astrinidis vangelis indicative projects
TRANSCRIPT
![Page 1: Astrinidis Vangelis Indicative Projects](https://reader036.vdocuments.net/reader036/viewer/2022081511/5875531f1a28ab00528b4e5d/html5/thumbnails/1.jpg)
Building design selected Building design selected projectsprojects
Post Office (Denco Post Office (Denco Ltd)Ltd)
Buildings & grounds Buildings & grounds maintenance (Denco Ltd)maintenance (Denco Ltd)
Athens –international AirportAthens –international Airport
![Page 2: Astrinidis Vangelis Indicative Projects](https://reader036.vdocuments.net/reader036/viewer/2022081511/5875531f1a28ab00528b4e5d/html5/thumbnails/2.jpg)
Finite Element analysis Finite Element analysis projectsprojects
![Page 3: Astrinidis Vangelis Indicative Projects](https://reader036.vdocuments.net/reader036/viewer/2022081511/5875531f1a28ab00528b4e5d/html5/thumbnails/3.jpg)
Industrial special design Industrial special design projectsprojects
![Page 4: Astrinidis Vangelis Indicative Projects](https://reader036.vdocuments.net/reader036/viewer/2022081511/5875531f1a28ab00528b4e5d/html5/thumbnails/4.jpg)
Bridge MonitoringBridge MonitoringFree cantilevering bridges and Free cantilevering bridges and Precast – simply supported decksPrecast – simply supported decks
![Page 5: Astrinidis Vangelis Indicative Projects](https://reader036.vdocuments.net/reader036/viewer/2022081511/5875531f1a28ab00528b4e5d/html5/thumbnails/5.jpg)
Reinforced earth projectReinforced earth project
![Page 6: Astrinidis Vangelis Indicative Projects](https://reader036.vdocuments.net/reader036/viewer/2022081511/5875531f1a28ab00528b4e5d/html5/thumbnails/6.jpg)
Egnatia Odos SAEgnatia Odos SA
8-1564
2-1531
7-1555 6-1551
5-1547
4-1539
3-1535
1-1527
Δοκός 4
Δοκός 3
Egnatia OdosEgnatia Odos (Τ3 (Τ3 Bridge Bridge))16 patched sensors (placement – consulting)16 patched sensors (placement – consulting)Comparison of FE analysis with recordings of Comparison of FE analysis with recordings of Calibrated loadsCalibrated loads
![Page 7: Astrinidis Vangelis Indicative Projects](https://reader036.vdocuments.net/reader036/viewer/2022081511/5875531f1a28ab00528b4e5d/html5/thumbnails/7.jpg)
Applications in the Seismic Applications in the Seismic retrofit of concrete retrofit of concrete
structures with FRPs and structures with FRPs and FRP STRUCTURAL FRP STRUCTURAL
MEMBERSMEMBERS
![Page 8: Astrinidis Vangelis Indicative Projects](https://reader036.vdocuments.net/reader036/viewer/2022081511/5875531f1a28ab00528b4e5d/html5/thumbnails/8.jpg)
Applications Applications Athens Acropolis - ParthenonAthens Acropolis - Parthenon52 custom made 52 custom made mountablemountable sensors sensors
(procurement of the sensors- (procurement of the sensors- placement - consulting)placement - consulting)
![Page 9: Astrinidis Vangelis Indicative Projects](https://reader036.vdocuments.net/reader036/viewer/2022081511/5875531f1a28ab00528b4e5d/html5/thumbnails/9.jpg)
Dynamic 250T Load – Test Dynamic 250T Load – Test MonitoringMonitoring
KONE crane in Newcastle KONE crane in Newcastle UponTyneUponTyne
KONE CranesKONE Cranes
![Page 10: Astrinidis Vangelis Indicative Projects](https://reader036.vdocuments.net/reader036/viewer/2022081511/5875531f1a28ab00528b4e5d/html5/thumbnails/10.jpg)
Customized software for Customized software for stress level visualization on stress level visualization on
sensor pointssensor points
![Page 11: Astrinidis Vangelis Indicative Projects](https://reader036.vdocuments.net/reader036/viewer/2022081511/5875531f1a28ab00528b4e5d/html5/thumbnails/11.jpg)
Public Power CorporationPublic Power CorporationPower Station Rehabilitation & Power Station Rehabilitation &
Engine Foundation Dynamic Engine Foundation Dynamic MonitoringMonitoring
![Page 12: Astrinidis Vangelis Indicative Projects](https://reader036.vdocuments.net/reader036/viewer/2022081511/5875531f1a28ab00528b4e5d/html5/thumbnails/12.jpg)
Strain Capacity Strain Capacity determination at determination at
servisability limit state – servisability limit state – defined from crack widthdefined from crack width
Crack width for given depth (depth = legend, in mm)
-0,1
0
0,1
0,2
0,3
0,4
0,5
02:31:12 02:32:38 02:34:05 02:35:31 02:36:58 02:38:24 02:39:50 02:41:17 02:42:43
Load (kN)
Crac
k W
idth
(mm
)
15,5
43,3
71,2
99,1
126,9
154,8
182,7
210,5
238,4
266,3