ATP11A Siteforge Process – 850 MHz

Document History

Version Author Date Remarks

Version 1.0 Ashish Shukla 3-Sep-2015 New ATP 11B procedure for 850 Mhz

Version 1.1 Ashish Shukla 11-SEP-2015 Modification in Slide 36 Remark about Existing Antenna Swap and Transfer to ware house

Agenda

Work Order Assignment Management Flow chart

Example on WO Assignment Management Flow

Procedure to use SITEFORGE using tab in field

WO Assignment Management Flow(ATP-11A)

Install and usage of various Login

Procedure to use SITEFORGE using tab in field

Introduction to Work Order Assignment Management

Work Order Assignment Management is also known as WAS.

WAS is going to help users in automating the Work Order(WO) flow in asystematic manner using a portal called SITEFORGE.

Using this portal each level of Management employees will receive andexecute their WO or Task assigned to them.

Helps to trace the network status through online mode.

Provides Visual steps to guide users on progress and upcoming steps.

Improves productivity & complete visibility.

Helps users to monitor Parameter Compliance Index(Planned Vs. Actual).

Helps users to Search/Filter Sites & WO based on various parameters.

Network Lifecycle Management Flow (Work Allocation System)

WO assignment management flow

Samsung QE“Accept”

“On hold” with issue list to eNB

Eng

Pre-ATP11A is acknowledged by eNB Engjoint ATP11A is performed (FE + eNB Eng)Report is modified on Tab ,if required (FE)

Joint-ATP11A is completed & report is uploaded on server. Samsung eNB er. to

certify

SOLPAR field er. Executes task(Pre ATP 11A) & saves it in tab & uploads to server once in coverage & notify

to eNB Eng.

CH assigns the WO to respective Samsung AM

1. AM assign Samsung eNBengineer & QE for that Site

2. Assign various tasks of that WO to single or multiple SOLPAR

SOLPAR PM assigns task to SOLPAR field engineer

RJIL Circle CTO

Accept/Reject

Task is auto-closed in SITEFORGE

End

Responsibility:

GIS/SIITE

FORGE;

Notification:

Samsung CH

Responsibility:Sam

sung CH;

Notification:Samsun

g AM, RJIL CTO

Responsibility:

Samsung Am

Notification:

Samsung CM

Responsibility:

SOLPAR PM

Notification :Samsung

AM & Samsung eNB

er.

Responsibility:

SOLPAR field

engineer

Notification: Samsung

eNB er. & SOLPAR PMResponsibility:

SOLPAR FE &

SAMSUNG eNB er.

Notification: Samsung

AM & SOLPAR PM

On Hold with

justification Response:Sam

sung QE

Notification:

Samsung-Reg

QM,AM,CM;

SOLPAR-PM,FE

SAMSUNG AM will Accept

Responsibility:

Samsung AM

Notification:

Regional

QM,SAMS

CM,Circle RJIL

CTO

Accept

Responsibility:

Circle RJIL CTO

Notfication:

Samsung

CH,AM;System(

GIS,REIMS)

Reject

AcceptResponsibility:

SAMSUNG AM

Notification:

SOLPAR PM,

SAMSUNG CH

WO is created & issued to respective SAMSUNG CH by RJIL

Login Creation & Siteforge Installation

Login creation - introductionObjective

• Procedure to install and use (Work Allocation System –WAS [Siteforge]) in Samsung Galaxy Tab 3 8” by Solpar field engineers

• Steps

User (Solpar field engr.) creation by : Solpar Project manager

Intimation mail to field engineer : From Siteforge team ([email protected])

Click activation link

Login to Siteforge and change password (default password is with project manager)

Download and install .apk (installation file).

Start using the siteforge by clicking the icon.

Login creation - Intimation mail

Receive mail from siteforge team

Click on Activation Link

Login creation – accessing the site first time

If the mail is accessible in the TAB

Click on Activation Link

If the mail is not accessible in the TAB (eg. Official mail not configured in the the TAB)

Open explorer, type below link in the address barhttps://siteforge.ril.com/siteforge/jsp/index.jsp

Login creation – password change

Change the password

Default password would be available with your project manager

Login

Login with the new password

Changing security setting

Before downloading the installation file, change the security setting

•Go to TAB setting

•Turn on Blocking mode •Tick Unknown sources check box

Download and install installation file (.apk) file

•Click ‘Download Apk’, •Once downloaded, go to notifications and click .apk file•Select install

ATP 11A Procedure

How to Login?-FE

Login with your user name from Samsung TAB

ATP 11A Process

Click on Task

ATP 11A Process

Click drop down Menu to Select Specific band

ATP 11A Process

Select 850 Band

ATP 11A Process

Select the Site and Click on Perform ATP 11A

Site Information

Click On Next

EDIT

Installation Scenario

Field Engineer need to answer the above question that they have installed Multiband or Penta Band during 850 Mhz Installation

Antenna Make & Model

Enter the Information based on ACE/ROSENBERGER Model Type Used

Antenna Height incuding building height and tower foundation height in Case of RTP/RTT/RTD

EDIT

EDIT

Antenna & Cable Information

Tilt Information

Azimuth Information

½ inch RF jumper Information

CPRI Cable & RRH Type

CPRI Length

RRH type V1/V2

Installation Check List

CDU Installation Check List

EDIT

Press yes or no to depict the status

Installation Check List

RRH Installation Check

Installation Check List

Antenna Installation Check

Installation Check List

Cabling Check for 850 Mhz

Grounding Check

Site Inventory List

Field Engineer need to capture the Serial number of all the site inventory for 850 Mhz

Capture the 850 Mhz L9CA serial Number

Capture 850 Mhz RRH Serial Number for all Three sectors

Capture 850 Mhz Antenna Serial Number for all Three sectors

Site Inventory List

Capture 850 Mhz Antenna Serial Number for all Three sectors

Incase of Pentaband / Muntiband Antenna capture the serial number of all the three RET in all the 3 Sectors

Site Photograph

Collect the mentioned photographs

Site Photograph

Site Photograph

Site Photograph

Site Photograph

Remarks

Add remarks about the work done if any

Click Next

Incase of existing antenna are swapped with new antenna then SOLPAR need to mention the YES/NO , and also confirm that they are sent back to

warehouse .

Acceptance Sheet

Thank You!!!