Asset Work Order History
From 8-11-2016 to 8-11-2021
Asset: UD6008 - 2013 - FORD F250 Utility Body 3/4 Ton Truck
AR-2018-31
50,209 50,20904/25/2018 10:45 / 04/25/2018 10:45Date Finished/Closed: Meter 1 Reading: Meter 1 Life:
Task: WAC Labor Parts CML08 $0.00 $0.00 $1,384.60002-140 - AUTOBODY REPAIR
AR-2018-65
52,036 52,03607/04/2018 06:28 / 07/04/2018 06:28Date Finished/Closed: Meter 1 Reading: Meter 1 Life:
Task: WAC Labor Parts CML08 $0.00 $0.00 $1,653.60002-140 - AUTOBODY REPAIR
CS-2016-1040
33,991 33,99111/23/2016 15:50 / 11/23/2016 15:52Date Finished/Closed: Meter 1 Reading: Meter 1 Life:
REMOVED NAIL PATCHED TIRE ALSO REPLACED LEAKING T P S SENSORComments:
Task: WAC Labor Parts CML08 $110.36 $131.52 $0.00017-030 - TIRE REPAIR
REMOVED NAIL PATCHED TIRE
CS-2017-1596
35,496 35,49601/09/2017 10:31 / 01/09/2017 11:28Date Finished/Closed: Meter 1 Reading: Meter 1 Life:
REMOVED NAIL FROM L / F TIRE INSTALLED PATCH ALSO REPLACED LEAKING T P S SENSOR CHECKED ALL TIRES FOR WEAR AND P S I RESET T P S SYSTEM
Comments:
Task: WAC Labor Parts CML03 $266.11 $76.26 $0.00017-010 - REPLACE 1 TIRE
REMOVED NAIL PATCHED L / F TIRE AND REPLACED T P S SENSOR
CS-2017-2400
37,237 37,23703/01/2017 16:39 / 03/02/2017 15:52Date Finished/Closed: Meter 1 Reading: Meter 1 Life:
Task: WAC Labor Parts CML03 $344.43 $0.00 $0.00017-010 - REPLACE 1 TIRE
07 $121.93 $0.00 $0.00022-010 - MISCELLANEOUS
03 $242.08 $0.00 $0.00013-020 - FRONT PADS
03 $205.59 $0.00 $0.00027-010 - MISCELLANEOUS
03 $62.30 $0.00 $0.00034-030 - EXTERIOR LIGHTING
11 $535.78 $1,640.08 $0.00PM-C - PM SERVICE
©2021 AssetWorks LLC. All Rights Reserved. Page 1 of 6
Report Date: 8/11/2021
Asset Work Order History
CS-2017-3305
39,411 39,41105/04/2017 20:47 / 05/05/2017 07:18Date Finished/Closed: Meter 1 Reading: Meter 1 Life:
Task: WAC Labor Parts CML08 $140.62 $0.00 $0.00017-030 - TIRE REPAIR
CS-2017-3627
41,318 41,31806/05/2017 17:17 / 06/06/2017 06:27Date Finished/Closed: Meter 1 Reading: Meter 1 Life:
Task: WAC Labor Parts CML03 $66.75 $520.48 $0.00002-110 - STEPS
03 $32.93 $0.00 $0.00035-010 - MISCELLANEOUS
CS-2017-5867
45,312 45,31210/30/2017 08:14 / 10/30/2017 08:22Date Finished/Closed: Meter 1 Reading: Meter 1 Life:
Task: WAC Labor Parts CML11 $178.00 $52.90 $0.00PM-C - PM SERVICE
CS-2017-6179
45,350 45,35011/14/2017 17:19 / 11/15/2017 11:15Date Finished/Closed: Meter 1 Reading: Meter 1 Life:
Task: WAC Labor Parts CML03 $182.45 $949.76 $0.00017-000 - TIRE DIAGNOSIS
CS-2018-7766
48,823 48,82302/17/2018 08:27 / 02/17/2018 09:30Date Finished/Closed: Meter 1 Reading: Meter 1 Life:
Task: WAC Labor Parts CML03 $44.50 $0.00 $0.00039-050 - GPS INSTALLATION
CS-2018-8461
50,167 50,16704/16/2018 08:25 / 04/16/2018 09:15Date Finished/Closed: Meter 1 Reading: Meter 1 Life:
Task: WAC Labor Parts CML03 $267.00 $0.00 $0.00013-002 - REAR DISC OR DRUM BRAKE SERVICE ONE AXLE
11 $178.00 $46.19 $0.00PM-C - PM SERVICE
10 $26.70 $0.00 $0.00017-050 - TPMS SYSTEM
03 $178.00 $521.44 $0.00017-011 - REPLACE 2 TIRES
01 $8.90 $371.31 $0.00013-003 - REAR DISC OR DRUM BRAKE SERVICE TWO AXLES
©2021 AssetWorks LLC. All Rights Reserved. Page 2 of 6
Report Date: 8/11/2021
Asset Work Order History
CS-2018-10374
52,077 52,07707/02/2018 12:27 / 07/02/2018 12:46Date Finished/Closed: Meter 1 Reading: Meter 1 Life:
Task: WAC Labor Parts CML08 $140.62 $0.00 $0.00033-010 - MISCELLANEOUS
08 $213.60 $0.00 $0.00003-180 - CHECK ENGINE LIGHT DIAGNOSIS
CS-2018-10901
52,478 52,47808/02/2018 09:03 / 08/02/2018 16:29Date Finished/Closed: Meter 1 Reading: Meter 1 Life:
Task: WAC Labor Parts CML03 $133.50 $859.74 $0.00002-020 - GLASS
CS-2018-11077
52,558 52,55808/14/2018 13:18 / 08/14/2018 13:50Date Finished/Closed: Meter 1 Reading: Meter 1 Life:
Task: WAC Labor Parts CML02 $258.10 $329.37 $0.00001-020 - AC REPAIR
10 $89.00 $0.00 $0.00001-000 - HVAC DIAGNOSIS
03 $89.00 $92.40 $0.00002-150 - DECALS
01 $89.00 $11.42 $0.00005-033 - RNI-UPDATE/VERIFIED
CS-2018-12988
56,372 56,37212/12/2018 16:12 / 12/13/2018 09:28Date Finished/Closed: Meter 1 Reading: Meter 1 Life:
Task: WAC Labor Parts CML01 $91.67 $0.00 $0.00005-033 - RNI-UPDATE/VERIFIED
11 $178.00 $36.08 $0.00PM-C - PM SERVICE
51 $178.00 $6.40 $0.00005-060 - THROTTLE BODY SERVICE
51 $178.00 $54.60 $0.00005-050 - COOLING SYSTEM SERVICE
51 $178.00 $0.00 $0.00005-100 - POWER STEERING FLUID SERVICE
51 $178.00 $6.12 $0.00005-090 - BRAKE FLUID SERVICE
51 $222.50 $83.10 $0.00005-080 - AUTOMATIC TRANSMISSION SERVICE
51 $178.00 $57.12 $0.00005-070 - DIFFERENTIAL SERVICE
03 $44.50 $0.00 $0.00005-020 - W/S WIPERS
CS-2019-14139
59,436 59,43603/06/2019 15:53 / 03/07/2019 07:03Date Finished/Closed: Meter 1 Reading: Meter 1 Life:
Task: WAC Labor Parts CML03 $146.85 $556.65 $0.00013-000 - BRAKE DIAGNOSIS
03 $267.00 $0.00 $0.00013-001 - FRONT DISC OR DRUM BRAKE SERVICE COMPLETE
©2021 AssetWorks LLC. All Rights Reserved. Page 3 of 6
Report Date: 8/11/2021
Asset Work Order History
CS-2019-15438
62,235 62,23505/15/2019 12:27 / 05/16/2019 07:46Date Finished/Closed: Meter 1 Reading: Meter 1 Life:
Task: WAC Labor Parts CML03 $356.00 $1,096.54 $0.00017-012 - REPLACE 4 TIRES
10 $1.78 $0.00 $0.00017-050 - TPMS SYSTEM
03 $95.00 $0.00 $0.00039-051 - FUEL MODULE INSTALLATION - SVID
CS-2019-15989
63,680 63,68006/19/2019 10:12 / 06/19/2019 13:14Date Finished/Closed: Meter 1 Reading: Meter 1 Life:
Task: WAC Labor Parts CML03 $178.00 $41.51 $0.00PM-C - PM SERVICE
CS-2019-17602
68,137 68,13709/27/2019 14:48 / 09/30/2019 08:25Date Finished/Closed: Meter 1 Reading: Meter 1 Life:
Task: WAC Labor Parts CML10 $57.85 $0.00 $0.00017-000 - TIRE DIAGNOSIS
08 $44.50 $0.00 $0.00017-030 - TIRE REPAIR
CS-2019-17740
68,482 68,48210/09/2019 15:04 / 10/10/2019 08:07Date Finished/Closed: Meter 1 Reading: Meter 1 Life:
Task: WAC Labor Parts CML11 $178.00 $41.80 $0.00PM-C - PM SERVICE
03 $4.45 $12.30 $0.00018-020 - MISCELLANEOUS
10 $24.92 $0.00 $0.00035-000 - BATTERY SYSTEM DIAGNOSIS
03 $108.58 $109.95 $0.00035-020 - CHASSIS BATTERY
CS-2020-19369
72,074 72,07401/15/2020 09:02 / 01/15/2020 18:15Date Finished/Closed: Meter 1 Reading: Meter 1 Life:
Task: WAC Labor Parts CML10 $89.00 $519.38 $0.00017-000 - TIRE DIAGNOSIS
03 $178.00 $0.00 $0.00017-011 - REPLACE 2 TIRES
08 $89.00 $0.00 $0.00017-050 - TPMS SYSTEM
©2021 AssetWorks LLC. All Rights Reserved. Page 4 of 6
Report Date: 8/11/2021
Asset Work Order History
CS-2020-21244 - SCHEDULED PM-C APPOINTMENT 4.28.2020
75,223 75,22305/05/2020 17:09 / 05/07/2020 11:30Date Finished/Closed: Meter 1 Reading: Meter 1 Life:
Task: WAC Labor Parts CML03 $222.50 $130.77 $0.00005-080 - AUTOMATIC TRANSMISSION SERVICE
51 $178.00 $34.51 $0.00PM-C - PM SERVICE
02 $178.00 $0.00 $0.00005-060 - THROTTLE BODY SERVICE
11 $178.00 $47.87 $0.00005-050 - COOLING SYSTEM SERVICE
03 $44.50 $9.24 $0.00005-020 - W/S WIPERS
20 $115.70 $0.00 $0.00001-000 - HVAC DIAGNOSIS
11 $178.00 $1,059.89 $0.00005-090 - BRAKE FLUID SERVICE
11 $178.00 $0.00 $0.00005-100 - POWER STEERING FLUID SERVICE
03 $267.00 $0.00 $0.00013-001 - FRONT DISC OR DRUM BRAKE SERVICE COMPLETE
03 $267.00 $0.00 $0.00013-002 - REAR DISC OR DRUM BRAKE SERVICE ONE AXLE
03 $178.00 $414.54 $0.00017-011 - REPLACE 2 TIRES
10 $89.00 $0.00 $0.00031-000 - CHARGING SYSTEM DIAGNOSIS
10 $89.00 $0.00 $0.00032-000 - STARTING SYSTEM DIAGNOSIS
03 $130.83 $5.65 $0.00034-030 - EXTERIOR LIGHTING
10 $89.00 $0.00 $0.00035-000 - BATTERY SYSTEM DIAGNOSIS
02 $89.00 $0.00 $0.00090-016 - INTERIOR CAB SANITIZING
20 $0.01 $0.00 $0.00090-080 - ROAD TEST
11 $178.00 $0.00 $0.00005-070 - DIFFERENTIAL SERVICE
CS-2020-22897
78,344 78,34409/08/2020 09:10 / 09/14/2020 07:45Date Finished/Closed: Meter 1 Reading: Meter 1 Life:
Task: WAC Labor Parts CML03 $44.50 $134.22 $0.00035-020 - CHASSIS BATTERY
10 $44.50 $0.00 $0.00035-000 - BATTERY SYSTEM DIAGNOSIS
10 $22.25 $0.00 $0.00010-011 - QUALITY CONTROL
08 $82.77 $0.00 $0.00001-015 - EVACUATE AND RECHARGE
03 $484.16 $127.95 $0.00001-013 - A/C EVAPORATOR CORE
10 $87.22 $0.00 $0.00001-000 - HVAC DIAGNOSIS
02 $89.00 $0.00 $0.00090-016 - INTERIOR CAB SANITIZING
CS-2020-23897 - SCHEDULED PM-C APPOINTMENT 10.29.2020
80,062 80,06210/30/2020 17:09 / 10/31/2020 07:44Date Finished/Closed: Meter 1 Reading: Meter 1 Life:
SCHEDULED PM-C APPOINTMENT 10.29.2020Comments:
Task: WAC Labor Parts CML10 $89.00 $0.00 $0.00001-000 - HVAC DIAGNOSIS
08 $89.00 $23.95 $0.00002-150 - DECALS
03 $44.50 $9.24 $0.00005-020 - W/S WIPERS
10 $24.03 $0.00 $0.00010-011 - QUALITY CONTROL
03 $178.00 $574.59 $0.00017-011 - REPLACE 2 TIRES
11 $178.00 $33.81 $0.00PM-C - PM SERVICE
10 $89.00 $0.00 $0.00032-000 - STARTING SYSTEM DIAGNOSIS
10 $89.00 $0.00 $0.00035-000 - BATTERY SYSTEM DIAGNOSIS
02 $89.00 $0.00 $0.00090-016 - INTERIOR CAB SANITIZING
20 $0.01 $0.00 $0.00090-080 - ROAD TEST
10 $89.00 $0.00 $0.00031-000 - CHARGING SYSTEM DIAGNOSIS
©2021 AssetWorks LLC. All Rights Reserved. Page 5 of 6
Report Date: 8/11/2021
Asset Work Order History
CS-2021-26080 - SCHEDULED PM-C 4/30/2021
84,527 84,52705/04/2021 12:28 / 05/06/2021 08:47Date Finished/Closed: Meter 1 Reading: Meter 1 Life:
SCHEDULED PM-C 4/30/2021Comments:
Task: WAC Labor Parts CML10 $89.00 $0.00 $0.00001-000 - HVAC DIAGNOSIS
03 $44.50 $11.06 $0.00005-020 - W/S WIPERS
11 $178.00 $34.51 $0.00PM-C - PM SERVICE
02 $89.00 $0.00 $0.00090-016 - INTERIOR CAB SANITIZING
10 $89.00 $0.00 $0.00035-000 - BATTERY SYSTEM DIAGNOSIS
10 $89.00 $0.00 $0.00032-000 - STARTING SYSTEM DIAGNOSIS
10 $22.25 $0.00 $0.00010-011 - QUALITY CONTROL
03 $356.00 $1,063.78 $0.00017-012 - REPLACE 4 TIRES
10 $89.00 $0.00 $0.00031-000 - CHARGING SYSTEM DIAGNOSIS
SE-2021-11214
80,062 80,06202/17/2021 09:09 / 02/24/2021 13:21Date Finished/Closed: Meter 1 Reading: Meter 1 Life:
Task: WAC Labor Parts CML03 $180.67 $21.55 $0.00002-010 - MISCELLANEOUS
08 $89.00 $0.00 $0.00010-011 - QUALITY CONTROL
SE-2021-12863
87,268 87,26808/11/2021 12:03 / 08/11/2021 13:54Date Finished/Closed: Meter 1 Reading: Meter 1 Life:
Task: WAC Labor Parts CML01 $28.48 $0.00 $0.00090-040 - VEHICLE SHUTTLING
02 $89.00 $0.00 $0.00090-016 - INTERIOR CAB SANITIZING
53 $176.00 $0.00 $0.00120-010 - DECOMMISSION
©2021 AssetWorks LLC. All Rights Reserved. Page 6 of 6
Report Date: 8/11/2021
Work Order DetailAR-2018-31
UD6008 2013 FORD F250 UTILITY BODY 3/4 TON TRUCK
Asset ID:
XD5184 CS - CENTRAL SHOPLicense Number: Repair Location:
AR-2018-31 CLOSEDWork Order ID: Job Status:
REPAIR OS - OUT OF SERVICEJob Type: Service Status:
50209 MILES 04/25/2018 10:45WO Meter 1: Projected Completion Date:
R - ROUTINEPriority:
Non Service Request Tasks
Task: 002-140 - Autobody Repair Warranty: NO
WAC: 08 - REPAIR Reason: AR - ACCIDENT-REPAIRABLE
Work Class: 2 - UNSCHEDULED Comments:
Task Notes
DMCINTYRE 4-5-2018 7:02AM APPROVED REPAIR WAITING FOR BODY SHOP TO PICK UP UNIT
DMCINTYRE 4-12-2018 4:39PM VEHICLE RETURNED COMPLETED FROM GONZ AND PUT IN TO CENTRAL SHOP TO COMPLETE PM-C
DMCINTYRE 4-9-2018 2:25PM GONZ PICKED UNIT UP 4/6/2018 AND BEGAN REPAIRS ESTIMATED COMPLETION 4/17/2018
DMCINTYRE 4-3-2018 10:33AM GONZ CAME TODAY TO WRITE ESTIMATE
Commercial Labor Hrs Total CostTax & MarkupLabor Cost Parts Cost Misc Cost
0.00Vendor: CEI - Cei 1,384.60 0.00 0.00 0.00 1,384.60
Delays
Delay HoursStatus End DatetimeStart Datetime
4/3/2018 9:37AM 4/3/2018 10:42AM 1.08AE - WAITING ACCIDENT ESTIMATE CLOSED
Delay HoursStatus End DatetimeStart Datetime
4/3/2018 10:42AM 4/5/2018 7:00AM 21.30AA - WAIT ACCIDENT APPROVAL CLOSED
Delay HoursStatus End DatetimeStart Datetime
4/5/2018 7:00AM 4/25/2018 10:45AM 170.75AB - WAIT ACCIDENT BODY REPAIR CLOSED
Overhead
Small Parts - Labor: 0.00
Small Parts - Parts: 0.00
Tools: 0.00
Overhead Costs: 0.00
Total Overhead Costs: 0.00
Messages
Unit Is Being Replaced In Fy 20-21 List
WO Notes
DMCINTYRE 04/03/2018 09:36 CLAIM # 1794860 ASSIGNED TO GONZ
©2021 AssetWorks LLC. All Rights Reserved. Page 1 of 2
Report Date: 8/11/2021
Work Order Detail Work Order: AR-2018-31
Comments: Internal Parts Cost:
Internal Labor Cost:
Commercial Labor Cost:
Commercial Parts Cost:
Work Order Total:
Commercial Misc Cost:
Overhead Costs: $0.00
$1,384.60
Commercial Total:
Internal Total: $0.00
Commercial Tax & Markup: $0.00
$0.00
$0.00
1,384.60
Equipment Usage Costs: $0.00
$1,384.60
©2021 AssetWorks LLC. All Rights Reserved. Page 2 of 2
Report Date: 8/11/2021
Work Order DetailAR-2018-65
UD6008 2013 FORD F250 UTILITY BODY 3/4 TON TRUCK
Asset ID:
XD5184 CS - CENTRAL SHOPLicense Number: Repair Location:
AR-2018-65 CLOSEDWork Order ID: Job Status:
REPAIR OS - OUT OF SERVICEJob Type: Service Status:
52036 MILES (EQ UPD) 07/04/2018 06:28WO Meter 1: Projected Completion Date:
R - ROUTINEPriority:
Non Service Request Tasks
Task: 002-140 - Autobody Repair Warranty: NO
WAC: 08 - REPAIR Reason: AR - ACCIDENT-REPAIRABLE
Work Class: 2 - UNSCHEDULED Comments:
Commercial Labor Hrs Total CostTax & MarkupLabor Cost Parts Cost Misc Cost
0.00Vendor: CEI - Cei 1,653.60 0.00 0.00 0.00 1,653.60
Delays
Delay HoursStatus End DatetimeStart Datetime
6/14/2018 8:54AM 6/28/2018 2:43PM 125.82AE - WAITING ACCIDENT ESTIMATE CLOSED
Delay HoursStatus End DatetimeStart Datetime
6/28/2018 2:43PM 7/4/2018 6:28AM 41.28I - WAIT SUBLET/INVOICE CLOSED
Overhead
Small Parts - Labor: 0.00
Small Parts - Parts: 0.00
Tools: 0.00
Overhead Costs: 0.00
Total Overhead Costs: 0.00
Messages
Unit Is Being Replaced In Fy 20-21 List
WO Notes
MLONDON 06/27/2018 15:03 GONZA RETURNED VEHICLE TODAY. DRIVER STATES THAT THE CHECK ENGINE LIGHT IS ON.
DMCINTYRE 06/14/2018 08:53 NEW CLAIM # 1816687 ASSIGNED TO GONZ COLLISION WAITING FOR ESTIMATE
Comments: Internal Parts Cost:
Internal Labor Cost:
Commercial Labor Cost:
Commercial Parts Cost:
Work Order Total:
Commercial Misc Cost:
Overhead Costs: $0.00
$1,653.60
Commercial Total:
Internal Total: $0.00
Commercial Tax & Markup: $0.00
$0.00
$0.00
1,653.60
Equipment Usage Costs: $0.00
$1,653.60
©2021 AssetWorks LLC. All Rights Reserved. Page 1 of 1
Report Date: 8/11/2021
Work Order DetailCS-2016-1040
UD6008 2013 FORD F250 UTILITY BODY 3/4 TON TRUCK
Asset ID:
XD5184 CS - CENTRAL SHOPLicense Number: Repair Location:
CS-2016-1040 CLOSEDWork Order ID: Job Status:
REPAIR OS - OUT OF SERVICEJob Type: Service Status:
33991 MILES (EQ UPD) 11/23/2016 15:52WO Meter 1: Projected Completion Date:
R - ROUTINEPriority:
Non Service Request Tasks
Task: 017-030 - Tire Repair Warranty: NO
WAC: 08 - REPAIR Reason: BD - BREAKDOWN
Work Class: 2 - UNSCHEDULED Comments: Removed Nail Patched Tire
Labor CostLabor Hrs
JKAUFMAN - James Kaufman 0.02 1.78Emp: 11/23/2016 15:50
JKAUFMAN - James Kaufman 1.22 108.5811/23/2016 15:47
Parts Total CostIss PriceQty Issued Tax & Markup
1.00 131.521FD-9L3Z1A189A-0 - 1FD; TPMS KIT 37.58 93.94
Serial #:Removed Serial #:
Overhead
Small Parts - Labor: 0.00
Small Parts - Parts: 0.00
Tools: 0.00
Overhead Costs: 7.50
Total Overhead Costs: 7.50
Messages
Unit Is Being Replaced In Fy 20-21 List
WO Notes
CDENHART 11/23/2016 14:18 NAIL IN PASSENGER REAR TIRE
Comments: Internal Parts Cost:
Internal Labor Cost:
Commercial Labor Cost:
Commercial Parts Cost:
Work Order Total:
Commercial Misc Cost:
Overhead Costs:
REMOVED NAIL PATCHED TIRE ALSO REPLACED LEAKING T P S SENSOR
$7.50
$249.38
$131.52
$110.36
Commercial Total:
Internal Total: $249.38
Commercial Tax & Markup: $0.00
$0.00
$0.00
0.00
Equipment Usage Costs: $0.00
$0.00
©2021 AssetWorks LLC. All Rights Reserved. Page 1 of 1
Report Date: 8/11/2021
Work Order DetailCS-2017-1596
UD6008 2013 FORD F250 UTILITY BODY 3/4 TON TRUCK
Asset ID:
XD5184 CS - CENTRAL SHOPLicense Number: Repair Location:
CS-2017-1596 CLOSEDWork Order ID: Job Status:
REPAIR 35496 MILES (EQ UPD)Job Type: WO Meter 1:
01/09/2017 11:28 R - ROUTINEProjected Completion Date:
Priority:
Non Service Request Tasks
Task: 017-010 - Replace 1 Tire Warranty: NO
WAC: 03 - REPLACED PART Reason: BD - BREAKDOWN
Work Class: 2 - UNSCHEDULED Comments: Removed Nail Patched L / F Tire And Replaced T P S Sensor
Labor CostLabor Hrs
JKAUFMAN - James Kaufman 0.88 78.32Emp: 01/09/2017 10:31
JKAUFMAN - James Kaufman 2.11 187.7901/09/2017 03:00
Parts Total CostIss PriceQty Issued Tax & Markup
1.00 76.261MC-TPMS12-0 - 1MC; TIRE PRESSURE SENSOR 21.79 54.47
Serial #:Removed Serial #:
Delays
Delay HoursStatus End DatetimeStart Datetime
1/9/2017 9:12AM 1/9/2017 9:38AM 0.43X - WAIT - SPECIALIZED TECHNICIAN CLOSED
Overhead
Small Parts - Labor: 0.00
Small Parts - Parts: 0.00
Tools: 0.00
Overhead Costs: 7.50
Total Overhead Costs: 7.50
Messages
Unit Is Being Replaced In Fy 20-21 List
WO Notes
MLONDON 01/09/2017 09:11 DRIVER FRONT TIRE GOING FLAT. SCREW IN TREAD. LAST PM SERVICED PERFORMED ON 06/21/16.
Comments: Internal Parts Cost:
Internal Labor Cost:
Commercial Labor Cost:
Commercial Parts Cost:
Work Order Total:
Commercial Misc Cost:
Overhead Costs:
REMOVED NAIL FROM L / F TIRE INSTALLED PATCH ALSO REPLACED LEAKING T P S SENSOR CHECKED ALL TIRES FOR WEAR AND P S I RESET T P S SYSTEM
$7.50
$349.87
$76.26
$266.11
Commercial Total:
Internal Total: $349.87
Commercial Tax & Markup: $0.00
$0.00
$0.00
0.00
Equipment Usage Costs: $0.00
$0.00
©2021 AssetWorks LLC. All Rights Reserved. Page 1 of 1
Report Date: 8/11/2021
Work Order DetailCS-2017-2400
UD6008 2013 FORD F250 UTILITY BODY 3/4 TON TRUCK
Asset ID:
XD5184 CS - CENTRAL SHOPLicense Number: Repair Location:
CS-2017-2400 CLOSEDWork Order ID: Job Status:
PM PM-C - PM SERVICEJob Type: PM Service:
01/31/2017 37237 MILES (EQ UPD)PM Scheduled: WO Meter 1:
03/02/2017 15:52 R - ROUTINEProjected Completion Date:
Priority:
Non Service Request Tasks
Task: 013-020 - Front Pads Warranty: NO
WAC: 03 - REPLACED PART Reason: NP - NOTED IN PM SERVICE
Work Class: 2 - UNSCHEDULED Comments: Replaced Front Brakes And Rotors
Task Notes
ASALDANA 3-1-2017 3:56PM REPLACED FRONT BRAKE PADS, AXLE SEALS AND FRONT ROTORS.
Labor CostLabor Hrs
ASALDANA - Alejandro Saldana 1.79 159.31Emp: 03/01/2017 03:00
ASALDANA - Alejandro Saldana 0.93 82.7703/01/2017 15:57
Task: 017-010 - Replace 1 Tire Warranty: NO
WAC: 03 - REPLACED PART Reason: NP - NOTED IN PM SERVICE
Work Class: 2 - UNSCHEDULED Comments: Mount And Balance 4 Tires
Task Notes
ASALDANA 3-1-2017 12:51PM MOUNT AND BALANCE 4 TIRES
Labor CostLabor Hrs
ASALDANA - Alejandro Saldana 3.50 311.50Emp: 03/01/2017 03:00
ASALDANA - Alejandro Saldana 0.37 32.9303/01/2017 12:51
Task: 022-010 - Miscellaneous Warranty: NO
WAC: 07 - LUBRICATE Reason: NP - NOTED IN PM SERVICE
Work Class: 2 - UNSCHEDULED Comments: Rear Diff Service Completed
Task Notes
ASALDANA 3-1-2017 12:05PM REAR DIFF SERVICE COMPLETED
Labor CostLabor Hrs
ASALDANA - Alejandro Saldana 1.02 90.78Emp: 03/01/2017 03:00
ASALDANA - Alejandro Saldana 0.35 31.1503/01/2017 12:05
Task: 027-010 - Miscellaneous Warranty: NO
WAC: 03 - REPLACED PART Reason: NP - NOTED IN PM SERVICE
Work Class: 2 - UNSCHEDULED Comments: Trans Flush Completed
Task Notes
ASALDANA 3-1-2017 12:29PM TRANS FLUSH COMPLETED
Labor CostLabor Hrs
ASALDANA - Alejandro Saldana 2.01 178.89Emp: 03/01/2017 03:00
ASALDANA - Alejandro Saldana 0.23 20.4703/01/2017 12:19
ASALDANA - Alejandro Saldana 0.07 6.2303/01/2017 12:29
©2021 AssetWorks LLC. All Rights Reserved. Page 1 of 5
Report Date: 8/11/2021
Work Order Detail Work Order: CS-2017-2400
Task: 034-030 - Exterior Lighting Warranty: NO
WAC: 03 - REPLACED PART Reason: NP - NOTED IN PM SERVICE
Work Class: 2 - UNSCHEDULED Comments: Replaced Spot Light Handle
Task Notes
ASALDANA 3-1-2017 4:19PM REPLACED SPOT LIGHT HANDLE
Labor CostLabor Hrs
ASALDANA - Alejandro Saldana 0.70 62.30Emp: 03/01/2017 16:39
Task: PM-C - Pm Service Warranty: NO
WAC: 11 - PM COMPLETE Reason: NP - NOTED IN PM SERVICE
Work Class: 2 - UNSCHEDULED Comments: Pm Inspection Completed
Task Notes
ASALDANA 3-1-2017 11:44AM PM INSPECTION COMPLETED
Labor CostLabor Hrs
ASALDANA - Alejandro Saldana 1.02 90.78Emp: 03/01/2017 11:44
ASALDANA - Alejandro Saldana 5.00 445.0003/01/2017 03:00
Parts Total CostIss PriceQty Issued Tax & Markup
2.00 354.141FD-BRRF94-0 - 1FD; 1FD 101.18 126.48
Serial #:Removed Serial #:
1.00 99.181MC-BRF1458-0 - 1MC; 1MC 28.34 70.84
Serial #:Removed Serial #:
2.00 15.541MC-BRS137-0 - 1MC; 1MC 4.44 5.55
Serial #:Removed Serial #:
1.00 1.729AP-WW1C-0 - 9AP; WASHER FLUID CONCENTRATE 0.49 1.23
Serial #:Removed Serial #:
7.00 12.459OC-5W20-0 - 9OC; 5W20 SYN OIL 3.56 1.27
Serial #:Removed Serial #:
1.00 39.65BK-7309534-0 - BK; HANDLE 11.33 28.32
Serial #:Removed Serial #:
3.00 55.36VAL-982-0 - VAL; 1QT SYNGEAROIL 75W140 15.82 13.18
Serial #:Removed Serial #:
1.00 12.33FIL-9883-0 - FIL; NAPAGOLD AIR FILTER 3.52 8.81
Serial #:Removed Serial #:
9.00 33.77NOL-75200-0 - NOL; TRAN FLU QT DEXRON3I 9.65 2.68
Serial #:Removed Serial #:
1.00 4.40OWI-NP22-0 - OWI; WIPER BLADE 1.26 3.14
Serial #:Removed Serial #:
1.00 4.40OWI-NP22-0 - OWI; WIPER BLADE 1.26 3.14
Serial #:Removed Serial #:
4.00 1,002.79TIR-225425-0 - TIR; LT245/75R17 FRS TRNSFRCE HT 286.51 179.07
Serial #:Removed Serial #:
1.00 4.35FIL-1372-0 - FIL; NAPAGOLD OIL FILTER 1.24 3.11
Serial #:Removed Serial #:
Delays
Delay HoursStatus End DatetimeStart Datetime
3/1/2017 12:19PM 3/1/2017 12:25PM 0.10PD - WAIT PARTS - OUT OF SERVICE CLOSED
Delay HoursStatus End DatetimeStart Datetime
3/1/2017 12:51PM 3/1/2017 3:01PM 2.17PD - WAIT PARTS - OUT OF SERVICE CLOSED
Overhead
©2021 AssetWorks LLC. All Rights Reserved. Page 2 of 5
Report Date: 8/11/2021
Work Order Detail Work Order: CS-2017-2400
Small Parts - Labor: 0.00
Small Parts - Parts: 0.00
Tools: 0.00
Overhead Costs: 7.50
Total Overhead Costs: 7.50
Messages
Unit Is Being Replaced In Fy 20-21 List
©2021 AssetWorks LLC. All Rights Reserved. Page 3 of 5
Report Date: 8/11/2021
Work Order Detail Work Order: CS-2017-2400
PM Checklist
Task / Comment Employee CompletedN/AFailed
PM-C Exception PM: No
PM-076 - START ENGINE, CHECK GAUGES, WARNING LIGHTS
ASALDANA - ALEJANDRO SALDANA
PM-077 - HEATER, DEFROSTER, A/C OPERATION ASALDANA - ALEJANDRO SALDANA
PM-078 - STEERING, FREE TRAVEL, BIND, PULL, VIBRATION ASALDANA - ALEJANDRO SALDANA
PM-079 - DECAL/SERVICE STICKER ASALDANA - ALEJANDRO SALDANA
PM-080 - VISUAL, LEAK, APPEARANCE, DAMAGE ASALDANA - ALEJANDRO SALDANA
PM-081 - HITCH & TRAILER PLUG SOCKET ASALDANA - ALEJANDRO SALDANA
PM-082 - HORN, WINDSHEILD WIPERS/WASHER OPERATION
ASALDANA - ALEJANDRO SALDANA
PM-083 - ALL GLASS & MIRRORS ASALDANA - ALEJANDRO SALDANA
PM-084 - ALL LIGHTS & HEAD LIGHTS FOR PROPER ADJUSTMENT
ASALDANA - ALEJANDRO SALDANA
PM-085 - ENGINE PERFORMANCE ASALDANA - ALEJANDRO SALDANA
PM-086 - SAFETY EQUIPMENT, FIRE EXTIN. BACK ALARM ASALDANA - ALEJANDRO SALDANA
PM-087 - POWER STEERING SYSTEM/ FLUID ASALDANA - ALEJANDRO SALDANA
PM-088 - ALL HOSES ASALDANA - ALEJANDRO SALDANA
PM-089 - ALL BELTS ASALDANA - ALEJANDRO SALDANA
PM-090 - ALL POINTS CHASSIS LUBRICATION ASALDANA - ALEJANDRO SALDANA
PM-091 - CHANGE ENGINE OIL & FILTER ASALDANA - ALEJANDRO SALDANA
PM-092 - TRANSMISSION FLUID LEVEL & CONDITION ASALDANA - ALEJANDRO SALDANA
PM-093 - DIFFERENTIAL & DRIVE AXLES ASALDANA - ALEJANDRO SALDANA
PM-094 - LUBE DOORS & HINGE POINTS ASALDANA - ALEJANDRO SALDANA
PM-095 - REPLACE FUEL, CABIN & AIR FILTER, (AS NEEDED) ASALDANA - ALEJANDRO SALDANA
PM-096 - OPERATION & CONDITION OF AUXILIARY COMPONENTS
ASALDANA - ALEJANDRO SALDANA
PM-097 - CHARGING SYS.& BATTERY TEST, STARTER, CLEAN TERMINALS
ASALDANA - ALEJANDRO SALDANA
PM-098 - ENGINE & TRANSMISSION MOUNTS ASALDANA - ALEJANDRO SALDANA
PM-099 - PRESSURE TEST COOLING SYSTEM ASALDANA - ALEJANDRO SALDANA
©2021 AssetWorks LLC. All Rights Reserved. Page 4 of 5
Report Date: 8/11/2021
Work Order Detail Work Order: CS-2017-2400
PM-100 - FAN CLUTCH/ ELECTRIC FAN OPERATION ASALDANA - ALEJANDRO SALDANA
PM-101 - EXHAUST SYSTEM VISUAL ASALDANA - ALEJANDRO SALDANA
PM-102 - SEAT BELTS ALL, SUPPLEMENTAL RESTRAINTS (SIR/AIRBAG)
ASALDANA - ALEJANDRO SALDANA
PM-103 - ROTATE & BALANCE TIRES ASALDANA - ALEJANDRO SALDANA
PM-104 - BRAKE SYSTEM CHECK/ABS/REGENERATION- ROTOR THICKNESS (MEETS
ASALDANA - ALEJANDRO SALDANA
PM-105 - BRAKE SYSTEM CHECK/ABS/REGENERATION- DRUM DIAMETER (MEETS SP
ASALDANA - ALEJANDRO SALDANA
PM-106 - FRONT LINING PERCENTAGE - LF ASALDANA - ALEJANDRO SALDANA
PM-107 - FRONT LINING PERCENTAGE - RF ASALDANA - ALEJANDRO SALDANA
PM-108 - REAR LINING PERCENTAGE - LR ASALDANA - ALEJANDRO SALDANA
PM-109 - REAR LINING PERCENTAGE - RR ASALDANA - ALEJANDRO SALDANA
PM-110 - MASTER CYLINDER FLUID LEVEL/CONDITION ASALDANA - ALEJANDRO SALDANA
PM-111 - PARKING BRAKE SYSTEM ASALDANA - ALEJANDRO SALDANA
PM-112 - HYDRO BOOST/POWER BOOSTER ASALDANA - ALEJANDRO SALDANA
WO Notes
MLONDON 02/27/2017 09:44 VEHICLE NEEDS A PM-C SERVICE.
Comments: Internal Parts Cost:
Internal Labor Cost:
Commercial Labor Cost:
Commercial Parts Cost:
Work Order Total:
Commercial Misc Cost:
Overhead Costs: $7.50
$3,159.69
$1,640.08
$1,512.11
Commercial Total:
Internal Total: $3,159.69
Commercial Tax & Markup: $0.00
$0.00
$0.00
0.00
Equipment Usage Costs: $0.00
$0.00
©2021 AssetWorks LLC. All Rights Reserved. Page 5 of 5
Report Date: 8/11/2021
Work Order DetailCS-2017-3305
UD6008 2013 FORD F250 UTILITY BODY 3/4 TON TRUCK
Asset ID:
XD5184 CS - CENTRAL SHOPLicense Number: Repair Location:
CS-2017-3305 CLOSEDWork Order ID: Job Status:
REPAIR OS - OUT OF SERVICEJob Type: Service Status:
39411 MILES (EQ UPD) 05/05/2017 07:18WO Meter 1: Projected Completion Date:
R - ROUTINEPriority:
Non Service Request Tasks
Task: 017-030 - Tire Repair Warranty: NO
WAC: 08 - REPAIR Reason: BD - BREAKDOWN
Work Class: 2 - UNSCHEDULED Comments:
Labor CostLabor Hrs
JKAUFMAN - James Kaufman -1.58 -140.62Emp: 05/04/2017 17:47
JKAUFMAN - James Kaufman 1.58 140.6205/04/2017 20:47
JKAUFMAN - James Kaufman 1.58 140.6205/04/2017 17:47
Overhead
Small Parts - Labor: 0.00
Small Parts - Parts: 0.00
Tools: 0.00
Overhead Costs: 7.50
Total Overhead Costs: 7.50
Messages
Unit Is Being Replaced In Fy 20-21 List
WO Notes
CDENHART 05/04/2017 12:55 PASSENGER REAR TIRE HAS A NAIL IN IT.LOW PRESSURE WARNING ON DASH
Comments: Internal Parts Cost:
Internal Labor Cost:
Commercial Labor Cost:
Commercial Parts Cost:
Work Order Total:
Commercial Misc Cost:
Overhead Costs: $7.50
$148.12
$140.62
Commercial Total:
Internal Total: $148.12
Commercial Tax & Markup: $0.00
$0.00
$0.00
0.00
Equipment Usage Costs: $0.00
$0.00
©2021 AssetWorks LLC. All Rights Reserved. Page 1 of 1
Report Date: 8/11/2021
Work Order DetailCS-2017-3627
UD6008 2013 FORD F250 UTILITY BODY 3/4 TON TRUCK
Asset ID:
XD5184 CS - CENTRAL SHOPLicense Number: Repair Location:
CS-2017-3627 CLOSEDWork Order ID: Job Status:
REPAIR 41318 MILES (EQ UPD)Job Type: WO Meter 1:
06/06/2017 06:27 R - ROUTINEProjected Completion Date:
Priority:
Non Service Request Tasks
Task: 002-110 - Steps Warranty: NO
WAC: 03 - REPLACED PART Reason: BD - BREAKDOWN
Work Class: 2 - UNSCHEDULED Comments: Replaced Running Boards
Labor CostLabor Hrs
ASALDANA - Alejandro Saldana 0.75 66.75Emp: 06/05/2017 16:55
Parts Total CostIss PriceQty Issued Tax & Markup
1.00 120.08BAT-7565-0 - BAT; BATTERY 34.31 85.77
Serial #:Removed Serial #:
1.00 400.401FD-4C3Z16450GAA-0 - 1FD; STEP ASSEMBLY 114.40 286.00
Serial #:Removed Serial #:
Task: 035-010 - Miscellaneous Warranty: NO
WAC: 03 - REPLACED PART Reason: BD - BREAKDOWN
Work Class: 2 - UNSCHEDULED Comments: Replaced Battery
Labor CostLabor Hrs
ASALDANA - Alejandro Saldana 0.37 32.93Emp: 06/05/2017 17:17
Overhead
Small Parts - Labor: 0.00
Small Parts - Parts: 0.00
Tools: 0.00
Overhead Costs: 7.50
Total Overhead Costs: 7.50
Messages
Unit Is Being Replaced In Fy 20-21 List
WO Notes
MLONDON 06/01/2017 11:01 STEP UP BARS AT THE BOTTOM OF THE DOORS ARE RUSTED OUT AND BROKEN. WOULD LIKE TO HAVE THEM REPLACED. LAST PM-C WAS PERFORMED ON 3/2/17.
Comments: Internal Parts Cost:
Internal Labor Cost:
Commercial Labor Cost:
Commercial Parts Cost:
Work Order Total:
Commercial Misc Cost:
Overhead Costs: $7.50
$627.66
$520.48
$99.68
Commercial Total:
Internal Total: $627.66
Commercial Tax & Markup: $0.00
$0.00
$0.00
0.00
Equipment Usage Costs: $0.00
$0.00
©2021 AssetWorks LLC. All Rights Reserved. Page 1 of 1
Report Date: 8/11/2021
Work Order DetailCS-2017-5867
UD6008 2013 FORD F250 UTILITY BODY 3/4 TON TRUCK
Asset ID:
XD5184 CS - CENTRAL SHOPLicense Number: Repair Location:
CS-2017-5867 CLOSEDWork Order ID: Job Status:
PM PM-C - PM SERVICEJob Type: PM Service:
09/01/2017 OS - OUT OF SERVICEPM Scheduled: Service Status:
45312 MILES (EQ UPD) 10/30/2017 08:22WO Meter 1: Projected Completion Date:
R - ROUTINEPriority:
Non Service Request Tasks
Task: PM-C - Pm Service Warranty: NO
WAC: 11 - PM COMPLETE Reason: NP - NOTED IN PM SERVICE
Work Class: 1 - SCHEDULED Comments: Pm Inspection Completed
Labor CostLabor Hrs
ASALDANA - Alejandro Saldana 0.52 178.00Emp: 10/30/2017 08:14
Parts Total CostIss PriceQty Issued Tax & Markup
1.00 2.679AP-WW1C-0 - 9AP; WASHER FLUID CONCENTRATE 0.76 1.91
Serial #:Removed Serial #:
7.00 12.459OC-5W20-0 - 9OC; 5W20 SYN OIL 3.56 1.27
Serial #:Removed Serial #:
1.00 4.40OWI-NP22-0 - OWI; WIPER BLADE 1.26 3.14
Serial #:Removed Serial #:
1.00 24.64FIL-9883-0 - FIL; NAPAGOLD AIR FILTER 7.04 17.60
Serial #:Removed Serial #:
1.00 4.40OWI-NP22-0 - OWI; WIPER BLADE 1.26 3.14
Serial #:Removed Serial #:
1.00 4.34FIL-1372-0 - FIL; NAPAGOLD OIL FILTER 1.24 3.10
Serial #:Removed Serial #:
Delays
Delay HoursStatus End DatetimeStart Datetime
10/25/2017 9:38AM 10/30/2017 7:43AM 34.37AT - AWAITING TECHNICIAN CLOSED
Overhead
Small Parts - Labor: 0.00
Small Parts - Parts: 0.00
Tools: 0.00
Overhead Costs: 0.00
Total Overhead Costs: 0.00
Messages
Unit Is Being Replaced In Fy 20-21 List
©2021 AssetWorks LLC. All Rights Reserved. Page 1 of 3
Report Date: 8/11/2021
Work Order Detail Work Order: CS-2017-5867
PM Checklist
Task / Comment Employee CompletedN/AFailed
PM-C Exception PM: No
PM-076 - START ENGINE, CHECK GAUGES, WARNING LIGHTS
ASALDANA - ALEJANDRO SALDANA
PM-077 - HEATER, DEFROSTER, A/C OPERATION ASALDANA - ALEJANDRO SALDANA
PM-078 - STEERING, FREE TRAVEL, BIND, PULL, VIBRATION ASALDANA - ALEJANDRO SALDANA
PM-079 - DECAL/SERVICE STICKER ASALDANA - ALEJANDRO SALDANA
PM-080 - VISUAL, LEAK, APPEARANCE, DAMAGE ASALDANA - ALEJANDRO SALDANA
PM-081 - HITCH & TRAILER PLUG SOCKET ASALDANA - ALEJANDRO SALDANA
PM-082 - HORN, WINDSHEILD WIPERS/WASHER OPERATION
ASALDANA - ALEJANDRO SALDANA
PM-083 - ALL GLASS & MIRRORS ASALDANA - ALEJANDRO SALDANA
PM-084 - ALL LIGHTS & HEAD LIGHTS FOR PROPER ADJUSTMENT
ASALDANA - ALEJANDRO SALDANA
PM-085 - ENGINE PERFORMANCE ASALDANA - ALEJANDRO SALDANA
PM-086 - SAFETY EQUIPMENT, FIRE EXTIN. BACK ALARM ASALDANA - ALEJANDRO SALDANA
PM-087 - POWER STEERING SYSTEM/ FLUID ASALDANA - ALEJANDRO SALDANA
PM-088 - ALL HOSES ASALDANA - ALEJANDRO SALDANA
PM-089 - ALL BELTS ASALDANA - ALEJANDRO SALDANA
PM-090 - ALL POINTS CHASSIS LUBRICATION ASALDANA - ALEJANDRO SALDANA
PM-091 - CHANGE ENGINE OIL & FILTER ASALDANA - ALEJANDRO SALDANA
PM-092 - TRANSMISSION FLUID LEVEL & CONDITION ASALDANA - ALEJANDRO SALDANA
PM-093 - DIFFERENTIAL & DRIVE AXLES ASALDANA - ALEJANDRO SALDANA
PM-094 - LUBE DOORS & HINGE POINTS ASALDANA - ALEJANDRO SALDANA
PM-095 - REPLACE FUEL, CABIN & AIR FILTER, (AS NEEDED) ASALDANA - ALEJANDRO SALDANA
PM-096 - OPERATION & CONDITION OF AUXILIARY COMPONENTS
ASALDANA - ALEJANDRO SALDANA
PM-097 - CHARGING SYS.& BATTERY TEST, STARTER, CLEAN TERMINALS
ASALDANA - ALEJANDRO SALDANA
PM-098 - ENGINE & TRANSMISSION MOUNTS ASALDANA - ALEJANDRO SALDANA
PM-099 - PRESSURE TEST COOLING SYSTEM ASALDANA - ALEJANDRO SALDANA
©2021 AssetWorks LLC. All Rights Reserved. Page 2 of 3
Report Date: 8/11/2021
Work Order Detail Work Order: CS-2017-5867
PM-100 - FAN CLUTCH/ ELECTRIC FAN OPERATION ASALDANA - ALEJANDRO SALDANA
PM-101 - EXHAUST SYSTEM VISUAL ASALDANA - ALEJANDRO SALDANA
PM-102 - SEAT BELTS ALL, SUPPLEMENTAL RESTRAINTS (SIR/AIRBAG)
ASALDANA - ALEJANDRO SALDANA
PM-103 - ROTATE & BALANCE TIRES ASALDANA - ALEJANDRO SALDANA
PM-104 - BRAKE SYSTEM CHECK/ABS/REGENERATION- ROTOR THICKNESS (MEETS
ASALDANA - ALEJANDRO SALDANA
PM-105 - BRAKE SYSTEM CHECK/ABS/REGENERATION- DRUM DIAMETER (MEETS SP
ASALDANA - ALEJANDRO SALDANA
PM-106 - FRONT LINING PERCENTAGE - LF ASALDANA - ALEJANDRO SALDANA
PM-107 - FRONT LINING PERCENTAGE - RF ASALDANA - ALEJANDRO SALDANA
PM-108 - REAR LINING PERCENTAGE - LR ASALDANA - ALEJANDRO SALDANA
PM-109 - REAR LINING PERCENTAGE - RR ASALDANA - ALEJANDRO SALDANA
PM-110 - MASTER CYLINDER FLUID LEVEL/CONDITION ASALDANA - ALEJANDRO SALDANA
PM-111 - PARKING BRAKE SYSTEM ASALDANA - ALEJANDRO SALDANA
PM-112 - HYDRO BOOST/POWER BOOSTER ASALDANA - ALEJANDRO SALDANA
WO Notes
DENHARTC 10/25/2017 09:38 PM SERVICE
Comments: Internal Parts Cost:
Internal Labor Cost:
Commercial Labor Cost:
Commercial Parts Cost:
Work Order Total:
Commercial Misc Cost:
Overhead Costs: $0.00
$230.90
$52.90
$178.00
Commercial Total:
Internal Total: $230.90
Commercial Tax & Markup: $0.00
$0.00
$0.00
0.00
Equipment Usage Costs: $0.00
$0.00
©2021 AssetWorks LLC. All Rights Reserved. Page 3 of 3
Report Date: 8/11/2021
Work Order DetailCS-2017-6179
UD6008 2013 FORD F250 UTILITY BODY 3/4 TON TRUCK
Asset ID:
XD5184 CS - CENTRAL SHOPLicense Number: Repair Location:
CS-2017-6179 CLOSEDWork Order ID: Job Status:
REPAIR OS - OUT OF SERVICEJob Type: Service Status:
45350 MILES (EQ UPD) 11/15/2017 11:15WO Meter 1: Projected Completion Date:
R - ROUTINEPriority:
Non Service Request Tasks
Task: 017-000 - Tire Diagnosis Warranty: NO
WAC: 03 - REPLACED PART Reason: WT - WEAR AND TEAR
Work Class: 2 - UNSCHEDULED Comments:
Task Notes
KROWE 11-14-2017 4:59PM THE RIGHT FRONT TIRE WAS FOUND TO BE LOW IT HAD A NAIL IN IT, THE THREADS HOWEVER WERE AT 4/32 WHICH IS ALMOST TO THE WEAR BARS THIS TIRE WILL BE REPLACED, THE LEFT FRONT TIRE HAD THE SAME LEVEL OF WEAR SO IT WILL BE REPLACED AS WELL
Labor CostLabor Hrs
KROWE - Karmichael Rowe 0.95 84.55Emp: 11/14/2017 17:19
KROWE - Karmichael Rowe 1.10 97.9011/14/2017 03:00
Parts Total CostIss PriceQty Issued Tax & Markup
4.00 949.76TIR-179636492-0 - TIR; LT245/75R17 WRANGLER SRA 271.36 169.60
Serial #:Removed Serial #:
Delays
Delay HoursStatus End DatetimeStart Datetime
11/14/2017 12:33PM 11/14/2017 4:22PM 3.82AT - AWAITING TECHNICIAN CLOSED
Overhead
Small Parts - Labor: 0.00
Small Parts - Parts: 0.00
Tools: 0.00
Overhead Costs: 0.00
Total Overhead Costs: 0.00
Messages
Unit Is Being Replaced In Fy 20-21 List
WO Notes
DENHARTC 11/14/2017 12:32 SCREW IN RIGHT FRONT TIRE
©2021 AssetWorks LLC. All Rights Reserved. Page 1 of 2
Report Date: 8/11/2021
Work Order Detail Work Order: CS-2017-6179
Comments: Internal Parts Cost:
Internal Labor Cost:
Commercial Labor Cost:
Commercial Parts Cost:
Work Order Total:
Commercial Misc Cost:
Overhead Costs: $0.00
$1,132.21
$949.76
$182.45
Commercial Total:
Internal Total: $1,132.21
Commercial Tax & Markup: $0.00
$0.00
$0.00
0.00
Equipment Usage Costs: $0.00
$0.00
©2021 AssetWorks LLC. All Rights Reserved. Page 2 of 2
Report Date: 8/11/2021
Work Order DetailCS-2018-7766
UD6008 2013 FORD F250 UTILITY BODY 3/4 TON TRUCK
Asset ID:
XD5184 CS - CENTRAL SHOPLicense Number: Repair Location:
CS-2018-7766 CLOSEDWork Order ID: Job Status:
REPAIR OS - OUT OF SERVICEJob Type: Service Status:
48823 MILES (EQ UPD) 02/17/2018 09:30WO Meter 1: Projected Completion Date:
R - ROUTINEPriority:
Non Service Request Tasks
Task: 039-050 - Gps Installation Warranty: NO
WAC: 03 - REPLACED PART Reason: MO - MODIFICATION
Work Class: 1 - SCHEDULED Comments:
Task Notes
KGIFFIN 2-17-2018 8:27AM REPLACED GPD UNIT WITH NEW ONE.
Labor CostLabor Hrs
KGIFFIN - Kiernan Giffin 0.82 44.50Emp: 02/17/2018 08:27
Delays
Delay HoursStatus End DatetimeStart Datetime
2/16/2018 4:50PM 2/17/2018 7:38AM 3.17AT - AWAITING TECHNICIAN CLOSED
Overhead
Small Parts - Labor: 0.00
Small Parts - Parts: 0.00
Tools: 0.00
Overhead Costs: 0.00
Total Overhead Costs: 0.00
Messages
Unit Is Being Replaced In Fy 20-21 List
WO Notes
WCASTRO 02/16/2018 16:50 GPS INSTALLATION
Comments: Internal Parts Cost:
Internal Labor Cost:
Commercial Labor Cost:
Commercial Parts Cost:
Work Order Total:
Commercial Misc Cost:
Overhead Costs: $0.00
$44.50
$44.50
Commercial Total:
Internal Total: $44.50
Commercial Tax & Markup: $0.00
$0.00
$0.00
0.00
Equipment Usage Costs: $0.00
$0.00
©2021 AssetWorks LLC. All Rights Reserved. Page 1 of 1
Report Date: 8/11/2021
Work Order DetailCS-2018-8461
UD6008 2013 FORD F250 UTILITY BODY 3/4 TON TRUCK
Asset ID:
XD5184 CS - CENTRAL SHOPLicense Number: Repair Location:
CS-2018-8461 CLOSEDWork Order ID: Job Status:
PM PM-C - PM SERVICEJob Type: PM Service:
04/30/2018 OS - OUT OF SERVICEPM Scheduled: Service Status:
50167 MILES (EQ UPD) 04/16/2018 09:15WO Meter 1: Projected Completion Date:
R - ROUTINEPriority:
Non Service Request Tasks
Task: 013-002 - Rear Disc Or Drum Brake Service One Axle Complete Warranty: NO
WAC: 03 - REPLACED PART Reason: NP - NOTED IN PM SERVICE
Work Class: 2 - UNSCHEDULED Comments:
Labor CostLabor Hrs
ASALDANA - Alejandro Saldana 1.08 267.00Emp: 04/16/2018 03:00
Task: 013-003 - Rear Disc Or Drum Brake Service Two Axles Complete Warranty: NO
WAC: 01 - ADJUST Reason: NP - NOTED IN PM SERVICE
Work Class: 2 - UNSCHEDULED Comments:
Task Notes
ASALDANA 4-13-2018 1:44PM REPLACED REAR PADS AND ROTORS
Labor CostLabor Hrs
ASALDANA - Alejandro Saldana -1.08 -96.12Emp: 04/13/2018 13:45
ASALDANA - Alejandro Saldana 1.08 96.1204/13/2018 13:45
ASALDANA - Alejandro Saldana 0.10 8.9004/16/2018 03:00
Parts Total CostIss PriceQty Issued Tax & Markup
1.00 76.081MC-BRF1456-0 - 1MC; 1MC 21.74 54.34
Serial #:Removed Serial #:
2.00 295.231MC-BRRF303-0 - 1MC; 1MC 84.35 105.44
Serial #:Removed Serial #:
Task: 017-011 - Replace 2 Tires Warranty: NO
WAC: 03 - REPLACED PART Reason: NP - NOTED IN PM SERVICE
Work Class: 2 - UNSCHEDULED Comments: Replaced Front Tires
Labor CostLabor Hrs
JKAUFMAN - James Kaufman 0.00 0.00Emp: 04/16/2018 08:25
JKAUFMAN - James Kaufman 0.90 178.0004/16/2018 08:23
Parts Total CostIss PriceQty Issued Tax & Markup
2.00 521.44TIR-225425-0 - TIR; LT245/75R17 FRS TRNSFRCE HT 148.98 186.23
Serial #:Removed Serial #:
Task: 017-050 - Tpms System Warranty: NO
WAC: 10 - DIAGNOSE Reason: NP - NOTED IN PM SERVICE
Work Class: 2 - UNSCHEDULED Comments: Tested All T P S Sensors Reset T P S System
Labor CostLabor Hrs
JKAUFMAN - James Kaufman 0.27 24.03Emp: 04/16/2018 07:29
JKAUFMAN - James Kaufman 0.03 2.6704/16/2018 08:25
©2021 AssetWorks LLC. All Rights Reserved. Page 1 of 4
Report Date: 8/11/2021
Work Order Detail Work Order: CS-2018-8461
Task: PM-C - Pm Service Warranty: NO
WAC: 11 - PM COMPLETE Reason: NP - NOTED IN PM SERVICE
Work Class: 2 - UNSCHEDULED Comments:
Task Notes
ASALDANA 4-13-2018 12:40PM PM INSPECTION COMPLETED
Labor CostLabor Hrs
ASALDANA - Alejandro Saldana 0.67 178.00Emp: 04/13/2018 08:39
Parts Total CostIss PriceQty Issued Tax & Markup
1.00 1.719AP-WW1C-0 - 9AP; WASHER FLUID CONCENTRATE 0.49 1.22
Serial #:Removed Serial #:
2.00 8.79OWI-NP22-0 - OWI; WIPER BLADE 2.51 3.14
Serial #:Removed Serial #:
1.00 4.34FIL-1372-0 - FIL; NAPAGOLD OIL FILTER 1.24 3.10
Serial #:Removed Serial #:
1.00 12.32FIL-9883-0 - FIL; NAPAGOLD AIR FILTER 3.52 8.80
Serial #:Removed Serial #:
2.00 6.58MAC-4810-0 - MAC; LOW VOC BRAKE CLNR 1.88 2.35
Serial #:Removed Serial #:
7.00 12.459OC-5W20-0 - 9OC; 5W20 SYN OIL 3.56 1.27
Serial #:Removed Serial #:
Delays
Delay HoursStatus End DatetimeStart Datetime
3/27/2018 2:01PM 4/13/2018 7:53AM 149.98AT - AWAITING TECHNICIAN CLOSED
Delay HoursStatus End DatetimeStart Datetime
4/13/2018 8:39AM 4/13/2018 12:39PM 4.00PD - WAIT PARTS - OUT OF SERVICE CLOSED
Delay HoursStatus End DatetimeStart Datetime
4/13/2018 1:45PM 4/16/2018 7:13AM 6.25AT - AWAITING TECHNICIAN CLOSED
Overhead
Small Parts - Labor: 0.00
Small Parts - Parts: 0.00
Tools: 0.00
Overhead Costs: 0.00
Total Overhead Costs: 0.00
Messages
Unit Is Being Replaced In Fy 20-21 List
©2021 AssetWorks LLC. All Rights Reserved. Page 2 of 4
Report Date: 8/11/2021
Work Order Detail Work Order: CS-2018-8461
PM Checklist
Task / Comment Employee CompletedN/AFailed
PM-C Exception PM: No
PM-076 - START ENGINE, CHECK GAUGES, WARNING LIGHTS
ASALDANA - ALEJANDRO SALDANA
PM-077 - HEATER, DEFROSTER, A/C OPERATION ASALDANA - ALEJANDRO SALDANA
PM-078 - STEERING, FREE TRAVEL, BIND, PULL, VIBRATION ASALDANA - ALEJANDRO SALDANA
PM-079 - DECAL/SERVICE STICKER ASALDANA - ALEJANDRO SALDANA
PM-080 - VISUAL, LEAK, APPEARANCE, DAMAGE ASALDANA - ALEJANDRO SALDANA
PM-081 - HITCH & TRAILER PLUG SOCKET ASALDANA - ALEJANDRO SALDANA
PM-082 - HORN, WINDSHEILD WIPERS/WASHER OPERATION
ASALDANA - ALEJANDRO SALDANA
PM-083 - ALL GLASS & MIRRORS ASALDANA - ALEJANDRO SALDANA
PM-084 - ALL LIGHTS & HEAD LIGHTS FOR PROPER ADJUSTMENT
ASALDANA - ALEJANDRO SALDANA
PM-085 - ENGINE PERFORMANCE ASALDANA - ALEJANDRO SALDANA
PM-086 - SAFETY EQUIPMENT, FIRE EXTIN. BACK ALARM ASALDANA - ALEJANDRO SALDANA
PM-087 - POWER STEERING SYSTEM/ FLUID ASALDANA - ALEJANDRO SALDANA
PM-088 - ALL HOSES ASALDANA - ALEJANDRO SALDANA
PM-089 - ALL BELTS ASALDANA - ALEJANDRO SALDANA
PM-090 - ALL POINTS CHASSIS LUBRICATION ASALDANA - ALEJANDRO SALDANA
PM-091 - CHANGE ENGINE OIL & FILTER ASALDANA - ALEJANDRO SALDANA
PM-092 - TRANSMISSION FLUID LEVEL & CONDITION ASALDANA - ALEJANDRO SALDANA
PM-093 - DIFFERENTIAL & DRIVE AXLES ASALDANA - ALEJANDRO SALDANA
PM-094 - LUBE DOORS & HINGE POINTS ASALDANA - ALEJANDRO SALDANA
PM-095 - REPLACE FUEL, CABIN & AIR FILTER, (AS NEEDED) ASALDANA - ALEJANDRO SALDANA
PM-096 - OPERATION & CONDITION OF AUXILIARY COMPONENTS
ASALDANA - ALEJANDRO SALDANA
PM-097 - CHARGING SYS.& BATTERY TEST, STARTER, CLEAN TERMINALS
ASALDANA - ALEJANDRO SALDANA
PM-098 - ENGINE & TRANSMISSION MOUNTS ASALDANA - ALEJANDRO SALDANA
PM-099 - PRESSURE TEST COOLING SYSTEM ASALDANA - ALEJANDRO SALDANA
©2021 AssetWorks LLC. All Rights Reserved. Page 3 of 4
Report Date: 8/11/2021
Work Order Detail Work Order: CS-2018-8461
PM-100 - FAN CLUTCH/ ELECTRIC FAN OPERATION ASALDANA - ALEJANDRO SALDANA
PM-101 - EXHAUST SYSTEM VISUAL ASALDANA - ALEJANDRO SALDANA
PM-102 - SEAT BELTS ALL, SUPPLEMENTAL RESTRAINTS (SIR/AIRBAG)
ASALDANA - ALEJANDRO SALDANA
PM-103 - ROTATE & BALANCE TIRES ASALDANA - ALEJANDRO SALDANA
PM-104 - BRAKE SYSTEM CHECK/ABS/REGENERATION- ROTOR THICKNESS (MEETS
ASALDANA - ALEJANDRO SALDANA
PM-105 - BRAKE SYSTEM CHECK/ABS/REGENERATION- DRUM DIAMETER (MEETS SP
ASALDANA - ALEJANDRO SALDANA
PM-106 - FRONT LINING PERCENTAGE - LF ASALDANA - ALEJANDRO SALDANA
PM-107 - FRONT LINING PERCENTAGE - RF ASALDANA - ALEJANDRO SALDANA
PM-108 - REAR LINING PERCENTAGE - LR ASALDANA - ALEJANDRO SALDANA
PM-109 - REAR LINING PERCENTAGE - RR ASALDANA - ALEJANDRO SALDANA
PM-110 - MASTER CYLINDER FLUID LEVEL/CONDITION ASALDANA - ALEJANDRO SALDANA
PM-111 - PARKING BRAKE SYSTEM ASALDANA - ALEJANDRO SALDANA
PM-112 - HYDRO BOOST/POWER BOOSTER ASALDANA - ALEJANDRO SALDANA
WO Notes
JKAUFMAN 04/16/2018 08:31 UNIT CORRECT MILEAGE IS 50181
JKAUFMAN 04/16/2018 08:28 PM CHECKLIST NEEDS TO BE COMPLETED IN ORDER TO CLOSE WORK ORDER
JKAUFMAN 04/16/2018 08:27 FRONT TIRES / T P S SENSORS COMPLETED
ASALDANA 04/13/2018 13:45 NEEDS TIRE REPLACED AND TMPS SYSTEM DIAG. WAITING FOR JIM
WCASTRO 03/27/2018 13:56 PM SERVICESPASSENGER SIDE STEP PLEASE CHECK.
Comments: Internal Parts Cost:
Internal Labor Cost:
Commercial Labor Cost:
Commercial Parts Cost:
Work Order Total:
Commercial Misc Cost:
Overhead Costs: $0.00
$1,597.54
$938.94
$658.60
Commercial Total:
Internal Total: $1,597.54
Commercial Tax & Markup: $0.00
$0.00
$0.00
0.00
Equipment Usage Costs: $0.00
$0.00
©2021 AssetWorks LLC. All Rights Reserved. Page 4 of 4
Report Date: 8/11/2021
Work Order DetailCS-2018-10374
UD6008 2013 FORD F250 UTILITY BODY 3/4 TON TRUCK
Asset ID:
XD5184 CS - CENTRAL SHOPLicense Number: Repair Location:
CS-2018-10374 CLOSEDWork Order ID: Job Status:
REPAIR OS - OUT OF SERVICEJob Type: Service Status:
52077 MILES (EQ UPD) 07/02/2018 12:46WO Meter 1: Projected Completion Date:
R - ROUTINEPriority:
Non Service Request Tasks
Task: 003-180 - Check Engine Light Diagnosis Warranty: NO
WAC: 08 - REPAIR Reason: WT - WEAR AND TEAR
Work Class: 2 - UNSCHEDULED Comments:
Task Notes
AAGRESTI 7-2-2018 12:28PM LARGE EVAP LAEK DETECTED.. FOUND CRACKED EVAP HOSE COMING OFF OF CANISTER....REPLACED HOSE AND RAN SERVICE BAY TEST ON UNIT. PASSED AT THIS TIME.
Labor CostLabor Hrs
AAGRESTI - Adam Agresti 1.95 173.55Emp: 06/29/2018 10:06
AAGRESTI - Adam Agresti 0.45 40.0506/29/2018 10:59
Task: 033-010 - Miscellaneous Warranty: NO
WAC: 08 - REPAIR Reason: WT - WEAR AND TEAR
Work Class: 2 - UNSCHEDULED Comments:
Task Notes
AAGRESTI 7-2-2018 12:27PM TRUCK WOULD NOT RUN CATALYST MONITOR.....FOUND UNIVERSAL O2 GROUND WIRE CHAFED AGAINST ANOTHER EXPOSED WIRE. RE ROUTED O2 GROUND WIRE AND SEALED EXPOESED WIRING. WENT ON EXTENSIVE ROAD TEST TO MAKE SURE MONITORS ARE RUNNING PROPERLY
Labor CostLabor Hrs
AAGRESTI - Adam Agresti 1.58 140.62Emp: 07/02/2018 12:27
Delays
Delay HoursStatus End DatetimeStart Datetime
6/28/2018 2:45PM 6/29/2018 8:09AM 5.40AT - AWAITING TECHNICIAN CLOSED
Delay HoursStatus End DatetimeStart Datetime
6/29/2018 10:59AM 7/2/2018 10:51AM 11.87WD - AWAITING DIAGNOSIS CLOSED
Overhead
Small Parts - Labor: 0.00
Small Parts - Parts: 0.00
Tools: 0.00
Overhead Costs: 0.00
Total Overhead Costs: 0.00
Messages
Unit Is Being Replaced In Fy 20-21 List
WO Notes
AAGRESTI 07/02/2018 11:34 IN PROCESS OF GETTING UNIT TO RUN CATALYST MONITORS
AAGRESTI 07/02/2018 11:26 TRUCK WILL NOT SET READINESS CATALYST MONITORS.........
DMCINTYRE 06/28/2018 14:44 CHECK ENGINE LIGHT IS ON
©2021 AssetWorks LLC. All Rights Reserved. Page 1 of 2
Report Date: 8/11/2021
Work Order Detail Work Order: CS-2018-10374
Comments: Internal Parts Cost:
Internal Labor Cost:
Commercial Labor Cost:
Commercial Parts Cost:
Work Order Total:
Commercial Misc Cost:
Overhead Costs: $0.00
$354.22
$354.22
Commercial Total:
Internal Total: $354.22
Commercial Tax & Markup: $0.00
$0.00
$0.00
0.00
Equipment Usage Costs: $0.00
$0.00
©2021 AssetWorks LLC. All Rights Reserved. Page 2 of 2
Report Date: 8/11/2021
Work Order DetailCS-2018-10901
UD6008 2013 FORD F250 UTILITY BODY 3/4 TON TRUCK
Asset ID:
XD5184 CS - CENTRAL SHOPLicense Number: Repair Location:
CS-2018-10901 CLOSEDWork Order ID: Job Status:
REPAIR OS - OUT OF SERVICEJob Type: Service Status:
52478 MILES (EQ UPD) 08/02/2018 16:29WO Meter 1: Projected Completion Date:
R - ROUTINEPriority:
Non Service Request Tasks
Task: 002-020 - Glass Warranty: NO
WAC: 03 - REPLACED PART Reason: WT - WEAR AND TEAR
Work Class: 2 - UNSCHEDULED Comments:
Task Notes
DMCINTYRE 8-2-2018 10:44AM REMOVE AND REINSTALL DOOR PANEL AND SPEAKER TO INSTALL NEW SIDEVIEW MIRROR. DOOR PANEL MIRROR TRIM COVER ON ORDER WILL CALL DEPT WHEN IT COMES IN
Labor CostLabor Hrs
DMCINTYRE - David Mcintyre 1.50 133.50Emp: 08/02/2018 03:00
Parts Total CostIss PriceQty Issued Tax & Markup
1.00 65.141FD-7C3Z17K709AC-0 - 1FD; 1FD 18.61 46.53
Serial #:Removed Serial #:
1.00 9.10FRT-0 - FREIGHT; NAPA FREIGHT CHARGES 2.60 6.50
Serial #:Removed Serial #:
1.00 785.501FD-DC3Z17683BACP-0 - 1FD; MIRRORASY 224.43 561.07
Serial #:Removed Serial #:
Delays
Delay HoursStatus End DatetimeStart Datetime
8/1/2018 11:11AM 8/2/2018 10:44AM 11.55PD - WAIT PARTS - OUT OF SERVICE CLOSED
Overhead
Small Parts - Labor: 0.00
Small Parts - Parts: 0.00
Tools: 0.00
Overhead Costs: 0.00
Total Overhead Costs: 0.00
Messages
Unit Is Being Replaced In Fy 20-21 List
WO Notes
DENHARTC 08/01/2018 11:09 REPLACE DRIVER SIDE MIRROR ASSEMBLY
©2021 AssetWorks LLC. All Rights Reserved. Page 1 of 2
Report Date: 8/11/2021
Work Order Detail Work Order: CS-2018-10901
Comments: Internal Parts Cost:
Internal Labor Cost:
Commercial Labor Cost:
Commercial Parts Cost:
Work Order Total:
Commercial Misc Cost:
Overhead Costs: $0.00
$993.24
$859.74
$133.50
Commercial Total:
Internal Total: $993.24
Commercial Tax & Markup: $0.00
$0.00
$0.00
0.00
Equipment Usage Costs: $0.00
$0.00
©2021 AssetWorks LLC. All Rights Reserved. Page 2 of 2
Report Date: 8/11/2021
Work Order DetailCS-2018-11077
UD6008 2013 FORD F250 UTILITY BODY 3/4 TON TRUCK
Asset ID:
XD5184 CS - CENTRAL SHOPLicense Number: Repair Location:
CS-2018-11077 CLOSEDWork Order ID: Job Status:
REPAIR OS - OUT OF SERVICEJob Type: Service Status:
52558 MILES (EQ UPD) 08/14/2018 13:50WO Meter 1: Projected Completion Date:
R - ROUTINEPriority:
Non Service Request Tasks
Task: 001-000 - Hvac Diagnosis Warranty: NO
WAC: 10 - DIAGNOSE Reason: BD - BREAKDOWN
Work Class: 2 - UNSCHEDULED Comments:
Task Notes
DMCINTYRE 8-13-2018 3:19PM EVACUATE AND MEASURE FREON INSPECT A/C COMPONENTS FOR SIGNS OF LEAKS, ADD DYE AND RECHECK FOR LEAKS.
Labor CostLabor Hrs
DMCINTYRE - David Mcintyre 1.00 89.00Emp: 08/13/2018 03:00
Task: 001-020 - Ac Repair Warranty: NO
WAC: 02 - CLEAN Reason: BD - BREAKDOWN
Work Class: 2 - UNSCHEDULED Comments:
Task Notes
DMCINTYRE 8-14-2018 1:49PM FLUSH A/C SYSTEM
DMCINTYRE 8-13-2018 3:27PM REMOVE AND REPLACE CONDENSOR
Labor CostLabor Hrs
DMCINTYRE - David Mcintyre 1.20 106.80Emp: 08/14/2018 03:00
DMCINTYRE - David Mcintyre 1.00 89.0008/14/2018 03:00
DMCINTYRE - David Mcintyre 0.70 62.3008/14/2018 03:00
Parts Total CostIss PriceQty Issued Tax & Markup
1.00 321.361FD-BC3Z19712B-0 - 1FD; CONDENSER 91.82 229.54
Serial #:Removed Serial #:
1.00 8.01TEM-801651-0 - TEM; PAGOIL 2.29 5.72
Serial #:Removed Serial #:
Task: 002-150 - Decals Warranty: NO
WAC: 03 - REPLACED PART Reason: BD - BREAKDOWN
Work Class: 2 - UNSCHEDULED Comments:
Task Notes
DMCINTYRE 8-14-2018 1:49PM REMOVE OLD CITY SEALS AND REPLACE WITH NEW CITY LOGOS
Labor CostLabor Hrs
DMCINTYRE - David Mcintyre 1.00 89.00Emp: 08/14/2018 03:00
Parts Total CostIss PriceQty Issued Tax & Markup
2.00 92.409OP-LARGEDECAL-0 - 9OP; CWPB LARGE DECAL 26.40 33.00
Serial #:Removed Serial #:
Task: 005-033 - Rni-Update/Verified Warranty: NO
WAC: 01 - ADJUST Reason: BD - BREAKDOWN
Work Class: 2 - UNSCHEDULED Comments:
Labor CostLabor Hrs
DMCINTYRE - David Mcintyre 1.00 89.00Emp: 08/14/2018 03:00
©2021 AssetWorks LLC. All Rights Reserved. Page 1 of 2
Report Date: 8/11/2021
Work Order Detail Work Order: CS-2018-11077
Parts Total CostIss PriceQty Issued Tax & Markup
1.00 11.42TEM-419955-0 - TEM; FLUSH SOLVENT 3.26 8.16
Serial #:Removed Serial #:
Delays
Delay HoursStatus End DatetimeStart Datetime
8/9/2018 2:39PM 8/13/2018 3:19PM 24.67AT - AWAITING TECHNICIAN CLOSED
Overhead
Small Parts - Labor: 0.00
Small Parts - Parts: 0.00
Tools: 0.00
Overhead Costs: 0.00
Total Overhead Costs: 0.00
Messages
Unit Is Being Replaced In Fy 20-21 List
WO Notes
LALIFF 08/09/2018 14:35 AC BLOWING WARM
Comments: Internal Parts Cost:
Internal Labor Cost:
Commercial Labor Cost:
Commercial Parts Cost:
Work Order Total:
Commercial Misc Cost:
Overhead Costs: $0.00
$958.29
$433.19
$525.10
Commercial Total:
Internal Total: $958.29
Commercial Tax & Markup: $0.00
$0.00
$0.00
0.00
Equipment Usage Costs: $0.00
$0.00
©2021 AssetWorks LLC. All Rights Reserved. Page 2 of 2
Report Date: 8/11/2021
Work Order DetailCS-2018-12988
UD6008 2013 FORD F250 UTILITY BODY 3/4 TON TRUCK
Asset ID:
XD5184 CS - CENTRAL SHOPLicense Number: Repair Location:
CS-2018-12988 CLOSEDWork Order ID: Job Status:
PM PM-C - PM SERVICEJob Type: PM Service:
10/16/2018 OS - OUT OF SERVICEPM Scheduled: Service Status:
56372 MILES (EQ UPD) 12/13/2018 09:28WO Meter 1: Projected Completion Date:
R - ROUTINEPriority:
Non Service Request Tasks
Task: 005-020 - W/S Wipers Warranty: NO
WAC: 03 - REPLACED PART Reason: NP - NOTED IN PM SERVICE
Work Class: 1 - SCHEDULED Comments:
Task Notes
HVELAZQUEZ12-13-2018 9:19AM TECH REPLACED FRONT WIPER BLADES.
Labor CostLabor Hrs
HVELAZQUE - Hector Velazquez 1.35 44.50Emp: 12/12/2018 12:10
Task: 005-033 - Rni-Update/Verified Warranty: NO
WAC: 01 - ADJUST Reason: NP - NOTED IN PM SERVICE
Work Class: 1 - SCHEDULED Comments:
Task Notes
HVELAZQUEZ12-13-2018 9:19AM RNI WAS UPDATED TO THE CURRENT VEHICLE MILEAGE.
Labor CostLabor Hrs
HVELAZQUE - Hector Velazquez -0.03 -2.67Emp: 12/12/2018 12:12
HVELAZQUE - Hector Velazquez 1.03 91.6712/12/2018 12:12
HVELAZQUE - Hector Velazquez 0.03 2.6712/12/2018 12:12
Task: 005-050 - Cooling System Service Warranty: NO
WAC: 51 - DEFERRED MAINTENANCE
Reason: NP - NOTED IN PM SERVICE
Work Class: 1 - SCHEDULED Comments:
Task Notes
HVELAZQUEZ12-13-2018 9:20AM TECH COMPLETED COOLING SYSTEM SERVICE ON VEHICLE. TECH ALSO TEST DROVE VEHICLE FOR PROPER ENGINE WARMUP AND OPERATION. ALSO CHECKED FOR LEAKS.
Labor CostLabor Hrs
HVELAZQUE - Hector Velazquez 1.05 178.00Emp: 12/12/2018 13:56
Parts Total CostIss PriceQty Issued Tax & Markup
2.00 27.30NAF-1DEX-0 - NAF; NAPA DEX COOL ANTIFRZ 7.80 9.75
Serial #:Removed Serial #:
2.00 27.30NAF-1DEX-0 - NAF; NAPA DEX COOL ANTIFRZ 7.80 9.75
Serial #:Removed Serial #:
Task: 005-060 - Throttle Body Service Warranty: NO
WAC: 51 - DEFERRED MAINTENANCE
Reason: NP - NOTED IN PM SERVICE
Work Class: 1 - SCHEDULED Comments:
Task Notes
HVELAZQUEZ12-13-2018 9:20AM TECH COMPLETED THROTTLE BODY SERVICE ON VEHICLE.
Labor CostLabor Hrs
HVELAZQUE - Hector Velazquez 0.33 178.00Emp: 12/12/2018 14:16
©2021 AssetWorks LLC. All Rights Reserved. Page 1 of 5
Report Date: 8/11/2021
Work Order Detail Work Order: CS-2018-12988
Parts Total CostIss PriceQty Issued Tax & Markup
1.00 6.40MMM-08866-0 - MMM; THRTL PLT INTAKE CLNR 1.83 4.57
Serial #:Removed Serial #:
Task: 005-070 - Differential Service Warranty: NO
WAC: 51 - DEFERRED MAINTENANCE
Reason: NP - NOTED IN PM SERVICE
Work Class: 1 - SCHEDULED Comments:
Task Notes
HVELAZQUEZ12-13-2018 9:22AM TECH PERFORMED REAR DIFFERENTIAL SERVICE ON VEHICLE. TEST DROVE AFTERWARDS TO VERIFY VEHICLE OPERATION
Labor CostLabor Hrs
HVELAZQUE - Hector Velazquez 0.32 178.00Emp: 12/12/2018 14:35
Parts Total CostIss PriceQty Issued Tax & Markup
3.00 57.12VAL-982-0 - VAL; 1QT SYNGEAROIL 75W140 16.32 13.60
Serial #:Removed Serial #:
Task: 005-080 - Automatic Transmission Service Warranty: NO
WAC: 51 - DEFERRED MAINTENANCE
Reason: NP - NOTED IN PM SERVICE
Work Class: 1 - SCHEDULED Comments:
Task Notes
HVELAZQUEZ12-13-2018 9:22AM TECH COMPLETED AUTOMATIC TRANSMISSION SERVICE ON VEHICLE AND TEST DROVE FOR PROPER TRANSMISSION OPERATION
Labor CostLabor Hrs
HVELAZQUE - Hector Velazquez 0.40 222.50Emp: 12/12/2018 14:59
Parts Total CostIss PriceQty Issued Tax & Markup
14.00 83.109OC-ATF-0 - 9OC; ATF SYN 23.74 4.24
Serial #:Removed Serial #:
Task: 005-090 - Brake Fluid Service Warranty: NO
WAC: 51 - DEFERRED MAINTENANCE
Reason: NP - NOTED IN PM SERVICE
Work Class: 1 - SCHEDULED Comments:
Task Notes
HVELAZQUEZ12-13-2018 9:23AM TECH COMPLETED BRAKE FLUSH SERVICE ON VEHICLE.
Labor CostLabor Hrs
HVELAZQUE - Hector Velazquez 0.43 178.00Emp: 12/12/2018 15:25
Parts Total CostIss PriceQty Issued Tax & Markup
1.00 6.12NBF-35032-0 - NBF; B FLUID DOT 332OZ 1.75 4.37
Serial #:Removed Serial #:
Task: 005-100 - Power Steering Fluid Service Warranty: NO
WAC: 51 - DEFERRED MAINTENANCE
Reason: NP - NOTED IN PM SERVICE
Work Class: 1 - SCHEDULED Comments:
Task Notes
HVELAZQUEZ12-13-2018 9:19AM TECH PERFORMED POWER STEERING SERVICE ON VEHICLE.
Labor CostLabor Hrs
HVELAZQUE - Hector Velazquez 0.68 178.00Emp: 12/12/2018 12:53
Task: PM-C - Pm Service Warranty: NO
WAC: 11 - PM COMPLETE Reason: -
Work Class: 1 - SCHEDULED Comments:
Task Notes
HVELAZQUEZ12-13-2018 9:24AM TECH COMPLETED PM SERVICE ON VEHICLE. TECH CHANGED OIL, OIL FILTER, WIPER BLADES, AIR FILTER, ROTATED TIRES, ADDED WASHER CONCENTRATE, AND PERFORMED PM INSPECTION
©2021 AssetWorks LLC. All Rights Reserved. Page 2 of 5
Report Date: 8/11/2021
Work Order Detail Work Order: CS-2018-12988
Labor CostLabor Hrs
HVELAZQUE - Hector Velazquez 0.78 178.00Emp: 12/12/2018 16:12
Parts Total CostIss PriceQty Issued Tax & Markup
2.00 8.79OWI-NP22-0 - OWI; WIPER BLADE 2.51 3.14
Serial #:Removed Serial #:
1.00 1.719AP-WW1C-0 - 9AP; WASHER FLUID CONCENTRATE 0.49 1.22
Serial #:Removed Serial #:
7.00 12.749OC-5W20-0 - 9OC; 5W20 SYN OIL 3.64 1.30
Serial #:Removed Serial #:
1.00 12.84FIL-9883-0 - FIL; NAPAGOLD AIR FILTER 3.67 9.17
Serial #:Removed Serial #:
Delays
Delay HoursStatus End DatetimeStart Datetime
12/11/2018 12:17PM 12/12/2018 10:49AM 10.53AT - AWAITING TECHNICIAN CLOSED
Overhead
Small Parts - Labor: 0.00
Small Parts - Parts: 0.00
Tools: 0.00
Overhead Costs: 17.57
Total Overhead Costs: 17.57
Messages
Unit Is Being Replaced In Fy 20-21 List
©2021 AssetWorks LLC. All Rights Reserved. Page 3 of 5
Report Date: 8/11/2021
Work Order Detail Work Order: CS-2018-12988
PM Checklist
Task / Comment Employee CompletedN/AFailed
PM-C Exception PM: No
PM-076 - START ENGINE, CHECK GAUGES, WARNING LIGHTS
HVELAZQUE - HECTOR VELAZQUEZ
PM-077 - HEATER, DEFROSTER, A/C OPERATION HVELAZQUE - HECTOR VELAZQUEZ
PM-078 - STEERING, FREE TRAVEL, BIND, PULL, VIBRATION HVELAZQUE - HECTOR VELAZQUEZ
PM-079 - DECAL/SERVICE STICKER HVELAZQUE - HECTOR VELAZQUEZ
PM-080 - VISUAL, LEAK, APPEARANCE, DAMAGE HVELAZQUE - HECTOR VELAZQUEZ
PM-081 - HITCH & TRAILER PLUG SOCKET HVELAZQUE - HECTOR VELAZQUEZ
PM-082 - HORN, WINDSHEILD WIPERS/WASHER OPERATION
HVELAZQUE - HECTOR VELAZQUEZ
PM-083 - ALL GLASS & MIRRORS HVELAZQUE - HECTOR VELAZQUEZ
PM-084 - ALL LIGHTS & HEAD LIGHTS FOR PROPER ADJUSTMENT
HVELAZQUE - HECTOR VELAZQUEZ
PM-085 - ENGINE PERFORMANCE HVELAZQUE - HECTOR VELAZQUEZ
PM-086 - SAFETY EQUIPMENT, FIRE EXTIN. BACK ALARM HVELAZQUE - HECTOR VELAZQUEZ
PM-087 - POWER STEERING SYSTEM/ FLUID HVELAZQUE - HECTOR VELAZQUEZ
PM-088 - ALL HOSES HVELAZQUE - HECTOR VELAZQUEZ
PM-089 - ALL BELTS HVELAZQUE - HECTOR VELAZQUEZ
PM-090 - ALL POINTS CHASSIS LUBRICATION HVELAZQUE - HECTOR VELAZQUEZ
PM-091 - CHANGE ENGINE OIL & FILTER HVELAZQUE - HECTOR VELAZQUEZ
PM-092 - TRANSMISSION FLUID LEVEL & CONDITION HVELAZQUE - HECTOR VELAZQUEZ
PM-093 - DIFFERENTIAL & DRIVE AXLES HVELAZQUE - HECTOR VELAZQUEZ
PM-094 - LUBE DOORS & HINGE POINTS HVELAZQUE - HECTOR VELAZQUEZ
PM-095 - REPLACE FUEL, CABIN & AIR FILTER, (AS NEEDED) HVELAZQUE - HECTOR VELAZQUEZ
PM-096 - OPERATION & CONDITION OF AUXILIARY COMPONENTS
HVELAZQUE - HECTOR VELAZQUEZ
PM-097 - CHARGING SYS.& BATTERY TEST, STARTER, CLEAN TERMINALS
HVELAZQUE - HECTOR VELAZQUEZ
PM-098 - ENGINE & TRANSMISSION MOUNTS HVELAZQUE - HECTOR VELAZQUEZ
PM-099 - PRESSURE TEST COOLING SYSTEM HVELAZQUE - HECTOR VELAZQUEZ
©2021 AssetWorks LLC. All Rights Reserved. Page 4 of 5
Report Date: 8/11/2021
Work Order Detail Work Order: CS-2018-12988
PM-100 - FAN CLUTCH/ ELECTRIC FAN OPERATION HVELAZQUE - HECTOR VELAZQUEZ
PM-101 - EXHAUST SYSTEM VISUAL HVELAZQUE - HECTOR VELAZQUEZ
PM-102 - SEAT BELTS ALL, SUPPLEMENTAL RESTRAINTS (SIR/AIRBAG)
HVELAZQUE - HECTOR VELAZQUEZ
PM-103 - ROTATE & BALANCE TIRES HVELAZQUE - HECTOR VELAZQUEZ
PM-104 - BRAKE SYSTEM CHECK/ABS/REGENERATION- ROTOR THICKNESS (MEETS
HVELAZQUE - HECTOR VELAZQUEZ
PM-105 - BRAKE SYSTEM CHECK/ABS/REGENERATION- DRUM DIAMETER (MEETS SP
HVELAZQUE - HECTOR VELAZQUEZ
PM-106 - FRONT LINING PERCENTAGE - LF HVELAZQUE - HECTOR VELAZQUEZ
PM-107 - FRONT LINING PERCENTAGE - RF HVELAZQUE - HECTOR VELAZQUEZ
PM-108 - REAR LINING PERCENTAGE - LR HVELAZQUE - HECTOR VELAZQUEZ
PM-109 - REAR LINING PERCENTAGE - RR HVELAZQUE - HECTOR VELAZQUEZ
PM-110 - MASTER CYLINDER FLUID LEVEL/CONDITION HVELAZQUE - HECTOR VELAZQUEZ
PM-111 - PARKING BRAKE SYSTEM HVELAZQUE - HECTOR VELAZQUEZ
PM-112 - HYDRO BOOST/POWER BOOSTER HVELAZQUE - HECTOR VELAZQUEZ
WO Notes
DENHARTC 12/11/2018 12:17 PM SERVICEUPDATE RNI
Comments: Internal Parts Cost:
Internal Labor Cost:
Commercial Labor Cost:
Commercial Parts Cost:
Work Order Total:
Commercial Misc Cost:
Overhead Costs: $17.57
$1,687.66
$243.42
$1,426.67
Commercial Total:
Internal Total: $1,687.66
Commercial Tax & Markup: $0.00
$0.00
$0.00
0.00
Equipment Usage Costs: $0.00
$0.00
©2021 AssetWorks LLC. All Rights Reserved. Page 5 of 5
Report Date: 8/11/2021
Work Order DetailCS-2019-14139
UD6008 2013 FORD F250 UTILITY BODY 3/4 TON TRUCK
Asset ID:
XD5184 CS - CENTRAL SHOPLicense Number: Repair Location:
CS-2019-14139 CLOSEDWork Order ID: Job Status:
REPAIR OS - OUT OF SERVICEJob Type: Service Status:
59436 MILES (EQ UPD) 03/07/2019 07:03WO Meter 1: Projected Completion Date:
R - ROUTINEPriority:
Non Service Request Tasks
Task: 013-000 - Brake Diagnosis Warranty: NO
WAC: 03 - REPLACED PART Reason: WT - WEAR AND TEAR
Work Class: 1 - SCHEDULED Comments:
Task Notes
HVELAZQUEZ 3-6-2019 3:53PM TECH VERIFIED CONCERN. GRINDING NOISE FOUND IN DRIVER FRONT. UPON INSPECTION TECH FOUND UNEVENLY WORN BRAKE PADS. TECH REPLACED ROTORS AND BRAKE PADS WITH NEW PARTS AND LUBRICATED MOVING PARTS WITH GREASE. TECH FINISHED REPLACEMENT AND TEST DROVE. VEHICLE IS OK AT THIS TIME.
Labor CostLabor Hrs
HVELAZQUE - Hector Velazquez 1.62 144.18Emp: 03/05/2019 14:23
HVELAZQUE - Hector Velazquez 0.03 2.6703/06/2019 15:53
Parts Total CostIss PriceQty Issued Tax & Markup
1.00 94.651FD-DC3Z2001H-0 - 1FD; PADS 27.04 67.61
Serial #:Removed Serial #:
2.00 11.40NOS-24245-0 - NOS; NAPA OIL SEAL 3.26 4.07
Serial #:Removed Serial #:
2.00 450.601FD-HC3Z1102H-0 - 1FD; ROTORS 128.74 160.93
Serial #:Removed Serial #:
Task: 013-001 - Front Disc Or Drum Brake Service Complete Warranty: NO
WAC: 03 - REPLACED PART Reason: WT - WEAR AND TEAR
Work Class: 1 - SCHEDULED Comments:
Labor CostLabor Hrs
HVELAZQUE - Hector Velazquez 2.00 267.00Emp: 03/06/2019 03:00
Delays
Delay HoursStatus End DatetimeStart Datetime
2/28/2019 3:38PM 3/5/2019 12:46PM 33.13AT - AWAITING TECHNICIAN CLOSED
Overhead
Small Parts - Labor: 0.00
Small Parts - Parts: 0.00
Tools: 0.00
Overhead Costs: 17.57
Total Overhead Costs: 17.57
Messages
Unit Is Being Replaced In Fy 20-21 List
WO Notes
DENHARTC 02/28/2019 15:37 OPERATOR STATES DRIVER SIDE FRONT BRAKE MAKING NOISE, GRINDING
©2021 AssetWorks LLC. All Rights Reserved. Page 1 of 2
Report Date: 8/11/2021
Work Order Detail Work Order: CS-2019-14139
Comments: Internal Parts Cost:
Internal Labor Cost:
Commercial Labor Cost:
Commercial Parts Cost:
Work Order Total:
Commercial Misc Cost:
Overhead Costs: $17.57
$988.07
$556.65
$413.85
Commercial Total:
Internal Total: $988.07
Commercial Tax & Markup: $0.00
$0.00
$0.00
0.00
Equipment Usage Costs: $0.00
$0.00
©2021 AssetWorks LLC. All Rights Reserved. Page 2 of 2
Report Date: 8/11/2021
Work Order DetailCS-2019-15438
UD6008 2013 FORD F250 UTILITY BODY 3/4 TON TRUCK
Asset ID:
XD5184 CS - CENTRAL SHOPLicense Number: Repair Location:
CS-2019-15438 CLOSEDWork Order ID: Job Status:
REPAIR IN-WO - IN SERVICE - OPEN WOJob Type: Service Status:
62235 MILES (EQ UPD) 05/16/2019 07:46WO Meter 1: Projected Completion Date:
R - ROUTINEPriority:
Non Service Request Tasks
Task: 017-012 - Replace 4 Tires Warranty: NO
WAC: 03 - REPLACED PART Reason: MO - MODIFICATION
Work Class: 1 - SCHEDULED Comments:
Task Notes
NNAVARRETE5-15-2019 12:27PM INCLUDES DISMOUNT, MOUNT, BALANCE AND REPLACE VALVE STEM RESET TPMS SYSTEM WERE APPLICABLE
REPLACED ALL 4 TIRES
Labor CostLabor Hrs
NNAVARRET - Nathan Navarrete 0.23 356.00Emp: 05/14/2019 16:48
NNAVARRET - Nathan Navarrete 1.42 0.0005/15/2019 08:30
NNAVARRET - Nathan Navarrete 2.25 0.0005/15/2019 12:27
Parts Total CostIss PriceQty Issued Tax & Markup
4.00 1,096.54TIR-225425-0 - TIR; LT24575R17 FRS TRNSFRCE HT 313.30 195.81
Serial #:Removed Serial #:
Task: 017-050 - Tpms System Warranty: NO
WAC: 10 - DIAGNOSE Reason: MO - MODIFICATION
Work Class: 1 - SCHEDULED Comments:
Task Notes
NNAVARRETE5-14-2019 5:23PM INSPECTED TIRES FOUND ALL 4 IN NEED OF REPLACEMENT
Labor CostLabor Hrs
NNAVARRET - Nathan Navarrete 0.02 1.78Emp: 05/14/2019 17:23
Task: 039-051 - Fuel Module Installation - Svid Warranty: NO
WAC: 03 - REPLACED PART Reason: MO - MODIFICATION
Work Class: 1 - SCHEDULED Comments:
Task Notes
NNAVARRETE5-14-2019 5:21PM INSTALL NEW FUEL MODULE SVID PER SPECIFICATION PROVIDED BY MANUFACTURER
Labor CostLabor Hrs
NNAVARRET - Nathan Navarrete 0.57 95.00Emp: 05/14/2019 17:22
Delays
Delay HoursStatus End DatetimeStart Datetime
5/14/2019 4:20PM 5/14/2019 4:29PM 0.15AT - AWAITING TECHNICIAN CLOSED
Overhead
Small Parts - Labor: 0.00
Small Parts - Parts: 0.00
Tools: 0.00
Overhead Costs: 17.57
Total Overhead Costs: 17.57
Messages
Unit Is Being Replaced In Fy 20-21 List
©2021 AssetWorks LLC. All Rights Reserved. Page 1 of 2
Report Date: 8/11/2021
Work Order Detail Work Order: CS-2019-15438
WO Notes
DENHARTC 05/14/2019 17:40 SVID 10556915
DENHARTC 05/14/2019 16:19 LOW TIRE LIGHT ON
INSTALL SVID
Comments: Internal Parts Cost:
Internal Labor Cost:
Commercial Labor Cost:
Commercial Parts Cost:
Work Order Total:
Commercial Misc Cost:
Overhead Costs: $17.57
$1,566.89
$1,096.54
$452.78
Commercial Total:
Internal Total: $1,566.89
Commercial Tax & Markup: $0.00
$0.00
$0.00
0.00
Equipment Usage Costs: $0.00
$0.00
©2021 AssetWorks LLC. All Rights Reserved. Page 2 of 2
Report Date: 8/11/2021
Work Order DetailCS-2019-15989
UD6008 2013 FORD F250 UTILITY BODY 3/4 TON TRUCK
Asset ID:
XD5184 CS - CENTRAL SHOPLicense Number: Repair Location:
CS-2019-15989 CLOSEDWork Order ID: Job Status:
PM PM-C - PM SERVICEJob Type: PM Service:
06/12/2019 OS - OUT OF SERVICEPM Scheduled: Service Status:
63680 MILES (EQ UPD) 06/19/2019 13:14WO Meter 1: Projected Completion Date:
R - ROUTINEPriority:
Non Service Request Tasks
Task: PM-C - Pm Service Warranty: NO
WAC: 03 - REPLACED PART Reason: -
Work Class: 1 - SCHEDULED Comments:
Task Notes
SJOSHUA 6-19-2019 10:12AM PM COMPLETE
Labor CostLabor Hrs
SJOSHUA - Saidon Joshua 1.78 0.00Emp: 06/19/2019 10:12
SJOSHUA - Saidon Joshua 0.35 178.0006/18/2019 17:24
Parts Total CostIss PriceQty Issued Tax & Markup
1.00 1.719AP-WW1C-0 - 9AP; WASHER FLUID CONCENTRATE 0.49 1.22
Serial #:Removed Serial #:
7.00 12.749OC-5W20-0 - 9OC; 5W20 SYN OIL 3.64 1.30
Serial #:Removed Serial #:
2.00 8.79OWI-NP22-0 - OWI; WIPER BLADE 2.51 3.14
Serial #:Removed Serial #:
1.00 13.50FIL-9883-0 - FIL; NAPAGOLD AIR FILTER 3.86 9.64
Serial #:Removed Serial #:
1.00 4.77FIL-1372-0 - FIL; NAPAGOLD OIL FILTER 1.36 3.41
Serial #:Removed Serial #:
Delays
Delay HoursStatus End DatetimeStart Datetime
6/17/2019 12:38PM 6/18/2019 5:03PM 16.42AT - AWAITING TECHNICIAN CLOSED
Overhead
Small Parts - Labor: 0.00
Small Parts - Parts: 0.00
Tools: 0.00
Overhead Costs: 17.57
Total Overhead Costs: 17.57
Messages
Unit Is Being Replaced In Fy 20-21 List
©2021 AssetWorks LLC. All Rights Reserved. Page 1 of 3
Report Date: 8/11/2021
Work Order Detail Work Order: CS-2019-15989
PM Checklist
Task / Comment Employee CompletedN/AFailed
PM-C Exception PM: No
PM-076 - START ENGINE, CHECK GAUGES, WARNING LIGHTS
SJOSHUA - SAIDON JOSHUA
PM-077 - HEATER, DEFROSTER, A/C OPERATION SJOSHUA - SAIDON JOSHUA
PM-078 - STEERING, FREE TRAVEL, BIND, PULL, VIBRATION SJOSHUA - SAIDON JOSHUA
PM-079 - DECAL/SERVICE STICKER SJOSHUA - SAIDON JOSHUA
PM-080 - VISUAL, LEAK, APPEARANCE, DAMAGE SJOSHUA - SAIDON JOSHUA
PM-081 - HITCH & TRAILER PLUG SOCKET SJOSHUA - SAIDON JOSHUA
PM-082 - HORN, WINDSHEILD WIPERS/WASHER OPERATION
SJOSHUA - SAIDON JOSHUA
PM-083 - ALL GLASS & MIRRORS SJOSHUA - SAIDON JOSHUA
PM-084 - ALL LIGHTS & HEAD LIGHTS FOR PROPER ADJUSTMENT
SJOSHUA - SAIDON JOSHUA
PM-085 - ENGINE PERFORMANCE SJOSHUA - SAIDON JOSHUA
PM-086 - SAFETY EQUIPMENT, FIRE EXTIN. BACK ALARM SJOSHUA - SAIDON JOSHUA
PM-087 - POWER STEERING SYSTEM/ FLUID SJOSHUA - SAIDON JOSHUA
PM-088 - ALL HOSES SJOSHUA - SAIDON JOSHUA
PM-089 - ALL BELTS SJOSHUA - SAIDON JOSHUA
PM-090 - ALL POINTS CHASSIS LUBRICATION SJOSHUA - SAIDON JOSHUA
PM-091 - CHANGE ENGINE OIL & FILTER SJOSHUA - SAIDON JOSHUA
PM-092 - TRANSMISSION FLUID LEVEL & CONDITION SJOSHUA - SAIDON JOSHUA
PM-093 - DIFFERENTIAL & DRIVE AXLES SJOSHUA - SAIDON JOSHUA
PM-094 - LUBE DOORS & HINGE POINTS SJOSHUA - SAIDON JOSHUA
PM-095 - REPLACE FUEL, CABIN & AIR FILTER, (AS NEEDED) SJOSHUA - SAIDON JOSHUA
PM-096 - OPERATION & CONDITION OF AUXILIARY COMPONENTS
SJOSHUA - SAIDON JOSHUA
PM-097 - CHARGING SYS.& BATTERY TEST, STARTER, CLEAN TERMINALS
SJOSHUA - SAIDON JOSHUA
PM-098 - ENGINE & TRANSMISSION MOUNTS SJOSHUA - SAIDON JOSHUA
PM-099 - PRESSURE TEST COOLING SYSTEM SJOSHUA - SAIDON JOSHUA
©2021 AssetWorks LLC. All Rights Reserved. Page 2 of 3
Report Date: 8/11/2021
Work Order Detail Work Order: CS-2019-15989
PM-100 - FAN CLUTCH/ ELECTRIC FAN OPERATION SJOSHUA - SAIDON JOSHUA
PM-101 - EXHAUST SYSTEM VISUAL SJOSHUA - SAIDON JOSHUA
PM-102 - SEAT BELTS ALL, SUPPLEMENTAL RESTRAINTS (SIR/AIRBAG)
SJOSHUA - SAIDON JOSHUA
PM-103 - ROTATE & BALANCE TIRES SJOSHUA - SAIDON JOSHUA
PM-104 - BRAKE SYSTEM CHECK/ABS/REGENERATION- ROTOR THICKNESS (MEETS
SJOSHUA - SAIDON JOSHUA
PM-105 - BRAKE SYSTEM CHECK/ABS/REGENERATION- DRUM DIAMETER (MEETS SP
SJOSHUA - SAIDON JOSHUA
PM-106 - FRONT LINING PERCENTAGE - LF SJOSHUA - SAIDON JOSHUA
PM-107 - FRONT LINING PERCENTAGE - RF SJOSHUA - SAIDON JOSHUA
PM-108 - REAR LINING PERCENTAGE - LR SJOSHUA - SAIDON JOSHUA
PM-109 - REAR LINING PERCENTAGE - RR SJOSHUA - SAIDON JOSHUA
PM-110 - MASTER CYLINDER FLUID LEVEL/CONDITION SJOSHUA - SAIDON JOSHUA
PM-111 - PARKING BRAKE SYSTEM SJOSHUA - SAIDON JOSHUA
PM-112 - HYDRO BOOST/POWER BOOSTER SJOSHUA - SAIDON JOSHUA
WO Notes
DENHARTC 06/17/2019 12:38 OPERATOR STATES CHANGE OIL LIGHT FLASHING ON DASH
DENHARTC 06/17/2019 12:37 PM SERVICE
Comments: Internal Parts Cost:
Internal Labor Cost:
Commercial Labor Cost:
Commercial Parts Cost:
Work Order Total:
Commercial Misc Cost:
Overhead Costs: $17.57
$237.08
$41.51
$178.00
Commercial Total:
Internal Total: $237.08
Commercial Tax & Markup: $0.00
$0.00
$0.00
0.00
Equipment Usage Costs: $0.00
$0.00
©2021 AssetWorks LLC. All Rights Reserved. Page 3 of 3
Report Date: 8/11/2021
Work Order DetailCS-2019-17602
UD6008 2013 FORD F250 UTILITY BODY 3/4 TON TRUCK
Asset ID:
XD5184 CS - CENTRAL SHOPLicense Number: Repair Location:
CS-2019-17602 CLOSEDWork Order ID: Job Status:
REPAIR OS - OUT OF SERVICEJob Type: Service Status:
68137 MILES (EQ UPD) 09/30/2019 08:25WO Meter 1: Projected Completion Date:
R - ROUTINEPriority:
Non Service Request Tasks
Task: 017-000 - Tire Diagnosis Warranty: NO
WAC: 10 - DIAGNOSE Reason: BD - BREAKDOWN
Work Class: 2 - UNSCHEDULED Comments:
Task Notes
JKAUFMAN 9-27-2019 2:39PM VERIFIED LEAK FROM R / F DUE TO A SMALL SCREW. REMOVED NAIL FROM R / R TIRE. DID NOT PUNCTURE / NO LEAK
Labor CostLabor Hrs
JKAUFMAN - James Kaufman 0.65 57.85Emp: 09/27/2019 14:39
Task: 017-030 - Tire Repair Warranty: NO
WAC: 08 - REPAIR Reason: BD - BREAKDOWN
Work Class: 2 - UNSCHEDULED Comments:
Task Notes
RREID 9-27-2019 1:26PM PASSANGER SIDE FRONT TIRE HAS NAIL
JKAUFMAN 9-27-2019 2:48PM REMOVED SCREW FROM R / F TIRE. INSTALLED PATCH. REBALANCED WHEEL. SET ALL TIRE PRESSURES AND CHECKED FOR WEAR
Labor CostLabor Hrs
JKAUFMAN - James Kaufman 0.15 0.00Emp: 09/27/2019 14:48
JKAUFMAN - James Kaufman 0.47 0.0009/27/2019 14:00
RREID - Ronald Reid 0.75 44.5009/27/2019 13:26
Overhead
Small Parts - Labor: 0.00
Small Parts - Parts: 0.00
Tools: 0.00
Overhead Costs: 17.57
Total Overhead Costs: 17.57
Messages
Unit Is Being Replaced In Fy 20-21 List
WO Notes
DENHARTC 09/27/2019 12:37 PASSENGER SIDE REAR TIRE LOSING AIR, HAS A NAIL IN IT.
OPERATOR IS WAITING
©2021 AssetWorks LLC. All Rights Reserved. Page 1 of 2
Report Date: 8/11/2021
Work Order Detail Work Order: CS-2019-17602
Comments: Internal Parts Cost:
Internal Labor Cost:
Commercial Labor Cost:
Commercial Parts Cost:
Work Order Total:
Commercial Misc Cost:
Overhead Costs: $17.57
$119.92
$102.35
Commercial Total:
Internal Total: $119.92
Commercial Tax & Markup: $0.00
$0.00
$0.00
0.00
Equipment Usage Costs: $0.00
$0.00
©2021 AssetWorks LLC. All Rights Reserved. Page 2 of 2
Report Date: 8/11/2021
Work Order DetailCS-2019-17740
UD6008 2013 FORD F250 UTILITY BODY 3/4 TON TRUCK
Asset ID:
XD5184 CS - CENTRAL SHOPLicense Number: Repair Location:
CS-2019-17740 CLOSEDWork Order ID: Job Status:
PM PM-C - PM SERVICEJob Type: PM Service:
12/19/2019 OS - OUT OF SERVICEPM Scheduled: Service Status:
68482 MILES (EQ UPD) 10/10/2019 08:07WO Meter 1: Projected Completion Date:
R - ROUTINEPriority:
Non Service Request Tasks
Task: 018-020 - Miscellaneous Warranty: NO
WAC: 03 - REPLACED PART Reason: NP - NOTED IN PM SERVICE
Work Class: 2 - UNSCHEDULED Comments:
Task Notes
NFLORES 10-9-2019 2:58PM TECH FOUND THAT LF RUB BEARING CAP WAS DAMAGED AND LEAKING GREASE, TECH REPLACED CAP AND TOPPED OFF GREASE.
Labor CostLabor Hrs
NFLORES - Nelson Flores 0.05 4.45Emp: 10/09/2019 15:00
Parts Total CostIss PriceQty Issued Tax & Markup
1.00 12.301FD-7C3Z1131A-0 - 1FD; CAP GREASE 2.84 9.46
Serial #:Removed Serial #:
Task: 035-000 - Battery System Diagnosis Warranty: NO
WAC: 10 - DIAGNOSE Reason: NP - NOTED IN PM SERVICE
Work Class: 2 - UNSCHEDULED Comments:
Task Notes
NFLORES 10-9-2019 3:00PM TECH FOUND THAT BATTERY WAS NOT HOLDING A CHARGE. ONCE TURNED OFF, BATTERY VOLTAGE WOULD DRAIN BELOW 10V, BATTERY WILL BE REPLACED.
Labor CostLabor Hrs
NFLORES - Nelson Flores 0.28 24.92Emp: 10/09/2019 14:57
Task: 035-020 - Chassis Battery Warranty: NO
WAC: 03 - REPLACED PART Reason: NP - NOTED IN PM SERVICE
Work Class: 2 - UNSCHEDULED Comments:
Task Notes
NFLORES 10-9-2019 2:59PM TECH FOUND THAT BATTERY WAS NO HOLDING A CHARGE. TECH REPLACED BATTERY AND VEHICLE STARTS AND RUNS AS DESIGNED.
Labor CostLabor Hrs
NFLORES - Nelson Flores 1.22 108.58Emp: 10/09/2019 14:40
Parts Total CostIss PriceQty Issued Tax & Markup
1.00 109.951AD-65P-0 - 1AD; GROUP 65 BAT 25.37 84.58
Serial #:Removed Serial #:
Task: PM-C - Pm Service Warranty: NO
WAC: 11 - PM COMPLETE Reason: -
Work Class: 2 - UNSCHEDULED Comments:
Task Notes
NFLORES 10-9-2019 2:59PM TECH COMPLETED PM SERVICE, OIL CHANGE, REPLACED BATTERY, AND LF HUB BEARING CAP.
Labor CostLabor Hrs
NFLORES - Nelson Flores 0.07 0.00Emp: 10/09/2019 15:04
NFLORES - Nelson Flores 1.08 178.0010/09/2019 12:51
©2021 AssetWorks LLC. All Rights Reserved. Page 1 of 4
Report Date: 8/11/2021
Work Order Detail Work Order: CS-2019-17740
Parts Total CostIss PriceQty Issued Tax & Markup
1.00 1.599AP-WW1C-0 - 9AP; WASHER FLUID CONCENTRATE 0.37 1.22
Serial #:Removed Serial #:
2.00 8.16OWI-NP22-0 - OWI; WIPER BLADE 1.88 3.14
Serial #:Removed Serial #:
1.00 1.899OC-5W20-0 - 9OC; 5W20 SYN OIL 0.44 1.45
Serial #:Removed Serial #:
1.00 4.43FIL-1372-0 - FIL; NAPAGOLD OIL FILTER 1.02 3.41
Serial #:Removed Serial #:
1.00 12.53FIL-9883-0 - FIL; NAPAGOLD AIR FILTER 2.89 9.64
Serial #:Removed Serial #:
7.00 13.209OC-5W20-0 - 9OC; 5W20 SYN OIL 3.05 1.45
Serial #:Removed Serial #:
Delays
Delay HoursStatus End DatetimeStart Datetime
10/9/2019 7:54AM 10/9/2019 11:46AM 3.77AT - AWAITING TECHNICIAN CLOSED
Overhead
Small Parts - Labor: 0.00
Small Parts - Parts: 0.00
Tools: 0.00
Overhead Costs: 17.57
Total Overhead Costs: 17.57
Messages
Unit Is Being Replaced In Fy 20-21 List
©2021 AssetWorks LLC. All Rights Reserved. Page 2 of 4
Report Date: 8/11/2021
Work Order Detail Work Order: CS-2019-17740
PM Checklist
Task / Comment Employee CompletedN/AFailed
PM-C Exception PM: No
PM-076 - START ENGINE, CHECK GAUGES, WARNING LIGHTS
NFLORES - NELSON FLORES
PM-077 - HEATER, DEFROSTER, A/C OPERATION NFLORES - NELSON FLORES
PM-078 - STEERING, FREE TRAVEL, BIND, PULL, VIBRATION NFLORES - NELSON FLORES
PM-079 - DECAL/SERVICE STICKER NFLORES - NELSON FLORES
PM-080 - VISUAL, LEAK, APPEARANCE, DAMAGE NFLORES - NELSON FLORES
PM-081 - HITCH & TRAILER PLUG SOCKET NFLORES - NELSON FLORES
PM-082 - HORN, WINDSHEILD WIPERS/WASHER OPERATION
NFLORES - NELSON FLORES
PM-083 - ALL GLASS & MIRRORS NFLORES - NELSON FLORES
PM-084 - ALL LIGHTS & HEAD LIGHTS FOR PROPER ADJUSTMENT
NFLORES - NELSON FLORES
PM-085 - ENGINE PERFORMANCE NFLORES - NELSON FLORES
PM-086 - SAFETY EQUIPMENT, FIRE EXTIN. BACK ALARM NFLORES - NELSON FLORES
PM-087 - POWER STEERING SYSTEM/ FLUID NFLORES - NELSON FLORES
PM-088 - ALL HOSES NFLORES - NELSON FLORES
PM-089 - ALL BELTS NFLORES - NELSON FLORES
PM-090 - ALL POINTS CHASSIS LUBRICATION NFLORES - NELSON FLORES
PM-091 - CHANGE ENGINE OIL & FILTER NFLORES - NELSON FLORES
PM-092 - TRANSMISSION FLUID LEVEL & CONDITION NFLORES - NELSON FLORES
PM-093 - DIFFERENTIAL & DRIVE AXLES NFLORES - NELSON FLORES
PM-094 - LUBE DOORS & HINGE POINTS NFLORES - NELSON FLORES
PM-095 - REPLACE FUEL, CABIN & AIR FILTER, (AS NEEDED) NFLORES - NELSON FLORES
PM-096 - OPERATION & CONDITION OF AUXILIARY COMPONENTS
NFLORES - NELSON FLORES
PM-097 - CHARGING SYS.& BATTERY TEST, STARTER, CLEAN TERMINALS
NFLORES - NELSON FLORES
PM-098 - ENGINE & TRANSMISSION MOUNTS NFLORES - NELSON FLORES
PM-099 - PRESSURE TEST COOLING SYSTEM NFLORES - NELSON FLORES
©2021 AssetWorks LLC. All Rights Reserved. Page 3 of 4
Report Date: 8/11/2021
Work Order Detail Work Order: CS-2019-17740
PM-100 - FAN CLUTCH/ ELECTRIC FAN OPERATION NFLORES - NELSON FLORES
PM-101 - EXHAUST SYSTEM VISUAL NFLORES - NELSON FLORES
PM-102 - SEAT BELTS ALL, SUPPLEMENTAL RESTRAINTS (SIR/AIRBAG)
NFLORES - NELSON FLORES
PM-103 - ROTATE & BALANCE TIRES NFLORES - NELSON FLORES
PM-104 - BRAKE SYSTEM CHECK/ABS/REGENERATION- ROTOR THICKNESS (MEETS
NFLORES - NELSON FLORES
PM-105 - BRAKE SYSTEM CHECK/ABS/REGENERATION- DRUM DIAMETER (MEETS SP
NFLORES - NELSON FLORES
PM-106 - FRONT LINING PERCENTAGE - LF NFLORES - NELSON FLORES
PM-107 - FRONT LINING PERCENTAGE - RF NFLORES - NELSON FLORES
PM-108 - REAR LINING PERCENTAGE - LR NFLORES - NELSON FLORES
PM-109 - REAR LINING PERCENTAGE - RR NFLORES - NELSON FLORES
PM-110 - MASTER CYLINDER FLUID LEVEL/CONDITION NFLORES - NELSON FLORES
PM-111 - PARKING BRAKE SYSTEM NFLORES - NELSON FLORES
PM-112 - HYDRO BOOST/POWER BOOSTER NFLORES - NELSON FLORES
WO Notes
WCASTRO 10/09/2019 07:53 PM SERVICESBATTERY IS BAD JUMP START FEW TIMES
Comments: Internal Parts Cost:
Internal Labor Cost:
Commercial Labor Cost:
Commercial Parts Cost:
Work Order Total:
Commercial Misc Cost:
Overhead Costs: $17.57
$497.57
$164.05
$315.95
Commercial Total:
Internal Total: $497.57
Commercial Tax & Markup: $0.00
$0.00
$0.00
0.00
Equipment Usage Costs: $0.00
$0.00
©2021 AssetWorks LLC. All Rights Reserved. Page 4 of 4
Report Date: 8/11/2021
Work Order DetailCS-2020-19369
UD6008 2013 FORD F250 UTILITY BODY 3/4 TON TRUCK
Asset ID:
XD5184 CS - CENTRAL SHOPLicense Number: Repair Location:
CS-2020-19369 CLOSEDWork Order ID: Job Status:
REPAIR OS - OUT OF SERVICEJob Type: Service Status:
72074 MILES (EQ UPD) 01/15/2020 18:15WO Meter 1: Projected Completion Date:
R - ROUTINEPriority:
Non Service Request Tasks
Task: 017-000 - Tire Diagnosis Warranty: NO
WAC: 10 - DIAGNOSE Reason: WT - WEAR AND TEAR
Work Class: 2 - UNSCHEDULED Comments:
Labor CostLabor Hrs
HVELAZQUE - Hector Velazquez 1.00 89.00Emp: 01/15/2020 03:00
Parts Total CostIss PriceQty Issued Tax & Markup
2.00 519.38TIR-48588-0 - TIR; LT245 75R17 MICHELIN DEFENDER 119.86 199.76
Serial #:Removed Serial #:
Task: 017-011 - Replace 2 Tires Warranty: NO
WAC: 03 - REPLACED PART Reason: WT - WEAR AND TEAR
Work Class: 2 - UNSCHEDULED Comments:
Labor CostLabor Hrs
HVELAZQUE - Hector Velazquez 1.27 178.00Emp: 01/15/2020 09:02
Task: 017-050 - Tpms System Warranty: NO
WAC: 08 - REPAIR Reason: WT - WEAR AND TEAR
Work Class: 2 - UNSCHEDULED Comments:
Labor CostLabor Hrs
HVELAZQUE - Hector Velazquez 1.00 89.00Emp: 01/15/2020 03:00
HVELAZQUE - Hector Velazquez -0.60 -53.4001/15/2020 03:00
HVELAZQUE - Hector Velazquez 0.60 53.4001/15/2020 03:00
Delays
Delay HoursStatus End DatetimeStart Datetime
1/15/2020 7:21AM 1/15/2020 7:26AM 0.00AT - AWAITING TECHNICIAN CLOSED
Overhead
Small Parts - Labor: 0.00
Small Parts - Parts: 0.00
Tools: 0.00
Overhead Costs: 17.57
Total Overhead Costs: 17.57
Messages
Unit Is Being Replaced In Fy 20-21 List
WO Notes
HVELAZQUEZ 01/15/2020 09:21 TECH REPLACED BOTH FRONT TIRES DUE TO BOTH BEING WORN TO LIMIT. TECH ALSO RESET TPMS SYSTEM
DMCINTYRE 01/15/2020 07:20 CHECK RIGHT FRONT TIRE FOR REPAIR OR REPLACEMENT, RESET TPMS SYSTEM
©2021 AssetWorks LLC. All Rights Reserved. Page 1 of 2
Report Date: 8/11/2021
Work Order Detail Work Order: CS-2020-19369
Comments: Internal Parts Cost:
Internal Labor Cost:
Commercial Labor Cost:
Commercial Parts Cost:
Work Order Total:
Commercial Misc Cost:
Overhead Costs: $17.57
$892.95
$519.38
$356.00
Commercial Total:
Internal Total: $892.95
Commercial Tax & Markup: $0.00
$0.00
$0.00
0.00
Equipment Usage Costs: $0.00
$0.00
©2021 AssetWorks LLC. All Rights Reserved. Page 2 of 2
Report Date: 8/11/2021
Work Order DetailCS-2020-21244
UD6008 2013 FORD F250 UTILITY BODY 3/4 TON TRUCK
Asset ID:
XD5184 CS - CENTRAL SHOPLicense Number: Repair Location:
CS-2020-21244 CLOSEDWork Order ID: Job Status:
PM PM-C - PM SERVICEJob Type: PM Service:
04/09/2020 OS - OUT OF SERVICEPM Scheduled: Service Status:
75223 MILES (EQ UPD) 05/07/2020 11:30WO Meter 1: Projected Completion Date:
SCHEDULED PM-C APPOINTMENT 4.28.2020 R - ROUTINETitle: Priority:
Non Service Request Tasks
Task: 001-000 - Hvac Diagnosis Warranty: NO
WAC: 20 - NO DEFECT FOUND Reason: NP - NOTED IN PM SERVICE
Work Class: 1 - SCHEDULED Comments:
Task Notes
RMAYSONET 5-5-2020 5:06PM CHECK AND TEST RECHARGE SYSTEM WORK GOOD
Labor CostLabor Hrs
RMAYSONET - Raul Maysonett 1.15 102.35Emp: 05/05/2020 12:52
RMAYSONET - Raul Maysonett 0.15 13.3505/05/2020 13:33
Task: 005-020 - W/S Wipers Warranty: NO
WAC: 03 - REPLACED PART Reason: NP - NOTED IN PM SERVICE
Work Class: 1 - SCHEDULED Comments:
Task Notes
RMAYSONET 5-5-2020 4:20PM REPLACES WIPER BLADES
Labor CostLabor Hrs
RMAYSONET - Raul Maysonett 0.70 44.50Emp: 05/04/2020 11:16
Parts Total CostIss PriceQty Issued Tax & Markup
2.00 9.24OWI-NP22-0 - OWI; WIPER BLADE 2.64 3.30
Serial #:Removed Serial #:
Task: 005-050 - Cooling System Service Warranty: NO
WAC: 11 - PM COMPLETE Reason: NP - NOTED IN PM SERVICE
Work Class: 1 - SCHEDULED Comments:
Task Notes
RMAYSONET 5-1-2020 12:55PM DRAIN AND REFILL ENGINE WITH COOLANT CHECK FOR ANY LEAKS COMPLETE
RMAYSONET 5-1-2020 1:12PM EXTRACT BROKEN DRAIN PLUG
Labor CostLabor Hrs
RMAYSONET - Raul Maysonett 0.18 178.00Emp: 05/01/2020 11:35
RMAYSONET - Raul Maysonett 1.03 0.0005/01/2020 13:23
Parts Total CostIss PriceQty Issued Tax & Markup
3.00 40.95NAF-1DEX-0 - NAF; NAPA DEX COOL ANTIFRZ 11.70 9.75
Serial #:Removed Serial #:
1.00 6.928AV-61127-0 - 8AV; DRAIN COCK 1.98 4.94
Serial #:Removed Serial #:
Task: 005-060 - Throttle Body Service Warranty: NO
WAC: 02 - CLEAN Reason: NP - NOTED IN PM SERVICE
Work Class: 1 - SCHEDULED Comments:
Task Notes
RMAYSONET 5-5-2020 4:26PM REMOVE CARBON CLEAN THROTTLE CHECK OPERATION OF BUTTERFLY VALVE COMPLETE
©2021 AssetWorks LLC. All Rights Reserved. Page 1 of 7
Report Date: 8/11/2021
Work Order Detail Work Order: CS-2020-21244
Labor CostLabor Hrs
RMAYSONET - Raul Maysonett 0.12 178.00Emp: 05/04/2020 11:23
RMAYSONET - Raul Maysonett 1.00 0.0005/05/2020 03:00
Task: 005-070 - Differential Service Warranty: NO
WAC: 11 - PM COMPLETE Reason: NP - NOTED IN PM SERVICE
Work Class: 1 - SCHEDULED Comments:
Task Notes
RMAYSONET 5-1-2020 12:58PM INSPECT COVER NO LEAKS DRAIN FLUID AND REFILL COMPLETE
Labor CostLabor Hrs
RMAYSONET - Raul Maysonett 0.60 178.00Emp: 05/01/2020 11:24
Task: 005-080 - Automatic Transmission Service Warranty: NO
WAC: 03 - REPLACED PART Reason: NP - NOTED IN PM SERVICE
Work Class: 1 - SCHEDULED Comments:
Task Notes
RMAYSONET 5-1-2020 1:10PM DRAIN REMOVE OIL PAN PLACE FILTER AND GASKET INSTALL PAN AND REFILL WITH TRANS FLUID COMPLETE
Labor CostLabor Hrs
RMAYSONET - Raul Maysonett 1.62 222.50Emp: 05/01/2020 10:01
RMAYSONET - Raul Maysonett 0.22 0.0005/01/2020 10:48
Parts Total CostIss PriceQty Issued Tax & Markup
12.00 71.239OC-ATF-0 - 9OC; ATF SYN 20.35 4.24
Serial #:Removed Serial #:
1.00 59.54ATP-15958-0 - ATP; PLATINUM FILTER KIT 17.01 42.53
Serial #:Removed Serial #:
Task: 005-090 - Brake Fluid Service Warranty: NO
WAC: 11 - PM COMPLETE Reason: NP - NOTED IN PM SERVICE
Work Class: 1 - SCHEDULED Comments:
Task Notes
RMAYSONET 5-5-2020 4:31PM DRAIN AND REFILL WITH APPROPRIATE FLUID AND BLEED COMPLETE
Labor CostLabor Hrs
RMAYSONET - Raul Maysonett 0.15 178.00Emp: 05/04/2020 09:08
RMAYSONET - Raul Maysonett 0.40 0.0005/04/2020 11:47
RMAYSONET - Raul Maysonett 0.08 0.0005/05/2020 07:02
RMAYSONET - Raul Maysonett 1.53 0.0005/05/2020 11:43
©2021 AssetWorks LLC. All Rights Reserved. Page 2 of 7
Report Date: 8/11/2021
Work Order Detail Work Order: CS-2020-21244
Parts Total CostIss PriceQty Issued Tax & Markup
2.00 18.821FD-8C3Z1190A-0 - 1FD; RETAINER 5.38 6.72
Serial #:Removed Serial #:
2.00 39.621FD-CC3Z1216A-0 - 1FD; CONE AND RACE 11.32 14.15
Serial #:Removed Serial #:
2.00 37.301FD-CC3Z4221A-0 - 1FD; BEARING ASY 10.66 13.32
Serial #:Removed Serial #:
1.00 104.271FD-DC3Z2001H-0 - 1FD; PADS 29.79 74.48
Serial #:Removed Serial #:
1.00 80.931FD-DC3Z2200D-0 - 1FD; BRAKE PAD 23.12 57.81
Serial #:Removed Serial #:
2.00 405.801FD-HC3Z1102H-0 - 1FD; ROTORS 115.94 144.93
Serial #:Removed Serial #:
2.00 366.721FD-HC3Z2C026A-0 - 1FD; ROTOR 104.78 130.97
Serial #:Removed Serial #:
1.00 6.43NBF-35032-0 - NBF; B FLUID DOT 3 32OZ 1.84 4.59
Serial #:Removed Serial #:
Task: 005-100 - Power Steering Fluid Service Warranty: NO
WAC: 11 - PM COMPLETE Reason: NP - NOTED IN PM SERVICE
Work Class: 1 - SCHEDULED Comments:
Task Notes
RMAYSONET 5-5-2020 4:37PM DRAIN AND REFILL POWER STEERING WITH APPROPRIATE FLUID CHECK FOR LEAKS NONE FOUND COMPLETE
Labor CostLabor Hrs
RMAYSONET - Raul Maysonett 0.18 178.00Emp: 05/04/2020 10:34
Task: 013-001 - Front Disc Or Drum Brake Service Complete Warranty: NO
WAC: 03 - REPLACED PART Reason: NP - NOTED IN PM SERVICE
Work Class: 1 - SCHEDULED Comments:
Task Notes
RMAYSONET 5-5-2020 4:42PM REMOVE INSTALL NEW ROTORS BEARINGS REPACK WITH GREASE AND SEALS
Labor CostLabor Hrs
RMAYSONET - Raul Maysonett 2.58 267.00Emp: 05/05/2020 09:37
Task: 013-002 - Rear Disc Or Drum Brake Service One Axle Complete Warranty: NO
WAC: 03 - REPLACED PART Reason: NP - NOTED IN PM SERVICE
Work Class: 1 - SCHEDULED Comments:
Task Notes
RMAYSONET 5-5-2020 4:47PM REMOVE REAR PADS AND ROTOR INSTALL NEW ROTORS AND PADS
Labor CostLabor Hrs
RMAYSONET - Raul Maysonett 0.57 267.00Emp: 05/05/2020 10:11
Task: 017-011 - Replace 2 Tires Warranty: NO
WAC: 03 - REPLACED PART Reason: NP - NOTED IN PM SERVICE
Work Class: 1 - SCHEDULED Comments:
Task Notes
RMAYSONET 5-1-2020 12:20PM DISMOUNT AND MOUNT NEW TIRES AND BALANCE COMPLETE
Labor CostLabor Hrs
RMAYSONET - Raul Maysonett 0.77 178.00Emp: 05/01/2020 12:21
Parts Total CostIss PriceQty Issued Tax & Markup
2.00 414.54TIR-060002377-0 - TIR; 245 75R17 MIC LTX 118.44 148.05
Serial #:Removed Serial #:
©2021 AssetWorks LLC. All Rights Reserved. Page 3 of 7
Report Date: 8/11/2021
Work Order Detail Work Order: CS-2020-21244
Task: 031-000 - Charging System Diagnosis Warranty: NO
WAC: 10 - DIAGNOSE Reason: NP - NOTED IN PM SERVICE
Work Class: 1 - SCHEDULED Comments:
Task Notes
RMAYSONET 5-5-2020 4:44PM CHECK AND TEST CHARGING WORKS GOOD
Labor CostLabor Hrs
RMAYSONET - Raul Maysonett 0.15 13.35Emp: 05/01/2020 06:44
RMAYSONET - Raul Maysonett 0.85 75.6505/05/2020 03:00
Task: 032-000 - Starting System Diagnosis Warranty: NO
WAC: 10 - DIAGNOSE Reason: NP - NOTED IN PM SERVICE
Work Class: 1 - SCHEDULED Comments:
Task Notes
RMAYSONET 5-5-2020 4:51PM STARTING SYSTEM GOOD
Labor CostLabor Hrs
RMAYSONET - Raul Maysonett 0.52 46.28Emp: 05/01/2020 06:35
RMAYSONET - Raul Maysonett 0.48 42.7205/05/2020 03:00
Task: 034-030 - Exterior Lighting Warranty: NO
WAC: 03 - REPLACED PART Reason: NP - NOTED IN PM SERVICE
Work Class: 1 - SCHEDULED Comments:
Task Notes
RMAYSONET 5-5-2020 5:00PM REPLACES TWO FRONT AMBER LIGHTS
Labor CostLabor Hrs
RMAYSONET - Raul Maysonett 1.47 130.83Emp: 05/05/2020 15:47
Parts Total CostIss PriceQty Issued Tax & Markup
2.00 4.82LIT-94993-0 - LIT; RIGHT ANGLE S T PGTL 1.38 1.72
Serial #:Removed Serial #:
1.00 0.83LMP-906N-0 - LMP; BOXED MINIATURES 0.24 0.59
Serial #:Removed Serial #:
Task: 035-000 - Battery System Diagnosis Warranty: NO
WAC: 10 - DIAGNOSE Reason: NP - NOTED IN PM SERVICE
Work Class: 1 - SCHEDULED Comments:
Task Notes
RMAYSONET 5-1-2020 1:02PM CHECK AND TEST BATTERY IS NEW SPRAY BATTERY PROTECTOR COMPLETE
Labor CostLabor Hrs
RMAYSONET - Raul Maysonett 0.48 42.72Emp: 05/01/2020 06:04
RMAYSONET - Raul Maysonett 0.52 46.2805/05/2020 03:00
Task: 090-016 - Interior Cab Sanitizing Warranty: NO
WAC: 02 - CLEAN Reason: NP - NOTED IN PM SERVICE
Work Class: 1 - SCHEDULED Comments:
Task Notes
RMAYSONET 5-5-2020 4:50PM WIPE DASHBOARD DOOR PANELS SEATS AND STEERING WHEEL COMPETE
Labor CostLabor Hrs
RMAYSONET - Raul Maysonett 0.77 89.00Emp: 05/05/2020 14:19
©2021 AssetWorks LLC. All Rights Reserved. Page 4 of 7
Report Date: 8/11/2021
Work Order Detail Work Order: CS-2020-21244
Task: 090-080 - Road Test Warranty: NO
WAC: 20 - NO DEFECT FOUND Reason: NP - NOTED IN PM SERVICE
Work Class: 1 - SCHEDULED Comments:
Task Notes
RMAYSONET 5-5-2020 4:59PM COMPLETE ROAD TEST PICK UP RUN GRATE
Labor CostLabor Hrs
RMAYSONET - Raul Maysonett 1.12 0.01Emp: 05/05/2020 16:54
Task: PM-C - Pm Service Warranty: NO
WAC: 51 - DEFERRED MAINTENANCE
Reason: NP - NOTED IN PM SERVICE
Work Class: 1 - SCHEDULED Comments:
Task Notes
RMAYSONET 5-5-2020 4:56PM PM SERVICE COMPLETE
Labor CostLabor Hrs
RMAYSONET - Raul Maysonett 0.25 0.00Emp: 05/05/2020 17:09
RMAYSONET - Raul Maysonett 1.67 178.0005/01/2020 08:24
Parts Total CostIss PriceQty Issued Tax & Markup
1.00 13.50FIL-9883-0 - FIL; NAPAGOLD AIR FILTER 3.86 9.64
Serial #:Removed Serial #:
8.00 16.249OC-5W20-0 - 9OC; 5W20 SYN OIL 4.64 1.45
Serial #:Removed Serial #:
1.00 4.77FIL-1372-0 - FIL; NAPAGOLD OIL FILTER 1.36 3.41
Serial #:Removed Serial #:
Delays
Delay HoursStatus End DatetimeStart Datetime
5/1/2020 1:23PM 5/4/2020 8:59AM 7.60AT - AWAITING TECHNICIAN CLOSED
Delay HoursStatus End DatetimeStart Datetime
4/27/2020 7:16PM 5/1/2020 5:35AM 36.73AT - AWAITING TECHNICIAN CLOSED
Overhead
Small Parts - Labor: 0.00
Small Parts - Parts: 0.00
Tools: 0.00
Overhead Costs: 17.57
Total Overhead Costs: 17.57
Messages
Unit Is Being Replaced In Fy 20-21 List
©2021 AssetWorks LLC. All Rights Reserved. Page 5 of 7
Report Date: 8/11/2021
Work Order Detail Work Order: CS-2020-21244
PM Checklist
Task / Comment Employee CompletedN/AFailed
PM-C Exception PM: No
PM-076 - START ENGINE, CHECK GAUGES, WARNING LIGHTS
RMAYSONET - RAUL MAYSONETT
PM-077 - HEATER, DEFROSTER, A/C OPERATION RMAYSONET - RAUL MAYSONETT
PM-078 - STEERING, FREE TRAVEL, BIND, PULL, VIBRATION RMAYSONET - RAUL MAYSONETT
PM-079 - DECAL/SERVICE STICKER RMAYSONET - RAUL MAYSONETT
PM-080 - VISUAL, LEAK, APPEARANCE, DAMAGE RMAYSONET - RAUL MAYSONETT
PM-081 - HITCH & TRAILER PLUG SOCKET RMAYSONET - RAUL MAYSONETT
PM-082 - HORN, WINDSHEILD WIPERS/WASHER OPERATION
RMAYSONET - RAUL MAYSONETT
PM-083 - ALL GLASS & MIRRORS RMAYSONET - RAUL MAYSONETT
PM-084 - ALL LIGHTS & HEAD LIGHTS FOR PROPER ADJUSTMENT
RMAYSONET - RAUL MAYSONETT
PM-085 - ENGINE PERFORMANCE RMAYSONET - RAUL MAYSONETT
PM-086 - SAFETY EQUIPMENT, FIRE EXTIN. BACK ALARM RMAYSONET - RAUL MAYSONETT
PM-087 - POWER STEERING SYSTEM/ FLUID RMAYSONET - RAUL MAYSONETT
PM-088 - ALL HOSES RMAYSONET - RAUL MAYSONETT
PM-089 - ALL BELTS RMAYSONET - RAUL MAYSONETT
PM-090 - ALL POINTS CHASSIS LUBRICATION RMAYSONET - RAUL MAYSONETT
PM-091 - CHANGE ENGINE OIL & FILTER RMAYSONET - RAUL MAYSONETT
PM-092 - TRANSMISSION FLUID LEVEL & CONDITION RMAYSONET - RAUL MAYSONETT
PM-093 - DIFFERENTIAL & DRIVE AXLES RMAYSONET - RAUL MAYSONETT
PM-094 - LUBE DOORS & HINGE POINTS RMAYSONET - RAUL MAYSONETT
PM-095 - REPLACE FUEL, CABIN & AIR FILTER, (AS NEEDED) RMAYSONET - RAUL MAYSONETT
PM-096 - OPERATION & CONDITION OF AUXILIARY COMPONENTS
RMAYSONET - RAUL MAYSONETT
PM-097 - CHARGING SYS.& BATTERY TEST, STARTER, CLEAN TERMINALS
RMAYSONET - RAUL MAYSONETT
PM-098 - ENGINE & TRANSMISSION MOUNTS RMAYSONET - RAUL MAYSONETT
PM-099 - PRESSURE TEST COOLING SYSTEM RMAYSONET - RAUL MAYSONETT
©2021 AssetWorks LLC. All Rights Reserved. Page 6 of 7
Report Date: 8/11/2021
Work Order Detail Work Order: CS-2020-21244
PM-100 - FAN CLUTCH/ ELECTRIC FAN OPERATION RMAYSONET - RAUL MAYSONETT
PM-101 - EXHAUST SYSTEM VISUAL RMAYSONET - RAUL MAYSONETT
PM-102 - SEAT BELTS ALL, SUPPLEMENTAL RESTRAINTS (SIR/AIRBAG)
RMAYSONET - RAUL MAYSONETT
PM-103 - ROTATE & BALANCE TIRES RMAYSONET - RAUL MAYSONETT
PM-104 - BRAKE SYSTEM CHECK/ABS/REGENERATION- ROTOR THICKNESS (MEETS
RMAYSONET - RAUL MAYSONETT
PM-105 - BRAKE SYSTEM CHECK/ABS/REGENERATION- DRUM DIAMETER (MEETS SP
RMAYSONET - RAUL MAYSONETT
PM-106 - FRONT LINING PERCENTAGE - LF RMAYSONET - RAUL MAYSONETT
PM-107 - FRONT LINING PERCENTAGE - RF RMAYSONET - RAUL MAYSONETT
PM-108 - REAR LINING PERCENTAGE - LR RMAYSONET - RAUL MAYSONETT
PM-109 - REAR LINING PERCENTAGE - RR RMAYSONET - RAUL MAYSONETT
PM-110 - MASTER CYLINDER FLUID LEVEL/CONDITION RMAYSONET - RAUL MAYSONETT
PM-111 - PARKING BRAKE SYSTEM RMAYSONET - RAUL MAYSONETT
PM-112 - HYDRO BOOST/POWER BOOSTER RMAYSONET - RAUL MAYSONETT
WO Notes
OHENRIQUE 04/27/2020 19:16 PM-C SERVICECHECK A/C SYSTEM NOT GETTING COLD
Comments: Internal Parts Cost:
Internal Labor Cost:
Commercial Labor Cost:
Commercial Parts Cost:
Work Order Total:
Commercial Misc Cost:
Overhead Costs: $17.57
$4,369.58
$1,702.47
$2,649.54
Commercial Total:
Internal Total: $4,369.58
Commercial Tax & Markup: $0.00
$0.00
$0.00
0.00
Equipment Usage Costs: $0.00
$0.00
©2021 AssetWorks LLC. All Rights Reserved. Page 7 of 7
Report Date: 8/11/2021
Work Order DetailCS-2020-22897
UD6008 2013 FORD F250 UTILITY BODY 3/4 TON TRUCK
Asset ID:
XD5184 CS - CENTRAL SHOPLicense Number: Repair Location:
CS-2020-22897 CLOSEDWork Order ID: Job Status:
REPAIR OS - OUT OF SERVICEJob Type: Service Status:
78344 MILES (EQ UPD) 09/14/2020 07:45WO Meter 1: Projected Completion Date:
R - ROUTINEPriority:
Non Service Request Tasks
Task: 001-000 - Hvac Diagnosis Warranty: NO
WAC: 10 - DIAGNOSE Reason: BD - BREAKDOWN
Work Class: 2 - UNSCHEDULED Comments:
Task Notes
FRICHARD 8-13-2020 11:37AM INSPECTED FOUND LOW FREON AND FOUND EVAPORATOR CORE IS LEAKING PARTS ON ORDER.
Labor CostLabor Hrs
FRICHARD - Fioravanti Richard 0.98 87.22Emp: 08/13/2020 11:37
Task: 001-013 - A/C Evaporator Core Warranty: NO
WAC: 03 - REPLACED PART Reason: BD - BREAKDOWN
Work Class: 2 - UNSCHEDULED Comments:
Task Notes
FRICHARD 9-2-2020 9:09AM REMOVING DASH BOARD TO REPLACE EVAPORATOR STOPPING FOR BREAK
FRICHARD 9-2-2020 12:01PM REMOVED DASH PANEL REMOVED AIR BOX ASSEMBLY REMOVED OLD EVAPORATOR AND INSPECTED AND INSTALLED NEW EVAPORATOR REASSEMBLE AIR BOX WILL PUT BACK IN TRUCK AFTER LUNCH.
FRICHARD 9-2-2020 2:07PM REINSTALLED AIR BOX REINSTALLED DASH BOARD
Labor CostLabor Hrs
FRICHARD - Fioravanti Richard 1.27 113.03Emp: 09/02/2020 09:09
FRICHARD - Fioravanti Richard 2.60 231.4009/02/2020 12:01
FRICHARD - Fioravanti Richard 1.57 139.7309/02/2020 14:07
Parts Total CostIss PriceQty Issued Tax & Markup
1.00 127.959AP-4712089-0 - 9AP; EVAPORATOR 36.56 91.39
Serial #:Removed Serial #:
Task: 001-015 - Evacuate And Recharge Warranty: NO
WAC: 08 - REPAIR Reason: BD - BREAKDOWN
Work Class: 2 - UNSCHEDULED Comments:
Task Notes
FRICHARD 9-2-2020 3:17PM PERFORMED EVAC AND RECHARGE OF A/C SYSTEM AFTER EVAP REPAIR
Labor CostLabor Hrs
FRICHARD - Fioravanti Richard 0.93 82.77Emp: 09/02/2020 15:17
Task: 010-011 - Quality Control Warranty: NO
WAC: 10 - DIAGNOSE Reason: NP - NOTED IN PM SERVICE
Work Class: 2 - UNSCHEDULED Comments:
Labor CostLabor Hrs
WCASTRO - Walter Castro 0.25 22.25Emp: 09/08/2020 03:00
©2021 AssetWorks LLC. All Rights Reserved. Page 1 of 3
Report Date: 8/11/2021
Work Order Detail Work Order: CS-2020-22897
Task: 035-000 - Battery System Diagnosis Warranty: NO
WAC: 10 - DIAGNOSE Reason: BD - BREAKDOWN
Work Class: 2 - UNSCHEDULED Comments:
Task Notes
FRICHARD 9-2-2020 3:07PM TRUCK WOULD NOT START HAD TO JUMP IN PARKING LOT LOAD TEST FAILED BATTERY 2 YEARS OLD WILL REPLACE
Labor CostLabor Hrs
FRICHARD - Fioravanti Richard 0.50 44.50Emp: 09/08/2020 03:00
Task: 035-020 - Chassis Battery Warranty: NO
WAC: 03 - REPLACED PART Reason: BD - BREAKDOWN
Work Class: 2 - UNSCHEDULED Comments:
Task Notes
FRICHARD 9-2-2020 3:07PM REMOVED AND REPLACED BAD BATTERY
Labor CostLabor Hrs
FRICHARD - Fioravanti Richard 0.50 44.50Emp: 09/08/2020 03:00
Parts Total CostIss PriceQty Issued Tax & Markup
1.00 134.22BAT-7565-0 - BAT; BATTERY 38.35 95.87
Serial #:Removed Serial #:
Task: 090-016 - Interior Cab Sanitizing Warranty: NO
WAC: 02 - CLEAN Reason: BD - BREAKDOWN
Work Class: 2 - UNSCHEDULED Comments:
Task Notes
FRICHARD 9-2-2020 3:08PM PERFORMED CLEANING AND DISINFECTING TREATMENT ON INTERIOR AREAS SUCH AS DASHBOARD, HARD SURFACES, UPHOLSTERY, DOOR PANELS, SEATS, AND STEERING WHEEL
Labor CostLabor Hrs
WCASTRO - Walter Castro 0.75 89.00Emp: 09/08/2020 03:00
Delays
Delay HoursStatus End DatetimeStart Datetime
8/13/2020 12:45PM 9/2/2020 7:53AM 163.25PD - WAIT PARTS - OUT OF SERVICE CLOSED
Delay HoursStatus End DatetimeStart Datetime
8/11/2020 7:37AM 8/13/2020 10:19AM 26.32AT - AWAITING TECHNICIAN CLOSED
Delay HoursStatus End DatetimeStart Datetime
9/2/2020 3:17PM 9/8/2020 9:07AM 41.83WS - WAITING FOR SERVICE CLOSED
Overhead
Small Parts - Labor: 0.00
Small Parts - Parts: 0.00
Tools: 0.00
Overhead Costs: 17.57
Total Overhead Costs: 17.57
Messages
Unit Is Being Replaced In Fy 20-21 List
WO Notes
DMCINTYRE 08/11/2020 07:37 CHECK A/C NOT GETTING COLDRESET OIL CHANGE LIGHT PM-C PERFORMED IN MAYSANITIZE CAB
©2021 AssetWorks LLC. All Rights Reserved. Page 2 of 3
Report Date: 8/11/2021
Work Order Detail Work Order: CS-2020-22897
Comments: Internal Parts Cost:
Internal Labor Cost:
Commercial Labor Cost:
Commercial Parts Cost:
Work Order Total:
Commercial Misc Cost:
Overhead Costs: $17.57
$1,134.14
$262.17
$854.40
Commercial Total:
Internal Total: $1,134.14
Commercial Tax & Markup: $0.00
$0.00
$0.00
0.00
Equipment Usage Costs: $0.00
$0.00
©2021 AssetWorks LLC. All Rights Reserved. Page 3 of 3
Report Date: 8/11/2021
Work Order DetailCS-2020-23897
UD6008 2013 FORD F250 UTILITY BODY 3/4 TON TRUCK
Asset ID:
XD5184 CS - CENTRAL SHOPLicense Number: Repair Location:
CS-2020-23897 CLOSEDWork Order ID: Job Status:
PM PM-C - PM SERVICEJob Type: PM Service:
11/05/2020 OS - OUT OF SERVICEPM Scheduled: Service Status:
80062 MILES (EQ UPD) 10/31/2020 07:44WO Meter 1: Projected Completion Date:
SCHEDULED PM-C APPOINTMENT 10.29.2020 R - ROUTINETitle: Priority:
Non Service Request Tasks
Task: 001-000 - Hvac Diagnosis Warranty: NO
WAC: 10 - DIAGNOSE Reason: NP - NOTED IN PM SERVICE
Work Class: 1 - SCHEDULED Comments:
Task Notes
JKAUFMAN 10-30-2020 3:07PM CHECKED A / C OPERATION. BLOWING GOOD AND COLD
Labor CostLabor Hrs
JKAUFMAN - James Kaufman 0.52 46.28Emp: 10/30/2020 03:00
JKAUFMAN - James Kaufman 0.48 42.7210/30/2020 15:07
Task: 002-150 - Decals Warranty: NO
WAC: 08 - REPAIR Reason: NP - NOTED IN PM SERVICE
Work Class: 1 - SCHEDULED Comments:
Task Notes
JKAUFMAN 10-30-2020 5:06PM NECESSARY TO REMOVE OUTDATED CITY LOGO FROM R / S REAR OF UNIT AND INSTALLED UNIT ID LETTERING AS NECESSARY
Labor CostLabor Hrs
JKAUFMAN - James Kaufman 0.48 42.72Emp: 10/30/2020 03:00
JKAUFMAN - James Kaufman 0.52 46.2810/30/2020 17:08
Parts Total CostIss PriceQty Issued Tax & Markup
1.00 23.95MMM-38987-0 - MMM; SPEC ADH RMVR 38987 6.84 17.11
Serial #:Removed Serial #:
Task: 005-020 - W/S Wipers Warranty: NO
WAC: 03 - REPLACED PART Reason: NP - NOTED IN PM SERVICE
Work Class: 1 - SCHEDULED Comments:
Task Notes
JKAUFMAN 10-30-2020 2:37PM REPLACED BOTH WIPER BLADES. FILLED WASHER FLUID. VERIFIED OPERATION
Labor CostLabor Hrs
JKAUFMAN - James Kaufman 0.17 44.50Emp: 10/30/2020 14:38
Parts Total CostIss PriceQty Issued Tax & Markup
2.00 9.24OWI-NP22-0 - OWI; WIPER BLADE 2.64 3.30
Serial #:Removed Serial #:
Task: 010-011 - Quality Control Warranty: NO
WAC: 10 - DIAGNOSE Reason: NP - NOTED IN PM SERVICE
Work Class: 1 - SCHEDULED Comments:
Task Notes
JKAUFMAN 10-30-2020 5:09PM QUALITY CONTROL
©2021 AssetWorks LLC. All Rights Reserved. Page 1 of 5
Report Date: 8/11/2021
Work Order Detail Work Order: CS-2020-23897
Labor CostLabor Hrs
WCASTRO - Walter Castro 0.25 22.25Emp: 10/30/2020 03:00
JKAUFMAN - James Kaufman 0.02 1.7810/30/2020 17:09
Task: 017-011 - Replace 2 Tires Warranty: NO
WAC: 03 - REPLACED PART Reason: NP - NOTED IN PM SERVICE
Work Class: 1 - SCHEDULED Comments:
Task Notes
JKAUFMAN 10-30-2020 4:13PM REPLACED BOTH FRONT TIRES
Labor CostLabor Hrs
JKAUFMAN - James Kaufman 0.02 178.00Emp: 10/30/2020 07:23
JKAUFMAN - James Kaufman 0.50 0.0010/30/2020 13:34
JKAUFMAN - James Kaufman 0.73 0.0010/30/2020 16:13
Parts Total CostIss PriceQty Issued Tax & Markup
2.00 574.59TIR-48588-0 - TIR; LT245 75R17 MICHELIN DEFENDER 164.17 205.21
Serial #:Removed Serial #:
Task: 031-000 - Charging System Diagnosis Warranty: NO
WAC: 10 - DIAGNOSE Reason: NP - NOTED IN PM SERVICE
Work Class: 1 - SCHEDULED Comments:
Task Notes
JKAUFMAN 10-30-2020 7:20AM CHARGING SYSTEM CHARGING VOLTAGE IS 14.06. GOOD OPERATION
Labor CostLabor Hrs
JKAUFMAN - James Kaufman 1.00 89.00Emp: 10/30/2020 03:00
Task: 032-000 - Starting System Diagnosis Warranty: NO
WAC: 10 - DIAGNOSE Reason: NP - NOTED IN PM SERVICE
Work Class: 1 - SCHEDULED Comments:
Task Notes
JKAUFMAN 10-30-2020 7:19AM STARTING SYSTEM CRANKING VOLTAGE IS 11.48. NORMAL OPERATION
Labor CostLabor Hrs
JKAUFMAN - James Kaufman 1.00 89.00Emp: 10/30/2020 03:00
Task: 035-000 - Battery System Diagnosis Warranty: NO
WAC: 10 - DIAGNOSE Reason: NP - NOTED IN PM SERVICE
Work Class: 1 - SCHEDULED Comments:
Task Notes
JKAUFMAN 10-30-2020 7:18AM TESTED BATTERY. GOOD AT THIS TIME
Labor CostLabor Hrs
JKAUFMAN - James Kaufman 0.23 20.47Emp: 10/29/2020 17:14
JKAUFMAN - James Kaufman 0.55 48.9510/30/2020 03:00
JKAUFMAN - James Kaufman 0.22 19.5810/30/2020 07:20
Task: 090-016 - Interior Cab Sanitizing Warranty: NO
WAC: 02 - CLEAN Reason: NP - NOTED IN PM SERVICE
Work Class: 1 - SCHEDULED Comments:
Task Notes
JKAUFMAN 10-30-2020 4:23PM SANITIZED FREQUENT TOUCH AREAS AS NECESSARY
Labor CostLabor Hrs
JKAUFMAN - James Kaufman 0.37 89.00Emp: 10/30/2020 15:29
JKAUFMAN - James Kaufman 0.17 0.0010/30/2020 16:23
©2021 AssetWorks LLC. All Rights Reserved. Page 2 of 5
Report Date: 8/11/2021
Work Order Detail Work Order: CS-2020-23897
Task: 090-080 - Road Test Warranty: NO
WAC: 20 - NO DEFECT FOUND Reason: NP - NOTED IN PM SERVICE
Work Class: 1 - SCHEDULED Comments:
Task Notes
JKAUFMAN 10-30-2020 4:36PM ROAD TEST UNIT
Labor CostLabor Hrs
JKAUFMAN - James Kaufman 0.23 0.01Emp: 10/30/2020 16:37
Task: PM-C - Pm Service Warranty: NO
WAC: 11 - PM COMPLETE Reason: NP - NOTED IN PM SERVICE
Work Class: 1 - SCHEDULED Comments:
Task Notes
JKAUFMAN 10-30-2020 2:15PM PERFORMED PM-C SERVICE
Labor CostLabor Hrs
JKAUFMAN - James Kaufman 0.22 0.00Emp: 10/30/2020 14:28
JKAUFMAN - James Kaufman 0.03 178.0010/30/2020 07:22
JKAUFMAN - James Kaufman 0.50 0.0010/30/2020 07:53
JKAUFMAN - James Kaufman 0.32 0.0010/30/2020 13:04
JKAUFMAN - James Kaufman 0.68 0.0010/30/2020 14:15
Parts Total CostIss PriceQty Issued Tax & Markup
1.00 3.36MAC-4810-0 - MAC; LOW VOC BRAKE CLNR 0.96 2.40
Serial #:Removed Serial #:
1.00 4.77FIL-1372-0 - FIL; NAPAGOLD OIL FILTER 1.36 3.41
Serial #:Removed Serial #:
1.00 13.50FIL-9883-0 - FIL; NAPAGOLD AIR FILTER 3.86 9.64
Serial #:Removed Serial #:
6.00 12.189OC-5W20-0 - 9OC; 5W20 SYN OIL 3.48 1.45
Serial #:Removed Serial #:
Delays
Delay HoursStatus End DatetimeStart Datetime
10/30/2020 7:53AM 10/30/2020 12:45PM 4.75AT - AWAITING TECHNICIAN CLOSED
Delay HoursStatus End DatetimeStart Datetime
10/29/2020 8:13AM 10/29/2020 4:59PM 8.77AT - AWAITING TECHNICIAN CLOSED
Delay HoursStatus End DatetimeStart Datetime
10/29/2020 5:14PM 10/30/2020 7:07AM 2.77AT - AWAITING TECHNICIAN CLOSED
Overhead
Small Parts - Labor: 0.00
Small Parts - Parts: 0.00
Tools: 0.00
Overhead Costs: 17.57
Total Overhead Costs: 17.57
Messages
Unit Is Being Replaced In Fy 20-21 List
©2021 AssetWorks LLC. All Rights Reserved. Page 3 of 5
Report Date: 8/11/2021
Work Order Detail Work Order: CS-2020-23897
PM Checklist
Task / Comment Employee CompletedN/AFailed
PM-C Exception PM: No
PM-076 - START ENGINE, CHECK GAUGES, WARNING LIGHTS
JKAUFMAN - JAMES KAUFMAN
PM-077 - HEATER, DEFROSTER, A/C OPERATION JKAUFMAN - JAMES KAUFMAN
PM-078 - STEERING, FREE TRAVEL, BIND, PULL, VIBRATION JKAUFMAN - JAMES KAUFMAN
PM-079 - DECAL/SERVICE STICKER JKAUFMAN - JAMES KAUFMAN
PM-080 - VISUAL, LEAK, APPEARANCE, DAMAGE JKAUFMAN - JAMES KAUFMAN
PM-081 - HITCH & TRAILER PLUG SOCKET JKAUFMAN - JAMES KAUFMAN
PM-082 - HORN, WINDSHEILD WIPERS/WASHER OPERATION
JKAUFMAN - JAMES KAUFMAN
PM-083 - ALL GLASS & MIRRORS JKAUFMAN - JAMES KAUFMAN
PM-084 - ALL LIGHTS & HEAD LIGHTS FOR PROPER ADJUSTMENT
JKAUFMAN - JAMES KAUFMAN
PM-085 - ENGINE PERFORMANCE JKAUFMAN - JAMES KAUFMAN
PM-086 - SAFETY EQUIPMENT, FIRE EXTIN. BACK ALARM JKAUFMAN - JAMES KAUFMAN
PM-087 - POWER STEERING SYSTEM/ FLUID JKAUFMAN - JAMES KAUFMAN
PM-088 - ALL HOSES JKAUFMAN - JAMES KAUFMAN
PM-089 - ALL BELTS JKAUFMAN - JAMES KAUFMAN
PM-090 - ALL POINTS CHASSIS LUBRICATION JKAUFMAN - JAMES KAUFMAN
PM-091 - CHANGE ENGINE OIL & FILTER JKAUFMAN - JAMES KAUFMAN
PM-092 - TRANSMISSION FLUID LEVEL & CONDITION JKAUFMAN - JAMES KAUFMAN
PM-093 - DIFFERENTIAL & DRIVE AXLES JKAUFMAN - JAMES KAUFMAN
PM-094 - LUBE DOORS & HINGE POINTS JKAUFMAN - JAMES KAUFMAN
PM-095 - REPLACE FUEL, CABIN & AIR FILTER, (AS NEEDED) JKAUFMAN - JAMES KAUFMAN
PM-096 - OPERATION & CONDITION OF AUXILIARY COMPONENTS
JKAUFMAN - JAMES KAUFMAN
PM-097 - CHARGING SYS.& BATTERY TEST, STARTER, CLEAN TERMINALS
JKAUFMAN - JAMES KAUFMAN
PM-098 - ENGINE & TRANSMISSION MOUNTS JKAUFMAN - JAMES KAUFMAN
PM-099 - PRESSURE TEST COOLING SYSTEM JKAUFMAN - JAMES KAUFMAN
©2021 AssetWorks LLC. All Rights Reserved. Page 4 of 5
Report Date: 8/11/2021
Work Order Detail Work Order: CS-2020-23897
PM-100 - FAN CLUTCH/ ELECTRIC FAN OPERATION JKAUFMAN - JAMES KAUFMAN
PM-101 - EXHAUST SYSTEM VISUAL JKAUFMAN - JAMES KAUFMAN
PM-102 - SEAT BELTS ALL, SUPPLEMENTAL RESTRAINTS (SIR/AIRBAG)
JKAUFMAN - JAMES KAUFMAN
PM-103 - ROTATE & BALANCE TIRES JKAUFMAN - JAMES KAUFMAN
PM-104 - BRAKE SYSTEM CHECK/ABS/REGENERATION- ROTOR THICKNESS (MEETS
JKAUFMAN - JAMES KAUFMAN
PM-105 - BRAKE SYSTEM CHECK/ABS/REGENERATION- DRUM DIAMETER (MEETS SP
JKAUFMAN - JAMES KAUFMAN
PM-106 - FRONT LINING PERCENTAGE - LF JKAUFMAN - JAMES KAUFMAN
PM-107 - FRONT LINING PERCENTAGE - RF JKAUFMAN - JAMES KAUFMAN
PM-108 - REAR LINING PERCENTAGE - LR JKAUFMAN - JAMES KAUFMAN
PM-109 - REAR LINING PERCENTAGE - RR JKAUFMAN - JAMES KAUFMAN
PM-110 - MASTER CYLINDER FLUID LEVEL/CONDITION JKAUFMAN - JAMES KAUFMAN
PM-111 - PARKING BRAKE SYSTEM JKAUFMAN - JAMES KAUFMAN
PM-112 - HYDRO BOOST/POWER BOOSTER JKAUFMAN - JAMES KAUFMAN
WO Notes
JKAUFMAN 10/30/2020 17:08 OPERATORS UNIT KEYS ARE IN COMPLETED UNIT BOX. UNIT PARKED ON READY LINE
JKAUFMAN 10/30/2020 13:33 FRONT TIRES ON ORDER
DMCINTYRE 10/29/2020 08:12 PM-C
Comments: Internal Parts Cost:
Internal Labor Cost:
Commercial Labor Cost:
Commercial Parts Cost:
Work Order Total:
Commercial Misc Cost:
Overhead Costs:
SCHEDULED PM-C APPOINTMENT 10.29.2020
$17.57
$1,617.70
$641.59
$958.54
Commercial Total:
Internal Total: $1,617.70
Commercial Tax & Markup: $0.00
$0.00
$0.00
0.00
Equipment Usage Costs: $0.00
$0.00
©2021 AssetWorks LLC. All Rights Reserved. Page 5 of 5
Report Date: 8/11/2021
Work Order DetailCS-2021-26080
UD6008 2013 FORD F250 UTILITY BODY 3/4 TON TRUCK
Asset ID:
XD5184 CS - CENTRAL SHOPLicense Number: Repair Location:
CS-2021-26080 CLOSEDWork Order ID: Job Status:
PM PM-C - PM SERVICEJob Type: PM Service:
04/30/2021 OS - OUT OF SERVICEPM Scheduled: Service Status:
84527 MILES (EQ UPD) 05/06/2021 08:47WO Meter 1: Projected Completion Date:
SCHEDULED PM-C 4/30/2021 10/30/2021Title: Next PM Due Date:
R - ROUTINEPriority:
Non Service Request Tasks
Task: 001-000 - Hvac Diagnosis Warranty: NO
WAC: 10 - DIAGNOSE Reason: NP - NOTED IN PM SERVICE
Work Class: 1 - SCHEDULED Comments:
Task Notes
NJANMAHAMAD5-3-2021 10:08AM HVAC SYSTEM OPERATING PROPERLY AT THIS TIME
Labor CostLabor Hrs
NJANMAHAM - Nicholas Janmahamad 1.00 89.00Emp: 05/04/2021 03:00
Task: 005-020 - W/S Wipers Warranty: NO
WAC: 03 - REPLACED PART Reason: NP - NOTED IN PM SERVICE
Work Class: 1 - SCHEDULED Comments:
Task Notes
NJANMAHAMAD5-3-2021 10:09AM FRONT WIPER BLADES REPLACED, WASH FLUID FILLED. WINDSHIELD CLEANING PROPERLY
Labor CostLabor Hrs
NJANMAHAM - Nicholas Janmahamad 0.05 44.50Emp: 05/03/2021 10:09
Parts Total CostIss PriceQty Issued Tax & Markup
1.00 1.829AP-M506-0 - 9AP; WASHER SOL 0.52 1.30
Serial #:Removed Serial #:
2.00 9.24OWI-NP22-0 - OWI; WIPER BLADE 2.64 3.30
Serial #:Removed Serial #:
Task: 010-011 - Quality Control Warranty: NO
WAC: 10 - DIAGNOSE Reason: NP - NOTED IN PM SERVICE
Work Class: 1 - SCHEDULED Comments:
Task Notes
NJANMAHAMAD5-4-2021 12:29PM UNIT READY FOR SERVICE
Labor CostLabor Hrs
OHENRIQUE - Osvaldo Henriquez 0.25 22.25Emp: 05/04/2021 03:00
Task: 017-012 - Replace 4 Tires Warranty: NO
WAC: 03 - REPLACED PART Reason: NP - NOTED IN PM SERVICE
Work Class: 1 - SCHEDULED Comments:
Task Notes
NJANMAHAMAD5-4-2021 12:28PM 4 TIREE MOUNT AND BALANCE COMPLETED. ALL TIRE PRESSURES RESET TO SPEC. UNIT ROAD TEST TO CONFIRM THERE ARE NO VIBRATIONS.
Labor CostLabor Hrs
NJANMAHAM - Nicholas Janmahamad 0.12 356.00Emp: 05/03/2021 10:16
NJANMAHAM - Nicholas Janmahamad 2.67 0.0005/04/2021 12:28
©2021 AssetWorks LLC. All Rights Reserved. Page 1 of 5
Report Date: 8/11/2021
Work Order Detail Work Order: CS-2021-26080
Parts Total CostIss PriceQty Issued Tax & Markup
4.00 1,063.78TIR-233007-0 - TIR; LT245 75R17 TRANSFORCE 303.94 189.96
Serial #:Removed Serial #:
Task: 031-000 - Charging System Diagnosis Warranty: NO
WAC: 10 - DIAGNOSE Reason: NP - NOTED IN PM SERVICE
Work Class: 1 - SCHEDULED Comments:
Task Notes
NJANMAHAMAD5-3-2021 10:07AM CHARGING SYSTEM OPERATING PROPERLY AT THIS TIME
Labor CostLabor Hrs
NJANMAHAM - Nicholas Janmahamad 1.00 89.00Emp: 05/04/2021 03:00
Task: 032-000 - Starting System Diagnosis Warranty: NO
WAC: 10 - DIAGNOSE Reason: NP - NOTED IN PM SERVICE
Work Class: 1 - SCHEDULED Comments:
Task Notes
NJANMAHAMAD5-3-2021 10:07AM STARTING SYSTEM OPERATING PROPERLY AT THIS TIME
Labor CostLabor Hrs
NJANMAHAM - Nicholas Janmahamad 1.00 89.00Emp: 05/04/2021 03:00
Task: 035-000 - Battery System Diagnosis Warranty: NO
WAC: 10 - DIAGNOSE Reason: NP - NOTED IN PM SERVICE
Work Class: 1 - SCHEDULED Comments:
Task Notes
NJANMAHAMAD5-3-2021 10:08AM BATTERY SYSTEM OPERATING PROPERLY AT THIS TIME
Labor CostLabor Hrs
NJANMAHAM - Nicholas Janmahamad 1.00 89.00Emp: 05/04/2021 03:00
Task: 090-016 - Interior Cab Sanitizing Warranty: NO
WAC: 02 - CLEAN Reason: NP - NOTED IN PM SERVICE
Work Class: 1 - SCHEDULED Comments:
Task Notes
NJANMAHAMAD5-3-2021 10:07AM INTERIOR CAB SANITIZED WITH GERMICIDAL DISINFECTANT SPRAY
Labor CostLabor Hrs
NJANMAHAM - Nicholas Janmahamad 0.75 89.00Emp: 05/04/2021 03:00
Task: PM-C - Pm Service Warranty: NO
WAC: 11 - PM COMPLETE Reason: -
Work Class: 1 - SCHEDULED Comments:
Task Notes
NJANMAHAMAD5-3-2021 10:05AM PM SERVICE COMPLETED.
Labor CostLabor Hrs
NJANMAHAM - Nicholas Janmahamad 4.08 178.00Emp: 04/30/2021 17:17
Parts Total CostIss PriceQty Issued Tax & Markup
1.00 13.50FIL-9883-0 - FIL; NAPA GOLD AIR FILTER 3.86 9.64
Serial #:Removed Serial #:
8.00 16.249OC-5W20-0 - 9OC; 5W20 SYN OIL 4.64 1.45
Serial #:Removed Serial #:
1.00 4.77FIL-1372-0 - FIL; NAPA GOLD OIL FILTER 1.36 3.41
Serial #:Removed Serial #:
Delays
©2021 AssetWorks LLC. All Rights Reserved. Page 2 of 5
Report Date: 8/11/2021
Work Order Detail Work Order: CS-2021-26080
Delay HoursStatus End DatetimeStart Datetime
4/30/2021 9:37AM 4/30/2021 1:12PM 3.58AT - AWAITING TECHNICIAN CLOSED
Delay HoursStatus End DatetimeStart Datetime
5/3/2021 10:17AM 5/4/2021 9:48AM 11.52PD - WAIT PARTS - OUT OF SERVICE CLOSED
Delay HoursStatus End DatetimeStart Datetime
5/2/2021 10:39AM 5/3/2021 9:10AM 1.17WS - WAITING FOR SERVICE CLOSED
Overhead
Small Parts - Labor: 0.00
Small Parts - Parts: 0.00
Tools: 0.00
Overhead Costs: 17.57
Total Overhead Costs: 17.57
Messages
Unit Is Being Replaced In Fy 20-21 List
©2021 AssetWorks LLC. All Rights Reserved. Page 3 of 5
Report Date: 8/11/2021
Work Order Detail Work Order: CS-2021-26080
PM Checklist
Task / Comment Employee CompletedN/AFailed
PM-C Exception PM: No
PM-076 - START ENGINE, CHECK GAUGES, WARNING LIGHTS
NJANMAHAM - NICHOLAS JANMAHAMAD
PM-077 - HEATER, DEFROSTER, A/C OPERATION NJANMAHAM - NICHOLAS JANMAHAMAD
PM-078 - STEERING, FREE TRAVEL, BIND, PULL, VIBRATION NJANMAHAM - NICHOLAS JANMAHAMAD
PM-079 - DECAL/SERVICE STICKER NJANMAHAM - NICHOLAS JANMAHAMAD
PM-080 - VISUAL, LEAK, APPEARANCE, DAMAGE NJANMAHAM - NICHOLAS JANMAHAMAD
PM-081 - HITCH & TRAILER PLUG SOCKET NJANMAHAM - NICHOLAS JANMAHAMAD
PM-082 - HORN, WINDSHEILD WIPERS/WASHER OPERATION
NJANMAHAM - NICHOLAS JANMAHAMAD
PM-083 - ALL GLASS & MIRRORS NJANMAHAM - NICHOLAS JANMAHAMAD
PM-084 - ALL LIGHTS & HEAD LIGHTS FOR PROPER ADJUSTMENT
NJANMAHAM - NICHOLAS JANMAHAMAD
PM-085 - ENGINE PERFORMANCE NJANMAHAM - NICHOLAS JANMAHAMAD
PM-086 - SAFETY EQUIPMENT, FIRE EXTIN. BACK ALARM NJANMAHAM - NICHOLAS JANMAHAMAD
PM-087 - POWER STEERING SYSTEM/ FLUID NJANMAHAM - NICHOLAS JANMAHAMAD
PM-088 - ALL HOSES NJANMAHAM - NICHOLAS JANMAHAMAD
PM-089 - ALL BELTS NJANMAHAM - NICHOLAS JANMAHAMAD
PM-090 - ALL POINTS CHASSIS LUBRICATION NJANMAHAM - NICHOLAS JANMAHAMAD
PM-091 - CHANGE ENGINE OIL & FILTER NJANMAHAM - NICHOLAS JANMAHAMAD
PM-092 - TRANSMISSION FLUID LEVEL & CONDITION NJANMAHAM - NICHOLAS JANMAHAMAD
PM-093 - DIFFERENTIAL & DRIVE AXLES NJANMAHAM - NICHOLAS JANMAHAMAD
PM-094 - LUBE DOORS & HINGE POINTS NJANMAHAM - NICHOLAS JANMAHAMAD
PM-095 - REPLACE FUEL, CABIN & AIR FILTER, (AS NEEDED) NJANMAHAM - NICHOLAS JANMAHAMAD
PM-096 - OPERATION & CONDITION OF AUXILIARY COMPONENTS
NJANMAHAM - NICHOLAS JANMAHAMAD
PM-097 - CHARGING SYS.& BATTERY TEST, STARTER, CLEAN TERMINALS
NJANMAHAM - NICHOLAS JANMAHAMAD
PM-098 - ENGINE & TRANSMISSION MOUNTS NJANMAHAM - NICHOLAS JANMAHAMAD
PM-099 - PRESSURE TEST COOLING SYSTEM NJANMAHAM - NICHOLAS JANMAHAMAD
©2021 AssetWorks LLC. All Rights Reserved. Page 4 of 5
Report Date: 8/11/2021
Work Order Detail Work Order: CS-2021-26080
PM-100 - FAN CLUTCH/ ELECTRIC FAN OPERATION NJANMAHAM - NICHOLAS JANMAHAMAD
PM-101 - EXHAUST SYSTEM VISUAL NJANMAHAM - NICHOLAS JANMAHAMAD
PM-102 - SEAT BELTS ALL, SUPPLEMENTAL RESTRAINTS (SIR/AIRBAG)
NJANMAHAM - NICHOLAS JANMAHAMAD
PM-103 - ROTATE & BALANCE TIRES NJANMAHAM - NICHOLAS JANMAHAMAD
PM-104 - BRAKE SYSTEM CHECK/ABS/REGENERATION- ROTOR THICKNESS (MEETS
NJANMAHAM - NICHOLAS JANMAHAMAD
PM-105 - BRAKE SYSTEM CHECK/ABS/REGENERATION- DRUM DIAMETER (MEETS SP
NJANMAHAM - NICHOLAS JANMAHAMAD
PM-106 - FRONT LINING PERCENTAGE - LF NJANMAHAM - NICHOLAS JANMAHAMAD
PM-107 - FRONT LINING PERCENTAGE - RF NJANMAHAM - NICHOLAS JANMAHAMAD
PM-108 - REAR LINING PERCENTAGE - LR NJANMAHAM - NICHOLAS JANMAHAMAD
PM-109 - REAR LINING PERCENTAGE - RR NJANMAHAM - NICHOLAS JANMAHAMAD
PM-110 - MASTER CYLINDER FLUID LEVEL/CONDITION NJANMAHAM - NICHOLAS JANMAHAMAD
PM-111 - PARKING BRAKE SYSTEM NJANMAHAM - NICHOLAS JANMAHAMAD
PM-112 - HYDRO BOOST/POWER BOOSTER NJANMAHAM - NICHOLAS JANMAHAMAD
WO Notes
NJANMAHAMAD 05/03/2021 10:16 DURING PM SERVICE, FOUND 4 TIRES CHOPPED AND LOW IN TREAD DEPTH. 4 TIRES RECOMMENDED FOR REPLACEMENT AT THIS TIME.
TIRES NOT IN STICK, ETA THIS AFTERNOONKAUDIA 04/30/2021 09:23 PM-C
Comments: Internal Parts Cost:
Internal Labor Cost:
Commercial Labor Cost:
Commercial Parts Cost:
Work Order Total:
Commercial Misc Cost:
Overhead Costs:
SCHEDULED PM-C 4/30/2021
$17.57
$2,172.67
$1,109.35
$1,045.75
Commercial Total:
Internal Total: $2,172.67
Commercial Tax & Markup: $0.00
$0.00
$0.00
0.00
Equipment Usage Costs: $0.00
$0.00
©2021 AssetWorks LLC. All Rights Reserved. Page 5 of 5
Report Date: 8/11/2021
Work Order DetailSE-2021-11214
UD6008 2013 FORD F250 UTILITY BODY 3/4 TON TRUCK
Asset ID:
XD5184 CS - CENTRAL SHOPLicense Number: Repair Location:
SE-2021-11214 CLOSEDWork Order ID: Job Status:
REPAIR IN-WO - IN SERVICE - OPEN WOJob Type: Service Status:
80062 MILES 02/24/2021 13:21WO Meter 1: Projected Completion Date:
R - ROUTINEPriority:
Non Service Request Tasks
Task: 002-010 - Miscellaneous Warranty: NO
WAC: 03 - REPLACED PART Reason: BD - BREAKDOWN
Work Class: 2 - UNSCHEDULED Comments:
Task Notes
MWILLIAMS 2-17-2021 9:05AM INSTALLED TANK CAP ON 02-17-2021.
MWILLIAMS 2-10-2021 9:34AM ORDERED TANK CAP FOR OPERATOR.
Labor CostLabor Hrs
MWILLIAMS - Matthew Williams 2.03 180.67Emp: 02/17/2021 09:09
Parts Total CostIss PriceQty Issued Tax & Markup
1.00 21.558AM-13696-0 - 8AM; THREADED LID W VENT 6.16 15.39
Serial #:Removed Serial #:
Task: 010-011 - Quality Control Warranty: NO
WAC: 08 - REPAIR Reason: NP - NOTED IN PM SERVICE
Work Class: 2 - UNSCHEDULED Comments:
Task Notes
MWILLIAMS 2-17-2021 9:05AM REVIEW REPAIRS BEING PERFORMED BY TECHNICIAN- VERIFY METER READINGS- VERIFY SAFETY PROCEDURES ARE BEING FOLLOWED- VERIFY DIAGNOSIS BY TECHNICIANS- VERIFY PROPER NOTES BY TECHNICIAN ON WORK ORDER- SATISIFIED WITH TECHNICIAN NOTES AND REPAIRS PERFORMED.
Labor CostLabor Hrs
MWILLIAMS - Matthew Williams 1.00 89.00Emp: 02/17/2021 03:00
Delays
Delay HoursStatus End DatetimeStart Datetime
2/10/2021 9:37AM 2/17/2021 7:07AM 58.38PA - WAIT PARTS - IN SERVICE CLOSED
Overhead
Small Parts - Labor: 0.00
Small Parts - Parts: 0.00
Tools: 0.00
Overhead Costs: 17.57
Total Overhead Costs: 17.57
Messages
Unit Is Being Replaced In Fy 20-21 List
WO Notes
MWILLIAMS 02/10/2021 09:32 1. PLEASE REPLACE TANK CAP.
©2021 AssetWorks LLC. All Rights Reserved. Page 1 of 2
Report Date: 8/11/2021
Work Order Detail Work Order: SE-2021-11214
Comments: Internal Parts Cost:
Internal Labor Cost:
Commercial Labor Cost:
Commercial Parts Cost:
Work Order Total:
Commercial Misc Cost:
Overhead Costs: $17.57
$308.79
$21.55
$269.67
Commercial Total:
Internal Total: $308.79
Commercial Tax & Markup: $0.00
$0.00
$0.00
0.00
Equipment Usage Costs: $0.00
$0.00
©2021 AssetWorks LLC. All Rights Reserved. Page 2 of 2
Report Date: 8/11/2021
Work Order DetailSE-2021-12863
UD6008 2013 FORD F250 UTILITY BODY 3/4 TON TRUCK
Asset ID:
XD5184 CS - CENTRAL SHOPLicense Number: Repair Location:
SE-2021-12863 CLOSEDWork Order ID: Job Status:
REPAIR OS - OUT OF SERVICEJob Type: Service Status:
87268 MILES (EQ UPD) 08/11/2021 13:54WO Meter 1: Projected Completion Date:
R - ROUTINEPriority:
Non Service Request Tasks
Task: 090-016 - Interior Cab Sanitizing Warranty: NO
WAC: 02 - CLEAN Reason: DI - DISPOSAL
Work Class: 1 - SCHEDULED Comments:
Task Notes
SJOSHUA 8-11-2021 8:46AM CLEANING AND DISINFECTING TREATMENT ON INTERIOR AREAS SUCH AS DASHBOARD, HARD SURFACES, UPHOLSTERY, DOOR PANELS, SEATS, AND STEERING WHEEL
Labor CostLabor Hrs
SJOSHUA - Saidon Joshua 0.37 89.00Emp: 08/10/2021 14:05
SJOSHUA - Saidon Joshua 0.03 0.0008/11/2021 08:49
SJOSHUA - Saidon Joshua 0.00 0.0008/11/2021 11:44
Task: 090-040 - Vehicle Shuttling Warranty: NO
WAC: 01 - ADJUST Reason: DI - DISPOSAL
Work Class: 1 - SCHEDULED Comments:
Task Notes
SJOSHUA 8-11-2021 12:43PM SHUTTLED VEHICLE TO AUCTION YARD
Labor CostLabor Hrs
SJOSHUA - Saidon Joshua 0.32 28.48Emp: 08/11/2021 12:03
Task: 120-010 - Decommission Warranty: NO
WAC: 53 - TAKE OUT OF SERVICE
Reason: DI - DISPOSAL
Work Class: 1 - SCHEDULED Comments:
Task Notes
SJOSHUA 8-11-2021 8:28AM REMOVED LAP TOP STAND AND VERIFIED NO GPS IS PRESENT , ALL DECALS ARE REMOVED , ASSET TAG HAS BEEN REMOVED ON UNIT, UNIT IS READY TO BE TAKEN TO AUCTION YARD
Labor CostLabor Hrs
SJOSHUA - Saidon Joshua 0.63 176.00Emp: 08/11/2021 08:47
Overhead
Small Parts - Labor: 0.00
Small Parts - Parts: 0.00
Tools: 0.00
Overhead Costs: 17.57
Total Overhead Costs: 17.57
Messages
Unit Is Being Replaced In Fy 20-21 List
WO Notes
RQUERY 08/11/2021 07:54 DECOMMISSION, REMOVE ALL CITY DECALS, LOGOS, TAG, ASSET TAG, GPS AND FUEL FOCUS SYSTEM, COMPUTER STAND, AND ANY CWPB EQUIPMENT.
RQUERY 08/10/2021 13:42 TRANSPORT TO FIRST FLEET FOR JJ KANE ONLINE SURPLUS AUCTION
©2021 AssetWorks LLC. All Rights Reserved. Page 1 of 2
Report Date: 8/11/2021
Work Order Detail Work Order: SE-2021-12863
Comments: Internal Parts Cost:
Internal Labor Cost:
Commercial Labor Cost:
Commercial Parts Cost:
Work Order Total:
Commercial Misc Cost:
Overhead Costs: $17.57
$311.05
$293.48
Commercial Total:
Internal Total: $311.05
Commercial Tax & Markup: $0.00
$0.00
$0.00
0.00
Equipment Usage Costs: $0.00
$0.00