at the palm bay parkway southern interchangeparkwaypatriots.weebly.com/uploads/2/1/4/0/2140400/...50...
TRANSCRIPT
![Page 1: at the Palm Bay Parkway Southern Interchangeparkwaypatriots.weebly.com/uploads/2/1/4/0/2140400/...50 mph Design Speed o ck Street Babc Inset Micco Road. Recommended Palm Bay Parkway](https://reader034.vdocuments.net/reader034/viewer/2022051914/6005b80267885f6f2049d0e8/html5/thumbnails/1.jpg)
at the Palm Bay Parkway Southern InterchangeProject Development & Environment (PD&E) StudyProject Development & Environment (PD&E) Study
Space Coast TPO – July 2011
![Page 2: at the Palm Bay Parkway Southern Interchangeparkwaypatriots.weebly.com/uploads/2/1/4/0/2140400/...50 mph Design Speed o ck Street Babc Inset Micco Road. Recommended Palm Bay Parkway](https://reader034.vdocuments.net/reader034/viewer/2022051914/6005b80267885f6f2049d0e8/html5/thumbnails/2.jpg)
Project Purpose & Need
System Linkage
Transportation Demand
Social & Economic Demand
Operational Capacity Operational Capacity
Safety
Emergency Response
![Page 3: at the Palm Bay Parkway Southern Interchangeparkwaypatriots.weebly.com/uploads/2/1/4/0/2140400/...50 mph Design Speed o ck Street Babc Inset Micco Road. Recommended Palm Bay Parkway](https://reader034.vdocuments.net/reader034/viewer/2022051914/6005b80267885f6f2049d0e8/html5/thumbnails/3.jpg)
Proposed Typical Sections
Micco Road
![Page 4: at the Palm Bay Parkway Southern Interchangeparkwaypatriots.weebly.com/uploads/2/1/4/0/2140400/...50 mph Design Speed o ck Street Babc Inset Micco Road. Recommended Palm Bay Parkway](https://reader034.vdocuments.net/reader034/viewer/2022051914/6005b80267885f6f2049d0e8/html5/thumbnails/4.jpg)
Alignment Alternatives 1&2
4 Alignments Considered – 2 Viable
![Page 5: at the Palm Bay Parkway Southern Interchangeparkwaypatriots.weebly.com/uploads/2/1/4/0/2140400/...50 mph Design Speed o ck Street Babc Inset Micco Road. Recommended Palm Bay Parkway](https://reader034.vdocuments.net/reader034/viewer/2022051914/6005b80267885f6f2049d0e8/html5/thumbnails/5.jpg)
Compressed Diamond Interchange AlternativeCompressed Diamond Interchange Alternative
2 Lane EB Left to I 95 NB (1000 VPH) 2 Lane EB Left to I-95 NB (1000 VPH)
8 lanes on Overpass Bridge
Least Land Area
Intersections Projected LOS “D”
![Page 6: at the Palm Bay Parkway Southern Interchangeparkwaypatriots.weebly.com/uploads/2/1/4/0/2140400/...50 mph Design Speed o ck Street Babc Inset Micco Road. Recommended Palm Bay Parkway](https://reader034.vdocuments.net/reader034/viewer/2022051914/6005b80267885f6f2049d0e8/html5/thumbnails/6.jpg)
Spread Diamond Interchange Alternative
2 Lane EB Left to I 95 NB (1000 VPH) 2 Lane EB Left to I-95 NB (1000 VPH)
6 lanes on Overpass Bridge
Most Land Area
Intersections Projected LOS “D”
![Page 7: at the Palm Bay Parkway Southern Interchangeparkwaypatriots.weebly.com/uploads/2/1/4/0/2140400/...50 mph Design Speed o ck Street Babc Inset Micco Road. Recommended Palm Bay Parkway](https://reader034.vdocuments.net/reader034/viewer/2022051914/6005b80267885f6f2049d0e8/html5/thumbnails/7.jpg)
PARCLO Interchange Alternative
Loop Ramp to Accommodate
(1000 VPH) EB Left Turn
7 Lanes on Overpass Bridge
Land Area
< Spread Diamond < Spread Diamond
> Compressed Diamond
Intersections Projections Intersections Projections
LOS “D” (West)
LOS “B” (East)
![Page 8: at the Palm Bay Parkway Southern Interchangeparkwaypatriots.weebly.com/uploads/2/1/4/0/2140400/...50 mph Design Speed o ck Street Babc Inset Micco Road. Recommended Palm Bay Parkway](https://reader034.vdocuments.net/reader034/viewer/2022051914/6005b80267885f6f2049d0e8/html5/thumbnails/8.jpg)
Evaluation Matrix
![Page 9: at the Palm Bay Parkway Southern Interchangeparkwaypatriots.weebly.com/uploads/2/1/4/0/2140400/...50 mph Design Speed o ck Street Babc Inset Micco Road. Recommended Palm Bay Parkway](https://reader034.vdocuments.net/reader034/viewer/2022051914/6005b80267885f6f2049d0e8/html5/thumbnails/9.jpg)
Evaluation Matrix
![Page 10: at the Palm Bay Parkway Southern Interchangeparkwaypatriots.weebly.com/uploads/2/1/4/0/2140400/...50 mph Design Speed o ck Street Babc Inset Micco Road. Recommended Palm Bay Parkway](https://reader034.vdocuments.net/reader034/viewer/2022051914/6005b80267885f6f2049d0e8/html5/thumbnails/10.jpg)
Locally Preferred Alternative – Alignment 1 w/ PARCLO Interchange
Suburban Typical SectionSuburban Typical Section50 mph Design Speed50 mph Design Speed
ock
Stre
etoc
k St
reet
Bab
coB
abco
InsetInset
Micco RoadMicco Road
![Page 11: at the Palm Bay Parkway Southern Interchangeparkwaypatriots.weebly.com/uploads/2/1/4/0/2140400/...50 mph Design Speed o ck Street Babc Inset Micco Road. Recommended Palm Bay Parkway](https://reader034.vdocuments.net/reader034/viewer/2022051914/6005b80267885f6f2049d0e8/html5/thumbnails/11.jpg)
Recommended Palm Bay Parkway Typical SectionsSuburban Typical Section-50mph Design SpeedSuburban Typical Section-50mph Design Speed
Urban Typical Section-45mph Design SpeedUrban Typical Section 45mph Design Speed
![Page 12: at the Palm Bay Parkway Southern Interchangeparkwaypatriots.weebly.com/uploads/2/1/4/0/2140400/...50 mph Design Speed o ck Street Babc Inset Micco Road. Recommended Palm Bay Parkway](https://reader034.vdocuments.net/reader034/viewer/2022051914/6005b80267885f6f2049d0e8/html5/thumbnails/12.jpg)
Locally Preferred Alternative
Alignment 1 w/ PARCLO Interchange
– More Consistent with Local Comprehensive Plans
– Lower Wetland Impacts
– Slightly More Floodplain Impacts than Lowest
Alternative
– Approximately 3% more than Lowest Project Cost
– Best Traffic Service
![Page 13: at the Palm Bay Parkway Southern Interchangeparkwaypatriots.weebly.com/uploads/2/1/4/0/2140400/...50 mph Design Speed o ck Street Babc Inset Micco Road. Recommended Palm Bay Parkway](https://reader034.vdocuments.net/reader034/viewer/2022051914/6005b80267885f6f2049d0e8/html5/thumbnails/13.jpg)
Locally Preferred Alternative
Engineering Refinements
– Overall Cost $87 Million
- Palm Bay Parkway - $44.5 Million
- Interchange - $42.5 Million
– Potential ROW Donations (included above)
- Palm Bay Parkway - $5.5 Million
- Interchange - $14.8 Million
![Page 14: at the Palm Bay Parkway Southern Interchangeparkwaypatriots.weebly.com/uploads/2/1/4/0/2140400/...50 mph Design Speed o ck Street Babc Inset Micco Road. Recommended Palm Bay Parkway](https://reader034.vdocuments.net/reader034/viewer/2022051914/6005b80267885f6f2049d0e8/html5/thumbnails/14.jpg)
Environmental Evaluations
Cultural / Historical Sites
– No Impacts / SHPO Concurrence Received
Contamination Sites
– No Impacts
Floodplains
– 27 Acres of Compensating Storage Required for Floodplain Impacts
Wetlands
– 24.3 Acres of Impacts
![Page 15: at the Palm Bay Parkway Southern Interchangeparkwaypatriots.weebly.com/uploads/2/1/4/0/2140400/...50 mph Design Speed o ck Street Babc Inset Micco Road. Recommended Palm Bay Parkway](https://reader034.vdocuments.net/reader034/viewer/2022051914/6005b80267885f6f2049d0e8/html5/thumbnails/15.jpg)
Wildlife and HabitatUSFWS Coordination Ongoing
– No Affect
– Lakela’s Mint
– May Affect but not Adversely Affect
– American Alligator
– Carter’s Mustard
Chaffseed– Chaffseed
– Everglades Snail Kite
– Red Cockaded Woodpecker
– May Affect May Affect
– Audubon’s Crested Caracara
– Florida Scrub Jay
– Eastern Indigo Snake
– Wood Stork
Continued Coordination Required During Design &
Permitting
![Page 16: at the Palm Bay Parkway Southern Interchangeparkwaypatriots.weebly.com/uploads/2/1/4/0/2140400/...50 mph Design Speed o ck Street Babc Inset Micco Road. Recommended Palm Bay Parkway](https://reader034.vdocuments.net/reader034/viewer/2022051914/6005b80267885f6f2049d0e8/html5/thumbnails/16.jpg)
Current Project Status
Environmental Documents
– Submitted to FHWA on June 2 2011Submitted to FHWA on June 2, 2011
Awaiting Review Comments
Palmbayinterchange.com
Updates– Updates
![Page 17: at the Palm Bay Parkway Southern Interchangeparkwaypatriots.weebly.com/uploads/2/1/4/0/2140400/...50 mph Design Speed o ck Street Babc Inset Micco Road. Recommended Palm Bay Parkway](https://reader034.vdocuments.net/reader034/viewer/2022051914/6005b80267885f6f2049d0e8/html5/thumbnails/17.jpg)
Next Steps
Public Hearing – Late Summer / Early Fall
Finalize Study – Late 2011 / Early 2012Finalize Study – Late 2011 / Early 2012
Federal Funds Available for Final Design
ROW and Construction Phases
C l U f d d– Currently Unfunded