auca f004 liner 7in 01-05-2015-preliminarv1

Upload: henry-calva-mena

Post on 08-Jul-2018

215 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/19/2019 Auca F004 Liner 7in 01-05-2015-PreliminarV1

    1/17

    -

    o - -

    - -

    S C H

    L U M B E R G E R

    W E L L S E R V I C E S E C U A D O R

    http://www.google.com.ec/url?sa=i&source=images&cd=&cad=rja&uact=8&docid=fKP6FPSi0yOgNM&tbnid=6x2_TBkilbnZyM&ved=0CAgQjRw&url=http://www.ekosnegocios.com/negocios/rse_empresa.aspx?idempresa%3D12153&ei=-VVEU9CrMMmW0gGksID4CQ&psig=AFQjCNFc4n02_pIFDQ1-_iU3ZtUTFQKCzQ&ust=1397073785846846

  • 8/19/2019 Auca F004 Liner 7in 01-05-2015-PreliminarV1

    2/17

    Liner de Produccion 7

    -

    -

    ≤TY≤

  • 8/19/2019 Auca F004 Liner 7in 01-05-2015-PreliminarV1

    3/17

    Liner de Produccion 7

    0 40 80 120 160Time (min)

    3

    2

    1

    0 M u d

    S u r

    f . P r e s s . (

    p s i ) ( x 1 0 0 0 )

    Mud Cement Head Press ure

    0 40 80 120 160Time (min)

    1 2

    8

    4

    0 M u d

    F l o w

    R a t e

    ( b b l / m i n ) Q in

    Q out

    1 0

    2 0

    3 0

    4 0

    5 0

    6 0

    7 0

    8 0

    9 0

    1 0 0

    0 5 10

    E f f i c i e n c y

    ( % )

    Circulation Efficiency

    At 11755 ft

    Volume ( )

    Efficiency

    Caudal Presión Presión + 20%

    bpm Psi Psi

    2 500 6004 800 960

    6 1200 1440

    8 1800 2160

    10 2400 2880

  • 8/19/2019 Auca F004 Liner 7in 01-05-2015-PreliminarV1

    4/17

    Liner de Produccion 7

    0

    5 0 0 0

    1 0 0 0 0

    1 5 0 0 0

    ft

    Fluid Sequence

    0 100%

    Pipe Standoff

    Between Cent. At Cent.

    0 40deg

    Deviation

    Deviation

    0 1 2deg/100ft

    Dogleg Severity

    DLS

  • 8/19/2019 Auca F004 Liner 7in 01-05-2015-PreliminarV1

    5/17

    Liner de Produccion 7

    ≤ T ≤

  • 8/19/2019 Auca F004 Liner 7in 01-05-2015-PreliminarV1

    6/17

    Liner de Produccion 7

  • 8/19/2019 Auca F004 Liner 7in 01-05-2015-PreliminarV1

    7/17

    Liner de Produccion 7

  • 8/19/2019 Auca F004 Liner 7in 01-05-2015-PreliminarV1

    8/17

    Liner de Produccion 7

    *

  • 8/19/2019 Auca F004 Liner 7in 01-05-2015-PreliminarV1

    9/17

    Liner de Produccion 7

    Original fluid Mud 9.50 lb/galk : 1.06E-2 lbf.s^n/ft2 n : 0.629 Ty : 2.50 lbf/100ft2

    Displacement Volume 240.8 bblDrill Pipe Volume 202.1 bblTotal Volume 434.8 bblTOC 10035.9 ft

    Name Volume(bbl)

    Ann. Len(ft)

    Top(ft)

    Density(lb/gal)

    Rheology

    Acido 20.0 456.4 7175.5 8.40 k:4.83E-5 lbf.ŝ n/ft2 n:0.992 Ty:0.69 lbf/100ft2 Agua 3.0 68.5 7631.9 8.32 viscosity:1.000 cP

    MUDPUSH II 40.0 913.4 7700.4 12.50 k:3.48E-2 lbf.s^n/ft2 n:0.522 Ty:7.31 lbf/100ft2 Lavador 20.0 454.0 8613.7 8.37 viscosity:3.913 cP

    Solucion silicato 30.0 645.5 9067.8 10.27 k:1.82E-4 lbf.s^n/ft2 n:0.813 Ty:0.66 lbf/100ft2 Lavador 15.0 322.7 9713.2 8.37 viscosity:3.913 cP

    ScavengerPlus 20.0 430.3 10035.9 13.50 k:3.80E-2 lbf.s^n/ft2 n:0.689 Ty:7.40 lbf/100ft2 Lead Slurry 15.0 435.8 10466.2 15.80 k:3.80E-2 lbf.s^n/ft2 n:0.540 Ty:6.89 lbf/100ft2

    Tail 31.0 852.9 10902.1 17.00 k:4.95E-2 lbf.s^n/ft2 n:0.639 Ty:10.31 lbf/100ft2 Agua 50.0 8827.1 8.32 viscosity:1.000 cP

    Mud 190.8 0.0 9.50 k:1.06E-2 lbf.s^n/ft2 n:0.629 Ty:2.50 lbf/100ft2

    Frac 2607 psi at 11755.0 ftPore 872 psi at 10890.0 ftCollapse 4160 psi at 11700.0 ftBurst 7240 psi at 11700.0 ftCsg.Pump out 109 tonCheck Valve Diff Press 735 psi

  • 8/19/2019 Auca F004 Liner 7in 01-05-2015-PreliminarV1

    10/17

    Liner de Produccion 7

    Name Flow Rate (bbl/min)

    Volume (bbl)

    Stage Time (min)

    Cum.Vol(bbl) .

    Inj.Temp.(degF)

    Comments

    Acido 5.0 20.0 4.0 20.0 80 Agua 5.0 3.0 0.6 3.0 80

    MUDPUSH II 5.0 40.0 8.0 40.0 80Lavador 5.0 20.0 4.0 20.0 80

    Solucion silicato 5.0 30.0 6.0 30.0 80Lavador 5.0 15.0 3.0 15.0 80

    ScavengerPlus 5.0 20.0 4.0 20.0 80Lead Slurry 5.0 15.0 3.0 15.0 80

    Tail 4.0 31.0 7.8 31.0 80 Agua 8.5 50.0 5.9 50.0 80

    Mud 8.5 100.0 11.8 100.0 80Mud 6.0 40.0 6.7 140.0 80

    Mud 3.0 12.0 4.0 152.0 80Mud 4.0 25.0 6.3 177.0 80Mud 3.0 13.8 4.6 190.8 80

    Total 01:19hr:mn

    434.8 bbl

    Frac 1209 psi at 11755.0 ftPore 563 psi at 10890.0 ftCollapse 4160 psi at 11700.0 ftBurst 5729 psi at 10690.0 ft

  • 8/19/2019 Auca F004 Liner 7in 01-05-2015-PreliminarV1

    11/17

    Liner de Produccion 7

    Top of centralization :10712.5 ftBottom Cent. MD :11735.0 ftCasing Shoe :11755.0 ftNB of Cent. Used :21NB of Floating Cent. :21

    Bottom MD(ft)

    Nbr. Cent. /Joint

    Cent. Name Code Min. STO(%)

    @ Depth(ft)

    10915.0 0 0/0 0.0 10929.611755.0 21 1/1 CENTEK CT-S 43.0 11755.0

    Cent. Name Code CasingOD(in)

    Max.OD(in)

    Min. OD(in) Rigid Origin Hole Size(in) RunningForce(lbf)

    RestoringForce(lbf)

    CENTEK CT-S 7 8.500 7.780 No CENTEK 8.500 0.00 2650.00

  • 8/19/2019 Auca F004 Liner 7in 01-05-2015-PreliminarV1

    12/17

    Liner de Produccion 7

    0 10 20 30 40 50 60 70 80 90

    Time (min)

    1 6

    1 5

    1 4

    1 3

    1 2

    1 1

    1 0

    9

    8

    A n n

    . P r e s s u r e ( l b / g a l )

    FracPoreHydrostaticDynamic

    Depth = 11755 ft

  • 8/19/2019 Auca F004 Liner 7in 01-05-2015-PreliminarV1

    13/17

    Liner de Produccion 7

  • 8/19/2019 Auca F004 Liner 7in 01-05-2015-PreliminarV1

    14/17

    Liner de Produccion 7

  • 8/19/2019 Auca F004 Liner 7in 01-05-2015-PreliminarV1

    15/17

    Liner de Produccion 7

  • 8/19/2019 Auca F004 Liner 7in 01-05-2015-PreliminarV1

    16/17

    Liner de Produccion 7

  • 8/19/2019 Auca F004 Liner 7in 01-05-2015-PreliminarV1

    17/17

    Liner de Produccion 7