asta powerproject enterprise - prone proje · asta powerproject enterprise facilitates project...

12
Optimise efficiency by centrally managing all your projects Empower collaboration by enabling the whole project team to access and work on the same project plan at the same time See the impact in the 3D view as you update the Gantt chart Control project costs, income and cash flow across your portfolio Enhance productivity and utilisation by allocating and tracking resources across multiple projects Improve access to vital information for clients and senior management via automated reports and dashboard views based on accurate, up-to-date data Capture resource effort against tasks using timesheets A proven application for collaborative working across projects Specifically designed for planners Asta Powerproject was specifically developed for the construction industry and has evolved over the years with ongoing input from our customers to keep in tune with the way that planners work. The Enterprise solution allows a number of people to access and update a central repository of project data so that you can: elecosoft.com Asta Powerproject: The power behind successful projects Asta Powerproject Enterprise We needed the Enterprise version because, unlike in a typical single project, we may have 200 different critical paths which don’t interact at all, yet we need to monitor and track resources and cash-flow within the whole contract. Graham Roebuck, Chief Planner within Skanska’s Infrastructure Services Division Enhanced collaboration throughout the BIM process Asta Powerproject Enterprise can integrate 3D models into the planning process, to create a 4D schedule. Delivering relevant information to all involved in the BIM process is a key tenet, supported through the use of the Enterprise suite. Asta Powerproject Enterprise is ideal for teams working within a single project or for empowering visibility across multiple projects, as all updates are synchronised in real-time. It has been used to successfully deliver a wide range projects from 2 planners sharing data on a site through to large scale construction.

Upload: others

Post on 30-May-2020

51 views

Category:

Documents


0 download

TRANSCRIPT

Optimise efficiency by centrally managing all

your projects

Empower collaboration by enabling the

whole project team to access and work on

the same project plan at the same time

See the impact in the 3D view as you update

the Gantt chart

Control project costs, income and cash flow

across your portfolio

Enhance productivity and utilisation by

allocating and tracking resources across

multiple projects

Improve access to vital information

for clients and senior management via

automated reports and dashboard views

based on accurate, up-to-date data

Capture resource effort against tasks using

timesheets

A proven application for collaborative working across projects

Specifically designed for plannersAsta Powerproject was specifically developed for the construction industry and has evolved over the years with ongoing input from our customers to keep in tune with the way that planners work. The Enterprise solution allows a number of people to access and update a central repository of project data so that you can:

elecosoft.com

Asta Powerproject: The power behind successful projects

Asta Powerproject Enterprise

We needed the Enterprise version because, unlike

in a typical single project, we may have 200 different critical paths which don’t

interact at all, yet we need to monitor and track resources and cash-flow within

the whole contract.Graham Roebuck, Chief Planner within Skanska’s

Infrastructure Services Division

Enhanced collaboration throughout the

BIM processAsta Powerproject Enterprise can integrate 3D models into the planning process, to create a 4D schedule. Delivering relevant information to all involved in the BIM process is a key tenet, supported through the use of the Enterprise suite.

Asta Powerproject Enterprise is ideal for teams working within a single project or for empowering visibility across multiple projects, as all updates are synchronised in real-time. It has been used to successfully deliver a wide range projects from 2 planners sharing data on a site through to large scale construction.

©2017 Elecosoft UK Ltd.

More informationFor information on licensing terms and a quote to suit your needs, please call us on +44 (0)1844 261700 or email [email protected].

elecosoft.com

Asta Powerproject: The power behind successful projects

Expert support Our experienced Professional Services team ensure that each Asta Powerproject Enterprise implementation is focused on your requirements – so that the processes, views and templates within the software actively support your workflow.

Asta Powerproject Enterprise

Our Elecosoft consultant had to absorb a lot

of information to understand the management’s aims, and what the

templates required would look like.

Cullum Detuners Ltd

Standardise processes aligned to your business model: We can discuss how you run your projects and help you create frameworks within the software specifically modelled on how you work. For example with one customer we explored how Asta Powerproject could be used to set and maintain planning quality standards and provided suitable templates that were not too complicated or prescriptive.

ImplementationWe can advise on the best approach and support your transition to an Enterprise solution. Our consultants have helped many organisations introduce Enterprise to centralise their projects to give better visibility across multiple projects. As part of this process, we can help to streamline your project creation process, allowing quicker creation of new projects with uniform codes and resources.

TrainingWe provide a wide range of training courses on how to use our software, but also recognise that sometimes you may have specific requirements that need individual attention. Therefore, tailored training options ensure that the material delivered reinforces the key techniques important to your organisation, and does not waste time on generic examples.

Data reporting and integrationAsta Powerproject Enterprise enables you update plans, share data and provide quality reports.

Quick and easy progress reporting from site, by linking with Site Progress Mobile, a downloadable app enabling mobile users to record the progress of tasks and repetitive events from a remote location against their work as scheduled in an Asta Powerproject project plan

With data held in the central database, information can be made available to other systems via our application programming interface. Likewise, data from other business applications can be integrated in

A flexible Business Intelligence system allows you to generate high- quality dashboard reports of complex or multiple projects

Ideal for for providing management and clients with accurate, up-to-date information

Asta Powerproject Enterprise delivers collaboration across programme plans by allowing a number of people to access and update a central repository of project data. Ideal for teams working within a single project or empowering visibility across multiple projects, with all updates synchronised in real-time.

As part of the scalable Asta Powerproject suite, the leading professional project management software for construction, Asta Powerproject Enterprise is a natural choice for organisations who are working on larger projects or those which need to balance resources and priorities across a portfolio of tasks.

“Using Asta Powerproject not only made the job of scheduling a much easier process but also meant we could consult more easily with the local council and communicate our plans to stakeholders”

Rob Owen, Mace Director, on the benefi t of using Asta Powerproject Enterprise on the construction of The Shard

Centrally manage all your projects for optimum effi ciency

Enable a number of people to access andwork on the same project plan at the same time, empowering collaboration

Allocate and track resources across multiple projects for enhanced productivity & utilisation

Control project costs, income and cash fl owacross your portfolio

Use Timesheets to capture resource effort against tasks

Provide clients and senior management with vital managementinformation via automated reports and dashboard views based on accurate, up-to-date data

With Asta Powerproject Enterprise you can:

elecosoft.com

Asta Powerproject: The power behind successful projects

Asta Powerproject Enterprise

“With so many projects of varying sizes to manage, we use Asta Powerproject Enterprise throughout. It helps us foresee upcoming hurdles and although it can’t fi x the problem, it helps us to manage it and sometimes prevent it.”

Gavin Clegg, North Midland Construction

Enhanced collaboration throughout the BIM process

Asta Powerproject can now integrate 3D models into the planning process, to create a 4D schedule. Delivering relevant information to all involved in the BIM process is a key tenet, supported through the use of the Enterprise suite.

Open system for easy integration

With Asta Powerproject Enterprise holding project data in the central database (typically SQL Server or Oracle), this information can be made available to other systems via our application programming interface. Likewise, data from other business applications can be integrated into the Asta environment.

Expert support and training

Asta’s experienced Professional Services team ensure that each Asta Powerproject Enterprise implementation is focused on your requirements – so that the processes, views and templates within the software actively support your workfl ow. Our Training Academy provides a wide range of training to help both new and more experienced users to improve their skills.

Specifi cally designed for planners

Asta Powerproject was specifi cally developed for the construction industry and has evolved over the years with ongoing input from our customers so that it is in tune with the way that planners work.

Business Intelligence

A fl exible system which allows you to generate high-quality dashboard reports of complex or multiple projects. These dashboard reports are ideal for providing management and clients with accurate, up-to-date information on any aspect of the project.

Quick and easy progress reporting

Asta Powerproject Enterprise provides quick and easy progress reporting from site, by linking with Site Progress Mobile.

Site Progress Mobile is a downloadable app which enables mobile users to record the progress of tasks and repetitive events from a remote location against their work as scheduled in an Asta Powerproject project plan. Each user sees only the relevant tasks and progress check lists for which they are responsible.

elecosoft.com

Asta Powerproject: The power behind successful projects

Asta Powerproject Enterprise

nurullaherel
Typewritten Text
nurullaherel
Typewritten Text
nurullaherel
Typewritten Text
nurullaherel
Typewritten Text
nurullaherel
Typewritten Text
nurullaherel
Typewritten Text
nurullaherel
Typewritten Text
nurullaherel
Typewritten Text
nurullaherel
Typewritten Text
nurullaherel
Typewritten Text
nurullaherel
Typewritten Text
Office address: FND S.C. Dzięcieliny 3/16 Street 04-745 Warsaw, Poland NIP: 952-208-09-36 Tel +48 22 401 22 05 Sales Department: [email protected]
nurullaherel
Typewritten Text
nurullaherel
Typewritten Text
nurullaherel
Typewritten Text

POWERFUL PROJECT, PORTFOLIO AND RESOURCE MANAGEMENT SOFTWARE

elecosoft.com

Asta Powerproject: The power behind successful projects

Asta Powerproject Enterprise

WHY INVEST IN A PROJECT, PORTFOLIO AND RESOURCE MANAGEMENT SOLUTION?Project management is now recognised as a strategic business tool for forward-

looking services organisations – particularly those that depend on high-value

knowledge workers for service delivery.

Asta Powerproject is a proven, scalable solution for managing people, time

and money across multiple projects and processes. With our Enterprise solution

you can:

Gain organisation-wide visibility over projects, people, costs/income and

deliverables – all project-related data is stored in a central database that can

be accessed in real-time via the web or across the network.

Deliver projects in shorter timeframes – with powerful scheduling,

baselining, progress, scenario planning, risk analysis and resource

modelling tools.

Forward plan your staffing requirements – generate a graphical capacity

plan for the project portfolio to assess the current and future workload of

project teams and individuals.

ASTA POWERPROJECT ENTERPRISE DELIVERS IMPROVED:Project Portfolio Management – Delivering the optimum mix of multiple project

resources and time management, across varying projects and programmes.

Project Management – Through extensive rescheduling features, including Critical

Path Analysis, you can fully assess the impact of changes across all projects.

Management Reporting – Dashboard reporting with Business Intelligence enables

senior management to receive easy access to high level information for improved

decision making.

Resource Management – Ensuring the best use of all types of resources for

multiple projects.

Cost & Revenue Management – Giving accurate up-to-date information and cost

analysis enabling improved cash flow.

Time & Expense Management – Integrated web based time sheets for accurate

time recording. Managers can easily monitor project costs and expenses.

ASTA POWERPROJECTENTERPRISE

The total solution for

managing projects and

resources to help achieve

on-time, on-cost delivery

across multiple projects.

“It’s important to use

resources wisely, people have

to be spread around.

Fortunately Asta’s software

makes this a painless task…

we can see exactly which

individual resources are over

or under-used and it helps us

realign resource where it is

most needed.”

STALIS LTD

“Asta Powerproject portfolio

management gives us KPIs

and new views that we didn’t

have before; it gives us the

ability to identify earlier the

projects that need help and

to predict what the final

spend will be.”

PERA TECHNOLOGY

“It is the linkage between

detailed project plans, project

accounts, documentation and

time sheets that is most

beneficial, something we could

not achieve with MS Project.

We now have a much more

holistic approach, which drives

up quality for our customers.”

CACI LTD

elecosoft.com

Asta Powerproject: The power behind successful projects

Asta Powerproject Enterprise

“Mult i -user access is fundamental to our business,

the very nature of what we do is reliant on a shared

capability to plan, manage, deliver and report, otherwise

we would have unconnected plans.”

ISS Dept. Lancaster University

Asta Powerproject Enterprise facilitates project collaboration between multiple users. Users can view real-

time information within the database (access rights permitting). When parts of the project are being edited,

Asta Powerproject locks the data at task level so that the rest of the plan remains accessible to other users.

Portfolio Project Resource Project income Time & Senior Assess risk Browser based

management management management & cost expense management access to

management management reporting project data

Align projects Plan, schedule Utilise Control project Fully integrated, Provide Model ‘what if’ Cost-effective,

with and proactively resources costs, income web-based managers with scenarios to web-based

organisational control projects more and cash flow time sheet up-to-date keep projects tools and

objectives effectively reporting status reports on track 24 x 7 report

application and dashboard access

views at the

touch of a

button

FUNCTIONALITY OVERVIEW

PROJECTMANAGEMENT

RESOURCEMANAGEMENT

BROWSER BASEDACCESS TO

PROJECT DATA

PROJECT INCOME & COSTMANAGEMENT

TIME & EXPENSEMANAGEMENT

SENIOR MANAGEMENTREPORTING

PORTFOLIOMANAGEMENT

ASSESS RISKCENTRAL

DATABASE

elecosoft.com

Asta Powerproject: The power behind successful projects

Asta Powerproject Enterprise

Centrally manage all your projects and programmes with optimum efficiency

PORTFOLIO MANAGEMENT

Keeping track of a portfolio of multiple projects

and resources can very quickly become

problematic and extremely time consuming

when done in silos. With the Asta Powerproject

Enterprise Solution you can:

centrally manage all your projects and

programmes with optimum efficiency.

control resources across the portfolio with a

shared resource pool.

prioritise projects based on your organisation’s

criteria – such as return on investment, cash

flow and KPIs.

maintain a balanced portfolio that meets the

financial objectives of the business and deliver

enhanced shareholder value.

analyse potential impact across all projects

with what-if scenario planning.

PROJECT MANAGEMENT

Meet challenging deadlines with powerful project management functionality.

Plan activities in any time unit – from minutes to years.

Create calendars for individual team members, departments

or the whole company.

Set up project templates to fast-track the planning process

and ensure that organisational methodologies are adhered to.

Link activities in any way to accurately show task

dependencies.

Instantly reschedule projects using Critical Path Analysis to

show the impact of progress on the project end date.

Monitor planned versus actual progress using multiple

baselines to capture a ‘snapshot in time’ and then compare variances.Baseline your projects to track ‘planned

versus actual’ progress, costs etc

elecosoft.com

Asta Powerproject: The power behind successful projects

Asta Powerproject Enterprise

RESOURCE MANAGEMENT

Asta Powerproject provides you with complete

visibility over all available resources so decisions

regarding prioritisation and allocation of valuable

resources are easier and quicker to make.

Forward plan staffing requirements by

allocating types of people to tasks, creating a

skills demand. Histograms highlight potential

resourcing issues enabling you to evaluate

the impact of future work on staffing levels,

costs and income.

Search for individuals based on skills and

attributes (e.g. cost rates, location, availability)

and weight these factors for the closest

possible match using the Resource Search

Engine. Assign the selected person to the task

with one click.

Specify tasks in terms of the resources and effort required

using Resource Modelling. This helps you make ‘trade off’

decisions such as weighing up the pros and cons of putting

more people ‘on the job’ versus the impact of this on costs

and project end dates.

Tasks can also be automatically exported to Microsoft

Outlook’s calendar or Asta’s Time Sheet for team members

to act upon.

Optimise resource allocation

Time recorded by team members using Time Sheet enables accurate costs,

income and margin to be calculated in main Asta Powerproject plan

PROJECT INCOME AND COST MANAGEMENT

Gain a real-time view of project-related costs, income and profitability.

Allocate staff and materials costs to activities to calculate the

overall project cost.

Set up charge-out rates (including overtime) for individuals whose

work is directly billable to clients.

Track actual versus planned cost/income to identify which

projects/clients/staff are making you the most money.

elecosoft.com

Asta Powerproject: The power behind successful projects

Asta Powerproject Enterprise

Quality dashboard reports give senior management clear

visibility across all project activity

ASSESS RISK

Assess levels of risk using Risk Analysis for Asta Powerproject,a decision support tool based on the Monte Carlo simulation

method. Risk Analysis enables you to manage risk proactively in

order to identify any difficulties that may affect the successful

completion of a project.

BROWSER BASED ACCESS TO PROJECT DATA

View, edit and share all your current project data regardless of time

or location for improved communication and project collaboration

with Web Access for Asta Powerproject.

SENIOR MANAGEMENT REPORTING

Keep senior management and all stakeholders fully informed using

Business Intelligence for Asta Powerproject. This powerful

analytical tool enables you to generate clear portfolio reports on any

combination of project data to help speed up the decision making

process and improve communication. It provides complete visibility

over your current performance to ensure that your objectives are

being met and that your costs are tightly managed.

With Business Intelligence you can:

generate accurate web-based dashboard reports

receive early warning of any delays or issues in

meeting deadlines

see complete visibility over the status of all your

projects, resources and costs

access standard reports such as KPI, critical milestones

and resource performance

achieve tighter cost control with visibility over project

margins and cash flow

TIME AND EXPENSE MANAGEMENT

Record time accurately and monitor

costs with Time Sheet forAsta Powerproject. This web-based

time reporting application enables team

members to record time spent on

planned and ad hoc activities, as well

as non-project activities – like holidays

and meetings. Once approved by a line

manager, progress recorded via time

sheets is updated and shown within the

main project.

Time Sheet reports include:

percentage of time spent on

chargeable work.

number of hours overtime in any

given period.

‘best and worst’ performers based

on efficiency.

utilisation rates by individual or team

Time can be booked against planned and unplanned activities in Time Sheet

elecosoft.com

Asta Powerproject: The power behind successful projects

Asta Powerproject Enterprise

Asta Powerproject - Sample Implementation Process – Standard Configuration

TRAINING

The Asta Training Academy provides a wide range of training

to help both new and more experienced users to improve their

skills in working with Asta Powerproject. Courses are held at

our Training Centre in Thame, Oxfordshire, at regional

locations throughout the UK, or can be held at your own

premises. We can tailor courses to your company

requirements and provide web-based training sessions.

ONGOING SUPPORT

Our support and upgrade package will help you get the most of your investment in our software and includes

providing all maintenance updates and upgrades free of

charge. Our highly accessible UK based technical support is

easy to reach on the phone, responding to 99% of all issues

within 1 business hour by phone and email. This

responsiveness can make a crucial difference when you

really need expert advice.

All supported users also have access to our comprehensive

online technical section, the Knowledgebase, where you will

find current version downloads, full access to the add-on

library and extensive product information.

PROVEN PRACTICAL IMPLEMENTATION METHODWith over 20 years of experience in implementing our project, portfolio and resource

management solutions, we have developed a proven process for maximising the benefits and

return from your investment in Asta Powerproject. Typically there are six key stages to our

implementation process for enterprise solutions.

CONSULTANCY

Our in-house team of dedicated project management software

professionals have experience of helping customers in many

different industries to adapt and customise their Asta

Powerproject solution. These experts can help guide you

throughout the implementation process and provide ongoing

consultation in line with your needs.

Consultancy support can range from creating new

management reports and customised project ‘views’,

right through to more complex requirements such as

integrating Asta Powerproject with other applications such

as ERP systems.

ProductAwareness

Training

Explore the scopeof the AstaPowerprojectsolution with ourconsultants, toassess whichelements arerelevant to yourexpectedbusinessprocesses.

Sta

ge 1

ImplementationPlanning

Workshop

Formalise andagree scope &responsibilities forimplementation.Agree projectstructure,customisations &database setup. Report confirmingactions signed byboth parties.

Sta

ge 2

ProjectSetup

Datasourceconfiguredremotely byAsta, coveringthe necessaryproject structure,coding, filters,resource profiles,views and reportsas defined withinthe agreed IPWreport.

Sta

ge 3

Installation& AdminTraining

Installation of AstaPowerprojectwithin yourorganisation’s IT system. Carriedout by Asta withthe assistance ofthe client’sdesignatedSystemAdministrator.

Sta

ge 4

UserTraining

Role-basedtraining coursesagreed with theclient to meetthe needs of theusers, deliveredto specificallyfocus on thekey functionalityeach role willutilise.

Sta

ge 5

Go-LiveAssistance & Review

Provide dedicatedhelp duringpreliminaryperiod with itemssuch as the firstapplication oftime sheets orclosing the initialreporting cycling.

Sta

ge 6

elecosoft.com

Asta Powerproject: The power behind successful projects

Asta Powerproject Enterprise

“With Asta Powerproject we can see

what each resource has coming up, what they are

working on now and next and highlight conflicts, so we can

give an accurate time of when that task can be

carried out; this just doesn’t happen with

something like MS Project.”

Denbighshire County Council

E: [email protected]

T: +44 (0)1844 261700

Elecosoft UK Ltd Kingston House

Goodsons Mews Wellington

Street

Thame

Oxfordshire

OX9 3BX

United Kingdom

F: +44 (0)1844 261314

©2015 Elecosoft UK Ltd

The total solution for managing projects and resources to help achieve on-time,

on-cost delivery across multiple projects

EXECUTIVE DISTRIBUTOR

elecosoft.com

Asta Powerproject: The power behind successful projects

Asta Powerproject Enterprise

Office Adress:Cevizlidere 1236 No:1/12 Balgat/Çankaya/ANKARA

: +903122121418: 06520

: [email protected]

Turkey Distributor

nurullaherel
Typewritten Text
nurullaherel
Typewritten Text
nurullaherel
Typewritten Text
nurullaherel
Typewritten Text
Office address: FND S.C. Dzięcieliny 3/16 Street 04-745 Warsaw, Poland NIP: 952-208-09-36 Tel +48 22 401 22 05 Sales Department: [email protected]
nurullaherel
Typewritten Text
nurullaherel
Typewritten Text
nurullaherel
Typewritten Text
nurullaherel
Typewritten Text