asset optimization using pi and af
DESCRIPTION
Regional Seminar Series Cincinnati. Asset Optimization using PI and AF. Nancy Shifflet Optimization Analyst NiSource Gas Transmission and Storage. Charles Harrison Optimization Team Leader NiSource Gas Transmission and Storage. October 7, 2009. NiSource Gas Transmission & Storage. - PowerPoint PPT PresentationTRANSCRIPT
Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved.
Asset Optimization using PI and AF
Regional Seminar SeriesCincinnati
Nancy ShiffletOptimization AnalystNiSource Gas Transmission and Storage
October 7, 2009
Charles HarrisonOptimization Team LeaderNiSource Gas Transmission and Storage
2 Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved.
NiSource Gas Transmission & Storage
Employees: 1,571Total Payroll: $98 millionOperating States: 17Miles of Pipe: approximately 14,000Compressor Stations: 100Total Horsepower: About 1.1 millionAnnual Deliveries: About 1 trillion cubic feetNumber of customers: 72 LDCs and a variety of commercial usersStorage Fields: 37 in four statesTotal Storage Capacity: 590 billion cubic feetTotal Working Gas: 253 billion cubic feetPeak Day Deliveries: 7.4 billion cubic feet (4.5 bcf from storage)State taxes paid annually: $58.6 million
NGT&S CompaniesColumbia Gas Transmission Corp.Columbia Gulf Transmission Co.Crossroads PipelineGranite State Gas TransmissionCentral Kentucky Gas TransmissionMillennium Pipeline (partner)Hardy Storage Company (partner)
Key Growth ProjectsMillennium PipelineHardy Storage and TransmissionEastern Market ExpansionAppalachian ExpansionOhio Storage Expansion Project
3 Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved.
“Never in the history of our business have we needed to optimize how our assets perform as much as we do in today’s business environment. At $10 an MCF for gas for fuel for our compressor stations we spend $600MM US Dollars a year.”
Central Diagnostic Monitoring and
Analytics
Results / Benefits
The Challenge: Optimizing the performance ofour fleet of gas compressors in service at 100stations over 14,000 miles of pipeline
• Performance Measurement
• Real Time Discovery of Performance Degradation
• Unit to Unit Comparison
• Centralized Diagnostic Monitoring
• Transform NGT&S Operating Expertise into PI Analytics
• KPI Dashboards
• Reduction in Compressor Engine Fuel Consumption
• Increase in Compressor Engine Operating Range
• Improved Compressor Engine Reliability
Business Value – Asset optimization using PI and AF
Customer Business Challenge
How PI Stretches
OPC
Compressor Engine Controls
Gas Control
Environmental
Facility Planning
Gas Control SCADA SCADA
Electronic Measurement
Compressor Services
Pipeline Integrity
Measurement
Model
EMOperations SupportWeather Weather
ModelOPC
Field Services
Gas Chromatograph
GQ
Gas Quality
iFix
Environmental
Essential
PI Enterprise Professional
ACE/AF
Data Users
PI
Optimization Analysts
5 Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved.
Compression
6 Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved.
Compression
7 Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved.
Compression
8 Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved.
Efficiency
9 Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved.
Compressor Station Fuel – KPIs (Concept)
10 Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved.
Energy Cost – (CF$/mcf)*(7350BTU lhv/BHP hr)*(1cf/1000BTU hhv)*(1BTU hhv/0.915BTU lhv) *(BHP)*(1mcf/1000cf)
11 Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved.
KPI - Model Heat Rate/Actual (PI-AF)
8155.79
7784.36
9/29/2009 9:54:05 AM9/29/2009 1:54:05 AM 8.00 hours
CS2 Unit3
0
5000
10000
7677.35
7709.22
9/29/2009 9:54:05 AM9/29/2009 1:54:05 AM 8.00 hours
CS2 Unit2
0
5000
10000
8158.14
7983.36
9/29/2009 9:54:05 AM9/29/2009 1:54:05 AM 8.00 hours
CS2 Unit1
0
5000
10000
12 Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved.
KPI - Model Heat Rate/Actual (PI-AF Element Relative Display)
13 Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved.
AF in PI Datalink
Unit1
BHPHrs CurrentHeatRate Fuel %
1667.72 8276.85122 14.6 OverRate by 3.68
Heat Rate
7983.359974 240 7743.85918 79.83
8222.86077
Unit1
BHPHrs CurrentHeatRate Fuel %
1726.32 8525.901392 14.9 OverRate by 9.02
Heat Rate
7820.374118 235 7585.76289 78.2
Thank youThank you
© Copyright 2009 OSIsoft, Inc.
777 Davis St., Suite 250 San Leandro, CA 94577