ato system improvements -...

13
Industry Engagement Forum 1 Presented by Ian Scensor Australian Taxation Office | 29 August 2017 ATO System Improvements

Upload: others

Post on 28-May-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ATO System Improvements - media.app.viostream.commedia.app.viostream.com/5b3ad5fc-8ba1-46f0-bb44-a... · Infrastructure Investment | Migration to cloud CLASSIFICATION –SuperStream

Industry Engagement Forum

1

Presented by Ian ScensorAustralian Taxation Office | 29 August 2017

ATO System Improvements

Page 2: ATO System Improvements - media.app.viostream.commedia.app.viostream.com/5b3ad5fc-8ba1-46f0-bb44-a... · Infrastructure Investment | Migration to cloud CLASSIFICATION –SuperStream

Improvements implemented to date

Improvements

Infrastructure

Investment

• Migrated to the new SAN architecture with full data replication

• Moved two key applications to cloud operations (ato.gov.au and ATO Online)

Performance and

operational

improvements

• Enhancements to the operations monitoring centre to bolster proactive

monitoring capability of our systems

• Centralised log monitoring processes to manage the myriad of system logs to

improve operational performance

Process, tools and

governance

• Refined playbooks to enhance speed of recovery

• Codified manual activities

• Improvements to the IT incident management process and interface with ATO

Business Continuity Management

Architect for

resilience

• Established many of the ‘single point of failure’ systems in the second data

centre

UNCLASSIFIED – SuperStream Business Engagement Forum 2

Page 3: ATO System Improvements - media.app.viostream.commedia.app.viostream.com/5b3ad5fc-8ba1-46f0-bb44-a... · Infrastructure Investment | Migration to cloud CLASSIFICATION –SuperStream

Improving SBR2

UNCLASSIFIED – SuperStream Business Engagement Forum 3

Phase 1 – Initial focus (current architecture)

Improving performance and availability

From Dec 2016

Phase 2 – Now

Migration to cloud

From August 2017

Infrastructure

investment

Performance and

operational improvements

Re-architecture

• Implementing performance improvements to enhance

throughput and response times of SBR2 transactions

• Addressing single points of failure in the SBR2 channel

• Staged ramp up of Digital

Service Providers (DSPs) on AWS

cloud

• Establishing service patterns

• Decoupling SBR2 from the broader ATO

technology environment

Phase 3 – Future

Re-architecting for improved resilience

2017 and beyond

Page 4: ATO System Improvements - media.app.viostream.commedia.app.viostream.com/5b3ad5fc-8ba1-46f0-bb44-a... · Infrastructure Investment | Migration to cloud CLASSIFICATION –SuperStream

Performance and operational improvements

UNCLASSIFIED – SuperStream Business Engagement Forum 4

0

20000

40000

60000

80000

100000

120000

140000

160000

<1 Second 1 to 2 Seconds 2 to 3 Seconds 3 to 4 Seconds 4 to 5 Seconds 5 to 10 Seconds >10 Seconds

SBR2 STIC weekly transaction volumes by response time

Week 5 to 11 Jun 2017

Week 12 to 18 Jun 2017

Week 19 to 25 Jun 2017

Week 26 Jun to 2 Jul 2017

Week 3 to 9 Jul 2017

Week 10 to 16 Jul 2017

Week 17 to 23 Jul 2017

Week 24 to 30 Jul 2017

Week 31 Jul to 6 Aug 2017

Week 7 to 13 Aug 2017

Week 14 to 20 Aug 2017

Tra

nsa

ctio

n v

olu

me

s

Response time

AU

G

JU

LJU

N

Page 5: ATO System Improvements - media.app.viostream.commedia.app.viostream.com/5b3ad5fc-8ba1-46f0-bb44-a... · Infrastructure Investment | Migration to cloud CLASSIFICATION –SuperStream

Infrastructure Investment | Migration to cloud

CLASSIFICATION – SuperStream Business Engagement Forum 5

SBR2 – Connections (On-premise and AWS cloud)Connection during staged implementation

Access to AWS eCommerce Cloud or eCommerce on-prem is activated by a change in

the DSP application to send to one of the two URLS.

The DSP application can point to either URL provided their product remains

whitelisted in both AWS and on-prem solutions.

DSP

DSP

URL

URL

AWS

On-prem

What information is expected

from Super ‘early adopters’?

1. Service to be utilised (e.g. SMAT2)

2. Agreed trustee participation

3. Timeframes for implementation

Page 6: ATO System Improvements - media.app.viostream.commedia.app.viostream.com/5b3ad5fc-8ba1-46f0-bb44-a... · Infrastructure Investment | Migration to cloud CLASSIFICATION –SuperStream

Infrastructure Investment | Timeline for on-boarding

DSPs to AWS Cloud

CLASSIFICATION – SuperStream Business Engagement Forum 6

1st Tranche DSP Start

PLS Developers

9 Aug 2017

August September2017

PLS-dependent

software

updates applied

(EAI, ICP)

5 Aug 2017

2nd Tranche DSP Start

PLS Developers

1 Sep 2017

3rd Tranche DSP Start

PLS Developers

SuperStream Developers

4 Sep 20174th Tranche DSP Start

11 Sep 2017

Page 7: ATO System Improvements - media.app.viostream.commedia.app.viostream.com/5b3ad5fc-8ba1-46f0-bb44-a... · Infrastructure Investment | Migration to cloud CLASSIFICATION –SuperStream

CLASSIFICATION – SuperStream Business Engagement Forum 7

Re-architecting | Re-architecting for improved resilience

Page 8: ATO System Improvements - media.app.viostream.commedia.app.viostream.com/5b3ad5fc-8ba1-46f0-bb44-a... · Infrastructure Investment | Migration to cloud CLASSIFICATION –SuperStream

Re-architecting |Decoupling back-end systems to improve resilience

CLASSIFICATION – SuperStream Business Engagement Forum 8

Queued Batch

Submit batch and bulk transactions which will be validated, queued and a submission

receipt is returned.

Limited Service Mode

Single interactive transactions will be validated and stored until back-end systems are

available. A submission receipt is returned. Users are able to complete obligations but

need to return for response when systems are available.

Access Response

Access processed responses on the channel even if back-end systems are unavailable.

Access Key Reports

Access key reports and informational services available on the channel.

Access Offline Data

Access key personal and identification information and pre-fill data from a secondary

data source. Users are advised of the currency of data as limitation on service.

Note: This slide represents early thinking. The future architecture patterns are still being explored.

Page 9: ATO System Improvements - media.app.viostream.commedia.app.viostream.com/5b3ad5fc-8ba1-46f0-bb44-a... · Infrastructure Investment | Migration to cloud CLASSIFICATION –SuperStream

Questions?

Page 10: ATO System Improvements - media.app.viostream.commedia.app.viostream.com/5b3ad5fc-8ba1-46f0-bb44-a... · Infrastructure Investment | Migration to cloud CLASSIFICATION –SuperStream

Appendix

Page 11: ATO System Improvements - media.app.viostream.commedia.app.viostream.com/5b3ad5fc-8ba1-46f0-bb44-a... · Infrastructure Investment | Migration to cloud CLASSIFICATION –SuperStream

Re-architecting | Initiatives for SBR2

UNCLASSIFIED – SuperStream Business Engagement Forum 11

* Current proposed list of enhancements for SBR2, further analysis is underway to identify additional improvements.

Scalability Initiatives* Availability Initiatives*

� Automated Scaling on demand � Resilience Patterns for Batch

� Dedicated STP cluster � Rolling Upgrades

� Throttling � Service Management Improvements

� Address Application Bottlenecks

� Performance & Stress Testing

Page 12: ATO System Improvements - media.app.viostream.commedia.app.viostream.com/5b3ad5fc-8ba1-46f0-bb44-a... · Infrastructure Investment | Migration to cloud CLASSIFICATION –SuperStream

Performance and operational improvements

UNCLASSIFIED – SuperStream Business Engagement Forum 12

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

>10 Seconds

5 to 10 Seconds

4 to 5 Seconds

3 to 4 Seconds

2 to 3 Seconds

1 to 2 Seconds

<1 Second

SBR2 SuperTICK daily transaction volumes - distribution by response time

Page 13: ATO System Improvements - media.app.viostream.commedia.app.viostream.com/5b3ad5fc-8ba1-46f0-bb44-a... · Infrastructure Investment | Migration to cloud CLASSIFICATION –SuperStream

Performance and operational improvements

UNCLASSIFIED – SuperStream Business Engagement Forum 13

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

Week 5 to 11 Jun

2017

Week 12 to 18

Jun 2017

Week 19 to 25

Jun 2017

Week 26 Jun to 2

Jul 2017

Week 3 to 9 Jul

2017

Week 10 to 16

Jul 2017

Week 17 to 23

Jul 2017

Week 24 to 30

Jul 2017

Week 31 Jul to 6

Aug 2017

Week 7 to 13

Aug 2017

Week 14 to 20

Aug 2017

SBR2 STIC weekly transaction volumes - distribution by response time

>10 Seconds

5 to 10 Seconds

4 to 5 Seconds

3 to 4 Seconds

2 to 3 Seconds

1 to 2 Seconds

<1 Second