at technology update...open session confidential at technology update recommendation that the board:...

17
Board Meeting| 25 October 2016 Agenda item no. 11.2 Open Session CONFIDENTIAL AT Technology Update Recommendation That the Board: i. Note the AT Technology Update. Executive summary The AT Technology Update, included as Attachment 1, will be presented as part of this agenda item. This will include the Journey Planner, which is now beginning to incorporate some first and last leg details; the Tamaki Ngapipi CCTV project, which will aid in traffic management; and the AT Labs and Developer Portal project. Attachments Attachment Number Description 1 AT Technology Update Presentation Document ownership Submitted and Recommended by Roger Jones Chief Technology Officer Approved for submission David Warburton Chief Executive

Upload: others

Post on 23-Jul-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: AT Technology Update...Open Session CONFIDENTIAL AT Technology Update Recommendation That the Board: i. Note the AT Technology Update. Executive summary The AT Technology Update, included

Board Meeting| 25 October 2016 Agenda item no. 11.2

Open Session CONFIDENTIAL

AT Technology Update Recommendation That the Board:

i. Note the AT Technology Update.

Executive summary The AT Technology Update, included as Attachment 1, will be presented as part of this agenda item. This will include the Journey Planner, which is now beginning to incorporate some first and last leg details; the Tamaki Ngapipi CCTV project, which will aid in traffic management; and the AT Labs and Developer Portal project.

Attachments Attachment Number Description 1 AT Technology Update Presentation

Document ownership Submitted and Recommended by Roger Jones

Chief Technology Officer

Approved for submission David Warburton

Chief Executive

Page 2: AT Technology Update...Open Session CONFIDENTIAL AT Technology Update Recommendation That the Board: i. Note the AT Technology Update. Executive summary The AT Technology Update, included

Technology UpdateRoger Jones, CTO25 October 2016

Page 3: AT Technology Update...Open Session CONFIDENTIAL AT Technology Update Recommendation That the Board: i. Note the AT Technology Update. Executive summary The AT Technology Update, included

2

• Currently in Test

• Uber fare information instead of walking component• Blue Bubble will also be available

Journey Planner Update

Page 4: AT Technology Update...Open Session CONFIDENTIAL AT Technology Update Recommendation That the Board: i. Note the AT Technology Update. Executive summary The AT Technology Update, included

3

Page 5: AT Technology Update...Open Session CONFIDENTIAL AT Technology Update Recommendation That the Board: i. Note the AT Technology Update. Executive summary The AT Technology Update, included

4

Page 6: AT Technology Update...Open Session CONFIDENTIAL AT Technology Update Recommendation That the Board: i. Note the AT Technology Update. Executive summary The AT Technology Update, included

5

• Project• Initially for traffic management, especially in

summer• Business case failed • Picked up, included safety, traffic time,

congestion monitoring, traffic counting made business case worthwhile

• 3 months from start to finish –• $150,000 total cost• 23 CCTV Cameras

Tamaki Ngapipi CCTV Update

Page 7: AT Technology Update...Open Session CONFIDENTIAL AT Technology Update Recommendation That the Board: i. Note the AT Technology Update. Executive summary The AT Technology Update, included

6

Tamaki Ngapipi CCTV

Page 8: AT Technology Update...Open Session CONFIDENTIAL AT Technology Update Recommendation That the Board: i. Note the AT Technology Update. Executive summary The AT Technology Update, included

7

Arterial Patteson Tamaki Drive PTZ (Mission Bay 120)

Tripwire - Count L O23.1 Vehicle count and classification by size and lane.Detection Zone

EnforcementA. O35.2 Buses only

Detection Zone Enforcement

A. O35.3 parking limit of ???

Tripwire - CountL O24.1 Count pedestrians in shopping area

1

2

3

4

Tripwire - CountL O24.1 Survey of pedestrian crossing points Detection Zone

EnforcementA. O35.3 parking limit of ???

Tripwire - CountL O25.2 Count of cyclists using footpath/cyclewayL O24.1 Count pedestrians

Tripwire - CountL O25.2 Count of cyclists using road

Page 9: AT Technology Update...Open Session CONFIDENTIAL AT Technology Update Recommendation That the Board: i. Note the AT Technology Update. Executive summary The AT Technology Update, included

8

Ferry Downtown 4 - Pier4 entry and berth

Tripwire - CountL O24.1 Count

people entering and leaving the pontoon

area.

Detection Zone – Modal operator

L O41.1 Vessel in berth count and classification by sizeA O22.4 Small pleasure boat illegally in berth

Detection Zone – Modal operator

L O41.1 Vessel in berth count and classification by sizeA O22.4 Small pleasure boat illegally in berth

Tripwire - CountL O23.1 Vessel count entering terminal area

Page 10: AT Technology Update...Open Session CONFIDENTIAL AT Technology Update Recommendation That the Board: i. Note the AT Technology Update. Executive summary The AT Technology Update, included

9

Park Downtown DA1A1 - Payment Station Left

Zone Detection Asset Protect - Pay station

A. O12.1 GraffitiA. O11.3 customer Stationary for extended period

Detection Zone - FacilityL. O24.1 People countA. O11.2 Any person movement between 2am and 5amA. O11.3 LoiteringA. O11.4 RunningA. O11.5 Crowds

Detection Zone - EnvironmentA. O12.6 Area not dark during operational times (5am to 2am)

Zone Detection Asset Protect - Security DoorA. O12.1 GraffitiA. O11.3 customer Stationary for extended period

Page 11: AT Technology Update...Open Session CONFIDENTIAL AT Technology Update Recommendation That the Board: i. Note the AT Technology Update. Executive summary The AT Technology Update, included

10

Park Downtown DEG01 - entry left lane

Tripwire - CountL O23.1 Vehicle

count and classification by size and lane.

Detection Zone TrafficA. O22.4 Stationary Vehicle for extended time

Detection Zone TrafficA. O22.4 Stationary Vehicle for extended time

Detection Zone - FacilityA. O11.2 Any person movement between 2am and 5amA. O11.3 LoiteringA. O11.4 RunningA. O11.5 Crowds

Tripwire - CountL O23.1 Vehicle

count and classification by size and lane.

Tripwire - CountL O23.1 Vehicle

count – Motorcycle access

Zone Detection Asset Protect – Barrier Arm

A. O12.2 Monitor barrier arm is operational

ANPR L O23.2 Vehicle

Identification

Page 12: AT Technology Update...Open Session CONFIDENTIAL AT Technology Update Recommendation That the Board: i. Note the AT Technology Update. Executive summary The AT Technology Update, included

11

Tripwire - Restricted Area

A. O11.1 People not to cross platform safety line when no service in station

Detection Zone - FacilityI. O24.1 People countA. O11.2 Any person movement between 2am and 5amA. O11.3 LoiteringA. O11.4 RunningA. O11.5 Crowds

Detection Zone - EnvironmentA. O12.6 Area not dark during operational times (5am to 2am)

Rail Otahuhu 6 Platform and Shelter

Detection Zone -Restricted Area

(Operational Track)A. O11.2 People not permitted in this area at any time

Page 13: AT Technology Update...Open Session CONFIDENTIAL AT Technology Update Recommendation That the Board: i. Note the AT Technology Update. Executive summary The AT Technology Update, included

12

• New access and functionality for development community.

• Ability to put concepts required out to development community, with code if available, time-frame to complete and options of rewards for successful outcome.

• Open Source development, T&Cs to be developed and QA process of submitted code to be finalised

AT Labs

Page 14: AT Technology Update...Open Session CONFIDENTIAL AT Technology Update Recommendation That the Board: i. Note the AT Technology Update. Executive summary The AT Technology Update, included

13

Page 15: AT Technology Update...Open Session CONFIDENTIAL AT Technology Update Recommendation That the Board: i. Note the AT Technology Update. Executive summary The AT Technology Update, included

14

Page 16: AT Technology Update...Open Session CONFIDENTIAL AT Technology Update Recommendation That the Board: i. Note the AT Technology Update. Executive summary The AT Technology Update, included

15

Page 17: AT Technology Update...Open Session CONFIDENTIAL AT Technology Update Recommendation That the Board: i. Note the AT Technology Update. Executive summary The AT Technology Update, included

16

Auckland Transport Mobile Apps (Android)

Only 3 developed by AT, remainder by other developers.