astec linear collider activities susan smith. astec aims to contribute to lc accelerator r&d,...

7

Click here to load reader

Upload: caroline-daniels

Post on 28-Mar-2015

212 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ASTeC Linear Collider Activities Susan Smith. ASTeC Aims To contribute to LC accelerator R&D, positioning the UK to take a lead in delivery of significant

ASTeC Linear Collider Activities

Susan Smith

Page 2: ASTeC Linear Collider Activities Susan Smith. ASTeC Aims To contribute to LC accelerator R&D, positioning the UK to take a lead in delivery of significant

Susan Smith ASTeC

Aims• To contribute to LC accelerator R&D,

positioning the UK to take a lead in delivery of significant accelerator system to any LC project

The capability exists within CLRC but the UK effort includes and will be significantly enhanced by the collaborations with and contributions from the university groups on specific areas and encouragement for UK industrial involvement

Page 3: ASTeC Linear Collider Activities Susan Smith. ASTeC Aims To contribute to LC accelerator R&D, positioning the UK to take a lead in delivery of significant

Susan Smith ASTeC

Primary Areas of Interest

• Beam delivery system

• Damping rings

• Positron source (undulator)

• Photo injector (CTF3 drive beam laser amplifier)

Page 4: ASTeC Linear Collider Activities Susan Smith. ASTeC Aims To contribute to LC accelerator R&D, positioning the UK to take a lead in delivery of significant

Susan Smith ASTeC

Beam delivery system (BDS)• Solenoidal Correction• Error and feedback simulation• Hosted BDIR 2000• Development of MERLIN code

– Manchester Uni (halo collimation simulation)

• Joint (CASE) student with Phil Burrows on FONT – Report planned to define the requirements for the

UK to take responsibility for the deliver TESLA BDS

Page 5: ASTeC Linear Collider Activities Susan Smith. ASTeC Aims To contribute to LC accelerator R&D, positioning the UK to take a lead in delivery of significant

Susan Smith ASTeC

Damping Rings

• Collaboration on CLIC design• Host Damping Ring workshop Autumn

2002– Report planned to define the

requirements for the UK to take responsibility for the deliver TESLA damping rings

Page 6: ASTeC Linear Collider Activities Susan Smith. ASTeC Aims To contribute to LC accelerator R&D, positioning the UK to take a lead in delivery of significant

Susan Smith ASTeC

SLAC/CLRC collaborations

4. Interaction Region Stabilisation and Design 

5. RF system development   6. Electronics and Controls Development 7. Injector Systems and Low Frequency

RF These are not exclusive topic areas, next steps is a

meeting in July for more detailed discussion on favoured areas, aimed at defining programmes and deliverables by the Autumn.

Page 7: ASTeC Linear Collider Activities Susan Smith. ASTeC Aims To contribute to LC accelerator R&D, positioning the UK to take a lead in delivery of significant

Susan Smith ASTeC

Finally

• ASTeC activity in this area is now expanding significantly, with specific recruitment into accelerator physics group initiated this year…