Page 1: Atlantic Pacific Marine, high fog installations

Atlantic Pacific Marine

Page 2: Atlantic Pacific Marine, high fog installations

38mm pipe hydraulically fabricated and installed Deck 4

Page 3: Atlantic Pacific Marine, high fog installations

3km of 38mm pipe hydraulically fabricated on

board and installed

Page 4: Atlantic Pacific Marine, high fog installations

Bottle banks installed in engine room

Page 5: Atlantic Pacific Marine, high fog installations

Pump units installed in engine room

Page 6: Atlantic Pacific Marine, high fog installations

Roxtec penetrations