atlas project support cost estimating soq 2012

Upload: vargasm99

Post on 05-Apr-2018

217 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/31/2019 Atlas Project Support Cost Estimating SoQ 2012

    1/22

  • 7/31/2019 Atlas Project Support Cost Estimating SoQ 2012

    2/22

  • 7/31/2019 Atlas Project Support Cost Estimating SoQ 2012

    3/22

    Atlas Project Support | Excellence

    What you leave behind is not what is engraved in stone monuments, but what is woven into the lives of others

    Firm Description

    Michael Vargas founded Atlas Project Support in 2009 on the principles of old-

    fashioned hard work and hiring the best personnel in the industry. The company hasbecome one of the leading energy and construction managers in California.

    Atlas is dedicated to delivering notable projects of outstanding quality, on time, while

    maximizing value for the consulting dollar. Its reputation has been built as a result of

    outstanding client relationships, supported by an experienced team of managers.

    Atlas continues to provide leadership, strength, stability, longevity and superior client

    service by:

    Creating a management structure that best serves our clients needs Hiring and retaining some of the most talented people in the industry Providing accurate and detailed cost estimating Focusing on preconstruction that ultimately saves our clients money Maintaining financial strength and stability Staying abreast of the latest industry technologies Pledging a high-level of service that maintains our reputation for quality Building lasting relationships through an enjoyable project experience.

    All of Atlas employees are based out of the San Diego corporate headquarters.

    Over the past three years the company has secured an average of $1 million in

    consulting revenue and currently has $1 million in construction management backlogwith the various public entities such as the County of San Diego Department of

    General Services and Los Angeles District USACE to perform preconstruction

    services and independent cost estimating.

    Corporate Headquarters: ......................................Primary Point of Contact:

    31303 Golf Club Drive ................................................................. Michael Vargas

    Bonsall, CA 92003 .................................................................... P: 619.865.9687

    F: 206.203.3968 ....................................... email:[email protected]

    Website:http://myatlasproject.com

    mailto:[email protected]:[email protected]:[email protected]://myatlasproject.com/http://myatlasproject.com/http://myatlasproject.com/http://myatlasproject.com/mailto:[email protected]
  • 7/31/2019 Atlas Project Support Cost Estimating SoQ 2012

    4/22

    Atlas Project Support | Excellence

    What you leave behind is not what is engraved in stone monuments, but what is woven into the lives of others

    Cost Consulting

    The genesis of our focus on highly specialized cost analysis is a direct result of clientfeedback. Every project requires reliable and often highly specialized costing solutions.

    Atlas offers cost standardization for facility owners, architects and construction

    managers. Managers of construction programs with a portfolio of multiple buildings,

    either in a campus environment or across regions of the U.S., apply Atlas models and

    databases for uniform construction design and corporate-wide construction budgeting.

    Cost modeling is useful for third party validation, negotiating contractor's bids andmonitoring as-built costs. Cost modeling drives the life cycle decision process in the

    early design phase.

    Atlas creates custom client models from actual client schematics and building plans that

    incorporate construction budgets and cost history. Atlas uses benchmark databases

    that are applied to the models to project costs forward in time, historically, and across

    various geographic locations

    IndependentCost Estimates

    EnergyConservation

    Costing

    DesignSchematic

    Pricing

    EconomicAnalysis

    Life CycleCost Analysis

  • 7/31/2019 Atlas Project Support Cost Estimating SoQ 2012

    5/22

    Atlas Project Support | Excellence

    What you leave behind is not what is engraved in stone monuments, but what is woven into the lives of others

    Independent Cost EstimatingFor many projects, obtaining an independent cost estimating is a mandated procedure.

    Atlas Project Support has taken this process of independent analysis to new heights by

    expanding the value of this costing technique by expanding its functionality and

    application. For owner liability reporting, contractor price checking, and change

    management, APSs independent cost estimating services bring tangible value to

    architects, engineers, building owners, and public agencies.

    This methodology ensures work is completed as soon as possible, with turnaround

    times that are forecasted and negotiated. APS independent cost estimating includes:an estimate review metrics report that summarizes and compares several key

    benchmark ratios and factors versus historical (and sometimes estimated) values from

    similar projects; cost targets for the company; and/or benchmarks from external

    sources.

    An Atlas Project Support independent cost estimate can be used in the following ways:

    Construction Document and Cost Review Construction Progress Monitoring Project Cost to Complete Analysis Construction Cost Estimating Deferred Maintenance Cost-to-Cure Estimates Capital Reserves Estimates Property Condition Reports Cost Estimating Support to the Appraisal Industry

  • 7/31/2019 Atlas Project Support Cost Estimating SoQ 2012

    6/22

    Atlas Project Support | Excellence

    What you leave behind is not what is engraved in stone monuments, but what is woven into the lives of others

    Energy Conservation Estimating

    In this estimating practice APS combines highly customizable cost estimatingtechniques including range of magnitude, detailed, and parametric costing with

    expertise in energy data analysis. Our energy efficiency estimating expertise covers

    energy program management initiatives, renewable energy systems and energy

    efficiency measure decision-making examination. APS clearly defines risk, cost, and

    makes recommendations in order to best achieve our clients energy goals. Generated

    reports demonstrate cost/energy savings as well as life cycle cost analysis and financial

    pro forma.

    This unique blend of energy-centric cost analysis is derived from a deep understanding

    of the economics of energy-related projects. From the design, implementation, or

    reporting of energy-related activities, Atlas Project Support guides clients in the most

    efficient and fiscally responsible action to move their energy projects forward.

    The APS techniques for this service are highly proprietary and based on years of

    involvement with many types of Cleantech projects. The use of energy modeling

    software, traditional take-offs, and historical databases make this service almost unique

    to the APS staff. The opportunity to glean invaluable decision-making information from

    this practice will provide the advantage your company is seeking to promote your

    project and have it move forward or certified.

  • 7/31/2019 Atlas Project Support Cost Estimating SoQ 2012

    7/22

    Atlas Project Support | Excellence

    What you leave behind is not what is engraved in stone monuments, but what is woven into the lives of others

    Conceptual EstimatingConceptual (parametric) estimating refers to a technique which utilizes the statistical

    relationship that exists between historical data and a particular delineated list of

    variables. Examples of these variables can include square footage in a construction

    project, building type, and other variables. This information is then used for the

    purposes of calculating and demonstrating a reliable estimate for the project at hand.

    One valuable aspect of parametric estimating is the high level of accuracy that can

    achieved. Accuracy levels of this method are, of course, dependent on the quality of the

    original data that is provided.

    Atlas long history of estimating a plethora of construction projects has provided a

    blueprint to guide other projects still in preliminary design. Our seasoned estimators

    can bring exceptional value by knowing what concepts to introduce into pricing as the

    design phases progress forward. Owners and architects can rely onAtlas documented

    history of being involved as active participants every step during the design phase. This

    long standing practice of Atlas is now an individual service being provided as a

    specialization by its APS staff.

    There are two key steps in this service:

    The identification step addresses project scope and development process at a

    conceptual level to include asset solution alternatives

    The feasibility step addresses schedule planning and development, cost

    estimating, resource planning, value analysis/engineering and risk management

    again, at a conceptual level of detail.

  • 7/31/2019 Atlas Project Support Cost Estimating SoQ 2012

    8/22

    Atlas Project Support | Excellence

    What you leave behind is not what is engraved in stone monuments, but what is woven into the lives of others

    QC/QA Program

    The main objective of the APS QC/QA program is to ensure the quality and accuracy of

    cost estimates. The cost estimating principles and processes provided here may be

    used to meet Federal requirements while utilizing industry standards and best practices.

    Atlas Project Supports Best Practice Estimating Controls Process:

    1. Define the estimates purpose

    2. Develop an estimating plan

    3. Define the project (or program) characteristics

    4. Determine the estimating structure [e.g., Work Breakdown Structure (WBS)]

    5. Identify ground rules and assumptions

    6. Obtain data

    7. Develop a point estimate and compare to an independent cost estimate

    8. Conduct sensitivity analysis

    9. Conduct risk and uncertainty analysis

    10. Document the estimate

    11. Present the estimate for management approval

    12. Update the estimate to reflect actual costs and changes

    APSs Quality Control and Quality Assurance procedures are an effective method for

    ensuring client satisfaction. With more than ten years of Atlas construction consulting

    guiding the formation of APS Best Practices, the vast historical data and lessons

    learned of Atlas Project Support are effused throughout APS Cost Consulting group.

    The rigorous standards the have made the parent brand Atlas the unrivaled benchmark

    in energy management in Southern California are the same standards, processes, and

    procedures leading APS Cost Consulting.

  • 7/31/2019 Atlas Project Support Cost Estimating SoQ 2012

    9/22

    Atlas Project Support | Excellence

    What you leave behind is not what is engraved in stone monuments, but what is woven into the lives of others

    Key Personnel Resumes

    Michael Vargas

    EXECUTIVE SUMMARY

    As Atlas senior cost consultant, Michael is specialized in cost engineering best

    practices and Green Building approaches. His specific expertise is in implementing

    effective controls by controlling the time, cost, quality, and scope at the right time and

    reacting according to measurable, verifiable results based on actual performance while

    measured against planned performance.

    CURRENT ROLES

    Principal of Atlas Project Support

    Adjunct Professor of Business Administration at Saint Leo University

    EDUCATION

    Graduate Certificate in Financial Analysis, Keller Graduate School of

    Management

    Master of Project Management, Keller Graduate School of Management

    M.B.A., Keller Graduate School of Management B.S.B.A. Management, San Diego State University

    CERTIFICATIONS AND SOFTWARE

    Certified Business Energy Professional- Association of Energy Engineers

    Certified Energy Plans Examiner- California Association Building Energy Consultants

    Certified Cost Technician- Association for the Advancement of Cost Engineering

    Green Building Construction Certificate- San Diego State University CES

    Entrepreneurial Management Center- San Diego State University

    Oracle University, Primavera P6 Certified Scheduler

    LEED Green Associate and GBCI Advisory Panel Member

    NAVFAC Certified Contractor Quality Manager

    OSHA 10 hour construction training- Current

    Advanced SharePoint 2007, Excel, Visio, MS Project, Primavera P6, Word, Access, PowerPoint

    (MS Office Suite), SalesForce, Sage ACT, Central Desktop, Outlook

    MRP-Fabtrol, StruMis, Division 5, Xactimate, On-Screen, JDEdwards-OneWorld and SES,Expedition and Contract Manager

  • 7/31/2019 Atlas Project Support Cost Estimating SoQ 2012

    10/22

    Atlas Project Support | Excellence

    What you leave behind is not what is engraved in stone monuments, but what is woven into the lives of others

    PROFESSIONAL EXPERIENCE

    04/2009-Present Atlas Project Support San Diego, CA

    Principal Consultant

    Consistently demonstrated sound judgment and experience in the application of

    scientific principles and techniques to problems of business and program

    planning; cost estimating; economic and financial analysis; cost engineering;

    program and project management; planning and scheduling; Earned Value cost

    and schedule performance measurement, and change control.

    Develop strategies and identify funding sources for renewable energy generation

    and energy conservation projects working with Utilities such as PG&E, SDG&E,

    and SCE. Draft and assist with negotiations with cross-functional team for complex

    contractual arrangements; negotiate terms of letters of understanding including

    inclusions, exclusions and qualifications.

    Perform comprehensive cost estimates using a variety of software including

    MCACES II and ACEIT for Federal clients.

    Knowledgeable in DOD technical expertise, knowledge of defense acquisition,

    and experience across a wide range of defense systems, system architectures

    and information technology platforms while adhering to TINA and FAR

    requirements.

    Use MS Project and Primavera P6 to create work lifecycles, allocate resources,

    create baselines, create WBS and assigned activities, and develop Master

    Project Schedules identifying major milestones, and administering resource

    pools.

    Provide Independent Cost Estimates for Clients to use as an analytical tool to

    validate, cross-check, or analyze estimates developed in proponency channels.

    The independent cost estimate also serves as a basis for verifying risk

    assessments.

    Perform Senior Estimating duties managing estimating staff of 3-4 persons.

    Been counted upon to work with various engineering, planning and surveyingfirms from the initial land acquisition/feasibility stage, through construction

    management supporting the entire development process, which included

    entitlement and regulatory permit processing including environmental clearance,

    engineering, Department of Energy (DOE) and CEC applications for NEPA and

    CEQA compliance issues.

  • 7/31/2019 Atlas Project Support Cost Estimating SoQ 2012

    11/22

    Atlas Project Support | Excellence

    What you leave behind is not what is engraved in stone monuments, but what is woven into the lives of others

    Gerry Collins

    EXECUTIVE SUMMARY

    Responsible for entire estimating, design, scopes of work development, job walks and

    proposal generation. Responsible for entire corporate, operations, project management,

    marketing and sales efforts including: public relations, media relations, advertising and

    publications. Also responsible for creating and maintain business partnerships and

    corporate contracts. Planned and implemented nation-wide rollouts

    EDUCATION:

    U.S.Navy, Cbc, Naval Construction Center, Port Hueneme, Ca (Construction A School)

    Long Beach City College, Long Beach, Ca (Communications, Marketing, Ba) Berean University, M.Th. Program, Costa Mesa, Ca (Ministerial Studies, Theology,

    Philosophy)

    CERTIFICATIONS:

    USACE/NAVFAC Construction Quality Control Manager

    OSHA 30 Hour CPR AED/First Aid Certified

    ECATTS Environmental Controls Certified

    Amtrak Contractor Safety Certification

    Scaffold/ Fall Protection Certified Competent Person

    EXPERIENCE:

    Chief Estimator

    Atlas Project Support

    Responsibilities include estimating, design, scopes of work development, job walks, project

    management, and proposal generation. Also responsible for creating and maintaining sub-

    contractor, business partnerships and corporate contracts. Also involved in executive level

    decision making, business plan development, and corporate and competitive strategies.

    Developed whitepaper and RFP's and engineering estimates for both Fortune 500 and

    government entities. Designed and oversaw completion of food processing facilities, TI and EPAprojects.

  • 7/31/2019 Atlas Project Support Cost Estimating SoQ 2012

    12/22

  • 7/31/2019 Atlas Project Support Cost Estimating SoQ 2012

    13/22

    Atlas Project Support | Excellence

    What you leave behind is not what is engraved in stone monuments, but what is woven into the lives of others

    Point of Departure Architects

    Owner Daniel Smith Architect, LEED AP, (619) 294-2500

    Personnel Michael Vargas

    Completion Date 05/2011 Present, Multiple and continuous projects

    Project Value $ 1,572,000.00

    DescriptionIndependent Cost Estimating Services - Residential, Tennant

    Improvement, and Commercial Mixed Use

    United States Army Corps of Engineers (USACE) Los Angeles District

    Owner Michelle Jones , 951-506-0055 PB/Entech

    Personnel Michael Vargas and Gerry Collins

    Completion

    Date01/2010 Present, Multiple projects

    Project Value $ 275,000,000.00

    Description

    Independent Cost Estimating Services for office buildings, hospital

    renovation, parking structures, dry and wet utility upgrades and

    power plant upgrades. Have performed over 200 Individual IGEs.

  • 7/31/2019 Atlas Project Support Cost Estimating SoQ 2012

    14/22

    Atlas Project Support | Excellence

    What you leave behind is not what is engraved in stone monuments, but what is woven into the lives of others

    AT&T Services, Inc. CRE - Building Design and Construction

    Host

    Organization AT&T - 433 S. Olive St., Los Angeles, CA

    Personnel Michael Vargas

    Completion

    Date8/10/2011

    Contact Name Tim Ng

    Contact Number 626 -308-8575

    Project Value $ 1,200,000.00

    DescriptionCost Engineering Audit as part of a justification package to sole

    source a vendor for a large chiller plant in Los Angeles

    AT&T Services, Inc. CRE - Building Design and Construction

    Host

    OrganizationAT&T - 14800 Ventura Boulevard, Sherman Oaks, CA

    Personnel Michael Vargas

    Completion

    Date8/10/2011

    Contact Name John Najar

    Contact Number 626 -308-8575

    Project Value $ 2,300,000.00

    Description Cost Engineering Audit HVAC & Lighting Energy Upgrade

  • 7/31/2019 Atlas Project Support Cost Estimating SoQ 2012

    15/22

    Atlas Project Support | Excellence

    What you leave behind is not what is engraved in stone monuments, but what is woven into the lives of others

    NAVSPECWARCEN - Facilities

    Host

    Organization Naval Special Warfare Basic Training Command

    Personnel Michael Vargas

    Completion

    Date12/15/2011

    Contact Name Brad Fisher

    Contact Number 619-537-2072

    Project Value $ 55,000.00

    Description Expand Cased Opening at Quarterdeck :Predictive Cost Modeling

    Reno ESP Cost Consulting

    Host

    OrganizationReno Contracting, Inc.

    Personnel Michael Vargas

    Completion

    DateOngoing

    Contact Name Eric Scheidlinger

    Contact Number 619-220-0224

    Project Value 1,000,000.00

    Description

    Perform variety of predictive cost modeling exercises, hard bid

    photovoltaic system cost estimates, and energy conservation

    estimating.

  • 7/31/2019 Atlas Project Support Cost Estimating SoQ 2012

    16/22

    Atlas Project Support | Excellence

    What you leave behind is not what is engraved in stone monuments, but what is woven into the lives of others

    Small Business Certificates

  • 7/31/2019 Atlas Project Support Cost Estimating SoQ 2012

    17/22

    Atlas Project Support | Excellence

    What you leave behind is not what is engraved in stone monuments, but what is woven into the lives of others

  • 7/31/2019 Atlas Project Support Cost Estimating SoQ 2012

    18/22

    Atlas Project Support | Excellence

    What you leave behind is not what is engraved in stone monuments, but what is woven into the lives of others

    Page

  • 7/31/2019 Atlas Project Support Cost Estimating SoQ 2012

    19/22

    Atlas Project Support | Excellence

    What you leave behind is not what is engraved in stone monuments, but what is woven into the lives of others

    Page

  • 7/31/2019 Atlas Project Support Cost Estimating SoQ 2012

    20/22

    Atlas Project Support | Excellence

    What you leave behind is not what is engraved in stone monuments, but what is woven into the lives of others

    Page

  • 7/31/2019 Atlas Project Support Cost Estimating SoQ 2012

    21/22

    Atlas Project Support | Excellence

    What you leave behind is not what is engraved in stone monuments, but what is woven into the lives of others

    Page

  • 7/31/2019 Atlas Project Support Cost Estimating SoQ 2012

    22/22

    Atlas Project Support | Excellence

    What you leave behind is not what is engraved in stone monuments, but what is woven into the lives of others

    Page

    http://www.myatlasproject.com/