Assuring Quality in a Fast-Paced World
Donald A. Streeter, P.E.
NYSDOT – Materials Bureau
![Page 2: Assuring Quality in a Fast-Paced World · Automation failure / tampering Scale inaccuracy / tampering Mix / materials variability Inspection – Expertise of TCI’s ... 12/16/2015](https://reader036.vdocuments.net/reader036/viewer/2022071214/604361f7c3842675b9206b1d/html5/thumbnails/2.jpg)
2
130 billion vehicle miles annually
485 public and private aviation facilities
12 major public and private ports
2
New York State’s Transportation System is a vast and expansive network
![Page 3: Assuring Quality in a Fast-Paced World · Automation failure / tampering Scale inaccuracy / tampering Mix / materials variability Inspection – Expertise of TCI’s ... 12/16/2015](https://reader036.vdocuments.net/reader036/viewer/2022071214/604361f7c3842675b9206b1d/html5/thumbnails/3.jpg)
3
Need for rapid repairs / replacement
Drivers First
![Page 4: Assuring Quality in a Fast-Paced World · Automation failure / tampering Scale inaccuracy / tampering Mix / materials variability Inspection – Expertise of TCI’s ... 12/16/2015](https://reader036.vdocuments.net/reader036/viewer/2022071214/604361f7c3842675b9206b1d/html5/thumbnails/4.jpg)
4
Need for rapid repairs / replacement Emergency response
![Page 5: Assuring Quality in a Fast-Paced World · Automation failure / tampering Scale inaccuracy / tampering Mix / materials variability Inspection – Expertise of TCI’s ... 12/16/2015](https://reader036.vdocuments.net/reader036/viewer/2022071214/604361f7c3842675b9206b1d/html5/thumbnails/5.jpg)
5
Our “Fast Paced” World
R u Imp8ent ??? Trained for Instant
Gratification
“Faster is better” mentality
Is “faster” really better?
![Page 6: Assuring Quality in a Fast-Paced World · Automation failure / tampering Scale inaccuracy / tampering Mix / materials variability Inspection – Expertise of TCI’s ... 12/16/2015](https://reader036.vdocuments.net/reader036/viewer/2022071214/604361f7c3842675b9206b1d/html5/thumbnails/6.jpg)
6
Minimizing Risk –Maximizing reward
Managing a Balancing Act between: Reasonable quality for service
What is reasonable – 25 yrs, 50 yrs, more?
Quality Assuance – adherence to specs?
Drivers First Minimize impact on traveling public
Cost Completing work within or below budget
![Page 7: Assuring Quality in a Fast-Paced World · Automation failure / tampering Scale inaccuracy / tampering Mix / materials variability Inspection – Expertise of TCI’s ... 12/16/2015](https://reader036.vdocuments.net/reader036/viewer/2022071214/604361f7c3842675b9206b1d/html5/thumbnails/7.jpg)
7
FHWA’s ABC EDC Initiative
Accelerated Bridge Construction: Precast construction
Accelerated PCC mixtures
UHPC Slide-in technology SPMT
![Page 8: Assuring Quality in a Fast-Paced World · Automation failure / tampering Scale inaccuracy / tampering Mix / materials variability Inspection – Expertise of TCI’s ... 12/16/2015](https://reader036.vdocuments.net/reader036/viewer/2022071214/604361f7c3842675b9206b1d/html5/thumbnails/8.jpg)
8
“Faster” and “Sustainable”Keys:
Do it right the first time
Don’t rush faster than you need to
Don’t push materials beyond their capabilities
Use the right materials for the job
Use responsible engineering judgment
Consider alternatives
Don’t use “Super, High, or Ultra” in the name
Goals:
Achieve Sustainability
Provide Quality Assurance
![Page 9: Assuring Quality in a Fast-Paced World · Automation failure / tampering Scale inaccuracy / tampering Mix / materials variability Inspection – Expertise of TCI’s ... 12/16/2015](https://reader036.vdocuments.net/reader036/viewer/2022071214/604361f7c3842675b9206b1d/html5/thumbnails/9.jpg)
9
Design
Select the right acceleration means Is “acceleration” even necessary?
Nights and weekend closures / temporary detours
vs.
Alternate traffic patterns
w/ long term detours
Consider alternativesand cost
![Page 10: Assuring Quality in a Fast-Paced World · Automation failure / tampering Scale inaccuracy / tampering Mix / materials variability Inspection – Expertise of TCI’s ... 12/16/2015](https://reader036.vdocuments.net/reader036/viewer/2022071214/604361f7c3842675b9206b1d/html5/thumbnails/10.jpg)
10
Faster Materials / Methods
Precast Components systems w/ Traditional PCC closures
Accelerated PCC closures
UHPC closures
![Page 11: Assuring Quality in a Fast-Paced World · Automation failure / tampering Scale inaccuracy / tampering Mix / materials variability Inspection – Expertise of TCI’s ... 12/16/2015](https://reader036.vdocuments.net/reader036/viewer/2022071214/604361f7c3842675b9206b1d/html5/thumbnails/11.jpg)
11
Fastest Materials / Methods
Pre-constructed components Slide in units
Temporary structures
![Page 12: Assuring Quality in a Fast-Paced World · Automation failure / tampering Scale inaccuracy / tampering Mix / materials variability Inspection – Expertise of TCI’s ... 12/16/2015](https://reader036.vdocuments.net/reader036/viewer/2022071214/604361f7c3842675b9206b1d/html5/thumbnails/12.jpg)
12
Rocket Science Requires attention to
details
Back-up systems
Extra oversight
![Page 13: Assuring Quality in a Fast-Paced World · Automation failure / tampering Scale inaccuracy / tampering Mix / materials variability Inspection – Expertise of TCI’s ... 12/16/2015](https://reader036.vdocuments.net/reader036/viewer/2022071214/604361f7c3842675b9206b1d/html5/thumbnails/13.jpg)
13
Quality Assurance - Materials
Approved / Qualified Products list
Trial batches for design mixtures Strength – ultimate and rate
F/T durability
Permeability / resistivity
Placement characteristics
![Page 14: Assuring Quality in a Fast-Paced World · Automation failure / tampering Scale inaccuracy / tampering Mix / materials variability Inspection – Expertise of TCI’s ... 12/16/2015](https://reader036.vdocuments.net/reader036/viewer/2022071214/604361f7c3842675b9206b1d/html5/thumbnails/14.jpg)
14
![Page 15: Assuring Quality in a Fast-Paced World · Automation failure / tampering Scale inaccuracy / tampering Mix / materials variability Inspection – Expertise of TCI’s ... 12/16/2015](https://reader036.vdocuments.net/reader036/viewer/2022071214/604361f7c3842675b9206b1d/html5/thumbnails/15.jpg)
15
Quality Assurance - Materials
Pre-evaluation Time consuming
Requires lead time
Doesn’t assure quality Minimizes risks
![Page 16: Assuring Quality in a Fast-Paced World · Automation failure / tampering Scale inaccuracy / tampering Mix / materials variability Inspection – Expertise of TCI’s ... 12/16/2015](https://reader036.vdocuments.net/reader036/viewer/2022071214/604361f7c3842675b9206b1d/html5/thumbnails/16.jpg)
16
Quality assurance - Construction
Trial placements Use mock-ups
![Page 17: Assuring Quality in a Fast-Paced World · Automation failure / tampering Scale inaccuracy / tampering Mix / materials variability Inspection – Expertise of TCI’s ... 12/16/2015](https://reader036.vdocuments.net/reader036/viewer/2022071214/604361f7c3842675b9206b1d/html5/thumbnails/17.jpg)
17
Construction
Once started… have to complete May need temporary placements / conditions
to open back to traffic
![Page 18: Assuring Quality in a Fast-Paced World · Automation failure / tampering Scale inaccuracy / tampering Mix / materials variability Inspection – Expertise of TCI’s ... 12/16/2015](https://reader036.vdocuments.net/reader036/viewer/2022071214/604361f7c3842675b9206b1d/html5/thumbnails/18.jpg)
18
Remember Murphy’s Law
![Page 19: Assuring Quality in a Fast-Paced World · Automation failure / tampering Scale inaccuracy / tampering Mix / materials variability Inspection – Expertise of TCI’s ... 12/16/2015](https://reader036.vdocuments.net/reader036/viewer/2022071214/604361f7c3842675b9206b1d/html5/thumbnails/19.jpg)
19
Murphy…
Weekend – 8pm Friday to noon Sunday Saturday 5 PM, On Schedule Started Pouring Joints Sat @ 10 PM on
Schedule, Scheduled to Finish Midnight Concrete Flash Setting Problems in the
Next 5 Hours…..5 Rejected Concrete Loads
Finished Pouring at 7 AM!!!! Left 9 hours - Curing, Temp. Barriers,
Paving, Striping and taking down TCP
![Page 20: Assuring Quality in a Fast-Paced World · Automation failure / tampering Scale inaccuracy / tampering Mix / materials variability Inspection – Expertise of TCI’s ... 12/16/2015](https://reader036.vdocuments.net/reader036/viewer/2022071214/604361f7c3842675b9206b1d/html5/thumbnails/20.jpg)
20
Minimizing Risk –Maximizing reward
The Balancing Act between: Reasonable quality for service Drivers First Completing work within or below budget
Assuring Performance and Quality?
![Page 21: Assuring Quality in a Fast-Paced World · Automation failure / tampering Scale inaccuracy / tampering Mix / materials variability Inspection – Expertise of TCI’s ... 12/16/2015](https://reader036.vdocuments.net/reader036/viewer/2022071214/604361f7c3842675b9206b1d/html5/thumbnails/21.jpg)
21
Performance / QualityCurrent prescriptive process: Automation / recordation Scale check / lab Mix designs Inspection – production
Gradation / moisture / friction
Project sampling Air / slump / cylinders
All DOT actions ergo all DOT Risk
![Page 22: Assuring Quality in a Fast-Paced World · Automation failure / tampering Scale inaccuracy / tampering Mix / materials variability Inspection – Expertise of TCI’s ... 12/16/2015](https://reader036.vdocuments.net/reader036/viewer/2022071214/604361f7c3842675b9206b1d/html5/thumbnails/22.jpg)
22
Performance / QualityPrescriptive Risks: Automation failure / tampering Scale inaccuracy / tampering Mix / materials variability Inspection – Expertise of TCI’s
Testing proficiency Awareness of plant operations
Project sampling Testing proficiency / Sample handling
End performance remains DOT’s Risk
![Page 23: Assuring Quality in a Fast-Paced World · Automation failure / tampering Scale inaccuracy / tampering Mix / materials variability Inspection – Expertise of TCI’s ... 12/16/2015](https://reader036.vdocuments.net/reader036/viewer/2022071214/604361f7c3842675b9206b1d/html5/thumbnails/23.jpg)
23
Performance based specsFor PCC production: Delegate responsibility Re-assign risk Improved economics Improved product Evaluation tools
New and existing tools – verify quality
![Page 24: Assuring Quality in a Fast-Paced World · Automation failure / tampering Scale inaccuracy / tampering Mix / materials variability Inspection – Expertise of TCI’s ... 12/16/2015](https://reader036.vdocuments.net/reader036/viewer/2022071214/604361f7c3842675b9206b1d/html5/thumbnails/24.jpg)
24
Performance process Automation / recordation required
Current system requirements remain certified by producer
Scale Checks / Lab facilities Current system requirements remain
certified by producer
Verified by DOT – payment measure
Truck inspection Current system requirements remain
certified by producer
![Page 25: Assuring Quality in a Fast-Paced World · Automation failure / tampering Scale inaccuracy / tampering Mix / materials variability Inspection – Expertise of TCI’s ... 12/16/2015](https://reader036.vdocuments.net/reader036/viewer/2022071214/604361f7c3842675b9206b1d/html5/thumbnails/25.jpg)
25
Performance process QC Plan
Producers to define QC process
DOT audits – assure effort / compliance Review of:
Agg gradation / moisture / friction
Cement / pozzolan sampling
Scale accuracy
Batch records
Truck conditions
Etc…
![Page 26: Assuring Quality in a Fast-Paced World · Automation failure / tampering Scale inaccuracy / tampering Mix / materials variability Inspection – Expertise of TCI’s ... 12/16/2015](https://reader036.vdocuments.net/reader036/viewer/2022071214/604361f7c3842675b9206b1d/html5/thumbnails/26.jpg)
26
Performance process Mix designs
Performance criteria for mixtures Strength
Resistivity (assures low permeability)
Indirectly controls w/c, pozzolan use,
aggregate gradation
Air content
Friction
ASR resistance
F/T resistance (flatwork)
JMF’s established
![Page 27: Assuring Quality in a Fast-Paced World · Automation failure / tampering Scale inaccuracy / tampering Mix / materials variability Inspection – Expertise of TCI’s ... 12/16/2015](https://reader036.vdocuments.net/reader036/viewer/2022071214/604361f7c3842675b9206b1d/html5/thumbnails/27.jpg)
27
Performance process Mix designs
We don’t care about: Min / max cement content
w/c ratio
Aggregate gradation
Slump
![Page 28: Assuring Quality in a Fast-Paced World · Automation failure / tampering Scale inaccuracy / tampering Mix / materials variability Inspection – Expertise of TCI’s ... 12/16/2015](https://reader036.vdocuments.net/reader036/viewer/2022071214/604361f7c3842675b9206b1d/html5/thumbnails/28.jpg)
28
Performance process Mix designs – benefits:
Mix economy Improved gradations
Strength w/ less cement
Improved mix characteristics Resistivity (assures low permeability)
Indirectly controls w/c, pozzolan use,
aggregate gradation
Varied strength designs
![Page 29: Assuring Quality in a Fast-Paced World · Automation failure / tampering Scale inaccuracy / tampering Mix / materials variability Inspection – Expertise of TCI’s ... 12/16/2015](https://reader036.vdocuments.net/reader036/viewer/2022071214/604361f7c3842675b9206b1d/html5/thumbnails/29.jpg)
29
Performance process Mix designs – issues:
Some prescriptive req Internal curing
DOT approved materials
Pay factors Strength / Air / Resistivity
Pass / fail vs pay factors?
Friction / safety
![Page 30: Assuring Quality in a Fast-Paced World · Automation failure / tampering Scale inaccuracy / tampering Mix / materials variability Inspection – Expertise of TCI’s ... 12/16/2015](https://reader036.vdocuments.net/reader036/viewer/2022071214/604361f7c3842675b9206b1d/html5/thumbnails/30.jpg)
30
Performance process Project sampling – Quality Control
Air F/T durability control Every 50 CY minimum
Slump Verify consistency Every 50 CY minimum
Cylinders (producers actions) As desired for own records Contractor data / statistical analysis?
![Page 31: Assuring Quality in a Fast-Paced World · Automation failure / tampering Scale inaccuracy / tampering Mix / materials variability Inspection – Expertise of TCI’s ... 12/16/2015](https://reader036.vdocuments.net/reader036/viewer/2022071214/604361f7c3842675b9206b1d/html5/thumbnails/31.jpg)
31
Performance based specsQuality Achieved / Acceptance Air meter / Super Air Meter (SAM) Surface resistivity Meter Wash samples Compressive strength
![Page 32: Assuring Quality in a Fast-Paced World · Automation failure / tampering Scale inaccuracy / tampering Mix / materials variability Inspection – Expertise of TCI’s ... 12/16/2015](https://reader036.vdocuments.net/reader036/viewer/2022071214/604361f7c3842675b9206b1d/html5/thumbnails/32.jpg)
32
Performance based specsQuality Achieved / Acceptance Air meter / Super Air Meter (SAM)
Measures: air content quality of bubble structure
Repeated pressure test 15 minute test
Verify convenence equip
![Page 33: Assuring Quality in a Fast-Paced World · Automation failure / tampering Scale inaccuracy / tampering Mix / materials variability Inspection – Expertise of TCI’s ... 12/16/2015](https://reader036.vdocuments.net/reader036/viewer/2022071214/604361f7c3842675b9206b1d/html5/thumbnails/33.jpg)
33
Performance based specsQuality Achieved / Acceptance Surface Resistivity Meter
Measures resistivity(inverse of permeability)
Indirectly controls:
Water content
Pozzolan use in mixtures
Mixture design
Cement content
Aggregate gradation
![Page 34: Assuring Quality in a Fast-Paced World · Automation failure / tampering Scale inaccuracy / tampering Mix / materials variability Inspection – Expertise of TCI’s ... 12/16/2015](https://reader036.vdocuments.net/reader036/viewer/2022071214/604361f7c3842675b9206b1d/html5/thumbnails/34.jpg)
34
Performance based specsQuality Achieved / Acceptance Wash samples
Friction ASR (?)
Compressive strength
![Page 35: Assuring Quality in a Fast-Paced World · Automation failure / tampering Scale inaccuracy / tampering Mix / materials variability Inspection – Expertise of TCI’s ... 12/16/2015](https://reader036.vdocuments.net/reader036/viewer/2022071214/604361f7c3842675b9206b1d/html5/thumbnails/35.jpg)
35
Performance process Field testing – risks:
Acceptance verification day of placement Correct materials used
Proper air content
Acceptance determined later date Strength
Resistivity
Results subject to proper QA Good sampling / testing
Cylinders handled properly
No impact on placement operations
![Page 36: Assuring Quality in a Fast-Paced World · Automation failure / tampering Scale inaccuracy / tampering Mix / materials variability Inspection – Expertise of TCI’s ... 12/16/2015](https://reader036.vdocuments.net/reader036/viewer/2022071214/604361f7c3842675b9206b1d/html5/thumbnails/36.jpg)
36
Q1: What types of closure materials are currently used with precast concrete components?
– Traditional PCC closures
– Accelerated PCC closures
– UHPC closures
![Page 37: Assuring Quality in a Fast-Paced World · Automation failure / tampering Scale inaccuracy / tampering Mix / materials variability Inspection – Expertise of TCI’s ... 12/16/2015](https://reader036.vdocuments.net/reader036/viewer/2022071214/604361f7c3842675b9206b1d/html5/thumbnails/37.jpg)
37
Q2: What are some of FHWA’s ABC initiatives?
– Precast construction
– Slide-in technology
– SPMT
![Page 38: Assuring Quality in a Fast-Paced World · Automation failure / tampering Scale inaccuracy / tampering Mix / materials variability Inspection – Expertise of TCI’s ... 12/16/2015](https://reader036.vdocuments.net/reader036/viewer/2022071214/604361f7c3842675b9206b1d/html5/thumbnails/38.jpg)
38
Q3: What are some of the potential benefits when using performance based PCC specifications?
- Delegated responsibility / authority- Improved economics- Improved product performance
![Page 39: Assuring Quality in a Fast-Paced World · Automation failure / tampering Scale inaccuracy / tampering Mix / materials variability Inspection – Expertise of TCI’s ... 12/16/2015](https://reader036.vdocuments.net/reader036/viewer/2022071214/604361f7c3842675b9206b1d/html5/thumbnails/39.jpg)
39
Q4: What are some of the performance criteria that determine quality of PCC mixtures? - Strength
- Resistivity (assures low permeability)
- Air content
- Friction
- ASR resistance
- F/T resistance (flatwork)
![Page 40: Assuring Quality in a Fast-Paced World · Automation failure / tampering Scale inaccuracy / tampering Mix / materials variability Inspection – Expertise of TCI’s ... 12/16/2015](https://reader036.vdocuments.net/reader036/viewer/2022071214/604361f7c3842675b9206b1d/html5/thumbnails/40.jpg)
40
Q5: What is SAM and what does it do?
- Super Air Meter- Measure air content and air bubble quality
(determines spacing factor, size, and specific surface of air in concrete)
![Page 41: Assuring Quality in a Fast-Paced World · Automation failure / tampering Scale inaccuracy / tampering Mix / materials variability Inspection – Expertise of TCI’s ... 12/16/2015](https://reader036.vdocuments.net/reader036/viewer/2022071214/604361f7c3842675b9206b1d/html5/thumbnails/41.jpg)
41
Q5: What does a Surface Resistivity Meter measure?
- Resistivity (permeability of concrete)- Indirectly controls quality of mixture including
Water content Pozzolan use in mixtures Mixture design