ASU / IGCCASU / IGCCIntegration StrategiesIntegration Strategies

Dave McCarthy

Ai P d t d Ch i l IAir Products and Chemicals, Inc.

Gasification Technologies 2009Colorado Springs, COp g ,

5 October 2009© Air Products and Chemicals, Inc. 2009 All Rights Reserved

Page 3: ASU / IGCCASU / IGCC Integration StrategiesIntegration ... · Oryx GTL Chevron Nigeria Texas Gasifier Rozenburg A5000 / A7000 2000 MTPD O2 3000 Buggenum Polk Plaquemine 0 ... –

Agenda

Proven Large-Scale Oxygen Supply: Cryogenic Air Separation UnitsSeparation Units

Industry experience with very large ASUOverview of the processOverview of the process

ASU Challenges specific to IGCCASU Reliability and Operabilityy p yConclusions

3

Page 4: ASU / IGCCASU / IGCC Integration StrategiesIntegration ... · Oryx GTL Chevron Nigeria Texas Gasifier Rozenburg A5000 / A7000 2000 MTPD O2 3000 Buggenum Polk Plaquemine 0 ... –

How Will Air Products Help Make IGCC Projects A Success …j

A long history of InnovationGeographic diversity for engineering and procurement, worldwide experience in building ASU’sLarge scale ASU experience worldwideApplication experience – we’ve supplied oxygen/air separation equipment for all major gasification technologies and specifically the IGCC application – we’ve “sweat” the detailsReliability - first company to supply high-reliability tonnageReliability first company to supply high reliability tonnage oxygen for gasification projects without oxygen backupVery high pressure oxygen experience - Lead the industry in operating experience supplying tonnage oxygen up to 1,500 psigA focused group of individuals to support gasification and its customers through Definition, Optimization, FEED, Execution, Startup and OperationsW ill t t th l t lik f

4

We will treat the plants like one of our own

Page 5: ASU / IGCCASU / IGCC Integration StrategiesIntegration ... · Oryx GTL Chevron Nigeria Texas Gasifier Rozenburg A5000 / A7000 2000 MTPD O2 3000 Buggenum Polk Plaquemine 0 ... –

ASU Flow Diagram/Train Configuration

Cryogenic Separation

Main AirCompression

AirPretreatment

N2Compression

BoostComp’r

Storage

Nitrogen

OxygenXAir

5

Page 6: ASU / IGCCASU / IGCC Integration StrategiesIntegration ... · Oryx GTL Chevron Nigeria Texas Gasifier Rozenburg A5000 / A7000 2000 MTPD O2 3000 Buggenum Polk Plaquemine 0 ... –

Experience - Large ASU Projects and Train Scale-upProjects and Train Scale-up

Market drives ASU scale-upProven 70% scale-upQuoting 5,000+ MTPD today

A5000 / A7000

4000

5000

Oryx GTL

Chevron Nigeria

TexasGasifier

Rozenburg

A5000 / A7000

2000

3000

MTP

D O

2

Buggenum

Polk

Plaquemine

0

1000

6

01987 1993 1996 1996 2006 2009 2011

Startup date

Page 7: ASU / IGCCASU / IGCC Integration StrategiesIntegration ... · Oryx GTL Chevron Nigeria Texas Gasifier Rozenburg A5000 / A7000 2000 MTPD O2 3000 Buggenum Polk Plaquemine 0 ... –

Large air separation units (ASUs)(ASUs)

7

Page 8: ASU / IGCCASU / IGCC Integration StrategiesIntegration ... · Oryx GTL Chevron Nigeria Texas Gasifier Rozenburg A5000 / A7000 2000 MTPD O2 3000 Buggenum Polk Plaquemine 0 ... –

Power Costs and Design

Power

Power is the single most important

component ofPower

Power is the single most important

component ofPower

component of the ASU cost

Technology

Powercomponent of the ASU cost

Technology • Equipment • Manufacturing• Construction• Engineering• Operations

gyand capital

improve ASU

Power

• Equipment • Manufacturing• Construction• Engineering• Operations

gyand capital

improve ASU

Power

$0.05 / kWhr $0.09 / kWhr consumption$0.05 / kWhr $0.09 / kWhr$0.05 / kWhr $0.09 / kWhr consumption

8

Page 9: ASU / IGCCASU / IGCC Integration StrategiesIntegration ... · Oryx GTL Chevron Nigeria Texas Gasifier Rozenburg A5000 / A7000 2000 MTPD O2 3000 Buggenum Polk Plaquemine 0 ... –

Process Cycle Selection CriteriaCriteria

Oxygen profileP it– Purity

– Pressure– Demand pattern

Argon co-production required?Power evaluation criteriaCapex sensitivityProcess integration philosophySite constraints, e.g. logistics, utility availability & quality, water consumptionOperating constraints e g availability reliability

9

Operating constraints, e.g. availability, reliability, time to on stream, ramp rate.

Page 10: ASU / IGCCASU / IGCC Integration StrategiesIntegration ... · Oryx GTL Chevron Nigeria Texas Gasifier Rozenburg A5000 / A7000 2000 MTPD O2 3000 Buggenum Polk Plaquemine 0 ... –

IGCC Integration Experience

Proven air and nitrogen integration experienceN I t ti N2 I t ti Ai N2 I t ti

Tampa

No IntegrationVarious Projects

1,350 to 3,500 sTPD

N2 IntegrationTampa Electric (1996)

2,020 sTPD

Air + N2 IntegrationDemkolec (1994)

1,960 sTPD

Tampa

GT GT

10

ASU ASU ASU

Page 11: ASU / IGCCASU / IGCC Integration StrategiesIntegration ... · Oryx GTL Chevron Nigeria Texas Gasifier Rozenburg A5000 / A7000 2000 MTPD O2 3000 Buggenum Polk Plaquemine 0 ... –

LASU Design challenges to IGCC power plants

Design based on customer’s specific requirements:

IGCC power plants

requirements:– Parasitic load

• Power vs. Capital costs • Purity requirements• Purity requirements• Co-products• Compression integration• Utility Integration• Utility Integration

– Operability• Fit with customer’s use patterns

Turndown / ramping up• Turndown / ramping up– Advanced control capabilities

11

Page 12: ASU / IGCCASU / IGCC Integration StrategiesIntegration ... · Oryx GTL Chevron Nigeria Texas Gasifier Rozenburg A5000 / A7000 2000 MTPD O2 3000 Buggenum Polk Plaquemine 0 ... –

LASU Execution challenges to IGCC power plants– Manufacturing

Transport of ASU(s) to site

IGCC power plants

• Transport of ASU(s) to site• Reducing construction / erection

costs and risks– Start-up– Start-up

• Shared Utilities• Back-up systems• Compression integration• Compression integration

– Reliability

12

Page 13: ASU / IGCCASU / IGCC Integration StrategiesIntegration ... · Oryx GTL Chevron Nigeria Texas Gasifier Rozenburg A5000 / A7000 2000 MTPD O2 3000 Buggenum Polk Plaquemine 0 ... –

Process Integration Goals and MethodsGoals and Methods

Reduce cost/improve efficiency without compromising operabilitycompromising operability

“Easy” integrations– Use of by-product energy (Steam)Use of by product energy (Steam)– Combined utility systems (Cooling Water)– Air/nitrogen integration with gas turbines

“Harder” integrationsHarder integrations– Internal streams between process units – Start-up requires other units to be in

operation

13

Page 14: ASU / IGCCASU / IGCC Integration StrategiesIntegration ... · Oryx GTL Chevron Nigeria Texas Gasifier Rozenburg A5000 / A7000 2000 MTPD O2 3000 Buggenum Polk Plaquemine 0 ... –

Reliability

Air Products operates the majority of plants that it designs and buildsThousands of man-years of ASU operating experience includes customers that require 100% availability of products100% availability of products

– Average plant availability is greater than 99%

A d ti f l t t i i 16 h• Average duration of plant trip is ~16 hr• Spare parts handling strategies in place• Maintenance shutdown once/3+ yrs

– Coincide with normal power plant maintenanceCoincide with normal power plant maintenance– Instantaneous back-up systems in place

today in safety-sensitive and electronic applications

14

applications

Page 15: ASU / IGCCASU / IGCC Integration StrategiesIntegration ... · Oryx GTL Chevron Nigeria Texas Gasifier Rozenburg A5000 / A7000 2000 MTPD O2 3000 Buggenum Polk Plaquemine 0 ... –

Operability: Plant Ramping & Advanced ControlsAdvanced Controls

Benefits of Advanced Control capabilities – Lower power consumption– Higher product recoveries– Faster disturbance response and mitigationFaster disturbance response and mitigation– Faster response to changing product

demandsHigher multi plant efficiency– Higher multi-plant efficiency

ASU ramping capabilities– 1%/min typical1%/min typical– 2%/min achievable with advanced control– 3%/min possible when “designed in”

Hi h t ibl b i li id

15

– Higher rates possible by using liquid oxygen backup

Page 16: ASU / IGCCASU / IGCC Integration StrategiesIntegration ... · Oryx GTL Chevron Nigeria Texas Gasifier Rozenburg A5000 / A7000 2000 MTPD O2 3000 Buggenum Polk Plaquemine 0 ... –

Summary

There is a major new industry requirement for ASU f f il f l fi d tiASUs for fossil-fuel fired power generationASUs have changed a great deal in the past 15 yearsy

– New cycles– Structured packing for distillation

M ffi i t– More power efficientSingle train sizes over 5000 ton/dayI t ti t itiIntegration opportunitiesManufacture/erection approach is project specific

16

p

Page 17: ASU / IGCCASU / IGCC Integration StrategiesIntegration ... · Oryx GTL Chevron Nigeria Texas Gasifier Rozenburg A5000 / A7000 2000 MTPD O2 3000 Buggenum Polk Plaquemine 0 ... –

It is about more than just O2…

APPLICATION EXPERIENCE: Supplied large oxygen/air separation equipment to all type of applications and industries:

– Power, Gasification, Refining / PetrochemicalsPower, Gasification, Refining / Petrochemicals

INTEGRATION EXPERIENCE: Air separation plants in all integration modes—– Oxygen supply control system

L d f ll i t t h td k h i• Load following, start-up shutdown, peak-shaving– Compression heat recovery– Standalone, nitrogen integrated, and air/nitrogen integrated (IGCC)

MEGA-TRAIN EXPERIENCE: Operating very large single train air separation plants since 1997 in Rozenburg, The Netherlands (3250 MTPD); also installed a 2x3500 MTPD unit in Qatar

RELIABILITY: First company to supply high-reliability tonnage oxygen for power projects without oxygen backup

17

OTHER GAS PRODUCTS: Broad industrial gas industry experience creates synergies with H2, CO, and CO2 markets

Page 18: ASU / IGCCASU / IGCC Integration StrategiesIntegration ... · Oryx GTL Chevron Nigeria Texas Gasifier Rozenburg A5000 / A7000 2000 MTPD O2 3000 Buggenum Polk Plaquemine 0 ... –

Thank youThank you

Page 19: ASU / IGCCASU / IGCC Integration StrategiesIntegration ... · Oryx GTL Chevron Nigeria Texas Gasifier Rozenburg A5000 / A7000 2000 MTPD O2 3000 Buggenum Polk Plaquemine 0 ... –

tell me moretell me morewww.airproducts.com