Attachment H.1 Raw Materials, Intermediates and Product Handling For inspection purposes only. Consent of copyright owner required for any other use. EPA Export 20-01-2014:23:28:21

Upload: others

Post on 23-Mar-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Attachment H.1 Consent of copyright owner required for any ... · a) Goods inwards loading bay area b) Goods inwards and sampling staging area c) Raw material warehouse d) Consumables

Attachment H.1

Raw Materials, Intermediates and Product Handling

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 20-01-2014:23:28:21

Page 2: Attachment H.1 Consent of copyright owner required for any ... · a) Goods inwards loading bay area b) Goods inwards and sampling staging area c) Raw material warehouse d) Consumables

1

Attachment H1 – Raw material, Intermediates and Product Handling.

Raw Materials Storage Materials on site are stored in both internal and external designated storage areas. The delineation of areas is illustrated in Drawing DG1000 for Building 1 and Drawing DG2000 for Building 2. Building 1 comprises of the following areas:

� Goods In/Out � Warehouse � Manufacturing � Personnel � QC Labs � Administration

The Warehouse is located on the west end of Building 1 and contains steel racking for storage of raw materials and finished goods. The warehouse is connected to the pre-weigh storage area, warehouse offices, receiving areas and weighing booths from where raw materials make their way into the main production/manufacturing area of Building 1. At Building 1 all raw materials are received into the warehouse where they are stored. Materials are transferred to the pre-weigh storage area on an as need basis for batches when requested by production from where they are taken for weighing in the weigh booth rooms. Any unused materials are brought back to the warehouse for storage. The material weighed and dispensed in the weigh booth room is transferred to the main manufacturing area for processing. There is an external chemical store and hazardous waste store located at the rear of Building 1. The store is split in two by a central wall separating the chemicals storage from the hazardous waste storage. This store is the bulk storage unit for the Main Production areas where chemicals are brought in on an as required basis to the production floors. The chemical store is bunded and is secured by a padlock for authorised personnel only. A spill protection area consisting of a paved area enclosed by grills exists at the entrance doors to both the chemicals storage and hazardous waste storage area. The main access to this external chemical store is through the main access gate located at the rear of the facility and access through the gate is controlled by Forest personnel only. There is also a storage area within the boiler compound area for the storage of gas cylinders. These cylinders are removed as required. There is no bulk storage of materials in the boiler room. There are a number of mobile plastic bunds in the boiler room for the local storage of boiler treatment chemicals. Building 2 comprises of the following areas:

� Goods In/Out � Warehouse � Manufacturing � DPI Manufacturing Suite � Personnel � DPI Lab � Future Development

Similar to Building 1, the warehouse at Building 2 is located at the southern end of Building 2 and contains steel racking for the storage of raw materials and finished goods. There are no in-process storage areas in Building 2 and all materials are stored in the warehouse.

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 20-01-2014:23:28:21

Page 3: Attachment H.1 Consent of copyright owner required for any ... · a) Goods inwards loading bay area b) Goods inwards and sampling staging area c) Raw material warehouse d) Consumables

2

There are 2 no. external chemical stores at Building 2; which are located along the southern façade, one of which is under the ownership of manufacturing personnel. This chemical store (BUND 14/B2) is bunded, has 2 no. sliding doors and is secured by a padlock for authorised personnel only. It contains IBCs and drums of materials used in the manufacturing process. The second chemical store (BUND 13/B2) is under the ownership of the QC laboratory and is secured by a padlock for authorised personnel only. The chemical store has 2 no. sliding doors and contains mixed solvent waste from the QC laboratory and also boiler treatment chemicals. In addition, there is an external ethanol store located along the western façade, at the rear of Building 2. Similarly, this chemical store is a prefabricated metal storage unit. The ethanol store has a capacity for the storage of 12 no. 1,000 litres IBCs of Ethanol which is used in the manufacturing process. There are no external storage tanks for bulk storage of fuels or solvents. Therefore there are no bunded areas with requirements for integrity testing. Raw Materials Handling Details of all raw materials, intermediates and products generated are included in Tables G.1 (i) and G (ii). There are detailed standard operating procedure in place for the storage and handling of raw materials and intermediates. The SOP reference CLO-SOP-WHS-00001 “Receipt, Identification, Storage and Handling of Purchased goods” is employed for this operation. In addition, there is also a SOP in place for the handling of solvents, namely ethanol. This SOP, reference CLO-SOP-MAN-00150 deals specifically with the transport of Ethanol IBC’s to and within the plant.

Warehousing Operations Warehousing operations carried out on site involve incoming stores, and intermediate and final product storage areas. Warehouse areas include the following:

a) Goods inwards loading bay area b) Goods inwards and sampling staging area c) Raw material warehouse d) Consumables cage e) Secondary packaging cage f) Finished goods warehouse g) Reject material cage h) Dispatch loading bay area

The warehouse is temperature controlled, and a facility pest control plan is in place. Standard Operating Procedure CLO-SOP-WHS-00003 outlines the procedure for the warehousing of products. Bund Register Table 1 and Table 2 outline the register of bunds employed at the Forest Laboratories facility. A map showing the locations of fixed bunds for Building 1 and Building 2 is included in this attachment.

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 20-01-2014:23:28:21

Page 4: Attachment H.1 Consent of copyright owner required for any ... · a) Goods inwards loading bay area b) Goods inwards and sampling staging area c) Raw material warehouse d) Consumables

3

Table 1: Register of Bund Locations at Building 1

Id Tag No. Bun d Type Bund Location Bund Capacity (litres) Material Stored BUND 1/B1 Steel Bund Boiler House Building 1 500 Boiler Treatment Chemicals BUND 2/B1 Plastic Bund Glatt Plant Room Building 1 250 General Plant Chemicals BUND 3/B1 Plastic Bund Plant Room Mezzanine Building 1 250 General Plant Chemicals BUND 4/B1 Plastic Bund Purification Plant Room Building 1 250 Water Treatment Chemicals BUND 5/B1 Bunded Press QC Laboratory Building 1 100 Laboratory Chemicals BUND 5.1/B1 Bunded Press QC Laboratory Building 1 100 Laboratory Chemicals BUND 6/B1 Chemical Store Rear of Building Building 1 260 Laboratory Chemicals BUND 7/B1 Hazard Waste Store Rear of Building Building 1 260 Mixed Solvent Waste from lab BUND 8/B1 Mobile Plastic Bund Boiler House Building 1 100 Boiler Treatment Chemicals BUND 8.1/B1 Mobile Plastic Bund Boiler House Building 1 100 Boiler Treatment Chemicals BUN8.2/B1 Mobile Plastic Bund Boiler House Building 1 100 Boiler Treatment Chemicals BUN8.3/B1 Mobile Plastic Bund Boiler House Building 1 100 Boiler Treatment Chemicals BUN 9/B1 Plastic Bund QC Laboratory Building 1 179 Laboratory Chemicals BUN 10/B1 Plastic Bund QC Laboratory Building 1 439 Laboratory Chemicals BUN 11/B1 Plastic Bund QC Laboratory Building 1 439 Laboratory Chemicals BT 1/B1 Balance tank Building 1 20,000 Process Water

PD1/B1 Process Waste Pumping Chamber Building 1 2000 Process Water

FS05/B1 Foul Waste Pumping Chamber Building 1 2000

Foul Water

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 20-01-2014:23:28:21

Page 5: Attachment H.1 Consent of copyright owner required for any ... · a) Goods inwards loading bay area b) Goods inwards and sampling staging area c) Raw material warehouse d) Consumables

4

Table 2: Register of Bund Locations at Building 2

Id Tag No. Bund Type Bund Location Bund Capacity (litres) BUN 12/B2 Plastic Bund Plant Room Mezzanine Building 2 250 General Plant Chemicals BUN 13/B2 Bunded Chemical Store Building 2 1100 Solvents for Manufacturing

BUN 14/B2 Bunded Chemical Store Building 2 1100

Mixed Solvent Waste from QC Lab, Boiler Treatment Chemicals

BUN 15/B2 Diesel Generator Bunding Building 2 260

Diesel

BUN 16 B2 Ethanol Chemical Store Side of Building 2 1100 Ethanol for manufacturing BUN 17 B2 Plastic Bund Boiler House Building 2 100 Boiler Treatment Chemicals BT 2/B2 Balance tank Building 2 20,000 Process Water

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 20-01-2014:23:28:22

Page 6: Attachment H.1 Consent of copyright owner required for any ... · a) Goods inwards loading bay area b) Goods inwards and sampling staging area c) Raw material warehouse d) Consumables

SPEEDBUMP

DRAIN

DOOR

STACKSPLANT EQUIPTMENT

PLANT EQUIPTMENT

STACKS

STACKS

HITACHI POWER TOOLS

Clonshaugh Industrial Estate Road

Clonshaugh Industrial Estate Road

Drawing Number

Drawing Status Sheet Size

Client

Rev

Drawing Scale

Amendment / IssueNo.

Project

Title

A3

DateDrawn By Checked By Approved By

Date App

MDE0977DG1000F01.dwg

1. Verifying Dimensions.The contractor shall verify dimensions against such otherdrawings or site conditions as pertain to this part of the work.

2. Existing Services.Any information concerning the location of existing servicesindicated on this drawing is intended for general guidance only. Itshall be the responsibility of the contractor to determine and verifythe exact horizontal and vertical alignment of all cables, pipes, etc.(both underground and overhead) before work commences.

3. Issue of Drawings.Hard copies, dwf and pdf will form a controlled issue of thedrawing. All other formats (dwg, dxf etc.) are deemed to be anuncontrolled issue and any work carried out based on these files isat the recipients own risk. RPS will not accept any responsibilityfor any errors arising from the use of these files, either by humanerror by the recipient, listing of un-dimensioned measurements,compatibility issues with the recipient's software, and any errorsarising when these files are used to aid the recipients drawingproduction, or setting out on site.

NOTES

4. Datum: Ordnance Survey Datum, Malin Head

IPCC Licence Implementation

Ordnance Survey IrelandLicence No. EN 00050 13©Ordnance Survey Ireland andGovernment of Ireland

T +353 1 4882900F +353 1 2835676W www.rpsgroup.com/ireland

E [email protected]

West PierBusiness CampusDun LaoghaireCo Dublin, Ireland

Ireland Limited

Forest

Laboratories

/

F01 Nov.'13 Final IssueDB

CRPC

Layout & Service Areas DemarcationBUILDING No.1 -

Final Issue 1:1,000 @ A3

MDE0977 DG1000 F01

Nov. '13P. ChadwickC. ReillyD. Byrne

CLONSHAUGH

INDUSTRIAL ESTATE

Coolock,Co. Dublin

10m SCALE 1:1000

KEY - Service Area Demarcation (B1)

Goods In/Out

Administration

Manufacturing

Personnel

QC Labs

Warehouse

BUILDING NO.1 AREA

Forest Laboratories

WarehouseGoodsIn/Out

Manufacturing

Personnel QC LabsAdmin.

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 20-01-2014:23:28:22

Page 7: Attachment H.1 Consent of copyright owner required for any ... · a) Goods inwards loading bay area b) Goods inwards and sampling staging area c) Raw material warehouse d) Consumables

CA

RPA

RK

NO

VUM

Drawing Number

Drawing Status Sheet Size

Client

Rev

Drawing Scale

Amendment / IssueNo.

Project

Title

A3

DateDrawn By Checked By Approved By

Date App

MDE0977DG2000F01.dwg

1. Verifying Dimensions.The contractor shall verify dimensions against such otherdrawings or site conditions as pertain to this part of the work.

2. Existing Services.Any information concerning the location of existing servicesindicated on this drawing is intended for general guidance only. Itshall be the responsibility of the contractor to determine and verifythe exact horizontal and vertical alignment of all cables, pipes, etc.(both underground and overhead) before work commences.

3. Issue of Drawings.Hard copies, dwf and pdf will form a controlled issue of thedrawing. All other formats (dwg, dxf etc.) are deemed to be anuncontrolled issue and any work carried out based on these files isat the recipients own risk. RPS will not accept any responsibilityfor any errors arising from the use of these files, either by humanerror by the recipient, listing of un-dimensioned measurements,compatibility issues with the recipient's software, and any errorsarising when these files are used to aid the recipients drawingproduction, or setting out on site.

NOTES

4. Datum: Ordnance Survey Datum, Malin Head

IPCC Licence Implementation

Ordnance Survey IrelandLicence No. EN 00050 13©Ordnance Survey Ireland andGovernment of Ireland

T +353 1 4882900F +353 1 2835676W www.rpsgroup.com/ireland

E [email protected]

West PierBusiness CampusDun LaoghaireCo Dublin, Ireland

Ireland Limited

Forest

Laboratories

/

F01 Nov.'13 Final IssueDB

CRPC

Layout & Service Areas DemarcationBUILDING No.2 -

Final Issue 1:1,000 @ A3

MDE0977 DG2000 F01

Nov. '13P. ChadwickC. ReillyD. Byrne

CLONSHAUGH

INDUSTRIAL ESTATE

Coolock,Co. Dublin

10m SCALE 1:1000

KEY - Service Area Demarcation (B1)

Goods In/Out

DPI Manufacturing Suite

Manufacturing

Personnel

DPI Laboratory

Warehouse

Future Development

BUILDING NO.2 AREA

Forest Laboratories

Future Developm

ent

Manufacturing

PersonnelFuture Development

Warehouse

DPI Manufacturing Suite

DPI Lab

Goods In/O

ut

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 20-01-2014:23:28:22

Page 8: Attachment H.1 Consent of copyright owner required for any ... · a) Goods inwards loading bay area b) Goods inwards and sampling staging area c) Raw material warehouse d) Consumables

SPEEDBUMP

DRAIN

DOOR

STACKSPLANT EQUIPTMENT

PLANT EQUIPTMENT

STACKS

STACKS

HITACHI POWER TOOLS

Clonshaugh Industrial Estate Road

Clonshaugh Industrial Estate Road

BUND 18/B1

BUND 19/B1

BUND 1/B1

BUND 8.2/B1

BUND 8.1/B1

BUND 8/B1

BUND 4/B1

BUND 2/B1

BUND 5.1/B1

BUND 5/B1

BUND 10/B1

BUND 11/B1

BUND 9/B1

BUND 6/B1

BUND 7/B1BALANCETANK BT 1/B1

OIL INTERCEPTORSW101/B1

OIL INTERCEPTORSW201/B1

OIL INTERCEPTORSW301/B1

PUMPINGCHAMBER PD1/B1

PUMPINGCHAMBERFS05/B1

BUND 8.3/B1

Drawing Number

Drawing Status Sheet Size

Client

Rev

Drawing Scale

Amendment / IssueNo.

Project

Title

A3

DateDrawn By Checked By Approved By

Date App

MDE0977DG4001F01.dwg

1. Verifying Dimensions.The contractor shall verify dimensions against such otherdrawings or site conditions as pertain to this part of the work.

2. Existing Services.Any information concerning the location of existing servicesindicated on this drawing is intended for general guidance only. Itshall be the responsibility of the contractor to determine and verifythe exact horizontal and vertical alignment of all cables, pipes, etc.(both underground and overhead) before work commences.

3. Issue of Drawings.Hard copies, dwf and pdf will form a controlled issue of thedrawing. All other formats (dwg, dxf etc.) are deemed to be anuncontrolled issue and any work carried out based on these files isat the recipients own risk. RPS will not accept any responsibilityfor any errors arising from the use of these files, either by humanerror by the recipient, listing of un-dimensioned measurements,compatibility issues with the recipient's software, and any errorsarising when these files are used to aid the recipients drawingproduction, or setting out on site.

NOTES

4. Datum: Ordnance Survey Datum, Malin Head

IPCC Licence Implementation

Ordnance Survey IrelandLicence No. EN 00050 13©Ordnance Survey Ireland andGovernment of Ireland

T +353 1 4882900F +353 1 2835676W www.rpsgroup.com/ireland

E [email protected]

West PierBusiness CampusDun LaoghaireCo Dublin, Ireland

Ireland Limited

Forest

Laboratories

/

F01 Nov.'13 Final IssueDB

CRPC

10m SCALE 1:1000

Building 1LOCATION OF BUNDS -

Final Issue 1:1,000 @ A3

MDE0997 DG4001 F01

Nov. '13P. ChadwickC. ReillyD. Byrne

CLONSHAUGH

INDUSTRIAL ESTATE

Coolock,Co. Dublin

LEGEND

Bund Structure

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 20-01-2014:23:28:22

Page 9: Attachment H.1 Consent of copyright owner required for any ... · a) Goods inwards loading bay area b) Goods inwards and sampling staging area c) Raw material warehouse d) Consumables

CA

RPA

RK

NO

VUM

BUND 17/B2

BUND 15/B2BUND 16/B2

BUND 14/B2

BUND 13/B2

OIL INTERCEPTORSW401/B2

OIL INTERCEPTORSW402/B2

BALANCETANK BT 2/B2

Drawing Number

Drawing Status Sheet Size

Client

Rev

Drawing Scale

Amendment / IssueNo.

Project

Title

A3

DateDrawn By Checked By Approved By

Date App

MDE0977DG4002F01.dwg

1. Verifying Dimensions.The contractor shall verify dimensions against such otherdrawings or site conditions as pertain to this part of the work.

2. Existing Services.Any information concerning the location of existing servicesindicated on this drawing is intended for general guidance only. Itshall be the responsibility of the contractor to determine and verifythe exact horizontal and vertical alignment of all cables, pipes, etc.(both underground and overhead) before work commences.

3. Issue of Drawings.Hard copies, dwf and pdf will form a controlled issue of thedrawing. All other formats (dwg, dxf etc.) are deemed to be anuncontrolled issue and any work carried out based on these files isat the recipients own risk. RPS will not accept any responsibilityfor any errors arising from the use of these files, either by humanerror by the recipient, listing of un-dimensioned measurements,compatibility issues with the recipient's software, and any errorsarising when these files are used to aid the recipients drawingproduction, or setting out on site.

NOTES

4. Datum: Ordnance Survey Datum, Malin Head

IPCC Licence Implementation

Ordnance Survey IrelandLicence No. EN 00050 13©Ordnance Survey Ireland andGovernment of Ireland

T +353 1 4882900F +353 1 2835676W www.rpsgroup.com/ireland

E [email protected]

West PierBusiness CampusDun LaoghaireCo Dublin, Ireland

Ireland Limited

Forest

Laboratories

/

F01 Nov.'13 Final IssueDB

CRPC

10m SCALE 1:1000

Building 2LOCATION OF BUNDS -

Final Issue 1:1,000 @ A3

MDE0997 DG4002 F01

Nov. '13P. ChadwickC. ReillyD. Byrne

CLONSHAUGH

INDUSTRIAL ESTATE

Coolock,Co. Dublin

LEGEND

Bund Structure

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 20-01-2014:23:28:22

Page 10: Attachment H.1 Consent of copyright owner required for any ... · a) Goods inwards loading bay area b) Goods inwards and sampling staging area c) Raw material warehouse d) Consumables

Attachment H.2

Arrangements for Disposal/Recovery of Waste

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 20-01-2014:23:28:22

Page 11: Attachment H.1 Consent of copyright owner required for any ... · a) Goods inwards loading bay area b) Goods inwards and sampling staging area c) Raw material warehouse d) Consumables

1

Attachment H.2 – Wastes Handling

The details of waste materials are provided in Tables H.1 (i) and H.1 (ii). The waste quantities are for the calendar year 2012. Waste is generated within the facility on a continuous basis and can be broken down into:

- Hazardous waste for incineration - Hazardous waste for recycling - Non-hazardous waste to landfill - Non-hazardous waste for recycling

The Table below outlines the details of the waste contractor, licence/permit details and disposal or recovery methods Waste Generation. Hazardous waste generated on-site includes tablets and powders, solvents, laboratory glass and other materials. Non-hazardous waste generated on-site includes mixed residual waste, recyclables, glass, metal, plastic and timber. Waste Undertaker

Address of Undertaker

Licence/Permit Details

Disposal Method

Final Disposal/ Recovery Site

Dee Environmental Services

DEE Environmental Services Ltd, Barretts Lane, Ardee, Co Louth

CP D36/1 issued by Dublin City Council for Trim Transport who collect waste for Dee Environmental Services

D10 Sava, Germany R12 RECYFUEL S.A,

Belgium

Advanced Environmental Solutions (AES)

Unit 1 Monread Commercial Park, Monread Road, Naas, County Kildare

Waste Collection Permit WCP-OY-08-601-01

D1 Various permitted disposal or recovery sites as listed in Appendix B of Waste Collection Permit WCP-OY-08-601-01

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 20-01-2014:23:28:22

Page 12: Attachment H.1 Consent of copyright owner required for any ... · a) Goods inwards loading bay area b) Goods inwards and sampling staging area c) Raw material warehouse d) Consumables

Appendix B Permitted disposal or recovery sites to be used in accordance with

Condition 2.3

• Advanced Environmental Solutions (Ireland) Ltd., Cappincur, Tullamore, Co Offaly Licence No.: WO 1 04-02

• Advanced Environmental Solutions (Ire/and) Ltd., Kyletalesha, PortJaoise Licence No.: W0194-02

• Advanced Environmental Solutions(Ireland) Ltd., Springfort Cross, Nenagh Licence No.: WP/TN/112

• Ashgrove Plant Ltd t/a Ashgrove Recycling., Churchfleld Industrial Estate, Churchfield , Co Cork Licence No.: W0147-01

• Asian Eagle Ltd., Courtstown Industrial Estate, Littleisland Licence No.: CK(S) 552/08

• Ballaghveny Landfill, North Tipperary Co. Co .. , Ballymackey, Nenagh Licence No.: W0078-02

• Ballydonagh Landfill, Westmeath Co. Co .. , Ballydonagh, Dublin Road, Athlone Licence No.: W0028-02

• Bard Na Mona Pic., Kilberry, Athy Licence No.: W0198-01

• Cel/mark Recycling., Benelux BV, Heuvel 7, NL 5664, Geldrop Licence No.:

• Celtic Waste Limited., Knockharley Landfill, Navan Licence No.: WL 146-1

• Crumb Rubber Ireland Ltd., Mooretown, Drumskin, Dundalk Licence No.: WP 2007/01

• Derryclure Landfill, Offaly Co. Co .. , Derryclure, Port/aoise Road, Tullamore Licence No.: W0029-02

• Donohill Landfill, South Tipperary Co. Co .. , Garryshane, Donohill Licence No.: W0074-02

• Drehid Waste Management Facility, Bord Na Mona Pic., Timahoe West, Coolcarrigan" Carbury Licence No.: W0201-02

• Finsa Forest Products Ltd., Scariff Licence No.: P0022-02

• Glassco Recycling Ltd., Site 4, Oberstown BUSiness Park, Naas Licence No.: 247/2006

• Goff Developments Ltd., Jacketstown, Drinagh Licence No.: WP/06/30

• Goff Recycling Ltd, AES (Ireland) Ltd., Balyknockan, Kilrane, Ross/are Harbour Licence No.: W0229-01

• Gypsum Recycling Ireland Ltd., Rathcoffey, Donadea Licence No.: 238/2006

• Hammond Lane Metal Co Ltd., Garrycastle, Athlone Licence No.: WP-173-2008

Page 45 of 53 WCp-OY -08-0601-01

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 20-01-2014:23:28:22

Page 13: Attachment H.1 Consent of copyright owner required for any ... · a) Goods inwards loading bay area b) Goods inwards and sampling staging area c) Raw material warehouse d) Consumables

• Hammond Lane Metal Company., Dublin 4 Licence No.: WP98107

• Hegarty Metals Processors (International) Ltd., Ballysimon Road, limerick Licence No.: WP05-04

• Highlander International Recycling Ltd., Highlander House, 1 Teigngrove, East Kilbride, Scotland Licence No. :

• Irish Lamp Recycling Co. Ltd., Woodstock Industrial Estate, Kilkenny Rd, Athy Licence No.: WFP­KE-08-0348-01

• KMK Metals Recycling Ltd., capplncur Industrial Estate, Daingean Road, Tullamore, Co Offaly Licence No.: W0113-03

• Kyletalesha Landfill, Laois Co. Co"' Clonsoughy, Kyleclonhobert, Mountmellick Road, Portlaoise Licence No. : W0026-02

• Leinster Environmenatals., Clermont Park, Haggardstown, Dundalk Licence No.: WP 2008/06

• Midland Waste Disposal Company Ltd., Clonmagaddan, Proudstown, Navan, Co Meath Licence No.: W0131-02

• Mulleady's Ltd., Cloonagh, Drumlish Licence No.: W0169-01

• Murphy Concrete Manufacturing Ltd., Sarsfieldstown, Gormanstown, Co Meath Licence No.: W0151-0l

• National Metal Recycling., Station Road, Clondalkin, Dublin 22 Licence No.: WPR 045/2

• Neiphin Trading Ltd., Kerdlffstown, Naas Licence No.: W0047-02

• Nurendale limited, tja Panda Waste Services., Rathdrinagh, Beauparc, Navan, Co Meath Licence No.: W0140-03

• Padraig Thornton Waste Disposal Ltd., Killeen Road, Ballyfermot, Dublin 10 Licence No.: WOO44-02

• Pat 0 Donnell - 00 Recycling Ltd., Ballyboe, Ballypatrick, Clonmel Licence No.: WM/WP/06/03(b)

• Polymer Recovery Ltd., Island House, Lower High Street Burford, Oxfordshire, Ox18 4RR Licence No.:

• Premier Waste Management Ltd., Unit 6 Premier Business Park, Turnpike Road, Ballymount, Dublin 22 Licence No.: WPR070

• Retech Processing., Enterprise Centre, Kells Road, Kings Court Licence No.: W.P 07/04

• Silliot Hili Landfill, Kildare Co. Co"' Sillot Hill and Brownstown, Kilcullen Licence No.: WOO14

• TechRec Ireland Limited., Unit 51, Park West Industrial Estate, Nangor Road, Dublin 12 Licence No.: W0233-01

• Whiteriver Landfill, Louth Co. Co"' Dunleer Licence No.: W006D-02

Page 46 of 53 WCp-OY -08-0601-01

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 20-01-2014:23:28:22