ATOMEXPO 2010

Senior Vice President, Alstom PowerGuy Chardon

08/06/2010

Page 2: ATOMEXPO 2010 Senior Vice President, Alstom Power Guy Chardon 08/06/2010

© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

AtomExpo 2010 - Guy Chardon - 08/06/2010 - P 2

Alstom Nuclear EquipmentAt the heart of the Nuclear Power Plant

Nuclear island Turbine island Balance of Plant

Page 3: ATOMEXPO 2010 Senior Vice President, Alstom Power Guy Chardon 08/06/2010

© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

AtomExpo 2010 - Guy Chardon - 08/06/2010 - P 3

Alstom Nuclear EquipmentFitting all type of reactors

• EPR

• VVER1200

• AP1000

• 700 MWe PHWR (India)

• Kerena

Page 4: ATOMEXPO 2010 Senior Vice President, Alstom Power Guy Chardon 08/06/2010

© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

AtomExpo 2010 - Guy Chardon - 08/06/2010 - P 4

Alstom Nuclear EquipmentBest Performance out of Any Nuclear Reactor

Oskarshamn 3 LP Rotor

Chooz first ARABELLE

• Best efficiency with single flow expansion:- Proven combined HP/IP module.- Continuous R&D developments.

• Excellent Reliability:- 300,000 Operating Hours experience.

• Solid welded rotor:- Best resistance to Stress Corrosion Cracking.- Secured supply chain.

• Mature family of last stage blades:- Oskarshamn 3 Last stage Blade (1750 mm) is

world longest operating blade since 2009.

• Design for low maintenance cost:- Reliability and durability proven by 300,000

Operating Hours experience.

Page 5: ATOMEXPO 2010 Senior Vice President, Alstom Power Guy Chardon 08/06/2010

© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

AtomExpo 2010 - Guy Chardon - 08/06/2010 - P 5

Key Player of Nuclear RenaissanceMain contracts in Execution (New and Retrofit)

China •Ling Ao 3+4•Taishan 1+2•Hongyanhe 1-4•Ningde•Fuqing•Fangjiashan 1 + 2

South Korea•Ulchin 1+2

USA•Calvert Cliffs 3•North Anna 1+2•Surry 1+2•Quad Cities 1+2•Dresden 2+3•Peach Bottom 2+3•San Onofre 2+3•Fort Calhoun

South Africa•Koeberg 1+2

France•Flamanville 3

Mexico•Laguna Verde 1+2

Sweden•Ringhals 4

Finland•Olkiluoto 1+2

Switzerland•Leibstadt

Legend•New Equipment•Retrofit

Page 6: ATOMEXPO 2010 Senior Vice President, Alstom Power Guy Chardon 08/06/2010

© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

AtomExpo 2010 - Guy Chardon - 08/06/2010 - P 6

Main contracts in ExecutionFlamanville 3, 1750 MWe in France

• Turbine Island excluding Civil:• Power Conversion systems, transportation and site erection.

• Other Equipment such as:• Circulating Water pumps, Emergency Generator, etc.

Lifting of an LP heater at siteWorld largest ARABELLETM steam turbine

March 2010April 2010

Page 7: ATOMEXPO 2010 Senior Vice President, Alstom Power Guy Chardon 08/06/2010

© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

AtomExpo 2010 - Guy Chardon - 08/06/2010 - P 7

Main contracts in ExecutionQuad Cities 2, 900 MWe Retrofit in USA

• Supply of 3 Low Pressure Turbine inner block retrofits and full Installation. MWe output uplift guarantee provided.

• Installation completed within the 24 day, turbine synchronized on 18th April 2010.

• Quad Cities 2 is the first of six Nuclear retrofit projects with Exelon, the last being completed in 2014, each designed to increase the efficiency, reliability and

capacity of each power plant.

Steam Turbine rotor, Chattanooga facility

Page 8: ATOMEXPO 2010 Senior Vice President, Alstom Power Guy Chardon 08/06/2010

© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

AtomExpo 2010 - Guy Chardon - 08/06/2010 - P 8

A worldwide organization A global business footprint …

Wuhan:•Engineering Execution

center•Local supply chain

development

Chattanooga:•Execution center•Calvert Cliffs 3 project

managementLevallois:•Execution centre•Nuclear systems

integration R&DSt Petersburg:•AAEM execution center•Tendering support and

local supply chain development

India:•Execution center•Local sourcing

Page 9: ATOMEXPO 2010 Senior Vice President, Alstom Power Guy Chardon 08/06/2010

© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

AtomExpo 2010 - Guy Chardon - 08/06/2010 - P 9

A worldwide organization …relying on a global manufacturing network

Rotating MachinesStatic EquipmentService FactoriesOther Factories

• Rotating Machines: Beijing, Belfort, Bexbach, Birr, Elblag (Foundry), Elblag (Turbines), Chattanooga (turbines), Mannheim, Morelia, Wroclaw.

• Static Equipment: Budapest, Brno, Durgapur, Neumark, Sizhou, Setubal, Surabaya, Wuhan , Chattanooga (boilers).

• Service Factories: Berlin, Richmond, Bucharest T, Bucharest G, Rugby, Sesto, Gatineau, Stafford, Karlovac.

• Other factories: Shahabad, Wellsville, Concordia, Kassel, Vinhedo, Osaka, Shanghai.

Page 10: ATOMEXPO 2010 Senior Vice President, Alstom Power Guy Chardon 08/06/2010

© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

AtomExpo 2010 - Guy Chardon - 08/06/2010 - P 10

A worldwide organization Alstom is extending its nuclear activity

• Alstom Technology has been selected by NPCIL and BHEL for the new 700 MW Indian designed PHWR Nuclear power plant program.

• Alstom is working with Areva on the EPR project Jaitapur for NPCIL, to supply Conventional Island.

• Manufacturing and engineering of large equipment for nuclear, gas new and retrofit in Chattanooga

• Operational in June 2010• World’s largest balancing facility • Easy access to 80% of existing or

planned US nuclear power plants• 350.000 m2 under a single roof

INDIA

USA

Page 11: ATOMEXPO 2010 Senior Vice President, Alstom Power Guy Chardon 08/06/2010

© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

AtomExpo 2010 - Guy Chardon - 08/06/2010 - P 11

Alstom’s nuclear activity in Russia

License to manufacture turbine - generator equipment based onARABELLE™ technology

49% 51%

Alstom set-up Joint Venture AAEM with AEM, Rosatom affiliate.

Page 12: ATOMEXPO 2010 Senior Vice President, Alstom Power Guy Chardon 08/06/2010

© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

AtomExpo 2010 - Guy Chardon - 08/06/2010 - P 12

• Good progress in Technology Transfer to AAEM JV.

• Alstom is ready for the next steps:- To develop manufacturing in Russia and execute projects

based on VVER1200 reactors.

Alstom’s nuclear activity in Russia

Page 13: ATOMEXPO 2010 Senior Vice President, Alstom Power Guy Chardon 08/06/2010

www.alstom.com

Page 14: ATOMEXPO 2010 Senior Vice President, Alstom Power Guy Chardon 08/06/2010

© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

Презентация - 01/01/2007 - P 14

AAEM manufacturing facility in PodolskRenovation project

Workshop space: ~ 53,000 sq. m.

Office space: ~ 15,000 sq.m.

Employees: ~ 840.

Special machines and tools: 43 pcs.

Heat treatment equipment: 14 pcs.

Welding equipment: 29 pcs.Blanking equipment: 6 pcs.

Automatic lines: 2 pcs.

Stands and benches: 51 pcs.

Page 15: ATOMEXPO 2010 Senior Vice President, Alstom Power Guy Chardon 08/06/2010

© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

AtomExpo 2010 - Guy Chardon - 08/06/2010 - P 15

Transfer and adaptation of technical information is up and running at the JV

Санкт-Петербург Подольск

Input-output devices, servers

Workstations

Input-output devices, servers

Workstations

Поставщики

АЭМ

ERP PDM

Производство

Заказчики

Инженерный центр

ALSTOMЗащищенный

VPN Канал связи Альстом-

ААЭМ

ААЭМ

● A common information space has been established to join the Engineering Centre in St.Petersburg and the manufacturing facility in Podolsk.

● The system for project information exchange (PIRS) allows AAEM’s integration into the common framework of data flow between Alstom and its partners.

St. Petersburg Podolsk

ManufacturingEngineering Centre

Secure VPN channel between

Alstom and AAEM

Suppliers

CustomersAEM