AT Measurement Systems. AB-CO Viewpoint. NOELL W ü rzburg. SM18. Colour code. To be maintained until LHC completion To be transformed after LHC completion New projects for LHC operation support To be maintained beyond LHC completion. The four categories. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: AT Measurement Systems

123-09-05 AB/CO Review, Adriaan Rijllart

AT Measurement SystemsAT Measurement Systems

AB-CO Viewpoint

NOELL Würzburg SM18

Page 2: AT Measurement Systems

223-09-05 AB/CO Review, Adriaan Rijllart

Colour codeColour code

To be maintained until LHC completion

To be transformed after LHC completion

New projects for LHC operation support

To be maintained beyond LHC completionTo be maintained beyond LHC completion

Page 3: AT Measurement Systems

323-09-05 AB/CO Review, Adriaan Rijllart

The four categoriesThe four categories

To be maintained until completion:

•Measurement benches in industry (50 in total)

To be maintained until completion and then transformed:

•SM18, Block 4 (and B181)

New projects

•FIDEL - Field Description for the LHC (DB)

•FAME - Fast Measurement Equipment (LV-RT)

To be maintained beyond LHC completion

•Cable, strands and Cryolab test systems

Page 4: AT Measurement Systems

423-09-05 AB/CO Review, Adriaan Rijllart

LabVIEW SystemsLabVIEW Systems

Systems in industry

•Magnetic measurements (Dipoles, Quads, Correctors)

•Geometric measurements (Bores, End caps, Feet)

•Electrical tests (Quench, Quench heaters, Isolation)

But I’m quite sure that some of these systems will be reused for the Magnet Rescue Factory.

Page 5: AT Measurement Systems

523-09-05 AB/CO Review, Adriaan Rijllart

LabVIEW Systems in industryLabVIEW Systems in industry

ALSTOM

ANSALDO

ACCELNOELL Zeitz

NOELL Würzburg

TESLA

ANTEC

QIMM8CIMM5CIMM10CIQR1CIQR2CIQR3CIQR4

CIMM2CIMM8CIQR5CIQR6

DIMM1DIMM5QIMM4DGM3DGM7DGM10DIQH3EDMA1EDMA2

DGM1DIMM2

QIMMSaclay1QIMMSaclay2QIMM7

DIMM3QIMM7DGM4DGM5DIQH5EDMA5EDMA6

CAT, India

DIMM4DIMM6QIMM5CIMM9CIMM11DGM2DGM6CIQR7DIQH1DIQH4EDMA7EDMA8

CIMM4CIMM6CIMM11

50 systems in operation

DGM 8 and 9 travel in between firms

EDMA3EDMA4

JEUMONT

Page 6: AT Measurement Systems

623-09-05 AB/CO Review, Adriaan Rijllart

LabVIEW Systems in industryLabVIEW Systems in industry

TESLA correctors

ANSALDO dipoles

Page 7: AT Measurement Systems

723-09-05 AB/CO Review, Adriaan Rijllart

LabVIEW Systems in industryLabVIEW Systems in industry

ACCEL, Troisdorf (quadrupoles)Noell, Zeitz (dipole cold-masses)

Page 8: AT Measurement Systems

823-09-05 AB/CO Review, Adriaan Rijllart

LabVIEW Systems at CERNLabVIEW Systems at CERN

SM18 Magnet Test Bench applications (-> Magnet Rescue Factory)

•Test Master + Hardware Recognition: Applications to automate sequence from all systems

•HFDAQ, LFDAQ, AQA, HVT, MMP, LOSS, MRM

New systems: FAME (implemented in PXI - LabVIEW-RT)

•On-line Hall plate DAQ 0.5 man*years

•On-line Rotating Coil DAQ 1.5 man*years

•On-line Fixed Coil DAQ ?

To be maintained beyond LHC completion

•Warm magnet test bench, Calibration bench, File Server MTBNFS1

•SC Cable Test Station

•SC Strand Test Station

•Central Cryolab test systems

Page 9: AT Measurement Systems

923-09-05 AB/CO Review, Adriaan Rijllart

LabVIEW Systems at CERNLabVIEW Systems at CERN

High Temperature Superconductor test Corrector Magnetic Measurements

Quench recording

High Voltage Isolation test

Page 10: AT Measurement Systems

1023-09-05 AB/CO Review, Adriaan Rijllart

LabVIEW Systems at CERNLabVIEW Systems at CERN

Superconducting Strands test B163 Special magnetic and optical measurements SM18

Corrector cold testsBlock 4

MagneticMeasurementsSM18

Page 11: AT Measurement Systems

1123-09-05 AB/CO Review, Adriaan Rijllart

LabVIEW Systems at CERNLabVIEW Systems at CERN

B163- FRESCA: superconducting cable reception test

SM18: Magnet Test Control Room

Page 12: AT Measurement Systems

1223-09-05 AB/CO Review, Adriaan Rijllart

Supervision and PLC Systems (Supervision and PLC Systems (PhilippePhilippe + Herv + Hervéé))

Upgrade from PCVue to PVSS using UNICOS on PLCs

•SM18: Refrigerator and cryo for the benches (PLC S7)

•Block4: Cryo for the benches + PLCs (S5 to S7)

To be maintained beyond LHC completion

•Manufacturing tools based on PLC for winding, collaring, and welding. Now at magnet industries, these tools need to be installed and maintained at CERN.

Page 13: AT Measurement Systems

1323-09-05 AB/CO Review, Adriaan Rijllart

Databases (Ronny and Maciej)Databases (Ronny and Maciej)

SM18 + Block4 upgrade to Oracle 10 (? not desirable)

•Magnetic Measurement Data

•Reference tables

•HW Recognition: maintain + develop MS-DS SSS (ongoing)

Magnet Rescue Factory and FIDEL

•HW Recognition: adaptation to low test rate, less complex

•Field description for LHC, 1 month cycle, measure analyse include in FIDEL (request of ABP)

•Later cycle time much faster (request of ABP)

Page 14: AT Measurement Systems

1423-09-05 AB/CO Review, Adriaan Rijllart

ConclusionConclusion

Systems deployed in industry will return

•Some will be reused for the Magnet Rescue Factory

Magnet Rescue Factory + SM18, Block 4

•LabVIEW, PCVue+PLC and Database upgrade

FAME and FIDEL

•LabVIEW-RT and Database

Many presently running systems are to be maintained

•LabVIEW Cables, Strands, Cryolab, Warm measurements and Calibration systems

•PLC manufacturing tools systems

•Magnetic Measurement DB