(~~atrt~~) ~~ax :.91-674-2361770 national highways ... 1330-2691143646.pdf · national highways...

9
~~~~ (~~aTrt~~) National Highways Authority of India (Ministry of Road Transport & Highways) ~ Cbllll(tlll,.:il'mrr /Regional Office, Odisha 301 -~, ~~, 1ffiir~, ~ of -iir/7, ~ "FcIm ~m - 751013,-31TmlT ~ BHARATMAlA 301-A, 3rd Floor, Pal Heights, Plot No: JI7, Jayadev Vihar • .., ••••••• ROADTOPROSHRrrY N~~ffr3011i54i/~~}8D", ~di3hO 12019 - ~/Tel. : .91-674-2361570/670 ~~ax :.91-674-2361770 t~ le-mail: [email protected] [email protected] ~/Website : http://www.nhai.org 27.06.2019 To The Sr. Technical Director, NIC Centre at MoRTH, Transport Bhawan, New Delhi 110001 Sub: Rehabilitation and up-gradation to four laning of Binjabahal to Teleibani section of NH-6 from Km.414.982 to Km.493.300 in the State of Odisha under Hybrid Annuity Mode- NOC proposal for laying underground Electrical Power Cable across NH-6 at Ch.448+000 (2 nos. Of crossing 3C*240 sqmm cable in 200 mm HOPE pipe) of NH-6 by the Executive Engineer, Mega Lift Projects, Keonjhar, Govt. of Odisha-Reg S~, Please find enclosed herewith a proposal of Executive Engineer, Mega Lift Projects, Division, Keonjhar for seeking NOC for laying electrical power cable for power supply, across the subject stretch of the project at chainage 448+000 (2 nos. of crossing of 3Cx240 sq. mm in 200 mm dia casing pipe) of NH-6 in Keonjhar District. 2. Accordingly, as per guidelines issued by MoRTH vide F. No. RW/NH-33044/29/2015/S&R(R) dt. 22.11.2016, the application along with the recommendations of concerned PD/Consultants are enclosed herewith with request to hoist the same in the Ministry's Website for public comments within 30 days of uploading on the website. This is issued with the approval of the "Regional Officer, NHAI, Regional Office, Odisha, Bhubaneswar" . Yours faithfully, (Dt~~ Manager (Tech) Corporate Office: G-5 & 6, Sector-10, Dwarka, New Delhi-110 075, Phone: 011-25074100/200 Website : http://www.nhai.org

Upload: others

Post on 25-Sep-2020

8 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: (~~aTrt~~) ~~ax :.91-674-2361770 National Highways ... 1330-2691143646.pdf · National Highways Authority ofIndia (Ministry of Road Transport & Highways) ~ 4l14f(tj4,~TT /Regional

~~~~(~~aTrt~~)

National Highways Authority of India(Ministry of Road Transport & Highways)

~ Cbllll(tlll,.:il'mrr /Regional Office, Odisha

• •

301 -~, ~~, 1ffiir~, ~ of -iir/7, ~ "FcIm~m -751013,-31TmlT

~ BHARATMAlA 301-A, 3rd Floor, Pal Heights, Plot No: JI7, Jayadev Vihar• .., ••••••• ROADTOPROSHRrrY N~~ffr3011i54i/~~}8D",~di3hO 12019

- ~/Tel. : .91-674-2361570/670~~ax :.91-674-2361770t~ le-mail: [email protected]

[email protected]~/Website : http://www.nhai.org

27.06.2019

ToThe Sr. Technical Director,NIC Centre at MoRTH,Transport Bhawan,New Delhi 110001

Sub: Rehabilitation and up-gradation to four laning of Binjabahal to Teleibani section of NH-6from Km.414.982 to Km.493.300 in the State of Odisha under Hybrid Annuity Mode- NOCproposal for laying underground Electrical Power Cable across NH-6 at Ch.448+000(2 nos. Of crossing 3C*240 sqmm cable in 200 mm HOPE pipe) of NH-6 by theExecutive Engineer, Mega Lift Projects, Keonjhar, Govt. of Odisha-Reg

S~,Please find enclosed herewith a proposal of Executive Engineer, Mega Lift Projects,

Division, Keonjhar for seeking NOC for laying electrical power cable for power supply, across thesubject stretch of the project at chainage 448+000 (2 nos. of crossing of 3Cx240 sq. mm in 200 mmdia casing pipe) of NH-6 in Keonjhar District.

2. Accordingly, as per guidelines issued by MoRTH vide F. No. RW/NH-33044/29/2015/S&R(R)dt. 22.11.2016, the application along with the recommendations of concerned PD/Consultants areenclosed herewith with request to hoist the same in the Ministry's Website for public commentswithin 30 days of uploading on the website.

This is issued with the approval of the "Regional Officer, NHAI, Regional Office, Odisha,Bhubaneswar" .

Yours faithfully,

(Dt~~Manager (Tech)

Corporate Office: G-5 & 6, Sector-10, Dwarka, New Delhi-110 075, Phone: 011-25074100/200Website : http://www.nhai.org

Page 2: (~~aTrt~~) ~~ax :.91-674-2361770 National Highways ... 1330-2691143646.pdf · National Highways Authority ofIndia (Ministry of Road Transport & Highways) ~ 4l14f(tj4,~TT /Regional

~~~~(~~~~~)

National Highways Authority of India(Ministry of Road Transport & Highways)

~ 4l14f(tj4,~TT /Regional Office, Odlsha301-~, ~~, -m;r~, ~;j"iir/7, ~ fcImijCj~lIilH - 751013, ~TT

~ BHARATMALA 301-A, 3rd Floor, Pal Heights, Plot No: J/7, Jayadev Vihar•••"'''''''' ROADYO,..,.,.,.... Bhubaneswar- 751013, OdlshaNHAI/13011/5411ROIODI 13&.9 12019

ItNVITATIONOF PUBLIC COMMENTS

- ~/Tel. : +91-674-2361570/670~/Fax: .91-674-2361770t.:irtir le-mail: [email protected]

[email protected]~/Website : http://www.nhai.org

27.06.2019

Sub: Rehabilitation and up-gradation to four laning of Binjabahal to Teleibani section of NH-6from Km.414.982 to Km.493.300 in the State of Odisha under Hybrid Annuity Mode- NOCproposal for laying underground Electrical Power Cable across NH-6 at Ch.448+000(2 nos. Of crossing 3C*240 sqmm cable in 200 mm HOPE pipe) of NH-6 by theExecutive Engineer, Mega Lift Projects, Keonjhar, Govt. of Odisha-Reg

Executive Engineer, Mega Lift Projects, Division, Keonjha has submitted a proposal forNOC laying for laying electrical power cable for power supply, across the subject stretch of theproject at chainage 448+000 (2 nos. of crossing of 3Cx240 sq. mm in 200 mm dia casing pipe) ofNI:l-6 in Keonjhar District.

2. As per guidelines issued by MoRTH vide F. No. RW/NH-33044/29/2015/S&R(R) dated22.11.2016, the Highway Administration will put out the application in the public domain for 30 daysfor seeking claims and objections (on grounds of public inconvenience, safety and general publicinterest).

3. In view of the above, the comments of public, if any, on the above mentioned proposal isinvited on below mentioned address:

The Regional Officer,National Highways Authority of India,

Regional Office, Odisha301-A, 3rd Floor, Pal Heights,

J/7, Jayadev Vihar, Bhubaneswar 751013, Odishae-mail: [email protected]

This is issued with the approval of the "Regional Officer, NHAI, Regional Office, Odisha,

Bhubaneswar" .

National Highways Authority of India,Regional Office, Odisha

301-A, 3rd Floor, Pal Heights,J/7, J;yadev Vihar, Bhubaneswar 751013

Corporate Office: G-5 & 6, Sector-10, Dwarka, New Delhi-110 075, Phone: 011-25074100/200Website : http://www.nhai.org

Page 3: (~~aTrt~~) ~~ax :.91-674-2361770 National Highways ... 1330-2691143646.pdf · National Highways Authority ofIndia (Ministry of Road Transport & Highways) ~ 4l14f(tj4,~TT /Regional

~--

-~,CHECK - LIST~~

Guidelines For Project Directors For Processing The Proposal For Laying Electrical Power Cable In The Land Across" Certificate for conformimg of all standard condition issued vide, 2. Ministry Circular NO.HN-III/P/66/76 Dated 18/19-11-1976

3. Ministry Circular No. RW/NJ-111/P/66/76 Dated 01-05-19824. Miriistry Circular No. RW/NH-11 037/1/86-001(11) Dated 28-07-19935. Ministry Circular No. RW/NH/11067/!/86 001 Dated 19-04-19956. Ministry Circular No. RW/NH/34066/2/95/S&S Dated 25-10-19997. Ministry Circular No. RW/NH-34066/7/2003 S&R Dated 17-09-20038 .Ministry Circular no. RW/NH-33044/29/2015/S&R® dt.22nd November 2016

Check list for getting approval for laying of water supply pipe line on NH landS.NO t~ ITEM I INFORMATION I STATUS REMARKS.,~~.

Augumentation of water supply to District in1 General InformationDeoqarn

1.1 Name And Address Of The ApplicantExecutive Engineer ,MEGA lift IrrigationProjects, Keonjhar, Odisha 758001

1.2 National Highway Number NH49(OLD NH-6)1.3 STATE ODISHA104 Location NEAR BARKOTE BRIDGE1.5 Chainace in km 448+0001.6 Length in Metres Total crossing length-45.0 x 2 = 90 .0 M

Width Of Available RoW 45.0M(a)Left Side From Centre Line (Towards

22.50 M1.7 Increasing Chalnaoe IKM Direction)

(b)Right Side From Centre line (Towards22.50 M

Increasing Chalnaoe IKM Direction)

Proposal To Lay Underground Power cable

1.8 (a) Left Side From Centre line (Towards 37.5 MIncreasing Chainage IKM Direction)(b)Right Side From Centre Line (Towards

37.5 MIncreasing Chalnaqe IKM Direction)Proposal To Acquire Land J

1.9 I (a) Left Side From Centre Line NA .<>.

l(b)RiQht Side From Centre Line NA --

Whether Proposal Is In The Same Side WhereNA

1.10 Land Is Not To Be Acquired

If Not Then Where To Lay The Water Pipeline

1.11 Details Of Already Laid Services, If Any AlongNA

The Proposal Route1.12 Number Of Lanes (2/4 or 618) Existing 2 lane

1.13Proposed Number Of Lanes (2 Lanes With

4 lane proposedPaved Shoulders)Service Road (Existing or Not)Y/N If Then Which

N.A1.14 Side .

l(a)Left Side From Centre line(Width)l(b)Right Side From Centre Line (width)Proposed Service Road N.A

1.15 I (a) Left Side From Centre Line(Width)I (b) Right Side From Centre Line (width)

Whether Proposal to lay Water supply pipeline isafter the service road or between the service and N.Amain carriageway

A

~

~-.,. "'!':.·''''Htltla 11ft

~ ~ tlWa¥ Engineef E,xe t''Ie EngIi1'.::. •• tI •••• III••• " A.I~1rity"II~II,. Proiects• Keolijl'!!l.i IEDURAI )'

cum Sf. 9

Page 4: (~~aTrt~~) ~~ax :.91-674-2361770 National Highways ... 1330-2691143646.pdf · National Highways Authority ofIndia (Ministry of Road Transport & Highways) ~ 4l14f(tj4,~TT /Regional

~ , Check list for getting approval for laying of water supply pipe line on NH land··S.NO ITEM INFORMATION I STATUS REMARKS

, ~(a) Carrying of sewage/gas pipelines on highwaybridges shall not be permitted as furmes/gases

, pipes can accelerate the process of corrosion or N.Amay cause explosions,thus,being much moreinjurious than leakage of water

(b) Carrying of water pipe lines on bridges shallalso be discourage(d)However ,if the watersupply aUtQorities seem to have no othenviable .alternativeand approach the highway authoritywell in time before the design of the bridge is N.Afinalize permitted to carry the pipeline on

1.16 independent superstructure,supported onextended portions of piers and abutments in

I

such a manner that in the final arrangemen I

enough free spade around the superstructure ofthe bridge remains available for inspection andrepairs,etc

Cc) Cost of required extension of thesubstructure as well as that of the supporting

No structure on the routesuperstructureshall be borne by the agency in I

charqe of the utilities.

(d) Services are not being allowedindiscriminately on the parapet/any part of the

N.A.

bridges,safety of bridges has to be kept in viewwhile permitting various services along bridg(e)Approvals are to be accorded in this regard withthe concurrence of the Ministry's Project ChiefEngineers only. ~

..~.•..If crossings of the road involvedIf yes, it shall be either encased in pipes orthrough structure or conduits specially built forthat purpose at the expenses ofthe agencyowning the line . .:

/"- (a) Existing drainage structures shall not beallowedto carry the lines .

Agreed

(b) is iton a line normal to NH Yes ,

(c ) crossings shall not be too near the existingstructures on the National Hiqhway.the minium

No existing structuredistance being 15 meter, what is the distancefrom the existing structures .

(d) The casing pipe ( or conduit pipe in the caseof electric cable) carrying the utility line shall be

~of steel .cast iron, or reinforced cement concrete

200mm Dia GI Conduitand have adequate strength and be largeenough to permit ready withdrawal of the carrier Proje t Girectnr

pipe/cable. Pl'1Ijnct Im ementalian Unit1.17 ilHlIlllIllI Hlghw y Authcrit, d IiB~

(e) Ends of the casing I conduit pipe in shall be .

sealed from the outside, so that it does not act Yes agreed 0as a drainaae oanh) . -(t) The casing / conduit pipe shall be sealel1(P ;~~ . f

Ye:0~E.y.ec twe E.1\9\l\e

drain to in cuts and Ioe of slope in the fills. • ••.••.•!:Ititt PfoieclS. ~ecnihal

~v=: ·V

Team t.e3(fer-wn Sr. Kighw3Y Engineer

Page 5: (~~aTrt~~) ~~ax :.91-674-2361770 National Highways ... 1330-2691143646.pdf · National Highways Authority ofIndia (Ministry of Road Transport & Highways) ~ 4l14f(tj4,~TT /Regional

,Check list for getting approval for laying of water supply pipe line on NH land

"v

"S,NO ITEM INFORMATION I STATUS REMARKS, (g) The top of the casing I conduit pipe should be,

at least 1.2 meter below the surface of the roadYes agreed

>subject to being at least 0.3 m below the draininvert.(h)Crossing shall be by boring method (HOD)specially where the existing road pavement is of

Yes agreedcement concrete or dense bituminous concretetype.

(i) The ca~i.ng Iconduit pipe shall be installed with ....~... Ian even beanng throughout its length and in

Yes agreedsuch a manner as to prevent the formation of awaterway along it.

2 Document IDrawing Enclosed with the proposal. Enclosed

Cross section showing the size of the trench forCable will be cross by pushing method

open trenching method (It Is Normal size of 1.2deep x 0.3 m wide) .

(HOD)

(i) should not be greater than 60 cm wider thanthe outer diameter of the pipe.(ii) Located as clos to the extreme edge of theright of way as possible but not less than 15

Yes agreedmeter from the centre lines of the nearest

2.1 carriaoe way .

(iii) Shall not be permitted top run along theNational highway when the road formation is Yes agreedsituated in double cuttin(g) Nor shall these belaid over existing culverts and bridqes.

(iv) These should be also laid that their top is atYes agreed and cable laying will be done

least 0.6 meter below the ground level so as not .to obstruct drainage of the road land .

1.2mtr below GL. .".,

2.2Cross section showing the size of pit and HOD methord used and location of cablelocation of cable for HOD method. alreadv shown.

Strip plan/Route plan showing power cable/" line,chainage,width of ROW,distance of

2.3 proposed cable from the edge of ROW Yes attached in drawing,important mile stone,intersections,crossdrainage works etc.

,

2.4 Methodology for laying of Power cable line. By pushing & Horizontal directional drilling

Open trenching method (may be allowed in theutility corridor only where pavement is neither

N.Acement concrete nor dense bituminous concretetype if yes, methodology or refilling of trench.

(a)The trench width should be at least 30 cm. butnot more than 60 cm wider than the outer N.A l)~diameter of the pipe. .~ ,PMl1~el g,rechlr

Pruject ImplementatioD O.ftbU8DSI HiohwllyAutharitr If ,.~

() IEOMJHAIE)4ecut~n9inee~ r

MegaUf'(. Pro\ecl!. Keo(\jh8

Page 6: (~~aTrt~~) ~~ax :.91-674-2361770 National Highways ... 1330-2691143646.pdf · National Highways Authority ofIndia (Ministry of Road Transport & Highways) ~ 4l14f(tj4,~TT /Regional

,Check list for getting approval for laying of water supply pipe line on NH lande. ,

·'S.NO ITEM INFORMATION I STATUS REMARKS<,

(b) For filling of the trench ,bedding shall be to adepth of not less than 30 cm. it shall consist of

, granular material ,free of lumps clods andcobbles ans graded to yield a firm surface N.Awithout sudden change in the bearing valu(e)Unsuitable soil and rock edges should beexcavted and replaced by selected material.

(c) The backfill shall be completed in two stagesN.A.-t.~,,- I .

v : ',

(i) side fill the level of the top of the pipe and2.4.1

(ii) Overfill to the bottom of the road crust.

(d) The side fill shall consist of granular materiallain in 15 cm layers each consolidated bymechanical tampering and controlled addition of

N.Amoisture of 90% of the proctor's density as thematerial that had been removed .consolldatlonby saturation or pending will not be permitted.

(e) The road crust shall be built to the samestrength as the existing crust on either side of

N.Athe trono(h)care shall be taken to avoid theformation of dip at the trench.

(f) The excavation shall be protected byflagman,signs and barricades and red lights Yesdurinq the nioht hours.(g) If required, a diversion shall be constructed atthe expense of the agency owning the utility line Yes ..

.~.2.4.2 Horizontal Directional drilling (HDD) Method. Yes

.'

Laying of Power cable pipeline through CD workHDD.

and method lavino .

(a) Open approaches the water mains/cablesshall be carried along a line as close to the dege

'2.4.3 of the right of the way as possible up to adistance of 30 m from the bridge and subject to Yesall other stipulation contained in the ministry's I

guidelines issued with letter NH-H1I66176 dated19-11-1976.

3 Draft License agreement signed by twoEnclosed

witnesses.

Performance bank guarantee in favour of NHAIhas to be obtained @RS.50/- per running meter

~4 (parallel to NH) and RS.1,OO,OOOper crossing of BGG shall be depoisted by the applicant at

NH,for a period of one year intially (extendable if the time of permission p .required till satisfactory completion of work) as a r~irliDlmm

~FMi~ef IfII 18111811tBlin UIItsecurity for ensuring/making. M~I!HHftI Hlgh~ Ity AulkBrlq I!! ~

Page 7: (~~aTrt~~) ~~ax :.91-674-2361770 National Highways ... 1330-2691143646.pdf · National Highways Authority ofIndia (Ministry of Road Transport & Highways) ~ 4l14f(tj4,~TT /Regional

r,

, \Check list for getting approval for laying of water supply pipe line on NH land

S.NO ITEM INFORMATION I STATUS REMARKS

- "- good the excavated trench for laying the. cables/ducts by proper filling and compaction> ,clearing dedris/loose earth produced due to

executing of trenching at least 50 m away fromthe edge of the right of way no payment shall bepayable by the NHAI to the license for clearingdebris/loose earth.

4.1 Performance BG as per above is to be beYes

obtained s». • .4.2 Confirmation' of BG has been obtained as per Will be obtained after permission of

NHAI aiudelines . crossino is issued

5 Affidative /undertaking from the application for.

Not to damage to other utility ,if damaged then to5.1 pay the losses either to NHAI or to the Yes Agreed

concerned aoenoy .5.2 Renewal of bank guarantee. N.A

5.3 Confirming all standard condition of NHAI'sYes binding and undertaking obtainedIouidellnes .

5.4 Shifting to water pipelines as and when requiredYes binding and undertaking obtained

bv NHAI at their own cost.5.5 Shiftino due to Lanning I widening of NH . Yes binding and undertaking obtained

5.6 Indemnity against all damages and claimsYes binding and undertaking obtainedclause (xxiv) .

5.7 Traffic movement during laying of water pipelineYes binding and undertaking obtained

to be manaaed bt the aoolicant .

5.8 If any claim is raised by the concessinaire thenYes binding and undertaking obtained

the same has to be paid by the applicant.

Prior approval of the NHAI shall be obtained .before undertaking any work of the .~.

5.9 installation,shifting or repairs,of alteration to the Yes binding and undertaking obtainedshowing water pipe line located in the NationalHighway right of ways.

---- Expenditure, if any incurred by NHAI forrepairing any damage cause to the National

5.10 Highway by the laying,maintenance or shifting of Yes binding and undertaking obtainedthe water pipe line will be borne by the agency ,owning the line.

If the NHAI consider it necessary in future tomove the utility line for any work of improvement .

8or repairs of the road ,it will be carried out asYes binding and undertaking obtained ,~desired by the NHAI or the cost of the agency

~owning the utility line with in a reasonable time

Pro(not exceeding 60 days)of the intimation given. Proiect Imlllem~tati.a n.lt.:. UIsltwu1 t~.rit1"~

Cerficate from the application in the following "w ••. lElllIJ "Iformat:Yes

11~ILaYing of water pipeline will not have any'" eleterious effects on any of the bridge Yescomponents and roadway safety for traffic. - rL

~7( r:: l~ngin..!E,y.eC\.I lJe eQr.inst~\\ {Olece, 'N

1-',,.. t'\';iC;'~' lAe~a'Y":~'" ~Y,? 'c'_, :~'! .

Page 8: (~~aTrt~~) ~~ax :.91-674-2361770 National Highways ... 1330-2691143646.pdf · National Highways Authority ofIndia (Ministry of Road Transport & Highways) ~ 4l14f(tj4,~TT /Regional

;

.~~~~, ~C=h=e=c=k=l=is~t~fo~r~g~e=tt=i=n~g=a~p~p=ro=v=a=l=fo=r=19a=yi=n~g=o=f=w~a~t~e~r~su~p~p§l~y~p=ip~e~li=ne~o~n=N=H==la=n=d~~~S.NO ITEM INFORMATION I STATUS REMARKS

- 5.1.2 (ii)tor Lanning "we do undertake that I will,;:eI6cates service road/approach road/utilities at

, my own cost not withstanding the permission Yesgranted within such time as well be stipulated byNHAI" for future six-Ianning or any otherdevelopment.

I

l~

6 Who will sign the agreement on behalf or water Executive Engineer ,MEGA Lift Irrigationpipeline aqenCV . Projects, keonihar

7 Certiflcatefcorn the Project Director I

7.1

Certificate for confirming of all standard conditionissued vide ministry circular NO.NH 41 (58)/68Dated 21-01-1969 Ministry circular No.RW/NHIIII/P/66/76 Dated 18/19/1/1976 ,Ministrycircular no - RW/NH-lIllp/66176,dated 11.5.1982,Ministry circular No.RW/NH-11037/1/86-DOI N(II)DA TED 2/1/1993 Ministry circular NO.RW/NH- 011037/1/86-DOI Dated 19-1-1995.Ministrycircular RW/NH-3406612195/S&R(B),dt.17.09.2003, 1. Ministrycircular no - RW/NH- 33044/29/2015/S&R(R) dt.22.11.2016

Certificate From PD In the following format:(i) itis certified that any other location of the waterpipeline would be extremely difficult andunreasonable costly and the installation of water Npipeline With in ROW will not adversely affect the 0

design, stability and traffic safety of the highway.nor the likely future improvement such aswid~ning of the carrigeway easing of curves etc.

7.2(ii) for 6 Lanning(a) Where is feasibility available 11 Ido certify thatthere will be no hindrance to proposed sixLanning based on the feasibility report ..-N F\.considering proprosed srructure at the sidelocatoin".

--(b) In case feasibility Report is not available -"ldo certify that sufficient ROW is available at sitefor accommodating proposed six Lannfng".

8

If NH section proposed to be taken up by NHAIon BOT basis -a clause is to be inserted in theagreement "the permitted highway on whichLicensee has been granted the right to lay watepipeline cablel duct has also been granted as aright to way to the concessionaire under theconcession agreement for up gradation of (-section from km --to km---of NH nO.--onbuild ,operate and transfer Basis) andtherefore,the license shall Honour our the same.

no

9 Who will supervise the work of laying of electrical ArtIpower cable. ./\ A pp~an

Page 9: (~~aTrt~~) ~~ax :.91-674-2361770 National Highways ... 1330-2691143646.pdf · National Highways Authority ofIndia (Ministry of Road Transport & Highways) ~ 4l14f(tj4,~TT /Regional

,---------I

Check list for getting approval for laying of water supply pipe line on NH land·'S.NO ITEM INFORMATION I STATUS REMARKS

~Who will ensure .that the defects in road portion

, 10 after laying of water pipeline are corrected and if Applicant, not corrected then what action will be taken.

Who will pay the claims for damage done11 Idisruption in working of concessionaire if asked Applicant

bv the concessionaire .A certificate from PD that he will entre the

12 proposed permission in the register records ofNo

the permission in the prescribed proforma(copy .enclosed) ':~':if any previous approval is accorded for ofunderground electrical power cable then photo

13 copy of register of records of permission N.Aaccorded as maintained by PD then copyenclosed.

_\..~~.t.\\r:::'v;.,', v ..:)

.; .:

t'·Executtv ngmeerMeg~UftP eels,Keonjhar

'nijvtt'Direttv'Mljlet IlIIpll\lllntatialr'thilt

MatlanalHilh •• , AuthDrityJlf,~1£ Jl.!I.JJU.i

-- ---_._--- ----~---------------------------