting - SLUoS - Low Pressure Sodium 90 - Woodville METERED/ASSUMED ENG ENG 4 2021 $4,544 60

192043 Public Lighting - SLUoS - Low Pressure Sodium 90 - Woodville METERED/ASSUMED ENG ENG 4 2021 $4,544 60

192044 Public Lighting - SLUoS - Low Pressure Sodium 90 - Woodville METERED/ASSUMED ENG ENG 4 2021 $4,544 60

192045 Public Lighting - SLUoS - Low Pressure Sodium 90 - Woodville Park METERED/ASSUMED ENG ENG 4 2021 $4,544 60

192046 Public Lighting - SLUoS - Low Pressure Sodium 90 - Woodville Park METERED/ASSUMED ENG ENG 4 2021 $4,544 60

192047 Public Lighting - SLUoS - Low Pressure Sodium 90 - Woodville Park METERED/ASSUMED ENG ENG 4 2021 $4,544 60

192048 Public Lighting - SLUoS - Low Pressure Sodium 90 - Woodville Park METERED/ASSUMED ENG ENG 4 2021 $4,544 60

192050 Public Lighting - SLUoS - Low Pressure Sodium 90 - Woodville Park METERED/ASSUMED ENG ENG 4 2021 $4,544 60

192051 Public Lighting - SLUoS - Low Pressure Sodium 90 - Woodville Park METERED/ASSUMED ENG ENG 4 2021 $4,544 60

192052 Public Lighting - SLUoS - Low Pressure Sodium 90 - Woodville Park METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191874 Public Lighting - SLUoS - Low Pressure Sodium 90 - Woodville Park METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191878 Public Lighting - SLUoS - Low Pressure Sodium 90 - Woodville Park METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191880 Public Lighting - SLUoS - Low Pressure Sodium 90 - Woodville Park METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191881 Public Lighting - SLUoS - Low Pressure Sodium 90 - Woodville Park METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191882 Public Lighting - SLUoS - Low Pressure Sodium 90 - Woodville Park METERED/ASSUMED ENG ENG 4 2021 $4,544 60

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 103: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 103 -

191876 Public Lighting - SLUoS - Low Pressure Sodium 90 - Woodville Park METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191856 Public Lighting - SLUoS - Low Pressure Sodium 90 - Woodville South METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191857 Public Lighting - SLUoS - Low Pressure Sodium 90 - Woodville South METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191853 Public Lighting - SLUoS - Low Pressure Sodium 90 - Woodville South METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191854 Public Lighting - SLUoS - Low Pressure Sodium 90 - Woodville South METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191845 Public Lighting - SLUoS - Low Pressure Sodium 90 - Woodville South METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191846 Public Lighting - SLUoS - Low Pressure Sodium 90 - Woodville South METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191847 Public Lighting - SLUoS - Low Pressure Sodium 90 - Woodville South METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191848 Public Lighting - SLUoS - Low Pressure Sodium 90 - Woodville South METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191849 Public Lighting - SLUoS - Low Pressure Sodium 90 - Woodville South METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191850 Public Lighting - SLUoS - Low Pressure Sodium 90 - Woodville South METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191851 Public Lighting - SLUoS - Low Pressure Sodium 90 - Woodville South METERED/ASSUMED ENG ENG 4 2021 $4,544 60

192024 Public Lighting - SLUoS - Low Pressure Sodium 90 - Woodville South METERED/ASSUMED ENG ENG 4 2021 $4,544 60

192025 Public Lighting - SLUoS - Low Pressure Sodium 90 - Woodville South METERED/ASSUMED ENG ENG 4 2021 $4,544 60

192026 Public Lighting - SLUoS - Low Pressure Sodium 90 - Woodville South METERED/ASSUMED ENG ENG 4 2021 $4,544 60

192027 Public Lighting - SLUoS - Low Pressure Sodium 90 - Woodville South METERED/ASSUMED ENG ENG 4 2021 $4,544 60

192028 Public Lighting - SLUoS - Low Pressure Sodium 90 - Woodville South METERED/ASSUMED ENG ENG 4 2021 $4,544 60

192017 Public Lighting - SLUoS - Low Pressure Sodium 90 - Woodville South METERED/ASSUMED ENG ENG 4 2021 $4,544 60

192018 Public Lighting - SLUoS - Low Pressure Sodium 90 - Woodville South METERED/ASSUMED ENG ENG 4 2021 $4,544 60

192019 Public Lighting - SLUoS - Low Pressure Sodium 90 - Woodville South METERED/ASSUMED ENG ENG 4 2021 $4,544 60

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 104: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 104 -

192020 Public Lighting - SLUoS - Low Pressure Sodium 90 - Woodville South METERED/ASSUMED ENG ENG 4 2021 $4,544 60

192021 Public Lighting - SLUoS - Low Pressure Sodium 90 - Woodville South METERED/ASSUMED ENG ENG 4 2021 $4,544 60

192022 Public Lighting - SLUoS - Low Pressure Sodium 90 - Woodville South METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191859 Public Lighting - SLUoS - Low Pressure Sodium 90 - Woodville West METERED/ASSUMED ENG ENG 4 2021 $4,544 60

194236 Public Lighting - SLUoS - Mercury 250 - Albert Park METERED/ASSUMED ENG ENG 4 2021 $4,544 60

192315 Public Lighting - SLUoS - Mercury 250 - Royal Park METERED/ASSUMED ENG ENG 4 2021 $4,544 60

194237 Public Lighting - SLUoS - Mercury 400 - 569-573 Rosetta Street West Croydon METERED/ASSUMED ENG ENG 4 2021 $4,544 60

194276 Public Lighting - SLUoS - Mercury 400 - Albert Park METERED/ASSUMED ENG ENG 4 2021 $4,544 60

192138 Public Lighting - SLUoS - Mercury 400 - Albert Park METERED/ASSUMED ENG ENG 4 2021 $4,544 60

192139 Public Lighting - SLUoS - Mercury 400 - Albert Park METERED/ASSUMED ENG ENG 4 2021 $4,544 60

192142 Public Lighting - SLUoS - Mercury 400 - Cheltenham METERED/ASSUMED ENG ENG 4 2021 $4,544 60

192143 Public Lighting - SLUoS - Mercury 400 - Cheltenham METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191811 Public Lighting - SLUoS - Mercury 400 - West Hindmarsh METERED/ASSUMED ENG ENG 4 2021 $4,544 60

192144 Public Lighting - SLUoS - Mercury 400 - Woodville METERED/ASSUMED ENG ENG 4 2021 $4,544 60

192145 Public Lighting - SLUoS - Mercury 400 - Woodville METERED/ASSUMED ENG ENG 4 2021 $4,544 60

192030 Public Lighting - SLUoS - Sodium 100 - 849-851 Port Road Woodville METERED/ASSUMED ENG ENG 4 2021 $4,544 60

192023 Public Lighting - SLUoS - Sodium 100 - 862 Woodville Road Woodville South METERED/ASSUMED ENG ENG 4 2021 $4,544 60

194263 Public Lighting - SLUoS - Sodium 100 - 9A Clark Terrace Seaton METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191926 Public Lighting - SLUoS - Sodium 100 - Albert Park METERED/ASSUMED ENG ENG 4 2021 $4,544 60

192015 Public Lighting - SLUoS - Sodium 100 - Beverley METERED/ASSUMED ENG ENG 4 2021 $4,544 60

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 105: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 105 -

192113 Public Lighting - SLUoS - Sodium 100 - Cheltenham METERED/ASSUMED ENG ENG 4 2021 $4,544 60

194242 Public Lighting - SLUoS - Sodium 100 - Findon METERED/ASSUMED ENG ENG 4 2021 $4,544 60

194249 Public Lighting - SLUoS - Sodium 100 - Findon METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191977 Public Lighting - SLUoS - Sodium 100 - Hindmarsh METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191910 Public Lighting - SLUoS - Sodium 100 - Hindmarsh METERED/ASSUMED ENG ENG 4 2021 $4,544 60

194260 Public Lighting - SLUoS - Sodium 100 - Seaton METERED/ASSUMED ENG ENG 4 2021 $4,544 60

194261 Public Lighting - SLUoS - Sodium 100 - Seaton METERED/ASSUMED ENG ENG 4 2021 $4,544 60

194262 Public Lighting - SLUoS - Sodium 100 - Seaton METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191819 Public Lighting - SLUoS - Sodium 100 - Welland METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191885 Public Lighting - SLUoS - Sodium 100 - West Croydon METERED/ASSUMED ENG ENG 4 2021 $4,544 60

192071 Public Lighting - SLUoS - Sodium 100 - West Croydon METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191983 Public Lighting - SLUoS - Sodium 100 - West Hindmarsh METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191871 Public Lighting - SLUoS - Sodium 100 - Woodville METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191869 Public Lighting - SLUoS - Sodium 100 - Woodville METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191865 Public Lighting - SLUoS - Sodium 100 - Woodville METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191867 Public Lighting - SLUoS - Sodium 100 - Woodville METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191877 Public Lighting - SLUoS - Sodium 100 - Woodville Park METERED/ASSUMED ENG ENG 4 2021 $4,544 60

191852 Public Lighting - SLUoS - Sodium 100 - Woodville South METERED/ASSUMED ENG ENG 4 2021 $4,544 60

194288 Public Lighting - SLUoS - Sodium 150 - 185 Crittenden Road Findon METERED/ASSUMED ENG ENG 4 2021 $4,544 60

194255 Public Lighting - SLUoS - Sodium 150 - Flinders Park METERED/ASSUMED ENG ENG 4 2021 $4,544 60

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 106: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 106 -

191973 Public Lighting - SLUoS - Sodium 150 - Hindmarsh METERED/ASSUMED ENG ENG 4 2021 $4,544 60

194270 Public Lighting - SLUoS - Sodium 150 - Seaton METERED/ASSUMED ENG ENG 4 2021 $4,544 60

192090 Public Lighting - SLUoS - Sodium 250 - Hindmarsh METERED/ASSUMED ENG ENG 4 2021 $4,544 60

192092 Public Lighting - SLUoS - Sodium 250 - Hindmarsh METERED/ASSUMED ENG ENG 4 2021 $4,544 60

192093 Public Lighting - SLUoS - Sodium 250 - Hindmarsh METERED/ASSUMED ENG ENG 4 2021 $4,544 60

192094 Public Lighting - SLUoS - Sodium 250 - Hindmarsh METERED/ASSUMED ENG ENG 4 2021 $4,544 60

192095 Public Lighting - SLUoS - Sodium 250 - Hindmarsh METERED/ASSUMED ENG ENG 4 2021 $4,544 60

Subtotal $1,390,464

194130 Public Lighting - CLER - Sodium 100 - Flinders Park CLER DPTI SAPN 5 2022 $0 60

194131 Public Lighting - CLER - Sodium 100 - Flinders Park CLER DPTI SAPN 5 2022 $0 60

194124 Public Lighting - CLER - Sodium 250 - Hindmarsh CLER DPTI SAPN 5 2022 $0 25

197016 Public Lighting - Energy Only - Mercury 80 BS 2000 - Harold and Cynthia Anderson Reserve - Sec 652 Seaview Road West Beach ENERGY ENG ENG 5 2022 $4,544 25

196604 Public Lighting - Metered - Code Required - Code needs to be added to system - Carnegie North Reserve - Oval - Lot 149 Cooke Crescent Royal Park

METERED ENG ENG 5 2022 $4,544 25

196613 Public Lighting - Metered - Code Required - Code needs to be added to system - Carnegie North Reserve - Oval - Lot 149 Fisher Street Royal Park

METERED ENG ENG 5 2022 $4,544 25

196619 Public Lighting - Metered - Code Required - Code needs to be added to system - Carnegie North Reserve - Oval - Lot 149 Fisher Street Royal Park

METERED ENG ENG 5 2022 $4,544 25

196232 Public Lighting - Metered - Compact Fluorecent 42W - Birkdale Grove West Lakes METERED ENG ENG 5 2022 $4,544 5

196231 Public Lighting - Metered - Compact Fluorecent 42W - St Andrews Way West Lakes METERED ENG ENG 5 2022 $4,544 5

195120 Public Lighting - Metered - Fluorescent 40 - 7/196 Military Road Henley Beach METERED ENG ENG 5 2022 $4,544 25

196810 Public Lighting - Metered - Mercury 80 - METERED ENG ENG 5 2022 $4,544 5

197051 Public Lighting - Metered - Mercury 80 - Parfitt Square - 113 Drayton Street Bowden METERED ENG ENG 5 2022 $4,544 25

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 107: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 107 -

194807 Public Lighting - Metered - Mercury 80 - Parfitt Square - 115-121 Drayton Street Bowden METERED ENG ENG 5 2022 $4,544 25

195318 Public Lighting - Metered - Mercury 80 - Parfitt Square - 115-121 Drayton Street Bowden METERED ENG ENG 5 2022 $4,544 25

197050 Public Lighting - Metered - Mercury 80 - Parfitt Square - Lot 1000 Drayton Street Bowden METERED ENG ENG 5 2022 $4,544 25

197228 Public Lighting - Metered - Mercury 80 - Parfitt Square - Lot 1000 Fourteenth Street Bowden METERED ENG ENG 5 2022 $4,544 25

197052 Public Lighting - Metered - Mercury 80 - Parfitt Square - Lot 1000 Thirteenth Street Bowden METERED ENG ENG 5 2022 $4,544 25

195317 Public Lighting - Metered - Mercury 80 - Parfitt Square - Lot 2 Fourteenth Street Bowden METERED ENG ENG 5 2022 $4,544 25

194806 Public Lighting - Metered - Mercury 80 - Parfitt Square - Lot 2 Quin Street Bowden METERED ENG ENG 5 2022 $4,544 25

194879 Public Lighting - Metered - Mercury 80 - Parfitt Square - Lot 2 Thirteenth Street Bowden METERED ENG ENG 5 2022 $4,544 25

195316 Public Lighting - Metered - Mercury 80 - Parfitt Square - Lot 2 Thirteenth Street Bowden METERED ENG ENG 5 2022 $4,544 25

195308 Public Lighting - Metered - Mercury 80 - Pedlar Reserve - Outer - Cairns Avenue Seaton METERED ENG ENG 5 2022 $4,544 25

192131 Public Lighting - SLUoS - Mercury 400 - 5/39-43B Woodville Road Woodville South METERED/ASSUMED ENG ENG 5 2022 $4,544 60

192132 Public Lighting - SLUoS - Mercury 400 - Woodville METERED/ASSUMED ENG ENG 5 2022 $4,544 60

192037 Public Lighting - SLUoS - Mercury 400 - Woodville METERED/ASSUMED ENG ENG 5 2022 $4,544 60

192129 Public Lighting - SLUoS - Mercury 400 - Woodville METERED/ASSUMED ENG ENG 5 2022 $4,544 60

192133 Public Lighting - SLUoS - Mercury 400 - Woodville South METERED/ASSUMED ENG ENG 5 2022 $4,544 60

192134 Public Lighting - SLUoS - Mercury 400 - Woodville South METERED/ASSUMED ENG ENG 5 2022 $4,544 60

192130 Public Lighting - SLUoS - Sodium 150 - Woodville South METERED/ASSUMED ENG ENG 5 2022 $4,544 60

196309 Public Lighting - Solar - Fluorescent 40 - Seaview Road West Beach SOLAR ENG ENG 5 2022 $4,544 5

Subtotal $122,688

197405 Public Lighting - CLER - Code Required - Code needs to be added to system - Sec 5807 Port Road Hindmarsh CLER ENG SAPN 6 2023 $4,544 25

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 108: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 108 -

197406 Public Lighting - CLER - Code Required - Code needs to be added to system - Sec 5807 Port Road Hindmarsh CLER ENG SAPN 6 2023 $4,544 25

201783 Public Lighting - CLER - Known Luminaire - St Clair CLER ENG SAPN 6 2023 $4,544 25

201799 Public Lighting - CLER - Known Luminaire - St Clair CLER ENG SAPN 6 2023 $4,544 25

201800 Public Lighting - CLER - Known Luminaire - St Clair CLER ENG SAPN 6 2023 $4,544 25

201845 Public Lighting - CLER - Known Luminaire - St Clair CLER ENG SAPN 6 2023 $4,544 25

195020 Public Lighting - CLER - Mercury 80 - St Clair Recreation Reserve - Lot 70 Actil Avenue St Clair CLER ENG SAPN 6 2023 $4,544 25

197194 Public Lighting - CLER - Sodium 50 - 30-32 Orsmond Street Hindmarsh CLER ENG SAPN 6 2023 $4,544 25

197195 Public Lighting - CLER - Sodium 50 - 41A Orsmond Street Hindmarsh CLER ENG SAPN 6 2023 $4,544 25

197201 Public Lighting - CLER - Sodium 50 - 6-8 Milner Street Hindmarsh CLER ENG SAPN 6 2023 $4,544 25

197313 Public Lighting - CLER - Sodium 50 - Milner Street Hindmarsh CLER ENG SAPN 6 2023 $4,544 25

196880 Public Lighting - Energy Only - Mercury 80 - St Clair Recreation Reserve - Lot 70 Woodville Road St Clair ENERGY ENG ENG 6 2023 $4,544 25

197140 Public Lighting - Energy Only - Mercury 80 BS 2000 - Harold and Cynthia Anderson Reserve - Sec 652 Seaview Road West Beach ENERGY ENG ENG 6 2023 $4,544 25

195421 Public Lighting - Energy Only - Mercury 80 BS 2000 - Harold and Cynthia Anderson Reserve - Sec 652 Seaview Road West Beach ENERGY ENG ENG 6 2023 $4,544 25

194730 Public Lighting - Metered - Code Required - Code needs to be added to system - 122-124 Glen Elder Street Beverley METERED ENG ENG 6 2023 $4,544 25

194731 Public Lighting - Metered - Code Required - Code needs to be added to system - 122-124 William Street Beverley METERED ENG ENG 6 2023 $4,544 25

194528 Public Lighting - Metered - Code Required - Code needs to be added to system - Sir Alex Ramsey Reserve - 200 Bower Road Semaphore Park

METERED ENG ENG 6 2023 $4,544 25

194651 Public Lighting - Metered - Code Required - Code needs to be added to system - Sir Alex Ramsey Reserve - Lot 175 Mallard Court Semaphore Park

METERED ENG ENG 6 2023 $4,544 25

194526 Public Lighting - Metered - Code Required - Code needs to be added to system - Toogood Reserve - Lot 37 Broadford Crescent Beverley METERED ENG ENG 6 2023 $4,544 25

195647 Public Lighting - Metered - Code Required - Code needs to be added to system - Toogood Reserve - Lot 37 Glen Elder Street Beverley METERED ENG ENG 6 2023 $4,544 25

195159 Public Lighting - Metered - Code Required - Code needs to be added to system - Toogood Reserve - Lot 37 Glen Elder Street Beverley METERED ENG ENG 6 2023 $4,544 25

195157 Public Lighting - Metered - Code Required - Code needs to be added to system - Toogood Reserve - Lot 37 Toogood Avenue Beverley METERED ENG ENG 6 2023 $4,544 25

194522 Public Lighting - Metered - Code Required - Code needs to be added to system - Toogood Reserve - Lot 37 Toogood Avenue Beverley METERED ENG ENG 6 2023 $4,544 25

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 109: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 109 -

194523 Public Lighting - Metered - Code Required - Code needs to be added to system - Toogood Reserve - Lot 37 Toogood Avenue Beverley METERED ENG ENG 6 2023 $4,544 25

194524 Public Lighting - Metered - Code Required - Code needs to be added to system - Toogood Reserve - Lot 37 Toogood Avenue Beverley METERED ENG ENG 6 2023 $4,544 25

195158 Public Lighting - Metered - Code Required - Code needs to be added to system - Toogood Reserve - Lot 50 Broadford Crescent Findon METERED ENG ENG 6 2023 $4,544 25

195648 Public Lighting - Metered - Code Required - Code needs to be added to system - Toogood Reserve - Lot 50 Holland Street Findon METERED ENG ENG 6 2023 $4,544 25

195646 Public Lighting - Metered - Code Required - Code needs to be added to system - Toogood Reserve - Lot 50 Holland Street Findon METERED ENG ENG 6 2023 $4,544 25

196451 Public Lighting - Metered - Mercury 250 - Albert Greenshields Reserve - Torrens Road Brompton METERED ENG ENG 6 2023 $4,544 25

196452 Public Lighting - Metered - Mercury 250 - Albert Greenshields Reserve - Torrens Road Brompton METERED ENG ENG 6 2023 $4,544 25

196453 Public Lighting - Metered - Mercury 250 - Albert Greenshields Reserve - Torrens Road Brompton METERED ENG ENG 6 2023 $4,544 25

197105 Public Lighting - Metered - Mercury 50 - Albert Greenshields Reserve - Wright Street Ridleyton METERED ENG ENG 6 2023 $4,544 25

195161 Public Lighting - Metered - Mercury 50 - Newcombe Reserve - Lot 247 Newcombe Avenue West Lakes Shore METERED ENG ENG 6 2023 $4,544 25

194527 Public Lighting - Metered - Mercury 50 - Newcombe Reserve - Lot 247 Newcombe Avenue West Lakes Shore METERED ENG ENG 6 2023 $4,544 25

195505 Public Lighting - Metered - Mercury 50 - Sir Alex Ramsey Reserve - Lot 12 Bartley Terrace Semaphore Park METERED ENG ENG 6 2023 $4,544 25

195498 Public Lighting - Metered - Mercury 50 - Sir Alex Ramsey Reserve - Lot 167 Bartley Terrace Semaphore Park METERED ENG ENG 6 2023 $4,544 25

195716 Public Lighting - Metered - Mercury 50 - Sir Alex Ramsey Reserve - Lot 174 Gannett Grove Semaphore Park METERED ENG ENG 6 2023 $4,544 25

195718 Public Lighting - Metered - Mercury 50 - Sir Alex Ramsey Reserve - Lot 174 Gannett Grove Semaphore Park METERED ENG ENG 6 2023 $4,544 25

195995 Public Lighting - Metered - Mercury 50 - Sir Alex Ramsey Reserve - Lot 174 Grebe Street Semaphore Park METERED ENG ENG 6 2023 $4,544 25

195001 Public Lighting - Metered - Mercury 50 - Sir Alex Ramsey Reserve - Lot 175 Bartley Terrace Semaphore Park METERED ENG ENG 6 2023 $4,544 25

195497 Public Lighting - Metered - Mercury 50 - Trust Reserve - Outer - 53 Plover Grove Semaphore Park METERED ENG ENG 6 2023 $4,544 25

197413 Public Lighting - Metered - Mercury 50 - Trust Reserve - Outer - Lot 32 Bartley Terrace Semaphore Park METERED ENG ENG 6 2023 $4,544 25

196593 Public Lighting - Metered - Mercury 80 - 122-124 Toogood Avenue Beverley METERED ENG ENG 6 2023 $4,544 25

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 110: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 110 -

197007 Public Lighting - Metered - Mercury 80 - Albert Greenshields Reserve - Wright Street Ridleyton METERED ENG ENG 6 2023 $4,544 25

195311 Public Lighting - Metered - Mercury 80 - Albert Greenshields Reserve - Wright Street Ridleyton METERED ENG ENG 6 2023 $4,544 25

195387 Public Lighting - Metered - Mercury 80 - Albert Greenshields Reserve - Wright Street Ridleyton METERED ENG ENG 6 2023 $4,544 25

195902 Public Lighting - Metered - Mercury 80 - Sir Alex Ramsey Reserve - Lot 173 Grebe Street Semaphore Park METERED ENG ENG 6 2023 $4,544 25

195991 Public Lighting - Metered - Mercury 80 - Sir Alex Ramsey Reserve - Lot 174 Grebe Street Semaphore Park METERED ENG ENG 6 2023 $4,544 25

195901 Public Lighting - Metered - Mercury 80 - Sir Alex Ramsey Reserve - Lot 174 Grebe Street Semaphore Park METERED ENG ENG 6 2023 $4,544 25

195713 Public Lighting - Metered - Mercury 80 - Sir Alex Ramsey Reserve - Lot 174 Grebe Street Semaphore Park METERED ENG ENG 6 2023 $4,544 25

195582 Public Lighting - Metered - Mercury 80 - Toogood Reserve - 122-124 Glen Elder Street Beverley METERED ENG ENG 6 2023 $4,544 25

195090 Public Lighting - Metered - Mercury 80 - Toogood Reserve - 122-124 Glen Elder Street Beverley METERED ENG ENG 6 2023 $4,544 25

197441 Public Lighting - Metered - Mercury 80 - Toogood Reserve - 122-124 William Street Beverley METERED ENG ENG 6 2023 $4,544 25

194553 Public Lighting - Metered - Mercury 80 - Toogood Reserve - Lot 37 Glen Elder Street Beverley METERED ENG ENG 6 2023 $4,544 25

194554 Public Lighting - Metered - Mercury 80 - Toogood Reserve - Lot 37 Glen Elder Street Beverley METERED ENG ENG 6 2023 $4,544 25

194555 Public Lighting - Metered - Mercury 80 - Toogood Reserve - Lot 37 Glen Elder Street Beverley METERED ENG ENG 6 2023 $4,544 25

194556 Public Lighting - Metered - Mercury 80 - Toogood Reserve - Lot 37 Glen Elder Street Beverley METERED ENG ENG 6 2023 $4,544 25

195085 Public Lighting - Metered - Mercury 80 - Toogood Reserve - Lot 37 Toogood Avenue Beverley METERED ENG ENG 6 2023 $4,544 25

195579 Public Lighting - Metered - Mercury 80 - Toogood Reserve - Lot 37 Toogood Avenue Beverley METERED ENG ENG 6 2023 $4,544 25

195583 Public Lighting - Metered - Mercury 80 - Toogood Reserve - Lot 50 Crittenden Road Findon METERED ENG ENG 6 2023 $4,544 25

195091 Public Lighting - Metered - Mercury 80 - Toogood Reserve - Lot 50 Crittenden Road Findon METERED ENG ENG 6 2023 $4,544 25

194557 Public Lighting - Metered - Mercury 80 - Toogood Reserve - Lot 50 Holland Street Findon METERED ENG ENG 6 2023 $4,544 25

194558 Public Lighting - Metered - Mercury 80 - Toogood Reserve - Lot 50 Holland Street Findon METERED ENG ENG 6 2023 $4,544 25

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 111: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 111 -

194560 Public Lighting - Metered - Mercury 80 - Toogood Reserve - Lot 50 Holland Street Findon METERED ENG ENG 6 2023 $4,544 25

196975 Public Lighting - Metered - Mercury 80 - Trust Reserve - Outer - Lot 100 Eagle Court Semaphore Park METERED ENG ENG 6 2023 $4,544 25

197054 Public Lighting - Metered - Mercury 80 - Trust Reserve - Outer - Lot 17 Greenfield Crescent Semaphore Park METERED ENG ENG 6 2023 $4,544 25

194696 Public Lighting - Metered - Mercury 80 - Trust Reserve - Outer - Lot 45 Greenfield Crescent Semaphore Park METERED ENG ENG 6 2023 $4,544 25

195736 Public Lighting - Metered - Mercury 80 BS 2000 - Sir Alex Ramsey Reserve - Lot 173 Grebe Street Semaphore Park METERED ENG ENG 6 2023 $4,544 25

195992 Public Lighting - Metered - Mercury 80 BS 2000 - Sir Alex Ramsey Reserve - Lot 173 Kingfisher Drive Semaphore Park METERED ENG ENG 6 2023 $4,544 25

196876 Public Lighting - Metered - Sodium 50 - Albert Greenshields Reserve - 133B Hawker Street Ridleyton METERED ENG ENG 6 2023 $4,544 25

196448 Public Lighting - Metered - Sodium 50 - Albert Greenshields Reserve - Lot 3 Blight Street Ridleyton METERED ENG ENG 6 2023 $4,544 25

195526 Public Lighting - Metered - Sodium 50 - Albert Greenshields Reserve - Lot 3 Blight Street Ridleyton METERED ENG ENG 6 2023 $4,544 25

195034 Public Lighting - Metered - Sodium 50 - Albert Greenshields Reserve - Lot 3 Greenshields Place Ridleyton METERED ENG ENG 6 2023 $4,544 25

195035 Public Lighting - Metered - Sodium 50 - Albert Greenshields Reserve - Lot 3 Greenshields Place Ridleyton METERED ENG ENG 6 2023 $4,544 25

197364 Public Lighting - Metered - Sodium 50 - Albert Greenshields Reserve - Lot 3 Greenshields Place Ridleyton METERED ENG ENG 6 2023 $4,544 25

199987 Public Lighting - SLUoS - Code Required - Code needs to be added to system - 12/19 Harrison Road Renown Park SLUOS SAPN SAPN 6 2023 $0 25

202877 Public Lighting - SLUoS - Code Required - Code needs to be added to system - 1-27 Amarina Court Semaphore Park SLUOS SAPN SAPN 6 2023 $0 25

206156 Public Lighting - SLUoS - Code Required - Code needs to be added to system - 16 Jersey Terrace Woodville SLUOS SAPN SAPN 6 2023 $0 25

206413 Public Lighting - SLUoS - Code Required - Code needs to be added to system - 25 Harrison Road Devon Park SLUOS SAPN SAPN 6 2023 $0 25

205452 Public Lighting - SLUoS - Code Required - Code needs to be added to system - 256 Seaview Road Henley Beach SLUOS SAPN SAPN 6 2023 $0 25

208699 Public Lighting - SLUoS - Code Required - Code needs to be added to system - 270 Seaview Road Henley Beach SLUOS SAPN SAPN 6 2023 $0 25

199848 Public Lighting - SLUoS - Code Required - Code needs to be added to system - 309 Seaview Road Henley Beach SLUOS SAPN SAPN 6 2023 $0 25

205782 Public Lighting - SLUoS - Code Required - Code needs to be added to system - 321 Seaview Road Henley Beach SLUOS SAPN SAPN 6 2023 $0 25

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 112: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 112 -

202334 Public Lighting - SLUoS - Code Required - Code needs to be added to system - 333 Seaview Road Henley Beach SLUOS SAPN SAPN 6 2023 $0 25

202161 Public Lighting - SLUoS - Code Required - Code needs to be added to system - 337 Seaview Road Henley Beach SLUOS SAPN SAPN 6 2023 $0 25

199884 Public Lighting - SLUoS - Code Required - Code needs to be added to system - 341B Seaview Road Henley Beach SLUOS SAPN SAPN 6 2023 $0 25

206822 Public Lighting - SLUoS - Code Required - Code needs to be added to system - 382 Seaview Road Henley Beach SLUOS SAPN SAPN 6 2023 $0 25

199576 Public Lighting - SLUoS - Code Required - Code needs to be added to system - 394 Seaview Road Henley Beach SLUOS SAPN SAPN 6 2023 $0 25

202544 Public Lighting - SLUoS - Code Required - Code needs to be added to system - 410 Seaview Road Henley Beach SLUOS SAPN SAPN 6 2023 $0 25

202579 Public Lighting - SLUoS - Code Required - Code needs to be added to system - 410 Seaview Road Henley Beach SLUOS SAPN SAPN 6 2023 $0 25

208949 Public Lighting - SLUoS - Code Required - Code needs to be added to system - 410 Seaview Road Henley Beach SLUOS SAPN SAPN 6 2023 $0 25

202446 Public Lighting - SLUoS - Code Required - Code needs to be added to system - 46 Harrison Road Devon Park SLUOS SAPN SAPN 6 2023 $0 25

206020 Public Lighting - SLUoS - Code Required - Code needs to be added to system - 487 Esplanade Grange SLUOS SAPN SAPN 6 2023 $0 25

206021 Public Lighting - SLUoS - Code Required - Code needs to be added to system - 487 Esplanade Grange SLUOS SAPN SAPN 6 2023 $0 25

206523 Public Lighting - SLUoS - Code Required - Code needs to be added to system - 487 Esplanade Grange SLUOS SAPN SAPN 6 2023 $0 25

206524 Public Lighting - SLUoS - Code Required - Code needs to be added to system - 487 Esplanade Grange SLUOS SAPN SAPN 6 2023 $0 25

206525 Public Lighting - SLUoS - Code Required - Code needs to be added to system - 487 Esplanade Grange SLUOS SAPN SAPN 6 2023 $0 25

206527 Public Lighting - SLUoS - Code Required - Code needs to be added to system - 487 Esplanade Grange SLUOS SAPN SAPN 6 2023 $0 25

207047 Public Lighting - SLUoS - Code Required - Code needs to be added to system - 487 Esplanade Grange SLUOS SAPN SAPN 6 2023 $0 25

204310 Public Lighting - SLUoS - Code Required - Code needs to be added to system - 499 Esplanade Grange SLUOS SAPN SAPN 6 2023 $0 25

197645 Public Lighting - SLUoS - Code Required - Code needs to be added to system - 507 Esplanade Grange SLUOS SAPN SAPN 6 2023 $0 25

202935 Public Lighting - SLUoS - Code Required - Code needs to be added to system - 6 Ulah Place Semaphore Park SLUOS SAPN SAPN 6 2023 $0 25

202653 Public Lighting - SLUoS - Code Required - Code needs to be added to system - 6-7 Tingira Place Semaphore Park SLUOS SAPN SAPN 6 2023 $0 25

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 113: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 113 -

202864 Public Lighting - SLUoS - Code Required - Code needs to be added to system - 7 Allora Place Semaphore Park SLUOS SAPN SAPN 6 2023 $0 25

202663 Public Lighting - SLUoS - Code Required - Code needs to be added to system - 7 Iluka Place Semaphore Park SLUOS SAPN SAPN 6 2023 $0 25

202662 Public Lighting - SLUoS - Code Required - Code needs to be added to system - 7 Noora Place Semaphore Park SLUOS SAPN SAPN 6 2023 $0 25

202658 Public Lighting - SLUoS - Code Required - Code needs to be added to system - 7 Paruna Place Semaphore Park SLUOS SAPN SAPN 6 2023 $0 25

204574 Public Lighting - SLUoS - Code Required - Code needs to be added to system - 75 Ninth Street Bowden SLUOS SAPN SAPN 6 2023 $0 25

199720 Public Lighting - SLUoS - Code Required - Code needs to be added to system - 84 Henley Beach Road Fulham Gardens SLUOS SAPN SAPN 6 2023 $0 25

204838 Public Lighting - SLUoS - Code Required - Code needs to be added to system - 936-940 Port Road Woodville West SLUOS SAPN SAPN 6 2023 $0 25

200282 Public Lighting - SLUoS - Code Required - Code needs to be added to system - Lot 100 Charlotte Court Grange SLUOS SAPN SAPN 6 2023 $0 25

208598 Public Lighting - SLUoS - Code Required - Code needs to be added to system - Lot 100 Charlotte Court Grange SLUOS SAPN SAPN 6 2023 $0 25

205801 Public Lighting - SLUoS - Code Required - Code needs to be added to system - Lot 11 Seaview Road Henley Beach South SLUOS SAPN SAPN 6 2023 $0 25

208165 Public Lighting - SLUoS - Code Required - Code needs to be added to system - Lot 167 Bartley Terrace Semaphore Park SLUOS SAPN SAPN 6 2023 $0 25

208164 Public Lighting - SLUoS - Code Required - Code needs to be added to system - Lot 167 Marabou Street Semaphore Park SLUOS SAPN SAPN 6 2023 $0 25

199910 Public Lighting - SLUoS - Code Required - Code needs to be added to system - Lot 70 Woodville Road St Clair SLUOS SAPN SAPN 6 2023 $0 25

206966 Public Lighting - SLUoS - Code Required - Code needs to be added to system - Lot 78 Cheltenham Parade Cheltenham SLUOS SAPN SAPN 6 2023 $0 25

204136 Public Lighting - SLUoS - Code Required - Code needs to be added to system - Lot A Esplanade Grange SLUOS SAPN SAPN 6 2023 $0 25

205818 Public Lighting - SLUoS - Code Required - Code needs to be added to system - Lot2 Woodville Road St Clair SLUOS SAPN SAPN 6 2023 $0 25

200161 Public Lighting - SLUoS - Code Required - Code needs to be added to system - Lot2 Woodville Road St Clair SLUOS SAPN SAPN 6 2023 $0 25

203932 Public Lighting - SLUoS - Code Required - Code needs to be added to system - Sec 652 Seaview Road West Beach SLUOS SAPN SAPN 6 2023 $0 25

205459 Public Lighting - SLUoS - Code Required - Code needs to be added to system - Sec 688 Seaview Road West Beach SLUOS SAPN SAPN 6 2023 $0 25

200849 Public Lighting - SLUoS - Code Required - Code needs to be added to system - Sec 992 Lochside Drive West Lakes SLUOS SAPN SAPN 6 2023 $0 25

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 114: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 114 -

201166 Public Lighting - SLUoS - Compact Fluorecent 42W - Fisher Reserve - Lot 203 Fisher Place West Lakes SLUOS SAPN SAPN 6 2023 $0 25

196865 Public Lighting - SLUoS - Compact Fluorecent 42W - Powell Reserve - 7 Powell Court West Lakes SLUOS SAPN SAPN 6 2023 $0 25

202249 Public Lighting - SLUoS - Flourescent 14x2E - 19-21 Harvey Street West Woodville SLUOS SAPN SAPN 6 2023 $0 25

202364 Public Lighting - SLUoS - Fluorescent 40 - Lot 101 Aroona Road Kilkenny SLUOS SAPN SAPN 6 2023 $0 25

201483 Public Lighting - SLUoS - Known Luminaire - SLUOS SAPN SAPN 6 2023 $0 25

199880 Public Lighting - SLUoS - Low Pressure Sodium 18 - 487 Esplanade Grange SLUOS SAPN SAPN 6 2023 $0 25

206068 Public Lighting - SLUoS - Low Pressure Sodium 18 - 515 Esplanade Grange SLUOS SAPN SAPN 6 2023 $0 25

206284 Public Lighting - SLUoS - Low Pressure Sodium 18 - 519 Esplanade Grange SLUOS SAPN SAPN 6 2023 $0 25

208923 Public Lighting - SLUoS - Low Pressure Sodium 18 - 59 Chambers Street Henley Beach SLUOS SAPN SAPN 6 2023 $0 25

196871 Public Lighting - SLUoS - Low Pressure Sodium 18 - Hero Reserve - Lot 77 Lord Hobart Way West Lakes SLUOS SAPN SAPN 6 2023 $0 25

197861 Public Lighting - SLUoS - Low Pressure Sodium 18 - Lot 91 Hubbard Street Beverley SLUOS SAPN SAPN 6 2023 $0 25

199857 Public Lighting - SLUoS - Low Pressure Sodium 18 - Lot 91 Hubbard Street Beverley SLUOS SAPN SAPN 6 2023 $0 25

200269 Public Lighting - SLUoS - Low Pressure Sodium 26 - 5 John Hindmarsh Frontage Brompton SLUOS SAPN SAPN 6 2023 $0 25

197494 Public Lighting - SLUoS - Low Pressure Sodium 26 - Lot 73 Duncan Street Findon SLUOS SAPN SAPN 6 2023 $0 25

201603 Public Lighting - SLUoS - Low Pressure Sodium 90 - SLUOS SAPN SAPN 6 2023 $0 25

201275 Public Lighting - SLUoS - Low Pressure Sodium 90 - SLUOS SAPN SAPN 6 2023 $0 25

201678 Public Lighting - SLUoS - Low Pressure Sodium 90 - SLUOS SAPN SAPN 6 2023 $0 25

201686 Public Lighting - SLUoS - Low Pressure Sodium 90 - SLUOS SAPN SAPN 6 2023 $0 25

201234 Public Lighting - SLUoS - Low Pressure Sodium 90 - SLUOS SAPN SAPN 6 2023 $0 25

201238 Public Lighting - SLUoS - Low Pressure Sodium 90 - SLUOS SAPN SAPN 6 2023 $0 25

201239 Public Lighting - SLUoS - Low Pressure Sodium 90 - SLUOS SAPN SAPN 6 2023 $0 25

208789 Public Lighting - SLUoS - Low Pressure Sodium 90 - 397 Seaview Road Henley Beach SLUOS SAPN SAPN 6 2023 $0 25

202051 Public Lighting - SLUoS - Mercury 250 - Lochside Reserve - Lot 67 Lochside Drive West Lakes SLUOS SAPN SAPN 6 2023 $0 25

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 115: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 115 -

201891 Public Lighting - SLUoS - Mercury 400 - SLUOS SAPN SAPN 6 2023 $0 25

201516 Public Lighting - SLUoS - Mercury 50 - SLUOS SAPN SAPN 6 2023 $0 25

195445 Public Lighting - SLUoS - Mercury 50 - Frome Reserve - Lot 119 Frome Crescent West Lakes SLUOS SAPN SAPN 6 2023 $0 25

195256 Public Lighting - SLUoS - Mercury 50 - Keppel Reserve - Lot 47 Keppel Grove West Lakes SLUOS SAPN SAPN 6 2023 $0 25

195189 Public Lighting - SLUoS - Mercury 50 - Lakeview Avenue West Lakes SLUOS SAPN SAPN 6 2023 $0 25

194611 Public Lighting - SLUoS - Mercury 50 - Lakeview Avenue West Lakes SLUOS SAPN SAPN 6 2023 $0 25

199867 Public Lighting - SLUoS - Mercury 50 - Lot 36 Tennyson Heights Court Tennyson SLUOS SAPN SAPN 6 2023 $0 25

207417 Public Lighting - SLUoS - Mercury 50 - Ross Reserve - Lot 323 Ross Avenue Flinders Park SLUOS SAPN SAPN 6 2023 $0 25

195472 Public Lighting - SLUoS - Mercury 50 - Sec 992 Everard Court West Lakes SLUOS SAPN SAPN 6 2023 $0 25

197218 Public Lighting - SLUoS - Mercury 50 - Settlers Reserve - Lot 34 Settlers Drive West Lakes SLUOS SAPN SAPN 6 2023 $0 25

201625 Public Lighting - SLUoS - Mercury 80 - SLUOS SAPN SAPN 6 2023 $0 25

202031 Public Lighting - SLUoS - Mercury 80 - SLUOS SAPN SAPN 6 2023 $0 25

201232 Public Lighting - SLUoS - Mercury 80 - SLUOS SAPN SAPN 6 2023 $0 25

204779 Public Lighting - SLUoS - Mercury 80 - 1 Esplanade Findon SLUOS SAPN SAPN 6 2023 $0 25

200378 Public Lighting - SLUoS - Mercury 80 - 1 Mann Drive Brompton SLUOS SAPN SAPN 6 2023 $0 25

200807 Public Lighting - SLUoS - Mercury 80 - 17 Chief Street Brompton SLUOS SAPN SAPN 6 2023 $0 25

204699 Public Lighting - SLUoS - Mercury 80 - 2 Esplanade Findon SLUOS SAPN SAPN 6 2023 $0 25

204401 Public Lighting - SLUoS - Mercury 80 - 2/219 Esplanade Henley Beach SLUOS SAPN SAPN 6 2023 $0 25

204402 Public Lighting - SLUoS - Mercury 80 - 215 Esplanade Henley Beach SLUOS SAPN SAPN 6 2023 $0 25

208285 Public Lighting - SLUoS - Mercury 80 - 223 Esplanade Henley Beach SLUOS SAPN SAPN 6 2023 $0 25

204398 Public Lighting - SLUoS - Mercury 80 - 231 Esplanade Henley Beach SLUOS SAPN SAPN 6 2023 $0 25

204395 Public Lighting - SLUoS - Mercury 80 - 241 Esplanade Henley Beach SLUOS SAPN SAPN 6 2023 $0 25

200377 Public Lighting - SLUoS - Mercury 80 - 4 Chief Street Brompton SLUOS SAPN SAPN 6 2023 $0 25

195289 Public Lighting - SLUoS - Mercury 80 - 4 Lochside Drive West Lakes SLUOS SAPN SAPN 6 2023 $0 25

194777 Public Lighting - SLUoS - Mercury 80 - 7 Lochside Drive West Lakes SLUOS SAPN SAPN 6 2023 $0 25

200817 Public Lighting - SLUoS - Mercury 80 - 9 Chief Street Brompton SLUOS SAPN SAPN 6 2023 $0 25

200815 Public Lighting - SLUoS - Mercury 80 - 9 Hull Street Brompton SLUOS SAPN SAPN 6 2023 $0 25

195280 Public Lighting - SLUoS - Mercury 80 - Heysen Crescent West Lakes Shore SLUOS SAPN SAPN 6 2023 $0 25

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 116: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 116 -

200973 Public Lighting - SLUoS - Mercury 80 - Lot 171 Kingfisher Drive Semaphore Park SLUOS SAPN SAPN 6 2023 $0 25

200971 Public Lighting - SLUoS - Mercury 80 - Lot 171 Marabou Street Semaphore Park SLUOS SAPN SAPN 6 2023 $0 25

200972 Public Lighting - SLUoS - Mercury 80 - Lot 171 Marabou Street Semaphore Park SLUOS SAPN SAPN 6 2023 $0 25

200974 Public Lighting - SLUoS - Mercury 80 - Lot 171 Oriole Place Semaphore Park SLUOS SAPN SAPN 6 2023 $0 25

203957 Public Lighting - SLUoS - Mercury 80 - Lot 331 McCole Circuit Allenby Gardens SLUOS SAPN SAPN 6 2023 $0 25

200456 Public Lighting - SLUoS - Mercury 80 - Lot 4 Ray Street Findon SLUOS SAPN SAPN 6 2023 $0 25

200462 Public Lighting - SLUoS - Mercury 80 - Lot 4 Winona Street Findon SLUOS SAPN SAPN 6 2023 $0 25

200463 Public Lighting - SLUoS - Mercury 80 - Lot 4 Winona Street Findon SLUOS SAPN SAPN 6 2023 $0 25

200465 Public Lighting - SLUoS - Mercury 80 - Lot 4 Winona Street Findon SLUOS SAPN SAPN 6 2023 $0 25

200460 Public Lighting - SLUoS - Mercury 80 - Lot 4 Winona Street Findon SLUOS SAPN SAPN 6 2023 $0 25

200414 Public Lighting - SLUoS - Mercury 80 - Lot108 Spurs Avenue Brompton SLUOS SAPN SAPN 6 2023 $0 25

200418 Public Lighting - SLUoS - Mercury 80 - Lot109 Spurs Avenue Brompton SLUOS SAPN SAPN 6 2023 $0 25

200798 Public Lighting - SLUoS - Mercury 80 - Lot61 Mann Drive Brompton SLUOS SAPN SAPN 6 2023 $0 25

200801 Public Lighting - SLUoS - Mercury 80 - Lot67 Mann Drive Brompton SLUOS SAPN SAPN 6 2023 $0 25

194779 Public Lighting - SLUoS - Mercury 80 - Martin Court Reserve - 67 Martin Court West Lakes SLUOS SAPN SAPN 6 2023 $0 25

195287 Public Lighting - SLUoS - Mercury 80 - Martin Court West Lakes SLUOS SAPN SAPN 6 2023 $0 25

195288 Public Lighting - SLUoS - Mercury 80 - Martin Court West Lakes SLUOS SAPN SAPN 6 2023 $0 25

194775 Public Lighting - SLUoS - Mercury 80 - Martin Court West Lakes SLUOS SAPN SAPN 6 2023 $0 25

194776 Public Lighting - SLUoS - Mercury 80 - Martin Court West Lakes SLUOS SAPN SAPN 6 2023 $0 25

202054 Public Lighting - SLUoS - Mercury 80 - MJ McInerney Reserve - Pinda Street West Croydon SLUOS SAPN SAPN 6 2023 $0 25

200461 Public Lighting - SLUoS - Mercury 80 - Winona Street Findon SLUOS SAPN SAPN 6 2023 $0 25

198636 Public Lighting - SLUoS - Mercury 80 BS 2000 - 1 Branwhite Street Findon SLUOS SAPN SAPN 6 2023 $0 25

202798 Public Lighting - SLUoS - Mercury 80 BS 2000 - 1 Harvest Court Findon SLUOS SAPN SAPN 6 2023 $0 25

204127 Public Lighting - SLUoS - Mercury 80 BS 2000 - 1 Kinross Avenue Seaton SLUOS SAPN SAPN 6 2023 $0 25

199565 Public Lighting - SLUoS - Mercury 80 BS 2000 - 1/14 Hindmarsh Avenue West Hindmarsh SLUOS SAPN SAPN 6 2023 $0 25

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 117: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 117 -

207613 Public Lighting - SLUoS - Mercury 80 BS 2000 - 1/19 Elizabeth Street Croydon SLUOS SAPN SAPN 6 2023 $0 25

204039 Public Lighting - SLUoS - Mercury 80 BS 2000 - 10 Jervois Avenue West Hindmarsh SLUOS SAPN SAPN 6 2023 $0 25

208562 Public Lighting - SLUoS - Mercury 80 BS 2000 - 11 Victoria Parade Semaphore Park SLUOS SAPN SAPN 6 2023 $0 25

208217 Public Lighting - SLUoS - Mercury 80 BS 2000 - 12 Croydon Avenue West Croydon SLUOS SAPN SAPN 6 2023 $0 25

205429 Public Lighting - SLUoS - Mercury 80 BS 2000 - 15 Sparrow Court Seaton SLUOS SAPN SAPN 6 2023 $0 25

204731 Public Lighting - SLUoS - Mercury 80 BS 2000 - 16 Holthouse Road Fulham Gardens SLUOS SAPN SAPN 6 2023 $0 25

204570 Public Lighting - SLUoS - Mercury 80 BS 2000 - 18 Napier Drive Grange SLUOS SAPN SAPN 6 2023 $0 25

208005 Public Lighting - SLUoS - Mercury 80 BS 2000 - 20 Palmer Court Renown Park SLUOS SAPN SAPN 6 2023 $0 25

207699 Public Lighting - SLUoS - Mercury 80 BS 2000 - 23 Hume Court Flinders Park SLUOS SAPN SAPN 6 2023 $0 25

208453 Public Lighting - SLUoS - Mercury 80 BS 2000 - 24 Wilson Court Grange SLUOS SAPN SAPN 6 2023 $0 25

206134 Public Lighting - SLUoS - Mercury 80 BS 2000 - 38 Rowell Crescent West Croydon SLUOS SAPN SAPN 6 2023 $0 25

208400 Public Lighting - SLUoS - Mercury 80 BS 2000 - 54 Lines Street Grange SLUOS SAPN SAPN 6 2023 $0 25

203745 Public Lighting - SLUoS - Mercury 80 BS 2000 - 82 Seaview Road Tennyson SLUOS SAPN SAPN 6 2023 $0 25

198767 Public Lighting - SLUoS - Mercury 80 BS 2000 - Lot 1 Vivian Street Henley Beach SLUOS SAPN SAPN 6 2023 $0 25

207913 Public Lighting - SLUoS - Mercury 80 BS 2000 - Lot 1 Vivian Street Henley Beach SLUOS SAPN SAPN 6 2023 $0 25

199364 Public Lighting - SLUoS - Mercury 80 BS 2000 - Lot 102 Holthouse Road Fulham Gardens SLUOS SAPN SAPN 6 2023 $0 25

200286 Public Lighting - SLUoS - Mercury 80 BS 2000 - Lot 220 Slipper Court Fulham Gardens SLUOS SAPN SAPN 6 2023 $0 25

204568 Public Lighting - SLUoS - Mercury 80 BS 2000 - Lot 227 Napier Drive Grange SLUOS SAPN SAPN 6 2023 $0 25

200559 Public Lighting - SLUoS - Mercury 80 BS 2000 - Lot 323 Scott Avenue Flinders Park SLUOS SAPN SAPN 6 2023 $0 25

205006 Public Lighting - SLUoS - Mercury 80 BS 2000 - Lot 59 Russell Terrace Woodville Park SLUOS SAPN SAPN 6 2023 $0 25

205007 Public Lighting - SLUoS - Mercury 80 BS 2000 - Lot 59 Windsor Avenue Woodville Park SLUOS SAPN SAPN 6 2023 $0 25

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 118: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 118 -

205008 Public Lighting - SLUoS - Mercury 80 BS 2000 - Lot 59 Windsor Avenue Woodville Park SLUOS SAPN SAPN 6 2023 $0 25

199405 Public Lighting - SLUoS - Mercury 80 BS 2000 - Lot 73 Atkin Street Henley Beach SLUOS SAPN SAPN 6 2023 $0 25

208157 Public Lighting - SLUoS - Mercury 80 BS 2000 - Lot 73 Griffiths Street Henley Beach SLUOS SAPN SAPN 6 2023 $0 25

205428 Public Lighting - SLUoS - Mercury 80 BS 2000 - Lot A Cairns Avenue Seaton SLUOS SAPN SAPN 6 2023 $0 25

205004 Public Lighting - SLUoS - Mercury 80 BS 2000 - Lot A Murray Street Fulham Gardens SLUOS SAPN SAPN 6 2023 $0 25

204862 Public Lighting - SLUoS - Mercury 80 BS 2000 - Lot B Bolingbroke Avenue Fulham Gardens SLUOS SAPN SAPN 6 2023 $0 25

202636 Public Lighting - SLUoS - Mercury 80 BS 2000 - Lot G Sheridan Street Woodville North SLUOS SAPN SAPN 6 2023 $0 25

206859 Public Lighting - SLUoS - Mercury 80 BS 2000 - Opp 2 Sackville Street West Croydon SLUOS SAPN SAPN 6 2023 $0 25

204560 Public Lighting - SLUoS - Mercury 80 BS 2000 - Sec 1660 Chambers Street Henley Beach SLUOS SAPN SAPN 6 2023 $0 25

200940 Public Lighting - SLUoS - Mercury 80 BS 2000 - Sec 1664 Sackville Street West Croydon SLUOS SAPN SAPN 6 2023 $0 25

204594 Public Lighting - SLUoS - Mercury 80 BS 2000 - Sec 787 Kanbara Street Flinders Park SLUOS SAPN SAPN 6 2023 $0 25

208167 Public Lighting - SLUoS - Mercury 80 BS 2000 - Sec 940 Reedie Street Henley Beach SLUOS SAPN SAPN 6 2023 $0 25

199005 Public Lighting - SLUoS - Mercury 80 URBAN - 1 Russell Street Henley Beach South SLUOS SAPN SAPN 6 2023 $0 25

204974 Public Lighting - SLUoS - Mercury 80 URBAN - 138 Flora Street Henley Beach South SLUOS SAPN SAPN 6 2023 $0 25

199205 Public Lighting - SLUoS - Mercury 80 URBAN - 604 Coombe Road Allenby Gardens SLUOS SAPN SAPN 6 2023 $0 25

205421 Public Lighting - SLUoS - Mercury 80 URBAN - 660 Burbridge Road West Beach SLUOS SAPN SAPN 6 2023 $0 25

200975 Public Lighting - SLUoS - Mercury 80 URBAN - Lot 171 Oriole Place Semaphore Park SLUOS SAPN SAPN 6 2023 $0 25

204567 Public Lighting - SLUoS - Mercury 80 URBAN - Lot 227 Napier Drive Grange SLUOS SAPN SAPN 6 2023 $0 25

206682 Public Lighting - SLUoS - Mercury 80 URBAN - Lot 83 Pinda Street Kilkenny SLUOS SAPN SAPN 6 2023 $0 25

200978 Public Lighting - SLUoS - Mercury 80 URBAN - Lot A Carnarvon Parade West Croydon SLUOS SAPN SAPN 6 2023 $0 25

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 119: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 119 -

198421 Public Lighting - SLUoS - Mercury 80 URBAN - Opp 84 Day Terrace West Croydon SLUOS SAPN SAPN 6 2023 $0 25

200912 Public Lighting - SLUoS - Mercury 80 URBAN - Sec 3286 Moredun Street Tennyson SLUOS SAPN SAPN 6 2023 $0 25

201291 Public Lighting - SLUoS - Sodium 100 - SLUOS SAPN SAPN 6 2023 $0 25

201864 Public Lighting - SLUoS - Sodium 100 - SLUOS SAPN SAPN 6 2023 $0 25

200307 Public Lighting - SLUoS - Sodium 100 - 15 Monmouth Street Ridleyton SLUOS SAPN SAPN 6 2023 $0 25

205293 Public Lighting - SLUoS - Sodium 100 - 347 Seaview Road Henley Beach SLUOS SAPN SAPN 6 2023 $0 25

205774 Public Lighting - SLUoS - Sodium 100 - 357-359 Seaview Road Henley Beach SLUOS SAPN SAPN 6 2023 $0 25

200112 Public Lighting - SLUoS - Sodium 100 - 367 Seaview Road Henley Beach SLUOS SAPN SAPN 6 2023 $0 25

206789 Public Lighting - SLUoS - Sodium 100 - 383 Seaview Road Henley Beach SLUOS SAPN SAPN 6 2023 $0 25

198251 Public Lighting - SLUoS - Sodium 100 - 4/89 Hawker Street Brompton SLUOS SAPN SAPN 6 2023 $0 25

199684 Public Lighting - SLUoS - Sodium 100 - 405 Seaview Road Henley Beach SLUOS SAPN SAPN 6 2023 $0 25

208784 Public Lighting - SLUoS - Sodium 100 - 413 Seaview Road Henley Beach SLUOS SAPN SAPN 6 2023 $0 25

200590 Public Lighting - SLUoS - Sodium 100 - 418 Seaview Road Henley Beach SLUOS SAPN SAPN 6 2023 $0 25

200081 Public Lighting - SLUoS - Sodium 100 - 451 Beach Street Grange SLUOS SAPN SAPN 6 2023 $0 25

206785 Public Lighting - SLUoS - Sodium 100 - 466-468 Seaview Road Henley Beach SLUOS SAPN SAPN 6 2023 $0 25

199685 Public Lighting - SLUoS - Sodium 100 - 478 Seaview Road Henley Beach SLUOS SAPN SAPN 6 2023 $0 25

205267 Public Lighting - SLUoS - Sodium 100 - 490 Seaview Road Henley Beach SLUOS SAPN SAPN 6 2023 $0 25

197619 Public Lighting - SLUoS - Sodium 100 - 5 Monmouth Street Ridleyton SLUOS SAPN SAPN 6 2023 $0 25

200207 Public Lighting - SLUoS - Sodium 100 - 500 Seaview Road Henley Beach SLUOS SAPN SAPN 6 2023 $0 25

206471 Public Lighting - SLUoS - Sodium 100 - 63 Hawker Street Brompton SLUOS SAPN SAPN 6 2023 $0 25

206987 Public Lighting - SLUoS - Sodium 100 - 70-76 Sturdee Street Flinders Park SLUOS SAPN SAPN 6 2023 $0 25

197548 Public Lighting - SLUoS - Sodium 100 - 8/9-11 Rowley Terrace Woodville SLUOS SAPN SAPN 6 2023 $0 25

206405 Public Lighting - SLUoS - Sodium 100 - 84 Rosetta Street West Croydon SLUOS SAPN SAPN 6 2023 $0 25

205497 Public Lighting - SLUoS - Sodium 100 - Lot 27 Park Terrace Ovingham SLUOS SAPN SAPN 6 2023 $0 25

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 120: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 120 -

200457 Public Lighting - SLUoS - Sodium 100 - Lot 4 Ray Street Findon SLUOS SAPN SAPN 6 2023 $0 25

200458 Public Lighting - SLUoS - Sodium 100 - Lot 4 Ray Street Findon SLUOS SAPN SAPN 6 2023 $0 25

198334 Public Lighting - SLUoS - Sodium 100 - Lot 4 Ray Street Findon SLUOS SAPN SAPN 6 2023 $0 25

206697 Public Lighting - SLUoS - Sodium 100 - Lot C Service Road Seaton SLUOS SAPN SAPN 6 2023 $0 25

200611 Public Lighting - SLUoS - Sodium 100 - Sec 652 Seaview Road West Beach SLUOS SAPN SAPN 6 2023 $0 25

201233 Public Lighting - SLUoS - Sodium 150 - SLUOS SAPN SAPN 6 2023 $0 25

201252 Public Lighting - SLUoS - Sodium 150 - SLUOS SAPN SAPN 6 2023 $0 25

201287 Public Lighting - SLUoS - Sodium 150 - SLUOS SAPN SAPN 6 2023 $0 25

201642 Public Lighting - SLUoS - Sodium 150 - SLUOS SAPN SAPN 6 2023 $0 25

199635 Public Lighting - SLUoS - Sodium 150 - 1/118 Hawker Street Bowden SLUOS SAPN SAPN 6 2023 $0 25

199728 Public Lighting - SLUoS - Sodium 150 - 1/25 Mellor Street West Beach SLUOS SAPN SAPN 6 2023 $0 25

206839 Public Lighting - SLUoS - Sodium 150 - 12 North Street Henley Beach SLUOS SAPN SAPN 6 2023 $0 25

197886 Public Lighting - SLUoS - Sodium 150 - 13 Headdey Court Woodville South SLUOS SAPN SAPN 6 2023 $0 25

205802 Public Lighting - SLUoS - Sodium 150 - 23 Seaview Road West Beach SLUOS SAPN SAPN 6 2023 $0 25

208944 Public Lighting - SLUoS - Sodium 150 - 29 Seaview Road West Beach SLUOS SAPN SAPN 6 2023 $0 25

205731 Public Lighting - SLUoS - Sodium 150 - 437 Seaview Road Grange SLUOS SAPN SAPN 6 2023 $0 25

199972 Public Lighting - SLUoS - Sodium 150 - 447 Seaview Road Grange SLUOS SAPN SAPN 6 2023 $0 25

197662 Public Lighting - SLUoS - Sodium 150 - 457 Seaview Road Grange SLUOS SAPN SAPN 6 2023 $0 25

206300 Public Lighting - SLUoS - Sodium 150 - 469 Seaview Road Grange SLUOS SAPN SAPN 6 2023 $0 25

206296 Public Lighting - SLUoS - Sodium 150 - 481 Seaview Road Grange SLUOS SAPN SAPN 6 2023 $0 25

206750 Public Lighting - SLUoS - Sodium 150 - 497 Seaview Road Grange SLUOS SAPN SAPN 6 2023 $0 25

206285 Public Lighting - SLUoS - Sodium 150 - 513 Seaview Road Grange SLUOS SAPN SAPN 6 2023 $0 25

197672 Public Lighting - SLUoS - Sodium 150 - 522 Seaview Road Grange SLUOS SAPN SAPN 6 2023 $0 25

197669 Public Lighting - SLUoS - Sodium 150 - 530 Seaview Road Grange SLUOS SAPN SAPN 6 2023 $0 25

197897 Public Lighting - SLUoS - Sodium 150 - 542 Seaview Road Grange SLUOS SAPN SAPN 6 2023 $0 25

206093 Public Lighting - SLUoS - Sodium 150 - 582 Seaview Road Grange SLUOS SAPN SAPN 6 2023 $0 25

197700 Public Lighting - SLUoS - Sodium 150 - 610 Seaview Road Grange SLUOS SAPN SAPN 6 2023 $0 25

197642 Public Lighting - SLUoS - Sodium 150 - 616 Seaview Road Grange SLUOS SAPN SAPN 6 2023 $0 25

206278 Public Lighting - SLUoS - Sodium 150 - 622 Seaview Road Grange SLUOS SAPN SAPN 6 2023 $0 25

206487 Public Lighting - SLUoS - Sodium 150 - 65 Hawker Street Brompton SLUOS SAPN SAPN 6 2023 $0 25

205938 Public Lighting - SLUoS - Sodium 150 - 7 Seaview Road West Beach SLUOS SAPN SAPN 6 2023 $0 25

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 121: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 121 -

206727 Public Lighting - SLUoS - Sodium 150 - 75 Hawker Street Brompton SLUOS SAPN SAPN 6 2023 $0 25

205984 Public Lighting - SLUoS - Sodium 150 - 8/15 Seaview Road West Beach SLUOS SAPN SAPN 6 2023 $0 25

206878 Public Lighting - SLUoS - Sodium 150 - Lot 42 Alma Terrace Seaton SLUOS SAPN SAPN 6 2023 $0 25

206914 Public Lighting - SLUoS - Sodium 150 - Lot 44 Bishop Street Renown Park SLUOS SAPN SAPN 6 2023 $0 25

206649 Public Lighting - SLUoS - Sodium 150 - Lot 9 Hawker Street Ovingham SLUOS SAPN SAPN 6 2023 $0 25

206600 Public Lighting - SLUoS - Sodium 50 - 1 Jervois Street Woodville West SLUOS SAPN SAPN 6 2023 $0 25

207387 Public Lighting - SLUoS - Sodium 50 - 1 McBurnie Close Brompton SLUOS SAPN SAPN 6 2023 $0 25

200554 Public Lighting - SLUoS - Sodium 50 - 1 Seventh Street Bowden SLUOS SAPN SAPN 6 2023 $0 25

198079 Public Lighting - SLUoS - Sodium 50 - 1 Seventh Street Bowden SLUOS SAPN SAPN 6 2023 $0 25

197599 Public Lighting - SLUoS - Sodium 50 - 12 John Hindmarsh Frontage Brompton SLUOS SAPN SAPN 6 2023 $0 25

207192 Public Lighting - SLUoS - Sodium 50 - 2 St James Boulevard Brompton SLUOS SAPN SAPN 6 2023 $0 25

206824 Public Lighting - SLUoS - Sodium 50 - 2/293 Esplanade Henley Beach SLUOS SAPN SAPN 6 2023 $0 25

207286 Public Lighting - SLUoS - Sodium 50 - 2/331 Esplanade Henley Beach SLUOS SAPN SAPN 6 2023 $0 25

206948 Public Lighting - SLUoS - Sodium 50 - 21 Kersley Court Brompton SLUOS SAPN SAPN 6 2023 $0 25

200140 Public Lighting - SLUoS - Sodium 50 - 211 South Street Henley Beach SLUOS SAPN SAPN 6 2023 $0 25

200842 Public Lighting - SLUoS - Sodium 50 - 23 The Avenue Athol Park SLUOS SAPN SAPN 6 2023 $0 25

208827 Public Lighting - SLUoS - Sodium 50 - 267 Esplanade Henley Beach SLUOS SAPN SAPN 6 2023 $0 25

198141 Public Lighting - SLUoS - Sodium 50 - 285 Esplanade Henley Beach SLUOS SAPN SAPN 6 2023 $0 25

205786 Public Lighting - SLUoS - Sodium 50 - 297 Esplanade Henley Beach SLUOS SAPN SAPN 6 2023 $0 25

206821 Public Lighting - SLUoS - Sodium 50 - 305 Esplanade Henley Beach SLUOS SAPN SAPN 6 2023 $0 25

207004 Public Lighting - SLUoS - Sodium 50 - 309-311 Esplanade Henley Beach SLUOS SAPN SAPN 6 2023 $0 25

208969 Public Lighting - SLUoS - Sodium 50 - 319 Esplanade Henley Beach SLUOS SAPN SAPN 6 2023 $0 25

206640 Public Lighting - SLUoS - Sodium 50 - 325 Esplanade Henley Beach SLUOS SAPN SAPN 6 2023 $0 25

200352 Public Lighting - SLUoS - Sodium 50 - 339 Esplanade Henley Beach SLUOS SAPN SAPN 6 2023 $0 25

200401 Public Lighting - SLUoS - Sodium 50 - 5 Corymbia Avenue Athol Park SLUOS SAPN SAPN 6 2023 $0 25

206977 Public Lighting - SLUoS - Sodium 50 - 62-68 Drayton Street Bowden SLUOS SAPN SAPN 6 2023 $0 25

207405 Public Lighting - SLUoS - Sodium 50 - 8 Sarah Court Pennington SLUOS SAPN SAPN 6 2023 $0 25

198227 Public Lighting - SLUoS - Sodium 50 - Lot 220 Slipper Court Fulham Gardens SLUOS SAPN SAPN 6 2023 $0 25

200174 Public Lighting - SLUoS - Sodium 50 - Lot 42 Alma Terrace Seaton SLUOS SAPN SAPN 6 2023 $0 25

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 122: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 122 -

207513 Public Lighting - SLUoS - Sodium 50 - Lot 50 Corcoran Drive West Lakes SLUOS SAPN SAPN 6 2023 $0 25

201070 Public Lighting - SLUoS - Sodium 50 - Lot 999 The Avenue Athol Park SLUOS SAPN SAPN 6 2023 $0 25

207485 Public Lighting - SLUoS - Sodium 50 - Lot102 The Avenue Athol Park SLUOS SAPN SAPN 6 2023 $0 25

200431 Public Lighting - SLUoS - Sodium 50 - Opp 11 Thirteenth Avenue Woodville North SLUOS SAPN SAPN 6 2023 $0 25

207305 Public Lighting - SLUoS - Sodium 50 - Sec 1004 Esplanade Henley Beach SLUOS SAPN SAPN 6 2023 $0 25

Subtotal $340,800

197407 Public Lighting - CLER - Code Required - Code needs to be added to system - Sec 5807 Port Road Hindmarsh CLER ENG SAPN 7 2024 $4,544 25

197367 Public Lighting - CLER - Mercury 50 - Midcourse Reserve - Lot 82 Beeston Way West Lakes CLER ENG SAPN 7 2024 $4,544 25

195018 Public Lighting - CLER - Mercury 80 - St Clair Recreation Reserve - Lot 70 Actil Avenue St Clair CLER ENG SAPN 7 2024 $4,544 25

197205 Public Lighting - CLER - Sodium 50 - 2 Milner Street Hindmarsh CLER ENG SAPN 7 2024 $4,544 25

197203 Public Lighting - CLER - Sodium 50 - 3 Milner Street Hindmarsh CLER ENG SAPN 7 2024 $4,544 60

197193 Public Lighting - CLER - Sodium 50 - 30-32 Orsmond Street Hindmarsh CLER ENG SAPN 7 2024 $4,544 25

197192 Public Lighting - CLER - Sodium 50 - 41 Orsmond Street Hindmarsh CLER ENG SAPN 7 2024 $4,544 25

197197 Public Lighting - CLER - Sodium 50 - Orsmond Street Hindmarsh CLER ENG SAPN 7 2024 $4,544 25

195043 Public Lighting - Energy Only - Code Required - Code needs to be added to system - Silver Reserve - Lot 125 Silver Crescent Grange ENERGY ENG ENG 7 2024 $4,544 25

195356 Public Lighting - Energy Only - Mercury 80 - Kirkcaldy Park - Lot 12 Charlotte Terrace Grange ENERGY ENG ENG 7 2024 $4,544 25

195381 Public Lighting - Energy Only - Mercury 80 - Kirkcaldy Park - Lot 12 Charlotte Terrace Grange ENERGY ENG ENG 7 2024 $4,544 25

197227 Public Lighting - Energy Only - Mercury 80 - West Street Reserve - 14-16 West Street Brompton ENERGY ENG ENG 7 2024 $4,544 5

194867 Public Lighting - Energy Only - Mercury 80 BS 2000 - Harold and Cynthia Anderson Reserve - Sec 652 Seaview Road West Beach ENERGY ENG ENG 7 2024 $4,544 25

194793 Public Lighting - Energy Only - Sodium 100 - Gray Reserve - 15 Winston Crescent West Beach ENERGY ENG ENG 7 2024 $4,544 5

195113 Public Lighting - Metered - Code Required - Code needs to be added to system - 49A Milner Street Hindmarsh METERED ENG ENG 7 2024 $4,544 5

195607 Public Lighting - Metered - Code Required - Code needs to be added to system - 49A Orsmond Street Hindmarsh METERED ENG ENG 7 2024 $4,544 5

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 123: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 123 -

195596 Public Lighting - Metered - Code Required - Code needs to be added to system - 64C Woodville Road Woodville METERED ENG ENG 7 2024 $4,544 5

195105 Public Lighting - Metered - Code Required - Code needs to be added to system - 64C Woodville Road Woodville METERED ENG ENG 7 2024 $4,544 5

194442 Public Lighting - Metered - Code Required - Code needs to be added to system - 77-81 Todville Street Woodville West METERED ENG ENG 7 2024 $4,544 25

194444 Public Lighting - Metered - Code Required - Code needs to be added to system - 77-81 Todville Street Woodville West METERED ENG ENG 7 2024 $4,544 25

195609 Public Lighting - Metered - Code Required - Code needs to be added to system - 77-81 Went Street Woodville West METERED ENG ENG 7 2024 $4,544 25

194724 Public Lighting - Metered - Code Required - Code needs to be added to system - David Reserve - Lot 68 Dunn Avenue Findon METERED ENG ENG 7 2024 $4,544 25

194726 Public Lighting - Metered - Code Required - Code needs to be added to system - David Reserve - Lot 68 Findon Road Findon METERED ENG ENG 7 2024 $4,544 25

195617 Public Lighting - Metered - Code Required - Code needs to be added to system - Fawk Reserve - Outer - 171B Adele Street Athol Park METERED ENG ENG 7 2024 $4,544 25

195124 Public Lighting - Metered - Code Required - Code needs to be added to system - Fawk Reserve - Outer - 171B Hamilton Road Athol Park METERED ENG ENG 7 2024 $4,544 25

194518 Public Lighting - Metered - Code Required - Code needs to be added to system - Findon Reserve - Judith Avenue Findon METERED ENG ENG 7 2024 $4,544 25

194519 Public Lighting - Metered - Code Required - Code needs to be added to system - Findon Reserve - Judith Avenue Findon METERED ENG ENG 7 2024 $4,544 25

195640 Public Lighting - Metered - Code Required - Code needs to be added to system - Findon Reserve - Judith Avenue Findon METERED ENG ENG 7 2024 $4,544 25

195560 Public Lighting - Metered - Code Required - Code needs to be added to system - Findon Reserve - Lot 73 Drummond Avenue Findon METERED ENG ENG 7 2024 $4,544 25

195643 Public Lighting - Metered - Code Required - Code needs to be added to system - Findon Reserve - Lot 73 Drummond Avenue Findon METERED ENG ENG 7 2024 $4,544 25

194533 Public Lighting - Metered - Code Required - Code needs to be added to system - Findon Reserve - Lot 73 Drummond Avenue Findon METERED ENG ENG 7 2024 $4,544 25

194534 Public Lighting - Metered - Code Required - Code needs to be added to system - Findon Reserve - Lot 73 Drummond Avenue Findon METERED ENG ENG 7 2024 $4,544 25

194535 Public Lighting - Metered - Code Required - Code needs to be added to system - Findon Reserve - Lot 73 Drummond Avenue Findon METERED ENG ENG 7 2024 $4,544 25

195062 Public Lighting - Metered - Code Required - Code needs to be added to system - Findon Reserve - Lot 73 Drummond Avenue Findon METERED ENG ENG 7 2024 $4,544 25

195063 Public Lighting - Metered - Code Required - Code needs to be added to system - Findon Reserve - Lot 73 Drummond Avenue Findon METERED ENG ENG 7 2024 $4,544 25

195154 Public Lighting - Metered - Code Required - Code needs to be added to system - Findon Reserve - Lot 73 Drummond Avenue Findon METERED ENG ENG 7 2024 $4,544 25

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 124: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 124 -

195155 Public Lighting - Metered - Code Required - Code needs to be added to system - Findon Reserve - Lot 73 Drummond Avenue Findon METERED ENG ENG 7 2024 $4,544 25

197393 Public Lighting - Metered - Code Required - Code needs to be added to system - Findon Reserve - Lot 73 Judith Avenue Findon METERED ENG ENG 7 2024 $4,544 25

197392 Public Lighting - Metered - Code Required - Code needs to be added to system - Findon Reserve - Lot 73 Reserve Parade Findon METERED ENG ENG 7 2024 $4,544 25

195639 Public Lighting - Metered - Code Required - Code needs to be added to system - Findon Reserve - Reserve Parade Findon METERED ENG ENG 7 2024 $4,544 25

195642 Public Lighting - Metered - Code Required - Code needs to be added to system - Findon Reserve - Reserve Parade Findon METERED ENG ENG 7 2024 $4,544 25

195152 Public Lighting - Metered - Code Required - Code needs to be added to system - Findon Reserve - Reserve Parade Findon METERED ENG ENG 7 2024 $4,544 25

195153 Public Lighting - Metered - Code Required - Code needs to be added to system - Findon Reserve - Reserve Parade Findon METERED ENG ENG 7 2024 $4,544 25

194520 Public Lighting - Metered - Code Required - Code needs to be added to system - Findon Reserve - Reserve Parade Findon METERED ENG ENG 7 2024 $4,544 25

194521 Public Lighting - Metered - Code Required - Code needs to be added to system - Findon Reserve - Reserve Parade Findon METERED ENG ENG 7 2024 $4,544 25

195644 Public Lighting - Metered - Code Required - Code needs to be added to system - Gleneagles Reserve - Outer - Lot 22 Dumfries Avenue Seaton

METERED ENG ENG 7 2024 $4,544 25

194727 Public Lighting - Metered - Code Required - Code needs to be added to system - Gleneagles Reserve - Outer - Lot 22 Leven Avenue Seaton METERED ENG ENG 7 2024 $4,544 25

195156 Public Lighting - Metered - Code Required - Code needs to be added to system - Gleneagles Reserve - Outer - Lot 22 Pape Avenue Seaton METERED ENG ENG 7 2024 $4,544 25

195645 Public Lighting - Metered - Code Required - Code needs to be added to system - Gleneagles Reserve - Outer - Lot 22 Pape Avenue Seaton METERED ENG ENG 7 2024 $4,544 25

195668 Public Lighting - Metered - Code Required - Code needs to be added to system - Huntingdale Reserve - Lot 86 Huntingdale Avenue West Lakes

METERED ENG ENG 7 2024 $4,544 25

195180 Public Lighting - Metered - Code Required - Code needs to be added to system - Huntingdale Reserve - Lot 86 Huntingdale Avenue West Lakes

METERED ENG ENG 7 2024 $4,544 25

195164 Public Lighting - Metered - Code Required - Code needs to be added to system - Jubilee Reserve - Outer - Lot 499 Varram Way West Lakes Shore

METERED ENG ENG 7 2024 $4,544 25

194732 Public Lighting - Metered - Code Required - Code needs to be added to system - Jubilee Reserve - Outer - Lot 499 Varram Way West Lakes Shore

METERED ENG ENG 7 2024 $4,544 25

195654 Public Lighting - Metered - Code Required - Code needs to be added to system - Jubilee Reserve - Outer - Lot 94 Bartley Terrace West METERED ENG ENG 7 2024 $4,544 25

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 125: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 125 -

Lakes Shore

194652 Public Lighting - Metered - Code Required - Code needs to be added to system - Jubilee Reserve - Outer - Lot 94 Sansom Road West Lakes Shore

METERED ENG ENG 7 2024 $4,544 25

194735 Public Lighting - Metered - Code Required - Code needs to be added to system - Jubilee Reserve - Outer - Lot 94 Varram Way West Lakes Shore

METERED ENG ENG 7 2024 $4,544 25

194736 Public Lighting - Metered - Code Required - Code needs to be added to system - Jubilee Reserve - Outer - Lot 94 Varram Way West Lakes Shore

METERED ENG ENG 7 2024 $4,544 25

195165 Public Lighting - Metered - Code Required - Code needs to be added to system - Jubilee Reserve - Outer - Lot 94 Varram Way West Lakes Shore

METERED ENG ENG 7 2024 $4,544 25

195166 Public Lighting - Metered - Code Required - Code needs to be added to system - Jubilee Reserve - Outer - Lot 94 Varram Way West Lakes Shore

METERED ENG ENG 7 2024 $4,544 25

195163 Public Lighting - Metered - Code Required - Code needs to be added to system - Jubilee Reserve - Outer - Lot 94 Varram Way West Lakes Shore

METERED ENG ENG 7 2024 $4,544 25

195656 Public Lighting - Metered - Code Required - Code needs to be added to system - Jubilee Reserve - Outer - Lot 94 Varram Way West Lakes Shore

METERED ENG ENG 7 2024 $4,544 25

195650 Public Lighting - Metered - Code Required - Code needs to be added to system - Jubilee Reserve - Outer - Lot 94 Varram Way West Lakes Shore

METERED ENG ENG 7 2024 $4,544 25

195651 Public Lighting - Metered - Code Required - Code needs to be added to system - Jubilee Reserve - Outer - Lot 94 Varram Way West Lakes Shore

METERED ENG ENG 7 2024 $4,544 25

195653 Public Lighting - Metered - Code Required - Code needs to be added to system - Jubilee Reserve - Outer - Lot 94 Varram Way West Lakes Shore

METERED ENG ENG 7 2024 $4,544 25

195612 Public Lighting - Metered - Code Required - Code needs to be added to system - Lot 68 Halsey Road Henley Beach South METERED ENG ENG 7 2024 $4,544 5

196642 Public Lighting - Metered - Code Required - Code needs to be added to system - Matheson Reserve - Outer - Buccleuch Avenue Findon METERED ENG ENG 7 2024 $4,544 25

196643 Public Lighting - Metered - Code Required - Code needs to be added to system - Matheson Reserve - Outer - Buccleuch Avenue Findon METERED ENG ENG 7 2024 $4,544 25

195562 Public Lighting - Metered - Code Required - Code needs to be added to system - Matheson Reserve - Outer - Buccleuch Avenue Findon METERED ENG ENG 7 2024 $4,544 25

195064 Public Lighting - Metered - Code Required - Code needs to be added to system - Matheson Reserve - Outer - Buccleuch Avenue Findon METERED ENG ENG 7 2024 $4,544 25

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 126: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 126 -

195065 Public Lighting - Metered - Code Required - Code needs to be added to system - Matheson Reserve - Outer - Buccleuch Avenue Findon METERED ENG ENG 7 2024 $4,544 25

194538 Public Lighting - Metered - Code Required - Code needs to be added to system - Matheson Reserve - Outer - Buccleuch Avenue Findon METERED ENG ENG 7 2024 $4,544 25

195118 Public Lighting - Metered - Code Required - Code needs to be added to system - RTLP - Breakout North Reserve - Lot 68 Halsey Road Henley Beach South

METERED ENG ENG 7 2024 $4,544 5

195616 Public Lighting - Metered - Code Required - Code needs to be added to system - St Clair Recreation Reserve - Brocas Avenue St Clair METERED ENG ENG 7 2024 $4,544 25

195123 Public Lighting - Metered - Code Required - Code needs to be added to system - St Clair Recreation Reserve - Brocas Avenue St Clair METERED ENG ENG 7 2024 $4,544 25

195059 Public Lighting - Metered - Code Required - Code needs to be added to system - St Clair Recreation Reserve - Lot 70 Actil Avenue St Clair METERED ENG ENG 7 2024 $4,544 25

195555 Public Lighting - Metered - Code Required - Code needs to be added to system - St Clair Recreation Reserve - Lot 70 Actil Avenue St Clair METERED ENG ENG 7 2024 $4,544 25

196727 Public Lighting - Metered - Compact Fluorecent 42W - 18 Sierra Avenue Grange METERED ENG ENG 7 2024 $4,544 5

194734 Public Lighting - Metered - Compact Fluorecent 42W - Jubilee Reserve - Outer - Lot 94 Varram Way West Lakes Shore METERED ENG ENG 7 2024 $4,544 25

196647 Public Lighting - Metered - Fluorescent 40 - 10 Went Street Woodville West METERED ENG ENG 7 2024 $4,544 25

195608 Public Lighting - Metered - Fluorescent 40 - 77-81 Went Street Woodville West METERED ENG ENG 7 2024 $4,544 25

194723 Public Lighting - Metered - Fluorescent 40 - Matheson Reserve - Outer - Buccleuch Avenue Findon METERED ENG ENG 7 2024 $4,544 25

195715 Public Lighting - Metered - Low Pressure Sodium 18 - Hero Reserve - Lot 72 Lord Hobart Way West Lakes METERED ENG ENG 7 2024 $4,544 25

195904 Public Lighting - Metered - Low Pressure Sodium 18 - Hero Reserve - Lot 77 Lord Hobart Way West Lakes METERED ENG ENG 7 2024 $4,544 25

195115 Public Lighting - Metered - Mercury 50 - 10 Went Street Woodville West METERED ENG ENG 7 2024 $4,544 25

197128 Public Lighting - Metered - Mercury 50 - 343 Military Road Semaphore Park METERED ENG ENG 7 2024 $4,544 5

197261 Public Lighting - Metered - Mercury 50 - 343 Military Road Semaphore Park METERED ENG ENG 7 2024 $4,544 5

195669 Public Lighting - Metered - Mercury 50 - Huntingdale Reserve - Lot 86 Huntingdale Avenue West Lakes METERED ENG ENG 7 2024 $4,544 25

194663 Public Lighting - Metered - Mercury 50 - Huntingdale Reserve - Lot 86 Sportsmans Drive West Lakes METERED ENG ENG 7 2024 $4,544 25

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 127: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 127 -

194662 Public Lighting - Metered - Mercury 50 - Huntingdale Reserve - Lot 86 Trimmer Parade West Lakes METERED ENG ENG 7 2024 $4,544 25

195004 Public Lighting - Metered - Mercury 50 - Jubilee Reserve - Outer - Lot 499 Sansom Road West Lakes Shore METERED ENG ENG 7 2024 $4,544 25

197337 Public Lighting - Metered - Mercury 50 - Jubilee Reserve - Outer - Lot 499 Sansom Road West Lakes Shore METERED ENG ENG 7 2024 $4,544 25

197420 Public Lighting - Metered - Mercury 50 - Jubilee Reserve - Outer - Lot 499 Sansom Road West Lakes Shore METERED ENG ENG 7 2024 $4,544 25

195008 Public Lighting - Metered - Mercury 50 - Jubilee Reserve - Outer - Lot 94 Sansom Road West Lakes Shore METERED ENG ENG 7 2024 $4,544 25

196276 Public Lighting - Metered - Mercury 50 - Jubilee Reserve - Outer - Sansom Road West Lakes Shore METERED ENG ENG 7 2024 $4,544 25

197180 Public Lighting - Metered - Mercury 50 - Point Malcolm Reserve - 343 Military Road Semaphore Park METERED ENG ENG 7 2024 $4,544 25

197181 Public Lighting - Metered - Mercury 50 - Point Malcolm Reserve - 343 Military Road Semaphore Park METERED ENG ENG 7 2024 $4,544 25

197264 Public Lighting - Metered - Mercury 50 - Point Malcolm Reserve - 343 Military Road Semaphore Park METERED ENG ENG 7 2024 $4,544 25

197265 Public Lighting - Metered - Mercury 50 - Point Malcolm Reserve - 343 Military Road Semaphore Park METERED ENG ENG 7 2024 $4,544 25

197287 Public Lighting - Metered - Mercury 50 - Point Malcolm Reserve - 343 Military Road Semaphore Park METERED ENG ENG 7 2024 $4,544 25

197262 Public Lighting - Metered - Mercury 50 - Point Malcolm Reserve - 343 Military Road Semaphore Park METERED ENG ENG 7 2024 $4,544 5

194944 Public Lighting - Metered - Mercury 50 - Point Malcolm Reserve - 343 Military Road Semaphore Park METERED ENG ENG 7 2024 $4,544 25

194962 Public Lighting - Metered - Mercury 50 - Point Malcolm Reserve - 343 Military Road Semaphore Park METERED ENG ENG 7 2024 $4,544 25

194967 Public Lighting - Metered - Mercury 50 - Point Malcolm Reserve - 343 Military Road Semaphore Park METERED ENG ENG 7 2024 $4,544 25

195002 Public Lighting - Metered - Mercury 50 - Samoa Reserve - 17 Bali Court West Lakes METERED ENG ENG 7 2024 $4,544 25

194740 Public Lighting - Metered - Mercury 50 - Samoa Reserve - 17 Bali Court West Lakes METERED ENG ENG 7 2024 $4,544 25

194741 Public Lighting - Metered - Mercury 50 - Samoa Reserve - 17 Samoa Court West Lakes METERED ENG ENG 7 2024 $4,544 25

195169 Public Lighting - Metered - Mercury 50 - Samoa Reserve - 17 Samoa Court West Lakes METERED ENG ENG 7 2024 $4,544 25

195170 Public Lighting - Metered - Mercury 50 - Samoa Reserve - 17 Samoa Court West Lakes METERED ENG ENG 7 2024 $4,544 25

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 128: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 128 -

195171 Public Lighting - Metered - Mercury 50 - Samoa Reserve - 17 Samoa Court West Lakes METERED ENG ENG 7 2024 $4,544 25

195657 Public Lighting - Metered - Mercury 50 - Samoa Reserve - 17 Samoa Court West Lakes METERED ENG ENG 7 2024 $4,544 25

195658 Public Lighting - Metered - Mercury 50 - Samoa Reserve - 17 Samoa Court West Lakes METERED ENG ENG 7 2024 $4,544 25

195499 Public Lighting - Metered - Mercury 50 - Samoa Reserve - 17 Samoa Court West Lakes METERED ENG ENG 7 2024 $4,544 25

194657 Public Lighting - Metered - Mercury 50 - Samoa Reserve - Lot 51 Samoa Court West Lakes METERED ENG ENG 7 2024 $4,544 25

194658 Public Lighting - Metered - Mercury 50 - Samoa Reserve - Lot 51 Samoa Court West Lakes METERED ENG ENG 7 2024 $4,544 25

195135 Public Lighting - Metered - Mercury 50 CLER - 67-71 Station Walk Woodville METERED ENG ENG 7 2024 $4,544 25

195136 Public Lighting - Metered - Mercury 50 CLER - 67-71 Woodville Road Woodville METERED ENG ENG 7 2024 $4,544 25

194500 Public Lighting - Metered - Mercury 50 CLER - 72 Kemp Street Woodville METERED ENG ENG 7 2024 $4,544 25

194501 Public Lighting - Metered - Mercury 50 CLER - 72 Kemp Street Woodville METERED ENG ENG 7 2024 $4,544 25

194504 Public Lighting - Metered - Mercury 50 CLER - 72 Norman Street Woodville METERED ENG ENG 7 2024 $4,544 25

195133 Public Lighting - Metered - Mercury 50 CLER - 72 Norman Street Woodville METERED ENG ENG 7 2024 $4,544 25

195134 Public Lighting - Metered - Mercury 50 CLER - 72 Norman Street Woodville METERED ENG ENG 7 2024 $4,544 25

195625 Public Lighting - Metered - Mercury 50 CLER - 72 Norman Street Woodville METERED ENG ENG 7 2024 $4,544 25

195628 Public Lighting - Metered - Mercury 50 CLER - 72-76 Kemp Street Woodville METERED ENG ENG 7 2024 $4,544 25

195629 Public Lighting - Metered - Mercury 50 CLER - 72-76 Kemp Street Woodville METERED ENG ENG 7 2024 $4,544 25

195619 Public Lighting - Metered - Mercury 50 CLER - 72-76 Kemp Street Woodville METERED ENG ENG 7 2024 $4,544 25

195621 Public Lighting - Metered - Mercury 50 CLER - 72-76 Kemp Street Woodville METERED ENG ENG 7 2024 $4,544 25

195138 Public Lighting - Metered - Mercury 50 CLER - 72-76 Kemp Street Woodville METERED ENG ENG 7 2024 $4,544 25

195128 Public Lighting - Metered - Mercury 50 CLER - 72-76 Kemp Street Woodville METERED ENG ENG 7 2024 $4,544 25

195131 Public Lighting - Metered - Mercury 50 CLER - 72-76 Kemp Street Woodville METERED ENG ENG 7 2024 $4,544 25

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 129: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 129 -

194601 Public Lighting - Metered - Mercury 50 CLER - 72-76 Kemp Street Woodville METERED ENG ENG 7 2024 $4,544 25

194602 Public Lighting - Metered - Mercury 50 CLER - 72-76 Kemp Street Woodville METERED ENG ENG 7 2024 $4,544 25

194495 Public Lighting - Metered - Mercury 50 CLER - 72-76 Kemp Street Woodville METERED ENG ENG 7 2024 $4,544 25

194496 Public Lighting - Metered - Mercury 50 CLER - 72-76 Kemp Street Woodville METERED ENG ENG 7 2024 $4,544 25

194497 Public Lighting - Metered - Mercury 50 CLER - 72-76 Kemp Street Woodville METERED ENG ENG 7 2024 $4,544 25

194498 Public Lighting - Metered - Mercury 50 CLER - 72-76 Norman Street Woodville METERED ENG ENG 7 2024 $4,544 25

194499 Public Lighting - Metered - Mercury 50 CLER - 72-76 Norman Street Woodville METERED ENG ENG 7 2024 $4,544 25

194598 Public Lighting - Metered - Mercury 50 CLER - 72-76 Norman Street Woodville METERED ENG ENG 7 2024 $4,544 25

195132 Public Lighting - Metered - Mercury 50 CLER - 72-76 Norman Street Woodville METERED ENG ENG 7 2024 $4,544 25

195129 Public Lighting - Metered - Mercury 50 CLER - 72-76 Norman Street Woodville METERED ENG ENG 7 2024 $4,544 25

195127 Public Lighting - Metered - Mercury 50 CLER - 72-76 Norman Street Woodville METERED ENG ENG 7 2024 $4,544 25

195622 Public Lighting - Metered - Mercury 50 CLER - 72-76 Norman Street Woodville METERED ENG ENG 7 2024 $4,544 25

195624 Public Lighting - Metered - Mercury 50 CLER - 72-76 Norman Street Woodville METERED ENG ENG 7 2024 $4,544 25

194440 Public Lighting - Metered - Mercury 80 - 64 Hubbard Street Beverley METERED ENG ENG 7 2024 $4,544 5

195110 Public Lighting - Metered - Mercury 80 - 66 East Avenue Beverley METERED ENG ENG 7 2024 $4,544 5

194441 Public Lighting - Metered - Mercury 80 - 77-81 Todville Street Woodville West METERED ENG ENG 7 2024 $4,544 25

195114 Public Lighting - Metered - Mercury 80 - 77-81 Todville Street Woodville West METERED ENG ENG 7 2024 $4,544 25

194725 Public Lighting - Metered - Mercury 80 - David Reserve - 222 Findon Road Findon METERED ENG ENG 7 2024 $4,544 25

194805 Public Lighting - Metered - Mercury 80 - David Reserve - Lot 68 Dunn Avenue Findon METERED ENG ENG 7 2024 $4,544 25

197008 Public Lighting - Metered - Mercury 80 - David Reserve - Lot 68 Dunn Avenue Findon METERED ENG ENG 7 2024 $4,544 25

196588 Public Lighting - Metered - Mercury 80 - David Reserve - Lot 68 Dunn Avenue Findon METERED ENG ENG 7 2024 $4,544 25

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 130: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 130 -

196590 Public Lighting - Metered - Mercury 80 - David Reserve - Lot 68 Findon Road Findon METERED ENG ENG 7 2024 $4,544 25

195307 Public Lighting - Metered - Mercury 80 - Fawk Reserve - Outer - 171B Hamilton Road Athol Park METERED ENG ENG 7 2024 $4,544 25

195390 Public Lighting - Metered - Mercury 80 - Fawk Reserve - Outer - 171B Hamilton Road Athol Park METERED ENG ENG 7 2024 $4,544 25

194905 Public Lighting - Metered - Mercury 80 - Fawk Reserve - Outer - 171B Hamilton Road Athol Park METERED ENG ENG 7 2024 $4,544 25

195167 Public Lighting - Metered - Mercury 80 - Jubilee Reserve - Outer - Lot 2 Edwin Street West Lakes Shore METERED ENG ENG 7 2024 $4,544 25

194738 Public Lighting - Metered - Mercury 80 - Jubilee Reserve - Outer - Lot 499 Edwin Street West Lakes Shore METERED ENG ENG 7 2024 $4,544 25

195655 Public Lighting - Metered - Mercury 80 - Jubilee Reserve - Outer - Lot 499 Sansom Road West Lakes Shore METERED ENG ENG 7 2024 $4,544 25

194737 Public Lighting - Metered - Mercury 80 - Jubilee Reserve - Outer - Lot 499 Varram Way West Lakes Shore METERED ENG ENG 7 2024 $4,544 25

195168 Public Lighting - Metered - Mercury 80 - Jubilee Reserve - Outer - Lot 499 Varram Way West Lakes Shore METERED ENG ENG 7 2024 $4,544 25

194655 Public Lighting - Metered - Mercury 80 - Jubilee Reserve - Outer - Lot 94 Varram Way West Lakes Shore METERED ENG ENG 7 2024 $4,544 25

194656 Public Lighting - Metered - Mercury 80 - Jubilee Reserve - Outer - Lot 94 Varram Way West Lakes Shore METERED ENG ENG 7 2024 $4,544 25

194739 Public Lighting - Metered - Sodium 100 - Samoa Reserve - 17 Samoa Court West Lakes METERED ENG ENG 7 2024 $4,544 25

194976 Public Lighting - Metered - Sodium 50 - 2 Crawford Lane Hindmarsh METERED ENG ENG 7 2024 $4,544 5

195468 Public Lighting - Metered - Sodium 50 - 2 Crawford Lane Hindmarsh METERED ENG ENG 7 2024 $4,544 5

194975 Public Lighting - Metered - Sodium 50 - 2 Orsmond Street Hindmarsh METERED ENG ENG 7 2024 $4,544 5

191961 Public Lighting - SLUoS - Low Pressure Sodium 90 - Woodville METERED/ASSUMED ENG ENG 7 2024 $4,544 60

191924 Public Lighting - SLUoS - Mercury 400 - Albert Park METERED/ASSUMED ENG ENG 7 2024 $4,544 60

192123 Public Lighting - SLUoS - Mercury 400 - Cheltenham METERED/ASSUMED ENG ENG 7 2024 $4,544 60

Subtotal $763,392

196864 Public Lighting - CLER - Mercury 80 - 24 Nambour Crescent West Lakes Shore CLER ENG SAPN 8 2025 $4,544 60

196951 Public Lighting - CLER - Mercury 80 - 33 Pelican Place Semaphore Park CLER ENG SAPN 8 2025 $4,544 60

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 131: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 131 -

194836 Public Lighting - CLER - Mercury 80 - 7 Nambucca Avenue West Lakes Shore CLER ENG SAPN 8 2025 $4,544 60

196863 Public Lighting - CLER - Mercury 80 - Mooloola Reserve - 9A Nambour Crescent West Lakes Shore CLER ENG SAPN 8 2025 $4,544 60

194909 Public Lighting - CLER - Mercury 80 - Todd Reserve - Lot 133 Daly Crescent West Lakes Shore CLER ENG SAPN 8 2025 $4,544 25

197116 Public Lighting - Energy Only - Mercury 80 - Kirkcaldy Park - Lot 12 Charlotte Terrace Grange ENERGY ENG ENG 8 2025 $4,544 25

197104 Public Lighting - Energy Only - Mercury 80 - St Clair Recreation Reserve - Lot 70 Woodville Road St Clair ENERGY ENG ENG 8 2025 $4,544 25

195359 Public Lighting - Energy Only - Mercury 80 BS 2000 - Harold and Cynthia Anderson Reserve - Sec 652 Seaview Road West Beach ENERGY ENG ENG 8 2025 $4,544 25

194513 Public Lighting - Metered - Code Required - Code needs to be added to system - Pedlar Reserve - Outer - Cairns Avenue Seaton METERED ENG ENG 8 2025 $4,544 25

194515 Public Lighting - Metered - Code Required - Code needs to be added to system - Pedlar Reserve - Outer - West Lakes Boulevard Seaton METERED ENG ENG 8 2025 $4,544 25

194516 Public Lighting - Metered - Code Required - Code needs to be added to system - Pedlar Reserve - Outer - West Lakes Boulevard Seaton METERED ENG ENG 8 2025 $4,544 25

194474 Public Lighting - Metered - Code Required - Code needs to be added to system - Woodville Oval - Koolunda Avenue Woodville South METERED ENG ENG 8 2025 $4,544 25

194476 Public Lighting - Metered - Code Required - Code needs to be added to system - Woodville Oval - Koolunda Avenue Woodville South METERED ENG ENG 8 2025 $4,544 25

195049 Public Lighting - Metered - Code Required - Code needs to be added to system - Woodville Oval - Koolunda Avenue Woodville South METERED ENG ENG 8 2025 $4,544 25

195052 Public Lighting - Metered - Code Required - Code needs to be added to system - Woodville Oval - Koolunda Avenue Woodville South METERED ENG ENG 8 2025 $4,544 25

195543 Public Lighting - Metered - Code Required - Code needs to be added to system - Woodville Oval - Koolunda Avenue Woodville South METERED ENG ENG 8 2025 $4,544 25

195544 Public Lighting - Metered - Code Required - Code needs to be added to system - Woodville Oval - Koolunda Avenue Woodville South METERED ENG ENG 8 2025 $4,544 25

195545 Public Lighting - Metered - Code Required - Code needs to be added to system - Woodville Oval - Koolunda Avenue Woodville South METERED ENG ENG 8 2025 $4,544 25

197378 Public Lighting - Metered - Code Required - Code needs to be added to system - Woodville Oval - Koolunda Avenue Woodville South METERED ENG ENG 8 2025 $4,544 25

197380 Public Lighting - Metered - Code Required - Code needs to be added to system - Woodville Oval - Koolunda Avenue Woodville South METERED ENG ENG 8 2025 $4,544 25

197381 Public Lighting - Metered - Code Required - Code needs to be added to system - Woodville Oval - Oval Avenue Woodville South METERED ENG ENG 8 2025 $4,544 25

197382 Public Lighting - Metered - Code Required - Code needs to be added to system - Woodville Oval - Oval Avenue Woodville South METERED ENG ENG 8 2025 $4,544 25

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 132: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 132 -

197383 Public Lighting - Metered - Code Required - Code needs to be added to system - Woodville Oval - Oval Avenue Woodville South METERED ENG ENG 8 2025 $4,544 25

197386 Public Lighting - Metered - Code Required - Code needs to be added to system - Woodville Oval - Oval Avenue Woodville South METERED ENG ENG 8 2025 $4,544 25

197388 Public Lighting - Metered - Code Required - Code needs to be added to system - Woodville Oval - Oval Avenue Woodville South METERED ENG ENG 8 2025 $4,544 25

196594 Public Lighting - Metered - Code Required - Code needs to be added to system - Woodville Oval - Oval Avenue Woodville South METERED ENG ENG 8 2025 $4,544 25

196595 Public Lighting - Metered - Code Required - Code needs to be added to system - Woodville Oval - Oval Avenue Woodville South METERED ENG ENG 8 2025 $4,544 25

196622 Public Lighting - Metered - Code Required - Code needs to be added to system - Woodville Oval - Oval Avenue Woodville South METERED ENG ENG 8 2025 $4,544 25

196624 Public Lighting - Metered - Code Required - Code needs to be added to system - Woodville Oval - Oval Avenue Woodville South METERED ENG ENG 8 2025 $4,544 25

196625 Public Lighting - Metered - Code Required - Code needs to be added to system - Woodville Oval - Oval Avenue Woodville South METERED ENG ENG 8 2025 $4,544 25

196626 Public Lighting - Metered - Code Required - Code needs to be added to system - Woodville Oval - Oval Avenue Woodville South METERED ENG ENG 8 2025 $4,544 25

195053 Public Lighting - Metered - Code Required - Code needs to be added to system - Woodville Oval - Oval Avenue Woodville South METERED ENG ENG 8 2025 $4,544 25

194473 Public Lighting - Metered - Code Required - Code needs to be added to system - Woodville Oval - Oval Avenue Woodville South METERED ENG ENG 8 2025 $4,544 25

197389 Public Lighting - Metered - Mercury 250 - Woodville Oval - Oval Avenue Woodville South METERED ENG ENG 8 2025 $4,544 25

197271 Public Lighting - Metered - Mercury 50 - Barbados Court West Lakes METERED ENG ENG 8 2025 $4,544 5

195630 Public Lighting - Metered - Sodium 50 - Emu Park - 65 Gibson Street Bowden METERED ENG ENG 8 2025 $4,544 25

195632 Public Lighting - Metered - Sodium 50 - Emu Park - 65 Gibson Street Bowden METERED ENG ENG 8 2025 $4,544 25

195139 Public Lighting - Metered - Sodium 50 - Emu Park - 65 Gibson Street Bowden METERED ENG ENG 8 2025 $4,544 25

195140 Public Lighting - Metered - Sodium 50 - Emu Park - 65 Seventh Street Bowden METERED ENG ENG 8 2025 $4,544 25

194508 Public Lighting - Metered - Sodium 50 - Emu Park - 65 Seventh Street Bowden METERED ENG ENG 8 2025 $4,544 25

192151 Public Lighting - SLUoS - Low Pressure Sodium 90 - 975 Port Road Cheltenham METERED/ASSUMED ENG ENG 8 2025 $4,544 60

192152 Public Lighting - SLUoS - Low Pressure Sodium 90 - 979 Port Road Cheltenham METERED/ASSUMED ENG ENG 8 2025 $4,544 60

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 133: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 133 -

191940 Public Lighting - SLUoS - Low Pressure Sodium 90 - Albert Park METERED/ASSUMED ENG ENG 8 2025 $4,544 60

192149 Public Lighting - SLUoS - Mercury 250 - 973 Port Road Cheltenham METERED/ASSUMED ENG ENG 8 2025 $4,544 60

192150 Public Lighting - SLUoS - Mercury 250 - Cheltenham METERED/ASSUMED ENG ENG 8 2025 $4,544 60

192147 Public Lighting - SLUoS - Mercury 400 - Albert Park METERED/ASSUMED ENG ENG 8 2025 $4,544 60

Subtotal $209,024

194210 Public Lighting - CLER - Sodium 150 - West Lakes CLER DPTI SAPN 9 2026 $0 25

194213 Public Lighting - CLER - Sodium 150 - West Lakes CLER DPTI SAPN 9 2026 $0 25

194215 Public Lighting - CLER - Sodium 150 - West Lakes CLER DPTI SAPN 9 2026 $0 25

194218 Public Lighting - CLER - Sodium 150 - West Lakes CLER ENG SAPN 9 2026 $4,544 25

194167 Public Lighting - CLER - Sodium 250 - West Lakes CLER DPTI SAPN 9 2026 $0 25

194169 Public Lighting - CLER - Sodium 250 - West Lakes CLER DPTI SAPN 9 2026 $0 25

194171 Public Lighting - CLER - Sodium 250 - West Lakes CLER DPTI SAPN 9 2026 $0 25

194173 Public Lighting - CLER - Sodium 250 - West Lakes CLER DPTI SAPN 9 2026 $0 25

194175 Public Lighting - CLER - Sodium 250 - West Lakes CLER DPTI SAPN 9 2026 $0 25

194177 Public Lighting - CLER - Sodium 250 - West Lakes CLER DPTI SAPN 9 2026 $0 25

194179 Public Lighting - CLER - Sodium 250 - West Lakes CLER DPTI SAPN 9 2026 $0 25

194181 Public Lighting - CLER - Sodium 250 - West Lakes CLER DPTI SAPN 9 2026 $0 25

194183 Public Lighting - CLER - Sodium 250 - West Lakes CLER DPTI SAPN 9 2026 $0 25

194187 Public Lighting - CLER - Sodium 250 - West Lakes CLER DPTI SAPN 9 2026 $0 25

194189 Public Lighting - CLER - Sodium 250 - West Lakes CLER DPTI SAPN 9 2026 $0 25

194191 Public Lighting - CLER - Sodium 250 - West Lakes CLER DPTI SAPN 9 2026 $0 25

194193 Public Lighting - CLER - Sodium 250 - West Lakes CLER DPTI SAPN 9 2026 $0 25

194195 Public Lighting - CLER - Sodium 250 - West Lakes CLER DPTI SAPN 9 2026 $0 25

197202 Public Lighting - CLER - Sodium 50 - 5 Milner Street Hindmarsh CLER ENG SAPN 9 2026 $4,544 60

195391 Public Lighting - Energy Only - Mercury 80 BS 2000 - Harold and Cynthia Anderson Reserve - Sec 652 Seaview Road West Beach ENERGY ENG ENG 9 2026 $4,544 25

195174 Public Lighting - Metered - Code Required - Code needs to be added to system - Krista Reserve - 7 Brigitte Court Kidman Park METERED ENG ENG 9 2026 $4,544 25

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 134: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 134 -

195661 Public Lighting - Metered - Code Required - Code needs to be added to system - Krista Reserve - 7 Roder Avenue Kidman Park METERED ENG ENG 9 2026 $4,544 25

195662 Public Lighting - Metered - Code Required - Code needs to be added to system - Krista Reserve - Lot 68 Francis Street Kidman Park METERED ENG ENG 9 2026 $4,544 25

194659 Public Lighting - Metered - Code Required - Code needs to be added to system - Krista Reserve - Lot 68 Francis Street Kidman Park METERED ENG ENG 9 2026 $4,544 25

195175 Public Lighting - Metered - Code Required - Code needs to be added to system - Krista Reserve - Lot 68 Roder Avenue Kidman Park METERED ENG ENG 9 2026 $4,544 25

195047 Public Lighting - Metered - Mercury 80 - Sid Knight Reserve - Lot 260 Chambers Street Henley Beach METERED ENG ENG 9 2026 $4,544 25

195293 Public Lighting - SLUoS - Low Pressure Sodium 18 - 1 Hero Way West Lakes SLUOS SAPN SAPN 9 2026 $0 60

196987 Public Lighting - SLUoS - Low Pressure Sodium 18 - 1 Hero Way West Lakes SLUOS SAPN SAPN 9 2026 $0 60

200033 Public Lighting - SLUoS - Low Pressure Sodium 18 - 3 Lister Crescent Woodville South SLUOS SAPN SAPN 9 2026 $0 60

207048 Public Lighting - SLUoS - Low Pressure Sodium 18 - 487 Esplanade Grange SLUOS SAPN SAPN 9 2026 $0 60

199643 Public Lighting - SLUoS - Low Pressure Sodium 18 - 535 Terminus Street Grange SLUOS SAPN SAPN 9 2026 $0 60

196993 Public Lighting - SLUoS - Low Pressure Sodium 18 - Hero Reserve - Lot 77 Lord Hobart Way West Lakes SLUOS SAPN SAPN 9 2026 $0 60

194780 Public Lighting - SLUoS - Low Pressure Sodium 18 - Rapid Reserve - Lot 83 Hero Way West Lakes SLUOS SAPN SAPN 9 2026 $0 60

199759 Public Lighting - SLUoS - Low Pressure Sodium 26 - 109 Alfred Avenue Beverley SLUOS SAPN SAPN 9 2026 $0 60

197812 Public Lighting - SLUoS - Low Pressure Sodium 26 - 20-22 Caskey Street Woodville North SLUOS SAPN SAPN 9 2026 $0 60

197730 Public Lighting - SLUoS - Low Pressure Sodium 26 - 28 Elizabeth Street Woodville West SLUOS SAPN SAPN 9 2026 $0 60

197615 Public Lighting - SLUoS - Low Pressure Sodium 26 - 36 Paget Street Ridleyton SLUOS SAPN SAPN 9 2026 $0 60

199527 Public Lighting - SLUoS - Low Pressure Sodium 26 - 59A-59B Green Street Brompton SLUOS SAPN SAPN 9 2026 $0 60

206345 Public Lighting - SLUoS - Low Pressure Sodium 26 - 6 Lucas Street Woodville South SLUOS SAPN SAPN 9 2026 $0 60

206122 Public Lighting - SLUoS - Low Pressure Sodium 26 - 6-10 First Street Brompton SLUOS SAPN SAPN 9 2026 $0 60

206547 Public Lighting - SLUoS - Low Pressure Sodium 55 - 102-110 Glenroy Street Pennington SLUOS SAPN SAPN 9 2026 $0 60

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 135: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 135 -

206327 Public Lighting - SLUoS - Low Pressure Sodium 55 - 11 Brocas Avenue St Clair SLUOS SAPN SAPN 9 2026 $0 60

199719 Public Lighting - SLUoS - Low Pressure Sodium 55 - 13 South Street Henley Beach SLUOS SAPN SAPN 9 2026 $0 60

199960 Public Lighting - SLUoS - Low Pressure Sodium 55 - 85-89 Park Avenue Athol Park SLUOS SAPN SAPN 9 2026 $0 60

200994 Public Lighting - SLUoS - Low Pressure Sodium 90 - 11-15 Cheltenham Parade Cheltenham SLUOS SAPN SAPN 9 2026 $0 60

205441 Public Lighting - SLUoS - Low Pressure Sodium 90 - 14/447-465 Valetta Road Fulham Gardens SLUOS SAPN SAPN 9 2026 $0 60

197292 Public Lighting - SLUoS - Low Pressure Sodium 90 - 170-184 Sportsmans Drive West Lakes SLUOS SAPN SAPN 9 2026 $0 60

197498 Public Lighting - SLUoS - Low Pressure Sodium 90 - 20 Coombe Road Allenby Gardens SLUOS SAPN SAPN 9 2026 $0 60

208816 Public Lighting - SLUoS - Low Pressure Sodium 90 - 23 Valetta Road Kidman Park SLUOS SAPN SAPN 9 2026 $0 60

206014 Public Lighting - SLUoS - Low Pressure Sodium 90 - 24A Leane Avenue Allenby Gardens SLUOS SAPN SAPN 9 2026 $0 60

205087 Public Lighting - SLUoS - Low Pressure Sodium 90 - 27 Coombe Road Allenby Gardens SLUOS SAPN SAPN 9 2026 $0 60

195459 Public Lighting - SLUoS - Low Pressure Sodium 90 - 31-49 Sportsmans Drive West Lakes SLUOS SAPN SAPN 9 2026 $0 60

199573 Public Lighting - SLUoS - Low Pressure Sodium 90 - 31A Park Terrace Ovingham SLUOS SAPN SAPN 9 2026 $0 60

199878 Public Lighting - SLUoS - Low Pressure Sodium 90 - 36 MacLagan Avenue Allenby Gardens SLUOS SAPN SAPN 9 2026 $0 60

205091 Public Lighting - SLUoS - Low Pressure Sodium 90 - 37 MacLagan Avenue Allenby Gardens SLUOS SAPN SAPN 9 2026 $0 60

208810 Public Lighting - SLUoS - Low Pressure Sodium 90 - 4 Rosemont Street Kidman Park SLUOS SAPN SAPN 9 2026 $0 60

199703 Public Lighting - SLUoS - Low Pressure Sodium 90 - 402 Valetta Road Kidman Park SLUOS SAPN SAPN 9 2026 $0 60

208814 Public Lighting - SLUoS - Low Pressure Sodium 90 - 406-412 Valetta Road Kidman Park SLUOS SAPN SAPN 9 2026 $0 60

206033 Public Lighting - SLUoS - Low Pressure Sodium 90 - 508-514 Brand Avenue Welland SLUOS SAPN SAPN 9 2026 $0 60

197517 Public Lighting - SLUoS - Low Pressure Sodium 90 - 64-70 Ninth Avenue Woodville North SLUOS SAPN SAPN 9 2026 $0 60

205284 Public Lighting - SLUoS - Low Pressure Sodium 90 - 7 Valetta Road Kidman Park SLUOS SAPN SAPN 9 2026 $0 60

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 136: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 136 -

205277 Public Lighting - SLUoS - Low Pressure Sodium 90 - 8 Valetta Road Kidman Park SLUOS SAPN SAPN 9 2026 $0 60

201220 Public Lighting - SLUoS - Low Pressure Sodium 90 - Cooke Reserve - Lot 147 Frederick Road Royal Park SLUOS SAPN SAPN 9 2026 $0 60

201211 Public Lighting - SLUoS - Low Pressure Sodium 90 - Cooke Reserve - Lot 147 Frederick Road Royal Park SLUOS SAPN SAPN 9 2026 $0 60

201311 Public Lighting - SLUoS - Low Pressure Sodium 90 - Grange Road Henley Beach SLUOS SAPN SAPN 9 2026 $0 60

201326 Public Lighting - SLUoS - Low Pressure Sodium 90 - Grange Road Seaton SLUOS SAPN SAPN 9 2026 $0 60

205465 Public Lighting - SLUoS - Low Pressure Sodium 90 - Lot 101 Brebner Drive Seaton SLUOS SAPN SAPN 9 2026 $0 60

205881 Public Lighting - SLUoS - Low Pressure Sodium 90 - Lot 110 Bartley Terrace West Lakes Shore SLUOS SAPN SAPN 9 2026 $0 60

200199 Public Lighting - SLUoS - Low Pressure Sodium 90 - Lot 14 Bartley Terrace West Lakes Shore SLUOS SAPN SAPN 9 2026 $0 60

197764 Public Lighting - SLUoS - Low Pressure Sodium 90 - Lot 175 Bartley Terrace Semaphore Park SLUOS SAPN SAPN 9 2026 $0 60

205614 Public Lighting - SLUoS - Low Pressure Sodium 90 - Lot 175 Bartley Terrace West Lakes Shore SLUOS SAPN SAPN 9 2026 $0 60

197190 Public Lighting - SLUoS - Low Pressure Sodium 90 - Lot 67 Sportsmans Drive West Lakes SLUOS SAPN SAPN 9 2026 $0 60

205290 Public Lighting - SLUoS - Low Pressure Sodium 90 - Sec 882 Valetta Road Kidman Park SLUOS SAPN SAPN 9 2026 $0 60

202360 Public Lighting - SLUoS - Mercury 250 - 111 Brocas Avenue St Clair SLUOS SAPN SAPN 9 2026 $0 60

202362 Public Lighting - SLUoS - Mercury 250 - 19 Kingborn Avenue Seaton SLUOS SAPN SAPN 9 2026 $0 60

200221 Public Lighting - SLUoS - Mercury 250 - 333 Findon Road Flinders Park SLUOS SAPN SAPN 9 2026 $0 60

207348 Public Lighting - SLUoS - Mercury 250 - 414-450 Findon Road Kidman Park SLUOS SAPN SAPN 9 2026 $0 60

202478 Public Lighting - SLUoS - Mercury 250 - 5-6 Frederick Road Seaton SLUOS SAPN SAPN 9 2026 $0 60

202513 Public Lighting - SLUoS - Mercury 250 - 61 Wattle Avenue Royal Park SLUOS SAPN SAPN 9 2026 $0 60

203987 Public Lighting - SLUoS - Mercury 250 - Lochside Reserve - Lot 67 Lochside Drive West Lakes SLUOS SAPN SAPN 9 2026 $0 60

201545 Public Lighting - SLUoS - Mercury 50 - SLUOS SAPN SAPN 9 2026 $0 60

195222 Public Lighting - SLUoS - Mercury 50 - 1 Hawaii Court West Lakes SLUOS SAPN SAPN 9 2026 $0 60

194684 Public Lighting - SLUoS - Mercury 50 - 1 Settlers Drive West Lakes SLUOS SAPN SAPN 9 2026 $0 60

194959 Public Lighting - SLUoS - Mercury 50 - 11 Fiji Place West Lakes SLUOS SAPN SAPN 9 2026 $0 60

201165 Public Lighting - SLUoS - Mercury 50 - 11 Siesta Court West Lakes SLUOS SAPN SAPN 9 2026 $0 60

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 137: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 137 -

197037 Public Lighting - SLUoS - Mercury 50 - 12 Mariners Crescent West Lakes SLUOS SAPN SAPN 9 2026 $0 60

197152 Public Lighting - SLUoS - Mercury 50 - 13 Eagle Court Semaphore Park SLUOS SAPN SAPN 9 2026 $0 60

202482 Public Lighting - SLUoS - Mercury 50 - 16 Circuit Drive Hendon SLUOS SAPN SAPN 9 2026 $0 60

194683 Public Lighting - SLUoS - Mercury 50 - 18 Mariners Crescent West Lakes SLUOS SAPN SAPN 9 2026 $0 60

196914 Public Lighting - SLUoS - Mercury 50 - 20 Dame Pattie Circuit West Lakes SLUOS SAPN SAPN 9 2026 $0 60

196688 Public Lighting - SLUoS - Mercury 50 - 20 The Annie Watt Circuit West Lakes Shore SLUOS SAPN SAPN 9 2026 $0 60

195706 Public Lighting - SLUoS - Mercury 50 - 21 Capri Close West Lakes SLUOS SAPN SAPN 9 2026 $0 60

196721 Public Lighting - SLUoS - Mercury 50 - 22 Dyer Court West Lakes SLUOS SAPN SAPN 9 2026 $0 60

197173 Public Lighting - SLUoS - Mercury 50 - 27 Eagle Court Semaphore Park SLUOS SAPN SAPN 9 2026 $0 60

196007 Public Lighting - SLUoS - Mercury 50 - 29 Antigua Grove West Lakes SLUOS SAPN SAPN 9 2026 $0 60

196390 Public Lighting - SLUoS - Mercury 50 - 37 Antigua Grove West Lakes SLUOS SAPN SAPN 9 2026 $0 60

202093 Public Lighting - SLUoS - Mercury 50 - 4 Circuit Drive Hendon SLUOS SAPN SAPN 9 2026 $0 60

194622 Public Lighting - SLUoS - Mercury 50 - 4 Libby Court Tennyson SLUOS SAPN SAPN 9 2026 $0 60

195036 Public Lighting - SLUoS - Mercury 50 - 42 McDonald Grove West Lakes SLUOS SAPN SAPN 9 2026 $0 60

202095 Public Lighting - SLUoS - Mercury 50 - 5 Butler Drive Hendon SLUOS SAPN SAPN 9 2026 $0 60

195727 Public Lighting - SLUoS - Mercury 50 - 5 Corfu Court West Lakes SLUOS SAPN SAPN 9 2026 $0 60

195244 Public Lighting - SLUoS - Mercury 50 - 5 Nareeda Way West Lakes SLUOS SAPN SAPN 9 2026 $0 60

202087 Public Lighting - SLUoS - Mercury 50 - 6 Butler Drive Hendon SLUOS SAPN SAPN 9 2026 $0 60

196472 Public Lighting - SLUoS - Mercury 50 - 6 Maui Court West Lakes SLUOS SAPN SAPN 9 2026 $0 60

201172 Public Lighting - SLUoS - Mercury 50 - 7 Siesta Court West Lakes SLUOS SAPN SAPN 9 2026 $0 60

202490 Public Lighting - SLUoS - Mercury 50 - 8 Circuit Drive Hendon SLUOS SAPN SAPN 9 2026 $0 60

194640 Public Lighting - SLUoS - Mercury 50 - 9 Martinique Court West Lakes SLUOS SAPN SAPN 9 2026 $0 60

201214 Public Lighting - SLUoS - Mercury 50 - 9 Siesta Court West Lakes SLUOS SAPN SAPN 9 2026 $0 60

195014 Public Lighting - SLUoS - Mercury 50 - Dyer Reserve - Lot 77 Waller Court West Lakes SLUOS SAPN SAPN 9 2026 $0 60

195233 Public Lighting - SLUoS - Mercury 50 - Lot 230 Maui Court West Lakes SLUOS SAPN SAPN 9 2026 $0 60

195910 Public Lighting - SLUoS - Mercury 50 - Mariners Reserve - 14 Settlers Drive West Lakes SLUOS SAPN SAPN 9 2026 $0 60

196976 Public Lighting - SLUoS - Mercury 50 - Mariners Reserve - 18 Settlers Drive West Lakes SLUOS SAPN SAPN 9 2026 $0 60

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 138: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 138 -

196832 Public Lighting - SLUoS - Mercury 50 - Martin Court Reserve - 1 Martin Court West Lakes SLUOS SAPN SAPN 9 2026 $0 60

196928 Public Lighting - SLUoS - Mercury 50 - Martin Court Reserve - 81 Martin Court West Lakes SLUOS SAPN SAPN 9 2026 $0 60

194426 Public Lighting - SLUoS - Mercury 50 - Settlers Reserve - Lot 34 Gretel Grove West Lakes SLUOS SAPN SAPN 9 2026 $0 60

196837 Public Lighting - SLUoS - Mercury 50 - Trust Reserve - Outer - 15 Eagle Court Semaphore Park SLUOS SAPN SAPN 9 2026 $0 60

197163 Public Lighting - SLUoS - Mercury 50 - Trust Reserve - Outer - 18 Eagle Court Semaphore Park SLUOS SAPN SAPN 9 2026 $0 60

206249 Public Lighting - SLUoS - Mercury 80 - 1 Griffin Lane Brompton SLUOS SAPN SAPN 9 2026 $0 60

200791 Public Lighting - SLUoS - Mercury 80 - 108 Kiln Drive Brompton SLUOS SAPN SAPN 9 2026 $0 60

201219 Public Lighting - SLUoS - Mercury 80 - 17 Sylvan Way Grange SLUOS SAPN SAPN 9 2026 $0 60

194774 Public Lighting - SLUoS - Mercury 80 - 2 Anthea Court West Lakes SLUOS SAPN SAPN 9 2026 $0 60

204584 Public Lighting - SLUoS - Mercury 80 - 26 Bentley Avenue Fulham Gardens SLUOS SAPN SAPN 9 2026 $0 60

200717 Public Lighting - SLUoS - Mercury 80 - 2A Primrose Court Grange SLUOS SAPN SAPN 9 2026 $0 60

201171 Public Lighting - SLUoS - Mercury 80 - 5 Sylvan Way Grange SLUOS SAPN SAPN 9 2026 $0 60

196982 Public Lighting - SLUoS - Mercury 80 - Lot 20 Anthea Court West Lakes SLUOS SAPN SAPN 9 2026 $0 60

195286 Public Lighting - SLUoS - Mercury 80 - Lot 21 Anthea Court West Lakes SLUOS SAPN SAPN 9 2026 $0 60

195285 Public Lighting - SLUoS - Mercury 80 - Lot 26 Anthea Court West Lakes SLUOS SAPN SAPN 9 2026 $0 60

200816 Public Lighting - SLUoS - Mercury 80 - Lot160 Thornes Lane Brompton SLUOS SAPN SAPN 9 2026 $0 60

200419 Public Lighting - SLUoS - Mercury 80 - Lot211 Spurs Avenue Brompton SLUOS SAPN SAPN 9 2026 $0 60

198997 Public Lighting - SLUoS - Mercury 80 - Sec 1004 Esplanade Henley Beach SLUOS SAPN SAPN 9 2026 $0 60

204396 Public Lighting - SLUoS - Mercury 80 - Sec 1649 Esplanade Henley Beach SLUOS SAPN SAPN 9 2026 $0 60

208089 Public Lighting - SLUoS - Mercury 80 - Sec 1649 Esplanade Henley Beach SLUOS SAPN SAPN 9 2026 $0 60

199372 Public Lighting - SLUoS - Mercury 80 - Sec 1650 Esplanade Henley Beach SLUOS SAPN SAPN 9 2026 $0 60

202909 Public Lighting - SLUoS - Mercury 80 BS 2000 - 1 Bach Crescent Seaton SLUOS SAPN SAPN 9 2026 $0 60

208541 Public Lighting - SLUoS - Mercury 80 BS 2000 - 1 First Avenue Semaphore Park SLUOS SAPN SAPN 9 2026 $0 60

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 139: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 139 -

208769 Public Lighting - SLUoS - Mercury 80 BS 2000 - 1 Meakin Terrace Seaton SLUOS SAPN SAPN 9 2026 $0 60

204363 Public Lighting - SLUoS - Mercury 80 BS 2000 - 1 Military Road Henley Beach SLUOS SAPN SAPN 9 2026 $0 60

199932 Public Lighting - SLUoS - Mercury 80 BS 2000 - 1 Regent Street Pennington SLUOS SAPN SAPN 9 2026 $0 60

208303 Public Lighting - SLUoS - Mercury 80 BS 2000 - 1/15 Cudmore Terrace Henley Beach SLUOS SAPN SAPN 9 2026 $0 60

199200 Public Lighting - SLUoS - Mercury 80 BS 2000 - 1/46 Military Road West Beach SLUOS SAPN SAPN 9 2026 $0 60

208449 Public Lighting - SLUoS - Mercury 80 BS 2000 - 1/54 Recreation Parade Semaphore Park SLUOS SAPN SAPN 9 2026 $0 60

198631 Public Lighting - SLUoS - Mercury 80 BS 2000 - 1/89 Botting Street Albert Park SLUOS SAPN SAPN 9 2026 $0 60

205140 Public Lighting - SLUoS - Mercury 80 BS 2000 - 10 Helen Street Pennington SLUOS SAPN SAPN 9 2026 $0 60

202644 Public Lighting - SLUoS - Mercury 80 BS 2000 - 10 Pennington Terrace Pennington SLUOS SAPN SAPN 9 2026 $0 60

199134 Public Lighting - SLUoS - Mercury 80 BS 2000 - 105 Chambers Street Henley Beach SLUOS SAPN SAPN 9 2026 $0 60

208297 Public Lighting - SLUoS - Mercury 80 BS 2000 - 114 Condon Street Pennington SLUOS SAPN SAPN 9 2026 $0 60

208225 Public Lighting - SLUoS - Mercury 80 BS 2000 - 12 Carlyle Avenue West Croydon SLUOS SAPN SAPN 9 2026 $0 60

207618 Public Lighting - SLUoS - Mercury 80 BS 2000 - 12 Day Terrace Croydon SLUOS SAPN SAPN 9 2026 $0 60

203204 Public Lighting - SLUoS - Mercury 80 BS 2000 - 12 Fortisgreen Avenue Pennington SLUOS SAPN SAPN 9 2026 $0 60

205037 Public Lighting - SLUoS - Mercury 80 BS 2000 - 12 George Street Pennington SLUOS SAPN SAPN 9 2026 $0 60

207708 Public Lighting - SLUoS - Mercury 80 BS 2000 - 12 Morton Street Kidman Park SLUOS SAPN SAPN 9 2026 $0 60

202891 Public Lighting - SLUoS - Mercury 80 BS 2000 - 126 Pham Close Pennington SLUOS SAPN SAPN 9 2026 $0 60

199441 Public Lighting - SLUoS - Mercury 80 BS 2000 - 13 Hazel Grove Semaphore Park SLUOS SAPN SAPN 9 2026 $0 60

202716 Public Lighting - SLUoS - Mercury 80 BS 2000 - 13 Seaton Terrace Seaton SLUOS SAPN SAPN 9 2026 $0 60

199320 Public Lighting - SLUoS - Mercury 80 BS 2000 - 139 William Street Beverley SLUOS SAPN SAPN 9 2026 $0 60

204473 Public Lighting - SLUoS - Mercury 80 BS 2000 - 14 Kellett Street Semaphore Park SLUOS SAPN SAPN 9 2026 $0 60

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 140: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 140 -

208283 Public Lighting - SLUoS - Mercury 80 BS 2000 - 14 Parukala Street Flinders Park SLUOS SAPN SAPN 9 2026 $0 60

203200 Public Lighting - SLUoS - Mercury 80 BS 2000 - 14 Ward Street Pennington SLUOS SAPN SAPN 9 2026 $0 60

198315 Public Lighting - SLUoS - Mercury 80 BS 2000 - 15 Adare Court Grange SLUOS SAPN SAPN 9 2026 $0 60

200386 Public Lighting - SLUoS - Mercury 80 BS 2000 - 15 Banks Avenue Flinders Park SLUOS SAPN SAPN 9 2026 $0 60

203669 Public Lighting - SLUoS - Mercury 80 BS 2000 - 15 East Street Brompton SLUOS SAPN SAPN 9 2026 $0 60

199481 Public Lighting - SLUoS - Mercury 80 BS 2000 - 15 Victoria Street Semaphore Park SLUOS SAPN SAPN 9 2026 $0 60

204067 Public Lighting - SLUoS - Mercury 80 BS 2000 - 16 Clayton Drive Grange SLUOS SAPN SAPN 9 2026 $0 60

199176 Public Lighting - SLUoS - Mercury 80 BS 2000 - 16 Debney Street Fulham Gardens SLUOS SAPN SAPN 9 2026 $0 60

202640 Public Lighting - SLUoS - Mercury 80 BS 2000 - 16 Pennington Terrace Pennington SLUOS SAPN SAPN 9 2026 $0 60

198494 Public Lighting - SLUoS - Mercury 80 BS 2000 - 16 Shandon Avenue Seaton SLUOS SAPN SAPN 9 2026 $0 60

197954 Public Lighting - SLUoS - Mercury 80 BS 2000 - 162 East Terrace Henley Beach SLUOS SAPN SAPN 9 2026 $0 60

204491 Public Lighting - SLUoS - Mercury 80 BS 2000 - 16A Beatty Street Flinders Park SLUOS SAPN SAPN 9 2026 $0 60

203546 Public Lighting - SLUoS - Mercury 80 BS 2000 - 17 Clarence Street West Croydon SLUOS SAPN SAPN 9 2026 $0 60

204585 Public Lighting - SLUoS - Mercury 80 BS 2000 - 17 Debney Street Fulham Gardens SLUOS SAPN SAPN 9 2026 $0 60

208323 Public Lighting - SLUoS - Mercury 80 BS 2000 - 17 Pennington Terrace Pennington SLUOS SAPN SAPN 9 2026 $0 60

202643 Public Lighting - SLUoS - Mercury 80 BS 2000 - 17 Regent Street Pennington SLUOS SAPN SAPN 9 2026 $0 60

204816 Public Lighting - SLUoS - Mercury 80 BS 2000 - 18 Irene Avenue Fulham Gardens SLUOS SAPN SAPN 9 2026 $0 60

205432 Public Lighting - SLUoS - Mercury 80 BS 2000 - 180 Cudmore Terrace Henley Beach SLUOS SAPN SAPN 9 2026 $0 60

204638 Public Lighting - SLUoS - Mercury 80 BS 2000 - 1A Findon Avenue Seaton SLUOS SAPN SAPN 9 2026 $0 60

199268 Public Lighting - SLUoS - Mercury 80 BS 2000 - 1A Fortisgreen Avenue Pennington SLUOS SAPN SAPN 9 2026 $0 60

198939 Public Lighting - SLUoS - Mercury 80 BS 2000 - 1A Robe Street Kidman Park SLUOS SAPN SAPN 9 2026 $0 60

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 141: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 141 -

198704 Public Lighting - SLUoS - Mercury 80 BS 2000 - 2 Jan Street Fulham Gardens SLUOS SAPN SAPN 9 2026 $0 60

207702 Public Lighting - SLUoS - Mercury 80 BS 2000 - 2 Jordan Avenue Fulham Gardens SLUOS SAPN SAPN 9 2026 $0 60

203646 Public Lighting - SLUoS - Mercury 80 BS 2000 - 2 Kerrison Street Henley Beach SLUOS SAPN SAPN 9 2026 $0 60

208492 Public Lighting - SLUoS - Mercury 80 BS 2000 - 2 Military Road Henley Beach SLUOS SAPN SAPN 9 2026 $0 60

204504 Public Lighting - SLUoS - Mercury 80 BS 2000 - 2 Pennington Terrace Pennington SLUOS SAPN SAPN 9 2026 $0 60

208894 Public Lighting - SLUoS - Mercury 80 BS 2000 - 2 Young Street Findon SLUOS SAPN SAPN 9 2026 $0 60

199662 Public Lighting - SLUoS - Mercury 80 BS 2000 - 2 Zephyr Grove Semaphore Park SLUOS SAPN SAPN 9 2026 $0 60

203512 Public Lighting - SLUoS - Mercury 80 BS 2000 - 2/28 George Street Pennington SLUOS SAPN SAPN 9 2026 $0 60

204514 Public Lighting - SLUoS - Mercury 80 BS 2000 - 2/79 Botting Street Albert Park SLUOS SAPN SAPN 9 2026 $0 60

203203 Public Lighting - SLUoS - Mercury 80 BS 2000 - 20 Fortisgreen Avenue Pennington SLUOS SAPN SAPN 9 2026 $0 60

208912 Public Lighting - SLUoS - Mercury 80 BS 2000 - 20 George Street Pennington SLUOS SAPN SAPN 9 2026 $0 60

203511 Public Lighting - SLUoS - Mercury 80 BS 2000 - 20 Harrison Road Pennington SLUOS SAPN SAPN 9 2026 $0 60

202854 Public Lighting - SLUoS - Mercury 80 BS 2000 - 20 Helen Street Pennington SLUOS SAPN SAPN 9 2026 $0 60

207727 Public Lighting - SLUoS - Mercury 80 BS 2000 - 20 Kingborn Avenue Seaton SLUOS SAPN SAPN 9 2026 $0 60

202642 Public Lighting - SLUoS - Mercury 80 BS 2000 - 20 Regent Street Pennington SLUOS SAPN SAPN 9 2026 $0 60

200348 Public Lighting - SLUoS - Mercury 80 BS 2000 - 214 Durham Street Henley Beach SLUOS SAPN SAPN 9 2026 $0 60

204388 Public Lighting - SLUoS - Mercury 80 BS 2000 - 214-214A Military Road Henley Beach SLUOS SAPN SAPN 9 2026 $0 60

204486 Public Lighting - SLUoS - Mercury 80 BS 2000 - 22 Beach Street Grange SLUOS SAPN SAPN 9 2026 $0 60

207766 Public Lighting - SLUoS - Mercury 80 BS 2000 - 22 Hurstfield Terrace Findon SLUOS SAPN SAPN 9 2026 $0 60

208057 Public Lighting - SLUoS - Mercury 80 BS 2000 - 22 Mitton Avenue Henley Beach SLUOS SAPN SAPN 9 2026 $0 60

203043 Public Lighting - SLUoS - Mercury 80 BS 2000 - 23 Crafter Street Grange SLUOS SAPN SAPN 9 2026 $0 60

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 142: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 142 -

199393 Public Lighting - SLUoS - Mercury 80 BS 2000 - 24 George Street Pennington SLUOS SAPN SAPN 9 2026 $0 60

208276 Public Lighting - SLUoS - Mercury 80 BS 2000 - 24 Reynell Street West Croydon SLUOS SAPN SAPN 9 2026 $0 60

204043 Public Lighting - SLUoS - Mercury 80 BS 2000 - 2-4 Toogood Avenue Beverley SLUOS SAPN SAPN 9 2026 $0 60

203847 Public Lighting - SLUoS - Mercury 80 BS 2000 - 259 Hammond Road Findon SLUOS SAPN SAPN 9 2026 $0 60

204532 Public Lighting - SLUoS - Mercury 80 BS 2000 - 25A First Avenue Cheltenham SLUOS SAPN SAPN 9 2026 $0 60

199762 Public Lighting - SLUoS - Mercury 80 BS 2000 - 26 Alfred Street Pennington SLUOS SAPN SAPN 9 2026 $0 60

198052 Public Lighting - SLUoS - Mercury 80 BS 2000 - 26 Coombe Road Allenby Gardens SLUOS SAPN SAPN 9 2026 $0 60

203991 Public Lighting - SLUoS - Mercury 80 BS 2000 - 26 Hindmarsh Avenue Welland SLUOS SAPN SAPN 9 2026 $0 60

204325 Public Lighting - SLUoS - Mercury 80 BS 2000 - 27 Hodgeman Road Pennington SLUOS SAPN SAPN 9 2026 $0 60

208033 Public Lighting - SLUoS - Mercury 80 BS 2000 - 27 Westall Avenue Flinders Park SLUOS SAPN SAPN 9 2026 $0 60

208359 Public Lighting - SLUoS - Mercury 80 BS 2000 - 28 Charles Sturt Avenue Grange SLUOS SAPN SAPN 9 2026 $0 60

202628 Public Lighting - SLUoS - Mercury 80 BS 2000 - 28 Helen Street Pennington SLUOS SAPN SAPN 9 2026 $0 60

207536 Public Lighting - SLUoS - Mercury 80 BS 2000 - 29 Lothian Avenue Seaton SLUOS SAPN SAPN 9 2026 $0 60

199540 Public Lighting - SLUoS - Mercury 80 BS 2000 - 298 Fourth Avenue Semaphore Park SLUOS SAPN SAPN 9 2026 $0 60

203086 Public Lighting - SLUoS - Mercury 80 BS 2000 - 2A Adele Street Athol Park SLUOS SAPN SAPN 9 2026 $0 60

198643 Public Lighting - SLUoS - Mercury 80 BS 2000 - 3 Brown Street West Croydon SLUOS SAPN SAPN 9 2026 $0 60

204839 Public Lighting - SLUoS - Mercury 80 BS 2000 - 3 Condon Street Pennington SLUOS SAPN SAPN 9 2026 $0 60

198708 Public Lighting - SLUoS - Mercury 80 BS 2000 - 3 Dundee Avenue Seaton SLUOS SAPN SAPN 9 2026 $0 60

205174 Public Lighting - SLUoS - Mercury 80 BS 2000 - 3 Fifth Avenue Cheltenham SLUOS SAPN SAPN 9 2026 $0 60

204157 Public Lighting - SLUoS - Mercury 80 BS 2000 - 3 Harvey Street Henley Beach SLUOS SAPN SAPN 9 2026 $0 60

202624 Public Lighting - SLUoS - Mercury 80 BS 2000 - 3 Helen Street Pennington SLUOS SAPN SAPN 9 2026 $0 60

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 143: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 143 -

207870 Public Lighting - SLUoS - Mercury 80 BS 2000 - 30 Crighton Avenue Royal Park SLUOS SAPN SAPN 9 2026 $0 60

203202 Public Lighting - SLUoS - Mercury 80 BS 2000 - 30 Fortisgreen Avenue Pennington SLUOS SAPN SAPN 9 2026 $0 60

202692 Public Lighting - SLUoS - Mercury 80 BS 2000 - 30 Hodgeman Road Pennington SLUOS SAPN SAPN 9 2026 $0 60

199168 Public Lighting - SLUoS - Mercury 80 BS 2000 - 30 Kristoff Avenue Fulham Gardens SLUOS SAPN SAPN 9 2026 $0 60

202710 Public Lighting - SLUoS - Mercury 80 BS 2000 - 30 Ward Street Pennington SLUOS SAPN SAPN 9 2026 $0 60

198576 Public Lighting - SLUoS - Mercury 80 BS 2000 - 31 Hallville Street Seaton SLUOS SAPN SAPN 9 2026 $0 60

199371 Public Lighting - SLUoS - Mercury 80 BS 2000 - 32 Somerset Avenue Fulham Gardens SLUOS SAPN SAPN 9 2026 $0 60

203853 Public Lighting - SLUoS - Mercury 80 BS 2000 - 324 First Avenue Semaphore Park SLUOS SAPN SAPN 9 2026 $0 60

199388 Public Lighting - SLUoS - Mercury 80 BS 2000 - 34 Aberfeldy Avenue Woodville SLUOS SAPN SAPN 9 2026 $0 60

202977 Public Lighting - SLUoS - Mercury 80 BS 2000 - 34 Carlton Crescent Woodville North SLUOS SAPN SAPN 9 2026 $0 60

203513 Public Lighting - SLUoS - Mercury 80 BS 2000 - 34 George Street Pennington SLUOS SAPN SAPN 9 2026 $0 60

202627 Public Lighting - SLUoS - Mercury 80 BS 2000 - 34 Helen Street Pennington SLUOS SAPN SAPN 9 2026 $0 60

203907 Public Lighting - SLUoS - Mercury 80 BS 2000 - 35 Fisher Terrace Fulham Gardens SLUOS SAPN SAPN 9 2026 $0 60

204944 Public Lighting - SLUoS - Mercury 80 BS 2000 - 35 John Street Flinders Park SLUOS SAPN SAPN 9 2026 $0 60

198425 Public Lighting - SLUoS - Mercury 80 BS 2000 - 36 Cedar Avenue West Croydon SLUOS SAPN SAPN 9 2026 $0 60

208363 Public Lighting - SLUoS - Mercury 80 BS 2000 - 36 Hoskin Avenue Kidman Park SLUOS SAPN SAPN 9 2026 $0 60

203199 Public Lighting - SLUoS - Mercury 80 BS 2000 - 36 Ward Street Pennington SLUOS SAPN SAPN 9 2026 $0 60

203201 Public Lighting - SLUoS - Mercury 80 BS 2000 - 38 Fortisgreen Avenue Pennington SLUOS SAPN SAPN 9 2026 $0 60

204148 Public Lighting - SLUoS - Mercury 80 BS 2000 - 38 Jamaica Avenue Fulham Gardens SLUOS SAPN SAPN 9 2026 $0 60

203756 Public Lighting - SLUoS - Mercury 80 BS 2000 - 38 Matheson Avenue Findon SLUOS SAPN SAPN 9 2026 $0 60

206957 Public Lighting - SLUoS - Mercury 80 BS 2000 - 38 Matthews Avenue SLUOS SAPN SAPN 9 2026 $0 60

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 144: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 144 -

Seaton

199267 Public Lighting - SLUoS - Mercury 80 BS 2000 - 38 St Albans Terrace Semaphore Park SLUOS SAPN SAPN 9 2026 $0 60

208247 Public Lighting - SLUoS - Mercury 80 BS 2000 - 39-45 Cheadle Street Fulham Gardens SLUOS SAPN SAPN 9 2026 $0 60

199323 Public Lighting - SLUoS - Mercury 80 BS 2000 - 4 Carley Crescent Seaton SLUOS SAPN SAPN 9 2026 $0 60

203467 Public Lighting - SLUoS - Mercury 80 BS 2000 - 4 George Street Pennington SLUOS SAPN SAPN 9 2026 $0 60

208407 Public Lighting - SLUoS - Mercury 80 BS 2000 - 4 Gluyas Avenue Grange SLUOS SAPN SAPN 9 2026 $0 60

204947 Public Lighting - SLUoS - Mercury 80 BS 2000 - 4 Jordan Avenue Fulham Gardens SLUOS SAPN SAPN 9 2026 $0 60

199333 Public Lighting - SLUoS - Mercury 80 BS 2000 - 4 Oakley Street Semaphore Park SLUOS SAPN SAPN 9 2026 $0 60

204586 Public Lighting - SLUoS - Mercury 80 BS 2000 - 4 Peters Avenue Fulham Gardens SLUOS SAPN SAPN 9 2026 $0 60

205703 Public Lighting - SLUoS - Mercury 80 BS 2000 - 4 Rapson Street Grange SLUOS SAPN SAPN 9 2026 $0 60

202637 Public Lighting - SLUoS - Mercury 80 BS 2000 - 4 Regent Street Pennington SLUOS SAPN SAPN 9 2026 $0 60

202691 Public Lighting - SLUoS - Mercury 80 BS 2000 - 40 Hodgeman Road Pennington SLUOS SAPN SAPN 9 2026 $0 60

202843 Public Lighting - SLUoS - Mercury 80 BS 2000 - 42 Helen Street Pennington SLUOS SAPN SAPN 9 2026 $0 60

203127 Public Lighting - SLUoS - Mercury 80 BS 2000 - 44 Fortisgreen Avenue Pennington SLUOS SAPN SAPN 9 2026 $0 60

205175 Public Lighting - SLUoS - Mercury 80 BS 2000 - 44 Ward Street Pennington SLUOS SAPN SAPN 9 2026 $0 60

204665 Public Lighting - SLUoS - Mercury 80 BS 2000 - 5 Hazel Grove Semaphore Park SLUOS SAPN SAPN 9 2026 $0 60

198978 Public Lighting - SLUoS - Mercury 80 BS 2000 - 5 Tracey Avenue Flinders Park SLUOS SAPN SAPN 9 2026 $0 60

202900 Public Lighting - SLUoS - Mercury 80 BS 2000 - 52 Ward Street Pennington SLUOS SAPN SAPN 9 2026 $0 60

205002 Public Lighting - SLUoS - Mercury 80 BS 2000 - 526A Webb Street Fulham Gardens SLUOS SAPN SAPN 9 2026 $0 60

208775 Public Lighting - SLUoS - Mercury 80 BS 2000 - 55 Hodgeman Road Pennington SLUOS SAPN SAPN 9 2026 $0 60

204022 Public Lighting - SLUoS - Mercury 80 BS 2000 - 5-6 Bunker Court Seaton SLUOS SAPN SAPN 9 2026 $0 60

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 145: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 145 -

207838 Public Lighting - SLUoS - Mercury 80 BS 2000 - 56 Chief Street Brompton SLUOS SAPN SAPN 9 2026 $0 60

198247 Public Lighting - SLUoS - Mercury 80 BS 2000 - 57 Fairford Terrace Semaphore Park SLUOS SAPN SAPN 9 2026 $0 60

207900 Public Lighting - SLUoS - Mercury 80 BS 2000 - 57 Margaret Avenue West Croydon SLUOS SAPN SAPN 9 2026 $0 60

208716 Public Lighting - SLUoS - Mercury 80 BS 2000 - 6 First Avenue Cheltenham SLUOS SAPN SAPN 9 2026 $0 60

207641 Public Lighting - SLUoS - Mercury 80 BS 2000 - 6 Holland Street Findon SLUOS SAPN SAPN 9 2026 $0 60

208373 Public Lighting - SLUoS - Mercury 80 BS 2000 - 6 Jervois Street Albert Park SLUOS SAPN SAPN 9 2026 $0 60

203335 Public Lighting - SLUoS - Mercury 80 BS 2000 - 6 Murphy Street Fulham Gardens SLUOS SAPN SAPN 9 2026 $0 60

198529 Public Lighting - SLUoS - Mercury 80 BS 2000 - 6 Nathan Court Kidman Park SLUOS SAPN SAPN 9 2026 $0 60

202623 Public Lighting - SLUoS - Mercury 80 BS 2000 - 6 Pennington Terrace Pennington SLUOS SAPN SAPN 9 2026 $0 60

200875 Public Lighting - SLUoS - Mercury 80 BS 2000 - 6 Pennington Terrace Pennington SLUOS SAPN SAPN 9 2026 $0 60

205177 Public Lighting - SLUoS - Mercury 80 BS 2000 - 6 Pennington Terrace Pennington SLUOS SAPN SAPN 9 2026 $0 60

203837 Public Lighting - SLUoS - Mercury 80 BS 2000 - 6 Sando Street Findon SLUOS SAPN SAPN 9 2026 $0 60

203193 Public Lighting - SLUoS - Mercury 80 BS 2000 - 6 Slade Place Seaton SLUOS SAPN SAPN 9 2026 $0 60

203098 Public Lighting - SLUoS - Mercury 80 BS 2000 - 62 Richardson Street Woodville North SLUOS SAPN SAPN 9 2026 $0 60

208550 Public Lighting - SLUoS - Mercury 80 BS 2000 - 623 Surrey Street Grange SLUOS SAPN SAPN 9 2026 $0 60

209003 Public Lighting - SLUoS - Mercury 80 BS 2000 - 63-69 Addison Road Pennington SLUOS SAPN SAPN 9 2026 $0 60

199112 Public Lighting - SLUoS - Mercury 80 BS 2000 - 64 Military Road West Beach SLUOS SAPN SAPN 9 2026 $0 60

202602 Public Lighting - SLUoS - Mercury 80 BS 2000 - 65 Willsmore Street Beverley SLUOS SAPN SAPN 9 2026 $0 60

199465 Public Lighting - SLUoS - Mercury 80 BS 2000 - 6-8 Toogood Avenue Beverley SLUOS SAPN SAPN 9 2026 $0 60

203167 Public Lighting - SLUoS - Mercury 80 BS 2000 - 700 Regent Street Pennington SLUOS SAPN SAPN 9 2026 $0 60

208329 Public Lighting - SLUoS - Mercury 80 BS 2000 - 700 Regent Street Pennington SLUOS SAPN SAPN 9 2026 $0 60

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 146: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 146 -

202873 Public Lighting - SLUoS - Mercury 80 BS 2000 - 71 Todville Street Woodville West SLUOS SAPN SAPN 9 2026 $0 60

199219 Public Lighting - SLUoS - Mercury 80 BS 2000 - 8 Arkaba Road Kilkenny SLUOS SAPN SAPN 9 2026 $0 60

198587 Public Lighting - SLUoS - Mercury 80 BS 2000 - 8 Minnie Street West Croydon SLUOS SAPN SAPN 9 2026 $0 60

199132 Public Lighting - SLUoS - Mercury 80 BS 2000 - 81 Cedar Avenue Royal Park SLUOS SAPN SAPN 9 2026 $0 60

205403 Public Lighting - SLUoS - Mercury 80 BS 2000 - 85A Botting Street Albert Park SLUOS SAPN SAPN 9 2026 $0 60

204469 Public Lighting - SLUoS - Mercury 80 BS 2000 - 9 Atkin Street Henley Beach SLUOS SAPN SAPN 9 2026 $0 60

202599 Public Lighting - SLUoS - Mercury 80 BS 2000 - 9 Condon Street Pennington SLUOS SAPN SAPN 9 2026 $0 60

204508 Public Lighting - SLUoS - Mercury 80 BS 2000 - 9 Norfolk Avenue Fulham Gardens SLUOS SAPN SAPN 9 2026 $0 60

202821 Public Lighting - SLUoS - Mercury 80 BS 2000 - 9 Pennington Terrace Pennington SLUOS SAPN SAPN 9 2026 $0 60

205141 Public Lighting - SLUoS - Mercury 80 BS 2000 - 9 Regent Street Pennington SLUOS SAPN SAPN 9 2026 $0 60

199822 Public Lighting - SLUoS - Mercury 80 BS 2000 - 93 Wattle Avenue Royal Park SLUOS SAPN SAPN 9 2026 $0 60

203008 Public Lighting - SLUoS - Mercury 80 BS 2000 - 94 Chief Street Brompton SLUOS SAPN SAPN 9 2026 $0 60

207764 Public Lighting - SLUoS - Mercury 80 BS 2000 - 99 Grange Road Allenby Gardens SLUOS SAPN SAPN 9 2026 $0 60

204440 Public Lighting - SLUoS - Mercury 80 BS 2000 - Lot 10 Chapel Street Hindmarsh SLUOS SAPN SAPN 9 2026 $0 60

208430 Public Lighting - SLUoS - Mercury 80 BS 2000 - Lot 11 Surrey Street Grange SLUOS SAPN SAPN 9 2026 $0 60

199257 Public Lighting - SLUoS - Mercury 80 BS 2000 - Lot 12 Jessup Street Kidman Park SLUOS SAPN SAPN 9 2026 $0 60

202499 Public Lighting - SLUoS - Mercury 80 BS 2000 - Lot 124 Kingston Avenue Royal Park SLUOS SAPN SAPN 9 2026 $0 60

202604 Public Lighting - SLUoS - Mercury 80 BS 2000 - Lot 15 Frederick Road Grange SLUOS SAPN SAPN 9 2026 $0 60

203699 Public Lighting - SLUoS - Mercury 80 BS 2000 - Lot 44 Third Avenue Semaphore Park SLUOS SAPN SAPN 9 2026 $0 60

203670 Public Lighting - SLUoS - Mercury 80 BS 2000 - Lot 73 Bardia Avenue Findon SLUOS SAPN SAPN 9 2026 $0 60

199456 Public Lighting - SLUoS - Mercury 80 BS 2000 - Sec 734 Par Crescent Seaton SLUOS SAPN SAPN 9 2026 $0 60

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 147: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 147 -

202245 Public Lighting - SLUoS - Mercury 80 URBAN - 11 Nesbit Street Albert Park SLUOS SAPN SAPN 9 2026 $0 60

202711 Public Lighting - SLUoS - Mercury 80 URBAN - 20 Ward Street Pennington SLUOS SAPN SAPN 9 2026 $0 60

208704 Public Lighting - SLUoS - Mercury 80 URBAN - 4 Ward Street Pennington SLUOS SAPN SAPN 9 2026 $0 60

198754 Public Lighting - SLUoS - Mercury 80 URBAN - Lot 15 Adare Court Grange SLUOS SAPN SAPN 9 2026 $0 60

199391 Public Lighting - SLUoS - Mercury 80 URBAN - Lot 4 Holden Street Hindmarsh SLUOS SAPN SAPN 9 2026 $0 60

200126 Public Lighting - SLUoS - Sodium 100 - 134 North Street Henley Beach SLUOS SAPN SAPN 9 2026 $0 60

198212 Public Lighting - SLUoS - Sodium 100 - 47 Burleigh Avenue Woodville North SLUOS SAPN SAPN 9 2026 $0 60

205529 Public Lighting - SLUoS - Sodium 100 - 47 Margaret Street Kidman Park SLUOS SAPN SAPN 9 2026 $0 60

200534 Public Lighting - SLUoS - Sodium 100 - 50 Reserve Parade Findon SLUOS SAPN SAPN 9 2026 $0 60

208676 Public Lighting - SLUoS - Sodium 100 - 8 Military Road Henley Beach SLUOS SAPN SAPN 9 2026 $0 60

199883 Public Lighting - SLUoS - Sodium 100 - Beach Street Grange SLUOS SAPN SAPN 9 2026 $0 60

207355 Public Lighting - SLUoS - Sodium 100 - Lot 94 Bartley Terrace West Lakes Shore SLUOS SAPN SAPN 9 2026 $0 60

200120 Public Lighting - SLUoS - Sodium 150 - 103 Marlborough Street Henley Beach SLUOS SAPN SAPN 9 2026 $0 60

197836 Public Lighting - SLUoS - Sodium 150 - 55-61 Chief Street Brompton SLUOS SAPN SAPN 9 2026 $0 60

200295 Public Lighting - SLUoS - Sodium 150 - 84 Chief Street Brompton SLUOS SAPN SAPN 9 2026 $0 60

206631 Public Lighting - SLUoS - Sodium 50 - 12 Iris Court Grange SLUOS SAPN SAPN 9 2026 $0 60

207319 Public Lighting - SLUoS - Sodium 50 - 129 Esplanade Henley Beach South SLUOS SAPN SAPN 9 2026 $0 60

207070 Public Lighting - SLUoS - Sodium 50 - 13 Guthrie Street Ovingham SLUOS SAPN SAPN 9 2026 $0 60

197689 Public Lighting - SLUoS - Sodium 50 - 141 Esplanade Henley Beach South SLUOS SAPN SAPN 9 2026 $0 60

202307 Public Lighting - SLUoS - Sodium 50 - 15/33 Sylvan Way Grange SLUOS SAPN SAPN 9 2026 $0 60

200146 Public Lighting - SLUoS - Sodium 50 - 157 Henley Beach Road Henley Beach SLUOS SAPN SAPN 9 2026 $0 60

207490 Public Lighting - SLUoS - Sodium 50 - 207-207B Esplanade Henley Beach SLUOS SAPN SAPN 9 2026 $0 60

207061 Public Lighting - SLUoS - Sodium 50 - 209A Esplanade Henley Beach SLUOS SAPN SAPN 9 2026 $0 60

200480 Public Lighting - SLUoS - Sodium 50 - 27 Grady Way Grange SLUOS SAPN SAPN 9 2026 $0 60

206319 Public Lighting - SLUoS - Sodium 50 - 41 Esplanade Henley Beach South SLUOS SAPN SAPN 9 2026 $0 60

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 148: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 148 -

200192 Public Lighting - SLUoS - Sodium 50 - 43 Arthur Street Pennington SLUOS SAPN SAPN 9 2026 $0 60

198098 Public Lighting - SLUoS - Sodium 50 - 6 John Street Flinders Park SLUOS SAPN SAPN 9 2026 $0 60

200937 Public Lighting - SLUoS - Sodium 50 - 64 Ninth Avenue Woodville North SLUOS SAPN SAPN 9 2026 $0 60

207163 Public Lighting - SLUoS - Sodium 50 - 67 Esplanade Henley Beach South SLUOS SAPN SAPN 9 2026 $0 60

206850 Public Lighting - SLUoS - Sodium 50 - 7 Burley Griffin Boulevard Brompton SLUOS SAPN SAPN 9 2026 $0 60

200152 Public Lighting - SLUoS - Sodium 50 - 79 Esplanade Henley Beach South SLUOS SAPN SAPN 9 2026 $0 60

200151 Public Lighting - SLUoS - Sodium 50 - 91 Esplanade Henley Beach South SLUOS SAPN SAPN 9 2026 $0 60

200190 Public Lighting - SLUoS - Sodium 50 - 96 Arthur Street Pennington SLUOS SAPN SAPN 9 2026 $0 60

197458 Public Lighting - SLUoS - Sodium 50 - 97A Esplanade Henley Beach South SLUOS SAPN SAPN 9 2026 $0 60

201210 Public Lighting - SLUoS - Sodium 50 - Lot 14 Siesta Court West Lakes SLUOS SAPN SAPN 9 2026 $0 60

200840 Public Lighting - SLUoS - Sodium 50 - Lot110 Kerry Street Athol Park SLUOS SAPN SAPN 9 2026 $0 60

Subtotal $40,896

Program Total $5,988,992

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 149: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 149 -

Appendix C Projected Upgrade/Exp/New 10 year Capital Works Program

Projected Capital Upgrade/New Works Program - Public_Lighting_May16_S1_V3 Year Item Description Estimate ($000)

Projected Capital

Upgrade/New Charles Sturt CC Year Item Description Estimate

2016 1 Public Lighting New $310 2016 Total $310 Year Item Description Estimate 2017 1 Nelson Ave Flinders Park $35 2017 1 Margaret St Kidman Park $190 2017 1 Cooke St Findon $50 2017 1 Clarice Sutherland Reserve $35 2017 Total $310 Year Item Description Estimate 2018 1 Public Lighting New $310 2018 Total $310 Year Item Description Estimate 2019 1 Public Lighting New $310 2019 Total $310 Year Item Description Estimate 2020 1 Public Lighting New $310 2020 Total $310 Year Item Description Estimate 2021 1 Public Lighting New $310 2021 Total $310 Year Item Description Estimate 2022 1 Public Lighting New $310 2022 Total $310 Year Item Description Estimate 2023 1 Public Lighting New $310 2023 Total $310 Year Item Description Estimate 2024 1 Public Lighting New $310 2024 Total $310 Year Item Description Estimate 2025 1 Public Lighting New $310 2025 Total $310

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 150: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 150 -

Appendix D Budgeted Expenditures Accommodated in LTFP

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 151: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 151 -

Appendix E Abbreviations

AAAC Average annual asset consumption

AM Asset management

AM Plan Asset management plan

ARI Average recurrence interval

ASC Annual service cost

BOD

CLER

Biochemical (biological) oxygen demand

Customer Lighting Equipment Rate (Lighting )Tariff)

CRC Current replacement cost

CWMS Community wastewater management systems

DA Depreciable amount

DRC Depreciated replacement cost

EF

EO

Earthworks/formation

Energy Only

IRMP Infrastructure risk management plan

LCC Life Cycle cost

LCE Life cycle expenditure

LTFP Long term financial plan

MMS Maintenance management system

PCI Pavement condition index

RV Residual value

SAPN

SLUoS

SoA

South Australian Power Networks

Street Lighting Use of System (Lighting Tariff)

State of the Assets

SS Suspended solids

vph Vehicles per hour

WDCRC Written down current replacement cost

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 152: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 152 -

Appendix F Glossary

Annual service cost (ASC) 1) Reporting actual cost The annual (accrual) cost of providing a service

including operations, maintenance, depreciation, finance/opportunity and disposal costs less revenue.

2) For investment analysis and budgeting An estimate of the cost that would be tendered,

per annum, if tenders were called for the supply of a service to a performance specification for a fixed term. The Annual Service Cost includes operations, maintenance, depreciation, finance/ opportunity and disposal costs, less revenue.

Asset A resource controlled by an entity as a result of past events and from which future economic benefits are expected to flow to the entity. Infrastructure assets are a sub-class of property, plant and equipment which are non-current assets with a life greater than 12 months and enable services to be provided.

Asset category Sub-group of assets within a class hierarchy for financial reporting and management purposes.

Asset class A group of assets having a similar nature or function in the operations of an entity, and which, for purposes of disclosure, is shown as a single item without supplementary disclosure.

Asset condition assessment The process of continuous or periodic inspection, assessment, measurement and interpretation of the resultant data to indicate the condition of a specific asset so as to determine the need for some preventative or remedial action.

Asset hierarchy A framework for segmenting an asset base into appropriate classifications. The asset hierarchy can be based on asset function or asset type or a combination of the two.

Asset management (AM) The combination of management, financial, economic, engineering and other practices applied to physical assets with the objective of providing the required level of service in the most cost effective manner.

Asset renewal funding ratio The ratio of the net present value of asset renewal funding accommodated over a 10 year period in a long term financial plan relative to the net present value of projected capital renewal expenditures identified in an asset management plan for the same period [AIFMG Financial Sustainability Indicator No 8].

Average annual asset consumption (AAAC)* The amount of an organisation’s asset base consumed during a reporting period (generally a year). This may be calculated by dividing the depreciable amount by the useful life (or total future economic benefits/service potential) and totalled for each and every asset OR by dividing the carrying amount (depreciated replacement cost) by the remaining useful life (or remaining future economic benefits/service potential) and totalled for each and every asset in an asset category or class.

Borrowings A borrowing or loan is a contractual obligation of the borrowing entity to deliver cash or another financial asset to the lending entity over a specified period of time or at a specified point in time, to cover both the initial capital provided and the cost of the interest incurred for providing this capital. A borrowing or loan provides the means for the borrowing entity to finance outlays (typically physical assets) when it has insufficient funds of its own to do so, and for the lending entity to make a financial return, normally in the form of interest revenue, on the funding provided.

Capital expenditure Relatively large (material) expenditure, which has benefits, expected to last for more than 12 months. Capital expenditure includes renewal, expansion and upgrade. Where capital projects involve a combination of renewal, expansion and/or upgrade expenditures, the total project cost needs to be allocated accordingly.

Capital expenditure - expansion Expenditure that extends the capacity of an existing asset to provide benefits, at the same standard as is currently enjoyed by existing beneficiaries, to a new group of users. It is discretionary expenditure, which increases future operations and maintenance costs, because it increases the organisation’s asset base, but may be associated with additional revenue from the new user group, eg. extending a drainage or road network, the provision of an oval or park in a new suburb for new residents.

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 153: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 153 -

Capital expenditure - new Expenditure which creates a new asset providing a new service/output that did not exist beforehand. As it increases service potential it may impact revenue and will increase future operations and maintenance expenditure.

Capital expenditure - renewal Expenditure on an existing asset or on replacing an existing asset, which returns the service capability of the asset up to that which it had originally. It is periodically required expenditure, relatively large (material) in value compared with the value of the components or sub-components of the asset being renewed. As it reinstates existing service potential, it generally has no impact on revenue, but may reduce future operations and maintenance expenditure if completed at the optimum time, eg. resurfacing or resheeting a material part of a road network, replacing a material section of a drainage network with pipes of the same capacity, resurfacing an oval.

Capital expenditure - upgrade Expenditure, which enhances an existing asset to provide a higher level of service or expenditure that will increase the life of the asset beyond that which it had originally. Upgrade expenditure is discretionary and often does not result in additional revenue unless direct user charges apply. It will increase operations and maintenance expenditure in the future because of the increase in the organisation’s asset base, eg. widening the sealed area of an existing road, replacing drainage pipes with pipes of a greater capacity, enlarging a grandstand at a sporting facility.

Capital funding Funding to pay for capital expenditure.

Capital grants Monies received generally tied to the specific projects for which they are granted, which are often upgrade and/or expansion or new investment proposals.

Capital investment expenditure See capital expenditure definition

Capitalisation threshold The value of expenditure on non-current assets above which the expenditure is recognised as capital expenditure and below which the expenditure is charged as an expense in the year of acquisition.

Carrying amount The amount at which an asset is recognised after deducting any accumulated depreciation / amortisation and accumulated impairment losses thereon.

Class of assets See asset class definition

Component Specific parts of an asset having independent physical or functional identity and having specific attributes such as different life expectancy, maintenance regimes, risk or criticality.

Core asset management Asset management which relies primarily on the use of an asset register, maintenance management systems, job resource management, inventory control, condition assessment, simple risk assessment and defined levels of service, in order to establish alternative treatment options and long-term cashflow predictions. Priorities are usually established on the basis of financial return gained by carrying out the work (rather than detailed risk analysis and optimised decision- making).

Cost of an asset The amount of cash or cash equivalents paid or the fair value of the consideration given to acquire an asset at the time of its acquisition or construction, including any costs necessary to place the asset into service. This includes one-off design and project management costs.

Critical assets Assets for which the financial, business or service level consequences of failure are sufficiently severe to justify proactive inspection and rehabilitation. Critical assets have a lower threshold for action than non-critical assets.

Current replacement cost (CRC) The cost the entity would incur to acquire the asset on the reporting date. The cost is measured by reference to the lowest cost at which the gross future economic benefits could be obtained in the normal course of business or the minimum it would cost, to replace the existing asset with a technologically modern equivalent new asset (not a second hand one) with the same economic benefits (gross service potential) allowing for any differences in the quantity and quality of output and in operating costs.

Deferred maintenance The shortfall in rehabilitation work undertaken relative to that required to maintain the service potential of an asset.

Depreciable amount The cost of an asset, or other amount substituted for its cost, less its residual value.

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 154: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 154 -

Depreciated replacement cost (DRC) The current replacement cost (CRC) of an asset less, where applicable, accumulated depreciation calculated on the basis of such cost to reflect the already consumed or expired future economic benefits of the asset.

Depreciation / amortisation The systematic allocation of the depreciable amount (service potential) of an asset over its useful life.

Economic life See useful life definition.

Expenditure The spending of money on goods and services. Expenditure includes recurrent and capital outlays.

Expenses Decreases in economic benefits during the accounting period in the form of outflows or depletions of assets or increases in liabilities that result in decreases in equity, other than those relating to distributions to equity participants.

Fair value The amount for which an asset could be exchanged, or a liability settled, between knowledgeable, willing parties, in an arms length transaction.

Financing gap A financing gap exists whenever an entity has insufficient capacity to finance asset renewal and other expenditure necessary to be able to appropriately maintain the range and level of services its existing asset stock was originally designed and intended to deliver. The service capability of the existing asset stock should be determined assuming no additional operating revenue, productivity improvements, or net financial liabilities above levels currently planned or projected. A current financing gap means service levels have already or are currently falling. A projected financing gap if not addressed will result in a future diminution of existing service levels.

Heritage asset An asset with historic, artistic, scientific, technological, geographical or environmental qualities that is held and maintained principally for its contribution to knowledge and culture and this purpose is central to the objectives of the entity holding it.

Impairment Loss The amount by which the carrying amount of an asset exceeds its recoverable amount.

Infrastructure assets Physical assets that contribute to meeting the needs of organisations or the need for access to major economic and social facilities and services, eg. roads, drainage, footpaths and cycleways. These are typically large, interconnected networks or portfolios of composite assets. The components of these assets may be separately maintained, renewed or replaced individually so that the required level and standard of service from the network of assets is continuously sustained. Generally the components and hence the assets have long lives. They are fixed in place and are often have no separate market value.

Investment property Property held to earn rentals or for capital appreciation or both, rather than for: (a) use in the production or supply of goods or services

or for administrative purposes; or (b) sale in the ordinary course of business.

Key performance indicator A qualitative or quantitative measure of a service or activity used to compare actual performance against a standard or other target. Performance indicators commonly relate to statutory limits, safety, responsiveness, cost, comfort, asset performance, reliability, efficiency, environmental protection and customer satisfaction.

Level of service The defined service quality for a particular service/activity against which service performance may be measured. Service levels usually relate to quality, quantity, reliability, responsiveness, environmental impact, acceptability and cost.

Life Cycle Cost * 1. Total LCC The total cost of an asset throughout its

life including planning, design, construction, acquisition, operation, maintenance, rehabilitation and disposal costs.

2. Average LCC The life cycle cost (LCC) is average cost to provide the service over the longest asset life cycle. It comprises average operations, maintenance expenditure plus asset consumption expense, represented by depreciation expense projected over 10 years. The Life Cycle Cost does not indicate the funds required to provide the service in a particular year.

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 155: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 155 -

Life Cycle Expenditure The Life Cycle Expenditure (LCE) is the average operations, maintenance and capital renewal expenditure accommodated in the long term financial plan over 10 years. Life Cycle Expenditure may be compared to average Life Cycle Cost to give an initial indicator of affordability of projected service levels when considered with asset age profiles.

Loans / borrowings See borrowings.

Maintenance All actions necessary for retaining an asset as near as practicable to an appropriate service condition, including regular ongoing day-to-day work necessary to keep assets operating, eg road patching but excluding rehabilitation or renewal. It is operating expenditure required to ensure that the asset reaches its expected useful life. • Planned maintenance

Repair work that is identified and managed through a maintenance management system (MMS). MMS activities include inspection, assessing the condition against failure/breakdown criteria/experience, prioritising scheduling, actioning the work and reporting what was done to develop a maintenance history and improve maintenance and service delivery performance.

• Reactive maintenance Unplanned repair work that is carried out in response to service requests and management/ supervisory directions.

• Specific maintenance Maintenance work to repair components or replace sub-components that needs to be identified as a specific maintenance item in the maintenance budget.

• Unplanned maintenance Corrective work required in the short-term to restore an asset to working condition so it can continue to deliver the required service or to maintain its level of security and integrity.

Maintenance expenditure * Recurrent expenditure, which is periodically or regularly required as part of the anticipated schedule of works required to ensure that the asset achieves its useful life and provides the required level of service. It is expenditure, which was anticipated in determining the asset’s useful life.

Materiality The notion of materiality guides the margin of error acceptable, the degree of precision required and the extent of the disclosure required when preparing general purpose financial reports. Information is material if its omission, misstatement or non-disclosure has the potential, individually or collectively, to influence the economic decisions of users taken on the basis of the financial report or affect the discharge of accountability by the management or governing body of the entity.

Modern equivalent asset Assets that replicate what is in existence with the most cost-effective asset performing the same level of service. It is the most cost efficient, currently available asset which will provide the same stream of services as the existing asset is capable of producing. It allows for technology changes and, improvements and efficiencies in production and installation techniques

Net present value (NPV) The value to the organisation of the cash flows associated with an asset, liability, activity or event calculated using a discount rate to reflect the time value of money. It is the net amount of discounted total cash inflows after deducting the value of the discounted total cash outflows arising from eg the continued use and subsequent disposal of the asset after deducting the value of the discounted total cash outflows.

Non-revenue generating investments Investments for the provision of goods and services to sustain or improve services to the community that are not expected to generate any savings or revenue to the Council, eg. parks and playgrounds, footpaths, roads and bridges, libraries, etc.

Operations Regular activities to provide services such as public health, safety and amenity, eg street sweeping, grass mowing and street lighting.

Operating expenditure Recurrent expenditure, which is continuously required to provide a service. In common use the term typically includes, eg power, fuel, staff, plant equipment, on-costs and overheads but excludes maintenance and depreciation. Maintenance and depreciation is on the other hand included in operating expenses.

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 156: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 156 -

Operating expense The gross outflow of economic benefits, being cash and non cash items, during the period arising in the course of ordinary activities of an entity when those outflows result in decreases in equity, other than decreases relating to distributions to equity participants.

Operating expenses Recurrent expenses continuously required to provide a service, including power, fuel, staff, plant equipment, maintenance, depreciation, on-costs and overheads.

Operations, maintenance and renewal financing ratio Ratio of estimated budget to projected expenditure for operations, maintenance and renewal of assets over a defined time (eg 5, 10 and 15 years).

Operations, maintenance and renewal gap Difference between budgeted expenditures in a long term financial plan (or estimated future budgets in absence of a long term financial plan) and projected expenditures for operations, maintenance and renewal of assets to achieve/maintain specified service levels, totalled over a defined time (e.g. 5, 10 and 15 years).

Pavement management system (PMS) A systematic process for measuring and predicting the condition of road pavements and wearing surfaces over time and recommending corrective actions.

PMS Score A measure of condition of a road segment determined from a Pavement Management System.

Rate of annual asset consumption * The ratio of annual asset consumption relative to the depreciable amount of the assets. It measures the amount of the consumable parts of assets that are consumed in a period (depreciation) expressed as a percentage of the depreciable amount.

Rate of annual asset renewal * The ratio of asset renewal and replacement expenditure relative to depreciable amount for a period. It measures whether assets are being replaced at the rate they are wearing out with capital renewal expenditure expressed as a percentage of depreciable amount (capital renewal expenditure/DA).

Rate of annual asset upgrade/new * A measure of the rate at which assets are being upgraded and expanded per annum with capital upgrade/new expenditure expressed as a percentage of depreciable amount (capital upgrade/expansion expenditure/DA).

Recoverable amount The higher of an asset's fair value, less costs to sell and its value in use.

Recurrent expenditure Relatively small (immaterial) expenditure or that which has benefits expected to last less than 12 months. Recurrent expenditure includes operations and maintenance expenditure.

Recurrent funding Funding to pay for recurrent expenditure.

Rehabilitation See capital renewal expenditure definition above.

Remaining useful life The time remaining until an asset ceases to provide the required service level or economic usefulness. Age plus remaining useful life is useful life.

Renewal See capital renewal expenditure definition above.

Residual value The estimated amount that an entity would currently obtain from disposal of the asset, after deducting the estimated costs of disposal, if the asset were already of the age and in the condition expected at the end of its useful life.

Revenue generating investments Investments for the provision of goods and services to sustain or improve services to the community that are expected to generate some savings or revenue to offset operating costs, eg public halls and theatres, childcare centres, sporting and recreation facilities, tourist information centres, etc.

Risk management The application of a formal process to the range of possible values relating to key factors associated with a risk in order to determine the resultant ranges of outcomes and their probability of occurrence.

Section or segment A self-contained part or piece of an infrastructure asset.

Service potential The total future service capacity of an asset. It is normally determined by reference to the operating capacity and economic life of an asset. A measure of service potential is used in the not-for-profit sector/public sector to value assets, particularly those not producing a cash flow.

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016

Page 157: Asset Management Plan 2016 · future users of the assets. Public lighting infrastructure includes listed lights below which assist to community safetysupport , promote recreational

- 157 -

Service potential remaining A measure of the future economic benefits remaining in assets. It may be expressed in dollar values (Fair Value) or as a percentage of total anticipated future economic benefits. It is also a measure of the percentage of the asset’s potential to provide services that is still available for use in providing services (Depreciated Replacement Cost/Depreciable Amount).

Specific Maintenance Replacement of higher value components/sub-components of assets that is undertaken on a regular cycle including repainting, replacement of air conditioning equipment, etc. This work generally falls below the capital/ maintenance threshold and needs to be identified in a specific maintenance budget allocation.

Strategic Longer-Term Plan A plan covering the term of office of councillors (4 years minimum) reflecting the needs of the community for the foreseeable future. It brings together the detailed requirements in the Council’s longer-term plans such as the asset management plan and the long-term financial plan. The plan is prepared in consultation with the community and details where the Council is at that point in time, where it wants to go, how it is going to get there, mechanisms for monitoring the achievement of the outcomes and how the plan will be resourced.

Sub-component Smaller individual parts that make up a component part.

Useful life Either: (a) the period over which an asset is expected to be

available for use by an entity, or (b) the number of production or similar units expected

to be obtained from the asset by the entity. It is estimated or expected time between placing the asset into service and removing it from service, or the estimated period of time over which the future economic benefits embodied in a depreciable asset, are expected to be consumed by the Council.

Value in Use The present value of future cash flows expected to be derived from an asset or cash generating unit. It is deemed to be depreciated replacement cost (DRC) for those assets whose future economic benefits are not primarily dependent on the asset's ability to generate net cash inflows, where the entity would, if deprived of the asset, replace its remaining future economic benefits.

Source: IPWEA, 2009, Glossary

Additional and modified glossary items shown *

City of Charles Sturt Council – PUBLIC LIGHTING ASSET MANAGEMENT PLAN – MAY 2016