atu-itu|tatu-itu|t preparing for wtsa major issues related to work programme gary fishman itu-t tsag...

20
A T U - I T U | T Preparing for WTSA Major Issues Related to Work Programme Gary Fishman ITU-T TSAG Chairman Preparatory Meeting for Africa for WTSA-04 Victoria Falls, 23-25 June 2004

Upload: jordan-mason

Post on 27-Mar-2015

213 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ATU-ITU|TATU-ITU|T Preparing for WTSA Major Issues Related to Work Programme Gary Fishman ITU-T TSAG Chairman Preparatory Meeting for Africa for WTSA-04

ATU-ITU|

T

Preparing for WTSA

Major Issues Related to Work Programme

  Gary FishmanITU-T TSAG Chairman

Preparatory Meeting for Africa for WTSA-04Victoria Falls, 23-25 June 2004

Page 2: ATU-ITU|TATU-ITU|T Preparing for WTSA Major Issues Related to Work Programme Gary Fishman ITU-T TSAG Chairman Preparatory Meeting for Africa for WTSA-04

WTSA Preparatory Group for Africa Victoria Falls 23-25 June 2004

2

ATU-ITU|

T

Changes of Substance Updating to recognize completed or

out of date elements No change other than factual elements

(e.g., dates)

WTSA Resolutions and A-Series Recommendations

What are the options?

Page 3: ATU-ITU|TATU-ITU|T Preparing for WTSA Major Issues Related to Work Programme Gary Fishman ITU-T TSAG Chairman Preparatory Meeting for Africa for WTSA-04

WTSA Preparatory Group for Africa Victoria Falls 23-25 June 2004

3

ATU-ITU|

T

Designed to introduce you to the major work programme-related issues for TSAG and WTSA-04

Will group these issues by work programme and strategy areas

Will provide a list of all Resolutions and A-Series Recommendations and where proposals have been made

Will provide contact information for the relevant TSAG correspondence groups

This Presentation

Page 4: ATU-ITU|TATU-ITU|T Preparing for WTSA Major Issues Related to Work Programme Gary Fishman ITU-T TSAG Chairman Preparatory Meeting for Africa for WTSA-04

WTSA Preparatory Group for Africa Victoria Falls 23-25 June 2004

4

ATU-ITU|

T

Work Programme Questions from Study Groups – new, revised,

unchanged Being posted as TDs on the TSAG web site Your role:

Review all Questions for content:Is the subject within the SG’s mandate Do they address your needsNo duplication with work of other SGsMilestones – for reflection in the Operational

Plan and Work Programme Data Base

Page 5: ATU-ITU|TATU-ITU|T Preparing for WTSA Major Issues Related to Work Programme Gary Fishman ITU-T TSAG Chairman Preparatory Meeting for Africa for WTSA-04

WTSA Preparatory Group for Africa Victoria Falls 23-25 June 2004

5

ATU-ITU|

T

Work ProgrammeSG structure

Identify critical areas for future work, such as: NGN Security Mobility

Network Infrastructure aspects, including: Optical Transport and IP-based Networks, Network Management, Signalling, Performance, EMC, etc.

Page 6: ATU-ITU|TATU-ITU|T Preparing for WTSA Major Issues Related to Work Programme Gary Fishman ITU-T TSAG Chairman Preparatory Meeting for Africa for WTSA-04

WTSA Preparatory Group for Africa Victoria Falls 23-25 June 2004

6

ATU-ITU|

T

Work Programme – Resolutions & Recommendations

Doc. SubjectHave there

been proposals?

Is Res/Rec completed?

Res 2Study Group responsibility and mandates

Res 29Alternative calling procedures on international telecom networks

Res 41Accounting rate principles for international telephone services

Page 7: ATU-ITU|TATU-ITU|T Preparing for WTSA Major Issues Related to Work Programme Gary Fishman ITU-T TSAG Chairman Preparatory Meeting for Africa for WTSA-04

WTSA Preparatory Group for Africa Victoria Falls 23-25 June 2004

7

ATU-ITU|

T

Work Programme – Resolutions & Recommendations

Doc. SubjectHave there

been proposals?

Is Res/Rec completed?

Supp 2Guidelines on interoperability experiments

Page 8: ATU-ITU|TATU-ITU|T Preparing for WTSA Major Issues Related to Work Programme Gary Fishman ITU-T TSAG Chairman Preparatory Meeting for Africa for WTSA-04

WTSA Preparatory Group for Africa Victoria Falls 23-25 June 2004

8

ATU-ITU|

T

Working Between TSAG Meetings by Correspondence

Work Programme Correspondence Groups

SG RestructuringSG Restructuring

Mr. Jacques Boulvin (FT)Mr. Jacques Boulvin (FT)Tel:Tel: +33 1 45 29 48 34+33 1 45 29 48 34 Fax:Fax: +33 1 45 29 60 70+33 1 45 29 60 70 jacquesjacques..boulvinboulvin@@francetelecomfrancetelecom.com.com

Page 9: ATU-ITU|TATU-ITU|T Preparing for WTSA Major Issues Related to Work Programme Gary Fishman ITU-T TSAG Chairman Preparatory Meeting for Africa for WTSA-04

WTSA Preparatory Group for Africa Victoria Falls 23-25 June 2004

9

ATU-ITU|

T

Strategy Standardization in relation to interests of

developing countries Enhancements to Resolution 17 In WTSA Resolutions, is there a need to

replace references to Resolution 74 (PP-98) (review the management, functioning and structure of ITU) and WG on Reform, by references to Resolution 106 (PP-02) (review of ITU structure) and WG on ITU Structure

Page 10: ATU-ITU|TATU-ITU|T Preparing for WTSA Major Issues Related to Work Programme Gary Fishman ITU-T TSAG Chairman Preparatory Meeting for Africa for WTSA-04

WTSA Preparatory Group for Africa Victoria Falls 23-25 June 2004

10

ATU-ITU|

T

Strategy

Doc.Doc. SubjectSubject Were there Were there proposals?proposals?

Is Res/Rec Is Res/Rec completed?completed?

Res 17Res 17

Telecommunication Telecommunication standardization in relation to standardization in relation to the interests of developing the interests of developing countriescountries

Res 33Res 33Guidelines for ITU-T Guidelines for ITU-T strategic activitiesstrategic activities

Res 36Res 36 ITU ReformITU Reform

Res 39Res 39 The changing role of WTSAThe changing role of WTSA

Page 11: ATU-ITU|TATU-ITU|T Preparing for WTSA Major Issues Related to Work Programme Gary Fishman ITU-T TSAG Chairman Preparatory Meeting for Africa for WTSA-04

WTSA Preparatory Group for Africa Victoria Falls 23-25 June 2004

11

ATU-ITU|

T

Working Between TSAG Meetings by Correspondence

Strategy Correspondence Groups

ITU-T User Guide for ITU-T User Guide for Study GroupsStudy Groups

Ron Box (ACA)Ron Box (ACA)Phone + 61 3 9963 6840Phone + 61 3 9963 6840Fax + 61 3 9963 6899Fax + 61 3 9963 6899Mobile + 61 408 423 811Mobile + 61 408 423 [email protected]@aca.gov.au

Concept of Guide for Concept of Guide for developing country developing country participation in ITU-Tparticipation in ITU-T

Mr. Phan Tam (Vietnam)Mr. Phan Tam (Vietnam)Ministry of Posts and Telematics Ministry of Posts and Telematics of Vietnamof VietnamTel: +84 4 9 43 69 09Tel: +84 4 9 43 69 09Fax: +84 4 8 22 65 90Fax: +84 4 8 22 65 [email protected]@mpt.gov.vn

Page 12: ATU-ITU|TATU-ITU|T Preparing for WTSA Major Issues Related to Work Programme Gary Fishman ITU-T TSAG Chairman Preparatory Meeting for Africa for WTSA-04

WTSA Preparatory Group for Africa Victoria Falls 23-25 June 2004

12

ATU-ITU|

T

Finance Matters

Impact of ITU Budget situation on work programme and TSB support

New work process needed that will synchronize provision of TSAG advice on finance matters with ITU budget preparation process

Adoption by Council of GoS and Dalberg Consultancy recommendations

Page 13: ATU-ITU|TATU-ITU|T Preparing for WTSA Major Issues Related to Work Programme Gary Fishman ITU-T TSAG Chairman Preparatory Meeting for Africa for WTSA-04

WTSA Preparatory Group for Africa Victoria Falls 23-25 June 2004

13

ATU-ITU|

T

Finance Matters

Doc.Doc. SubjectSubject Were there Were there proposals?proposals?

Is Res/Rec Is Res/Rec completed?completed?

Res 34Res 34 Voluntary contributionsVoluntary contributions

Page 14: ATU-ITU|TATU-ITU|T Preparing for WTSA Major Issues Related to Work Programme Gary Fishman ITU-T TSAG Chairman Preparatory Meeting for Africa for WTSA-04

WTSA Preparatory Group for Africa Victoria Falls 23-25 June 2004

14

ATU-ITU|

T

Working Between TSAG Meetings by Correspondence

Finance Correspondence Group

Linkage, resources and Linkage, resources and sequence of eventssequence of events

Mr. Bruce Gracie (Industry Canada) Mr. Bruce Gracie (Industry Canada) Tel: +1 613 990-4254 Tel: +1 613 990-4254 Fax: +1 613 998-4530 Fax: +1 613 998-4530 [email protected]@ic.gc.ca

Page 15: ATU-ITU|TATU-ITU|T Preparing for WTSA Major Issues Related to Work Programme Gary Fishman ITU-T TSAG Chairman Preparatory Meeting for Africa for WTSA-04

WTSA Preparatory Group for Africa Victoria Falls 23-25 June 2004

15

ATU-ITU|

T

Plenipot – 2002 Many Resolutions and Decisions of PP-02 impact ITU-T and

require action Many items will be handled through the Director and through

TSAG These include:

Resolution 71 - Strategic plan for the Union 2004-2007 Resolution 72 - Linking strategic, financial and operational

planning in the ITU Resolution 107 - Improvements to the management and

functioning of ITU Resolution 109 - Review and consolidation of provisions

regarding observers

Page 16: ATU-ITU|TATU-ITU|T Preparing for WTSA Major Issues Related to Work Programme Gary Fishman ITU-T TSAG Chairman Preparatory Meeting for Africa for WTSA-04

WTSA Preparatory Group for Africa Victoria Falls 23-25 June 2004

16

ATU-ITU|

T

Plenipot – 2002 Some Resolutions and Recommendations may

receive WTSA-04 attention

Dec 7 - Review of the management of the Union Delegation of authority to Directors for the Sector

budgets should be exercised following advice from the Sector advisory groups.

Dec 8 - ITU input to WSIS declaration of principles and plan of action and info document on ITU activities Pertained to WSIS Phase 1, but WTSA could

develop inputs to Phase 2 regarding standardization

Page 17: ATU-ITU|TATU-ITU|T Preparing for WTSA Major Issues Related to Work Programme Gary Fishman ITU-T TSAG Chairman Preparatory Meeting for Africa for WTSA-04

WTSA Preparatory Group for Africa Victoria Falls 23-25 June 2004

17

ATU-ITU|

T

Plenipot – 2002 Some Resolutions and Recommendations

may receive WTSA-04 attention

Resolution 21 - Special measures concerning alternative calling procedures on international telecommunication networksHow is this related to WTSA Resolution

29 Resolution 25 – Strengthening the regional

presence

Page 18: ATU-ITU|TATU-ITU|T Preparing for WTSA Major Issues Related to Work Programme Gary Fishman ITU-T TSAG Chairman Preparatory Meeting for Africa for WTSA-04

WTSA Preparatory Group for Africa Victoria Falls 23-25 June 2004

18

ATU-ITU|

T

Plenipot – 2002 Some Resolutions and Recommendations

may receive WTSA-04 attention Resolution 106 – Review of the ITU structure

Review functions of the Sectors, study current structure, working methods and procedures of the Sectors

Resolution 123 - Bridging the standardization gap between developing and developed countries pursue initiatives that assist in bridging the

standardization gap

Page 19: ATU-ITU|TATU-ITU|T Preparing for WTSA Major Issues Related to Work Programme Gary Fishman ITU-T TSAG Chairman Preparatory Meeting for Africa for WTSA-04

WTSA Preparatory Group for Africa Victoria Falls 23-25 June 2004

19

ATU-ITU|

T

Working Between TSAG Meetings by Correspondence

General TSAG Matters Correspondence Group

General TSAG General TSAG MattersMatters

Mr. Gary Fishman (Lucent Technologies) Mr. Gary Fishman (Lucent Technologies)

Tel: +1 732 949 3401Tel: +1 732 949 3401

Fax: +1 732 949 1196Fax: +1 732 949 1196

[email protected]@lucent.com

Page 20: ATU-ITU|TATU-ITU|T Preparing for WTSA Major Issues Related to Work Programme Gary Fishman ITU-T TSAG Chairman Preparatory Meeting for Africa for WTSA-04

WTSA Preparatory Group for Africa Victoria Falls 23-25 June 2004

20

ATU-ITU|

T

Preparations for TSAG and WTSA-2004

Regional and national processes should be Regional and national processes should be fully engaged by nowfully engaged by now

Consultations with ITU-T leadership and Consultations with ITU-T leadership and between regions will assist good between regions will assist good preparationpreparation