attachment fastronaut high 1.63 $1,437,044 district school security 1.00 $61,932 building access...
TRANSCRIPT
Facilities Services2700 Judge Fran Jamieson WayViera, Florida 32940-6601
Campus Capital Needs Sales Surtax Funded
Attachment F
Estimate
Detail ReportCondition CodeFacility
Astronaut High 1.63 $1,437,044District School Security $61,9321.00
Building Access Security Equipment $61,932Public Access Control 1.00 $61,932
Educational Technology $138,4192.00
Technology Equipment Renewal $138,419Computer Replacement 3.00 $36,411Server Replacement 4.00 $39,998Switch Replacement 1.00 $28,798Telephone System Replacement 1.00 $30,811Wireless Access Points Replacement 1.00 $2,400
Facility Renewal $1,236,6931.50
ADA Code Deficiency Corrections $56,909Exterior Stairs and Railings 2.00 $56,909
Central Mechanical Plant Renewal $301,920Makeup Water Secondary Backflow Preventer and Water Treatment 1.00 $301,920
Cooling and Heating Control System Renewal $211,602Building Automation System 2.00 $211,602
Air Conditioning and Air Distribution Equipment Renewal $283,856HVAC Systems EPA Non Compliant Refrigerant 1.00 $283,856
Exterior Building Wall Finish System Renewal $349,623Exterior Finish 2.00 $346,552Soffits 1.00 $3,071
Exterior Door/Window/Louver System Renewal $17,243Windows 2.00 $17,243
Building Water and Sanitary Piping System Renewal $3,685Supply Piping 2.00 $3,685
Electrical Distribution System Renewal $8,314Panel Boards 1.00 $8,314
Interior and Exterior Lighting Equipment Renewal $3,543Emergency Lighting 1.00 $3,543
July 22, 2014
Exhibit B ‐‐ Sales Surtax Summary Form
Astronaut High SchoolConstruction Manger Firm Name: Core Construction Date: January 9, 2020
DISTRICT SCHOOL SECURITY60 01 Perimeter/Entry Fencing and Gates60 02 Building Access and Security Equipment
EDUCATIONAL TECHNOLOGY65 01 Technology Building Cabling65 02 Technology Equipment Renewal65 03 Classroom Technology Infrastructure (Electrical, HVAC, Data)
FACILITY RENEWAL50 00 Facility Renewal (design and preconstsruction) $122,137.00 ‐$122,137.0051 01 Safety and Building Code Deficiency Corrections51 02 ADA Code Deficiency Correction $56,909.00 $56,909.0051 03 Fire Alarm System Renewal52 04 Central Mechanical Plant Renewal $529,890.62 $301,920.00 ‐$227,970.6252 05 Cooling and Heating Control System Renewal $267,387.22 $211,602.00 ‐$55,785.2252 06 Air Conditioning and Air Distribution Equipment Renewal $481,755.57 $283,856.00 ‐$197,899.5753 07 Roofing System Renewal $140,729.91 ‐$140,729.9153 08 Exterior Building Wall Finish System Renewal $349,623.00 $349,623.0053 09 Exterior Door/Window/Louver System Renewal $17,243.00 $17,243.0052 10 Building Water and Sanitary Piping System Renewal $16,043.23 $3,685.00 ‐$12,358.2352 11 Water Heating System Renewal54 12 Electrical Supply System (Transformers, Switchgear, Wiring) Renewal54 13 Electrical Distribution System Renewal $116,981.91 $8,314.00 ‐$108,667.9154 14 Electrical Components (Lightning Protection, Intercom, Generator) Renewal*54 15 Interior and Exterior Lighting Equipment Renewal $3,543.00 $3,543.0052 16 Air Supply and Exhaust System Renewal52 17 Site Utility Systems (Gas, Electric, Storm, Water, Sanitary) Renewal
Additional administration and permitting $10,000.00 ‐$10,000.00Sales surtax supplement ‐$460,000.00 $460,000.00
$1,552,788.47 $1,236,695.00 ‐$327,863.00 $11,769.53
BalanceAttachment F Spent & EncumberedGroup/Category Description Proposed Price
Month Year Revenue Cumulative Security 50% ET 15% Facilities 35% Total
August 2019 $1,294,012 $1,294,012 $647,006 $194,102 $452,904 $1,294,012September 2019 $3,474,204 $4,768,216 $1,737,102 $521,131 $1,215,971 $3,474,204October 2019 $3,440,101 $8,208,317 $1,720,051 $516,015 $1,204,035 $3,440,101November 2019 $4,526,234 $12,734,551 $2,263,117 $678,935 $1,584,182 $4,526,234December 2019 $3,425,373 $16,159,924 $1,712,687 $513,806 $1,198,881 $3,425,373January 2020 $3,315,820 $19,475,744 $1,657,910 $497,373 $1,160,537 $3,315,820February 2020 $5,420,075 $24,895,819 $2,710,038 $813,011 $1,897,026 $5,420,075March 2020 $3,315,493 $28,211,312 $1,657,747 $497,324 $1,160,423 $3,315,493April 2020 $3,355,854 $31,567,166 $1,677,927 $503,378 $1,174,549 $3,355,854May 2020 $5,389,791 $36,956,957 $2,694,896 $808,469 $1,886,427 $5,389,791June 2020 $3,554,107 $40,511,064 $1,777,054 $533,116 $1,243,937 $3,554,107July 2020 $3,574,694 $44,085,758 $1,787,347 $536,204 $1,251,143 $3,574,694August 2020 $4,954,442 $49,040,200 $2,477,221 $743,166 $1,734,055 $4,954,442September 2020 $3,474,204 $52,514,404 $1,737,102 $521,131 $1,215,971 $3,474,204October 2020 $3,440,101 $55,954,505 $1,720,051 $516,015 $1,204,035 $3,440,101November 2020 $4,526,234 $60,480,739 $2,263,117 $678,935 $1,584,182 $4,526,234December 2020 $3,218,487 $63,699,226 $1,609,244 $482,773 $1,126,470 $3,218,487January 2021 $3,315,820 $67,015,046 $1,657,910 $497,373 $1,160,537 $3,315,820February 2021 $5,420,075 $72,435,121 $2,710,038 $813,011 $1,897,026 $5,420,075
Total $72,435,121 $35,570,555 $10,671,166 $24,899,388 $72,435,121Estimated based on prior year receipts
Approved/Requested Allocations: Security ET Facilities Total
Repayment of temporary transfer ‐ security to facilities 9,332,130.58$ 9,332,130.58$ Allocation to security previously approved but not used) 280,144.46$ 280,144.46$ Building Automation System plan (Board approved September 24, 2019) $200,000 200,000.00$ Columbia, McAuliffe, Challenger 7 HVAC (Board approved September 24, 2019) $7,000,000 7,000,000.00$ Computer replacement (Board approved September 24, 2019) 500,000$ 500,000.00$ Longleaf Elementary facility renewal ‐ supplemental funding ICOC Approved 12/11/2019 250,000$ 250,000.00$ Cocoa Beach High facility renewal ‐ supplemental funding ICOC Approved 12/11/2019 1,000,000$ 1,000,000.00$ Satellite High facility renewal ‐ supplemental funding ICOC Approved 12/11/2019 1,200,000$ 1,200,000.00$ Mims Elementary facility renewal ‐ supplemental funding ICOC Approved 12/11/2019 Board agenda 1/28 1,200,000$ 1,200,000.00$ McNair Elementary facility renewal ‐ supplemental funding ICOC Approved 12/11/2019 1,000,000$ 1,000,000.00$ Edgewood Jr./Sr. High facility renewal ‐ supplemental funding ICOC Approved 12/11/2019 1,600,000$ 1,600,000.00$ Additional allocation Columbia, McAuliffe, Challenger 7 HVAC ICOC Approved 12/11/2019 2,000,000$ 2,000,000.00$ Cambridge Elementary facility renewal ‐ supplemental request ICOC Approved 01/09/2020 Board agenda 1/14 700,000$ 700,000.00$ Enterprise Elementary facility renewal ‐ supplemental request ICOC Approved 01/09/2020 Board agenda 1/14 650,000$ 650,000.00$ Titusville High facility renewal ‐ supplemental request ICOC Approved 01/09/2020 Board agenda 1/14 770,000$ 770,000.00$ Imperial Estates facility renewal ‐ supplemental request ICOC Approved 01/09/2020 Board agenda 1/14 520,000$ 520,000.00$ Astronaut High facility renewal ‐ supplemental request ICOC Approved 01/09/2020 Board agenda 1/28 460,000$ 460,000.00$ Space Coast Jr./Sr. High facility renewal ‐ supplemental request ICOC Approved 01/09/2020 Board agenda 1/28 450,000$ 450,000.00$ Suntree Elementary ‐ GMP Pending ICOC Approved 01/09/2020 240,000$ 240,000.00$ Manatee Elementary ‐ supplemental request ICOC Approved 01/09/2020 Board agenda 1/28 460,000$ 460,000.00$ Sunrise Elementary ‐ GMP pending ICOC Approved 01/09/2020 270,000$ 270,000.00$ Gardendale Alternative Learning Center ‐ GMP pending ICOC Approved 01/09/2020 200,000$ 200,000.00$ Clearlake Adult Education Center ‐ GMP pending ICOC Approved 01/09/2020 300,000$ 300,000.00$ Cocoa Beach Jr./Sr. High AHU 8.2 ICOC Approved 01/09/2020 Board agenda 1/14 200,000$ 200,000.00$ Bayside High structural repair ‐ GMP pending ICOC Approved 01/09/2020 400,000$ 400,000.00$ Jupiter Elementary ‐ GMP pending ICOC Approved 01/09/2020 100,000$ 100,000.00$ Riviera Elementary ‐ GMP pending ICOC Approved 01/09/2020 300,000$ 300,000.00$ Palm Bay High (roof top AHUs Building 7 and elevator) ‐ GMP pending ICOC Approved 01/09/2020 500,000$ 500,000.00$ Palm Bay High (3 new chillers) ‐ GMP pending ICOC Approved 01/09/2020 1,400,000$ 1,400,000.00$
Total Allocation 9,612,275$ 500,000$ 23,370,000$ 33,482,275$
Net Remaining Allocation 25,958,279$ 10,171,166$ 1,529,388$ 38,952,846$
Updated 01/13/2020
Exhibit C- Project Assignment Page 1 of 4
EXHIBIT C
GUARANTEED MAXIMUM PRICE
TO THE CONTINUING CONTRACT FOR
CONSTRUCTION MANAGEMENT SERVICES/RFQ #18-Q-091-DR
BY AND BETWEEN
THE SCHOOL BOARD OF BREVARD COUNTY, FLORIDA
2700 Judge Fran Jamieson Way
Viera, Florida 32940-6601
Phone: (321) 631-1911
Fax: (321) 633-4646
AND
CORE CONSTRUCTION SERVICES OF FLORIDA, LLC
FOR THE CONSTRUCTION OF:
SCHOOL: Astronaut High School
PROJECT: Facility Renewal
Exhibit C- Project Assignment Page 2 of 4
ARTICLE 1. GUARANTEED MAXIMUM PRICE (GMP)
1.1.1 Guaranteed Maximum Price (GMP): Construction Manager guarantees that it shall not exceed a Guaranteed Maximum Price (GMP) of One Million, Five Hundred Fifty-Two Thousand, Seven Hundred Eighty-Eight Dollars and Forty-Seven Cents ($1,552,788.47) for the identified Sub-Project. 1.2 Basis of the GMP: 1.2.1 Construction Documents: The Scope of Work for the GMP shall be as defined in the
Construction Documents, prepared by CDE Company, titled Astronaut High School Facility Renewal and dated November 20, 2019.
1.2.2 List of Contract Documents attached as Exhibit C-1. 1.2.3 Exceptions, Clarifications and Exclusions: The Scope of Work defined in the Contract
Documents shall be modified and/or clarified as shown in attached Exhibit C-2. 1.2.4 Truth-In-Negotiation: The Construction Manager certifies that the wage rates and other
factual unit costs supporting the compensation are accurate, complete and current at the time of execution of each Sub-Project of which this certificate is a part. The original price and any additions thereto shall be adjusted to exclude any significant sums by which the Owner determines the Sub-Project amount was increased due to inaccurate, incomplete or non-current wage rates and other factual unit costs and that such original Sub-Project adjustments shall be made within one year following the end of the Agreement.
ARTICLE 2. PROJECT TIME 2.1 Substantial Completion Date: Substantial Completion of the Work as defined in Article 6.1.2 of the
General Conditions to the Continuing Contract for Construction Management Services shall be achieved by July 31, 2020.
2.2 Final Completion Date: Final Completion for the Work as defined in Article 6.1.3 of the General Conditions to the Continuing Contract for Construction Management Services shall be achieved by September 30, 2020.
2.3 Project Schedule: Attached to this Amendment will be a schedule identifying the above noted completion times and intermediate milestone dates estimated for the Project. The proposed schedule shall be integrated into the Construction Manager's CPM Schedule upon approval of its Guaranteed Maximum Price Amendment.
ARTICLE 3. CONSTRUCTION MANAGEMENT FEE 3.1 Construction Management Fee: The Construction Management Fee for the Project shall be either
a ☒Lump Sum or ☐Not-To-Exceed Fee (Check Correct Type – Reference Sub-Project Work Request (Exhibit B) which identifies the Fee type) of Sixty-Eight Thousand, Eight Hundred Thirty-Three Dollars and Eighty-One Cents ($68,833.81).
Exhibit C- Project Assignment Page 3 of 4
ARTICLE 4. REIMBURSABLE GENERAL CONDITIONS COSTS
4.1 General Conditions: General Conditions costs for the Project shall not exceed One Hundred
Seventy-Nine Thousand, Eight Hundred Ninety-Five Dollars and Twelve Cents ($179,895.12).
General Conditions costs shall be reimbursed at actual cost. General Condition costs shall be in
compliance with the General Conditions to the Construction Management Contract (Exhibit A)
and are identified in the attached document, prepared by the Construction Manager titled GMP
Report for Astronaut High School Facility Renewal Renovations and dated January 9, 2020.
ARTICLE 5. LIQUIDATED DAMAGES
5.1 Substantial Completion: Construction Manager shall pay Owner One Thousand Dollars ($1,000.00)
as liquidated damages for each day that Substantial Completion extends beyond the Substantial
Completion Date.
5.2 Final Completion: Construction Manager shall pay Owner Five Hundred Dollars ($500.00) as
liquidated damages for each day that Final Completion extends beyond the Final Completion Date.
ARTICLE 6. PROJECT REPRESENTATIVES
6.1 Owner’s Representative: Owner designates the individual listed below as its Owner’s
Representative to provide direct interface with Construction Manager with respect to Owner’s
responsibilities:
Art Johnson, Owner’s Project Manager.
6.2 Construction Manager's Representative: Construction Managerdesignates the individual listed
below as its Construction Manager's Representative to provide direct interface with Owner with
respect to Construction Manager's responsibilities:
Saravanan Sathya, Construction Manager's Project Manager.
(REMAINDER OF PAGE INTENTIONALLY LEFT BLANK)
January 9, 2020
Mr. Arthur C. Johnson
Project Manager
Brevard Public Schools
Office of Facilities Management Services
1254 S. Florida Avenue
Rockledge, FL 32955
Re: GMP Report for Astronaut High School Facility Renewal Renovations
Dear Mr. Johnson,
We are pleased to submit our GMP Astronaut High School Facility Renewal Renovations. This
estimate is based on the plans and specifications prepared by Schenkel Shultz Architecture &
CDE Company Engineering for Architecture dated November 26, 2019.
CORE Construction’s GMP Estimate Total: $1,552,788.47
A general description of the work included in the GMP Base Bid scope is listed below:
Architectural
• Perform selective demolition of existing conditions.
• Remove, repair, & reinstall (12) existing stainless-steel column covers.
• Infill “The Pit” with structural foam and pour new 4” concrete pad.
• Install new floor tile at “The Pit” level with adjacent floor tile.
• Replace Building 3 roof with new standing seam metal roof system.
• Provide new metal stud framing, drywall, frames, and doors at building 3 bathrooms.
• Install new floor and wall tile in Building 3 bathrooms.
• Reinstall existing faucets and water closets at building 3 bathrooms.
• Install new partition and toilet accessories at building 3 bathrooms.
• Paint ceilings, frames and doors at building 3 bathrooms.
Electrical
• Perform selective demolition of existing conditions.
• Replace selected panels with new panels.
• Replace selected surge suppression devices and add new surge suppression devices on
panels.
• Provide new circuit breakers as indicated.
• Provide electrical support for HVAC equipment renovation work.
Mechanical
• Perform selective demolition of existing conditions.
• Demolition and replacement of chilled water pipe as indicated.
• Demolition and replacement of (2) chilled water pumps.
• Demolition and replacement of (2) chilled water air handling units.
• Demolition and replacement of (2) split dx air handling unit and condensing unit.
• Demolition and replacement of (25) ductless split air handling unit and condensing unit.
• Demolition and replacement of supply and return air ductwork.
• Demolition and replacement of (6) exhaust fans.
• Repairs to existing cooling tower, replacing (4) 10 HP motors.
• Provide new controls as indicated.
Included in this GMP Report you will find the following documents enclosed:
1. Project Description
2a. GMP Estimate Schedule of Values
2b. Schedule Cost Item Breakdown
3. Bid Recap Summary
4. General Conditions
5. General Requirements
6. Summary of Allowances
7. Assumptions and Exclusions
8. Milestone Schedule Dates
9. Enumeration of Documents
10. Anticipated ODP Value – Forthcoming
We look forward to a successful and enjoyable project together. Thank you for this opportunity,
please do not hesitate to contact me directly with any questions or comments.
Respectfully submitted,
Joshua Gray
Preconstruction Manager
CORE Construction Services of Florida, LLC
Astronaut High School
Facility Renewal
PROJECT DESCRIPTION
Astronaut High School is part of the Brevard Public School system and is located at 800 War
Eagle Blvd, Titusville, FL 32796. The campus was originally constructed in 1972.
The existing campus is in need of upgrades to the Electrical and HVAC systems. The design for
renewal was based on the Campus Capital Needs Sales Surtax Funded Report completed in July
22, 2014. This GMP is based on the plans and specifications provided by Schenkel Shultz
Architecture & CDE Company Engineering for Architecture dated November 26, 2019.
This project consists of a base bid to update the HVAC systems includes new mechanical
equipment for Building 1, Building 3, and Building 7 including supporting electrical. The existing
cooling tower will be refurbished, with four new 10 HP fan motors installed. New chilled water
pipe will be installed. Two chilled water pumps, twenty-five ductless split air handing &
condensing units, & six exhaust fans will be replaced. Also included in the base bid is the
installation of a new BAS for mechanical controls.
1/9/2020
DIV. DESCRIPTION TOTAL
1 General Requirements 56,415.94
1a Final Cleaning 1,355.00
2a Demolition 4,410.00
3a Concrete 11,800.00
4a Masonry -
5a Metals 6,070.00
6a Architectural Woodwork (PLAM Cabinets) -
7a Waterproofing & Joint Sealants -
7b Roofing, Gutters, DS, Fascia, Soffit 105,263.00
8a Doors, Frames & Hardware 4,000.00
8b Storefronts, Windows & Glazing 1,350.00
9a Drywall Patching Allowance 4,100.00
9c Acoustical Ceilings & Panels Allowance 5,000.00
9d Carpet & Vinyl Flooring -
9e Tile 32,344.00
9f Painting Allowance 2,990.00
10a Visual Display Boards -
10b Signage NIC
10c Misc. Specialties 4,403.00
10d Metal Walkway Covers -
10g Lockers -
21a Fire Sprinklers -
22a Plumbing 12,000.00
23a HVAC 944,625.00
23b Test & Balance Allowance 12,065.00
26a Electrical 87,500.00
31a Sitework & Paving Allowance -
A TOTAL ALL DIVISIONS 1,295,690.94
B General Conditions 75,473.12
C Design Construction Administration (N/A) -
D General Liability (.402% of Total All Divisions & GCs) 5,512.08
E TOTAL COST OF WORK 1,376,676.14
F CM FEES - [5% of (G)] 68,833.81
G CM Contingency (5%) 64,784.55
H Subcontractor Default Insurance [1.489%] 18,432.63
I Builder's Risk - [0.90% of (A)] 11,661.22
J SUBTOTAL PROPOSED GMP (E+F+G+H+l) 1,540,388.34
K Bond - 0.805% of GMP Subtotal 12,400.13
L TOTAL PROPOSED GMP (J+K) 1,552,788.47
CORE Construction Services of Florida, LLC
Schedule of Values
Brevard Public Schools
Astronaut High School Facility Renewal
GMP Estimate
1 of 1
Astronaut High School Facility RenewalDetailed Estimate - Astronaut High School
EXISTING CONDITIONS 4,410 02-1000 DEMOLITION 4,410
1 Demolition of Existing Conditions 1 LS 4,410.00 4,410
BUILDING STRUCTURE 11,800.00 03-3000 CONCRETE 11,800.00
1 GeoFoam Structural Foam Infill @ The Pit 1 LS 9,750.00 9,750.00
2 Poured Concrete Slab @ The Pit 1 LS 2,050.00 2,050.00
MISC METALS 6,070.00 05-5000 MISC METALS 6,070.00
1 New Metal Rainhoods & Bug Screens @ Bldg. 2 1 LS 3,230.00 3,230.00
2 Stainless Steel Column Cover Repair 1 LS 2,840.00 2,840.00
BUILDING ENVELOPE 105,263.00 07-3000 ROOFING 105,263.00
1 New SSM Roof Sytem (Dense Deck, P&S WP) @ Bldg. 3 1 LS 105,263.00 105,263.00
2 New Metal Panel Eaves @ Bldg. 3 - -
3 New Metal Soffits @ Bldg. 3 - -
4 New 7" Gutters & Downspouts @ Bldg. 3 - -
DOORS & WINDOWS 5,350.00 08-2000 DOORS, TRIM, & HARDWARE 4,000.00
1 Replace Doors @ Bldg. 3 Bathrooms 1 LS 4,000.00 4,000.00
2 Replace Door 801A & 800B Offset Astragals - -
08-8420 WINDOWS 1,350.00 1 Screw Windows Shut @ Bldg. 3 1 LS 1,350.00 1,350.00
FINISHES 45,789.00 09-2000 METAL FRAMING & DRYWALL 4,100.00
1 New Framing & Drywall @ Bldg. 3 Bathrooms 1 LS 4,100.00 4,100.00
2 Frame New Door Openings @ Bldg. 3 Bathrooms - -
3 New Ceilings for Plumbing / HVAC @ Bldg. 3 Bathrooms - -
09-3000 TILE 32,344.00 1 New Tile Mosaic @ The Pit 1 LS 11,805.00 11,805.00
2 New Floor & Wall Tile @ Bldg. 3 Bathrooms 1 LS 20,539.00 20,539.00
09-5100 ACOUSTICAL CEILINGS 5,000.00 1 ACT Repair Replacement Allowance 1 LS 5,000.00 5,000.00
09-9000 PAINTING 2,990.00 1 Painting @ Bldg. 3 Bathroom Doors, Frames, & Ceilings 1 LS 2,990.00 2,990.00
09-9990 FINAL CLEANING 1,355.00 1 Final Cleaning 1 LS 1,355.00 1,355.00
SPECIALTIES 4,403.00 10-2020 TOILET PARTITIONS 2,321.00
1 ADA Stalls @ Bldg. 3 Bathrooms 1 LS 2,321.00 2,321.00
10-3210 TOILET ACCESSORIES 2,082.00 1 Toilet Accessories @ Bldg. 3 Bathrooms 1 LS 2,082.00 2,082.00
MEP SYSTEMS 1,056,190.00 22-1000 PLUMBING 12,000.00
1 Plumbing Allowance 1 LS 12,000.00 12,000.00
23-8000 HVAC 956,690.00 1 Central Mechanical Plant Renewal 1 LS 360,343.00 360,343.00
2 Cooling & Heating Control System Renewal 1 LS 200,000.00 200,000.00
3 Air Conditioning & Air Distribution Equipment Renewal 1 LS 384,282.00 384,282.00
4 Test & Balance Allowance 1 LS 12,065.00 12,065.00
26-1000 ELECTRICAL 87,500.00 1 Full Electrical Scope per Plans & Specs 1 LS 87,500.00 87,500
GRAND TOTAL 1,239,275.00$
UNIT COST TOTAL COST
CODEDESCRIPTION QUANTITY UNIT
PAGE 1 OF 1
SCHOOL
CM
BID OPENING DATE
A/E
DIV NO. BIDDERS
LEVELED BID
AMOUNT
1A
Kings Service Solutions, LLC 1,355.00$
Daisy Fresh Commercial Cleaning, Inc. 5,564.00$
2A
MGM Contracting Inc. 4,410.00$
EE&G 10,452.00$
Creative Environmental Services, Inc. 13,600.00$
Environmental Construction, Inc. NO BID
3A
Central Florida Construction Walls 12,396.00$
MGM Contracting, Inc. 11,800.00$
Liberty Concrete & Forming NO BID
Don Kings Concrete, Inc. NO BID
5A
MGM Contracting, Inc. 6,070.00$
7B
MGM Contracting, Inc. 118,200.00$
Atlas Apex 194,000.00$
Architectural Sheet Metal 105,263.00$
Advanced Roofing NO BID
8A
C&S Supply Orlando 4,000.00$
A.G. Mauro 3,799.00$
Performance Door & Hardware NO BID
9A
Architectural Drywall Systems, Inc. 8,575.00$
MGM Contracting, Inc. 4,100.00$
Horus Construction Services, Inc. 10,698.00$
Mader Southeast, Inc. NO BID
Ramm Drywall Paint & Stucco NO BID
9E
AJ Flooring 32,344.00$
MGM Contracting, Inc. 32,695.00$
Elite Flooring Inc. NO BID
Spectra Contract Flooring NO BID
9F
Hot Spray Industrial Coatings, Inc. 4,365.00$
MGM Contracting, Inc. 13,800.00$
Steve Harper Painting, Inc. 5,100.00$
Jerry Jackson Painting NO BID
10B
Vital Sign of Orlando, Inc. 14,207.00$
Don Bell Signs, LLC 15,484.00$
10C
Mardale Specialties Direct, Inc. 4,403.00$
C&S Supply or Orlando, Inc. NO BID
Schedule 10 Specialties, Inc. NO BID
22A
General Mechanical Included Below
Ferran Mechanical Included Below
W.W. Gay Mechanical Contractor, Inc. NO BID
Hill York NO BID
23A
General Mechanical 944,625.00$
Ferran Mechanical 960,681.00$
W.W. Gay Mechanical Contractor, Inc. NO BID
Hill York NO BID
23B
Bay to Bay 12,065.00$
Air Balance Unlimited 6,900.00$
Richard Flanders 4,500.00$
Southern Independent Testing Agency 10,645.00$
26A
Giles Electric 87,500.00$
Grassland Electrical 172,500.00$
Boys Electrical Contractors, LLC NO BID
Carter Electric Co. Inc. NO BID
Astronaut High School Facility Renewal
Schenkel Shultz Architecture / CDE Company
Core Construction Service of FL
December 12, 2019
METALS
ROOFING, GUTTERS, DS, FASCIA, SOFFIT
DOORS, FRAMES & HARDWARE
MISC SPECIALTIES (Toilet Compartment, Toilet Accessories,
LockerS)
PAINTING
SIGNAGE
DRYWALL
TILE
DIVISION DESCRIPTION
FINAL CLEANING
DEMOLITION
CONCRETE
PLUMBING
HVAC
TEST & BALANCE
ELECTRICAL
GENERAL CONDITIONS
1/6/2020
Loaded Total
Rate Hrs Total
Description Quantity Unit Hrs/Wk $/Hr Hrs $
PROJECT MANAGEMENT
Project Oversight (8hr/week) 10.00 week 6.00 93.45 60.00 5,607.00
Project Manager (40hr/week) 11.00 week 30.00 81.82 330.00 27,000.60
Assistant Project Manager (20hr/week) 10.00 week 15.00 43.91 150.00 6,586.50
Project Coordinator (12hr/week) 11.00 week 8.00 27.72 88.00 2,439.36
Project Accountant (12hr/week) 11.00 week 8.00 43.07 88.00 3,790.16
Superintendent (40hr/week) 11.00 week 30.00 51.45 330.00 16,978.50
Assistant Superintendent (24hr/week) 10.00 week 30.00 43.57 300.00 13,071.00
TOTAL GENERAL CONDITIONS 1046.00 75,473.12
ASTRONAUT HIGH SCHOOL FACILITY RENEWAL
CORE CONSTRUCTION
UNIT COSTS
GENERAL REQUIREMENTS
Labor
$
Material
$
Sub
$
Equip
$
Labor
$
Material
$
Sub
$
Equip
$
FIELD OFFICE - - - - -
Drinking Water (Use School Facilities) - - - - -
Temporary Toilets (Use School
Facilities)
- - - - -
OFFICE EQUIPMENT - 250 700 - 950
Copy / Fax Machine (Lease) 2.0 350 - - 700 - 700
Office supplies 1.0 250 - 250 - - 250
COMPUTER EQUIPMENT - 540 - 1,871 2,411
Field Computers & IT ($1.39/MH) 1.39 1,346 - - - 1,871 1,871
Wireless Internet Card (3 months) 3.0 180.00 - 540 - - 540
TELEPHONE SYSTEM - 624 - - 624
Cellular Telephones (QTY 4 @ $52/mo) 3.0 208.00 - 624 - - 624
POSTAGE & COURIER - 100 - - 100
Monthly Charges 2.0 50.00 - 100 - - 100
ASTRONAUT HIGH SCHOOL SCHOOL
CORE CONSTRUCTION
Description Qty Unit Costs Total Costs General
Requirements
Total
$
GENERAL REQUIREMENTS
Labor
$
Material
$
Sub
$
Equip
$
Labor
$
Material
$
Sub
$
Equip
$
ASTRONAUT HIGH SCHOOL SCHOOL
CORE CONSTRUCTION
Description Qty Unit Costs Total Costs General
Requirements
Total
$DRAWINGS - - 1,955 - 1,955
Drawings for CM 3 185 - - 555 - 555
As Built Drawings & Training DVD 1 250 - - 250 - 250
CM Monthly Report & Materials 3 50 - - 150 - 150
O&M & Closeout Docs 1 1,000 - - 1,000 - 1,000
POWER COMPANY CHARGES - - 7,500 - 7,500
Temporary Generator for Admin While
Power is Not Available (Includes rental
fees, set up and fuel)
1 7,500 - - 7,500 - 7,500
PROJECT VEHICLES - - - 6,520 6,520
Automobile & Fuel (2 Vehicles - at
$163/WK)
20.0 326 - - - 6,520 6,520
SAFETY & SECURITY - 200 2,000 - 2,200
First Aid Supplies / Kit 1 100.00 - 100 - - 100
Hard Hats/Safety Glasses/Harness/etc. 1.0 100 - 100 - - 100
Temporary Fencing Panels 400 5.00 - - 2,000 - 2,000
GENERAL LABOR & CLEANING 3,456 5,400 7,500 - 16,356
Daily Cleaning & General Purpose
Labor (16hrs @ $18/hr Per Week)
12 288.00 3,456 - - - 3,456
Dumpsters / Dump Charges 12 450.00 - 5,400 - - 5,400
GENERAL REQUIREMENTS
Labor
$
Material
$
Sub
$
Equip
$
Labor
$
Material
$
Sub
$
Equip
$
ASTRONAUT HIGH SCHOOL SCHOOL
CORE CONSTRUCTION
Description Qty Unit Costs Total Costs General
Requirements
Total
$Final Building Cleaning (For Admin,
Cafeteria, & Media Buildings - No
Waxing)
1 7,500 - - 7,500 - 7,500
JOB SIGNS - 250 - - 250
Safety/ Directional Signs 1 250.00 - 250 - - 250
MISCELLANEOUS - 1,050 4,500 12,000 17,550
Small Tools & Supplies 1.0 250.00 - 250 - - 250
Protection of Existing Surfaces,
Furniture, & Equipment
1.0 800.00 - 800 - - 800
Temporary Cooling & Dehumidifiers for
Admin & Media Zone
1.0 4,500 12,000 - - 4,500 12,000 16,500
TOTAL GENERAL REQUIREMENTS 3,456 8,514 24,155 20,391 56,415.94
Astronaut High School Facility RenewalSUMMARY OF ALLOWANCES 1/6/2020
9a Drywall Patching All labor, materials, and equipment for patching drywall or
drywall finishes damaged as a result of new installations. 4,100
9c Acoustical Ceiling System
All labor, materials, and equipment for repair and/or
replacement of damaged acoustical ceiling panels or tracks as a
result of new installations.
5,000
9f Painting
All labor, materials, and equipment for painting any newly
installed pipe/conduit, miscellaneous paint patches from
demolition, and exposed duct above stage
2,990
23b Test & Balance All labor, materials, and equipment for test & balance of the
refurbished HVAC systems. 12,065
Allowances Total: 24,155
All allowance numbers are inclusive of material, sales tax, delivery, stocking, labor, and equipment for installation, protection of work and
cleanup for that portion of work unless otherwise noted.
# ALLOWANCE DESCRIPTIONALLOWANCE
AMOUNT
Astronaut High School – Facility Renewal Renovations
JANUARY 6, 2020
Assumptions, Clarifications, & Exclusions
General Assumptions
• This proposal does not include any costs for building permit, mechanical/electrical/plumbing permits.
• This proposal assumes there will be no students or faculty in construction areas for summer school
activities for the duration of the summer recess.
• This proposal assumes the CM will have access to an existing office or portable to be used as a
construction office for the duration of the summer recess.
• This proposal assumes exhaust fans may be replaced in their original locations.
• This proposal includes temporary air and dehumidification at the Media Center & Administration while
systems are replaced. We assume no students of faculty will need to occupy any other space during
construction.
• This proposal includes State and County taxes as applicable and does not discount for anticipated
Owner Direct Purchases.
• This proposal assumes the new ceiling tile and grid in areas where it may need to be replaced will not
achieve a perfect match to the existing adjacent grid.
• This proposal assumes the existing utilities (electrical, water, & sanitary) will be available for use during
construction at no cost to the CM or the project. All utility consumption costs to be By Owner.
• This proposal includes Owner’s rights to salvage any materials or equipment prior to the start of
construction.
• Final clean included for Building 1 “The Pit” & Building 3 Bathrooms.
Specific Exclusions to Proposal
• Asbestos Abatement
• Lead Paint Abatement
• Any LEED standards or certifications.
• This proposal does not include any temporary air or dehumidification at the Classrooms or Cafeteria
Building.
• Final cleaning services in Mechanical Areas. Mechanical Areas will be turned over in the condition in
which they are received.
• Any work to the covered walkways.
• Any repairs to doors, hardware, windows, or exterior sealants not explicitly included with the
predefined scope of work.
• Any perimeter/entry fencing or gates.
• Any upgrades or installations to building access controls or security.
• Any sitework unless it is being restored due to damage from new work put in place.
• FF&E - Furniture, Fixtures, and Equipment.
• Any underground chiller pipe replacement.
Astronaut High School – Facility Renewal Renovations
JANUARY 6, 2020
• Preconstruction test and balance reports on existing HVAC systems and equipment.
• Storing or relocating off site any existing materials/equipment planned for demolition or replacement.
• Any architectural repairs other than those included with the predefined scope of work.
• Any stripping or waxing or polishing of existing floors.
• Any new flooring or tile outside of the predefined scope of work unless damaged/disturbed as a result
of new installations.
Astronaut High School
Facility Renewal
MILESTONE SCHEDULE DATES
OWNER DELIVERABLE: DATE
CM GMP SUBMISSION 12/18/2019
CM/BPS GMP FINALIZED (SUBMIT TO BOARD AGENDA) 1/8/2020
BPS BOARD APPROVAL OF GMP 1/28/2020
BPS PROJECT NTP 1/29/2020
CM SUBMIT LONG LEAD SUBMITTALS 2/12/2020
CM/EOR APPROVE LONG LEAD SUBMITTALS 2/26/2020
CM/BPS ODP PROCESSED FOR LONG LEAD EQUIPMENT 3/18/2020
CM/BPS ISSUE PO FOR LONG LEAD EQUIPMENT 3/19/2020
CM EARLY PREP WORK / CONTROLS 4/30/2020
CM LONG LEAD EQUIPMENT PROCUREMENT / DELIVERY 5/27/2020
CM BEGIN CONSTRUCTION 6/1/2020
CM SUBSTANTIAL COMPLETION 7/31/2020
Milestone dates above are for the base bid scope of work only. CM assumes that
Commissioning, performed under Brevard Public Schools, will occur after Substantial
Completion.
PROJECT NAME: Astronaut High School Facility Renewal
Drawing Description Current Set
ADDENDUM
#1
ADDENDUM
#2
GENERAL INFORMATION DRAWING LIST
G-001 COVER SHEET AND INDEX 20-Nov-19
ARCHITECTURAL DRAWING LIST
AS100 SCOPE LOCATION PLAN 20-Nov-19
A101 FIRST FLOOR DEPRESSED PIT INFILL AND ENTRY COLUMNS 20-Nov-19 26-Nov-19
A101.1 BUILDING 1 EXTERIOR ENTRY COLUMN DETAILS 20-Nov-19
A101.2 MUSIC DOUBLE DOOR ASTRAGALS 20-Nov-19
A101.3 ADMINISTRATION ENTRY EXTERIOR ELEVATIONS 20-Nov-19 26-Nov-19
A102 STORAGE BUILDING 2 RAIN HOOD REPLACEMENTS 20-Nov-19
A103 BUILDING 3 FLOOR PLANS AND ROOF PLAN 20-Nov-19
A104 BUILDING 3 TOILET ROOM PLANS AND PHOTOS 20-Nov-19
A105 BUILDING 3 DEMOLITION PHOTOS 20-Nov-19
A106 ROOF DETAILS 20-Nov-19 26-Nov-19
MECHANICAL DRAWING LIST
M-001 MECHANICAL ABBREVIATIONS, LEGENDS AND NOTES 20-Nov-19
MD101 BUILDING 1-1ST FLOOR HVAC PLAN-DEMO 20-Nov-19
MD102 BUILDING 1-2ND FLOOR HVAC PLAN-DEMO 20-Nov-19
MD103 BUILDING 1-ROOF PLAN-DEMO 20-Nov-19
MD401 BUILDING 1-COOLING TOWER YARD PLAN-DEMO 20-Nov-19 26-Nov-19
M-101 BUILDING 1-1ST FLOOR HVAC PLAN-NEW 20-Nov-19
M-102 BUILDING 1-2ND FLOOR HVAC PLAN-NEW 20-Nov-19
M-103 BUILDING 1-ROOF PLAN-NEW 20-Nov-19
M-104 BUILDING 3-HVAC PLANS 20-Nov-19
M-105 BUILDING 7-HVAC PLANS 20-Nov-19
M-401 BUILDING 1-CHILLER PLANT PLAN-NEW 20-Nov-19 26-Nov-19
M-402 BUILDING 1-AHU-1-18 REPLACEMENT 20-Nov-19
M-501 DETAILS 20-Nov-19
M-601 SCHEDULES (1 OF 2) 20-Nov-19
M-602 SCHEDULES (2 OF 2) 20-Nov-19
M-701 AHU'S CONTROLS 20-Nov-19
M-702 BUILDING 1-AHU 1-18 CONTROLS 20-Nov-19
M-703 CHILLER PLANT CONTROLS 20-Nov-19 26-Nov-19
M-704 CONTROLS 20-Nov-19 26-Nov-19
PLUMBING DRAWING LIST
P-001 PLUMBING ABBREVIATIONS, LEGEND AND NOTES 20-Nov-19
P-101 BUILDING 3-PLUMBING PLANS 20-Nov-19 26-Nov-19
ELECTRICAL DRAWING LIST
E-001 ELECTRICAL ABBREVIATIONS, LEGEND AND NOTES 20-Nov-19
ED-101 BUILDING 1-1ST FLOOR ELECTRICAL PLAN-DEMO 20-Nov-19
ED-102 BUILDING 1-2ND FLOOR ELECTRICAL PLAN-DEMO 20-Nov-19
ED-103 BUILDING 1-ROOF ELECTRICAL PLAN-DEMO 20-Nov-19
ED-104 BUILDING 1 MECH YARD-ELECTRICAL DEMO 20-Nov-19 26-Nov-19
E-101 BUILDING 1-1ST FLOOR ELECTRICAL PLAN-NEW 20-Nov-19
E-102 BUILDING 1-2ND FLOOR ELECTRICAL PLAN-NEW 20-Nov-19
E-103 ROOF ELECTRICAL PLAN-NEW 20-Nov-19
E-104 BUILDING 1 MECH YARD-ELECTRICAL-NEW 20-Nov-19
E-105 BUILDING 3-ELECTRICAL PLANS 20-Nov-19
E-106 BUILDING 7-ELECTRICAL PLANS 20-Nov-19
E-107 BUILDINGS 5,6 AND 8-ELECTRICAL PLANS 20-Nov-19
DIVISION SPECIFICATION DESCRIPTION DATE
2 EXISTING CONDITIONS
02 41 19 SELECTIVE DEMOLITION 20-Nov-19
3 CONCRETE
03 20 00 CONCRETE REINFORCING 20-Nov-19
03 30 00 CAST-IN-PLACE CONCRETE 20-Nov-19
6 WOOD AND PLASTICS
06 10 53 MISCELLANEOUS ROUGH CARPENTRY
7 THERMAL AND MOISTURE PROTECTION
07 41 13 METAL ROOF PANELS 20-Nov-19
07 62 00 SHEET METAL TRIM 20-Nov-19
07 92 00 JOINT SEALANTS 20-Nov-19
07 95 13 EXPANSION JOINT COVER ASSEMBLIES 20-Nov-19 26-Nov-19
DIVISION SPECIFICATION DESCRIPTION DATE
8 OPENINGS
08 12 13 HOLLOW METAL FRAMES 20-Nov-19
08 14 16 WOOD DOORS 20-Nov-19
Attachment C
Enumeration of Documents
Page 1 of 3
PROJECT NAME: Astronaut High School Facility Renewal
Drawing Description Current Set
ADDENDUM
#1
ADDENDUM
#2
Attachment C
Enumeration of Documents
9 FINISHES
09 22 16 NON-STRUCTURAL METAL FRAMING 20-Nov-19
09 29 00 GYPSUM BOARD 20-Nov-19
09 30 01 TILE 20-Nov-19
09 91 00 PAINTING
10 SPECIALTIES
10 14 19 DIMENSIONAL LETTERING SIGNAGE 20-Nov-19
10 21 13 TOILET COMPARTMENTS 20-Nov-19
10 28 13 TOILET ACCESSORIES 20-Nov-19
10 51 00 METAL LOCKERS 20-Nov-19
12 FURNISHINGS
12 21 16 VERTICAL WINDOW BLINDS 20-Nov-19
22 PLUMBING
22 05 18 ESCUTCHEONS FOR PLUMBING PIPING 20-Nov-19
22 05 23.12 BALL VALVES FOR PLUMBING PIPING 20-Nov-19
22 05 29 HANGARS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT 20-Nov-19
22 07 19 PLUMBING PIPING INSULATION 20-Nov-19
22 11 16 20-Nov-19
23 HEATING, VENTILATING AND AIR CONDITIONING
23 00 00 GENERAL MECHANICAL PROVISIONS 20-Nov-19
23 03 00 MECHANICAL IDENTIFICATION 20-Nov-19
23 05 00 BASIC MECHANICAL REQUIREMENTS 20-Nov-19
23 05 48 VIBRATION ISOLATION 20-Nov-19
23 05 93 TESTING, ADJUSTING AND BALANCING (HYDRONICS) 20-Nov-19
23 05 94 TESTING, ADJUSTING AND BALANCING (AIR SIDE) 20-Nov-19
23 07 00 MECHANICAL SYSTEMS INSULATION 20-Nov-19
23 07 13 DUCTWORK INSULATION 20-Nov-19
23 09 23 DIRECT DIGITAL CONTROL SYSTEMS 20-Nov-19
23 21 13 HYDRONIC PIPING 20-Nov-19
23 21 23 CENTRIFUGAL PUMPS 20-Nov-19
23 23 00 REFRIGERANT PIPING 20-Nov-19
23 31 11 DUCTWORK AND ACCESSORIES 20-Nov-19
23 34 16 MODULAR AIR-HANDLING UNITS 20-Nov-19
23 36 00 AIR TERMINAL UNITS 20-Nov-19
23 81 26 SPLIT-SYSTEM AIR 20-Nov-19
26 ELECTRICAL
26 00 10 BASIC ELECTRICAL REQUIREMENTS 20-Nov-19
26 05 19 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES 20-Nov-19
26 05 26 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS 20-Nov-19
26 05 29 HANGARS AND SUPPORTS FOR ELECTRICAL SYSTEMS 20-Nov-19
26 05 33 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS 20-Nov-19
26 05 53 IDENTIFICATION FOR ELECTRICAL SYSTEMS 20-Nov-19
26 27 26 WIRING DEVICES 20-Nov-19
26 28 16 ENCLOSED SWITCHES AND CIRCUIT BREAKERS 20-Nov-19
26 43 13 SURGE PROTECTION FOR LOW-VOLTAGE ELECTRICAL POWER CIRCUITS
Page 2 of 3
PROJECT NAME: Astronaut High School Facility Renewal
Drawing Description Current Set
ADDENDUM
#1
ADDENDUM
#2
Attachment C
Enumeration of Documents
Page 3 of 3