City of Riverside Attachment D FINAL ENVIRONMENTAL IMPACT REPORT OCTOBER 2012 RIVERSIDE TRANSMISSION RELIABILITY PROJECT ANA 032-248 (PER-02) RPU (October 2012) SB 124464/124462 ATTACHMENT D: PRELIMINARY 230 KV PROJECT LAYOUT

Upload: others

Post on 20-Jun-2020

7 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ATTACHMENT D: PRELIMINARY 230 KV PROJECT LAYOUT...JB8 JB7 JB6 JB5 JB4 JB3 JB2 I6 / JA1 JB9 / JD1 JA2 / JB1 RIVERSIDE TRANSMISSION RELIABILITY PROJECT ° 0 500 1,000 2,000 Feet Scale:

City of Riverside Attachment D

FINAL ENVIRONMENTAL IMPACT REPORT OCTOBER 2012 RIVERSIDE TRANSMISSION RELIABILITY PROJECT

ANA 032-248 (PER-02) RPU (October 2012) SB 124464/124462

ATTACHMENT D: PRELIMINARY 230 KV PROJECT LAYOUT

Page 2: ATTACHMENT D: PRELIMINARY 230 KV PROJECT LAYOUT...JB8 JB7 JB6 JB5 JB4 JB3 JB2 I6 / JA1 JB9 / JD1 JA2 / JB1 RIVERSIDE TRANSMISSION RELIABILITY PROJECT ° 0 500 1,000 2,000 Feet Scale:

City of Riverside Attachment D

FINAL ENVIRONMENTAL IMPACT REPORT OCTOBER 2012 RIVERSIDE TRANSMISSION RELIABILITY PROJECT

ANA 032-248 (PER-02) RPU (October 2012) SB 124464/124462

THIS PAGE INTENTIONALLY LEFT BLANK

Page 3: ATTACHMENT D: PRELIMINARY 230 KV PROJECT LAYOUT...JB8 JB7 JB6 JB5 JB4 JB3 JB2 I6 / JA1 JB9 / JD1 JA2 / JB1 RIVERSIDE TRANSMISSION RELIABILITY PROJECT ° 0 500 1,000 2,000 Feet Scale:

City ofRiverside

RiversideCounty

City ofJurupa Valley

RiversideCounty

AX5 AX4

AX3 AX2AX1

Wildlife Sub

RIVERSIDE TRANSMISSION RELIABILITY PROJECT° 0 1,000 2,000500

Feet

Scale: 1 in = 1,000 mi

Page 1 of 6

Preliminary 230 kV Project Layout

Legend

City Boundary

Indicative Access

Structure Location

Marshalling YardWilderness Substation

230 kV Centerline

The data presented here are based on preliminary engineering design performed to date and represent the best available information used to establish anticipated construction activities and assess impacts to the environment. The land disturbance estimates, locations of towers, access roads, etc. provided are therefore subject to change based on final engineering.

Page 4: ATTACHMENT D: PRELIMINARY 230 KV PROJECT LAYOUT...JB8 JB7 JB6 JB5 JB4 JB3 JB2 I6 / JA1 JB9 / JD1 JA2 / JB1 RIVERSIDE TRANSMISSION RELIABILITY PROJECT ° 0 500 1,000 2,000 Feet Scale:

City ofRiverside

RiversideCounty

City ofJurupa Valley

D6 D5D4

D3

D2

AX20 AX19 AX18 AX17AX16

AX15

NO-9

NO-8

NO-7 NO-6

NO-12

NO-11

NO-10

AX21 / D1

RIVERSIDE TRANSMISSION RELIABILITY PROJECT° 0 1,000 2,000500

Feet

Scale: 1 in = 1,000 mi

Page 2 of 6

Preliminary 230 kV Project Layout

Legend

City Boundary

Indicative Access

Structure Location

Marshalling YardWilderness Substation

230 kV Centerline

The data presented here are based on preliminary engineering design performed to date and represent the best available information used to establish anticipated construction activities and assess impacts to the environment. The land disturbance estimates, locations of towers, access roads, etc. provided are therefore subject to change based on final engineering.

Page 5: ATTACHMENT D: PRELIMINARY 230 KV PROJECT LAYOUT...JB8 JB7 JB6 JB5 JB4 JB3 JB2 I6 / JA1 JB9 / JD1 JA2 / JB1 RIVERSIDE TRANSMISSION RELIABILITY PROJECT ° 0 500 1,000 2,000 Feet Scale:

City ofRiverside

RiversideCounty

City ofJurupa Valley

I5I4 I3 I2

D9 D8 D7

D17

D16

D15 D14 D13 D12 D11 D10

D18 / I1

RIVERSIDE TRANSMISSION RELIABILITY PROJECT° 0 1,000 2,000500

Feet

Scale: 1 in = 1,000 mi

Page 3 of 6

Preliminary 230 kV Project Layout

Legend

City Boundary

Indicative Access

Structure Location

Marshalling YardWilderness Substation

230 kV Centerline

The data presented here are based on preliminary engineering design performed to date and represent the best available information used to establish anticipated construction activities and assess impacts to the environment. The land disturbance estimates, locations of towers, access roads, etc. provided are therefore subject to change based on final engineering.

Page 6: ATTACHMENT D: PRELIMINARY 230 KV PROJECT LAYOUT...JB8 JB7 JB6 JB5 JB4 JB3 JB2 I6 / JA1 JB9 / JD1 JA2 / JB1 RIVERSIDE TRANSMISSION RELIABILITY PROJECT ° 0 500 1,000 2,000 Feet Scale:

City ofJurupa Valley

City ofNorco

City ofNorco

City ofEastvale

JD3

JD2

JB8 JB7 JB6 JB5 JB4

JB3

JB2

I6 / JA1

JB9 / JD1

JA2 / JB1

RIVERSIDE TRANSMISSION RELIABILITY PROJECT° 0 1,000 2,000500

Feet

Scale: 1 in = 1,000 mi

Page 4 of 6

Preliminary 230 kV Project Layout

Legend

City Boundary

Indicative Access

Structure Location

Marshalling YardWilderness Substation

230 kV Centerline

The data presented here are based on preliminary engineering design performed to date and represent the best available information used to establish anticipated construction activities and assess impacts to the environment. The land disturbance estimates, locations of towers, access roads, etc. provided are therefore subject to change based on final engineering.

Page 7: ATTACHMENT D: PRELIMINARY 230 KV PROJECT LAYOUT...JB8 JB7 JB6 JB5 JB4 JB3 JB2 I6 / JA1 JB9 / JD1 JA2 / JB1 RIVERSIDE TRANSMISSION RELIABILITY PROJECT ° 0 500 1,000 2,000 Feet Scale:

City ofEastvale

City ofJurupa Valley

JD9

JD8

JD7

JD6

JD5

JD4

JD14

JD13

JD12

JD11

JD10

RIVERSIDE TRANSMISSION RELIABILITY PROJECT° 0 1,000 2,000500

Feet

Scale: 1 in = 1,000 mi

Page 5 of 6

Preliminary 230 kV Project Layout

Legend

City Boundary

Indicative Access

Structure Location

Marshalling YardWilderness Substation

230 kV Centerline

The data presented here are based on preliminary engineering design performed to date and represent the best available information used to establish anticipated construction activities and assess impacts to the environment. The land disturbance estimates, locations of towers, access roads, etc. provided are therefore subject to change based on final engineering.

Page 8: ATTACHMENT D: PRELIMINARY 230 KV PROJECT LAYOUT...JB8 JB7 JB6 JB5 JB4 JB3 JB2 I6 / JA1 JB9 / JD1 JA2 / JB1 RIVERSIDE TRANSMISSION RELIABILITY PROJECT ° 0 500 1,000 2,000 Feet Scale:

City ofJurupa Valley

City ofEastvale

JD26

JD25

JD24

JD23

JD22JD21JD20JD19

JD18

JD17

JD16

JD15

M1-T2

RIVERSIDE TRANSMISSION RELIABILITY PROJECT° 0 1,000 2,000500

Feet

Scale: 1 in = 1,000 mi

Page 6 of 6

Preliminary 230 kV Project Layout

Legend

City Boundary

Indicative Access

Structure Location

Marshalling YardWilderness Substation

230 kV Centerline

The data presented here are based on preliminary engineering design performed to date and represent the best available information used to establish anticipated construction activities and assess impacts to the environment. The land disturbance estimates, locations of towers, access roads, etc. provided are therefore subject to change based on final engineering.